RESOURCE ESTIMATION GUIDE

UPDATED:

01/07/2008

© ENERGEX 2008

RESOURCE ESTIMATION GUIDE

APPROVED: R.ENGLISH DATE: 1/07/08

UNCONTROLLED COPY

RESOURCE ESTIMATION GUIDE

Sect

Title

1 Overhead Construction

2 Pole Mounted Plant

3 Underground Construction

4 Ground Mounted Plant and Substations

5 Street lighting

6 Estimating Information

9562-A4 BMS02174

RESOURCE ESTIMATION GUIDE

Updated:

01/07/2008

© ENERGEX 2008

UNCONTROLLED COPY

PREFACE

Scope This standard applies to the ENERGEX distribution network only. This document covers the major material and labour resource models within the Ellipse system. It is designed to assist Distribution Network Planners and Designers in estimating and ordering resources for Overhead, Underground and Public Lighting constructions. It is not intended as a substitute for any current Construction or Design manuals that contain additional resource estimation information.

General This standard is subject to amendment by ENERGEX at any time. Any proposed deviation from this standard must be submitted to ENERGEX for approval before it is implemented.

Updates & Subscription This document, when downloaded or printed, is uncontrolled. Users are responsible for ensuring they are using the latest information. This can be achieved by registering on ENERGEX’s Intranet/Internet subscription service. Both internal and external subscribers will be notified by email of any changes to the document.

Disclaimer The requirements of Australian Standards, building codes and other relevant statutory bodies are regarded as the accepted minimum for the ENERGEX distribution Network. Where this document exceeds those requirements, this standard will become the accepted minimum. ENERGEX will not accept any liability for work carried out to a superseded standard. ENERGEX may not accept work carried out which is not in accordance with the current standard. ENERGEX standards are subject to ongoing review. If conflict exists between standard documents the most recent standard is to be adopted.

Interpretation In the event that any user of this standard considers the content to be uncertain, ambiguous or otherwise in need of interpretation, the user should request ENERGEX to clarify the provision. ENERGEX interpretation shall then apply as standard and is final and binding. No correspondence will be entered into with any person disputing the content published in the standard or the accuracy of ENERGEX’s interpretation.

9562-A4 BMS02174

RESOURCE ESTIMATION GUIDE

Updated:

01/07/2008

© ENERGEX 2008

UNCONTROLLED COPY

SECTION 1 OVERHEAD CONSTRUCTION

Sub-Sect

Title Page

1 Poles 1

2 Stays 2

3 Poletop Constructions 3

33kV 3

33kV OHEW & OPGW 4

11kV Bare Open Wire 5

11kV Insulated (CCT & HVABC) 6

LV 7

Communications, Streetlights & Other 8

4 Overhead Conductors & Cables 9

5 Conductor Fittings 10

6 Bridging 13

7 Connectors 14

8 Services 15

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 1 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 2 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 3 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 4 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 5 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 6 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 7 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 8 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 9 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 10 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 11 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 12 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 13 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 14 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 15 of 16

UNCONTROLLED COPY

Resource Estimation Guide - Section 1 Page 16 of 16

UNCONTROLLED COPY

SECTION 2 POLE MOUNTED PLANT

Sub-Sect

Title Page

1 Pole Transformers 1

2 Switches 2

Air Break Switches 2

Load Break Switches 3

Reclosers 4

Master Dropout Fuses 5

LV Disconnectors 6

3 Regulators 7

4 Metering Units 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 1 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 2 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 3 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 4 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 5 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 6 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 7 of 8

UNCONTROLLED COPY

Resource Estimation Guide - Section 2 Page 8 of 8

UNCONTROLLED COPY

SECTION 3 UNDERGROUND CONSTRUCTION

Sub-Sect

Title Page

1 Civil Works 1

Excavation & Reinstatement 1

Conduits & Accessories 2

2 Cables 3

3 Pillars 4

4 Cable Joints 6

5 Cable Terminations on Plant 9

6 Cable Terminations on Poles 10

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 1 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 2 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 3 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 4 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 5 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 6 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 7 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 8 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 9 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 10 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 11 of 13

UNCONTROLLED COPY

Resource Estimation Guide - Section 3 Page 12 of 13

UNCONTROLLED COPY

Recommended