View
0
Download
0
Category
Preview:
Citation preview
12 LOS ANGELES BUSINESS JOURNAL SEPTEMBER 3, 2018
THE LIST NEXT WEEKThe Largest Colleges, M.B.A. Programs, Community Colleges and M.S. Programs in L.A. CountyRanked by construction cost; excludes infrastructure projects
CONSTRUCTION PROJECTS
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
1Los Angeles Stadium EntertainmentDistrict at Hollywood Park898 S. Prairie Ave.Inglewood 90301
$5,000.0 football stadium for the Los Angeles Rams andLos Angeles Chargers; 6,000-seat performing artsvenue, 300 hotel rooms, retail and office space
November 2016Summer 202013,068,000
Kroenke Sports & Entertainment/Hollywood Park Land Co.HKS Inc.
Turner Construction/AECOM(213) 891-3000/(213) 593-8000
2Lucas Museum of Narrative Art inExposition ParkExposition ParkLos Angeles 90007
1,200.01 four-story exhibition space for George Lucas March 20182021300,000
George LucasMAD Architects
Hathaway DinwiddieConstruction Co.(213) 236-0500
3Century Plaza Development2025 Avenue of the StarsCentury City 90067
900.0 Century Plaza Hotel renovation; two new 46-storytowers with 363 condominiums
Decemeber 2016April 20191,937,712
Next Century PartnersGensler/Harley Ellis Deveraux/MarmolRadziner & Associates
Webcor Construction(213) 239-2800
4Oceanwide Plaza11th Street and Figueroa StreetLos Angeles 90015
814.0 mixed-use project comprised of high-riseresidential towers, hotel, retail, LED signage,parking
March 2015December 20182,600,000
Oceanwide Holdings Co. Ltd.CallisonRTKL
Lendlease(213) 430-4660
5Aven1120 S. Grand Ave.Los Angeles 90015
750.0 mixed-use project, including 38-story apartmentcomplex with 536 units
July 20162019910,000
DTLA South Park PropertiesAC Martin
Mack Urban/AECOM(213) 437-0470/(213) 593-8000
6Providence Tarzana Medical CenterReimagined Project18321 Clark St.Tarzana 91356
542.01 redevelopment of medical center, including newpatient care wing and emergency department
Summer 20182022256,000
Providence Health & ServicesPerkins + Will
McCarthy Building Cos.(949) 851-8383
7Academy on Vine1341 Vine St.Los Angeles 90028
450.01 20-story apartment building with 200 units;commercial buildings
June 2018Spring 2020545,000
Kilroy RealtyHouse and Robertson/Shimoda DesignGroup
Hathaway DinwiddieConstruction Co./WebcorConstruction(213) 694-3630/(213) 239-2800
8Metropolis Los Angeles Tower II877 Francisco St.Los Angeles 90017
431.0 40-story building, 514 luxury condominiums January 201520181,392,346
Greenland USAHarley Ellis Devereaux
Webcor Construction(213) 239-2800
9Long Beach Civic Center333 W. Ocean Blvd.Long Beach 90802
400.0 new offices for the Port of Long Beach and 580residential units, 200 hotel rooms, library andpublic park
October 20152020600,000
City of Long BeachSkidmore, Owings & Merrill
Clark Construction Group,California(714) 429-9778
10Woodland Hills Medical Center5601 De Soto Ave.Woodland Hills 91364
342.0 multiple projects addressing operational,infrastructure and annual improvements
January 2015February 2021841,000
Kaiser PermanenteHMC Architects
McCarthy Building Cos. Inc.(949) 851-8383
11Circa1200 S. Figueroa St.Los Angeles 90015
335.0 two 35-story residential towers over an eight-levelparking podium for 2,000 cars and 48,000 squarefeet of ground level retail
March 2015September 20182,000,000
Circa 1200Harley Ellis Devereaux/HansonLA
AECOM/Tishman(213) 593-8000/(213) 443-5030
12Beverly Center Renovation8500 Beverly Blvd.Los Angeles 90048
300.0 retail center renovation 20162018886,000
Taubman Co.Neumann Smith
Jacobsen/Swinerton JV(801) 973-0500/(213) 896-3400
Edition Hotel and Residences9040 Sunset Blvd.West Hollywood 90069
300.0 190-room hotel and residences January 20162018440,000
Witkoff Group/New ValleyHKS Architects
Pankow Builders(626) 304-1190
14Los Angeles Memorial Coliseum3911 S. Figueroa St.Los Angeles 90037
270.01 renovation for the University of SouthernCalifornia Trojans' football stadium
January 201820191,000,000
University of Southern CaliforniaDLR Group
Hathaway DinwiddieConstruction Co./AECOM(213) 236-0500/(213) 593-8000
15Pendry West Hollywood Hotel &Residences8430 Sunset Blvd.West Hollywood 90069
240.01 two mid-rise buildings totaling 149 hotel roomsand 40 condominiums
October 20172019527,000
Combined Properties/AECOM CapitalEYRC Architects/Cuningham Group
Trimont Real Estate Advisors(949) 955-1821
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractorsand architects. Projects must be under construction as of August, 2018. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 5700 Wilshire Blvd., Suite 170, Los Angeles 90036. ©2018 Los AngelesBusiness Journal. This list may not be reprinted in whole or in part without prior written permission from the editor.Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Continued on page 14
12-20_lists_construction+infrastructure.indd 12 8/30/18 7:37 PM
14 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 3, 2018
Continued on page 16
CONSTRUCTION PROJECTS Continued from page 12
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
16Ivy Station8824 National Blvd.Culver City 90232
$240.0 mixed-use complex featuring 148-room hotel,office space and 200 apartments
June 2017January 2020500,000
Lowe EnterprisesEhrlich Yanai Rhee Chaney Architects
Bernards(818) 898-1521
17Academy Museum of Motion Pictures6067 Wilshire Blvd.Los Angeles 90670
221.0 1,000-seat Geffen Theater and renovation ofhistoric May Co. building
April 2017May 2019290,000
Academy of Motion Picture Arts andSciencesRenzo Piano Building Workshop/Gensler
Matt Construction(562) 903-2277
18Rancho Los Amigos NationalRehabilitation Center7601 Imperial HighwayDowney 90242
218.0 expansion of existing hospital to include 162 newbeds, renovation of existing hospital buildings andoutpatient services
April 2015September 2018293,500
County of Los AngelesSmithGroup JJR/Taylor Design
McCarthy Building Cos. Inc.(949) 851-8383
19Landmark II11750 Wilshire Blvd.Los Angeles 90670
203.0 34-story building totaling 376 apartments March 2018April 2021415,000
Douglas Emmett Inc.Gensler
Matt Construction(562) 903-2277
20NoHo West6150 Laurel Canyon Blvd.North Hollywood 91606
200.01 mixed-use complex with 742 apartments April 2017Late 2019570,000
Merlone Geier Partners/GPI Cos.STIR Architecture
W.E. O'Neil Construction Co.(310) 643-7900
21Hollywood Presbyterian MedicalCenter1300 N. Vermont Ave.Los Angeles 90027
188.31 acute care services replacement hospital building September 20172020174,954
Hollywood Presbyterian Medical CenterKMD Architects
Skanska USA Inc.(213) 694-3630
22CSU Los Angeles Student HousingEast5151 State University DriveLos Angeles 90032
165.3 new student housing facility June 2018August 2021380,000
California State University, Los AngelesHarley Ellis Devereaux
McCarthy Building Cos. Inc.(949) 851-8383
23Four Seasons Private Residences atLos Angeles9000 W. 3rd St.Los Angeles 90048
155.0 58 luxury condominiums June 2017June 2019372,000
Genton Property GroupCallisonRTKL
Webcor Construction(213) 239-2800
24Onni Group Tower825 S. Hill St.Los Angeles 90014
150.01 49-story, 488-unit residential tower February 20162019529,000
Onni GroupChris Dikeakos Architects
Onni Group(213) 629-2041
Linea2441 S. Sepulveda Blvd.Los Angeles 90064
150.01 mixed-use apartment building with 595 units April 20172020430,000
Carmel PartnersVTBS Architects/Bennitt Design
Carmel Partners(424) 291-8604
26AVA Hollywood6677 W. Santa Monica Blvd.Los Angeles 90038
133.01 seven-story apartment building with 695apartments
February 2017Early 2019629,000
AvalonBay CommunitiesKoning Eizenberg Architecture
AvalonBay Communities(310) 481-1270
27LA Plaza Village555 N. Spring St./555 N. BroadwayLos Angeles 90012
130.0 355-unit mixed-use residential project July 2016January 2019767,834
Trammell Crow/Cesar Chavez FoundationJohnson Fain
Morley Builders(310) 399-1600
28Santa Monica Proper Hotel710 Wilshire Blvd.Santa Monica 90401
121.0 271-room hotel August 2016February 2019162,242
710 WilshireHoward Laks Architects
Morley Builders(310) 399-1600
29Henry Mayo Newhall Hospital NewPatient Tower23845 McBean ParkwayValencia 91355
120.8 six-story patient tower which will connect to theexisting 238-bed hospital
May 2014December 2018163,369
Henry Mayo Newhall HospitalHMC Architects
Bernards(818) 898-1521
30Godfrey Hotel1400 Cahuenga Blvd.Los Angeles 90028
111.01 seven-story hotel with 20 rooms September 2017201975,000
Oxford Capital GroupSteinberg Architects
davisReed Inc.(858) 523-9760
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractorsand architects. Projects must be under construction as of August, 2018. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 5700 Wilshire Blvd., Suite 170, Los Angeles 90036. ©2018 Los AngelesBusiness Journal. This list may not be reprinted in whole or in part without prior written permission from the editor.Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
12-20_lists_construction+infrastructure.indd 14 8/30/18 7:37 PM
16 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 3, 2018
GRAND REUNIONJoin thousands of
Matadors and friends atCSUN’S 60TH ANNIVERSARY
CELEBRATION
csun.edu/60
GRAND REUNIONGRAND REUNIONCALIFORNIA STATE UNIVERSITY, NORTHRIDGE
Saturday, Oct. 13, 2018
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
31Rise Hollywood1311 N. Cahuenga Blvd.Los Angeles 90028
$110.01 seven-story apartment complex, 360 units April 2017Fall 2019240,000
Cal-Coast Development and RescoreNadel Architects
NANA
The Aliso950 E. Third St.Los Angeles 90013
110.01 472-unit mixed-use apartment complex March 2016Fall 2018400,000
Legendary Development/FairfieldResidentialKava Massih Architects
Milender White(949) 724-9531
Residences at Wilshire Curson620 S. Curson Ave.Los Angeles 90036
110.01 20-story apartment complex, 285 units August 2018Late 2020NA
J.H. Snyder Co.MVE+Partners
J.H. Snyder Co.(323) 857-5546
34Amli MDRVia Marina and Panay WayMarina Del Rey 90292
105.01 six-building, 585-unit apartment complex, new241 boat slip marina, parking garage
Summer 2014Winter 2018700,000
Amli ResidentialTCA Architects
Western National Group(949) 862-6200
35Culver Steps and Town PlazaExpansion9300 Culver Blvd.Culver City 90232
100.0 mixed-use redevelopment including ground-levelretail, a four-story office building, and a grandstair
November 2017Spring 2019115,000
Hackman Capital PartnersEYRC Architects/SWA Group
KPRS Construction ServicesInc.(714) 672-0800
1133 S. Hope St.1133 S. Hope St.Los Angeles 90015
100.0 mixed-use building March 2017July 2019330,215
Full Star PropertiesChris Dikeakos Architects
Lendlease(213) 430-4660
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractorsand architects. Projects must be under construction as of August, 2018. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 5700 Wilshire Blvd., Suite 170, Los Angeles 90036. ©2018 Los AngelesBusiness Journal. This list may not be reprinted in whole or in part without prior written permission from the editor.Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Continued from page 14CONSTRUCTION PROJECTS
Continued on page 18
12-20_lists_construction+infrastructure.indd 16 8/30/18 7:38 PM
18 LOS ANGELES BUSINESS JOURNAL THE LIST SEPTEMBER 3, 2018
CONSTRUCTION PROJECTS Continued from page 16
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
37Sherman Oaks Center for EnrichedStudies Modernization Project18605 Erwin St.Tarzana 91335
$88.01 school renovation Fall 20182020NA
Sherman Oaks Center for Enriched StudiesNA
Sinanian Development Inc.(818) 996-9666
38Park Fifth437 S. Hill St.Los Angeles 90013
78.7 mixed-use housing project with 313 residentialunits
June 2016December 2018494,021
MacFarlane PartnersAnkrom Moisan Architects
Bernards(818) 898-1521
Water's Edge III5533 EA WayPlaya Del Ray 90094
78.7 four-story office building April 2018November 2019407,276
Wedge OfficeSPF:a
McCarthy Building Cos. Inc.(949) 851-8383
40Santa Monica College StudentServices Building1900 Pico Blvd.Santa Monica 90405
78.2 three-story student services building June 2016March 2019111,956
Santa Monica CollegeMorris Architects
Bernards(818) 898-1521
41Archer School for Girls CampusPreservation and Improvement Plan11725 W. Sunset Blvd.Los Angeles 90670
74.0 multipurpose facility, performing arts center,visual arts center and aquatics center
May 2017April 202073,500
Archer School For Girls Inc.Parallax Associates Inc.
Matt Construction(562) 903-2277
42L.A. Harbor College - SAILS1111 Figueroa PlaceLos Angeles 91744
72.7 two-story student union building, one-story healthbuilding
September 2010May 201985,000
Los Angeles Community College DistrictHMC Architects
Bernards(818) 898-1521
43Center for Early Education563 N. Alfred St.West Hollywood 90670
66.0 childhood and elementary education building May 2016December 201985,000
Center for Early EducationJohnson Favaro
Matt Construction(562) 903-2277
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractorsand architects. Projects must be under construction as of August, 2018. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 5700 Wilshire Blvd., Suite 170, Los Angeles 90036. ©2018 Los AngelesBusiness Journal. This list may not be reprinted in whole or in part without prior written permission from the editor.Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
BUILD BETTERBUILD SAFERBUILD w
ith
Build Better with LIUNA and its contractors, who have created industry-specific agreements and provided valuable support to projects before elected officials, regulators, and public forums.
Build Safer with LIUNA and its contractors, who committed more than 532,000 hours of skills and safety training to 33,577 craftspeople and graduated 1,272 apprentices in 2017.
Build with LIUNA and its contractors, who have raised industry standards, promoted quality, and most importantly, protected the bottom line.
Jon P. PreciadoSouthern California
District Council(626) 350-6900
www.SCDCL.org
SAFE | ON-TIME | UNDER BUDGET
Sergio RasconLIUNA Local 300
- Los Angeles -(213) 385-3550
www.Local300.com
Peter SantillanLIUNA Local 1309
- Long Beach -(562) 421-9346
www.Local1309.com
Laborers’InternationalUnion ofNorth America
12-20_lists_construction+infrastructure.indd 18 8/30/18 7:38 PM
SEPTEMBER 3, 2018 THE LIST LOS ANGELES BUSINESS JOURNAL 19
CONSTRUCTION PROJECTS
Continued on page 20
Rank Project• name
• location
ConstructionCost(millions)
Description Profile• start date
• estimated completion
date
• square footage
Planners• owner
• architect
General Contractor• name
• phone
44Goodman Logistics Center Santa FeSprings12588 Florence Ave.Santa Fe Springs 90670
$62.0 36-foot clear height ceilings, one cross-dockfacility, two front-loaded distribution facilities,185-foot truck court
October 2016September 20181,205,366
GoodmanWare Malcomb
Millie and Severson Inc.(562) 493-3611
45Weddington Apartments11058 W. Chandler Blvd.North Hollywood 91601
61.01 pair of five-story buildings with 329 apartments April 20172019355,000
Grey Star Real Estate PartnersVTBS Architects
NANA
46Los Angeles LGBT Center’s Anita MayRosenstein Campus6725 Santa Monica Blvd.Los Angeles 90028
60.01 new campus including 224 units for seniors,homeless youth and young people
March 2017Spring 2019NA
Los Angeles LGBT CenterLeong Leong/Killefer Flamman
Swinerton Inc.(213) 896-3400
47Cal Poly Pomona Student ServicesBuildingCalifornia State Polytechnic UniversityPomona 91768
59.9 student services and administrative building July 2016September 2018138,452
California State UniversityCO Architects
C.W. Driver(626) 351-8800
48Essex Hollywood6240 Sunset Blvd.Los Angeles 90028
54.01 seven-story mixed-use apartment complexincluding 200 multifamily units
October 2017December 2019152,900
Essex Property TrustTCA Architects
McCormick Construction(818) 843-2010
49Cal State Los Angeles, ParkingStructure E5151 State University DriveLos Angeles 90032
52.0 five-level parking structure June 2017August 2019730,000
Cal State Los AngelesWRNS Studio
Rudolph and Sletten Inc.(949) 252-1919
50Herald Examiner Renovation1111 S. BroadwayLos Angeles 90015
50.01 redevelopment into mixed-use commercial space,restaurants and creative offices
January 20172019116,000
Hearst Corp./Georgetown Co.Gensler
NANA
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners, general contractorsand architects. Projects must be under construction as of August, 2018. To the best of our knowledge, this informationis accurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions
and typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 5700 Wilshire Blvd., Suite 170, Los Angeles 90036. ©2018 Los AngelesBusiness Journal. This list may not be reprinted in whole or in part without prior written permission from the editor.Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
Rank Project• name
• location
Construction Cost(millions)
Description Profile• start date
• estimated
completion date
Planners• owner
• architect
General Contractor• name
• phone
1Purple Line Extension Phase 2Wilshire/Rodeo to Century City/ConstellationLos Angeles
$2,530.01 2.6 miles of additional tracks toMetro’s rail system and two newstations at Wilshire/Rodeo and CenturyCity/Constellation
February 20182025
Los Angeles County MetropolitanTransportation AuthoritySTV Inc.
Tutor Perini Corp./O&G JV(818) 362-8391
2LAX - Delta Sky Way ProjectLos Angeles International AirportLos Angeles 90045
1,900.01 upgrade and connect Terminals 2, 3,and the Tom Bradley InternationalTerminal
September20182023
Delta AirlinesNA
NANA
3Purple Line Extension Section 15055 S. Wilshire Blvd., Suite 700Los Angeles 90036
1,582.0 3.9-mile subway extension to BeverlyHills, from three new stations atWilshire/La Brea, Wilshire/Fairfax andWilshire/La Cienega
January 2015June 2023
Los Angeles County MetropolitanTransportation AuthorityParson Transportation Group
Skanska/Traylor/Shea JV(213) 694-3630
4Foothill Gold Line ExtensionGlendora to MontclairGlendora
1,500.01 12.3-mile extension to the Metro GoldLine system for new light rail stationsin Glendora, San Dimas, La Verne,Pomona, Claremont and Montclair
Decemeber20172027
Los Angeles County MetropolitanTransportation AuthorityNA
NANA
5Port of Long Beach Middle HarborPort of Long BeachLong Beach 90802
1,493.0 upgrade terminals and rehabilitateMiddle Harbor Piers D, E and F
Spring 20112019
City of Long BeachNA
NANA
6LAX Midfield Satellite Concourse NorthLos Angeles International AirportLos Angeles 90045
1,300.0 multilevel concourse holding 11 newgates, tunnels, parking aprons, serviceroads, taxiways
January 2015December2019
Los Angeles World AirportsCorgan Associates/Gensler
Turner/PCL JV(213) 891-3000
Alamitos Energy Center690 N. Studebaker RoadLong Beach 90802
1,300.0 natural gas power plant and100-megawatt battery energy storagesystem
July 20172019
AES Alamitos Energy / AES Corp.AES Southland
Kiewit Corp.(310) 846-2400
1 Business Journal estimate.NA - Not Available JV - Joint Venture Note: Information provided by representatives of the owners and generalcontractors. Projects must be under construction as of August, 2018. To the best of our knowledge, this information isaccurate as of press time. While every effort is made to ensure the accuracy and thoroughness of the list, omissions and
typographical errors sometimes occur. Please send corrections or additions on company letterhead to the ResearchDepartment, Los Angeles Business Journal, 5700 Wilshire Blvd., Suite 170, Los Angeles 90036. ©2018 Los AngelesBusiness Journal. This list may not be reprinted in whole or in part without prior written permission from the editor.Reprints are available from Wright’s Media (877) 652-5295.
Researched by Joshua Niv
THE LIST Ranked by construction costINFRASTRUCTURE CONSTRUCTION PROJECTS
12-20_lists_construction+infrastructure.indd 19 8/30/18 7:38 PM
Recommended