SCH Controls Readiness Review: Site Magnetic Fields HAZARDS: Significant fields in adjoining cells Personnel access to very high fields under magnet POSSIBLE CONTROLS: Tape on floor in adjacent cells Light or field indicator in other cells Tape on floor, user training in SCH cell. Restricted access under shield
Citation preview
SCH Controls Readiness Review: Site
2015
SCH Controls Readiness Review: Site
UNIQUE HAZARDS:• Significant fields in adjoining magnet cells• Magnetic field is larger than a normal magnet
cell• Platform is much taller• Cryogens, Quench
SCH Controls Readiness Review: Site
Magnetic FieldsHAZARDS:• Significant fields in adjoining
cells• Personnel access to very high
fields under magnet
POSSIBLE CONTROLS:• Tape on floor in adjacent cells• Light or field indicator in other
cells• Tape on floor, user training in
SCH cell.• Restricted access under shield
SCH Controls Readiness Review: Site
Electrical ShockHAZARDS:• Exposed magnet power cable & bus
connections on hydrant• Exposed electrical components on
rear electrical platform
POSSIBLE CONTROLS:• Stab / switch covers• Restricted access behind magnet• LO/TO for maintenance
SCH Controls Readiness Review: Site
FallHAZARDS:• 12’ tall platform• Access gate• Lifting items onto platform• Carrying items up stairs
POSSIBLE CONTROLS:• Caution square on floor next to gate
w signage• Harness area at gate• Lock on the gate.• Normal OSHA handrails
SCH Controls Readiness Review: SiteMaterial Handling
Magnet Coils 6’Research Dewar > 7’ProbesHAZARDS:• Tripping while going up stairs• Falling items when hoisting up to
platform• Falls with gate open.POSSIBLE CONTROLS:• Use crane to lift coils, probes
• Crane training• User Support Assistance
• Small pass through in handrail for probes.
SCH Controls Readiness Review: Site
ODHHAZARDS:• Nitrogen slow leak• Nitrogen fast release• Helium fast release – Quench vent
CONTROLS:• All N2 vents piped to outside• O2 sensor at rear of cell for N2• Vented helium stored in ceiling area:
• He stored volume: 70 liquid liters• Flow shutdown interlocks• 200 liquid liters = 5280 SCUFT• Open Ceiling area = 5900 SQFT.
Thank You!