FACTORY PAINT AREA Generally the eyeglasses manufacturer in our country has not own paint area. We brought the machineries of Italy in order not to have to depend on an external factory in the paint spectacles area. The factory use this area only four days for month, because we use it only for our production. But this area has a capacity to paint 3000 pairs daily. Please click to continue

Paint day in factory

Embed Size (px)

Citation preview

Page 1: Paint day in factory

FACTORY PAINT AREAGenerally the eyeglasses manufacturer in our country has not own paint area.

We brought the machineries of Italy in order not to have to depend on an external factory in the paint spectacles area.

The factory use this area only four days for month,because we use it only for our production. But this area has a capacity to paint 3000 pairs daily.

Please click to continue

Page 2: Paint day in factory

© Oscar y Santiago Parmo . Todos los Derechos Reservados. Designed by Maria Parmo

Page 3: Paint day in factory

CLEANER SPECTACLES FRAMES MACHINE

Page 4: Paint day in factory

Ultrasonic cleaner machine

Page 5: Paint day in factory

Automatic paint machine

Page 6: Paint day in factory

Two different air compressor in order to bring the best air quantity to the paint machine

Page 7: Paint day in factory

stove

Page 8: Paint day in factory

Work table of the technician in colors

Page 9: Paint day in factory
Page 10: Paint day in factory

Workers loading the spectaclesin special devices tointroduce it in the paint machine

Page 11: Paint day in factory

Paint machine working

Page 12: Paint day in factory
Page 13: Paint day in factory

Drying machine: the spectacles turn in this machineby twenty minuts before enteringto the stove where the process finishes

Page 14: Paint day in factory

Stove

Page 15: Paint day in factory

Spectacles with paint process finish

Page 16: Paint day in factory

The spectacles retire of the devices and they are placed in trays in which they are separated one by one to take care of the painting until it arrives at the maximum point of hardness.

Page 17: Paint day in factory
Page 18: Paint day in factory

Last hour in factory