PROVIDING RENEWABLE ENERGY

AND FOOD IN PAPUA

MERAUKE PROJECT - MEDCOGROUP

FACTS ON INDONESIA RICE INDUSTRYRice Production and Import Historical Rice Price

Indonesia Food Imports

• Rice is main staple food in Indonesia• People of Indonesia eat rice frequently

(3 times per day on average).• Low income people spend 70% of their

income on rice

MEDCOGROUP FOOD ZONE AND ENERGYFOREST DEVELOPMENT

ADOPT A CIRCULAR ECONOMYBUSINESS MODEL

ENERGY FOREST

POWER PLANT FOOD ESTATE

Integrated Food and

Energy Business

LIVESTOCK

ORGANIC FERTILIZER

WOODPRODUCT

THE OBJECTIVES AND PROGRAMS

WHY MERAUKE - PAPUA ?

Power Plant 3

Food Estate

Buepe Industrial

Complex (Power

plant, Food and

Pellet industry)

Food Estate

Food Estate

Wapeko

Industrial

Complex (Power

plant and food

industry)

EnergyForest

Energy Forest

Energy Forest

New regulation of Indonesian Forest Ministry allowing HTI concession (Forest Plantation) to allocate20-30% of its land for food/rice

OUR CONCESSION OF APRROX. 275,000 HA

Putting the right plant, in the right place, for the right purpose!

Medco implemented Agroforestry practices to

optimize benefits from forest development

1. FOOD ZONE (RICE)

Paddy field ResultJOKOWIPICTURE

President Jokowi visited 425 ha pilot project of modern rice farming and announced Merauke as National Rice Estate to support the country’s food self-sufficiency program

Paddy field Result

MERAUKE RICE DEVELOPMENT AREA

CURRENT STAGE AND TARGET

ALREADY PLANTED/ DEVELOPED

TARGET

ENERGY FOREST3,000 HA 100,000 HA

FOOD ESTATE (RICE) 1,000 HA 50,000 HA

BIOMASS POWER PLANT7 MW 50 MW

WOOD INDUSTRY

WOOD PRODUCTS(500,000 TON/YR)

WOOD PRODUCTS(700,000 TON/YR)

FACTS ON ELECTRICITY IN PAPUA REGION

45.93%Electricity Ratio Papua Province

65.6%Electricity Ratio West Papua Province

ELECTRICITY FACTS IN PAPUA & MERAUKE

Papua’s electricity reserve margin is 9%,

lower than PLN’ standards of 25% - 30%

About 2 million Papua people are yet to

receive electricity supply

Merauke ‘s electricity demand grows

2.75% per year

Merauke electricity ratio is 43.04%.

Lower than 100% target

Merauke &

Wapeko are

the right

locations

9,000 Ha modern rice farm in Wapeko

require additional electricity supply

Power plants in Merauke dominated by fuel

2. ENERGY FOREST & WOOD PRODUCTS INDUSTRY

We have constructed a woodchip mill with capacity of 600,000 ton/year.

Our target is to build wood pellet mill with capacity of 500,000 ton/year combined with Torre faction system.

Nursery produces 120,000 seeds/month 3,000 Ha planted 200 KM main and secondary road

3. BIOMASS POWER PLANT

Debarker Machine

We have constructed 7 MW biomass power plant in our site and currently is constructing our second plant (3.5 MW) in Wapeko. Next plant will be 10 MW in Merauke

7 MW power plant

Most of cities in Papua are still powered by diesel Power Plant with cost of more than USD 0.25 / KWh. Our Biomass power plant could cost as low as USD 0.17/KWh.

Therefore, there are opportunities to build similar power plants in other cities in Papua.

BIOMASS UTILIZATION FOR POWER PLANT

Powerpack is the Solution

Roadmap to 50 MW Target

Thank You