Specialist Services to the Oil & Gas and Petrochemical IndustriesEstablished 1999 in Kuala Lumpur, Malaysia

•pdms modeling

•offshore living quarters

•engineering services

•as-built surveying

Catalogues, Specifications, Intelligent P&IDs and Pipe Spooling

Specialising in Architectural & Interior Design Works

Structural, Piping, Mechanical and E&I Services Design

plant designengineers sdn bhd

www.pdengineers.biz

proj

ects

sele

ctd

clients include:

major projects:

2004 MalaysiaAs-built Laser Scan survey and 3D PDMS modelling of Bintulu Stabiliser Plant 1 & 2for MMC Oil & Gas Engineering & Shell Sarawak Berhad

2004 IndonesiaAs-built Laser Scan survey and 3D PDMS modelling of Central Gathering Station I in Duri, Riau, Sumatrafor Caltex Pacific Indonesia

2003/2004 Malaysia/VietnamAs-built Laser Scan survey and 3D PDMS modelling of riser tie-ins & Deck extension plus flow line/manifold modifications.for Talisman Malaysia Limited

2003 MalaysiaAs-built Laser Scan survey and 3D PDMS modelling of Pulai A offshore process platform.for MMC Oil & Gas Engineering & Petronas Carigali Sdn Bhd

2002 SingaporeAs-built Laser Scan survey, 3D modelling & verification with PDMS model of combined cycle power station.for Alstom Power Sdn Bhd & Senoko Power Station Ltd

www.pdengineers.biz

Gas Manifold Extention

for

TALISMAN ENERGY

BS-A PLATFORMMalaysia

project case study

www.pdengineers.biz

Project background:

• Talisman Energy BS-A Platform

• Location about 200km offshore Kota Baru (Malaysia

Vietnam Joint Development Area)

• Better then expected production

• Additional flow lines needed to be installed and existing

Gas manifolds needed to be extended.

plant designengineers sdn bhd

www.pdengineers.biz

Client requirements:

• No shutdown during installation of deck extension and

pipe spools

• Installation window small

• No work barge/boat available for any rework

• Especially the deck extension had to fit. No room for any

mismatch.

plant designengineers sdn bhd

www.pdengineers.biz

Scope of Work:

• 3D Laser Scan Survey and 3D Modelling of effected

areas (Manifolds, Wellheads, Water Injection, Drain

Vessel & Structure)

plant designengineers sdn bhd

Deliverables:

• Registered Point Cloud

• Semi Intelligent PDMS Model

• Clash Report (New design verified against existing

conditions)

www.pdengineers.biz

Coordination:

• Provide appointed Design Consultant with 3D As-Built

PDMS Model. (Engineering PDMS Model was available)

• Verify and resolve any clashes between 3D As-Built

PDMS Model and Design consultant’s new design.

• Dimensional verification of Fabricated (Tag welded)

Deck extension by appointed Fabricator.

• Dimensional verification of Fabricated critical pipe

spools

plant designengineers sdn bhd

www.pdengineers.biz

plant designengineers sdn bhd

Planning and Logistics

• Kuala Lumpur – Kota Baru Airport (1 hour flight)

• Kota Baru Helibase – BS-A Platform (1 Hour Helicopter flight)

Depart 06.00 KL Arrive on the Platform 12.00 noonDid it work out?

www.pdengineers.biz

plant designengineers sdn bhd

Well no…….

www.pdengineers.biz

plant designengineers sdn bhd

2 Days later we arrived…

www.pdengineers.biz

plant designengineers sdn bhd

www.pdengineers.biz

plant designengineers sdn bhd

Manifold Area

www.pdengineers.biz

plant designengineers sdn bhd

Wellhead Area

www.pdengineers.biz

plant designengineers sdn bhd

Drain VesselWater Injection Area

www.pdengineers.biz

case

stu

dyWork flowlaser scanning at site

registering survey data onplatform

point cloud processing in home office

3D model in cyclone

import to PDMS

www.pdengineers.biz

case

stu

dyplant designengineers sdn bhd

Malaysia

www.pdengineers.biz

plant designengineers sdn bhd

Drain Vessel Area

www.pdengineers.biz

plant designengineers sdn bhd

Manifold Area

www.pdengineers.biz

plant designengineers sdn bhd

Manifold Area

www.pdengineers.biz

plant designengineers sdn bhd

Manifold Area

www.pdengineers.biz

plant designengineers sdn bhd

Turn around time for the Survey and Modeling:• 3D Laser Scan Survey - 5 days (3 days of scanning, about 60 scans)

• 3D Modeling in Cyclone - 3 weeks

• Transfer to PDMS and Labelling of objects – 3 days

• Clash Check – 2 days (35 clashes/misalignments)

Completed within 6 weeks as per Schedule

www.pdengineers.biz

plant designengineers sdn bhd

Survey at the fabrication yard

www.pdengineers.biz

plant designengineers sdn bhd

Turn around time for Dimensional Verification of Fabricated Deck extention and Pipe Spools:

• Initial Dimensional Survey of Deck extension - 1 day survey

(25mm offset was measured against existing conditions)

• Resurvey of Deck extension after 25mm correction – 1 day

• Dimensional Survey of critical pipe spools – 1 day

Completed inclusive of Resurvey within 1 week

www.pdengineers.biz

plant designengineers sdn bhd

Installation of Deck extention:

• Perfect fit

Installation of Pipe spools:

• Installation of the pipe spools is ongoing