8/11/2019 GT Mtc. Practices
1/59
GAS TURBINE MTC.
PRACTICES
GE FRAME 6B,9E & 9FAGAS TURBINES
8/11/2019 GT Mtc. Practices
2/59
GAS TURBINE
Principle of working :- Works on BratonCycle with two nos. Adiabaticprocesses of compression & expansionin compressor and turbine respectivelyand two constant pressure processesi.e. Heat addition in combustionchambers and exhaust in atmosphere.
8/11/2019 GT Mtc. Practices
3/59
WORKING PRINCIPLE
BRATONCYCLE
8/11/2019 GT Mtc. Practices
4/59
The Actual Thermodynamiccycle
For all practical reasons theactual thermal efficiencywill depend on
Pressure ratio Turbine inlet Temp Compressor inlet temp Efficiency of Compressor and
Turbine
8/11/2019 GT Mtc. Practices
5/59
GAS TURBINE
Principle of Operation:- Rotor is initiallybrought to speed by starting means.Atmospheric air is drawn into the compressor
and raised to static pressure more than theatmospheric. This high pressure air isallowed to pass through continuous flowCombustion Chambers where fuel is ignitedwith high voltage igniters. The product ofcombustion is expanded in the turbine whichcause it to spin and thus applying a torque tothe driven accessories i.e. Generator
8/11/2019 GT Mtc. Practices
6/59
8/11/2019 GT Mtc. Practices
7/59
WORKING PRINCIPLE
8/11/2019 GT Mtc. Practices
8/59
8/11/2019 GT Mtc. Practices
9/59Time
1
2
3
4
0
0-1 Cranking1-2 Purging2-3 Speed down to firing speed3- Firing3-4 Warm up4-5 Acceleration5-6 Full Speed no load
5 6
Torque converter angle
Fuel
Speed
8/11/2019 GT Mtc. Practices
10/59
8/11/2019 GT Mtc. Practices
11/59
MAINTENANCE PLANNING
TO KEEP LOW COST OF OPERATION& HIGH AVAILABILITY OF M/Cs, AWELL PLANNED MTC. PROGRAMMEIS REQUIRED
8/11/2019 GT Mtc. Practices
12/59
FACTORS AFFECTING MTC.PLANNING
TYPE OF FUEL USEDFIRING TEMPERATUREOVERSPEED OPERATION OF M/C
DESIGN FEATURESDUTY CYCLEPARTS AVAILABILITYON SITE MTC. CAPABILITY
DIAGNOSTIC & EXPERT SYSTEM OFANALYSISMFRS RECOMMENDED MTC. PROGRAM
8/11/2019 GT Mtc. Practices
13/59
DUTY CYCLE
MTC. PLANNING IS AFFECTED BYNATURE OF OPERATION PHILOSOPHY I.E.PEAKING OR BASE LOAD OPERATIONS,STANDBY OPERATION & NO. OF STARTS& SHUTDOWNS.
GAS TURBINE WEARS IN DIFFERENTWAYS FOR DIFFERENT SERVICEREQUIREMENTS AND DUTY CYCLES.
THERMAL MECHANICAL FATIGUE IS THELIMITER FOR CYCLIC OPERATION ANDCREEP, OXIDATION, HOT CORROSION ARETHE LIMITER FOR CONTINUOUS DUTYAPPLICATIONS
8/11/2019 GT Mtc. Practices
14/59
CYCLIC DUTY OPERATIONS
EFFECTSTMFHCFRUB/ WEAR
FOD
8/11/2019 GT Mtc. Practices
15/59
CONT. DUTY OPERATIONS
EFFECTSCREEPRUPTURE
HCFCORROSIONOXIDATIONEROSIONRUB/WEARFOD
8/11/2019 GT Mtc. Practices
16/59
OPERATING DUTY DEFINITION
FiredDuty Service Factor Hrs/Starts
Stand-by 90 % >>50
8/11/2019 GT Mtc. Practices
17/59
FIRING TEMPERATUREFIRING TEMP. IS THE LIMITING FACTORFOR LOAD ON THE TURBINE. HIGHER THEFIRING TEMP. SHORTER WILL BE THE
MTBI. HIGH FIRING TEMP. MAY BE DUETO- PEAK LOAD OPERATION OF M/CWET CONTROL CURVE OPERATION OF M/C
WITH STEAM/WATER INJECTION OR WITHINLET FOGGINGPART LOAD OPERATION OF M/C INCOMBINED CYCLE
8/11/2019 GT Mtc. Practices
18/59
TYPE OF FUEL USED
WITH USE OF HEAVY FUELS IN GTs, THEMTC. INTERVALS ARE REDUCED AS DUETO BURNING OF HEAVY FUELS RADIANT
THERMAL ENERGY IS RELEASEDRESULTING INTO REDUCTION OF HGPSPARES LIFE. ALSO PRESENCE OFCORROSIVE ELEMENTS IN THE HEAVY
FUELS HOT CORROSION IN HGP SPARESIS INCREASED.
CONTD .
8/11/2019 GT Mtc. Practices
19/59
TYPE OF FUEL USEDFUEL USED IN GAS TURBINE IS THE KEYFACTOR IN DECIDING THE MTC.PLANNING. THE SEVERITY FACTOR FOR
VARIOUS FUELS ARE AS FOLLOW - GAS - 1 DISTILLATE - 1.5
CRUDE - 2 TO 3RESIDUAL - 3 TO 4
8/11/2019 GT Mtc. Practices
20/59
BASE LINE OPERATION
GAS TURBINE OPERATION ON GASFUEL FOR CONTINUOUS DUTY CYCLEWITH NO STEAM/ WATER INJECTION ISCALLED BASE LINE OPERATION .
IN BASE LINE OPERATION MTC.INTERVAL BETWEEN TWO INSPECTIONS
IS THE MAXIMUM AS THE MTC. FACTORIS UNITY.
8/11/2019 GT Mtc. Practices
21/59
OVER SPEED OPERATION
MTC. FCATOR FOR OVER SPEEDOPERATION OF MACHINE-
SPD100 101 102 103 104 105
MF 1 1.2 1.4 1.6 1.8 2
8/11/2019 GT Mtc. Practices
22/59
DESIGN FEATURES
ALL THE CASINGS STARTING FROM INLETPLENUM TO EXHAUST CASING ARE SPLIT
AT HORIZONTAL CENTRE LINE TOACCESS INTERNALS FOR INSPECTION/REPLACEMENT. BRGS., IGV, COMP.STATOR BLADES, NOZZLES, SHROUDSETC, CAN BE REPLACED WITHOUTACTUALLY LIFTING THE TURBINE ROTOR
8/11/2019 GT Mtc. Practices
23/59
MFR. RECOMMENDED MTC.PROGRAMME
AS PER GE FOLLOWING PREVENTIVE MTC.INSPECTIONS ARE CARRIED OUT ON GTs
BOROSCOPIC INSPECTIONCOMBUSTION INSPECTION (CI)HOT GAS PATH INSPECTION (HGPI)MAJOR INSPECTION (MI)
8/11/2019 GT Mtc. Practices
24/59
COMBUSTION INSPECTION
DURING CI, FUEL NOZZLES ANDCOMBUSTION CHAMBERS OF GASTURBINE ARE DISASSEMBLED FORINSPECTION AND BOROSCOPICINSPECTION IS CARRIED OUT FORCOMPRESSOR AND TURBINEPORTION
CONTD....
8/11/2019 GT Mtc. Practices
25/59
COMBUSTION INSPECTION
DURING CI FOLLOWING SPARES AREINSPECTED/ REPLACED
FUEL NOZZLESCOMBUSTION LINERSTRANSITION PIECESX. FIRE TUBESRETAINERSEND SEAL BLOCKS
BULL HORNEND SEALS
8/11/2019 GT Mtc. Practices
26/59
COMBUSTION INSPECTION
RECOMMENDED INTERVAL FOR CI ISAS GIVEN BELOW-
TYPE OFINSP
RECOMMENDED HRS/STARTS
6B 9E 9FA
CI DLN 12000/450 12000/450 8000/450
NONDLN
12000/1200 8000/900 -
8/11/2019 GT Mtc. Practices
27/59
CALCULATION FOR MTC. INTERVAL FOR CI BASED ONHRS CRITERION -
MTC. INTERVALS (HRS)= RECOMMENDED HRS
MTC. FACTORMTC. FACTOR = ANNUAL FACTORED HRS
ANNUAL ACTUAL HRS
ANNUAL FACTORED HRS = G+ 1.5D + 3H + 6PANNUAL ACTUAL HRS = G + D + H + P
G = ANNUAL HRS OF OPR. ON GAS FUELD = ANNUAL HRS OF OPR. ON DISTILLATE FUELH = ANNUAL HRS OF OPR. ON HEAVY FUELP = ANNUAL HRS OF OPR. ON PEAL LOAD
COMBUSTION INSPECTION
8/11/2019 GT Mtc. Practices
28/59
HOT GAS PATH INSPECTION
DURING HGPI, FUEL NOZZLES,COMBUSTION CHAMBERS ANDTURBINE PORTION OF GASTURBINE ARE DISASSEMBLED FORINSPECTION AND BOROSCOPICINSPECTION IS CARRIED OUT FOR
COMPRESSOR PORTIONCONTD....
8/11/2019 GT Mtc. Practices
29/59
DURING HGPI FOLLOWING SPARES AREINSPECTED/ REPLACED
ALL THE SPARES OF CI + BUCKETS STG .I, II & III SHROUD STG .I, II & III NOZZLE STG .I, II & III VIGV & EXHAUST FRAME
BOROSCOPE INSPECTION OF COMPRESSOR
HOT GAS PATH INSPECTION
8/11/2019 GT Mtc. Practices
30/59
HOT GAS PATH INSPECTION
RECOMMENDED INTERVAL FOR HGPIIS AS GIVEN BELOW-
TYPE OF INSP RECOMMENDED HRS/STARTS
6B 9E 9FA
HGPI 24000/1200 24000/900 24000/900
8/11/2019 GT Mtc. Practices
31/59
CALCULATION FOR MTC. INTERVAL FOR HGPI BAESDON HRS CRITERION -
MTC. INTERVALS (HRS)= 24000
MTC. FACTORMTC. FACTOR = ANNUAL FACTORED HRS
ANNUAL ACTUAL HRS
ANNUAL FACTORED HRS = G+ 1.5D + 3H + 6PANNUAL ACTUAL HRS = G + D + H + P
G = ANNUAL HRS OF OPR. ON GAS FUELD = ANNUAL HRS OF OPR. ON DISTILLATE FUELH = ANNUAL HRS OF OPR. ON HEAVY FUELP = ANNUAL HRS OF OPR. ON PEAL LOAD
HOT GAS PATH INSPECTION
8/11/2019 GT Mtc. Practices
32/59
MAJOR INSPECTION
DURING MAJOR INSPECTION,FLANGE TO FLANGE OF GT ISDISASSEMBLED/INSPECTED. ITINCLUDES F/N, CC, TURBINE,COMPRESSOR & BEARINGS. OTHERAUXILIARIES AND SUPPORT SYTEM
I.E. INLET PLENUM, EXHAUSTPLENUM, OIL PUMPS, AGB ETC AREINSPECTED.
CONTD....
8/11/2019 GT Mtc. Practices
33/59
DURING MAJOR INSPECTION FOLLOWINGVITAL SPARES ARE INSPECTED/REPLACED
ALL THE SPARES OF HGPI +VIGV, INLET PLENUM & EXHAUST PLENUM COMPRESSORTURBINE BEARINGSAGB, MOP, AOP, EOP, ATOM. AIR COMP.STARTING MEANS, STARTING CLUTCHATOM. AIR COOLER & L.O. COOLER
MAJOR INSPECTION
8/11/2019 GT Mtc. Practices
34/59
MAJOR INSPECTION
RECOMMENDED INTERVAL FOR MI ISAS GIVEN BELOW-
TYPE OFINSP
RECOMMENDED HRS/STARTS
6B 9E 9FA
MAJORINSP.
48,000/2,400 48,000/2,400 48,000/2,400
8/11/2019 GT Mtc. Practices
35/59
CALCULATION FOR MTC. INTERVAL FOR MAJORIISPECTION BAESD ON HRS CRITERION -
MTC. INTERVALS (HRS)= 48,000
MTC. FACTORMTC. FACTOR = ANNUAL FACTORED HRS
ANNUAL ACTUAL HRS
ANNUAL FACTORED HRS = G+ 1.5D + 3H + 6PANNUAL ACTUAL HRS = G + D + H + P
G = ANNUAL HRS OF OPR. ON GAS FUELD = ANNUAL HRS OF OPR. ON DISTILLATE FUELH = ANNUAL HRS OF OPR. ON HEAVY FUELP = ANNUAL HRS OF OPR. ON PEAL LOAD
MAJOR INSPECTION
8/11/2019 GT Mtc. Practices
36/59
LOAD Vs EXHAUST TEMPERATUREVIBRATION LEVELFUEL FLOW AND ITS PRESSUREEXHAUST TEMPERATURE & SPREAD VARIATIONSTART UP TIMECOASTING DOWN TIMEWHEEL SPACE TEMPERATURECPD & CTDINLET AIR DIFF. PRESSURE ACROSS FILTERSEXHAUST PRESSURE DROP
PERFORMANCE INDICATORS
8/11/2019 GT Mtc. Practices
37/59
FACTORS AFFECTING GTPERFORMANCE/ OUTPUT
INLET AIR DIFF. PRESSURE EXHAUST GASES DIFF. PRESSURE
AMBIENT AIR TEMPERATURE GENERATING FREQUENCE STEAM / WATER INJECTION
INLET AIR FOGGINGTYPE OF FUEL USED
8/11/2019 GT Mtc. Practices
38/59
EFFECT OF DIFF. FACTORS ONGT PERFORMANCE/ OUTPUT
INLET AIR & EXH. DIFF. PRESSURE(FRAME 9E)
VALUE F/CONSMP OUTPUT
INLET PRDROP
100 mm ofH2O
+ 0.4 -1.4
EXH. PRDROP
100 mm ofH2O
+ 0.4 - 0.4
8/11/2019 GT Mtc. Practices
39/59
EFFECT OF INLET AIR TEMP. ONGT PERFORMANCE/ OUTPUT
MODEL PG 9001E
INLETTEMP
(F)
EXH.TEMP
(F)
HEATRATE
( )
OUTPUT( )
HEATCONSMP.
( )
AIRFLOW
( )
20 929 97 116 112 108.5
40 939 98.5 108 106 104
60 952 100 100 100 100
80 964 102.5 94 94 95.5
100 978 105 84 88 91.5
120 993 108 77 83 87.5
8/11/2019 GT Mtc. Practices
40/59
MODEL PG9001E
EFFECT OF FREQUENCY ONGT PERFORMANCE/ OUTPUT
FREQUENCY(Hz)
OUTPUT( )
50.0 100
49.5 100
49.0 99
48.5 98
48.0 97
47.5 96
47.0 95
8/11/2019 GT Mtc. Practices
41/59
8/11/2019 GT Mtc. Practices
42/59
LIFE OF HGP SPARESMODEL 9E
REPAIR REPLACEMENTF/NOZZLES CI 2 (CI)/3 (CI)
COMBUSTION LINERS CI 3 (CI)/5 (CI)TRANSITION PIECES CI 4 (CI)/6 (CI)X- FIRE TUBES CI 2 (CI)/3 (CI)BUCKETS STG. I, II & III HGPI 2(HGPI)/3(HGPI)
NOZZLES STG. I, II & III HGPI 3(HGPI)/3(HGPI)SHROUDS STG. I, II & III HGPI 3(HGPI)/3(HGPI)
8/11/2019 GT Mtc. Practices
43/59
RELIABILITY
Probability of not being forced out ofservice when unit is needed
RELIABILITY = (1- FOH /PH)X100
FOH Forced Outage Hrs.PH Period Hrs.
8/11/2019 GT Mtc. Practices
44/59
AVAILABILITY
Probability of being available,independent of whether the unit isneeded.
AVAILABILITY = (1- UH /PH)X100
UH Unavailable Hrs.PH Period Hrs.
8/11/2019 GT Mtc. Practices
45/59
EQUIVALENT RELIABILITY
Probability of a combined cycle powerplant not being totally forced out ofservice when unit is required includesthe effect of Gas & Steam cycle MWoutput contribution to plant output.
= [1-{GTFOH +B( HRSGFOH +STFOH)}X100]GTPH BPH STPH
contd.
8/11/2019 GT Mtc. Practices
46/59
EQUIVALENT RELIABILITY
GTFOH = GT Forced Outage Hrs.
GTPH = GT Period Hrs.
HRSGFOH = HRSG Forced Outage Hrs.
BPH = HRSG Period Hrs.
STFOH = Steam Turbine Forced Outage Hrs.
STPH = Steam Turbine Period Hrs.
B = Steam Cycle MW output contribution
8/11/2019 GT Mtc. Practices
47/59
EQUIVALENT AVAILABILITY
Probability of a combined cycle powerplant available for power generationindependent of whether the unit isneeded -includes the effect of Gas &Steam cycle MW output contribution toplant output.
= [1-{GTUH +B( HRSGUH +STUH)}X100]GTPH BPH STPH
contd.
8/11/2019 GT Mtc. Practices
48/59
EQUIVALENT AVAILABILITY
GTUH = GT Unavailable Hrs.
GTPH = GT Period Hrs.
HRSGUH = HRSG Unavailable Hrs.
BPH = HRSG Period Hrs.
STUH = Steam Turbine Unavailable Hrs.
STPH = Steam Turbine Period Hrs.
B = Steam Cycle MW output contribution
8/11/2019 GT Mtc. Practices
49/59
MTBF
MTBF Measure of probability ofcompleting the current run. Failureevents are restricted to forced outageswhile in service.
MTBF= SH/FO
SH Service Hrs.FO Nos. of Forced Outages
8/11/2019 GT Mtc. Practices
50/59
Service Factor
Service Factor Measure ofoperational use usually expressed onan annual basis.
Service Factor = SH/PH X 100
SH Service Hrs.PH Period Hrs.
8/11/2019 GT Mtc. Practices
51/59
OPERATING LEVERAGE
OPERATING LEVERAGE = FIXED COSTVARIABLE COST
OPERATING LEVERAGE IS GETTINGREDUCED AS THE PLANT GOES OLDERDUE TO REDUCTION OF FIXED COST BY
WAY OF DEPRECIATION AND INCREASEIN HEAT RATE DUE TO AGING
8/11/2019 GT Mtc. Practices
52/59
CONTRIBUTION FACTOR
C. FACTOR= TARIFF/KWHVARIABLE COST/KWH
GIVE DC TO SLDC IN SUCH A WAY THATTHE CONTRIBUTION FACTOR SHOULDALWAYS REMAIN POSITIVE TO AVOIDLOSSES. THIS CAN BE DONE BY LOADINGTHE MACHINES OPTIMALLY ANDAVOIDING THE PARTIAL LOADING OFMACHINES FOR LONGER DURATION.
HEAT RATE W R T
8/11/2019 GT Mtc. Practices
53/59
HEAT RATE W.R.T.LOADING
OUT PUT(%)
HR(1 0C)
HR(15 0C)
HR(32 0C)
HR(49 0C)
120 97 99 101 103
100 99 100 102 103
80 105 106 106 107
60 115 115 115 115
40 133 133 133 133
8/11/2019 GT Mtc. Practices
54/59
8/11/2019 GT Mtc. Practices
55/59
COMPARISON DIFF MAKE
8/11/2019 GT Mtc. Practices
56/59
COMPARISON DIFF. MAKEGT MODELS
OEM Conventional Advance (F/FA class) Model GT ISO
Output (MW)
Net CC Efficiency(%)
Model GT ISO Output (MW)
Net CC Efficiency (%)
GE 9E 126.10 52.7 9FA 255.6 57.1
Siemens V94.2 159.40 52.2 V94.3A
265.9 57.3
MHI* 701DA 144.09 51.6 701F 270.3 57.0
Alstom 13E2 165.10 52.9 GT 26 263.0 56.3
8/11/2019 GT Mtc. Practices
57/59
FLANGE TO FLANGE VIEW OFF CLASS GAS TURBINE
8/11/2019 GT Mtc. Practices
58/59
QUESTIONS ?
8/11/2019 GT Mtc. Practices
59/59
K. S. YADAVManager (M-I)Pragati Power StationCell - 9717694741email ksyadavipgcl@yahoo.co.in