Overview KANGEAN ENERGY INDONESIA LTD
Prepared By
INVENTORY & LOGISTIC DIVISION
©2016
VENDORS
Overview
KANGEAN ENERGY INDONESIA LTD
VENDOR’S DAY BERSAMA EAST JAVA 2017
Golden Tulip Hotel, Batu - Malang
DIDI BASUKI
VP SCM
2
OVERVIEW
KANGEAN ENERGY INDONESIA LTD
DIDI BASUKI
VP SCM
EAST JAVA VENDOR’S DAY , 27 JULY 2017
Golden Tulip Hotel, Batu - Malang
HISTORY
4
KEI FIELDS
PAGERUNGAN (PAG)
Production type : Gas & Condensate
Lifespan : 1993 – Now
Cum. Production (1993 – Now)
Gas : 1,191 Bscf
Condensate. : 13.9 MMbbl
TERANG SIRASUN BATUR (TSB)
Production type : Gas
Lifespan : 2012 – Now
Cum. Production : 438 Bscf
Estimated Reserves : 855.1 Bscf
5
KEI FIELD
PAG
PUO
SED
TSB
PUO
Terang - Sirasun - Batur Area
SEGENTOH
6
UP COMING PROJECT TSB Phase 2 – Development
• Phase 1
5 subsea completion development wells in Terang gas field had been drilled and completed in the middle of 2011 and started producing gas in May 2012.
• Phase 2
Drilling 4 subsea development wells in Sirasun and Batur gas field is planned to be commenced in March 2018 (Target spud-in) followed by Subsea facility installation.
Target Gas-in : Jan 2019
LOGISTIC MAP
8
Sirasun-Batur
16
2km
(8
0N
M)
Tanjungwangi Supply Base
GAS BUYERS
Existing Metering System
New Metering System
80 BBTUD
65 BBTUD
60BBTUD
20BBTUD
TSB Field
JAKARTA OFFICE
Wisma Mulia Building 25 – 26 Floor Jl. Jend. Gatot Subroto No 42
Jakarta - Indonesia
10
KEI OFFICE
SURABAYA REP OFFICE
Jl Raya Jemursari No 52 Surabaya – East Java
TANJUNGWANGI SHOREBASE
Jl. Raya Situbondo No.44, Desa Ketapang, Kecamatan Kalipuro, Banyuwangi 68451
Thank You...
Copyright : KEI-SCM 2017