Future development same as today’s (fairly low density ...€¦ · Annual Operating Costs $ in...

Preview:

Citation preview

Planning Theme

• Future development same astoday’s (fairly low density).County’s portion of regionalgrowth declines over time.

Capital CostsCapital Costs$ in Billions

9999....22224444

8888....000077777777....66665555 7777....55552222

00001111

2222333344445555

666677778888

999911110000

AAAA BBBB CCCC DDDD AAAA BBBB CCCC DDDD

Annual Operating Costs$ in Millions

111199995555....3333

222255557777....9999222244444444....3333 222233339999....5555

0

50

100

150

200

250

300

AAAA BBBB CCCC DDDD AAAA BBBB CCCC DDDD

Recommended