MAEDA – CHINA STATE JOINT VENTURE
GROUNDWATER DRAWDOWN CONTINGENCY
PLAN
Ref Nº : 823A-MCJV-EPL-ALL-01003 rev. E
Page Nº : 1 of 9 Date : 11 May 12
XRL Contract 823A – Tai Kong Po to Tse Uk Tsuen Tunnels
Contents
1.0 Introduction 2.0 Description of Works 3.0 Programme of Monitoring 4.0 Alert, Action and Alarm Level (AAA) and Emergency
Response
Appendix 1 Organization Chart for Implementation of Groundwater Drawdown Contingency Plan Appendix 2 Groundwater Monitoring Locations
MAEDA – CHINA STATE JOINT VENTURE
GROUNDWATER DRAWDOWN CONTINGENCY
PLAN
Ref Nº : 823A-MCJV-EPL-ALL-01003 rev. E
Page Nº : 2 of 9 Date : 11 May 12
XRL Contract 823A – Tai Kong Po to Tse Uk Tsuen Tunnels
Amendments Since Last Issue
Text Affected
Remarks
Section 2.0 – 4.0 Revised according to EPD’s comments
Recommended