NCC Infrastructure

NCC Wind PowerFinland

Content1. NCC services2. Contract model3. References in Finland4. Contacts

NCC Infrastructure

NCC Infrastructure

We provide wide range of services for wind parks• Assistance in permitting sites• Site surveys• Design• Civil engineering• Electrical engineering

NCC´s Wind Power Services

NCC Infrastructure

• Access roads, platforms and assembly areas ‒ Geotechnical investigations ‒ Design and construction

• Foundations‒ Geotechnical investigations and design ‒ Design and construction of foundations‒ Assembly of anchor cages, cable ducts etc.

• Electrical and data network‒ Design, acquisition and construction of substation, main

transformer, cables and accessories‒ Investigation, testing and energization of electrical system

• Assisting in building permitting processes

NCC’s scope as wind farm contractor

ReferencesWind Power Projects in Finland

NCC Infrastructure

NCC Infrastructure

• 6 wind turbines, Vestas• Customer Empower Oy• Construction time 6–11/2011• NCC’s scope‒ Construction of access roads and assembly areas ‒ Road design

Tuuliwatti, Simo Wind Farm

NCC Infrastructure

• 9 turbines, Nordex N117• Construction time 11/2012–6/2013• NCC’s scope‒ Foundation ground works design and construction ‒ Foundation design and construction‒ Substation, electrical and data network design and construction‒ Main contractor liability during the Nordex works

Taaleritehdas, Honkajoki Wind Farm

NCC Infrastructure

• 8 turbines, Nordex N117• Construction time 07/2013-07/2014• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Substation, electrical and data network design and construction‒ Main contractor liability during the Nordex works

Taaleritehdas, Nyby Wind Farm

NCC Infrastructure

• 19 turbines, Nordex N117• Construction time 2/2014–5/2015• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Electrical and data network design and construction‒ Main contractor liability during the Nordex works

Taaleritehdas,Myllykangas Wind Farm

NCC Infrastructure

• 9 turbines, Nordex N131• Construction time 1–10/2015• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Substation, electrical and data network design and construction‒ Main contractor liability during the Nordex works

Taaleritehdas, Kooninkallio Wind Farm

NCC Infrastructure

• 6 turbines, Vestas V126• Construction time 1–9/2015• NCC’s scope‒ Access roads, platforms and assembly areas

• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Substation, electrical and data network design and construction

Taaleritehdas, Kytölä Wind Farm

NCC Infrastructure

• 2 turbines Nordex N131 and 1 N117• Construction time 3–10/2015• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Electrical and data network design and construction‒ Main contractor liability during the Nordex works

Taaleritehdas, Myllykangas II Wind Farm

NCC Infrastructure

• 13 turbines, Nordex N131• Construction time 12/2015–9/2016• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Substation, electrical and data network design and construction

Taaleritehdas, KiPe Wind Farm (Step 1)

NCC Infrastructure

• 20 turbines, Nordex N131• Construction time 1/2016–8/2017• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Electrical and data network design and construction

Taaleritehdas, KiPe Wind Farm(Steps 2A and 2B)

NCC Infrastructure

• 9 turbines, Nordex N131• Construction time 12/2015–9/2016• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Substation, electrical and data network design and construction

Taaleritehdas, Kantti Wind Farm

NCC Infrastructure

• 9 turbines, Nordex N131• Construction time 12/2015–9/2016• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Substation, electrical and data network design and construction

Taaleritehdas, Limakko Wind Farm

NCC Infrastructure

• Joint project with NCC Infrastructure in Sweden• 179 turbines, GE Turbine• Construction time 2017–2019• NCC’s scope‒ Access roads, platforms and assembly areas

• Geotechnical investigations• Design and construction

‒ Foundations• Geotechnical investigations and design • Design and construction of foundations• Assembly of anchor cages, cable ducts etc.

‒ Electrical and data network design and construction

Markbygden Wind Farm Piteå, Sweden

Mikko NiinimaaGeneral Construction ManagerProject Manager, Wind Power ConstructionTel. +358 50 3100 454, mikko.niinimaa@ncc.fi

NCC Infrastructure

Contact

Tuomas MäkiläBusiness Manager, Electrical Power Engineering Project Manager, Wind Power ConstructionTel. +358 43 8501 424, tuomas.makila@ncc.fi