Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium

Preview:

DESCRIPTION

Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011. Please follow the template as closely as possible Please do not add superfluous information You have 15 minutes to present, please keep that in mind - PowerPoint PPT Presentation

Citation preview

RS-X 2011—LRR 1

Pushing the RockSat Concept to New

ExtremesColorado Space Grant Consortium

Launch Readiness Review (LRR)

8 July, 2011

RS-X 2011—LRR 2

About This Template

1. Please follow the template as closely as possible

2. Please do not add superfluous information

3. You have 15 minutes to present, please keep that in mind

4. Please don’t lie to me… I will do what I can to help

5. If you have questions, please don’t hesitate to contact me

RS-X 2011—LRR 3

Mission Overview

For completeness and for those that might not remember

June Testing Results

4

Sequence Testing

Environmental

Mass/Electrical Checks

Plans/Readiness

30.01 lbfFinal Weight

June Testing

5

Mission Readiness

66

Action Item Close Out

From your previous slide (Quad Chart)?

1. What actions/issues have been closed?a) How?

2. What actions/issues are still open?a) Can you resolve them in the next few days?b) Is de-scoping an option?c) Can I help with anything?

77

Mission Readiness

Can you complete your full mission?

If not, why?Time constraints?Hardware didn’t survive vibe?

What aspect(s) of your mission has/have changed?

88

Lessons Learned

Pass along your knowledge to next year’s teams

What worked well for your team (in general)?What didn’t work?What did you learn from June testing?What would you do differently?What suggestions do you have for me to make next year

better?**Keep in mind this is the pilot year ;)

9

Interface Readiness

RS-X 2011—LRR 10

Interface (GSE) Testing

Can you pass my GSE test?

Review the procedure!!!!Do you understand all of it?Are you concerned about any portion of the test?

What caused you to fail the first time?Have you fixed that?

If you have questions, call/email me

PLEASE don’t make Thursday a late night

RS-X 2011—LRR 11

Interface Requirements

Requirement Description Verification

RS-X 1.0All payloads shall arrive with the power connector properly wired according to: RS-X Power ICD I

RS-X 2.0 All payloads shall have neutral power pins relative to GSE ground T

RS-X 3.0 The payload decks shall be neutral with respect to GSE ground T

RS-X 4.0The payload power system shall be operable in accordance with the specifications given in: RS-X Power ICD T

RS-X 5.0Customers shall use no more than 1 Amp Hour (Ah) over the course of the flight T

RS-X 6.0All payloads shall arrive with the telemetry connector properly wired according with the specifications given in: RS-X Telemetry ICD I

RS-X 7.0All payloads shall arrive with the correct voltages on each pin in accordance with: RS-X Telemetry ICD T

RS-X 8.0The payload telemetry system shall operate in accordance with the specifications given in: RS-X Telemetry ICD T

RS-X 9.0 All payloads shall weigh 30±1 lbf I

These are the requirements my GSE verifies… Are you ready???

RS-X 2011—LRR 12

Integration Readiness

Are you ready for integration?

Pictures would be great!!!

If you’re not ready, will you be ready by Thursday check-out?Don’t lie, but realize “no” isn’t an acceptable answer

RS-X 2011—LRR 13

Are You Ready???

Are you ready?!?!? I am!!!

□Yes (you only have one option)

This is going to be an incredible experience!!!

RS-X 2011—LRR 14

Pushing the RockSat Concept to New

Extremes

Questions?

Recommended