SCH Controls Readiness Review: Site Magnetic Fields HAZARDS: Significant fields in adjoining cells Personnel access to very high fields under magnet POSSIBLE CONTROLS: Tape on floor in adjacent cells Light or field indicator in other cells Tape on floor, user training in SCH cell. Restricted access under shield

Citation preview

SCH Controls Readiness Review: Site

2015

SCH Controls Readiness Review: Site

UNIQUE HAZARDS:• Significant fields in adjoining magnet cells• Magnetic field is larger than a normal magnet

cell• Platform is much taller• Cryogens, Quench

SCH Controls Readiness Review: Site

Magnetic FieldsHAZARDS:• Significant fields in adjoining

cells• Personnel access to very high

fields under magnet

POSSIBLE CONTROLS:• Tape on floor in adjacent cells• Light or field indicator in other

cells• Tape on floor, user training in

SCH cell.• Restricted access under shield

SCH Controls Readiness Review: Site

Electrical ShockHAZARDS:• Exposed magnet power cable & bus

connections on hydrant• Exposed electrical components on

rear electrical platform

POSSIBLE CONTROLS:• Stab / switch covers• Restricted access behind magnet• LO/TO for maintenance

SCH Controls Readiness Review: Site

FallHAZARDS:• 12’ tall platform• Access gate• Lifting items onto platform• Carrying items up stairs

POSSIBLE CONTROLS:• Caution square on floor next to gate

w signage• Harness area at gate• Lock on the gate.• Normal OSHA handrails

SCH Controls Readiness Review: SiteMaterial Handling

Magnet Coils 6’Research Dewar > 7’ProbesHAZARDS:• Tripping while going up stairs• Falling items when hoisting up to

platform• Falls with gate open.POSSIBLE CONTROLS:• Use crane to lift coils, probes

• Crane training• User Support Assistance

• Small pass through in handrail for probes.

SCH Controls Readiness Review: Site

ODHHAZARDS:• Nitrogen slow leak• Nitrogen fast release• Helium fast release – Quench vent

CONTROLS:• All N2 vents piped to outside• O2 sensor at rear of cell for N2• Vented helium stored in ceiling area:

• He stored volume: 70 liquid liters• Flow shutdown interlocks• 200 liquid liters = 5280 SCUFT• Open Ceiling area = 5900 SQFT.