View
0
Download
0
Category
Preview:
Citation preview
Digital Directorate
Life Cycle Industry Days03-05 August 2021
Digital DirectoratePresentation
Steven D. Wert, SESAFLCMC/HB
66ABG/PA Clearance Number: 66 ABG-2021-0031DISTRIBUTION A: Approved for public release: Distribution Unlimited
Mission: Expedite delivery, and effectively support, warfighting battle management systems in partnership with users and industry*
Vision: Our people make the Digital Directorate the most proactive and effective DoD life cycle management organization
2021 Priorities• Taking care of our people and
executing our mission• Defense assisted acquisition• Speed, innovation, and technology
Aerospace MgmtSystems
Detachment 12(Kessel Run)
COCOM Comm& Control
Theater Battle Control
C2ISR
Airspace Mission Plan Sys
International Airborne BMC2
Foreign MilitarySales
Strategic Warn & Surv Systems
AWACS
Force Protection
Aerospace Dominance Enabler
Qatar IAMD
RDT&E: $1.2B
PROC: $2.8B
O&M: $1.6B
FMS: $5.6B
$11B Total AY & FMS
ACAT I
ACAT II ACAT IIIFMS804 PrgmsSWAP PrgmsAML EXEMPTSUSTAINMENT
2
156
17317
23461
(2 ACAT 1C)
RDT& E:11%
PROC:25%
O&M:14%
FMS:50%
*… and promote modern software development across the Air Force
MIL: 458
CIV: 1876
CTR: 1464
OTHER: 282
3935 Total Manpower
DIGITAL DIRECTORATEScope and Mission Areas
22
MIL11%
CIV46%
CTR36%
OTHER7%
3
DIGITAL DIRECTORATEGeographically Diverse
DPA Support of DHHS
4
HBD: Tecan Robotic Pipette TipsHBQ: Teel Plastics Swabsticks
HBS: COPAN Nasal SwabsHBN: Puritan MedicalFlock Tip Swabs
HBS: Vapotherm HFNasal Cannula
HBG: Siemens HealthineersAntigen Tests
HBS: OraSureRapid AntigenSelf-Test
Speed, Innovation, & Technology
• We have a mindset for non-traditional strategies—competition wherever possible, small businesses & start-ups, and breaking down large contracts
• Tracking expected acquisition/contracting savings in 2021
• Continue to leverage partnerships to imagine what our systems could be rather than waiting for requirements
• Advance digital engineering/acquisition—modern software development, cloud, open architectures, M&S, and GFE development environments—to be considered for all program ASPs
5
6
Building on Prior Priorities
• Plan & execute well—critical events—accountability
• Own the tech baseline—competition—small business
• Open architecture—OMS/UCI—Govt reference architecture
• Agile DevOps—DIU and DDS partnerships
• Non-traditional approaches, Mid-Tier Acq
• AF Pitch Days—start-ups and VCs
• Speed, innovation, and technology
• Digital engineering/acquisition20
10
2021
• Sustain and modernize the Joint Environmental Toolkit (JET) applications within the AFW-VPC environment via a DevSecOps pipeline• Mission Management (flight briefings) • IWWC (weather warnings & dissemination)• Sensor data ingest & processing (interface
to SCAs) • Automated Observations (METAR/SPECI)
Business Opportunity
Contract Information
HBA Potential OpportunityWeather Application Rapid Production (WARPspeed)
7
ScheduleAnticipated Contract Strategy:
• ~$10M• Single contract award• GSA Schedule 70
Anticipated Contract Type: • FFP/T&M
POC: Mr. Jeff Zhu, (781) 225-5046
• Draft RFP Date: Nov 21• Period of Performance: Jun 22 – Jun 26
Business Opportunity
Schedule Contract Information
HBA Potential OpportunityFixed Based Weather Systems (FBWS)
8
• Provide life-cycle sustainment for 400 Fixed based weather systems across 225 USAF and Army bases
• Low Level Wind-Shear capability that provides point, area or both, wind profile surface to a minimum 10K ft
• Forward Scatter sensor for lithometeor (dust, smoke, pollution) detection and reporting
• Remote Maintenance Capability for depot level activities on sensors worldwide
Anticipated Contract Strategy: • ~$63M• IDIQ CLS contract
Anticipated Contract Type: • FFP
POC: Mr. Jeff Green, (781) 225-5478
• Draft RFP: Jun 22• RFP Release: Aug 22• Contract Award: May 23• Performance Period: May 23– May 28
HBC Potential OpportunityNational Target Base Desired Ground Zero Integrated Development System 4 (NIDS 4), Command and Control Software Engineering Services IV (C2SESIV), and Mission Planning Analysis Common Services 2 (MPACS 2)
Business Opportunity
ScheduleNIDS 4• FOPR Release: Aug 21• Contract Award: Mar 22• Period of Performance: Apr 22 - Jul 27C2SESIV• FOPR Release: May 23• Contract Award: Nov 23• Period of Performance: Feb 24 – Apr 29MPACS 2 • FOPR Release: Nov 21• Contract Award: Jul 22• Period of Performance: Aug 22 - Oct 27
• Software development for software applications
• On-site support for software applications
• Focus on Agile and DevOps• Scope includes potential future
growth
Contract InformationAnticipated Contract Strategy:
• Commercial Agile S/W Dev Services• Software Development
• ~ $40M-$53M contract value• Alliant II GWAC
Anticipated Contract Types: • Multiple – Predominately T&M
POC: Ms. Rebecca Burke, (402) 912-7525 and Mr. Scott W. Snyder (402) 912-7825
9 9
AFLCMC/Det 12 Potential OpportunityFalconer (Formerly Long-Term Modification & Sustainment Next Gen)
10
Business Opportunity
Schedule• RFP Release: Sep 21• Contract Award: May 22• Period of Performance: Jun 22 – Jun 27
• Air Operations Center (AOC) Weapon System (WS) is a system of systems program of record that incorporates numerous 3rd party s/w apps and COTS products
• Sustain established AOC WS 10.1 baseline while supporting migration and/or integration of legacy AOC WS 10.1 and third party applications to the cloud.
Contract InformationAnticipated Contract Strategy:
• ~ $200M - $400M contract value• FAR Part 16.5
Anticipated Contract Types: • T&M
POC: Mr. Todd Meyers, (781) 225-9393
10
HBG Business OpportunityAF DCGS Requirements Support Services (ADReSS)
11
Small Business Opportunity
Tentative Schedule• SSS Release – 28 Feb 21• Industry Week – 3-7 May• Pre-RFP Industry Day #2 – Nov 21• Draft RFP Release – Dec 21• RFP Release - Jan 22• Source Selection Evaluation – Jun 22• Award – Oct 22
• 10 Year, Multi-Award IDIQ for the development, test, integration, and fielding of new AF DCGS capabilities and execution of investment requirements
• Aligned to AF DCGS Way Forward with Open Architecture, SAFe Agile Development, Cloud Development, Cybersecurity, Data Analytics, and virtualization
• Opportunities to participate in studies and evaluation of potential future capabilities, innovative research, and whitepaper solutions
• NAICS Codes:• 541715 – Research and Development in the Physical Engineering, and
Life Sciences (except Nanotechnology and Biotechnology)• 541330 – Engineering Services
Contract Information• Pop: 10 Year (Nov 22-Nov 32)• Competitive Multi-Award IDIQ
• 4 ‘Contractor Pools’• Full and Open Competition• Small Business Set-Aside• Studies and Quick Reactions• Innovation and Whitepapers
• CLIN Structure: FFP, CPFF, CPIF, FPIF, Cost Reimbursable, T&M
POC: 1st Lt David Noland, (478) 222-8057
ADReSS
Software Developmen
tHardware
Development
Testing and Evaluation
Cybersecurity
Integration and Fielding
Cybersecurity
Studies and Quick
Reactions
SME Capability Support
Non-COTS Hardware
and Software
Procurement
COTS Hardware
and Software
Procurement
HBG Potential OpportunityEnterprise Support Provider (ESP)
12
Business Opportunity
Schedule• Draft RFP Release: Apr 22• RFP Release: Jun 22• Contract Award: May 23• Period of Performance: May 23 – May 28
AF DCGS anticipates awarding a contract to provide both long-term Open Architecture (OA) and Legacy Information Technology (IT)-based system sustainment and short-term rapid response capabilities. ESP services include:• Infrastructure, Storage, and Enterprise Services• Security/Cyber Services• Enterprise Service Desk Services • Enterprise Service Level Management• HW/SW Testing, Release and Fielding• Distributed End User Computing Services
Contract InformationAnticipated Contract Strategy:
• ~ $285M contract value• Full & Open Competition
Anticipated Contract Types: • Multiple award Indefinite Delivery,
Indefinite Quantity (IDIQ) contract• FFP, CPIF, CPFF, T&M
POC: Mr. Tim Carson, (478) 222-8521
HBQ Potential OpportunityShared Early Warning System (SEWS 3)
13
Business Opportunity
Schedule• Draft FOPR Release: Jul 21• FOPR Release: Sep 21• Contract Award: Jun 22• Period of Performance: Aug 22 – Jan 29
• Operations, maintenance, sustainment support for SEWS architecture and US & FMS customers
• Integration of GOTS/COTS system of systems• Maintenance & Modernization • Training & Sustainment at remote user sites• Collaboration w/future R&D contracts
Contract InformationAnticipated Contract Strategy:
• ~ $100M contract value• GSA OASIS ID/IQ• Fair Opportunity - FAR 16.5
Anticipated Contract Types: • CPIF, CPFF, CR
POC: Mr. Gary Monson, (719) 556-2249
HBZ Potential OpportunityMission Planning Sustainment Contract IV
14
Business Opportunity
Schedule• RFP Release: Aug 21• Contract Award: Aug 22• Period of Performance: Aug 22– Aug 32
• Sustainment services across the world in support of multiple commands
• On-site support for mission planning hardware and software
• Scope includes software development, technical documentation, configuration management, software security, operational cloud support
• Focus on agile support
Contract InformationAnticipated Contract Strategy:
• ~ $500M contract value• Single Award IDIQ
Anticipated Contract Types: • FFP, CR
POC: Ms. Christi McElheny, (801) 777-2805
Recent/Potential New Programs
• ACC E-7—FY23 POM initiative; potential start funding in FY22• Air Base Air Defense (ABAD)—significant program for OCONUS base defense• Spectrum Efficient Natl Surveillance Radars (SENSR)—potential DoD lead• Counter-Rocket, Artillery, and Mortar (C-RAM) UON—prototype underway• MAF C2, 618th Air Ops Center—will come with manpower and software factory• Tactical Mobile Over the Horizon Radar (TACMOR)—nation of Palau• P&A for E-7X Korea—FMS manpower• Kuwait Long Range Radar and Air Operations Center—FMS manpower• AUS Wedgetail Phase 6—FMS manpower• India I-Star—significant program, FMS manpower, draft LOR for LOA in work• N/NC Pathfinder (ABMS applications)—possible ABMS manpower, BCS-F team• Northern Approaches Surveillance (NAS) AoA—outcome unknown• N/NC Over the Horizon Radar (OTHR)—site survey $ in FY21-22• Electronic Flight Bag (EFB)—accept conditional on corporate AF funding• Decision Support System w/ WHMO (DSS)—absorbed by HBC• TALON ARCHER—sustainment assigned to HBZ• EOD Intelligence Mgmt System (EODIMS)—accepted to HBG/SWEG• Disaster Response Force COP (DRF COP)—rqmts & $ to C2IMERA• Transition of NINJA to PoR—still working transition plan• BDOC of the Future—restructure of IBDSS, funding is the primary issue• UON for additional SPADOC Emulation Analysis and Risk Reduction
(SPEARR)• Bahrain F-16 weapons storage security• Pandemic Case Management Suite (PCMS)• Magellan• Puckboard
Recently AssignedForeign Military SalesIn Process or Conditional Acceptance
15
Challenges
• Delegation of authority, new acquisition authorities, and AF wide innovation efforts have made it easier to start and prototype promising new capabilities—we won’t be able to scale and sustain them all
• Developing Cloud-based new capability while sustaining and modernizing legacy creates funding challenges and requires decisions to assume risk
• Emerging software acquisition pathways being applied to portfolios of programs requiring capability need statements across functions
• Digital acquisition will be as game-changing as agile DevSecOps has been, but a bigger challenge that requires cultural change and upskilling our workforce
16
Recommended