7/24/2019 FR-EE-403-00003-L
1/20
L 5-NOV-2014 Issued for COMPANY Review TAT NAS MTH
Rev. Date Description Prepd By Chkd By Apprd By
COMPANY EPC CONTRACTOR
Abu Dhabi Polymers Company Limited (Borouge)
PROJECT
BOROUGE PO FLARE GAS RECOVERY PROJECT
TITLE
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Contractor Project No.:6502 Contractor Doc No: 6502-10-100-M1380-005-01
Document Class: 1
BOROUGE Document Inform ation:
Project No. Document Number Page Rev.
PE/000451 FR-EE-403-00003 1 OF 14 L
7/24/2019 FR-EE-403-00003-L
2/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 2 OF 14 L
Revision / Changes:
RevisionNo.
Page No. Section Change(s)
7/24/2019 FR-EE-403-00003-L
3/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 3 OF 14 L
TABLE OF CONTENTS
1 INTRODUCTION .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2 STUDY OBJECTIVE . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . 4
3 REFERENCE DOCUMENTS .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4
ETAP MODEL . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . 5
5
BASIS & ASSUMPTIONS . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . 6
6 NETWORK DESCRIPTION FOR STUDY .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
7 MODEL SIMULATION CONDITIONS .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
8 FAULT CURRENT LEVELS . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . 7
9
RELAY TYPE . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . . . . . . . . . 9
10 HV PROTECTION RELAY SETTINGS DATA .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
11
TIME CURRENT CURVES .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
12 CONCLUSION AND RECOMMENDATIONS .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Attachments:
Attachment A: ETAP SLD
Attachment B: ETAP Report
7/24/2019 FR-EE-403-00003-L
4/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 4 OF 14 L
1 INTRODUCTION
The intent of this study report is to carry out electrical power system analysis by performing protectioncoordination study of the electrical network under the scope of Borouge PO Flare Gas Recovery project (B3).
2 STUDY OBJECTIVEThe main objectives of protection coordination study are as follows:
To determine the characteristics, ratings, and settings of over current protective devices that minimizes plantoutages and interrupts short circuits as rapidly as possible.
To verify the existing protection device settings.
To verify the proper margin between protective devices in series to enable a back-up protection system.That is, upstream devices are on a standby basis to act expeditiously in case the immediate device nearer
to the fault location fails to operate.
Relay Coordination study is performed on the basis & recommendations of following international standards
IEEE Std 399-1997. (IEEE Recommended Practice for Industrial & Commercial PowerSystem Analysis)
IEEE Std 242-2001. (IEEE Recommended Practice for Protection and Coordination ofIndustrial and Commercial Power Systems)
3 REFERENCE DOCUMENTS
The documents listed below have been considered as the basis/reference for the relay settings & protectioncoordination study:
Document Name Borouge Document No. Contractor Document No.
Electrical Cable Schedule FR-EE-403-00006 6502-10-100-D1-1382-001-01
Electrical Load Summary (B3) STU-EE-FR-003 6502-10-100-D1381-002-01
Electrical One Line DiagramB3 PE5 Process Substation Unit N-42(11KV, 3.3
KV, 0.415 KV)TEC-EE-FR-0044 ----
11 KV SWITCHGEAR 42-ES-9001Protection and Metering One Line Diagram
TEC-EE-FR-0045 ----
Electrical One Line DiagramB3 PP4 Process Substation UNIT N-45
TEC-EE-FR-0046 ----
11 KV SWITCHGEAR 45-ES-9001Protection and Metering One Line Diagram
TEC-EE-FR-0047 ----
3.3 KV SWITCHGEAR 45-ES-9002
Protection and Metering One Line Diagram
TEC-EE-FR-0048 ----
3.3 KV SWITCHGEAR 42-ES-9002Protection and Metering One Line Diagram
TEC-EE-FR-0050 ----
BOR 3 PO SUBSTATIONProtection and Metering Diagram 0.415 KV
SwitchgearTEC-EE-FR-0049 ----
Electrical One Line DiagramPE5 Extrusion Substation
Unit N-42(11KV, 3.3 KV, 0.415 KV)42-EE-153-920001 ----
Electrical One Line DiagramPP4 Extrusion Substation
Unit N-42(11KV, 3.3 KV, 0.415 KV)45-EE-153-920001 ----
7/24/2019 FR-EE-403-00003-L
5/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 5 OF 14 L
4 ETAP MODEL
As per Descon / Contractor scope (DOC: Electrical System Description and Scope Definition for EPCPackage) in Borouge 3 expansion project, Descon has to analyze the impact of newly added loads (which arein Descon scope, DOC: Electrical Load Summary B3) on the electrical network of B3 by performing theprotection coordination study.
The details of ETAP model provided by Company are as follows:
Name:ETAP-3583-PO
This contains the following switchgears with associated electrical equipment (Motors, Transformers, andCables etc).
80-ES-1802 (33 KV) 41-ES-9001 (11 KV) 41-ES-9002 (3.3 KV)
41-ES-9203 (3.3 KV) 41-ES-9011 (0.415) 41-ES-9211 (0.415 KV)
42-ES-9213 (0.415 KV) 41-ES-9212 (0.415 KV) 41-ES-9201 (11 KV)
42-ES-9201 (11 KV) 42-ES-9001 (11 KV) 42-ES-9002 (11 KV)
42-ES-9203 (3.3 KV) 42-ES-9011 (0.415 KV) 42-ES-9211 (0.415 KV)
42-ES-9212 (0.415 KV) 44-ES-9001 (11 KV) 44-ES-9002 (3.3 KV)
44-ES-9202 (3.3 KV) 44-ES-9011 (0.415 KV) 44-ES-9211 (0.415 KV)
44-ES-9212 (0.415 KV) 45-ES-9001 (11 KV) 45-ES-9002 (3.3 KV)
45-ES-9202 (3.3 KV) 45-ES-9011 (0.415 KV) 45-ES-9211 (0.415 KV)
Loads in Contractors scope have been modeled along with associated cables.
7/24/2019 FR-EE-403-00003-L
6/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 6 OF 14 L
5 BASIS & ASSUMPTIONS
The basis and assumptions are listed below
The protection data for motors i.e starting time, thermal withstand limits, thermal time constants etc arebased on technical data provided by vendor and assumptions are made where vendor data is pending.
Thermal overload settings of motors shall be performed at site during commissioning stage.
For simulation purposes, exact Relay/ETU model is used as available in standard ETAP device library. Incase of unavailability of particular model, nearest match having similar characteristics is used.
In this report, following switchgears of Unit 42 (PE5) and Unit 45 (PP4) are under observation as most ofthe loads under contractors scope are being fed from theses switchgears. However attached ETAP reportwill reflect the results of other switchgears as well.
42-ES-9001 (11 KV) 45-ES-9001 (11 KV) 42-ES-9011 (0.415 KV) 45-ES-9011 (0.415 KV)
6 NETWORK DESCRIPTION FOR STUDY
For the simulation, ETAP models have been updated as per the reference documents mentioned in section 3of this report. The Network Description for the study is as follows:
The main power sources for 11 KV switchgear 42-ES-9001 are 2 Nos. 33 KV feeders supplied byswitchgear 80-EE-1802 through 31.5 MVA, 33/11.5 KV transformers (42-EP-9011, 42-EP-9012).
2 Nos. 11 KV feeders (from switchgear 42-ES-9001) are stepped down by 2 Nos. 3.15 MVA, 11/0.433 KVtransformers (42-EP-9031, 42-EP-9032) to feed 0.415 KV switchgear 42-ES-9011.
The main power sources for 11 KV switchgear 45-ES-9001 are 2 Nos. 33 KV feeders supplied byswitchgear 80-EE-1803 through 31.5 MVA, 33/11.5 KV transformers (45-EP-9011, 45-EP-9012).
2 Nos. 11 KV feeders (from switchgear 45-ES-9001) are stepped down by 2 Nos. 2.5 MVA, 11/0.433 KVtransformers (45-EP-9031, 45-EP-9032) to feed 0.415 KV switchgear 45-ES-9011.
Following Generators are operating in Standby mode and considered OFF in the analysis.
42-EG-9201 42-EG-9001 45-EG-9001 45-EG-9201
7 MODEL SIMULATION CONDITIONS
Following are the basis of model simulation conditions.
Loads are categorized into Continuous, Intermittent and Stand by 100%, 50% & 0% loading respectively.
All Lump Loads are considered as Continuous and operating at 80% loading.
Loading Category is selected as Normal.
Primary tap positions are set at +2.5% of nominal voltage, for all transformers (for Unit 42 & 45).
33kV Grid bus is considered as slack/swing bus.
The by-pass switches for VFDs are closed to get maximum short circuit contribution from motors.
Maximum short circuit power from utility to switchgears of unit 42 and 45 is considered 1257 MVA (3-phase)as per etap model/etap report submitted by Company described in section 5 of this report.
Minimum short circuit power from utility to switchgears of unit 42 and 45 is considered 850 MVA (3-phase)as per etap model/etap report submitted by Company described in section 5 of this report.
7/24/2019 FR-EE-403-00003-L
7/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 7 OF 14 L
8 FAULT CURRENT LEVELS
Initial Symmetrical Short Circuit Current (maximum):
BusNominal
Voltage (kV)Rated ShortCircuit (kA)
Initial Symmetrical RMS Current kA (Ik )
Three Phase Line to Ground Line to LineDouble Line to
Ground
42-ES-9001 A 11 31.5 26.3 0.4 23.1 23.2
42-ES-9001 B 11 31.5 26.3 0.4 23.1 23.2
42-ES-9011 A 0.415 80 54.2 47.3 46.8 52.8
42-ES-9011 B 0.415 80 54.2 47.3 46.8 52.845-ES-9001 A 11 31.5 25.1 0.4 21.8 21.9
45-ES-9001 B 11 31.5 25.1 0.4 21.8 21.9
45-ES-9011 A 0.415 80 47.7 42.8 41.2 46.845-ES-9011 B 0.415 80 47.7 42.8 41.2 46.8
Peak Short Circuit Current (maximum):
BusNominal
Voltage (kV)Rated ShortCircuit (kA)
Peak Short Circuit Current kA (ip)
Three Phase Line to Ground Line to LineDouble Line to
Ground
42-ES-9001 A 11 31.5 67.7 1.08 59.4 59.7
42-ES-9001 B 11 31.5 67.7 1.08 59.4 59.7
42-ES-9011 A 0.415 80 124.3 108.6 107.3 121.3
42-ES-9011 B 0.415 80 124.3 108.6 107.3 121.3
45-ES-9001 A 11 31.5 64.9 1.08 56.4 56.7
45-ES-9001 B 11 31.5 64.9 1.08 56.4 56.7
45-ES-9011 A 0.415 80 110.4 99.1 95.3 108.2
45-ES-9011 B 0.415 80 110.4 99.1 95.3 108.2
Symmetrical Short Circuit Breaking Current (maximum):
BusNominal
Voltage (kV)Rated ShortCircuit (kA)
Symmetrical Short Circuit Breaking Current kA (Ib)
Line to Ground Line to Line Double Line to Ground
42-ES-9001 A 11 31.5 0.4 23.1 23.2
42-ES-9001 B 11 31.5 0.4 23.1 23.2
42-ES-9011 A 0.415 80 47.3 46.8 52.8
42-ES-9011 B 0.415 80 47.3 46.8 52.8
45-ES-9001 A 11 31.5 0.4 21.8 21.9
45-ES-9001 B 11 31.5 0.4 21.8 21.9
45-ES-9011 A 0.415 80 42.8 41.2 46.8
45-ES-9011 B 0.415 80 42.8 41.2 46.8
7/24/2019 FR-EE-403-00003-L
8/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 8 OF 14 L
Initial Symmetrical Short Circuit Current (minimum):
BusNominal
Voltage (kV)Rated ShortCircuit (kA)
Initial Symmetr ical RMS Current kA (I k)
Three Phase Line to Ground Line to Line Double Line toGround
42-ES-9001 A 11 31.5 14.1 0.3 12.2 12.3
42-ES-9001 B 11 31.5 14.1 0.3 12.2 12.3
42-ES-9011 A 0.415 80 29.7 30.6 25.7 30.2
42-ES-9011 B 0.415 80 29.7 30.6 25.7 30.2
45-ES-9001 A 11 31.5 14.1 0.3 12.2 12.3
45-ES-9001 B 11 31.5 14.1 0.3 12.2 12.3
45-ES-9011 A 0.415 80 28.1 28.9 24.3 28.5
45-ES-9011 B 0.415 80 28.1 28.9 24.3 28.5
Peak Short Circuit Current (minimum):
BusNominal
Voltage (kV)Rated ShortCircuit (kA)
Peak Short Circuit Current kA (ip)
Three Phase Line to Ground Line to LineDouble Line to
Ground
42-ES-9001 A 11 31.5 36.7 0.9 31.8 32
42-ES-9001 B 11 31.5 36.7 0.9 31.8 32
42-ES-9011 A 0.415 80 74.7 77.1 64.7 76
42-ES-9011 B 0.415 80 74.7 77.1 64.7 76
45-ES-9001 A 11 31.5 36.7 0.9 31.8 32
45-ES-9001 B 11 31.5 36.7 0.9 31.8 32
45-ES-9011 A 0.415 80 70.2 72.3 60.8 71.4
45-ES-9011 B 0.415 80 70.2 72.3 60.8 71.4
Symmetrical Short Circuit Breaking Current (minimum):
BusNominal
Voltage (kV)Rated ShortCircuit (kA)
Symmetrical Short Circuit Breaking Current kA (Ib)
Line to Ground Line to Line Double Line to Ground
42-ES-9001 A 11 31.5 0.3 12.2 12.3
42-ES-9001 B 11 31.5 0.3 12.2 12.3
42-ES-9011 A 0.415 80 30.6 25.7 30.2
42-ES-9011 B 0.415 80 30.6 25.7 30.2
45-ES-9001 A 11 31.5 0.3 12.2 12.3
45-ES-9001 B 11 31.5 0.3 12.2 12.3
45-ES-9011 A 0.415 80 28.9 24.3 28.5
45-ES-9011 B 0.415 80 28.9 24.3 28.5
7/24/2019 FR-EE-403-00003-L
9/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 9 OF 14 L
9 RELAY TYPE
The relays used for HV motor feeder protection are ABB make REF630 with following protection functions.
Motor FeederREF 630
50P Phase definite time OC
51P Phase inverse OC
50N Earth definite time OC
51N Earth inverse OC
87M Differential protection
74 Alarm
42R Running CB
86 Lockout
46 Phase balance current relay
38 Bearing protection49 Thermal protection
49T Temperature protection
48 Incomplete Sequence Relay
66 Jogging device
10 HV PROTECTION RELAY SETTINGS DATA
Only over current protection function settings (50P, 50G, 51P, 51G) are proposed in this document. All othersettings shall be performed at site during commissioning stage.
Motor TAG 47-XK-921-KM-921 47-XK-931-KM-931
Description Motor feeder Motor feeder
Relay REF 630 REF 630
CT Ratio 250-1 200-1OVERCURRENT STAGE I> (51) Settings
Pickup Value 0.9 0.9
TMS 3.5 2.11
Characteristic CurveIEC-
Extremely InverseIEC-
Extremely Inverse
OVERCURRENT INSTANTANEOUS I>> (50) Settings
Pickup Value 6.71 6.41
Time 0.05 0.05
RESIDUAL CURRENT INSTANTANEOUS I02 > (50N) Settings
Pickup Value 0.21 0.18
Time 0.05 0.05
7/24/2019 FR-EE-403-00003-L
10/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 10 OF 14 L
11 TIME CURRENT CURVES
Time current curves (TCC) are plotted to verify the present state of coordination.
a. 47-XK-921-KM-921 PE compressor motor relay phase TCC.
Figure 1
7/24/2019 FR-EE-403-00003-L
11/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 11 OF 14 L
b. 47-XK-921-KM-921 PE compressor motor relay earth time current curves
Figure 2
7/24/2019 FR-EE-403-00003-L
12/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 12 OF 14 L
c. 47-XK-931-KM-931 PP compressor motor relay phase time current curves
Figure 3
7/24/2019 FR-EE-403-00003-L
13/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 13 OF 14 L
d. 47-XK-931-KM-931 PP compressor motor relay earth time current curves
Figure 4
7/24/2019 FR-EE-403-00003-L
14/20
Abu Dhabi Polymers Company Limited (Borouge)
BOROUGE PO FLARE GAS RECOVERY PROJECT
RELAY SETTINGS & PROTECTION COORDINATION STUDY
Issued date Project No. Document Number Page Rev.
5-NOV-2014 PE/000451 FR-EE-403-00003 14 OF 14 L
12 CONCLUSION AND RECOMMENDATIONS
Relay coordination study has been performed after incorporating protection settings of existing system andproposed protection settings of newly added loads. The study reflects that both HV & LV electrical systemsare adequate and properly coordinated after the Borouge project load additions and no modification/updatein protection settings of existing system is required at this stage.
7/24/2019 FR-EE-403-00003-L
15/20
PROTECTION COORDINATION STUDY
ETAP SLD
ATTACHMENT A
7/24/2019 FR-EE-403-00003-L
16/20
-Line Diagram - SCMAX (Star Sequence-of-Operation)
12:05:32 Oct 31, 2014 Project File: ETAP-3583-PO
42- ES- 9001 A
42-
XE-
705-
NM-
701A
1400kW
42-XE- 705- EC- 701A
42- XE-705-EP- 701A1750 kVA
R
CB330
42-EP-9233
R
CB331
42- EP-9031
R
CB332
C/ 42- ES-9001 B
XC/42-
ES-
001B
0 A
CB326
42-EP-9032
CB32R
CB338Open
80- ES-1802 B
I>
R
42-EP-901231. 5 MVA
CB339
R
CB341
R
CB334
C/ 42- ES-9001 A
XC/42-
ES-
001A
0 A
R
CB335
80- ES- 1802 A
I>
R
42- EP-901131. 5 MVA
CB336
R
42-EP-9231
R
CB337
42-
XK-
402-
KM-
402
2300kW
R
CB17CB40
R
47-ECC
-500
01
1-3/
C18
5
47-
XK-
921-
KM-
921
3300kW
42- XE-705-EP- 701A1750 kVA
42-XE- 705- EC- 701A
42-
XE-
705-
NM-
701A
1400kW
80- ES- 1802 A 80- ES- 1802 B
42- ES- 9001 A
CB335CB334CB332CB331CB330
CB338Open
CB32CB341CB326
CB336CB339
42- EP-901131. 5 MVA
42-EP-901231. 5 MVA
C/ 42- ES-9001 A
XC/42-
ES-
001A
0 A
C/ 42- ES-9001 B
XC/42-
ES-
001B
0 A
CB337
42- EP-9031
42-EP-903242- EP- 9231 42- EP- 9233
42-
XK-
402-
KM-
402
2300kW
CB17
47-ECC
-500
01
1-3/
C18
5
47-
XK-
921-
KM-
921
3300kW
CB40
7/24/2019 FR-EE-403-00003-L
17/20
-Line Diagram - SCMAX (Star Sequence-of-Operation)
12:03:46 Oct 31, 2014 Project File: ETAP-3583-PO
45- ES- 9001 A
47-
XK-
931-
KM-
931
2650kW
47-ECC
-500
02
1-3/
C18
5
R
CB38
45- ES- 9001 A
47-ECC
-500
02
1-3/
C18
5
CB38
47-
XK-
931-
KM-
931
2650kW
45- ES-9001 B
C/45-ES-9001
B
XC/4
5-
ES-
9001B
0 A
CB571
45- EP- 9031
R
CB577
C/45-
ES-
9001A
XC/45-
ES-
9001A
0 A
R
CB580
CB583 Open
R
80- ES-1803 A
I>
R
45- EP- 901131. 5 MVA
CB581
R
45- EP- 9231
R
CB582
45-
XK-
401-
KM-
401
3150kW
R
CB28 CB579
R R
CB586
45- EP- 9032
CB572
45-
XE-
705-
NM-
701
2 1 0 0
k W
80- ES- 1803 B
I>
R
45- EP- 901231. 5 MVA
CB584
R
45- EP- 9232
CB585
45-
XE-
705-
NM-
701
2 1 0 0
k W
XC/45-
ES-
9001A
0 A
45- ES-9001 B
XC/4
5-
ES-
9001B
0 A
C/45-ES-9001
B
C/45-
ES-
9001A
45- EP- 901131. 5 MVA
45- EP- 901231. 5 MVA
CB586CB571
CB572
CB583 Open
CB577 CB579 CB580
CB581
CB582
CB584
CB585
80- ES- 1803 A 80- ES- 1803 B
45- EP- 9031
45- EP- 9032
45- EP- 9231
45- EP- 9232
45-
XK-
401-
KM-
401
3150kW
CB28
7/24/2019 FR-EE-403-00003-L
18/20
PROTECTION COORDINATION STUDYETAP REPORT
ATTACHMENT B
7/24/2019 FR-EE-403-00003-L
19/20
Project: BOROUGE #3 ETAP
Location: LHR PAK
Contract: 6502
Engineer: DIPL
Filename: ETAP-3583-PO
Page: 1
Date: 29-10-2014
Revision: Base
12.5.0C
Overcurrent Relay Settings
OCR: R_42-ES-9001-A1
MFR: ABB
Model: RE_630
Tag #:
GND:
If (kA)Base kVCT
2500/1
24.70
0.40
2500/1Phase:
LG, (User-Defin
3 ph, (User-Defi
OC Level: OC1
SettingRange
Phase TOC IEC - Normal Inverse
Pickup (Tap) 0.3 - 5 xCT Sec 0.790
Time Dial 0.150
Phase INST Pickup 0.01 - 35 xCT Sec 6.300
Time Delay 0.04 - 30 Sec 0.400
Ground INST Pickup 0.01 - 400 xCT Sec 0.100
Time Delay 0.01 - 300 Sec 0.600
OCR: R_42-ES-9001-KM-921
MFR: ABB
Model: RE_630
Tag #:
GND:
If (kA)Base kVCT
100/1
24.70
0.40
250/1Phase:
LG, (User-Defin
3 ph, (User-Defi
OC Level: OC1
SettingRange
Phase TOC IEC - Extremely Inverse
Pickup (Tap) 0.3 - 5 xCT Sec 0.900
Time Dial 3.500
Phase INST Pickup 0.01 - 35 xCT Sec 6.710
Time Delay 0.04 - 30 Sec 0.050
Ground INST Pickup 0.01 - 400 xCT Sec 0.210
Time Delay 0.01 - 300 Sec 0.050
ATTACHMENT B
7/24/2019 FR-EE-403-00003-L
20/20
Project: BOROUGE #3 ETAP
Location: LHR PAK
Contract: 6502
Engineer: DIPL
Filename: ETAP-3583-PO
Page: 2
Date: 29-10-2014
Revision: Base
12.5.0C
Overcurrent Relay Settings
OCR: R_45-ES-9001-A1
MFR: ABB
Model: RE_630
Tag #:
GND:
If (kA)Base kVCT
2500/1
23.90
0.40
2500/1Phase:
LG, (User-Defin
3 ph, (User-Defi
OC Level: OC1
SettingRange
Phase TOC IEC - Normal Inverse
Pickup (Tap) 0.3 - 5 xCT Sec 0.790
Time Dial 0.150
Phase INST Pickup 0.01 - 35 xCT Sec 6.300
Time Delay 0.04 - 30 Sec 0.400
Ground INST Pickup 0.01 - 400 xCT Sec 0.100
Time Delay 0.01 - 300 Sec 0.600
OCR: R_45-ES-9001-KM-931
MFR: ABB
Model: RE_630
Tag #:
GND:
If (kA)Base kVCT
100/1
23.90
0.40
200/1Phase:
LG, (User-Defin
3 ph, (User-Defi
OC Level: OC1
SettingRange
Phase TOC IEC - Extremely Inverse
Pickup (Tap) 0.3 - 5 xCT Sec 0.900
Time Dial 2.110
Phase INST Pickup 0.01 - 35 xCT Sec 6.410
Time Delay 0.04 - 30 Sec 0.050
Ground INST Pickup 0.01 - 400 xCT Sec 0.180
Time Delay 0.01 - 300 Sec 0.050
Recommended