GREAT AUTO PARTS

Preview:

DESCRIPTION

GREAT AUTO PARTS. 2011. Sep. Agenda. Our Company Products Quality Controls Lab R & D Manufacturing PPAP Samples Turnover Contact us. Company. Founded in 1988, re-engineered in 2005, Great Auto Parts specializes in Chassis part manufacturing for almost 30 years. - PowerPoint PPT Presentation

Citation preview

2011. Sep.

GREAT AUTO PARTS

Our Company Products Quality Controls Lab R & D Manufacturing PPAP Samples Turnover Contact us

Agenda

Founded in 1988, re-engineered in 2005, Great Auto Parts specializes in Chassis part manufacturing for almost 30 years.

Provides the highest quality and competitive products and services.

Brand new plant (7000 square meters) in ChungKang Export processing Zone started production in August 2010.

Company

Four main catalogs Inner Tie Rod EndsBall StudsHousingsBall Pins

Products

Quality policyAll members participating, continually improving.Fulfill customers’ needs and requirements.

ISO 9001 : 2008 CertifiedTS 16949 : Working with a consultant team and planning to be certified before June 2012.

Quality Controls

Established the chassis parts test lab that never seen in our field in Taiwan.

LAB

Roughness measuring tester

Roundness measuring tester

The optical outline projector

The outline measuring machine

Rockwell hardness testerMicro Vickers hardness tester

HARDNESS TESTER

The metallurgical microscope

Inspection Machine

The universal material tester inspects the mechanical property of our

products, and also conducts pull-in and push-out test.

Material Tester

The material torsion tester

The drop Impart Tester

2.5D Auto Measuring Machine

Lab

The Cutter

The Mounting press

The polisher

Rack End project Develops and designs new products ( include OEM ) all according to

ISO quality control requirements and SAE J490, J491 regulations. Announces more than 100 new products every single year. Follows OE,555 or Moog specs but continuously improving in

manufacturing procedures to remain higher quality and lower cost. Ball Studs/Pins and Housing

Following customers design . Keep customers design confidentially.

Research and Design

Employee: 55 Capacity(1 shift): (pcs/month)

Forging parts: 1,600,000 CNC machining parts: 600,000

Lead Time Rack Ends: 40 days. Ball Studs/Pins : 25 days. Housings: 20 days

Manufacturing capacity

CNC machine: 20 The dedicated lathe for ball stud: 14 The drilling machine: 10 The hydraulic straightening machine:

1 The shot peening Machine: 2 Ball stud/ pin Forging machine: 6 And more..

Equipment

We summit full samples and documents to the customer for their verifying needs before mass production. These documents are Check List Warrant Sample products Process flow chart Dimensional results Material inspected results Process FMEA Control plan Initial process study MSA study ISO /TS Certificates

PPAP samples and documents

Net Sales : USD 3.7 millionsNorth America : 46%Taiwan : 34%Italy : 12%The others : 8%

YEAR 2010

Turnover

Contact Us• Contact : Vincent Cho 、 E-Mail :

Sales@greatap.com.tw• http://www.greatap.com.tw• TEL : +886-426-595757#200 FAX : +886-426-595758• No.51 Jing 3rd Rd, Wuchi district, Taichung City 43541,

Taiwan.

Recommended