14
“Delivering Outstanding Services” Dyer Brio Project Update Strategic Plan 2015 Goal: 7) Enhance and Sustain El Paso’s Infrastructure Network Strategy: 7.2 Improve competitiveness through infrastructure improvements impacting the quality of life

Dyer Brio Project Update

Embed Size (px)

DESCRIPTION

Dyer Brio Project Update

Citation preview

“Delivering Outstanding Services”

Dyer Brio Project Update

Strategic Plan 2015 Goal:

7) Enhance and Sustain El Paso’s Infrastructure Network

Strategy:

7.2 Improve competitiveness through infrastructure improvements impacting the quality of life

“Delivering Outstanding Services” 2

Brio Articulated Vehicles

• 60-foot long articulated vehicle

• 45 seated capacity, 59 standing capacity

• ADA Ramp Deployment • On-board Digital El Paso

Hot Spot • On-board bicycle rack • Next stop request • Fare box

Vehicle Improvements

“Delivering Outstanding Services”

Brio Service Improvements

• Frequent bus service 10 min peak, and 15 min off peak 14 hours M-F: 6am – 8pm 11 hours Sat/Holiday: 9am – 6pm No Sunday/Holiday Service

• Less frequent bus stops (approx 1 mile spacing) • Traffic signal prioritization

3

“Delivering Outstanding Services”

Brio Station Improvements

• Pedestrian lighting/sidewalks • Ticket Vending Machines • Digital El Paso Hot Spot • Near-level boarding • ADA accessibility • Landscaping • Bicycle racks • Station Artwork • Real-time displays • Solar trash compactor • Information display case • Mini-shelter design concept

4

“Delivering Outstanding Services” 5

“Delivering Outstanding Services” 6

Dyer Brio Corridor

Corridor Features:

• Length: 11 miles

• From DTC to Northgate TC (proposed)

• Station Platforms: 18

• Vehicles: 10

7

Downtown to Five Points

8

Fort Bliss to Northgate

“Delivering Outstanding Services”

Ellerthorpe Stations

9

“Delivering Outstanding Services”

Hercules Mini-Shelter Concept

10

“Delivering Outstanding Services”

Northgate Transfer Center & Transit-Oriented Development

11

“Delivering Outstanding Services”

Dyer BRIO

12

Alameda BRIO

Project Overview

Districts 2, 4, and 8

Approved Budget $35.7M

Source(s) of Funding Certificates of Obligation, Category 2, FTA5309

Completion of Design March 2016

Construction Let Date July 2016

Critical Assumptions New TxDOT requirements, if any ROW issues/concerns, if any

Open to the Public November 2017

“Delivering Outstanding Services”

Northgate Transfer Center

13

Alameda BRIO

Project Overview

Districts 2, 4, and 8

Approved Budget $15.5M

Source(s) of Funding Certificates of Obligation, Tiger V

Completion of Design January 2016

Construction Let Date February 2016

Critical Assumptions ROW issues/concerns, if any

Open to the Public Late 2017 / Early 2018

“Delivering Outstanding Services”

Dyer BRIO

14

Questions/Comments