Founded as a partnership firm for execution of Signaling contracts.1976Became a Public Listed Company.
Diversified in execution of Ballasted Trackwork.
Diversified in execution of Optic Fiber Communication.
19841992
2005
1994
20032000 Diversified in execution of Automatic Fare Collection System for Metro.
Diversified in execution of Ballastless Trackwork for Metro.
Diversified in the field of Electronic Interlocking.
HIGHLIGHTS OF THE JOURNEY
First Signalling work on contract in India. First Indian Company to Install Longest OFC Network of 1000 Kms. First Indian company to achieve Highest Speed of Track Construction (2Km per
day). First Indian Company to achieve Highest Test Speed of track (130 Kmph. on the
very first trial day). First Indian Company to execute successfully largest Signalling contract of 54
Stations. First Private Company to do Turnkey Rail Facility Work. First Indian Company to install Contact Less Automatic Fare Collection System for
Delhi Metro. First Indian Company to install Ballast Less Track for Underground Section of Delhi
Metro.
ACHIEVEMENTS
Design
Preparation of Engineering Drawings
Commissioning
Documentation
Training
Maintenance & Warranty Services
Supply of all Materials & Equipments
Installation
Testing
TURNKEY SOLUTION PROVIDER
Railway Metro Private Siding
BALLASTED TRACK BALLASTLESS TRACK SIGNALLING TELECOM
AUTOMATIC FARE COLLECTION SYSTEM Note: -Civil work related to track work like Earthwork, Bridge work, Buildings etc is also executed by us.
OUR - EXPERTISE
Gauge Conversion
New Line & Siding Line
Installations of Points & Crossings
Yard Remodeling
Ballast Less Track
TRACK EXPERIENCE
1400 Kms
742 Kms
1300 Nos
125 Kms
150 Kms
CIVIL EXPERIENCE
Major Bridges
Minor Bridges/Culverts
Building
Earthwork
35 Nos
400 Nos
30 Nos
5 Million Cum
SIGNALLING EXPERIENCE
Conventional Signalling
Panel Interlocking
Color Light Signalling
Level Crossing Interlocking
260 Stations
362 Stations
340 Stations
256 Nos
Axle Counters
Audio Frequency Track Circuits
225 Nos
115 Nos
Token Less Block Systems
Multi Aspect Signalling
215 Stations
58 Stations
Solid State Interlocking
Signaling for 25 KV AC Traction
106 Stations
59 Stations
SIGNALLING EXPERIENCE CONT..
Major Yard Signalling
Route Relay Interlocking
38 Nos
40 Stations
Electronic Interlocking 44 Stations
Under Ground Copper Cables
Under Ground OFC Systems
8490 Kms
3084 Kms
Over Head Lines
Mobile Train Radio
400 Kms
220 Cabs
OFC Equipment Installation
Wireless Network (GSM)
112 Stations
60 Kms
Microwave / UHF Radio Towers 32 Nos
MSO & EBTS 4 Nos
TELECOMMUNICATON EXPERIENCE
Automatic Fare Collection Gates
Ticket Office Machines
1382 Gates
644 Nos
Electrical Distribution Cabinets
Ticket Readers / AVM
720 Nos
368 Nos
OCC / SDC
Networking Equipments
7 Nos
478 Nos
Ticket Vending Machine 178 Nos
RAILWAY AUTOMATION EXPERIENCE
COMPOSITE WORK (TRACK AND S&T) IN NORTH CENTRAL RAILWAY.
• Track Work : 127.14Kms.• Work Value : US $15.09 Million
DOUBLING PROJECT IN WEST CENTRAL RAILWAY.
• Track Work : 89 Kms.• Work Value : US $ 30.94 Million
COMPOSITE WORK (CIVIL, S&T AND TRACK) IN NORTH WESTERN RAILWAY.
• Track Work : 59.5 Kms.• Work Value : US $18.57 Million
MAJOR TURNKEY PROJECTS IN HAND
TRACK AND S&T WORK IN DIVISION OF NORTH EASTERN RAILWAY, UTTAR PRADESH.
• Track Work :106.92 Kms.• Work Value : US $ 24.26 Million
TRACK WORK AND INSTALLATION OF THIRD RAIL IN KOLKATA METRO RAIL.
• Track Work : 25 Km• Work Value : US $18.74 Million
TRACK AND RAILWAY AUTOMATION WORK IN JAIPUR METRO.
• No.of Stations : 8 Stations• Work Value : US $ 5.35 Million
MAJOR TURNKEY PROJECTS IN HAND
TRACK AND S&T WORK IN DIVISION OF SOUTH CENTRAL RAILWAY, ANDHRA PRADESH
• Track Work : 64 Kms.• Work Value : US $ 20.21 Million
BALLASTED AND BALLASTLESS TRACK WORK FOR DELHI MRTS PROJECT PHASE -III.
• Track Work : 92 Km• Work Value : US $44.16 Million
MAJOR TURNKEY PROJECTS IN HAND
TRACK AND SIGNALLING WORK OF NORTH CENTRAL RAILWAY.
• Track Work : 92 Kms.• Work Value : US $ 30.17 Million
TRACK WORK FOR DELHI METRO CORRIDOR PHASE-I.
• Track Work : 40Kms.• Work Value : US $ 5.5 Million
TRACK WORK FOR DELHI METRO CORRIDOR PHASE II.
• Track Work : 70 Kms.• Work Value : US $ 2.24 Million
MAJOR TURNKEY PROJECTS COMPLETED
TRACK WORK FOR RAPID METRO RAIL, GURGAON.
• Track Work : 8 Km• Work Value : US $ 1.89 Million
GAUGE CONVERSION IN SOUTHERN RAILWAY.
• Track Work : 150 Kms.• Work Value : US $ 40.45 Million
TRACK WORK FOR DELHI METRO AIRPORT LINE.
• Track Work : 50Kms.• Work Value : US $16.12 Million
MAJOR TURNKEY PROJECTS COMPLETED
Konkan Railway
• Biggest Signalling Project Undertaken (54 Stations Panel Interlocking)
• Biggest Telecom Project (OFC System 1000 Km)• B.G.Track in Deep Cuttings 60 Kms.• Highest Quality standards maintained.• On Time Completion.• Work won all round appreciation.
MAJOR TURNKEY PROJECTS COMPLETED
COMPANY COUNTRY PROJECTS
Siemens Germany • For various Signalling Projects in Indian Railways.
Ansaldo Italy • For various Signalling Projects in Indian Railways.
Signalling Equipments
INTERNATIONAL CO-OPERATION
Track & Civil
COMPANY COUNTRY PROJECTS
TSO France • Track Work For Delhi Metro Corridor Phase-I.
Pandrol UK • Track work For Kolkata Metro Rail Corporation.
Railway Automation
COMPANY COUNTRY PROJECTS
Samsung SDS Korea • Delhi Metro AFC Work For Phase I & Phase II • Jaipur Metro AFC Work For Phase I.• Bangalore Metro AFC Work For Phase I.
1. Eastern Railway Signalling and Telecommunication work in Sealdah Division of Eastern Railway.
2. North Eastern RailwayComposite work in Lucknow division of North Eastern Railway.
3. South Eastern RailwayConstruction of 3rd Line between Rajkharswan-Sini section of South Eastern Railway.
4. Northeast Western RailwayElectronic Interlocking in Rewari-Sadalpur-Hisar section of Bikaner division of North Western Railway.
5. Rail Vikas Nigam Limited Composite work in Kota & Bhopal Division of West Central Railway.
OUR VALUED CLIENT
1 32 4 5
OUR VALUED CLIENT
1 32 4 5
1. Delhi Metro Rail CorporationTotal Ballastless Track of 73.69 TKM.Total Ballasted Track of 33.47 TKM.
2. Bangalore Metro Rail Corporation Total Ballastless Track work of 18 TKM.
3. Jaipur Metro Rail CorporationTotal Ballastless Track of 26.51 TKM.Total Ballasted Track of 3.38 TKM.
4. Kolkata Metro Rail CorporationTotal Ballastless Track of 29.10 TKM.Total Ballasted Track of 4.25 TKM.
5. Rapid Metro, Gurgaon Haryana Total Ballastless Track work of 8 TKM.
OUR VALUED CLIENT
1 32 4 5
1. National Thermal Power Corporation Limited
Signalling and Telecommunication work along with associated electrical work for NTPC Kahalgaon.
2. Aravali Power Company Private Limited (India)
Railway siding including Earthwork, Civil and Ballast supply for MGR Yard in APCL Plant, Jhajjar Haryana.
3. Bharat Oman RefineriesSignalling work including supplies of material, designing, testing, commissioning at BORL in-plant Yard at Bina in Bhopal Division.
4. Hindustan Petroleum Corporation Ltd.
Railway Siding for Hindustan Petroleum at Somnathpur, Balasore, Odisha
5. Mumbai Port Trust Remodelling & Upgradation of Railway Yard, includes Track Linking, Ballast Supply at Wadala, Mumbai.
OUR VALUED CLIENT
1. VedantaRailway Siding and Linkage for Power Plant of 1215 MW capacity at Jharsuda, Odisha..
2. Adani PortsTrack Laying nd Linking for Gujrat Adni Port Limited, Mundra.
3. Indian Oil TankingComposite work at Jasai-Chirle Yard of Central Railway as per requirement of Indian Oiltanking Ltd., Navghar Mumbai.
4. Reliance EnergyRailway Siding in 2x300 MW DCR Thermal Power Project, Yamuna Nagar, Haryana.
1 32 4