KALINDEE RAIL NIRMAN (ENGINEERS) LTDA Leading Engineering & Construction Company
for Railway Infrastructure : Track, Civil, Signaling
and Telecommunication
About KALINDEEAbout KALINDEE
Executing Railway Construction Projects since 1976. The only Company which has done more than 1000 Kms of B.G. Tracks
and modern Signalling at more than 800 Stations on Indian Railways. Corporate Enterprise since 1984 Sound Financial standing Vast Experience:- Railway Signalling, Telecom, Track, Bridges, Civil
Works & Metro Rail Projects Turnkey Construction Capabilities Successfully completed many Challenging Projects. ISO 9001:2000 Certified Company Operations covering all parts of India Equity widely held by Indian Public.
1
Board of Directors
Mr. R. D. Sharma
Chairman and Managing Director
Mr. Arvind Gemini
Whole-Time Director
Mr. Neeraj Kumar Singh Mr. S. K. Khanna
Director Director
Mr. Shanti Narayan Mr. S. P. Mehta
Director Director
Bankers
State Bank of India State Bank of Patiala Yes Bank Ltd., Overseas Branch, Commercial Branch 48, Nyay Marg,Jawahar Vyapar Bhawan, Chanderlok Building Chanakyapuri1, Tolstoy Marg, 36, Janpath New Delhi - 110021New Delhi – 110001 New Delhi – 110001
Axis Bank ABN AMRO Bank Ltd. HDFC Bank Ltd.2nd Floor,Statesman House “Hansalaya Building” M-39,2nd Floor,Barakhamba Road, 15,Barakhamba Road Outer CircleNew Delhi-110001 New Delhi-110001 Connaught Circus,
Opp. Super Bazar,
New Delhi-110001
Trade Mark3
Sector Focus Sector Focus
Railways Railways Track, Signaling and Telecommunication, Fixed Installations for Electric Traction, Civil WorksTrack, Signaling and Telecommunication, Fixed Installations for Electric Traction, Civil Works
Construction of infrastructure facilities for Surface Transport
and Telecommunication Systems
Metro Rail Systems Metro Rail Systems
Track, Signaling, Telecommunication, Access Control Systems and Automatic Fare Collection Track, Signaling, Telecommunication, Access Control Systems and Automatic Fare Collection
Corporate Corporate Rail Sidings, Installation and up gradation of Rail Yard, Civil Works. Rail Sidings, Installation and up gradation of Rail Yard, Civil Works.
PORT PORT Rail Track, Sidings, Yards, Signaling & Telecommunications, Civil WorksRail Track, Sidings, Yards, Signaling & Telecommunications, Civil Works
4
Shareholding Pattern:Shareholding Pattern:31st March 200931st March 2009
Promoter 17.21
Mutual Funds 9.10
Banks, FI and Insurance Companies
0.07
Body Corporate 23.13
FII’s 14.65
Indian Public 35.60
NRI/OCB’s 0.23
In percentage
5
Financial HighlightsFinancial Highlights
Year
04-05 05-06 06-07 07-08 08-09
TURNOVER 540.836
901.324 1881.201 2460.344 2812.236
OTHER INCOME 2.958 --- --- --- 2.740
MATERIAL COST & OTHER EXP.
492.958 820.903 1689.968 2228.216 2630.96
PROFIT BEFORE INTEREST, DEPRECIATION & TAX
50.836 80.421 191.233 252.051 174.404
DEPRECIATION 4.951 5.417 6.153 8.793 13.947
TAXATION 10.099 24.364 51.605 69.450 56.065
NET PROFIT AFTER TAX
19.715 36.092 94.415 142.160 104.392
PAID UP CAPITAL 49.458 49.458 105.204 107.274 112.248
NET WORTH 144.636 176.468 695.616 858.068 1029.552
EARNING PER SHARE (INR)
3.981 7.297 15..310 (basic) 14.930 (diluted)
13.59 (basic) 11.56 (diluted)
9.50
MILLION
INR
6
TurnoverTurnover
7
TURNOVER (YEAR 2003-2008)
0
500
1000
1500
2000
2500
3000
2003 2004 2005 2006 2007 2008
YEAR
TU
RN
OV
ER
(M
ILL
ION
/IN
R)
Net Profit (After Tax)Net Profit (After Tax)
8
NET PROFIT AFTER TAX (YEAR 2003-2008)
0
50
100
150
2003 2004 2005 2006 2007 2008
YEAR
NE
T P
RO
FIT
AFT
ER
TA
X
(MIL
LIO
N /
INR
)
Financial PerformanceFinancial Performance (in Million INR)(in Million INR)
9
FINANCIAL
0
500
1000
1500
2000
2500
2003 2004 2005 2006 2007 2008
Year
Rs
(Mill
ion
)
Total Asset
Total Liabilities
Net Worth
Current Assets
Current Liabilities
Special FeaturesSpecial Features
Vast and diversified Experience
Experienced Man Power
Simultaneous Execution Of Several Projects spread at Different Locations
Quality & “On-time” Construction
Excellent Reputation with clients and others
Well Known For Co-operation
Amenable Attitude: No Litigation or Arbitration
10
Our CMD Mr. R. D. SharmaOur CMD Mr. R. D. Sharma
A modest beginning as an employee of Western Railway.
Founded the Company in 1984 and piloted the same to newer heights.
Pioneer in railway Construction by private agency for turnkey contracts.
A well known personality in the Construction Industry and on the Indian Railways.
Highly decorated with honours and awards .
Recipient of prestigious “Bharat Ratna Visvesvaraya Award” in 1987 by the President of India.
Recipient of Gulzari Lal Nanda foundation’s “NAITIK-SAMMAN” by Governor of Rajasthan on 5th August 2006.
11
RecognitionRecognition
Sincere efforts and performance of KALINDEE has won all round appreciation and recognition which include:
Letters of Appreciation by Client Organizations
Articles of Commendation by the Press
Special requests by Client Organizations to Kalindee to under take works under Challenging Situations, where other companies had failed. .
12
Main Line of BusinessMain Line of Business
Design, Supply, Installation & Commissioning on Turn-Key basis of :
Metro Rail Track Work Railway New Line & Gauge Conversion Railway Yards and Sidings Civil Works: Earthwork, Buildings,
Bridges, Roads etc. Railway Safety and Signaling Systems. Fixed Traction Installations for Electric
Traction Metro’s Rail Access Control and Fare
Collection Systems Telecom Networks based on Optical
Fiber & Copper cable Wireless Networks Microwave Towers
13
Capability for Turn-Key ConstructionCapability for Turn-Key Construction
Design, Installation, Testing and Commissioning of :- Railway Yards and Lines including Track & Turn-Outs Associated Civil Works Alterations to existing Track, Signaling and Telecom Installations Railway Signaling Installations Telecommunication Installations Railway Electrification
Materials and Equipment Procurement & Supply Clearance from Ports
Logistical Support Manpower, Transport, Storage and Security
Liaison & Co-ordination at all Levels of executions and management. Maintenance and Warranty Support Simultaneous Management of Projects at Different Locations. Association with International Companies for ‘State of Art Technologies’ International practices for Project Management, Quality Control, Industrial
Safety, Environmental Protection, Designs, Drawings and Documentation
14
Management StrengthsManagement Strengths
Kalindee has acquired management capabilities to execute
Projects on Turnkey basis, Several Projects involving different technologies simultaneously
(Ballasted and Ballast-less Track, Railway yards, Automatic Fare Collection, GSM Radio network, Optical Fibre Communication, Signaling, Industrial Sidings, etc)
Several projects at different locations Projects on time or even ahead of schedule.
Kalindee can be proud of :
Adequate financial strength to undertake more projects, rapidly rising Turnover- INR 1881 M (2006/ 07) expected to rise to 11000 M by 2010
Skilled and Trained Manpower Capability to augment its infrastructure to meet requirements of projects
in hand
15
RESOURCESRESOURCES
Man Power Management Staff 20 Engineers 30 Supervisors 60 Technicians 350
Construction Machines And Tools Signaling, Telecommunication, Civil
Works Technical skills
EI, PI, RRI, CLS, AFTC, OFC, AFC, WAN & LAN, GSM
Management skills Project, Finance, Manpower, Material Organizational capacity Several Projects simultaneously Sound Financial Position Turn Over 1881 M INR (2006-07 ) Reliable & Experienced Sub-
Contractors Railway Approved Quality Material
Suppliers Reliable & Experienced Material
Transporters Good Rapport with Railways
16
Industry Overview:Industry Overview:Indian Railways - OpportunitiesIndian Railways - Opportunities
Indian Railways is one of the largest rail networks of the world with more than 63,300 route kms network.
It constitutes the lifeline and mainstay of country’s transport infrastructure carrying about 40% of freight traffic and 20% of passenger traffic accounting for 2.3% of country’s GDP directly and several times larger with forward and backward linkages.
Over the last few years, Indian Railways has managed to achieve a dramatic reinvention of its business and is presently witnessing one of the most impressive and unprecedented expansion in its history. The freight and passenger traffic on Indian Railways has been growing at average rate of 9.2% and 7% respectively during last three years and is projected even faster in coming years.
Traffic growth of Railways now exceeds that of GDP - a phenomenon without precedent.
It has been assessed that Indian Railways would need to spend around Rs. 2,30,000 crore (US $ 50 billion) on various capacity enhancement measures over the next 5-10 years period.
In the past Indian Railways had made several attempts to rope in private participation in Joint Ventures for rail infrastructure projects which were however limited in scale and scope. The current strategy is to leverage private capital through PPPs to the maximum extent in areas which are amenable to PPPs to improve efficiencies and control costs. To begin with following projects have been identified to be implemented on PPP route:
17
Indian Railways - OpportunitiesIndian Railways - Opportunities
A new Dedicated Freight Corridor initially covering about 2700 route kms equivalent to around 5000 track kilometers at an approximate cost of Rs. 32,000 crores (US $ 7.80 billion) linking the ports of Western India and ports and mines of Eastern India to Delhi and Punjab.
World class Railway Stations particularly at Metro cities eg. Delhi, Mumbai etc.
Setting up of SPV for manufacturing of locomotives / coaches / wagons.
High Speed corridors on linking a few of bustling metropolises with high speed rail link to facilitate train travel over 600-1000 kms within 2 to 4 hours.
Operation of container trains and construction of Private Sidings etc.
Port connectivity works and other Infrastructure Projects through Rail Vikas Nigam Ltd (RVNL), New Delhi etc.
18
Indian Railways - OpportunitiesIndian Railways - Opportunities
Dedicated Freight CorridorDedicated Freight Corridor
The biggest railway project - and India’s largest infrastructure Project approved in 2005 by committee on Infrastructure headed by Prime Minister.
Construction on Rs. 600 billion project is expected to commence in early 2007-08 and will be completed in 11th Five Year Plan (2007-12) . Once completed, it would add 10,000 kms to existing rail network which is extremely significant considering that only 9625 kms has been added since 1950-51.
The corridor will initially encompass western and eastern routes with about 2,700 route km (equivalent to about 5,000 km of track)
Indian Railways will construct a multimodal high axle load freight corridor with computerised control with Rs. 32,000 crores approx in the first phase. This is the largest spending Railways will undertake in a decade after the ambitious Konkan Railway project.
The corridor will link the ports of western and eastern India to New Delhi and Punjab. The corridor project is being implemented through a special purpose vehicle Freight Corridor
Corporation of India Limited (DFCCIL) with an authorised capital of Rs. 40 billion created through a mix of engineering, procurement and construction and public-private partnership methods. Other freight corridors are to follow, leading to 11,500 km of dedicated freight corridors.
19
Railway Sidings- OpportunitiesRailway Sidings- Opportunities
All large industrial projects, power generation units, mining projects etc need Rail linkages with main Railway lines for smooth, efficient and reliable transportation of raw materials, finished goods etc.
With the faster Industrial growth envisaged in line with anticipated economic growth, demand for Rail linkages, Rail yards, Rail siding etc enabling huge business opportunities in this sector.
Company has already executed / commissioned such projects in the past for Mumbai port, Vishakhapatnam port, Adani port, Paradip port, BPCL, HPCL etc.
Company is presently executing Rail siding projects for Reliance for their power project in Yamuna Nagar, Haryana, Vedanta for their Aluminum Project in Orissa, Dalmia (OCL) for their Cement Project in Orissa etc.
20
Metro Rail Systems - OpportunitiesMetro Rail Systems - Opportunities
DELHI METROPHASE – I
Mass Rapid Transport Systems (MRTS) projects are gaining momentum and is being implemented through SPV DMRC owned by Union Government and Delhi State Government. The progress of the Delhi MRTS project is notable. In all, 65 kms of Delhi Metro under Phase – I is fully operational comprising Line 1 (Shahdara-Trinagar-Rithala: 22.06 kms), Line 2 (Delhi University to Central Secretariat: 10.84 kms), Line 3 (Indraprastha – Barakhamba Road – Dwarka subcity: .32.10 kms)
PHASE - II
Further expansion of Delhi Metro in other parts of city and outside in NCR region is under high momentum of execution covering a length of approx. 100 km at a cost of Rs. 13000 crore approx expected to be completed in 2010.
OTHER METRO PROJECTSMRTS projects of Mumbai, Bangalore and Hyderabad have already got Union Cabinet approval in March, 2006.
21
Metro Rail Systems - OpportunitiesMetro Rail Systems - Opportunities
Mumbai MRTS Project is to be implemented by MRDA through SPV route under BOT scheme in phases covering a length of about 145.38 kms and is expected to cost about Rs. 195.25 billion expected to be completed in 2021. In August 2004, Maharastra Government approved the implementation of first section (Versova – Andheri – Ghatkopar) of phase I on BOT through PPP model with Reliance Energy as preferred bidder and is expected to be completed by December, 2009 which started in November, 2006.
Bangalore MRTS Project is to be implemented by Bangalore Mass Rapid Transit Ltd (BMRTL) through SPV created by Karnataka Govt. and is proposed to be implemented in several phases spanning about 33 kms with an estimated outlay of Rs. 6395 crores. While Karnataka Government cleared the proposal in March, 2005, Union Government gave its approval in April, 2007. Work on first elevated section of 7 kms started in December, 2006. Phase I is expected to be commissioned in December, 2007.
Hyderabad MRTS Project cleared in Jan, 2007 is proposed to be implemented by a SPV Hyderabad Metro Rail Limited through PPP route on BOT basis with authorised capital of Rs. 10 billion and is expected to cost about Rs. 8760 crores. It is expected to commence in January, 2007 and is likely to be completed in 2011 with 66.39 kms long stretch.
22
Outstanding Achievements Outstanding Achievements
Turnkey Rail Track Contracts : (Ballast-less & Ballasted): Ballasted Track Assembly 2 Kms / Day Ballasted Track Speed Trial Run 130 Kmph Ballast-less Track work 300 m/day
Turnkey Rail Infrastructure Contracts Railway Signaling Works on Contract Telecommunication Works on Contract Turnkey Railway Signaling Contracts Turnkey Telecommunication Contracts Largest Contract undertaken :
On Konkan Railway Corporation for: Railway Signaling 54 stationsOFC 1000 KmTrack 60 Km
23
Major projects presently on hand Major projects presently on hand
Work value Turnkey Projects ( In Million USD)
• VILLUPURAM-MAYILADUTURAI (RVNL) 41.37
[121.78 kms Gauge conversion project if southern railway in JV with Tata Projects Ltd.]• VEDANTA ALUMINA LTD. 12.28
[Rly. Siding for Smelter Plant at Jharsuguda, Chhatisgarh]• RELIANCE ENERGY LTD. 2.82
[Rly. Siding at Yamuna Nagar for 2X300 MW DCR thermal power project]• GOOTY-PULLAMPET (RVNL) 23.34
[151.05 kms signalling project of south central railway in JV with Leighton Holdings Ltd., Singapore]
• PALWAL-BHUTESHWAR (RVNL) 26.98
[81 km track laying & signaling project in nothern railway in JV with Cobra SA, Spain]
• TRACK WORK FOR DMRC PHASE II 20.68 [31.30 kms (both underground & elevated track laying project
part -1 Corridor, Yamuna Bank Depot and Workshop]• AFC FOR DMRC PHASE II 18.22 [Installation & commissioning of AFC system in 41 stations of Delhi Metro
in JV with Samsung SDS ,Korea]24
Our Valued ClientsOur Valued Clients
Indian Railways Konkan Railway Corporation Bharti Telecom Vizag Port Trust Videsh Sanchar Nigam Mumbai Port Trust Adani Port Trust Tata Tele Services Indian Oil Tanking Reliance Energy Reliance Infrastructure Ltd
Delhi Metro Rail Corporation Maharastra State Electricity Board Bharat Petrochemicals National Thermal Power Corporation Hindustan Petroleum Corporation Rail Vikas Nigam OCL India Ltd. (Dalmia Group) Tata Steel Ltd. Vedanta Alumina Ltd. RITES
25
International Co-operationInternational Co-operation (for Track & Civil Engineering) (for Track & Civil Engineering)
Kalindee Has Been Associated With:-
Company Country Technology TSO FRANCE METRO TRACKWERMER TRACTE GERMANY ROADSCHINA HARBOUR CO. CHINA CIVILEICHHOLZ GERMANY TRACKBWG GERMANY TRACKPANDROL UK TRACK
26
International Co-operationInternational Co-operation (for Signaling)(for Signaling)
Kalindee Has Been Associated With :-
Company Country HARMON IND. USA INTERLOGIC UK SASIB (GRS) USA UNION SWITCH USAGE TRANSPORTATION USA
27
Kalindee Has Been Associated With :-
Company Country Technology ERICSSON SWEEDEN TELECOM BOSCH TELECOM GERMANY TELECOM KABEL RHEYDT GERMANY OFC ALCATEL PORTUGAL TELECOM MOTOROLA USA GSM SAMSUNG SDS KOREA AFC GE TRANSPORTATION UK TELECOM
International Co-operationInternational Co-operation (for Telecommunication)(for Telecommunication)
28
Rail Track Construction for Delhi MetroRail Track Construction for Delhi Metro
Salient Features of the Project completed are : Ballast-less Track : 24.271 Kms. Ballasted Track in Depot : 10.825 Kms. Ballast-less Scissor Cross Over (1:12) : 4 Sets Ballast-less Points and Crossing (1:12) : 4 Sets Ballast-less Points and Crossing (1:8.5) : 7 Sets Ballasted Scissor Crossover (1:8.5) : 1 Set Ballasted Points and Crossing (1:8.5) : 62 Sets Flash Butt Weld : 4346 Nos. A.T. Weld : 1388 Nos. Completion period : 18 months
29
Ballast-less Track WorkBallast-less Track Work
30
Ballast-less Points & Crossing in TunnelBallast-less Points & Crossing in Tunnel
31
Preparation for Casting - GSF SettingPreparation for Casting - GSF Setting
32
Ballast-less Track Works in TunnelBallast-less Track Works in Tunnel
33
Flash Butt WeldingFlash Butt Welding
34
ACCESS CONTROL AND FARE COLLECTION SYSTEMS FOR METRO RAILACCESS CONTROL AND FARE COLLECTION SYSTEMS FOR METRO RAIL
Kalindee has acquired in the ‘State of Art Technology’ for Access Control and Automatic Fare Collection System having installed the same for Delhi Metro Rail Corporation.
This system uses the latest contact-less tokens for fare collection for the first time in the World for Single/Double journey in addition to the contact-less smart card. All the equipments at individual stations are connected to the Station computer through LAN (CAT5 / OFC) and all the stations in turn are connected to the Operation Control Central through WAN (OFC) at Shastri Park.
Till date Kalindee has successfully commissioned 34 Stations (24 Elevated and 10 Underground), 1 Operational Control Centre, 1 Software Development Centre and 1 Training Centre comprising of 317 Nos. of AFC Gates, 178 Ticket Office Machines (TOM) including the Excess Fare Collection Office, 98 Nos. of Ticket Readers (TR), 34 Station Computers, 31 sets of UPS ranging from 7.5 to 15 KVA, 145 Electrical Distribution Cabinets, 35 Nos. of Cisco Routers and 85 Nos. of HP Switches.
Recently Kalindee in Consortium with Samsung SDS has won the BS 22 A&B Contract from DMRC in a very tough Global Competition for implementing the AFC System on 19 Stations of Phase II. This includes 41 Stations Foreign Supplies also.
Similar AFC Projects are under consideration with MMOPL (Mumbai Metro Phase I).
• Array of AFC Gates
• Smart Card Reader
• Ticket Office Machine
35
Major Turnkey Projects CompletedMajor Turnkey Projects Completed
Remodeling & up-gradation of Railway Yard at Wadala and Raoli for Mumbai Port Trust
Installed Track : 18.7 Kms.Points & Crossings : 70 Nos.Traps : 3 Nos.
Private Railway Siding for IOTL at Navghar, MumbaiInstalled Track : 7.25 Kms.Points & Crossings : 18 Nos.Traps : 9 Nos.
Private Railway Siding for HPCL at Balasore, OrissaInstalled Track : 4 Kms.Points & Crossings : 10 Nos.Traps : 5 Nos.
Approach Road to Bina Thermal Power StationTotal Length : 6.85 Kms.
36
Track WorksTrack Works
Straight Track : 1068 Kms. Points & Crossings (1:12) : 204 Nos. Points & Crossings (1:8.5): 353 Nos. Points & Crossings (1:16) : 4 Nos. Trap Points : 154 Nos. Mixed Gauge Diamonds : 4 Nos.
37
Nokha – Naugar – Merta Road : 144 Kms. Track Work Completed In Record Time of 4 MonthsAchieved Highest Av. Linking Speed Of 2 Kms/day Executed in Hostile Environment of Desert Area Initial Speed Trial Of 120 Kmph Commercial Sanctioned Speed Of 100 Kmph Set A Land Mark Of Quality and On Time Track work for the contiguous Bikaner- Nokha (62 Kms) was completed by Railway Staff engaging 5 Contractors in 9 Months time and achieving speed trail of 60 Kmph only & Commercial sanctioned Speed of 50 Kmph only.
Jodhpur- Phulera : 300 Kms Track Work also Completed in Record Time of 4 Months Time. Phulera – Ajmer : 82 Kms Track work Completed in 2 Months and 10 Days only All these works reveal the highest level of quality and record time completion showing the competency of our Project Management along with efficient Manpower and Resources Management.
Above examples amply demonstrate our Project Management Capabilities to execute Quality Work in Record Time.
QUALITY PROJECT EXECUTION IN RECORD TIME
38
PRESTIGIOUS PROJECTS UNDERTAKEN ON KONKAN RAILWAY
54 Stations Panel Interlocking : Biggest Signaling Project undertaken OFC System on 1000 Km: Biggest Telecom Project undertaken 60 Km of B.G. track : laid in hostile mountainous environment.
Route Map of Konkan Railway
Kalindee’s performance won all-round appreciation and applause for executing these projects in time and as per the highest standards of quality.
39
Signaling works completedSignaling works completed
Electronic Interlocking 8 Stns. Panel interlocking 212 Stns. Color light Signaling 182 Stns. Conventional Signaling 260 Stns. For 25 KV AC Traction 41 Stns. LC Interlocking 127 Nos. Route relay interlocking 26 Stns. Major yard Signaling 33 Stns. Token Less Block System 98 Stns. Multiple Aspect Signaling 58 Stns. Axle Counter Block Systems 137 Nos. Automatic Signaling 26 Kms. Audio Frequency Track Circuit Automatic (AFTC) for Signaling 115 Sets
40
Telecommunication works completedTelecommunication works completed
U/G Optical Fibre System 2,434 Kms
OFC Equipment Installation 100 Stations
Wireless Network (GSM) 60 Kms.
MSO and EBTS 4 Nos.
Mobile Train Radio 220 Cabs
U/G Copper Cable 6,984 Kms.
Overhead Lines 400 Kms.
Fab. And Erec. of M/W 32 Nos. Towers
41
Major S&T Turnkey Projects CompletedMajor S&T Turnkey Projects Completed
Signaling at 23 stations with panel interlocking on Nagpur - Durg section
Signaling at 54 stations on Konkan Railway.
1000 Km long OFC Communication System for Konkan Railway
150 Kms. OFC Communication System on Northern Railway
RRI System at Cuttack Station of East Coast Railway
42