www.pdengineers.biz
plant designengineers sdn bhd
Ron BoumanTechnical Director
Kuala Lumpur Malaysia
www.pdengineers.biz
prof
ileco
mpa
ny
Specialist Services to the Oil & Gas and Petrochemical IndustriesEstablished 1999 in Kuala Lumpur, Malaysia
•pdms modeling
•offshore living quarters
•engineering services
•as-built surveying
Catalogues, Specifications, Intelligent P&IDs and Pipe Spooling
Specialising in Architectural & Interior Design Works
Structural, Piping, Mechanical and E&I Services Design
plant designengineers sdn bhd
www.pdengineers.biz
proj
ects
sele
ctd
clients include:
major projects:
2004 MalaysiaAs-built Laser Scan survey and 3D PDMS modelling of Bintulu Stabiliser Plant 1 & 2for MMC Oil & Gas Engineering & Shell Sarawak Berhad
2004 IndonesiaAs-built Laser Scan survey and 3D PDMS modelling of Central Gathering Station I in Duri, Riau, Sumatrafor Caltex Pacific Indonesia
2003/2004 Malaysia/VietnamAs-built Laser Scan survey and 3D PDMS modelling of riser tie-ins & Deck extension plus flow line/manifold modifications.for Talisman Malaysia Limited
2003 MalaysiaAs-built Laser Scan survey and 3D PDMS modelling of Pulai A offshore process platform.for MMC Oil & Gas Engineering & Petronas Carigali Sdn Bhd
2002 SingaporeAs-built Laser Scan survey, 3D modelling & verification with PDMS model of combined cycle power station.for Alstom Power Sdn Bhd & Senoko Power Station Ltd
www.pdengineers.biz
Gas Manifold Extention
for
TALISMAN ENERGY
BS-A PLATFORMMalaysia
project case study
www.pdengineers.biz
Project background:
• Talisman Energy BS-A Platform
• Location about 200km offshore Kota Baru (Malaysia
Vietnam Joint Development Area)
• Better then expected production
• Additional flow lines needed to be installed and existing
Gas manifolds needed to be extended.
plant designengineers sdn bhd
www.pdengineers.biz
Client requirements:
• No shutdown during installation of deck extension and
pipe spools
• Installation window small
• No work barge/boat available for any rework
• Especially the deck extension had to fit. No room for any
mismatch.
plant designengineers sdn bhd
www.pdengineers.biz
Scope of Work:
• 3D Laser Scan Survey and 3D Modelling of effected
areas (Manifolds, Wellheads, Water Injection, Drain
Vessel & Structure)
plant designengineers sdn bhd
Deliverables:
• Registered Point Cloud
• Semi Intelligent PDMS Model
• Clash Report (New design verified against existing
conditions)
www.pdengineers.biz
Coordination:
• Provide appointed Design Consultant with 3D As-Built
PDMS Model. (Engineering PDMS Model was available)
• Verify and resolve any clashes between 3D As-Built
PDMS Model and Design consultant’s new design.
• Dimensional verification of Fabricated (Tag welded)
Deck extension by appointed Fabricator.
• Dimensional verification of Fabricated critical pipe
spools
plant designengineers sdn bhd
www.pdengineers.biz
plant designengineers sdn bhd
Planning and Logistics
• Kuala Lumpur – Kota Baru Airport (1 hour flight)
• Kota Baru Helibase – BS-A Platform (1 Hour Helicopter flight)
Depart 06.00 KL Arrive on the Platform 12.00 noonDid it work out?
www.pdengineers.biz
plant designengineers sdn bhd
Well no…….
www.pdengineers.biz
plant designengineers sdn bhd
2 Days later we arrived…
www.pdengineers.biz
plant designengineers sdn bhd
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
www.pdengineers.biz
plant designengineers sdn bhd
Wellhead Area
www.pdengineers.biz
plant designengineers sdn bhd
Drain VesselWater Injection Area
www.pdengineers.biz
case
stu
dyWork flowlaser scanning at site
registering survey data onplatform
point cloud processing in home office
3D model in cyclone
import to PDMS
www.pdengineers.biz
case
stu
dyplant designengineers sdn bhd
Malaysia
www.pdengineers.biz
plant designengineers sdn bhd
Drain Vessel Area
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
www.pdengineers.biz
plant designengineers sdn bhd
Manifold Area
www.pdengineers.biz
plant designengineers sdn bhd
Turn around time for the Survey and Modeling:• 3D Laser Scan Survey - 5 days (3 days of scanning, about 60 scans)
• 3D Modeling in Cyclone - 3 weeks
• Transfer to PDMS and Labelling of objects – 3 days
• Clash Check – 2 days (35 clashes/misalignments)
Completed within 6 weeks as per Schedule
www.pdengineers.biz
plant designengineers sdn bhd
Survey at the fabrication yard
www.pdengineers.biz
plant designengineers sdn bhd
Turn around time for Dimensional Verification of Fabricated Deck extention and Pipe Spools:
• Initial Dimensional Survey of Deck extension - 1 day survey
(25mm offset was measured against existing conditions)
• Resurvey of Deck extension after 25mm correction – 1 day
• Dimensional Survey of critical pipe spools – 1 day
Completed inclusive of Resurvey within 1 week
www.pdengineers.biz
plant designengineers sdn bhd
Installation of Deck extention:
• Perfect fit
Installation of Pipe spools:
• Installation of the pipe spools is ongoing
www.pdengineers.biz
Thank you