FACTORY PAINT AREAGenerally the eyeglasses manufacturer in our country has not own paint area.

We brought the machineries of Italy in order not to have to depend on an external factory in the paint spectacles area.

The factory use this area only four days for month,because we use it only for our production. But this area has a capacity to paint 3000 pairs daily.

Please click to continue

© Oscar y Santiago Parmo . Todos los Derechos Reservados. Designed by Maria Parmo

CLEANER SPECTACLES FRAMES MACHINE

Ultrasonic cleaner machine

Automatic paint machine

Two different air compressor in order to bring the best air quantity to the paint machine

stove

Work table of the technician in colors

Workers loading the spectaclesin special devices tointroduce it in the paint machine

Paint machine working

Drying machine: the spectacles turn in this machineby twenty minuts before enteringto the stove where the process finishes

Stove

Spectacles with paint process finish

The spectacles retire of the devices and they are placed in trays in which they are separated one by one to take care of the painting until it arrives at the maximum point of hardness.

Last hour in factory