BULLA GADUUD
IMPLMENTED BY:
PROJECT:
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
GOVERNMENT.
GSPublisherVersion 0.0.100.100
DRAWING CONTENTDRAWING NOSHEET NO
PROPOSED PREFAB INSTALLATIONBULLA GADUUD
OCTOBER 2017 DRAWING INDEX
SIGNED & STAMPED:
01.
02.
03.
04.
05.06.
01/27
02/27
03/27
04/27
05/27
07/27
Cover page.
07.08/2708.
06/27
09/2709.
Drawing Index.
Site photos.
3D Scenes.
Floor layout.
Elevations.
Section.
10/2710.11/2711.
Site map.
Structural details.
Septic tank and soak pit.
Area schedule.
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
Longitude 000 4' 9" SLatitude 420 34' 19" E
LOCATION
03/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing titleSITE PHOTOS
04/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title3D SCENES
05/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
8501,500 1,600 1,500 4,950
10010,200
100
10,400
5,35
060
040
060
03,
350
100
5,00
010
0900 10
0900 10
03,
000
100
10,3
00
8501,500 1,600 1,500 4,950
1003,000
1003,000
1004,000
100
3,15
01,
500
638
900
1,76
21,
500
850
100
5,00
010
01,
900
100
3,00
010
0
650 300 300
Conference hall(floor boarding)
Hallway(floor boarding)
Office 1(floor boarding)
D1 D1 D1
D1D2
D2
D1pv
pv
pvpvpv
pv
pv
wc
wc
w1
w1w1
w1 w1
w1
w2
w2
Office 2(floor boarding)
Office 3(floor boarding)
pv pv
pv
pv
pvpv
pv
pvw.h.b
w.h.b
FLOOR LAYOUT
06/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
2002,350
200 4501,500
400 200975 825
200 7001,500
700 200
200 7001,500
700 200 7001,500
700 2003,900
200 2003,900
200 7001,500
700 200 7001,500
700 200
200
200
200
3,10
0
2002,900
200100
600400
600100
2002,350
2002,350
200
600
1,10
01,
200
800
600
1,70
060
080
0
North Elevation South Elevation
East ElevationWest Elevation
ELEVATIONS
07/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
1001,800
1008,300
100
6002,285
6002,512
6003,303
600
600
200
1,50
060
060
020
0
3,70
0
300 300
200
200
10,500
150
2,80
015
0
2,13
7
974
Floor panel to detail
Purpose builtaliminium door
Roof panel to detail
Floor panel to detail
VR Concrete footing
Concrete steps
SECTION
08/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
A B C D
1
2
3
4
5
3,100 3,100 4,100
2,55
02,
550
2,00
03,
100
Wall Grid
C C C C
D
D
D
D
D
2,885 3,112 3,903
2,35
22,
550
2,00
02,
898
600
600
Footing Grid
STRUCTURAL
09/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
110
10
900
MIN
.
600
550
200
200
VAR
IES
1,20
09,
040
1,80
0
800
1,20
09,
520
800
1,80
0
600
800 16,000 800
600
800 16,000 800
300
800
800 2,400 800
1,20
06,
000
VAR
IES
400 9,200 400
400
600
2380
400 8,000 400
300
600
5015
00
1,20
0
400
800 800
600
5,6001,200
1,80
01,
400
1,20
0
1,80
01,
400
2001,20
0
3,200600 3,200
800
2001,20
0
3,200
1,80
01,
400
1,200
600
600
1,00
020
020
01,
000
500
2,50
0
2,50
0
1,800
800
3,000
200 5,000 200
200 1,800 200 3,000 200
1,400300
North Elevation
Eas
t Ele
vatio
n
South Elevation
Wes
t Ele
vatio
n
100mmØ AGRICULTURAL PIPE
HALF OF THE OPEN JOINTS110mm WIDE TAR PAPER TO COVER
60-80mm CRUSHED STONE
OR TAR PAPERPOLYTHYNE SHEETING
COMPACTED MURRAM
66
SCALE 1:20FRENCH DRAIN - LAYOUT
10mm WIDE OPEN JOINTS
EARTH BACKFILL
TAR PAPER OVER 10mm GAPS
60-80mm CRUSHED STONE
TO FALL OF 1:200PERFORATED PITCH FIBER PIPE LAID
100mm DIAMETER AGRICULTURAL PIPE OR
SCALE 1:10SECTION 6 - 6
06 06 06 06 06 06
0201
01
02 02 02 02 02 02 02 02 02
01
SCALE = 1 : 25SECTION 1 - 1
02
06
SECTION 2 - 2
06
02 02
06
02 02 02
SCALE = 1 : 25
02
06 06 06
0202
02 02
08 08
(VAR
IES)
SECTION 4 - 4SCALE = 1 : 25
WALL `C'
5
SCALE = 1 : 50
21Y10-25-200`U' BAR
10Y
8-27
-200
(EF)
10Y
8-28
-200
(EF)
21Y10-26-200`U(EF)
5
10Y
8-27
-200
(EF)
21
24
2222
21
2222
SECTION 3 - 3SCALE = 1 : 25
12
10
12
10
12 12
(VAR
IES)
15
15
15
15
15
15
15
15
07 07
07 07
07 07
07 07
07 07
07 07
SECTION 5 - 5SCALE = 1 : 25
26
25
26
25
26 26
28
4 WALL `B'SCALE = 1 : 50
24Y10-21-200`U' BAR
15Y
8-23
-200
(EF)
15Y
8-24
-200
(EF) 24Y10-22-200`U(EF)
4
15Y
8-23
-200
(EF)
08 08
SECTION 1 - 1
TWL
200
VARIES
TWL
VARIES
200mmTHK. MASONRY WALLWITH WATERPROOFEDRENDERING
MIN
. 450
E2
E1
800x600 MEDIUM DUTYAIR TIGHT IC COVER & FRAME
150mm Thick Slab
150
150
VARIES
800x600 MEDIUM DUTYAIR TIGHT IC COVER & FRAME
WITH WATERPROOFEDRENDERING
200mmTHK. R.C.WALL
(1: 3 : 6 MIX.)50mmTHK. CONC. BLINDING
Y12 - 50 - 250B15Y12 - 51 - 250B2
100mm DIA. NIPPLE
WITH PUDDLE FLANGE100mm DIA. G.I. PIPE (200mm LONG)
VENT PIPE DETAIL10
0
G.I BEND100mm DIA. 90
SCALE 1:25
100mm DIA. EQUAL TEE
WIRE GAUZEMOSQUITO
WALL `A' 2No.
50mmTHK. CONC. BLINDING(1: 3 : 6 MIX.)
SCALE = 1 : 50
SCALE = 1 : 50200mmTHK. COVER SLAB R.C DETAILS
150mmTHK. R.C SLAB
WALL `A'
WAL
L `C
'
WALL `A'
WAL
L `B
'(ABR)
26Y10-01-250B1
4Y10-02-250B1
4Y10-02-250B1 4Y10-02-250B1
4Y10-02-250B1
(6)
(6)
15Y10-03-300B2 3Y10-04-300B2
(ABR)
2Y12-05T2&B2 2Y12-05T2&B2
2Y12-05T2&B22Y12-05T2&B2
3Y8-07-250T2 3Y8-07-250T2
3Y8-
06-2
50T2
3Y8-
06-2
50T2
2Y8-08T2 2Y8-08T22Y8-
08T2
2Y8-
08T2
45Y10-10-200`U'BAR 23Y10-11-200`U'BAR
45Y10-12-200(EF) 23Y10-13-200(EF)
10Y
8-14
-200
`U'B
AR
15Y
8-14
-200
`U'B
AR
10Y
8-15
-200
(EF)
4Y8 -15-200 (EF)
10Y
8-16
-200
(EF)
3
3GL
TWL OUTLET
1
TO SUBSOILRADIAL ARMS
IRRIGATION
REINFORCED WITH BRC A142 TOP AND BOTTOM
1
BAFFLE
2Y8-
08T2
2Y8-
08T2
02 02 02 02 02 02 02
2
2
02 02
2A
2A
Y12 - 50 - 250B14Y12 - 51 - 250B2
SCALE = 1 : 100
B.R.C. MESH A142
SEPTIC TANK
10/11
GSPublisherVersion 0.0.100.100
NOTES
All drawings and concepts remain theproperty of IOM
All dimensions are in mm unless statedAny discrepancies in the drawings should bereported to the consultants before thecontractor commences work on site.
PROJECT: CONSULTANT ScaleDate
Drawn By:
Reviewed andApproved by:
OCTOBER 2017
Eng. James Nandwa
1: 100
Project No.Grant No.
PROPOSED PREFABINSTALLATION
-BULLA GADUUD-
Drawing No.
SHEET NO.
Drawing title
FLOOR AREA SCHEDULES
SPACE USE FLOOR AREA (M2) REMARKS
OFFICE 1 9M2
100.01m2TOTAL FLOOR AREA:
OFFICE 2
OFFICE 3
MEETING ROOM
LADIES
GENTS
PASSAGE
9M2
12M2
51M2
1.62M2
1.62M2
15.77M2
AREA SCHEDULE
11/11