Dyer Brio Project Update

Preview:

DESCRIPTION

Dyer Brio Project Update

Citation preview

“Delivering Outstanding Services”

Dyer Brio Project Update

Strategic Plan 2015 Goal:

7) Enhance and Sustain El Paso’s Infrastructure Network

Strategy:

7.2 Improve competitiveness through infrastructure improvements impacting the quality of life

“Delivering Outstanding Services” 2

Brio Articulated Vehicles

• 60-foot long articulated vehicle

• 45 seated capacity, 59 standing capacity

• ADA Ramp Deployment • On-board Digital El Paso

Hot Spot • On-board bicycle rack • Next stop request • Fare box

Vehicle Improvements

“Delivering Outstanding Services”

Brio Service Improvements

• Frequent bus service 10 min peak, and 15 min off peak 14 hours M-F: 6am – 8pm 11 hours Sat/Holiday: 9am – 6pm No Sunday/Holiday Service

• Less frequent bus stops (approx 1 mile spacing) • Traffic signal prioritization

3

“Delivering Outstanding Services”

Brio Station Improvements

• Pedestrian lighting/sidewalks • Ticket Vending Machines • Digital El Paso Hot Spot • Near-level boarding • ADA accessibility • Landscaping • Bicycle racks • Station Artwork • Real-time displays • Solar trash compactor • Information display case • Mini-shelter design concept

4

“Delivering Outstanding Services” 5

“Delivering Outstanding Services” 6

Dyer Brio Corridor

Corridor Features:

• Length: 11 miles

• From DTC to Northgate TC (proposed)

• Station Platforms: 18

• Vehicles: 10

7

Downtown to Five Points

8

Fort Bliss to Northgate

“Delivering Outstanding Services”

Ellerthorpe Stations

9

“Delivering Outstanding Services”

Hercules Mini-Shelter Concept

10

“Delivering Outstanding Services”

Northgate Transfer Center & Transit-Oriented Development

11

“Delivering Outstanding Services”

Dyer BRIO

12

Alameda BRIO

Project Overview

Districts 2, 4, and 8

Approved Budget $35.7M

Source(s) of Funding Certificates of Obligation, Category 2, FTA5309

Completion of Design March 2016

Construction Let Date July 2016

Critical Assumptions New TxDOT requirements, if any ROW issues/concerns, if any

Open to the Public November 2017

“Delivering Outstanding Services”

Northgate Transfer Center

13

Alameda BRIO

Project Overview

Districts 2, 4, and 8

Approved Budget $15.5M

Source(s) of Funding Certificates of Obligation, Tiger V

Completion of Design January 2016

Construction Let Date February 2016

Critical Assumptions ROW issues/concerns, if any

Open to the Public Late 2017 / Early 2018

“Delivering Outstanding Services”

Dyer BRIO

14

Questions/Comments

Recommended