eTransport Walkthrough ... Run Slide Show for full advantage ... Bjorn H. Bakken, PhD

Preview:

DESCRIPTION

eTransport Walkthrough ... Run Slide Show for full advantage ... Bjorn H. Bakken, PhD bjorn.h.bakken@sintef.no SINTEF Energy Research www.energy.sintef.no www.sintef.no/etransport. SINTEF Energy Research. ... Opening the case. Select existing case from database or press New. - PowerPoint PPT Presentation

Citation preview

eTransport WalkthrougheTransport Walkthrough

... Run Slide Show for full advantage ...... Run Slide Show for full advantage ...

Bjorn H. Bakken, PhDBjorn H. Bakken, PhD bjorn.h.bakken@sintef.nobjorn.h.bakken@sintef.no

SINTEF Energy ResearchSINTEF Energy Research

www.energy.sintef.nowww.energy.sintef.nowww.sintef.no/etransportwww.sintef.no/etransport

SINTEF Energy Research

... Opening the case ...... Opening the case ...

Select existing case from database or

press New

‘Drag and drop’ component

library

‘Drag and drop’ component

library

Energy system drawing

Energy system drawing

Operation and investment analysis

Operation and investment analysis

Pan & Zoom window

Pan & Zoom window

1. Set Timesteps ...1. Set Timesteps ...

1-3 days (24-72 timesteps) per segment are recommended for

operational analysis

Any number of Segments (seasons) may be specified

by clicking New.

The sum of Weight over all Segments must equal one year (365 when Timestep

is set as 24 hours)

The load and price profiles given for each component is multiplied with the Coefficient for the respective Segment

2. Set Segments ...2. Set Segments ...

3. Set Years ...3. Set Years ...The Years parameter defines

the Investment periods in the case. They do NOT have to be

of equal length.

The load and price profiles given for each component is multiplied with the Coefficient

for each Year

... Case layout ...... Case layout ...

Electricity and heat loads

Electric peak load boiler

Electricity spot market

Utility buy-back market

Electricity grid

District heating grid

CHP alt. 1:Gas fired CHP

CHP alt. 2:Low quality waste fired CHP

CHP alt. 3:High quality wood waste fired CHP

... Heat load ...... Heat load ...

Data used by Investment analysis; included in all

components

When no parameters are given, this component is valid in all Segments, Years and

Investment alternatives

Technology specific data used by

Operational analysis

... El source ...... El source ...

These tables are always displayed as a function

of the Timesteps setting (here: 24)

... El market ...... El market ...

The El market is an option to sell electricity at a given price (constant or variable). Can also represent a Load.

... Power line ...... Power line ...

eTransport uses DC Power Flow to calculate the

electricity network flows. Any number of lines and cables

may be specified.

... DH pipeline ...... DH pipeline ...

... Gas source ...... Gas source ...

This source is included in Investment

alternative CHP1

The pressure setting is only valid when the Gas Source is connected to a Gas Node

in a gas network.

This source is included in Investment

alternative CHP2

... Waste source ...... Waste source ...

... Storage ...... Storage ...

... Gas fired CHP ...... Gas fired CHP ...

... Boiler ...... Boiler ...

The boiler is defined as a separate

Investment alternative

... Investment setup ...... Investment setup ...

...or Investment Parameters from any component

Select Edit Investments from the Data menu...

... Run investment analysis ...... Run investment analysis ...

Combination & timing of investments:Red=Not allowedGreen=AllowedYellow=Mandatory combinations-> NB: The combination matrix must

be evaluated horizontally

The report from the AMPL solver can be inspected e.g. to search for deficit penalties or errors

Choose variablesto display

Investment alternatives list; Click to highlight components on drawing screen

... View results: Investments ...... View results: Investments ...

... View results: Investments ...... View results: Investments ...

4 types of emissions calculated for all alternatives

Choose variablesto display

Ranked list of investment alternatives

Tree structure shows the components included in

each investment alternative

Operational analysis for Rank 1 (CHP 2 + Boiler)

...for Period 2010-2015...Select variables

... View results: Operation ...... View results: Operation ...

Selected components highlighted on screen

- the user can scroll through any combination of Rank, Period and Segment

eTransport WalkthrougheTransport Walkthrough

Contact:Contact:

Bjorn H. Bakken, PhDBjorn H. Bakken, PhD bjorn.h.bakken@sintef.nobjorn.h.bakken@sintef.no

SINTEF Energy ResearchSINTEF Energy Research

www.energy.sintef.nowww.energy.sintef.nowww.sintef.no/etransportwww.sintef.no/etransport