Upload
sylvester-evans
View
32
Download
0
Tags:
Embed Size (px)
DESCRIPTION
GREAT AUTO PARTS. 2011. Sep. Agenda. Our Company Products Quality Controls Lab R & D Manufacturing PPAP Samples Turnover Contact us. Company. Founded in 1988, re-engineered in 2005, Great Auto Parts specializes in Chassis part manufacturing for almost 30 years. - PowerPoint PPT Presentation
Citation preview
2011. Sep.
GREAT AUTO PARTS
Our Company Products Quality Controls Lab R & D Manufacturing PPAP Samples Turnover Contact us
Agenda
Founded in 1988, re-engineered in 2005, Great Auto Parts specializes in Chassis part manufacturing for almost 30 years.
Provides the highest quality and competitive products and services.
Brand new plant (7000 square meters) in ChungKang Export processing Zone started production in August 2010.
Company
Four main catalogs Inner Tie Rod EndsBall StudsHousingsBall Pins
Products
Quality policyAll members participating, continually improving.Fulfill customers’ needs and requirements.
ISO 9001 : 2008 CertifiedTS 16949 : Working with a consultant team and planning to be certified before June 2012.
Quality Controls
Established the chassis parts test lab that never seen in our field in Taiwan.
LAB
Roughness measuring tester
Roundness measuring tester
The optical outline projector
The outline measuring machine
Rockwell hardness testerMicro Vickers hardness tester
HARDNESS TESTER
The metallurgical microscope
Inspection Machine
The universal material tester inspects the mechanical property of our
products, and also conducts pull-in and push-out test.
Material Tester
The material torsion tester
The drop Impart Tester
2.5D Auto Measuring Machine
Lab
The Cutter
The Mounting press
The polisher
Rack End project Develops and designs new products ( include OEM ) all according to
ISO quality control requirements and SAE J490, J491 regulations. Announces more than 100 new products every single year. Follows OE,555 or Moog specs but continuously improving in
manufacturing procedures to remain higher quality and lower cost. Ball Studs/Pins and Housing
Following customers design . Keep customers design confidentially.
Research and Design
Employee: 55 Capacity(1 shift): (pcs/month)
Forging parts: 1,600,000 CNC machining parts: 600,000
Lead Time Rack Ends: 40 days. Ball Studs/Pins : 25 days. Housings: 20 days
Manufacturing capacity
CNC machine: 20 The dedicated lathe for ball stud: 14 The drilling machine: 10 The hydraulic straightening machine:
1 The shot peening Machine: 2 Ball stud/ pin Forging machine: 6 And more..
Equipment
We summit full samples and documents to the customer for their verifying needs before mass production. These documents are Check List Warrant Sample products Process flow chart Dimensional results Material inspected results Process FMEA Control plan Initial process study MSA study ISO /TS Certificates
PPAP samples and documents
Net Sales : USD 3.7 millionsNorth America : 46%Taiwan : 34%Italy : 12%The others : 8%
YEAR 2010
Turnover
Contact Us• Contact : Vincent Cho 、 E-Mail :
[email protected]• http://www.greatap.com.tw• TEL : +886-426-595757#200 FAX : +886-426-595758• No.51 Jing 3rd Rd, Wuchi district, Taichung City 43541,
Taiwan.