Wind State Wind Mill (State) 19.36 2.854 3.179 5.237
Solar State Solar (State)
Total State 5558.09 2173.792 2594.929 7349.390
LSHS Private GMR Vasavi 4x49 196.00 92.299 192 67.186 236.450
LSHS Private Samalpatty 7x15 105.66 43.656 105.4 23.634 95.088
LSHS Private Madurai PCL 105.66 44.463 105.9 23.157 93.465
Naphta/
NG&NPrivate Pillai Perumal Nallur 330.50 94.367 193.350
Wind Private Wind Mill + Boimass 1342 417.429 754.187 1198.681
Diesel/
LSHSPrivate TCPL 63.50 39.374 57.6 40.212 122.250
Diesel/
LSHSPrivate HITEC 15.00 6.806 7.667 21.976
Diesel/
LSHSPrivate Manali 2.285 1.572 3.882
Lignite Private Neyveli STCMS Unit 250.00 138.240 256.5 126.568 451.483
Gas Private ABAN 1x74.1+1x38.81 113.21 36.108 117 74.010 181.536
RES Private Cogeneration 70.000 46.000 166.000
RES Private Solar 246.60
Cogen Private Other CPPs
Gas Private Arkay Energy Ltd. 52.80 - 51.1 12.672 54.455
Total Purchase 1478.93 985.027 1176.865 2818.616
Lignite Central Neyveli TS I 6x50 + 3x100 600.00 365.904 589 356.334 1029.093
Total 7637.02 3524.723 4128.128 11197.099
Pump
ModeState Kadamparai (Pump mode) 45.692 49.375 109.835
Pondycherry
Diesel CentralKaraikal Combined Cycle
Diesel Power Plant1x32.5 32.50 22.293 22.748 66.813
Central Sector
Coal Central Ramagundam STPS 3x200 + 4x500 2600.00 1772.359 1543.749 5285.611
Lignite Central Neyveli TS II 7 x 210 1470.00 881.502 1249 784.205 2114.662
Lignite Central Neyveli TPS - I Exp. 2x210 420.00 290.816 429.2 285.137 773.068
Coal CentralTalcher Stage II-NTPC
(Relief) 4x500 2000.00 738.686 1122.205 3668.230
Nuclear Central MAPS (Kalpakkam) 390.00 101.236 163.640 677.948
Nuclear Central Kaiga GS 2x220 440.00 255.847 223.457 660.792
TOTAL 7320.000 4040.446 4122.393 13180.311
State Hydro-Total 1384.07 2364.23 7493.03
State Thermal-Total 4685.52 5049.11 15396.09
State Others- Total 5.65 5.28 9.74
State Purchase- Total 2700.79 2805.62 8460.31
ISGS-Coal/Lignite-Total 4071.56 4114.38 12937.48
ISGS Nuclear- Total 357.08 387.10 1338.74
SR- Grand Total 13204.68 14725.71 45635.38
7 Tallak: 220 kV DC line from Hiriyur 400 kV Station
to Tallak
- 61 - Jun-06 Tenders invited
8 220 kV 2nd circuit line from Somanahalli to T.K.Halli
in the existing corridor (SC)
- 63 - Resurvey to be conducted.
9 220 kV DC line from Anchepalya to Tubinkere 220
kV station-Lilo Shimoga-Mysore up to Uyyaganahalli
- 76 - Dec-06 The line is rerouted as 220 kV
LILO from Shimoaga-Mysore line
up to proposed Uyyaganahalli s/s
10 LILO of 220 kV Hoody-Somanahally DC line to
proposed 220/66 kV station at Naganathapura
- 0.6 - Mar-07 Revised estimate sent.
11 Construction of 220 kV DC line between 400/220 kV
station, Nelamangala and DB pura and providing
two Nos. of TBs at Nelamangala and DB Pura.
Nov. 2003 33.71 - Jun-06 148 towers erected. 220 kV TB at
Nelamangala end Commissioned
on 30-9-05
12 Constuction of 220 kV LILO line from Shimoga-
Neelamangala to the proposed 220 kV Nittur
station.
0.5 Works under progress
Mysore Zone
1 220 kV LILO from T.K.Halli-Hootagalli line to
Vajamangala
- - - Dec-07 TAC approved
2 Interlinking 220 KV lines from proposed 400 KV
station at Bastipura
a) 220 kV LILO line to Bastipura to Hootagalli line
- - - Jun-07 Commissioned on 2.05.2006
b) Bastipura to Shimoga line Commissioned on 4.05.2006
3 220 KV SC line on DC Towers from proposed
440/220 KV Bastipura RS to Kushalanagara
- - - Jun-07 Tender invited
4 Construction of 220 kV TBs at 200 kV Kadakola for
proposed 220 kV DC line from 400/220 kV station
Bastipura.
13.08.2006 DWA issued
Hassan Zone
1 Construction of 220 kV DC line from Varahi-
Shimoga and dismantling of 110 kV SC line
16.07.98 2x100 2x82.5 Mar-06 Construction of 220 kV DC line in
the existing corridor of 110 kV SC
line up to Hulikal ridge completed.
Tender for remaining section invited.
2 Terminal Bay at MRS for Varahi to Shimoga line 14.02.2000 - Mar-06 Revised estimate submitted for
balance work
3 220 kV line in Shiralakoppa in Shimoga District - - - May-06 Tenders invited
4 Construction of 220 kV DC line from Varahi to
Kavoor via Khemar in the existing corridor of 110 kV
SC, SK line
- 290 - Mar-06 Tender to be invited by
CEE(T&P)
5 a) Construction of 220 MC line from Sharavathi
Generating Station to Dugadimane limits.
b) Providing 03 Nos. of 220 kV Bays at Sharavathi
Generating Station for the above line
c) Dismantling of 220 kV SC lines
13.875 Mar-06 Work under progress
6 220 kV DC line tapping from Khemar-Kavoor line to
Bykampady OR 220 kV DC line tapping from
Tannirbhavi line to Bykampady
- - - Mar-07 DPR is being prepared.
7 a) Guruvayangere - Puttur DC line
b) 2 Nos. of 220 kV TBs at Khemar SS for Puttur
line
- 2005-06a) work under progress.
B) DWA issued to M/s L & T
8 220 kV DC LILO line from Shimoga - Mysore line
upto proposed 220 kV Uyyaganahalli station.
- - - Aug-08 DPR approved.
9 Construction of 220 kV DC LILO line at
Yachanahalli in C.R. Pattna Tq. tapping from the
existing 220 kV line from Shimaga-Mysore line
- 2.757 - May-06 Work under progress. Way leave
problem to be attended.
10 Chikkamagalur-Bastipur-220KV LILO to KR Pet R/S Jul-06 Survey work completed
Bagalkot Zone
1 220 kV line from Chikkodi to Kudachi - 142.11 2005-06 Work under progress
4 220 kV LILO line from both the circuits of 220 kV
Sharavathi-Hubli D/C line to the 220 kV switching
station at Sirsi on 220 kV MC towers having 4
circuits.
6.65 Mar-06 Revised DWA issued on 30-01-
06. Work yet to be taken up.
5 220KV Line to Bidnal
1) 220 KV LILO from Hubli- Mahalingapur 1.053 Aug-07 Tender floated
2) 220 KV D/C LILO line from Hubli- Gadag 0.441 Aug-07 Tender floated
3) 220 KV D/C link line between Nag- Hubli 1.365 Aug-07 Tender floated
6 220 Kv D/C line Narendra to Mahalingapur Dec-'07 Works being tendered
7 Const. of 220 kV DC and MC lines passing through
KIADB land in front of 220 kV Narendra station
Tender floated
Gulbarga Zone
1 220 kV DC LILO line from 220 kV Lingasugur-
Shahabad SC line to proposed 220 kV S/S at
Shahapur
- 4.025 4.025 2005-06 works under progress
2 Proposed 220 kV DC line from RTPS to proposed
220 kV S/S at Shahapur by linking the 220 kV
RTPS-Gulbarga DC line
- 1.7 - 2005-06 works under progress
3 220 kV DC LILO lines to 220 kV S/S at Shahabad
from one circuit of 220 kV Shahapur-Gulbarga DC
line
- 3.95 3.95 2005-06 Work under progress
4 220 kV additional SC Line from RTPS to Raichur - 20 - Jun-06 Work to be tendered.
5 220 kV LILO line to Sindhanur from Lingsugur-II line - 70 - Oct-06 DPR under preparation
KERALA
220 KV LINES
1 LILO of Thrissur-Kozhikode 220KV SC to
Malapparamba
Nov. 2000 4 - 2005-06
2 LILO of Kayamkulam-Edamon to Edappon S/S
(Bharanikavu-Edappon)
May-01 2x8.5 - Jun-06 Work in progress
3 DC line from Koonathara-Shornur May-00 2x4.26 5 2005-06 Work in progress
4 LILO of Veeyapuram-Punnapara (DC) 2x18.62 - Jun-06
5 Interconnecting lines to Cochin 400kV PGCIL S/S Mar-07 Decision regarding the scheme is
finalised.
6 Interconnecting lines to existing state grid Mar-07 Decision regarding the scheme is
finalised.
7 LILO at Vadakara from Kozhikode -Kannur line (DC) 2x1 - Mar-06 Land not acquired
8 Interconnecting lines to Kozhikode 400kV PGCIL
S/S
Not fixed Concurrence from PGCIL
awaited.
9 Pothencode - Kattakada(DC) 2x30 - Mar-07 Line survey completed.
10 Athirapally - Kodakara 75 Mar-07
TAMIL NADU
400 KV LINES
1 Neyveli-Melakkottaiyur 400 KV SC line on DC
towers
170 Work yet to be taken up (By
turnkey).
2 Almathy-Melakkottaiyur 400 KV SC line on DC
towers
60 Work yet to be taken up (By
turnkey).
230 KV LINES
1 Karaikudi-Madurai North (SC) 77.56 70 2005-06 Test charged for a length of
67.43 Km on 01.11.03
2 LILO of Korattur - Koyambedu 230 KV line at
Alamathy 400 KV S/S
34 2005-06 Work under progress
4 Almathy 400 KV S/S to Avadi 230 KV SS by UG
cable near Avadi
3 2005-06 Work under progress
5 Avadi Railway Crossing to Koladi (common point)
for Almathy
9 2005-06 Work under progress
6 Mylapore-Tharamani 11 2005-06 Yet to be taken up.
12a Elephant Gate-Tondiarpet 5 2005-06 Work yet to be taken up.
12b 230 KV UG Cable Elephant Gate- Mylapore 4 2005-06 Work yet to be taken up.
14 Melakkottaiyur 400KV SS - Kadapperi 230KV SS
(SC on DC)
40 2006-07 Work yet to be taken up (By
turnkey).
15 Melakkottaiyur 400KV SS-Acharappakkam 230KV
SS (SC on DC)
80 - 2005-06 Work yet to be taken up (By
turnkey).
16 LILO of Unjanai- Pugalur at Puthansanthai 35.7 - Apr-06 Charged on 29.03.2006
18 LILO of 230 KV SP Koil-Tharamani -I at
Melakkottaiyur 400 KV SS
20 - 2006-07 Work yet to be taken up (By
turnkey).
19 LILO of 230 KV SP Koil-Tharamani-II at
Melakkottaiyur 400 KV SS
20 - 2006-07 Work yet to be taken up (By
turnkey).
21 DC line from Arasur SS- Palladam SS 40 - 2006-07 To be taken up.
22 Changing of conductor in Sriperumbudur-Korattur
line (Improvement)
20.27 4.5 2005-06 A portion of the work has been
completed
23 S.P.Koil-Tharamani SC line on Perambakkam-
Tharamani portion
45.8 - 2005-06 Towers erected. Work under
progress.
24 Provision of 230 KV lines to LILO Neyveli TS-II to
Neveli Zero unit to transfer Cuddalore SS load
14 2005-06 Works to be taken up
25 LILO of TTPS-SR Puddur 230 KV line at
Kudankulam APP site (Start up power)
18 May,2006
26 LILO of Myvadi-Pugalur feeder at Palladam SS 100 - 2006-07 Yet to be taken up.
27 Erection of DC line on DC towers from Almathy SS
to Manali 230 KV SS with Zebra conductor
50 - Mar-06 Survey completed.
28 230 kV SC line on SC towers from Vinnamangalam
S/S to Thiruvalam 230 kV SS with Zebra conductor
88 Mar-06 Deferred for the present
29 Erection of 230 kV SC link line on DC towers with
Zebra conductor from the existing Deviakkurichi 230
KV SS to 230 kV Pudhanchandai SS
100 2006-07 Survey completed.Estimate under
sanction.
30 Replacement of old KUNDAH conductor in 230 kV
Singarapet-Salem feeder from location 105 to 300
with Zebra conductor
60 Deferred for the present
31 LILO of 230 kV Thiruvarur-Karaikkudi line at
Karambayam SS
10 2006-07 Yet to be taken up
32 Kayathar-Sankaneri 230/33 Kv SS 178 2005-06 Work under progress
33 Pugalur -Chekkanoorani 230 kV line at the prop.
Renganathapuram s/s
24 2006-07 Tender called for.
34 Errection of 230 kV DC line on DC towers from
Myvadi S/S to the prop. Ponnapuram 230 kV S/S
38 2005-06 To be taken up
35 Errection of 230 kV SC link line on DC towers from
230 kV Myvadi S/S 230 kV S/S at
Othakalmandapam
58 2005-06 To be taken up
36 Errection of 230 kV SC line on DC towers from
Neyveli Zero Unit to the Propd Ulundurpet 230 kV
S/S
25 2006-07 `
37 Errection of 230 kV SC line from Villupuram 230
kV S/S to the Propd. Ulundurpet 230 kV S/S
52 2006-07 To be taken up
38 LILO of one of the ckts of the sactioned 230 kV
Kayathar 230/33 kV S/S Sankneri DC line at the
prop. Udayathur 230 kV S/S
60 2006-07 To be taken up
39 Valathur- Paramkudi 2006-07 Profile submitted
40 LILO of 110 kV Erode-Sankaneri line at BKB-1 3.6 Commissioned during Feb- 06
41 LILO of 230 kV Kayathar 230/33 kV Alagarkoil
(North Madhrai)- karakkudi 230 kV at the propd. 230
kV Valathur S/S
210 2006-07 Profile approved.
14. ¤ü×�ÖÖ �Öê¡Ö ´Öë 400 ‹¾ÖÓ 220/230 ×�ú ¾ÖÖê −ÖµÖê ˆ¯Ö �ëú¦üÖë �êú ×−Ö´ÖÖÔÖ �úÖµÖÔ �úß ¯ÖÏ Ö×ŸÖ �úß ÃÖ´Öß�ÖÖ
Sl.
No.
Name Voltage Ratio
(KV)
Capacity
(MVA)
Date of
Investment
Decision
Target date
for
completion
Remarks
ANDHRA PRADESH
400 KV
1 Gajwel 400/220 2x315 Dec-07
2 Ditchipally 400/220 2x315 Mar-07 Works are programmed to start.
3 Chittoor 400/220 1x315 2005-06 Works in progress
4 Nellore 400/220 2x315 2005-06 1st ICT Commissioned on
18.12.2005
5 Narasaraopeta 400/220 2x315 Dec-07 Investment approval from APERC
is awaited.
6 Yeddumailaram 400/220 2x315 Mar-08 Scheme is under formulation.
7 Malkaram 400/220 2x315 Dec-08 Scheme is under formulation.
220 KV
1 Bhimavaram 220/132 2x100 Mar-06 Contract is awarded for balance
works.
2 Gudivada 220/132 2x100 Test charged on 22.10.2004 and
taken into service on 20.03.2005
and put into commercial operation
on 30.03.2005
3 Vemagiri 220/132 - 2005-06 Commissioned with 4 bays on
06.12.2002. Balance 4 bays also
completed
4 Bhongir 220/132 2x100 1st T/F commissioned on
30.03.2000. 2nd T/F to be
erected.
5 220kV features at existing
132/33 kV S/S Shamshabad
220/132/33 1x100 2005-06 Charged on 21-7-05. Control room
works under progress
6 Tekkali 220/132 1x100 Mar-06 Works under progress
7 Kamavarapukota 220/132 2x100 Feb-06 Works are in progress.
REVIEW OF PROGRESS OF WORKS ON NEW 400 KV & 230/220 KV SUBSTATIONS UNDER
STATE SECTOR IN SR
KARNATAKA
400 KV
1 Guttur (Davangere) 400/220 1x315 (Addl) - Mar-06 Commissioned on 31.03.2006
3 Talaguppa (3rd Transformer) 400/220 1x315 Aug-05 Work under progress
220 KV
Bangalore Zone
1 Nagarbhavi with link lines 220/66 2x100 Jan. 2002 Aug-06 Fresh tenders to be invited
2 Devanahalli International
Airport (Begur)
220/66 2X100 - Jun-06 Worh under progress
3 Naganathapura 220/66 2X100 - 39142 TAC approved. DPR approved
4 Hoskote (Pillaguppa) with link
lines
220/66 2x100 - Mar-07 TAC approved. DPR approved
5 Tallak 220/66 2x100 - Jun-06 Tender under evaluation
6 HAL 220/66 2x100 - Aug-06 Work under progresss
7 SDSTA & RICD (Nimhans) 220/66 2x150 - Jun-06 LOI issued
8 'A' Station compound 220/66 2x150 - Jun-06 Work under progress
9 Nittur: East 2x100 MVA
220/110/11 kV station at Nittur
220/110/11 2x110 Mar-06 Work nearing completion.
11 Vrishabhavathi valley 220/66 2x100 Feb-07 DPR approved
12 Yelahaka(Arakavathi L/o) 220/66 2X100 Feb-07 DPR under preparation
13 Replacement 2x100 MVA by
2x150 MVA Tr. 220/66 kV at
NRS
220/66 2x100 Feb-06 Work awarded
14 2x100 MVA by 2x100MVA
STN with astd lines at HBR
Layout
2x100 Mar-08 TAC approved
15 2x100MVA 220KV s/s at
Dobaspet
2x100 Mar-08 DPR approved
16 2x100 MVA 220/66 KVs/s at
Hoskete
2x100 Feb-08 Land acquired and fenced.
17 Kanakapura S/S with 220 KV
LILO line associated with 66
kV line
220/66 1x100 Feb-07 LOI issued
18 Bidadi(Addl) Trs. 220/66 1x100 Feb-07 DPR under preparation
19 East division compound 220/66 2x150 Mar-07 Tender floated
20 Establishing S/S GIS with
220kV DC/UGC line from HAL
220/66 Mar-07 Work under progress
21 HSR Layout 220/66 2x150 March, 07 Works under progress
Replacing of 2x100 MVA by
2x150 MVA Transformer
22 Subramanyapura replacing of
2x100 MVA by 2x150 MVA
Transformer
2x150 March, 07 Works awarded
Hassan Zone
1 Addl 3d Tr 315
MVA,220/400kv Tr at 400kv
S/S at Talaguppa
1x315 2005-06 Work awarded to BHEL.Work
under progress
2 Shiralkoppa in Shimoga
District
220/110/11 2x100 - Jan-07 Work tendered
3 Kemar: 2nd transformer 220/110 1x100
(Addl)
- Jan-06 Work under progress.
4 C.R.Patna (Yachanahalli) 220/66 2x100 - Aug-06 Work under progress.
5 Bykampady 220/110 2X100 - Mar-07 TAC approved
6 Puttur (Netnamandur) 220/110 2x100 - 2005-06 Work completed. Ready for
commissioning
Mysore Zone
1 Kollegal (Madhuvanahalli) 220/66 2x100 - 2005-06 Commissioned on 16.03.2006
2 K.R.Pet 220/66 2X100 - Jun-07 Bids under evaluation.
3 Kushalanagar 220/66 2x100 - Jun-07 Bid to be placed before PC
4 Vajamangala 220/66 2x100 - Dec-07 DPR to be received. Land
acquired. Proposal to be placed
before TACBagalkot Zone
1 Kudachi 220/110 2x100 - Charged on 23.01.06.
Commissioned on 27.03.2006
2 Bidnal 220/110 1x100 Jun-06 Work under progress
3 Sirsi 220/110 1x50 Mar-06 Work under progress
4 Haveri(Addl.) 220/110 1x50 38777 Work under progress
5 Narendra 220 2005-06 Work under progress
6 Haveri 220 Dec-06 Work under progress
Gulbarga Zone
1 Shahapur 220/110 2x100 - 2005-06 Work under progress
2 Sindhanur 220/110 2x100 - Oct-06 Estimate submitted, DPR awaited.
3 Itagi: 2nd transformer (Addl) 220/66 1x100 - Mar-06 Work under progress
KERALA
220 KV
UPGRADATION
1 Punnapra 220/110 2x100 - Jun-06
2 Kundara (REC) 220/110 (2x100+
3x12.5)
- 2005-06 Work under progress
3 Kalamassery (Enhancement of
transformer capacities)
220/110 (2x100+
2x120) to
4x200
- 1st, 2nd & 3rd Transformers : already
commissioned.
4th Transformer : Work not started.
4 Edappon (REC) 220/110 2x100 - Jun-06 Work under progress
5 Shoranur 220/110 2x100 - Works completed
6 Thaliparamba 220/110 2x100 - 2005-06 Work under progress
7 Vadakara 220/110 2x100 - Mar-06
8 Kattakkada 220/110 2x100 - Jun-06
9 Nallalam(Existing) 220/110 (2x100+1x60
) to
(2x100+2x60
)
Works completed
10 Malaparamba 220/110 2x100 +
2x12.5
2005-06 Work under progress
11 Pothoncode (Bay extn.) 220/110 4 bays Work under progress
12 Muvattupuzha March 07 Decision reg the scheme is
finalisd
13 Ext. of Edamon substation March 07 Work not started
TAMIL NADU
400 KV
1 Alamathy 400/230 1x315+
1x200
- March '06 315 MVA ICT commissioned on
16-6-06
2 Melakkottaiyur 400/230 2x315
(6x105)
2006-07 To be taken up by M/s. PGCIL
230 KV
1 Pudanchandai 230/110 2x100 - March, 06 Commissioned on 28.04.2006
2 Palladam 230/110 2x100 2006-07 Site handed over
3 Tharamani (Addl.) 230/110 1x100 2006-07 Work to be taken up
4 Gummidipoondi (Addl.) 230/110 1x100 2006-07 Work to be taken up
5 Manali (Addl.) 230/110 1x100 Mar-06 Work to be taken up
6 Sankaneri (Addl.) 230/110 1x100 Mar-06 Work commenced
7 Thudiyalur (Addl.) 230/110 1x100 2006-07 Work to be taken up
8 Karambayam 230/110 2x100 2006-07 Site yet to be handed over
9 Sriperumbudur 230/110 1x100 March, 06 Commissioned on 30.03.2006
10 Siruseri 230/110 2x100 2006-07 Work under progress
11 Valathur 230/110 3x100 2006-07 Work under progress
12 Karamadai 230/110 2x100 2006-07 Site yet to be handed over
13 Renganathapuram 230/110 2x50 2006-07 Work under progress
14 Udayathur 230/33 2x50 2006-07 Work is being executed by the
developer
15 Basin Bridge(GMR Vasavi) 230/110 4x100 2006-07 Work awrded
16 Ulundurpet 230/110 2x100 2006-07 Work to be taken up
17 Chithode 230/110 1x100 2006-07 Work to be taken up
18 Ponnapuram 230/110 2x100 2006-07 Work to be taken up
15. ¤ü×�ÖÖ �Öê¡Ö ´Öë ¯ÖÖ¾Ö¸ü × ÖÏ›ü �úß �ëú¦üßµÖ ¯ÖÖ¸êüÂÖÖ µÖÖê•Ö−ÖÖ†Öë �êú ×−Ö´ÖÖÔÖ �úÖµÖÔ �úß ¯ÖÏ Ö×ŸÖ �úß ÃÖ´Öß�ÖÖREVIEW OF PROGRESS OF WORKS OF POWERGRID EXECUTED CENTRAL TRANSMISSION SCHEMES
Sl.
No.
Name of the Transmission Line Date of
investme-nt
decision by
Planning
Commiss-
ion
Length in
Circuit
Kms.
Stringi-ng
comple-
ted in
circuit
Kms.
Target date
of comple-
tion
Remarks in respect of target dates as per
OCC
AGENERATION EVACUATION SCHEME
1 Kaiga APP Stage-II Additional Transmission System
1.1 Narendra-Davanagere (D/C) Mar-05 316 Sep-07 Awarded on 30.11.2005
1.2 Nelamangala-Mysore (DC) Aug. 2003 266 266 Mar-06 Commercial operation w.e.f 1-5-
2006
1.3 Mysore-Kozhikode (D/C) Mar-05 421.63 Dec-07 Awarded in December 2005
1.4 LILO (1xD/C) of 400 KV Kolar-Sriperumbudur
line at Melakottaiyur
-Do- 80 Dec-07 Awarded in February 2006
1.5 New 400/220 KV, 2x315 MVA sub-stations at
Mysore
-Do- Mar-06 Substation along with ICT1
commissioned on 26-4-2006. ICT2
Commissioned on 30-4-2006
1.6 Ext. of Mysore substation Dec-07 Award placed in January 06. Engg.
in progress
1.7 New 400/220 KV, 2x315 MVA sub-stations at
Kozhikode
-Do- Dec-07 Award placed in January 06. Engg.
in progress
1.8 New 400/220 KV, 2x315 MVA sub-stations at
Melakottaiyur
-Do- Feb., 08 Award placed in January 06. Engg.
in progress
1.9 Second 400/220 KV, 315 MVA transformer at
Vijayawada
-Do- Feb-08
1.10 Second 400/220 KV, 315 MVA transformer at
Hiriyur
-Do- Dec-07 Award placed in Dec. 06. Engg. in
progress
1.11 Sub-station extension for line bays at
Narendra
-Do- Sep-07 Award placed in Dec. 06. Engg. in
progress
1.12 Sub-station extension for line bays at
Davanagere(KPTCL)
-Do- Sep-07 Award placed in January 06. Civil
work in progress
1.13 Sub-station extension for line bays at
Nelamangala(400 kV)
-Do- Mar-06 Line bays commissioned on 26-4-
2006.
1.14 Bay Extn. Of Mysore S/S(400 kV) Dec-07 Engineering work in progress
1.15 Bay Extn. Of Hiriyur S/S(400 kV) Feb-08 Tender activities at cc in process.
2 Neyveli TS-II Expansion (2x250 MW) Transmission System
2.1 Neyveli TS-II Expansion - Neyveli TS-II
(2xS/C)
Jan-05 6 Dec-07 Engineering survey under progress
2.2 Neyveli TS-II Expansion-Pugalur (D/C) -Do- 284 Dec-07 Award placed
2.3 Pugalur-Madurai (D/C) -Do- 246 Dec-07 Foundation work commenced from
June. 06
2.4 Udumalpet-Arasur (D/C) -Do- 156 Dec-07 Award placed.
2.5 LILO (1xD/C) of Neyveli-Sriperumbudur 400
KV S/C line at Pondicherry
-Do- 30 Dec-07 Award placed.
2.6 LILO (1xD/C) of Ramagundam-Khammam
400 KV S/C line at Warangal
-Do- 36 Dec-07 Award placed.
2.7 New 400/220 KV, 2x315 MVA sub-station at
Pugalur
-Do- Dec-07 Award placed in February 06. Engg.
in progress
2.8 New 400/220 KV, 2x315 MVA sub-station at
Arasur
-Do- Dec-07 Award placed in March 06. Engg. in
progress
2.9 New 400/220 KV, 2x315 MVA sub-station at
Pondicherry
-Do- Dec-07 Award placed in March 06. Engg. in
progress
2.10 New 400/220 KV, 2x315 MVA sub-station at
Warangal
-Do- Dec-07 Award placed in March 06. Engg. in
progress
2.11 Sub-station Extension for line bays at
Madurai
-Do- Dec-07 Award placed in February 06. Engg.
in progress
2.12 Sub-station Extension for line bays at Neyveli
TS-II
-Do- Oct-07
2.13 Sub-station Extension for line bays at
Udumalpet
-Do- Dec-07 Award placed in March 06. Engg. in
progress
3 Kudankulam APP (2000 MW) Transmission System
3.1 KAPP-Tirunelveli 400 KV Quad D/C line-1 25.05.2005 144 May-07 Completion matching with Ist unit of
Gen. project
3.2 KAPP-Tirunelveli 400 KV Quad D/C line-2 25.05.2005 168 Dec-07
3.3 LILO of both circuits of Madurai-
Thiruvananthapuram (D/C) at Tirunelveli
(2xD/C LILO lines)
25.05.2005 220 May-07 Award placed in December 2005.
3.4 Tirunelveli-Udumalpet (D/C) 25.05.2005 600 Dec-07 Foundation work under progress
3.5 Tirunelveli-Edamon (D/C) 25.05.2005 220 Nov-08 Survey under progress.
3.6 Edamon-Moovattupuzha(East Cochin) Quad
DC
25.05.2005 290 Nov-08 Award placed in March 2006
3.7 Moovattupuzha(East Cochin) - North Trichur,
Quad DC line
25.05.2005 180 Nov-08 Award expected by August 2007
3.8 New 400/220 KV, 2x315 MVA sub-station at
Tirunelveli
-Do- May-07 Award placed in Nov 05. Civil work
in progress
3.9 New 400/220 KV, 2x315 MVA sub-station at
Cochin (Muvattapuzha)
-Do- Nov-08 Award expected by July 2006
3.10 3rd 400/220 KV, 1x315 MVA transformer at
Thiruvananthapuram S/S
-Do- Nov-08 Award expected by July 2007
3.11 Ext. o f 400/220 kV North Trichur(PG)
subsation
Nov-08 Award expected by July 2008
3.12 Addl. 400/220 KV, 1x315 MVA transformer at
Udumalpet S/S
-Do- Nov-08 Award expected by July 2009
B REGIONAL SYSTEM STRENGTHENING SCHEME
1 SR Strengthening Scheme (III&IV)
1.1 Raichur-Gooty 400 kV (D/C) 320 Apr - 07 Award placed in June 2005
1.2 LILO of both circuits of 400 KV Nellore-
SPBudur D/C line at Alamathi Nellore-
Almathi-I&II, Almathi-Sriperambdur I&II
Commissioned on 24-5-006 and on
25.5.06
1.3 Nelamangala-Somanahalli (D/C) Oct'04 100 April 2007 Towers supply & erection contracts
awarded
1.4 2nd 315 MVA Transformer at 400/220 KV
sub-station of Cuddapah
June-07 Civil work in progress.
1.5 2nd 315 MVA Transformer at 400/220 KV
sub-station of Khammam
June-07
1.6 2nd 315 MVA Transformer at 400/220 KV
sub-station of Gooty
April 07 Civil work in progress.
1.7 Ext. 400 kV subsation at Raichur April 07 Civil work in progress.
1.8 Ext. of 400 kv substation at Nelamangala Apr-07 Civil work in progress.
1.9 2nd 315 MVA Transformer at 400/220 KV
sub-station of Vizag
June-07
1.10 1x167 MVA Transformer at 400/220 KV sub-
station of Munirabad
June-07
1.11 2nd 315 MVA Transformer at 400/220 KV
sub-station of Kolar
June-07 27 months from date of first LOA.
1.12 Extn. Of Somanahalli S/S Apr-07 Civil work in progress.
1.13 Provision of 80 MVAR Bus Reactor at Nellore
S/S
July-07 Civil work in progress.
1.14 Extn. Of Almathi S/S(400 kV) Feb-07 Commissioned in May-2006.
2 Regional System Strengthening Scheme V
2.1 LILO of one circuit of Madurai-Trichy (D/C) at
Karaikudi
31.05.2005 126 May-08 Packages under tedreing.
2.2 LILO of one circuit of Talaguppa-
Nelamangala (D/C) at Hassan
-Do- 100 Aug, 09 Packages under tedreing.
2.3 New 400/220 KV, 2x315 MVA sub-station at
Hassan
-Do- May-08 Tedreing activities under progress.
2.4 New 400/220 kV, 2x315 MVA S/S at
Karaikudi
May-08 Tedreing activities under progress.
2.5 Ext. of 400 kv substation at Gooty 1x315
MVA
Jun-07 Civil work in progress.
2.6 Ext. of 400 kv substation at Nellore 1x80
MVA
Jun-07 Civil work in progress.
2.7 Ext. of 400 kv substation at Munirabad 1x315
MVA
Jun-07 Engg. in progress
2.8 Ext. of 400 kv substation at Kolar 3x167MVA Jun-07 Engg. in progress
2.9 Ext. of 400 kv substation at Somanahalli Jun-07 Engg. in progress
2.10 Ext. of 400 kv substation at Gajuwaka 1x315
MVA
Jun-07 Award anticipated in July 2006.
2.11 Ext. of 400 kv substation at Khammam 1x315
MVA
Jun-07 Award anticipated in July 2006.
3 System Strengthening Scheme VI
3.1 Second 400/220 KV, 315 MVA transformer at
Vijayawada
Dec-07 Award placed in Dec. 05. Engg. in
progress
3.2 LILO of one ckt of Vijayawada-Gajuwaka 400
kV D/C line at Vemagiri
Dec-06 Survey under progress
4 System Strengthening Scheme VII
4.1 Karaikudi substation 2x315 MVA July- 09
4.2 Hassan substation 2x315 MVA July- 09
5 Upgradation of tranfer capacity of talcher-
Kolar HVDC Bipole
April 08 Award placed in April 06. Engg. in
progress
ANNEXURE - IA
Date
Maximum
Demand
(Unrestricted)
at 50 Hz
Maximum
Demand
(Restricted)
(Actuals)
Minimum
Demand
(Actuals)
Min/Max
(Restricted)
Min/Max
(Unrestricted)
Load
Factor
1 2 3 4=3/2 5=3/1 6
1-Jun-06 6280 6279 4907 0.78 0.78 94.59
2-Jun-06 6386 6299 4914 0.78 0.77 95.39
3-Jun-06 6599 6224 4648 0.75 0.70 94.36
4-Jun-06 6168 6035 4692 0.78 0.76 94.35
5-Jun-06 6334 6087 4860 0.80 0.77 96.09
6-Jun-06 6601 6252 5032 0.83 0.79 93.85
7-Jun-06 6876 6404 5187 0.81 0.75 94.80
8-Jun-06 6989 6882 5221 0.76 0.75 91.01
9-Jun-06 7285 7089 5287 0.75 0.73 88.53
10-Jun-06 6786 6596 5381 0.82 0.79 93.27
11-Jun-06 6844 6640 4991 0.75 0.73 91.14
12-Jun-06 7017 6554 5388 0.82 0.77 94.25
13-Jun-06 6893 6730 5639 0.84 0.82 93.86
14-Jun-06 6762 6539 5578 0.85 0.82 92.96
15-Jun-06 6941 6740 5632 0.84 0.81 91.93
16-Jun-06 6559 6399 5475 0.82 0.80 95.07
17-Jun-06 6886 6735 5252 0.78 0.76 90.48
18-Jun-06 6449 6258 4958 0.79 0.77 93.37
19-Jun-06 6589 6440 5318 0.83 0.81 93.57
20-Jun-06 6711 6544 5186 0.79 0.77 90.01
21-Jun-06 6488 6321 4815 0.76 0.74 91.99
22-Jun-06 6522 6400 4902 0.77 0.75 89.06
23-Jun-06 6446 6386 5025 0.79 0.78 88.83
24-Jun-06 6442 6342 5064 0.80 0.79 90.43
25-Jun-06 6179 6167 4865 0.79 0.79 93.07
26-Jun-06 6518 6469 4930 0.80 0.80 90.88
27-Jun-06 6804 6799 5191 0.76 0.76 89.67
28-Jun-06 6527 6492 4900 0.75 0.75 91.12
29-Jun-06 6378 6371 4876 0.77 0.76 90.58
30-Jun-06 6406 6409 4939 0.77 0.77 90.89
Minimum 4648 0.75 0.70 88.53
Maximum 7285 7089 0.85 0.82 96.09
Average 0.79 0.77 92.31
Demands are Ex-bus
†×¬Ö�úŸÖ´Ö ‹¾ÖÓ −µÖæ−ÖŸÖ´Ö ¤îü×−Ö�ú ´ÖÖÓ�Ö ´Öê ¾ÖÖ ´Öë DAILY MAXIMUM AND MINIMUM DEMANDS IN MEGA WATTS
†ÖÓ¬ÖÐ ¯ÖϤêü¿Ö ANDHRA PRADESH
ANNEXURE - I B
Date
Maximum
Demand
(Unrestricted)
at 50 Hz
Maximum
Demand
(Restricted)
(Actuals)
Minimum
Demand
(Actuals)
Min/Max
(Restricted)
Min/Max
(Unrestricted)
Load
Factor
1 2 3 4=3/2 5=3/1 6
1-Jun-06 3840 3838 2418 0.63 0.63 85.46
2-Jun-06 3608 3954 2467 0.63 0.69 84.82
3-Jun-06 4271 4180 2495 0.60 0.58 81.48
4-Jun-06 3422 3420 2188 0.64 0.64 92.92
5-Jun-06 4124 4046 2534 0.63 0.61 87.84
6-Jun-06 4525 4390 2701 0.62 0.60 84.83
7-Jun-06 4481 4388 2880 0.66 0.64 89.71
8-Jun-06 4521 4431 2856 0.64 0.63 91.00
9-Jun-06 4618 4505 3022 0.67 0.65 93.62
10-Jun-06 4609 4458 3118 0.70 0.68 94.00
11-Jun-06 4301 4236 2899 0.68 0.67 93.34
12-Jun-06 5031 4952 3060 0.68 0.67 87.57
13-Jun-06 4933 4832 3368 0.70 0.68 93.24
14-Jun-06 5043 4914 3429 0.70 0.68 91.82
15-Jun-06 4565 4423 3125 0.71 0.68 97.81
16-Jun-06 4925 3932 2792 0.71 0.57 96.25
17-Jun-06 4477 4336 2739 0.63 0.61 84.56
18-Jun-06 4131 4009 2715 0.68 0.66 86.31
19-Jun-06 3797 3694 2244 0.61 0.59 95.06
20-Jun-06 4352 4255 2167 0.51 0.50 76.90
21-Jun-06 4210 4129 2547 0.62 0.60 83.83
22-Jun-06 4405 4335 2275 0.61 0.60 80.75
23-Jun-06 3991 3956 2663 0.67 0.67 88.45
24-Jun-06 3875 3817 2174 0.57 0.56 82.66
25-Jun-06 3469 3437 1805 0.53 0.52 82.39
26-Jun-06 4149 4114 2044 0.50 0.49 79.01
27-Jun-06 4091 4055 2551 0.63 0.62 88.48
28-Jun-06 3849 3840 2605 0.68 0.68 94.62
29-Jun-06 4052 4048 2477 0.61 0.61 88.14
30-Jun-06 4096 4098 2429 0.59 0.59 86.54
Minimum 1805 0.50 0.49 76.90
Maximum 5043 4952 0.71 0.69 97.81
Average 0.71 0.62 88.11
�ú−ÖÖÔ™ü�ú KARNATAKA
†×¬Ö�úŸÖ´Ö ‹¾ÖÓ −µÖæ−ÖŸÖ´Ö ¤îü×−Ö�ú ´ÖÖÓ�Ö ´Öê ¾ÖÖ ´Öë DAILY MAXIMUM AND MINIMUM DEMANDS IN MEGA WATTS
ANNEXURE - IC
Date
Maximum
Demand
(Unrestricted)
at 50 Hz
Maximum
Demand
(Restricted)
(Actuals)
Minimum
Demand
(Actuals)
Min/Max
(Restricted)
Min/Max
(Unrestricted)
Load
Factor
1 2 3 4=3/2 5=3/1 6
1-Jun-06 2306 2248 895 0.40 0.39 61.68
2-Jun-06 2355 2297 1045 0.45 0.44 64.92
3-Jun-06 2399 2341 1173 0.50 0.49 65.63
4-Jun-06 2297 2240 1173 0.52 0.51 64.35
5-Jun-06 2410 2353 1211 0.51 0.50 65.15
6-Jun-06 2508 2451 1186 0.48 0.47 64.65
7-Jun-06 2541 2483 1244 0.50 0.49 65.45
8-Jun-06 2495 2438 1254 0.51 0.50 65.77
9-Jun-06 2420 2363 1280 0.55 0.54 66.04
10-Jun-06 2512 2455 1301 0.53 0.52 66.58
11-Jun-06 2405 2347 1225 0.52 0.51 65.23
12-Jun-06 2558 2500 1280 0.51 0.50 65.05
13-Jun-06 2458 2401 1241 0.52 0.50 64.92
14-Jun-06 2557 2500 1352 0.54 0.53 66.73
15-Jun-06 2509 2451 1395 0.57 0.56 68.94
16-Jun-06 2473 2416 1307 0.54 0.53 69.04
17-Jun-06 2479 2422 1245 0.51 0.50 67.56
18-Jun-06 2468 2411 1237 0.51 0.50 65.74
19-Jun-06 2594 2536 1326 0.50 0.49 66.37
20-Jun-06 2487 2429 1259 0.52 0.51 67.78
21-Jun-06 2497 2439 1322 0.54 0.53 66.87
22-Jun-06 2402 2345 1120 0.48 0.47 66.90
23-Jun-06 2350 2292 1057 0.46 0.45 62.87
24-Jun-06 2310 2253 1085 0.48 0.47 65.88
25-Jun-06 2276 2219 1018 0.46 0.45 62.42
26-Jun-06 2378 2320 1122 0.48 0.47 65.76
27-Jun-06 2484 2426 1212 0.50 0.49 66.75
28-Jun-06 2345 2288 1205 0.53 0.51 68.48
29-Jun-06 2336 2278 1096 0.46 0.45 65.29
30-Jun-06 2389 2332 1057 0.45 0.44 65.18
Minimum 895 0.40 0.39 61.68
Maximum 2594 2536 0.57 0.56 69.04
Average 0.50 0.49 65.80
�êú¸ü»Ö KERALA
†×¬Ö�úŸÖ´Ö ‹¾ÖÓ −µÖæ−ÖŸÖ´Ö ¤îü×−Ö�ú ´ÖÖÓ�Ö ´Öê ¾ÖÖ ´Öë DAILY MAXIMUM AND MINIMUM DEMANDS IN MEGA WATTS
ANNEXURE - ID
Date
Maximum
Demand
(Unrestricted)
at 50 Hz
Maximum
Demand
(Restricted)
(Actuals)
Minimum
Demand
(Actuals)
Min/Max
(Restricted)
Min/Max
(Unrestricted)
Load
Factor
1 2 3 4=3/2 5=3/1 6
1-Jun-06 7894 7903 5853 0.74 0.74 79.27
2-Jun-06 8090 8035 5955 0.74 0.74 81.29
3-Jun-06 8134 8031 6131 0.76 0.75 80.61
4-Jun-06 7345 7281 5890 0.81 0.80 79.98
5-Jun-06 7950 7869 5745 0.75 0.74 77.97
6-Jun-06 7960 7711 5865 0.76 0.74 84.18
7-Jun-06 8146 7936 6042 0.76 0.74 78.94
8-Jun-06 8261 8050 6216 0.77 0.75 77.32
9-Jun-06 8210 7957 6287 0.79 0.77 80.47
10-Jun-06 8300 8012 6469 0.81 0.78 84.46
11-Jun-06 7711 7506 6573 0.88 0.85 84.15
12-Jun-06 8548 8327 6233 0.75 0.73 79.32
13-Jun-06 8286 8072 6612 0.82 0.80 80.56
14-Jun-06 8107 7776 6345 0.82 0.78 81.09
15-Jun-06 8068 7906 5966 0.78 0.77 81.24
16-Jun-06 7981 7768 6186 0.80 0.78 82.30
17-Jun-06 7745 7566 5904 0.78 0.76 80.58
18-Jun-06 7362 7183 6245 0.87 0.85 90.20
19-Jun-06 8151 7938 5898 0.74 0.72 82.95
20-Jun-06 8015 7805 5798 0.74 0.72 77.84
21-Jun-06 7832 7642 6033 0.79 0.77 80.25
22-Jun-06 7557 7468 5782 0.77 0.77 82.35
23-Jun-06 7400 7304 5698 0.78 0.77 79.92
24-Jun-06 7858 7826 5569 0.71 0.71 75.60
25-Jun-06 7075 7058 5922 0.77 0.77 84.19
26-Jun-06 7797 7847 5442 0.69 0.70 79.66
27-Jun-06 7805 7820 6038 0.77 0.77 81.95
28-Jun-06 7987 7927 6238 0.79 0.78 78.93
29-Jun-06 7807 7853 5992 0.76 0.77 80.34
30-Jun-06 8091 8097 5966 0.74 0.74 78.33
Minimum 5442 0.69 0.70 75.60
Maximum 8548 8327 0.88 0.85 90.20
Average 0.77 0.76 80.87
†×¬Ö�úŸÖ´Ö ‹¾ÖÓ −µÖæ−ÖŸÖ´Ö ¤îü×−Ö�ú ´ÖÖÓ�Ö ´Öê ¾ÖÖ ´Öë DAILY MAXIMUM AND MINIMUM DEMANDS IN MEGA WATTS
ŸÖ×´Ö»Ö −ÖÖ›ãü TAMIL NADU
LOAD CURVE OF SOUTHERN REGION ON MAXIMUM DEMAND DAY
Maximum Demand: 22342 MW on 12.06.2006
16000
17000
18000
19000
20000
21000
22000
23000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURS
MW
LOAD CURVE OF SOUTHERN REGION ON MINIMUM DEMAND DAY
Minimum Demand: 14985 MW on 26.06.2006
13000
14000
15000
16000
17000
18000
19000
20000
21000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOURS
MW
ANNEXURE II C
HOURS MAXIMUM DEMAND DAY MINIMUM DEMAND DAY
12-Jun-06 26-Jun-06
1 17152 15539
2 16985 14985
3 17210 15013
4 17723 15494
5 18609 16218
6 19715 17664
7 20131 18253
8 20508 17979
9 20358 17960
10 20444 17820
11 20722 17246
12 21068 17612
13 20373 17769
14 21260 17573
15 20976 17748
16 21015 17576
17 20401 16788
18 20080 16177
19 20913 18482
20 22342 20359
21 21652 19956
22 20679 18885
23 19936 17347
24 18383 15771
MAXIMUM 22342 20359
MINIMUM 16985 14985
HOURLY VALUES IN MW FOR SOUTHERN REGION
ON MAXIMUM DEMAND DAY AND MINIMUM DEMAND DAY
INTRA REGIONAL ENERGY EXCHANGES IN MU USING ISTS
Jun-06
From
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
At Seller
Periphery
At Buyer
Periphery
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.151 1.117 0.000 0.000 0.000 0.000 1.151 1.117 0.000 0.000 22.774 21.832
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 181.887 174.861
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
1.151 1.117 0.000 0.000 0.000 0.000 0.000 0.000 1.151 1.117 0.000 0.000 0.000 0.000 204.661 196.693
Jun-06
WHEELED ENERGYTHROUGH SR ( Schedule Energy)
Jun-06
FROM
Seller
Periphery
Buyer
Periphery
Seller
Periphery
Buyer
Periphery
Seller
Periphery
Buyer
Periphery
Seller
Periphery
Buyer
Periphery
Seller
Periphery
Buyer
Periphery
Seller
Periphery
Buyer
Periphery
ER 0 0 0 0 10.813 10.277
NR 0 0 0 0 0 0
WR 0 0 0 0 0 0
ACTUAL INTER REGIONAL ENERGY EXCHANGES IN MU
Jun-06 Jun-06
ER WR
SR SR
ER end = At Gazuwaka East Bus and Talcher Interconnecting Bus
WR end = At Chandrapur East Bus
Cum. from April 2006 to
KARNATAKA
WR
WR END
NR WR
136.88 131.5590
Cum. from April 2006 to
TO
TO
FROM
ANDHRA PRADESH
Cum. from April 2006 to
TAMIL NADU
Jun-06
At Seller Periphery At Buyer Periphery
ER
ER END
Jun-06
TO
SR WR
Jun-06
WR END
TAMIL NADU
SR
TO
SR
FROM
Cum. from April 2006 to
TAMIL NADU
At Seller Periphery At Buyer Periphery
ER END
ER
TOTAL SOUTHERN REGION
27.083
KERALA
53.025 261.454
40.384
Annexure
-III
11.793
SR
WR
716.213
7.939
270.033
ER
KARNATAKA
KERALA
TAMIL NADU
Cum. from April 2006 to Jun-06
KERALA ANDHRA PRADESH KARNATAKA KERALA
ANDHRA PRADESH
NTPC
ER
Jun-06
Mutual(TN's share from
RGCCPP, Kym)0
NR
Annexure IV
A. †−ÖãÃÖæ×“ÖŸÖ ×«ü¯Ö1ÖßµÖ ×¾Ö×−Ö´ÖµÖ SCHEDULED BILATERAL EXCHANGES IN MUFrom
UtilityAt Seller
PeripheryAt Buyer Periphery
Kerala Tamil NaduMutual(TN's share
from RGCCPP, Kym)0.000 0.000
Kerala Tamil Nadu Mutual( from BSES ) 0.000 0.000
Kerala Tamil Nadu NVN 0.000 0.000
KAR AP NVVN 1.151 1.117
At Seller
Periphery
At Interegional
Periphery
AP PSEB RETL WR 0.905 0.867
AP CSEB RETL WR 8.131 7.794
AP GUVNL SKP WR 2.769 2.677
AP PSEB RETL ER 0.365 0.350
TOTAL AP 12.168 11.688
KAR PSEB LANCO WR 8.631 8.306
KAR PSEB NVVN WR 3.444 3.287
KAR MPSEB NVVN WR 14.414 13.951
KAR MSEDCL PTC WR 36.622 35.029
KAR MSEDCL JSW WR 2.385 2.270
KAR PSEB LANCO ER 13.106 12.645
KAR PSEB NVVN ER 13.775 13.308
KAR HPGCL NVVN ER 2.801 2.694
TOTAL KAR 95.177 91.489
KER PSEB NVN WR 139.578 134.167
KER HPGCL NVN WR 17.879 17.188
KER CSEB NVN WR 22.150 21.276
KER WBSEB PTC ER 2.013 1.931
TOTAL KER 181.620 174.562
TN PSEB AEL WR 14.547 14.006
TN MSEDCL AEL WR 3.300 3.180
TN MPSEB AEL WR 15.000 14.477
TOTAL TN 32.847 31.663
TOTAL SOUTHERN REGION 321.812 309.403
Inter Regional Exchanges(OA)
At Seller
PeripheryAt Buyer Periphery
KAR(Jindal) MSEDCL PTC Chikkodi-Kolhapur 31.509 30.228
IMPORT
NIL
B.¯Öæ 1Öê �êú ‹−Ö™ü߯ÖßÃÖß �ëú¦üÖë ÃÖê †−ÖãÃÖæ×“ÖŸÖ †ÓŸÖ¸ü 1Öê¡ÖßµÖ ×¾Ö×−Ö´ÖµÖ
BENEFICIERY
FSTPP KHSTPP TSTPP TOTAL
Tamil Nadu 42.629 16.314 25.790 84.733
Goa's share in RSTPS scheduled at Chandrapur South bus for wheeling to Goa is 4.861 MU
ENERGY SCHEDULED FROM NTPC STATIONS IN ER
SCHEDULED INTER REGIONAL EXCHANGES IN MU FROM NTPC STATIONS IN ER
To Beneficiary Trader Link
Energy in MU