NAWDEX workshop 2016 final discussion 2 · 2016-04-11 · other profilers –UK, Iceland and...

Preview:

Citation preview

Welcome to the NAWDEX preparation workshop(1st Waves to Weather “Campaign Data ‐ Cross Cutting Activity”)

DLR Oberpfaffenhofen4 to 6 April 2016

Final discussion

• Sea Survival TrainingMo. 18. April, Mi. 20. April, Mi. 15. Juni (engl.)

Actions

• JM: produce plot for CIP showing ground obs sites (radiosondes, MST, Chilbolton, other profilers – UK, Iceland and Canada)

• JM: Discuss with Nina Petersen (Iceland Met Office) about involvement in daily general meeting (and/or forecast planning discussion) and decisions on additional ground‐based obs. Also, contribution to local forecasting for aircraft operation.

• JM: ask Nina about office possibilities and accommodation near Keflavik.• JM: Leeds/NCAS observations to South of Iceland – ask Geraint. • JM: Ask Met Office about possibilities for :

• NAT track forecasts• Forecasts of cloud top height• Radiosonde commitment• MODE‐S wind coverage

• JM: Contributions to CIP – EUFAR proposal flight plans plus circuits to deduce area‐average divergence and vorticity from obs.

• JM: Contact DAOS WG about additional satellite obs during NAWDEX experiment and scientific interest by them.

• JM: Update Polar PP on NAWDEX plans and possibility of relevant science for PPP.

• AS+steering group: Create matrix of science objectives and prioritisation (include the RS calibration work).

• AS: Check access  to satellite position data for underpasses in advance (with local time). Will be part of table to discuss with instrument scientists.

• AS: Contact Norway Met Service about NAWDEX (via Thomas Spengler) and also Andoya MST

• AS: Check on turbulence probe measurements from HALO and D‐Falcon.• AS: Contact Luca about EUMETSAT about additional products (such as cloud top 

temperatures) and rapid scan zone for NAWDEX.• AS: contact flight facility about

• Internet Situation• Offices  (check alternative option for an operation center outside airport)• Accommodation (participants may check on their own)

• AS: send a list of accommodation options (with prices)• AS: get in contact with NARVAL‐II  community: back transfer planning via Azores on 

31 August 2016 in case of an interesting weather system• AS: ask Martin Weissmann how to bring the sondes into the GTS• AS/JQ: update webpages with links to forecast products• AS: contact Steve Cavallo to ask for forecast products for TPVs

Actions

• AS: Update of the CIP• create a list for stopover options for both aircraft• add a description of working hour restrictions to the CIP• Description of the planning procedures• Create a table showing constraints of all instruments• Answer posed questions about aircraft operations within the CIP

• Martin Hagen: contact DWD for access to EUMETNET data.• MH: Plan Chilbolton overflight for transit flights. • OR: Plan Falcon overpass of Uist ST radar and possibly Aberystwyth too. GR: Check 

on met measurements (T, u, v, RH) from French Falcon and also turbulence probe.• JD:Make contact with SHOUT programme and make case added value to SHOUT 

of linking with NAWDEX. For example, in deciding dropsonde locations (e.g., within WCB affecting ridge over Atlantic).

• Mech: Look into temperature retrievals from HAMP radiometers and vertical resolution that can be achieved. Also, linking curtain observations with intermittent radiosondes with higher vertical resolution.

Actions

Actions• FP, SH

• Feedback about accommodation• Check for options  to locate operation centre outside the airport• Define alternate airports• Working hours• Weekend working hours

• ALL: • decide within your groups who can be in Iceland at what time• Get familiar with FC products

Thank you!

Special thanks go to Audine Laurian, Andrea Schäfer (both LMU) and Susanne Flierl (DLR)

Recommended