Pushing the RockSat Concept to New E x tremes Colorado Space Grant Consortium Launch Readiness Review (LRR) 8 July, 2011. Please follow the template as closely as possible Please do not add superfluous information You have 15 minutes to present, please keep that in mind - PowerPoint PPT Presentation
Citation preview
RS-X 2011—LRR 1
Pushing the RockSat Concept to New
ExtremesColorado Space Grant Consortium
Launch Readiness Review (LRR)
8 July, 2011
RS-X 2011—LRR 2
About This Template
1. Please follow the template as closely as possible
2. Please do not add superfluous information
3. You have 15 minutes to present, please keep that in mind
4. Please don’t lie to me… I will do what I can to help
5. If you have questions, please don’t hesitate to contact me
RS-X 2011—LRR 3
Mission Overview
For completeness and for those that might not remember
June Testing Results
4
Sequence Testing
Environmental
Mass/Electrical Checks
Plans/Readiness
30.01 lbfFinal Weight
June Testing
5
Mission Readiness
66
Action Item Close Out
From your previous slide (Quad Chart)?
1. What actions/issues have been closed?a) How?
2. What actions/issues are still open?a) Can you resolve them in the next few days?b) Is de-scoping an option?c) Can I help with anything?
77
Mission Readiness
Can you complete your full mission?
If not, why?Time constraints?Hardware didn’t survive vibe?
What aspect(s) of your mission has/have changed?
88
Lessons Learned
Pass along your knowledge to next year’s teams
What worked well for your team (in general)?What didn’t work?What did you learn from June testing?What would you do differently?What suggestions do you have for me to make next year
better?**Keep in mind this is the pilot year ;)
9
Interface Readiness
RS-X 2011—LRR 10
Interface (GSE) Testing
Can you pass my GSE test?
Review the procedure!!!!Do you understand all of it?Are you concerned about any portion of the test?
What caused you to fail the first time?Have you fixed that?
If you have questions, call/email me
PLEASE don’t make Thursday a late night
RS-X 2011—LRR 11
Interface Requirements
Requirement Description Verification
RS-X 1.0All payloads shall arrive with the power connector properly wired according to: RS-X Power ICD I
RS-X 2.0 All payloads shall have neutral power pins relative to GSE ground T
RS-X 3.0 The payload decks shall be neutral with respect to GSE ground T
RS-X 4.0The payload power system shall be operable in accordance with the specifications given in: RS-X Power ICD T
RS-X 5.0Customers shall use no more than 1 Amp Hour (Ah) over the course of the flight T
RS-X 6.0All payloads shall arrive with the telemetry connector properly wired according with the specifications given in: RS-X Telemetry ICD I
RS-X 7.0All payloads shall arrive with the correct voltages on each pin in accordance with: RS-X Telemetry ICD T
RS-X 8.0The payload telemetry system shall operate in accordance with the specifications given in: RS-X Telemetry ICD T
RS-X 9.0 All payloads shall weigh 30±1 lbf I
These are the requirements my GSE verifies… Are you ready???
RS-X 2011—LRR 12
Integration Readiness
Are you ready for integration?
Pictures would be great!!!
If you’re not ready, will you be ready by Thursday check-out?Don’t lie, but realize “no” isn’t an acceptable answer
RS-X 2011—LRR 13
Are You Ready???
Are you ready?!?!? I am!!!
□Yes (you only have one option)
This is going to be an incredible experience!!!
RS-X 2011—LRR 14
Pushing the RockSat Concept to New
Extremes
Questions?