CASINO PROJECT | Supplementary Information Report | Mar 2015
Volume A.ii: Project introduction & oVerView
Volume A.iii: BioPhysicAl VAlued comPonents
Volume A.V: AdditionAl yesAA reQuirements
Volume A.iV: socio-economic VAlued comPonents
Introduction Employment and Income
Employability
Community Vitality
Community Infrastructure and Services
Economic Development and Business Sector
Cultural Continuity
Land Use and Tenure
First Nations and Community Consultation
A.4 Project Description
A.3 Project Location
A.5 Effects Assessment Methodology
A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information
A.4A Tailings Management Facility Construction Material Alternatives
A.2A Traditional Knowledge Bibliography
A.4B Information on Alternative Access Road Alignments
A.4c Feasibility Design of the Heap Leach Facility
A.4d Report on the Feasibility Design of the Tailings Management Facility
A.4F Waste Storage Area and Stockpiles Feasibility Design
A.4e Results of Additional Lab Testing of Leach Ore
A.4G Updated Hydrometeorology Report
A.4h Cold Climate Passive Treatment Systems Literature Review
A.4i Open Pit Geotechnical Design
A.4l Revised Tailings Management Facility Seepage Assessment
A.4m Processing Flow Sheets
A.4n Scoping Level Assessment of Casino Property
A.4o Advanced Metallurgical Assessment of the Casino Copper Gold Project
A.4P Production of Environmental Tailings Samples for the Casino Deposit
A.4Q Mine Site Borrow Materials Assessment Report
A.4r Report on Laboratory Geotechnical Testing of Tailings Materials
A.4j Laboratory Evaluation of the SO2/Air and Peroxide Process
A.4K Metal Uptake in Northern Constructed Wetlands
Effects of the Environment on the Project
Accidents and Malfunctions
Environmental Management
Environmental Monitoring Plans
Conclusions
References
Waste and Hazardous Materials Management Plan
Spill Contingency Management Plan
Sediment and Erosion Control Management Plan
Invasive Species Management Plan
ML/ARD Management Plan
Liquid Natural Gas Management Plan
Socio-Economic Management Plan
Road Use Plan
Economic Impacts of the Casino Mine Project
Heritage Resources Assessment Areas
Heritage Sites Summary
Terrain Features
Water Quality
Air Quality
Noise
Fish and AquaticResources
Wildlife
Rare Plants and Vegetation Health
Variability Water Balance Model Report
Water Quality Predictions Report
Potential Effects of Climate Change on the Variability Water Balance
Updated Appendix B5 to Appendix 7A
2008 Environmental Studies Report: Final
Casino Mine Site Borrow Sites ML/ARD Potential
2013-2014 Groundwater Data Report
Emissions Inventory for Construction and Operations
Casino Geochemical Source Term Development: Appendix B
Extension of Numerical Groundwater Modelling to include Dip Creek Watershed
The Effect of Acid Rock Drainage on Casino Creek
Casino Kinetic Testwork 2014 Update for Ore, Waste Rock and Tailings
Preliminary Risk Assessment Metal Leaching and Acid Rock Drainage
Toxicity Testing Reports
Appendix A2 to Casino Waste Rock and Ore Geochemical Static Test As-sessment Report: Cross-Sections
Updated Fish Habitat Offsetting Plan
Wildlife Mitigation and Monitoring Plan V.1.2.
Moose Late Winter Habitat Suitability Report
Fish Habitat Evaluation: Instream Flow and Habitat Evaluation Procedure Study
Wildlife Baseline Report V.2
A.1
A.2
A.6
A.7
A.13 A.20
A.21
A.22
A.23
A.24
A.25
A.14
A.16
A.17
A.15
A.18
A.19
A.7A
A.22A
A.22B
A.22c
A.22d
A.22h
A.22G
A.22F
A.22e
A.7B
A.7c
A.13A
A.18A
A.18B
A.7d
A.7e
A.7K
A.7m
A.8A
A.7l
A.7n
A.7F
A.7i
A.7j
A.7G
A.7h
A.8
A.9
A.10
A.12
A.11
A.10A
A.12A
A.12c
A.10B
A.12B
Volume A.i: PREFACE
Volume A.ii: Project introduction & oVerView
Volume A.iii: BioPhysicAl VAlued comPonents
Volume A.V: AdditionAl yesAA reQuirements
Volume A.iV: socio-economic VAlued comPonents
Introduction Employment and Income
Employability
Community Vitality
Community Infrastructure and Services
Economic Development and Business Sector
Cultural Continuity
Land Use and Tenure
First Nations and Community Consultation
A.4 Project Description
A.3 Project Location
A.5 Effects Assessment Methodology
A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information
A.4A Tailings Management Facility Construction Material Alternatives
A.2A Traditional Knowledge Bibliography
A.4B Information on Alternative Access Road Alignments
A.4c Feasibility Design of the Heap Leach Facility
A.4d Report on the Feasibility Design of the Tailings Management Facility
A.4F Waste Storage Area and Stockpiles Feasibility Design
A.4e Results of Additional Lab Testing of Leach Ore
A.4G Updated Hydrometeorology Report
A.4h Cold Climate Passive Treatment Systems Literature Review
A.4i Open Pit Geotechnical Design
A.4l Revised Tailings Management Facility Seepage Assessment
A.4m Processing Flow Sheets
A.4n Scoping Level Assessment of Casino Property
A.4o Advanced Metallurgical Assessment of the Casino Copper Gold Project
A.4P Production of Environmental Tailings Samples for the Casino Deposit
A.4Q Mine Site Borrow Materials Assessment Report
A.4r Report on Laboratory Geotechnical Testing of Tailings Materials
A.4j Laboratory Evaluation of the SO2/Air and Peroxide Process
A.4K Metal Uptake in Northern Constructed Wetlands
Effects of the Environment on the Project
Accidents and Malfunctions
Environmental Management
Environmental Monitoring Plans
Conclusions
References
Waste and Hazardous Materials Management Plan
Spill Contingency Management Plan
Sediment and Erosion Control Management Plan
Invasive Species Management Plan
ML/ARD Management Plan
Liquid Natural Gas Management Plan
Socio-Economic Management Plan
Road Use Plan
Economic Impacts of the Casino Mine Project
Heritage Resources Assessment Areas
Heritage Sites Summary
Terrain Features
Water Quality
Air Quality
Noise
Fish and AquaticResources
Wildlife
Rare Plants and Vegetation Health
Variability Water Balance Model Report
Water Quality Predictions Report
Potential Effects of Climate Change on the Variability Water Balance
Updated Appendix B5 to Appendix 7A
2008 Environmental Studies Report: Final
Casino Mine Site Borrow Sites ML/ARD Potential
2013-2014 Groundwater Data Report
Emissions Inventory for Construction and Operations
Casino Geochemical Source Term Development: Appendix B
Extension of Numerical Groundwater Modelling to include Dip Creek Watershed
The Effect of Acid Rock Drainage on Casino Creek
Casino Kinetic Testwork 2014 Update for Ore, Waste Rock and Tailings
Preliminary Risk Assessment Metal Leaching and Acid Rock Drainage
Toxicity Testing Reports
Appendix A2 to Casino Waste Rock and Ore Geochemical Static Test As-sessment Report: Cross-Sections
Updated Fish Habitat Offsetting Plan
Wildlife Mitigation and Monitoring Plan V.1.2.
Moose Late Winter Habitat Suitability Report
Fish Habitat Evaluation: Instream Flow and Habitat Evaluation Procedure Study
Wildlife Baseline Report V.2
A.1
A.2
A.6
A.7
A.13 A.20
A.21
A.22
A.23
A.24
A.25
A.14
A.16
A.17
A.15
A.18
A.19
A.7A
A.22A
A.22B
A.22c
A.22d
A.22h
A.22G
A.22F
A.22e
A.7B
A.7c
A.13A
A.18A
A.18B
A.7d
A.7e
A.7K
A.7m
A.8A
A.7l
A.7n
A.7F
A.7i
A.7j
A.7G
A.7h
A.8
A.9
A.10
A.12
A.11
A.10A
A.12A
A.12c
A.10B
A.12B
Volume A.i: PREFACE
VOLUME A.II: PROJECT INTRODUCTION & OVERVIEW
APPENDIX A.4M: Processing Flow Sheets
PRELIMINARY
NOT FOR CONSTRUCTION
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
HEAP
HEAP LEACH COPPER - MOLYBDENUM FLOTATION
SULFIDE ORE
PRIMARY
CRUSHING
PEBBLE
CRUSHING
SAG
MILL
BALL
MILL
COPPER/MOLYBDENITE
FLOTATION
TAILING
DEWATERING
TAILINGS
POND
LOADOUT
MOLYBDENITE FLOTATION
MOLYBDENITE
CLEANER
FLOTATION
BARRENPREGNANTCYCLONE
CIC
SART
COPPER PRODUCTS
TO MARKET
GYPSUM
TO
TAILINGS
REFINING
ELECTROWINNING
ELUTION
GOLD DORE
TO MARKET
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
OVERALL PROCESS
000-FS-001
SULFIDES
SLIMES
SANDS
MOLYBDENITE
CONCENTRATE
TO MARKET
MOLYBDENITE
CONCENTRATE
DEWATERING
COPPER
CONCENTRATE
DEWATERING
COPPER CONCENTRATE
TO MARKET
OXIDE ORE
PRIMARY
CRUSHING
SECONDARY
CRUSHING
SCREEN
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
CRUSHER
PRIMARY
DISCHARGE FEEDER
FEEDER
BREAKER
ROCK
FEEDER
SAG MILL FEED CONVEYOR
BELT SCALE
MAGNET
CONVEYOR
CRUSHER
DUMP HOPPER
DISCHARGE HOPPER
CRUSHER
PRELIMINARY
NOT FOR CONSTRUCTION
BALL LOADING
SYSTEM
SAG MILL
FEEDER FEEDER
LEGEND:
METAL DETECTOR
STOCKPILE BUILDING
STOCKPILE
ROM
STOCKPILE AREA
SUMP PUMP
DUST COLLECTORDUST COLLECTOR
DUST COLLECTOR
BELT SCALE
CRUSHER AREA
OVERHEAD CRANE
CRUSHER
CRUSHER
RECLAIMRECLAIMRECLAIMRECLAIM
STOCKPILE FEED
RECLAIM TUNNEL
CASINO PROJECT
GENERAL
FLOW SHEET
000-FS-002
CRUSHING AREA
SUMP PUMP
STOCKPILE FEED
CONTROL ROOM
RECLAIM ELECTRICAL
BUILDING
CRUSHING AREA
AIR RECEIVER
CRUSHER
BUILDING
CRUSHING AREA
AIR COMPRESSOR
INSTRUMENT
AIR DRYER
ECCENTRIC
REMOVAL CARTLUBE PACKAGE
VENTILATION
FAN
MAGNET
TOTE BOX
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
SAG MILL
CRANE
CONTROL
ROOM
LEGEND:
SAG MILL
LINER HANDLER
AIR RECEIVERAIR RECEIVER
AIR COMPRESSOR
TOTE BOX
INSTRUMENT
MAGNET
BELT SCALE
JACKING CRADLE
SAG MILL
JACKING SYSTEM
HYDRAULIC
SAG MILL
PLANT
AIR DRYER
INSTRUMENT
BALL MILL
REMOVAL TOOL
LINER BOLT
LINER HANDLER
SAG MILL
FEED PUMP
SUMP PUMP
BALL MILL
CLUSTER
SAMPLER
BALL MILL
GRINDING AREA
CYCLONE
CYCLONE
SAMPLER
PRIMARY
SECONDARY
SYSTEM
BALL LOADING
BALL MILL
PSM
SIZE MONITOR
PARTICLE
LUBE PACKAGE
BALL MILL
JACKING CRADLE
BALL MILL
LUBE PACKAGE
SAG MILL
SAG MILL
REMOVAL TOOL
LINER BOLT
BALL MILL
DETECTOR
METAL
GATE
DIVERTER
CONVEYOR
CYCLONE O/F
PSM
CHILLERS
TOOL KIT
LINER HANDLER
CYCLONE
CRANE
BALL MILL
CRANE
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
GRINDING & CLASSIFICATION
000-FS-003
TROMMEL
SCREEN
SAG AREA
SUMP PUMP
PEBBLE CRUSHER
AREA SUMP PUMP
PARTICLE
SIZE MONITOR
SAMPLER
FEED TANK
SECONDARY
SAMPLER
SAMPLER
FEED TANK
PRIMARY
SAMPLER
CYCLONE
CLUSTER
BOX
CYCLONE O/F
BOX
PEBBLE
CRUSHER FEEDER
PEBBLE
CRUSHER
SAG OVERSIZE
SURGE BIN
PEBBLE WASH
SCREEN
PEBBLE
CONVEYOR No. 1
MAGNET MAGNET
PEBBLE
CONVEYOR No. 2
CYCLONE
FEED SUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
FEED TANK
SAMPLER
SAMPLER
SECONDARY
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO PROJECT
GENERAL
FLOW SHEET
Cu ROUGHER FLOTATION
000-FS-004
ROUGHER
FLOTATION CELL
PYRITE SCAVENGER
CELLS
PYRITE SCAVENGER
CELLS (FUTURE)
PYRITE SCAVENGER
CELLS
ROUGHER
FLOTATION CELL
ROUGHER AREA
SUMP PUMP
PRIMARY
SAMPLER
ROUGHER AREA
SUMP PUMP
ROUGHER
CONCENTRATE
SAMPLER
COPPER 1st CLEANER
DISTRIBUTOR
COPPER 1st
CLEANER CELLS
CLEANER AREA
SUMP PUMP
COPPER 1st
CLEANER CELLS
PRIMARY
SAMPLER
SECONDARY
SAMPLER
SAMPLER
FEED TANK
ROUGHER
CONCENTRATE
SAMPLER
ROUGHER
CONCENTRATE
SUMP
ROUGHER
CONCENTRATE PUMP
Cu 1st CLEANER
TAILING SAMPLER
Cu 1st CLEANER
TAILING SAMPLER
PYRITE SCAVENGER
CELLS (FUTURE)
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
AIR DRYER
AIR COMPRESSOR
AIR RECEIVER
INSTRUMENT
LEGEND:
AIR RECEIVER
INSTRUMENT
BLOWER
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
Cu CLEANER FLOTATION
000-FS-005
COPPER COLUMN
TAILS SUMP
COPPER COLUMN
TAILING PUMP
COPPER 3rd
CLEANER FEED PUMP
COPPER 3rd CLEANER
FEED SUMP
BLOWER
(COLUMN CELLS)
COPPER 3rd
CLEANER
COLUMN CELLS
COPPER CLEANER
AREA SUMP PUMP
COPPER 3rd
CLEANER
DISTRIBUTOR
REGRIND
CYCLONE
FEED PUMP
REGRIND MILL
REGRIND CYCLONE
FEED SUMP
REGRIND AREA
SUMP PUMP
COPPER REGRIND
CYCLONE CLUSTER
BRIDGE CRANE
COPPER 2nd CLEANER
FLOTATION CELLS
COPPER 2nd CLEANER
TAILING SUMP
COPPER 2nd
CLEANER TAILING PUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
TAILING
THICKENER AREA
SUMP PUMP
TAILING
THICKENER
RECIRCULATE
PUMPS
TAILING
THICKENER
OVERFLOW
SUMP PUMP
SEEPAGE PUMPS
D8 DOZER
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO PROJECT
GENERAL
FLOW SHEET
TAILING DEWATERING
000-FS-006
TAILING
THICKENER
OVERFLOW
PUMPS
TAILING
THICKENERS
TAILING RECLAIM
BARGE PUMP
PYRITE THICKENER
AREA SUMP PUMP
PYRITE
THICKENER
UNDERFLOW
PUMPS
PYRITE
THICKENER
TAILING CYCLONE
CLUSTER
TAILING CYCLONE
FEED SUMP
RECLAIM
WATER BARGE
TAILING CYCLONE
PLANT HEAD
WATER TANK
TAILING CYCLONE
OVERFLOW PUMP
(FUTURE)
TAILING CYCLONE
OVERFLOW SUMP
TAILING CYCLONE
UNDERFLOW PUMP
(FUTURE)
TAILING CYCLONE
UNDERFLOW SUMP
WATER
BUFFER TANK
SEAL WATER
TANK SEAL WATER PUMP
(FUTURE)
SEAL WATER
FILTER
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
CuMo CONCENTRATE
THICKENER
AREA SUMP PUMP
CuMo
CONCENTRATE
THICKENER
UNDERFLOW
PUMP
CuMo
CONCENTRATE
THICKENER
CuMo CONCENTRATE
THICKENER
OVERFLOW SUMP
LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
Mo ROUGHER FLOTATION
000-FS-007
CuMo
CONCENTRATE
OVERFLOW PUMP
MOLY
REGRIND
MILL
MOLY 1st
CLEANER TAILS
SAMPLER
MOLY ROUGHER
TAILS SAMPLER
MOLY 1st
CLEANER
FLOTATION CELLS
MOLY 1st CLEANER
CONCENTRATE
SAMPLER
MOLY ROUGHER
CONCENTRATE
SAMPLER
MULTI-STREAM
ANALYZER
MOLY ROUGHER
FLOTATION CELLS
MOLY 1st CLEANER
FEED PUMP
MOLY ROUGHER
CONDITIONING
TANK No. 1
AGITATOR
MOLY ROUGHER
CONDITIONING
TANK No. 2
AGITATOR
MOLY REGRIND
SUMP
MOLY REGRIND
PUMP
MOLY ROUGHER
AREA SUMP PUMP
LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
Mo CLEANER FLOTATION
000-FS-008
MOLY CLEANER AREA
SUMP PUMP
MOLY 2nd CLEANER
TAILS PUMP
MOLY 2nd CLEANER
TAILS SUMP
MOLY 3rd CLEANER
FEED SUMP
MOLY FINAL CLEANER
CONCENTRATE SAMPLER
MOLY 3rd
CLEANER COLUMN
CELL
MOLY 3rd CLEANER
FEED PUMP
MOLY 2nd CLEANER
FEED SUMP
MOLY 2nd
CLEANER COLUMN
CELL
MOLY 2nd CLEANER
FEED PUMP
MOLY 4th
CLEANER COLUMN
CELL
MOLY 3rd CLEANER
CONCENTRATE SUMP
MOLY 4th CLEANER
FEED PUMPS
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
CONVEYOR
BELT SCALE
LEGEND:
SUMP PUMP
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
000-FS-009
FILTER AREA
SUMP PUMP
COPPER
THICKENER
OVERFLOW PUMP
COPPER
THICKENER OVERFLOW
PUMP SUMP
FILTRATE PUMP
FILTER BUILDING
CRANE
MOLY
SEPARATION
TAILING
SAMPLER
COPPER
CONCENTRATE
THICKENER
COPPER
THICKENER
UNDERFLOW PUMP
COPPER
THICKENER AREA
SUMP PUMP
Cu CONCENTRATE
CONCENTRATE AREA
MOLY
SEPARATION
TAILING
SAMPLE TANK
DISTRIBUTOR
COPPER FILTER
FEED TANK
FILTRATE TANK
COPPER FILTER
FEED PUMP
COPPER
CONCENTRATE
FILTER
PRESSURE
FILTRATION AIR
COMPRESSOR
PRESSURE
FILTRATION
AIR RECEIVER
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
LEGEND:
FILTER FEED TANK
FORKLIFT
AGITATOR
MOLY FILTER
FAN
MOLY FILTER
PACKAGING SYSTEM
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
000-FS-010
FILTRATE
PUMP
MOLY
CONCENTRATE
DRYER
OIL
HEATER
CLEANUP
PUMP
MOLYBDENITE
CONCENTRATE BIN
ROTARY
VALVE
MOLY DUST
COLLECTOR
PLATFORM
SCALE AND
PRINTER
FEEED PUMP
MOLY
FILTRATE
TANK
PRESSURE
FILTRATION AIR
COMPRESSOR
PRESSURE
FILTRATION
AIR RECEIVER
BIN ACTIVATOR
Mo SCREW
CONVEYOR
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
MOLY COLLECTOR (No. 2 DIESEL FUEL) SYSTEMMIBC (FROTHER) SYSTEM
LIME SYSTEM
LEGEND:
SCREW CONVEYOR
OVERHEAD CRANE
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
REAGENTS SHEET 1
000-FS-011
LIME AREA
SUMP PUMP
MILK OF LIME
TANK
MILK OF LIME
TANK AGITATOR
M.O.L. DISTRIBUTION
PUMP
GENERAL
REAGENT AREA
SUMP PUMP
MIBC
DISTRIBUTION
PUMP
MIBC
STORAGE TANK
DISTRIBUTION
PUMP
DISTRIBUTION
TANK
LIME VERTICAL
MILL
XANTHATE SYSTEM (PAX 350)
DISTRIBUTION TANK
AGITATOR
XANTHATE
TRANSFER PUMP
XANTHATE MIX
TANK
NITROGEN PACKAGE 800-RE-003
XANTHATE
DISTRIBUTION PUMP
XANTHATE
AGITATOR
VENDOR PACKAGE
METERING
PUMPS
METERING
PUMPS
SCREW CONVEYOR
FRONT END LOADER
TOTES
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
LEGEND:
PROMOTER No. 1 (AEROPHINE 3418A) SYSTEM
FLOCCULANT SYSTEM
SODIUM HYDROSULFIDE (NaHS)
MIX TANK AGITATOR
MIX TANK
PROMOTER No. 2 (AERO FLOAT 208) SYSTEM
AGITATOR
AGITATOR
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
REAGENTS SHEET 2
000-FS-012
DISTRIBUTION
PUMP
PROMOTER
MIX TANK
PROMOTER
DISTRIBUTION
PUMP
DISTRIBUTION
PUMP
DISTRIBUTION
TANK
TRANSFER
PUMP
METERING
PUMPS
METERING
PUMPS
METERING
PUMPS
STORAGE TANK
IN-LINE MIXER
TOTES
TOTES
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO SITE
FLOW SHEET
GENERAL
PROCESS WATER
000-FS-013
PROCESS WATER
POND
RECLAIM WATER
SUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO PROJECT
GENERAL
FLOW SHEET
PROCESS WATER
000-FS-013
PROCESS
WATER POND
RECLAIM
BOOSTER PUMP
RECLAIM
BOOSTER TANK
RECLAIM
BOOSTER TANK
RECLAIM
BOOSTER PUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO PROJECT
GENERAL
FLOW SHEET
FRESH WATER
000-FS-014
FRESH/FIRE
WATER POND
HIGH PRESSURE
GLAND SEAL
WATER PUMP
GLAND SEAL
WATER TANK
GLAND SEAL
WATER PUMP
MINE WATER
TANK
POTABLE WATER
TANK
CHLORINATOR
PACKAGE
WITH FILTER
FRESH WATER
INTAKE PUMPS
FRESH WATER
BOOSTER PUMPS
FRESH WATER
BOOSTER TANK
FRESH WATER
BOOSTER PUMPS
FRESH WATER
BOOSTER TANK
FRESH WATER
BOOSTER PUMPS
FRESH WATER
BOOSTER TANK
FRESH WATER
BOOSTER PUMPS
FRESH WATER
BOOSTER TANK
FRESH WATER
INTAKE TANK
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
CASINO SITE
FLOW SHEET
GENERAL
PYRITE LEACH / CIL
000-FS-015
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
050-FS-001
BIN VIBRATOR
LIME BIN
METAL
DETECTOR
SECONDARY
SCREEN FEED
CONVEYOR
BELT SCALE
PRIMARY
CRUSHER
SECONDARY
SCREEN
FINE ORE
TRANSFER
CONVEYOR
SECONDARY
CRUSHER
MAGNET
DUST
COLLECTOR
FAN
SECONDARY
CRUSHER
FEED BIN
MINE TRUCK
ROM STOCKPILE
PRIMARY
CRUSHER
APRON FEEDER
ROCK
BREAKER
BELT SCALE
SECONDARY
CRUSHER
BELT FEEDER
OXIDE CRUSHING
BUILDING
SCREW CONVEYOR
ROCK BOX
ROTARY VALVE
MOBILE CRANE
OXIDE CRUSHING
AIR RECEIVER
SECONDARY SCREEN
DISCHARGE CONVEYOR
ECCENTRIC
REMOVAL CART
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
OVERLAND CONVEYANCE
050-FS-002
INTERMEDIATE
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
LEGEND:
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
OVERLAND
TRANSFER
CONVEYOR
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
HEAP LEACH
050-FS-003
EVENTS POND
EVENTS POND PUMP
HEAP LEACH PAD
OVERFLOW DITCH
PUMP CASING
DRIP LINE CART
CRAWLER DOZER
PREGNANT
SOLUTION PUMP
LEAK DETECTION
PUMP
EMERGENCY SHOWER
EYEWASH
LEACH PILE
STACKING
CONVEYOR
TELESCOPING
STACKER FEED
CONVEYOR
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
GOLD ADSORPTION
050-FS-004
BARREN
SOLUTION FILTER
BARREN
SOLUTION
SAMPLER
BARREN
SOLUTION TANK
BARREN
SOLUTION
PUMP, VFD
LEGEND:
PREGNANT LEACH
SOLUTION SAMPLER
CARBON
SAFETY SCREEN
CARBON
SIZING SCREEN
CARBON
SIZING SCREEN
BARREN
COLUMN
SAMPLER
SART FEED
PUMP
ADR FEED
PUMP
PREGNANT SOLUTION
DISTRIBUTION TANK
TRASH SCREEN
CARBON
ADSORPTION
AREA PUMP
ADSORPTION COLUMNCARBON TRANSFER PUMP
ADSORPTION COLUMNCARBON TRANSFER PUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
CARBON WASH / STRIP
050-FS-005
SAFETY STN SHOWER &
EYEWASH/ACID AREA
BARREN STRIP
SOLUTION PUMP
KILN FEED
DEWATERING SCREEN
CARBON
DISTRIBUTOR TANK
STRIP
COLUMN No. 2
STRIP
COLUMN No. 1
CARBON STRIP
TRANSFER PUMP
ACID WASH
VENT FAN
ACID WASH
COLUMN
CONC. ACID AREA
SUMP PUMPDILUTE ACID TANK
ACID WASH CARBON
TRANSFER PUMP
ACID WASH
PUMP
BARREN STRIP
SOLUTION TANK
STRIP SOLUTION
HEATER NO. 2
STRIP
SOLUTION
HEATER NO.1
RECOVERY
HEAT EXCHANGER
E/W BARREN
RETURN TANK
BARREN
RETURN PUMP
STRIP AREA
SUMP PUMP
CARBON FINES
PUMP
CARBON FINES
FILTER
REGENERATION
AREA SPILLAGE PUMP
CARBON FINES
TANK
CARBON FINES
AGITATOR
TRIM HEAT
EXCHANGER
SAFETY STN
CARBON STRIP AREA
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
050-FS-006
CARBON SUPERSACS
HANDLING HOIST
HANDLING CART
SLAG JAW
CRUSHER
E/W SLUDGE FILTER
PRESS
BULLION
FURNACE HOIST
E/W SLUDGE,
DIAPHRAGM PUMP
CARBON QUENCH
TANK
CATHODE HANDLING
HOIST
CARBON
REGENERATION KILN
KILN EXHAUST
FAN
ACTIVATED
CARBON
STORAGE TANK
BULLION
FURNACE
EW CELL
EXHAUST FAN
ELECTROWINNING CELLS
e/w RECTIFIER
SAFETY STN SHOWER &
EYEWASH/SMELT AREA
E/W WASH/SLUDGE TANK
E/W AREA SUMP
PUMP
CARBON
TRANSFER PUMP
(ACTIVE)
BULLION FURNACE
VENT FAN
BAGHOUSE DUST
COLLECTOR
CARBON
ATTRITION TANK
CARBON ATTRITION
AGITATOR
KILN SCREW
FEEDER
HIGH PRESSURE
SPRAYER
VAULT DOOR
SLAG POT
SLAG MOLD SETFLUX MIXER
TO ATMOS.
SLAG ROLL
CRUSHER
DORE
BALANCE
SLAG PRILL
SCREEN
PLATFORM
SCALE
CARBON
TRANSFER PUMP
TANK KILN
FEED
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
SART PROCESS
050-FS-007
2
SART FEED
FILTER
NaHS IN-LINE
MIXER
SULFURIC ACID
IN-LINE MIXER
AGITATOR
PRECIPITATION
REACTOR
2
Cu S UNDERFLOW
RECIRCULATION PUMP
2
Cu S UNDERFLOW
ADVANCE PUMP
NEUTRALIZATION
FEED TANK
AGITATOR
Cu S UNDERFLOW
NEUTRALIZATION
TANK
AGITATOR
Cu S HOLDING
TANK
2
NEUTRALIZATION
FEED PUMP
GYPSUM
SLURRY PUMP
TREATED
SOLUTION PUMP
AGITATOR
NEUTRALIZATION
REACTOR No. 1
AGITATOR
NEUTRALIZATION
REACTOR No. 2
GYPSUM UNDERFLOW
RECIRCULATION PUMP
GYPSUM UNDERFLOW
ADVANCE PUMP
GYPSUM
THICKENERCu S THICKENER
TREATED
SOLUTION TANK
AGITATOR
GYPSUM
HOLDING TANK
Cu S FILTER
CAKE CONVEYOR
Cu S FILTER
PRESS
DRYER
FEED BIN
DRIED Cu S
STORAGE BIN
Cu S DRYER
DISAGGREGATOR
BRIDGE CRANE
BAG ROLLING
CONVEYOR
2
2
2
2
2
Cu S HOLDING
TANK PUMP
2
TREATED
SOLUTION FILTER
PLANT AIR
RECEIVER
PLANT AIR
COMPRESSOR
INSTRUMENT
AIR RECEIVER
EYEWASH /
SAFETY SHOWER
INSTRUMENT
AIR DRYER
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
REAGENTS SHEET 1
050-FS-008
NaOH MAKEUP SYSTEM
CYANIDE MAKEUP SYSTEM
AIR SYSTEM
LIME SYSTEM
CAUSTIC TRANSFER PUMP
AIR RECEIVER
AIR COMPRESSOR
HCI SUPPLY
NaHS SYSTEM
(SPARE)
CYANIDE MIX TANK
CYANIDE
DISTRIBUTION PUMP
CYANIDE AREA
SUMP PUMP
CYANIDE STORAGE
TANK
CYANIDE SOLUTION
TRANSFER PUMP
BIN VENT
BIN VENT
CAUSTIC
STORAGE TANK
CAUSTIC SOLUTION
DISTRIBUTION PUMP
HCL ACID
METERING PUMP
REAGENTS
HOIST
CYANIDE AREA
SAFETY STATION
NaHS UNLOADING
PUMP
NaHS STORAGE
TANK
NaHS DISTRIBUTION
PUMP
NaHS AREA
SUMP PUMP
NaOH STORAGE
TANK
NaOH DISTRIBUTION
PUMP
NaOH AREA
SUMP PUMP
NaOH DISTRIBUTION
PUMP - SCRUBBER
BRIDGE CRANE
LIME AREA
SUMP PUMP
LIME
DISTRIBUTION
PUMP
LIME STORAGE
& SLAKING
PACKAGE
LIME
TRANSFER
PUMP
LIME SLURRY TANK
LIME GRIT SCREW
CONVEYOR
LIME GRIT
REMOVAL SCREEN
SLAKER FEEDER
LIME SLAKER
LIME SILO
LIME SILO VENT
AGITATOR
LIME DIST. TANK
AGITATOR
AGITATOR
CAUSTIC MIX TANK
AGITATOR
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
050-FS-009
NOTE:
MINE YARD FRESH/FIRE WATER
FRESH/FIRE WATER
SEWAGE/WASTE WATER
MINE YARD
FRESH/FIRE WATER
IMMERSION HEATER
ADR FIRE WATER
DISTRIBUTION PUMP
MINE YARD
FRESH WATER
DISTRIBUTION
PUMP
MINE YARD
FRESH WATER
TRANSFER PUMP
ADR FIRE WATER
RECIRCULATION PUMP
ADR FRESH/
FIRE WATER
TANK
FRESH/FIRE WATER TANK
IMMERSION HEATER
LAB. SUMP
WASTE WATER PUMP
MINE YARD
FRESH/FIRE
WATER TANK
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDYDESCRIPTIONDWG. NO.R E F E R E N C E S
TITLE DWG. NO.R E F E R E N C E S
TITLE NO. CLIENTNO.R E V I S I O N S
DATEBY APP'D CLIENTR E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR.
PROJECT MGR
CHECKED BY
DRAWN BY
DESIGNED BY
SCALE: DATE
DATEREV NO.
DWG NO.PROJECT NO. M3-PN 120001
DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
REAGENTS SHEET 2
050-FS-010
FLOCCULANT SYSTEM
VENDOR PACKAGE
ANTI-SCALANT SUPPLY & DISTRIBUTION
SULFURIC ACID SYSTEM
FLOCCULANT
FEED SYSTEM
FLOCCULANT
MIX TANK
AGITATOR
FLOCCULANT
MIX TANK
FLOCCULANT
TRANSFER
PUMP
FLOCCULANT
DAY TANK
FLOCCULANT
DISTRIBUTION
PUMP
ANTISCALANT
METERING PUMP
ANTISCALANT
TANK
SULFURIC ACID
UNLOADING PUMP
SULFURIC ACID
STORAGE TANK
SULFURIC ACID
DISTRIBUTION
PUMP
SULFURIC
ACID AREA
SUMP PUMP
ANTISCALANT
METERING PUMP
ANTISCALANT
ISOTANK
SCRUBBER
PACKAGE -
SART PLANT
SCRUBBER - SART PLANT
Recommended