REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM BRIDGE

Preview:

Citation preview

REVISED PERT-CPM DIAGRAM

BAR CHART

S-CURVE

1

1

N

LFES

L E G E N D:

CRITICAL PATH

ACTIVITY

DUMMY

EVENT NO. - N

EARLY START - ES

LATE FINISH - LF

REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM

BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY (PHASE II)

(DUE TO TIME EXTENSION NO. 1)

REPUBLIC OF THE PHILIPPINES

NATIONAL CAPITAL REGION

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

2ND STREET, PORT AREA MANILA

CONSTRUCTION DIVISION

PROJECT AND LOCATION:

BRIDGE - REHABILITATION/MAJOR REPAIR OF

PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ)

ALONG MARCOS HIGHWAY (PHASE II)

SHEET CONTENTS:PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:

SHEET No.:

CEFERINO A. LONDINA

AUTHORIZED MANAGING OFFICER

EDGARDO S. RAMOS

ENGINEER III

PROJECT ENGINEER III

EDWIN M. LUZON

CHIEF, CONSTRUCTION DIVISION

ADOR G. CANLAS, CESO IV

REGIONAL DIRECTOR

SUBMITTED BY:

JUBY B. CORDON, CEO

ASSISTANT REGIONAL DIRECTOR

REVISED PERT - CPM

1

2 2

S

0 0

4

70 70

6

116116

3

39 39

10

222222

11

232232

7

162191

1

2 2

2

9 9

5

100100

9

191191

14

240240

8

177191

13

237240

12

232240