View
218
Download
1
Category
Preview:
Citation preview
PROJECT LOCATION
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
EXCHANGE
Project Team
Signatures
3/16" = 1'-0"
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
G-001
COVER AND DRAWINGINDEX
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
JBLM - McCHORD EXPRESSIMAGE UPGRADEBUILDING 545
PN: 4915-12-006100% BID DOCUMENTSSEPTEMBER 19, 2014
OWNER - ARMY AND AIR FORCE EXCHANGE SERVICE (AAFES)CONTACT - GUS HAMSHO3911 S. WALTON WALKER BLVD.DALLAS TX, 75236-1598214.312.6215hamshog@aafes.comwww.aafes.com
ALSC ARCHITECTS, P.S.CONTACT - LESA A. WEBB / KEN MURPHY203 NORTH WASHINGTON, SUITE 400SPOKANE, WA 99201509.838.8568 PHONE509.458.3710 FAXlwebb@alscarchitects.comkmurphy@alscarchitects.comwww.alscarchitects.com
RIVERSIDE ENGINEERING, PLLCCONTACT - MICHAEL HUBBARD816 W. FRANCIS AVE., #381SPOKANE, WA 99205509.343.6963mhubbard@nwme.netwww.nwme.net
DEI ELECTRICAL CONSULTANTS, INC.CONTACT - ERIC SHIRLEY2205 N WOODRUFF RD, SUITE 5SPOKANE VALLEY, WA 99206509.747.5139eric@deicorp.comwww.deicorp.com
DRAWING INDEX
GENERAL
G-001 COVER AND DRAWING INDEX
G-002 ABBREVIATIONS / SYMBOLS AND MATERIAL LEGEND
ARCHITECTURAL
A-100 PHASING PLAN
A-101 DEMO PLAN
A-102 FLOOR PLAN - DOOR SCHEDULE - DETAILS
A-103 PHOTO SHEET
A-104 PHOTO SHEET
A-251 INTERIOR ELEVATIONS, FINISH LEGEND & FINISHSCHEDULE
A-401 ENLARGED PLANS, ELEVATIONS & SCHEDULES
MECHANICAL
M-001 LEGENDS, ABBREVIATIONS AND GENERAL NOTES
M-101 SCHEDULES
M-201 FLOOR PLAN
ELECTRICAL
E-100 SYMBOLS / NOTES / SCHEDULES
E-101 SNACK AVENUE - POWER PLAN
VICINITY MAP
BASE MAP
EXCHANGE - CO
EXCHANGE - PM
GENERAL CONTRACTOR
ARCHITECT / ENGINEER
SIGNATURE DATE
SIGNATURE DATE
SIGNATURE DATE
SIGNATURE DATE
Revision Schedule
Revision #
Revision
Description Revision Date
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
G-002
ABBREVIATIONS /SYMBOLS ANDMATERIAL LEGEND
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
CLCL
LEGENDS & SYMBOLS
UNRATED WALL
FIRE RATED WALL RATING BASED ON TYPE
THERMAL OR ACOUSTICAL
WALL LEGEND
CONCRETE WALL C.I.P.C/P.C.C.
CMU WALL
EXISTING CONCRETE OR CMU
WALL REFERENCE
COLUMN REFERENCE/GRID BUBBLES
MATCHLINE
SECTION REFERENCE
ELEVATION REFERENCE
DETAIL & ENLARGED PLAN REFERENCE
WINDOW REFERENCE
DOOR REFERENCE
ROOM NAME & NUMBER REFERENCE
FINISH/MATERIAL REFERENCE
ELEVATION INDICATORS
REVISION INDICATOR & NORTH ARROW
PROPERTY LINE
CENTER LINE
CONTOUR LINES
SIGNAGE SYMBOL
KEYNOTE SYMBOL
SPECIALTY EQUIPMENT
REFERENCE SYMBOL LEGEND
MATCHLINE - SEE SHEET A100
ICON LEGEND
FLOOR DRAIN
FIRE EXTINGUISHER & HOSE CABINET
FIRE EXTINGUISHER CABINET
FIRE SPRINKLER HEAD
RETURN/EXCHANGE AIR GRILL 2' x 2'
SUPPLY AIR GRILL 2' x 2'
RECESSED FLUORESCENT 2' x 2'
RECESSED FLUORESCENT 2' x 4'
RECESSED FLUORESCENT 1' x 4'
SURFACE MOUNTED FLUORESCENT
RECESSED CAN
1
A100
SHEET REFERENCE1
A100
SHEET REFERENCE
1
A100
1
A100
SHEET REFERENCE
WINDOW ALPHA DESIGNATION1t
DOOR NUMBER
ROOM NAME
101
ROOM NAME
ROOM NUMBER
SQUARE FOOTAGE
MM 101 REFERENCE NUMBER
FINISH TYPE
NAME
TYPE
HEIGHT
1
NORTH
PR
OJE
CT
300 WALL TYPE
SECTION REFERENCE
ELEVATION REFERENCE
24
3
EXTERIOR INTERIOR
CALLOUT REFERENCE
150 SF
ELEVATIONSECTION/ELEVATION/FLOOR PLAN
A VARIES
FLOOR/CEILING PLAN
TRUE
FD
FEHC
FEC
EARTHWORK CONCRETE & MASONRY WOOD
METAL
EARTHWORK - UNMOVED
INSULATION
EARTHWORK - BACKFILLED
GRAVEL/POROUS FILL
FINISH
ROUGH
BLOCKING
PLYWOOD
PRECAST/CAST IN PLACE
STEEL
SAND/MORTAR/PLASTER
BATT/LOOSE FILL
RIGID
CONCRETE BLOCK
BRICK
A
1 2NUMBERS FOR VERTICAL GRIDSLETTERS FOR HORIZONTAL GRIDS
NEW
EXISTING
76
72
203B
1
1
XXX
SIGN DESIGNATION PER SPECIFICATIONS
SIGN DESIGNATION PER SPECIFICATIONS
ARCHITECTURAL ABBREVIATIONS& AND
ANGLE@ ATC CENTER LINEO DIAMTER or ROUND┴ PERPENDICULAR# POUNDS or NUMBERx TIMES or BYP PROPERTY LINE
'A'AB ANCHOR BOLTABC AGGREGATE BASE COURSEABV ABOVEAC ASPHALTIC CONCRETEA/C AIR CONDITIONINGACC ACCESSACFL ACCESS FLOORACID RES ACID RESISTANTACP ACOUSTICAL PANELACT ACOUSTICAL TILEAD AREA DRAINADD ADDENDUMADH ADHESIVEADJT ADJUSTABLEAF ACCESS FLOORAFF ABOVE FINISH FLOORAFG ABOVE FINISH GRADEAFS ABOVE FINISH SLABAGGR AGGREGATEALT ALTERNATEALUM ALUMINUMANOD ANODIZEDAP ACCESS PANELAPC ACOUSTICAL PANEL CEILINGAPPROX APPROXIMATE(LY)ARCH ARCHITECT(URAL)ASB ASBESTOSASKLR AUTOMATIC SPRINKLERASPH ASPHALTASSY ASSEMBLYASTM AMERICAN SOCIETY for TESTING
& MATERIALSATC ACOUSTICAL TILE CEILINGATF ATHLETIC FLOORINGAUTO AUTOMATICAWP ACOUSTICAL WALL PANEL
'B'BALC BALCONYBB BULLETIN BOARDBD BOARDBEL BELOWBET BETWEENBITUM BITUMINOUSBKG BACKINGBJT BED JOINTBLDG BUILDINGBLKG BLOCKINGBLTN BUILT-INBM BEAMBOD BOTTOM OF DECKBOF BOTTOM OF FOOTINGBOH BACK OF HOUSEBOJ BOTTOM OF JOISTSBOT BOTTOMBPL BEARING PLATEBR BEDROOMBRCG BRACINGBRG BEARINGBRK BRICKBRZ BRONZEBS BOTH SIDESBSMT BASEMENTBUR BUILT-UP ROOF(ING)BVL BEVELBW BOTH WAYS
'C'CAB CABINETCB CATCH BASIN, CORNER BEADCAN CANOPYCANTIL CANTILEVERCBB CEMENTITIOUS (BACKER)
BOARDCEM CEMENTCER CERAMICCF CONTRACTOR FURNISHEDCF/CI CONTRACTOR FURNISHED/
CONTRACTOR INSTALLEDCF/OI CONTRACTOR FURNISHED/
OWNER INSTALLEDCFE CONTRACTOR FURNISHED
EQUIPMENTCFLG COUNTERFLASH(ING)CFT CUBIC FOOTCG CORNER GUARDCH BD CHALKBOARDCHFR CHAMFERCHT CEILING HEIGHTCI CAST IRONCIP(C) CAST-IN-PLACE (CONCRETE)CIR CIRCLE/CIRCULARCIRC CIRCUMFERENCECJ CONTROL JOINT,
CONSTRUCTION JOINGCK CAULK(ING)CLG CEILINGCLL CONTRACT LIMIT LINECLR CLEAR(ANCE)CLRM CLASSROOMCLS CLOSURECMT CERAMIC MOSAICCMU CONCRETE MASONRY UNIT(S)CMPST COMPOSITECNTR COUNTERCO CLEANOUT, CASED OPENING,
CUTOUTCOL COLUMNCOMB COMBINE/COMBINATIONCOMP COMPRESS(ED/ION/IBLE)COMPO COMPOSITION/COMPOSITECOMPT COMPARTMENTCONC CONCRETECONF CONFERENCECONN CONNECTCONST CONSTRUCTIONCONT CONTINUE/CONTINUOUSCONTR CONTRACTORCOR CORRIDORCORR CORRUGATEDCOTG CLEANOUT TO GRADECPLP CEMENT PLASTER (PORTLAND)CPR COPPERCPT CARPETCR CLOSET RODCRG CROSS GRAINCRS COURSECRT YD COURTYARDCSK COUNTERSINK(SUNK)CSMT CASEMENTCST CAST STONECSWK CASEWORKCT CERAMIC TILECTB CERAMIC TILE BASECTR CENTERCU FT CUBIC FEETCU YD CUBIC YARD(S)CW COLD WATER
'D'D DEEP, DEPTHDBL DOUBLEDEG DEGREEDEMO DEMOLISH/DEMOLITIONDET DETAILDEP DEPRESSEDDF DRINKING FOUNTAINDH DIAGONAL HUNGDIA DIAMETERDIAG DIAGONAL, DIAGRAMDIAM DIAMETERDIM DIMENSIONDISP DISPENSERDIV DIVISIONDL DEAD LOADDMPF DAMPROOF(ING)DMT DEMOUNTABLEDN DOWNDP DAMP PROOFINGDPR DAMPERDR DOOR, DINING ROOM,
DRESSING ROOM, DRIVEDRN DRAINDRST DOOR STOPDS DOWNSPOUTDSP DRY STANDPIPEDSPL DISPOSALDT DRAIN TILEDTA DOVETAIL ANCHORDTL DETAILDTS DOVETAIL ANCHOR SLOTDW DUMBWAITERDWG DRAWINGDWR DRAWER
'E"E EAST(E) EXISTINGEA EACHEHD ELECTRIC HAND DRYEREIFS EXTERIOR INSULATION
FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELEC ELECTRIC(AL)
ELEV ELEVATOREMER EMERGENCYENCL ENCLOSUREENGR ENGINEERENTR ENTRANCEESMT EASEMENTEP ELECTRICAL PANELEQ EQUALEQUIP EQUIPMENTEST ESTIMATEEW EACH WAYEWC ELECTRICAL WATER COOLEREXCA EXCAVATE(ION)EXH FN EXHAUST FANEXH HD EXHAUST HOODEXIST EXISTINGEXP EXPANSION, EXPOSED,
EXPOSUREEXP BT EXPANSION BOLTEXT EXTERIOREXT LT EXIT LIGHT
'F'FA FIRE ALARM, FRESH AIRFACP FIRE ALARM CONTROL PANELFAS FASTEN(ER)FB FLAT BARFBD FIRE BOARDFBRK FIRE BRICKFBO FURNISHED BY OTHERSFD FLOOR DRAINFDC FIRE DEPARTMENT CONNECTIONFDTN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FACTORY FINISHFF EL FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE &
EQUIPMENTFFL FINISHED FLOOR LINEFGL FIBERGLASSFH FIRE HYDRANTFHC FIRE HOSE CABINETFIN FINISH(ED)FIN FLR FINISH FLOORFIN GR FINISH GRADEFJT FLUSH JOINTFLA FLASHINGFLCO FLOOR CLEAN OUTFLG FLASHINGFLR FLOOR, FILLERFLUOR FLUORESCENTFND FOUNDATIONFO FINISH OPENINGFOB FACE OF BRICKFOC FACE OF CONCRETEFOF FACE OF FINISHFOM FACE OF MASONRYFOS FACE OF STUD(S)FP FIREPROOFFPL FLOOR PLATEFRMG FRAMINGFR FRAME(D)/FRAMINGFRA FRESH AIRFRC FIRE-RESISTANT COATINGFRP FIBER REINFORCED POLYESTERFRR FIRE-RESISTANCE RATINGFRTW FIRE RETARDENT
TREATED WOODFRZ FREEZERFS FULL SIZE, FULL SCALEFT FOOT or FEET, FIRE TREATEDFTD FACIAL TISSUE DISPENSERFTG FOOTINGFUR FURR(ED/ING)FUT FUTUREFWC FABRIC WALLCOVERING
'G'GA GAUGEGALV GALVANIZED, GALVANICGB GRAB BARGC GENERAL CONTRACTORGD GRADE, GRADINGGDR GUARD RAILGEN GENERAL, GENERATORGF GROUND FACEGFCI GROUND FAULT
CIRCUIT INTERRUPTERGFRC GLASS FIBER REINFORCED
CONCRETEGI GALVANIZED IRONGKT GASKT(ED)GL GLASS/GLAZINGGL BLK GLASS BLOCKGLU LAM GLU-LAMINATED BEAM/WOODGP GALVANIZED PIPEGPDW GYPSUM DRYWALLGPL GYPSUM LATHGPPL GYPSUM PLASTERGR FL GROUND FLOORGR LN GRADE LINEGRN GRANITEGSB GYPSUM SHEATHING BOARDGSM GALVANIZED SHEET METALGSS GLAZED STRUCTURAL SHEETGST GLAZED STRUCTURAL TILEGT GROUTGUT GUTTERGV GALVANIZEDGVL GRAVELGYM GYMNASIUMGYP GYPSUMGYP BD GYPSUM BOARD
'H'HB HOSE BIBBHBD HARDBOARDHC HANDICAP, HOLLOW COREHD HAND DRYER, HEAVY DUTYHDR HEADERHDW HARDWAREHDWD HARDWOODHES HIGH EARLY STRENGTH CEMENTHK HOOKHM HOLLOW METALHNDRL HANDRAILHO HOLD-OPENHORIZ HORIZONTALHT HEIGHTHTG HEATINGHVAC HEATING VENTILATING
AIR CONDITIONINGHW HOTWATERHWT HOTWATER TANKHEX/HX HEXAGONAL
'I'ID INSIDE DIAMETER,
INSIDE DIMENSIONINCANDINCANDESCENTINCIN INCINERATORINCL INCLUDEDINSUL INSULATIONINT INTERIORINTM INTERMEDIATEINV INVERT(ED)IPS IRON PIPE SIZEIS ISLAND, INSECT SCREENISO ISOMETRICIWH INSTANTANEOUS
WATER HEATER
'J'J JOISTJC JANITOR'S CLOSETJF JOINT FILLERJT JOINTJ-BOX JUNCTION BOX
'K'KO KNOCK OUTKIT KITCHENKPL KICKPLATE
'L'L LENGTHLAB LABORATORYLAD LADDERLAM LAMINATELAV LAVATORYLB POUNDLBL LABELLC LIGHT CONTROLLD BRG LOAD BEARINGLGT LIGHT(ING)LH LEFT HANDEDLIB LIBRARYLINO LINOLEUMLKR LOCKERLKR RM LOCKER ROOMLL LIVE LOAD, LOWER LEVELLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLMS LIMESTONELOC LOCATIONLOUV LOUVERLP LIGHT POLELPT LOW POINTLPG LIQUID PETROLEUM GASLRG LARGELT LIGHTLT SW LIGHT SWITCHLTG LIGHTINGLTL LINTEL
LT LIGHT(ING)LVR LOUVERLW LIGHTWEIGHTLWC LIGHTWEIGHT CONCRETE
'M'M METERMAINT MAINTENANCEMAS MASONRYMATL MATERIALMAX MAXIMUMMB MACHINE BOLT, MAIL BOXMBR MEMBERMC MEDICINE CABINET,
MANHOLE COVER, METAL-CLADMECH RM MECHANICAL ROOMMECH MECHANICALMED MEDIUM, MEDICALMEL MELAMINEMEMB MEMBRANEMET METALMFD METAL FLOOR DECKINGMEZZ MEZZANINEMFR MANUFACTURE(R)MFR REC MANUFACTURER'S
RECOMMENDATIONMH MANHOLEMIN MINIMUMMIRR MIRRORMISC MISCELLANEOUSMLDG MOLDING (MOULDING)MLWK MILLWORKMMB MEMBRANEMO MASONRY OPENING,
MOTOR OPERATEDMOD MODIFYMOD MODULARMOPR MOP RACKMOV MOVABLEMR MAP RECEPTORMRB MARBLEMRD METAL ROOF DECK(ING)MS MOP SINK, MACHINE SCREWMT MOUNT(ED/ING)MTFR METAL FURRINGMTHR METAL THRESHOLDMTL METALMTLR METAL ROOFMULL MULLIONMVBL MOVABLEMWK MILLWORK
'N'N NORTHNAT NATURALNCOMBL NONCOMBUSTIBLENIC NOT IN CONTRACTNL NIGHT LIGHTNMT NONMETALLICNO NUMBERNOM NOMINALNR NOISE REDUCTIONNRC NOISE REDUCTION COEFFICIENTNS NO SCALENTS NOT TO SCALE
'O'OA OVERALL, OUTSIDE AIROBS OBSCUREOC ON CENTEROCC OCCUPYOD OUTSIDE DIAMETER,
OUTSIDE DIMENSIONOF OUTSIDE FACEOF/CI OWNER FURNISHED/
CONTRACTOR INSTALLEDOF/OI OWNER FURNISHED/
OWNER INSTALLEDOFD OVERFLOW DRAINOFF OFFICEOFS OUTSIDE FACE OF STUDOGL OBSCURE GLASSOH OVER(HANG/HEAD)OH DR OVERHEAD (COILING) DOOROPNG OPENINGOPH OPPOSITE HANDOPP OPPOSITEOPS OPPOSITE SURFACEOPT OPTIONALORD OVERFLOW ROOF DRAIN
'P'P PAINTPA PUBLIC ADDRESSPAR PARALLELPAT PATTERNPB PANIC BAR, PANELBOARDPBD PARTICLE BOARDPCC PRECAST CONCRETEPCF POUNDS PER CUBIC FOOTPE PEDESTALPED PEDESTALPEND PENDANTPERF PERFORATE(D)PERIM PERIMETERPERM PERMANENTPFB PREFABRICATEDPFL POUNDS PER LINEAR FOOTPFM PREFINISHEDPG PLATE GLASSPH PHASEPIL PILASTERPK GAR PARKING GARAGEPK LOT PARKING LOTPL PROPERTY LINEPLAM PLASTIC LAMINATEPLAS PLASTICPLST PLASTERPLY PLYWOODPNL PANELPNT PAINT(ED)POL POLISH(ED)PORC PORCELAINPR PAIR, PIPE RAILPRCST PRECASTPREFAB PREFABRICATE(D)PREFIN PREFINISHEDPRELIM PRELIMINARYPRF PREFORMEDPRKG PARKINGPROP PROPERTYPSC PRE-STRESSED CONCRETEPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPSL PIPE SLEEVEPT PRESSURE TREATEDPTD PAPER TOWEL DISPENSERPTDR PAPTER TOWEL DISPENSER
& RECEPTACLEPTN PARTITIONPTR PAPER TOWEL RECEPTACLEPV PAVE(D)PVC POLYVINYL CHLORIDEPVMT PAVEMENTPWR POWER
'Q'QT QUARRY TILEQTB QUARRY TILE BASEQTR QUARTERQTY QUANTITYQUAD QUADRANTQUAL QUALITY
'R'R RADIUS, RISER, RANGERA RETURN AIRRAD RADIUSRB RUBBER BASERB HK ROBE HOOKRBL RUBBLE STONERBT RUBBER TILERCP REFLECTED CEILING PLANRCPTN RECEPTIONRD ROOF DRAIN, ROADREBAR REINFORCING STEEL BARSREC RECESSEDRECPT RECEPTACLEREF REFERENCEREFG REFRIGIRATORREFL REFLECTEDREG REGISTERREINF REINFORCE(D)REM REMOVE(ABLE)REQD REQUIREDRESIL RESILIENTREST RESTROOMREV REVISED, REVISIONRF RESILIENT FLOORINGRFG ROOFINGRFH ROOF HATCHRFL REFLECT(ED/IVE/OR)RH RIGHT HANDEDRH ROOF HATCHRL RAIL(ING)RM ROOMRO ROUGH OPENINGROW RIGHT OF WAYRT RIGHTRTF RUBBER TILE FLOORRVS REVERSERWL RAIN WATER LEADERRWR RECESSED WASTE RECEPTACLE
'S'S SOUTHSA SUPPLY AIRSAN SANITARYSC SOLID CORESCD SEAT COVER DISPENSERSCHED SCHEDULESCP SCUPPERSCR SHOWER CURTAIN RODSCRN SCREENSCT STRUCTURAL CLAY TILESD SMOKE DETECTOR,
STORM DRAIN,SOAP DISPENSER
SDG SIDINGSECT SECTIONSF SQUARE FOOT (FEET)SFGL SAFETY GLASSSG SHEET GLASSSGD SLIDING GLASS DOORSH SHELFSHFT SHAFT (ELEVATOR)SHO SHORE(D/ING)SHR SHOWERSHT SHEETSHTHG SHEATHINGSHV SHELVINGSIM SIMILARSKLT SKYLIGHTSL SIDELIGHTSLNT SEALANTSM SHEET METAL, SMALL, SMOOTHSMP SUMP PUMPSND SANITARY NAPKIN DISPENSERSND INS SANITARY NAPKINDISPOSAL UNITSOV SHUTOFF VALVESP STANDPIPE, SUMP PITSPC SPACE(R)SPM SOLID PLASTIC MATERIALSPEC SPECIFICATIONSPKLR SPRINKLERSPKR SPEAKERSPRT SUPPORTSPL SPECIALSQ SQUARESS SANITARY SEWER, STORM SEWERSSK SERVICE SINKSST STAINLESS STEELST STAIR(S), STREETSTA STATIONSTC SOUND TRANSMISSION CLASSSTD STANDARDSTG SEATINGSTL STEELSTL LNTL STEEL LINTELSTL PL STEEL PLATESTL RF DK STEEL ROOF DECKSTOR STORAGESTR STRAIGHT, STRINGER(S)STRUCT STRUCTURALSUB FL SUB FLOORSUSP SUSPEND(ED)SV SHEET VINYLSW SIDEWALK, SWITCHSYMM SYMMETRICALSYN SYNTHETICSYS SYSTEM
'T'T TREADT&B TOP & BOTTOMT&G TONG & GROOVET/S TUB / SHOWERTB TOWEL BAR, THROUGH BOLTTBD TO BE DETERMINEDTD TRENCH DRAINTDR TOWEL DISPENSER &RECEPTACLETEL TELEPHONETEMP TEMPORARYTER TERRAZZOTFF TOP OF FINISH FLOORTHK THICK(NESS)THR THRESHOLDTHRU THROUGHTK BD TACKBOARDTKS TACK STRIPTO TOP OFTOB TOP OF BEAMTOC TOP OF CONCRETE/CURBTOC FTG TOP OF CONCRETE FOOTINGTOC WALL TOP OF CONCRETE WALLTO FDN TOP OF FOUNDATIONTOL TOLERANCETOM TOP OF MASONRYTOP TOP OF PARAPET,
TOP OF PAVEMENTTOPO TOPOGRAPHYTOS TOP OF SLAB, TOP OF STEELTOT TOP OF TRUSSTOW TOP OF WALLTP TELEPHONE POLETPD TOILET PAPER DISPENSERTPH TOILET PAPER HOLDERTPTN TOILET PARTITIONTR TOWEL RACKTRANS TRANSOM, TRANSPARENTTRTD TREATEDTS TUBE STEELTSTAT THERMOSTATTTB TELEPHONE TERMINAL BOARDTV TELEVISIONTYP TYPICAL
'U'UC UNDERCUTUGND UNDERGROUNDUL UNDERWRITERS
LABORATORIESUNFIN UNFINISH(ED)UNIF UNIFORMUNO UNLESS NOTED OTHERWISEUR URINALUTIL UTILITY
'V'V VOLTVAR VARIES, VARIATIONVB VINYL BASEVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVF VINYL FABRICVG VERTICAL GRAINVIF VERIFY IN FIELDVIN VINYLVJ V-JOINT(ED)VNR VENEERVOLT VOLTAGEVP VENEER PLASTERVR VAPOR RETARDERVRM VERMICULITEVRFY VERIFYVT VINYL TILEVWC VINYL WALLCOVERING
'W'W WEST, WIDE, WASTE, WATTW/ WITHW/O WITHOUTWB WOOD BASEWC WATER CLOSET,
WALL COVERINGWD WOODWDW WINDOWWGL WIRED GLASSWH WATER HEATER, WEEP HOLE,
WALL HYDRANT, WALL HUNGWHB WHEEL BUMPERWHSE WAREHOUSEWI WROUGHT IRONWIN WINDOWWLD WELDEDWM WIRE MESHWO WHERE OCCURS, WITHOUTWP WATERPROOF(ED/ING)WPT WORKING POINTWPM WATERPROOF MEMBRANEWR WEATHER RESISTANTWS WEATHER STRIPWSCT WAINSCOTWT WEIGHT, WATERTIGHTWW WINDOW WALLWWF WELDED WIRE FABRICWWM WELDED WIRE MESH
'X'XFMR TRANSFORMER
'Y'YH YARD HYDRANT
'Z'Z ZEBRA
L
L
Revision Schedule
Revision #
Revision
Description Revision Date
1
2
3
4
5
6
A B C D E F
PH.5
SUBWAYNO WORKTHIS AREA
PH.2
PH.1
MPANO WORKTHIS AREA
EXIT
EXIT
RETAIL SALES
103
BREAKROOM
105
HALL
104
STORAGE
108
OFFICE/MANAGER
107
TOILET
106
FREEZERCOOLER
JANITOR
109
PH.4
PH.3
PH.1a
PH.1a
WEEK 1
PRE-CON / MOBILIZATION / NTP -10 DAYS
Ph 1 - 15 DAYS
CONSTRUCTION - 75 DAYS
WEEK 2 WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8
MONTH 1 MONTH 2
EXPRESS REMODEL
TOTAL CONSTRUCTION : 75 DAYSCLOSEOUT: 10 DAYS
Ph 1A (SUBWAY) - 15 DAYS
Ph 2 - 10 DAYS Ph 3 - 10 DAYS Ph 4 - 10 DAYS Ph 5 - 20 DAYS Closeout - 10 DAYS
WEEK 9
PHASE 1A AT SUBWAY AND MAIN ENTRY TO RUN CONCURRENTLY WITH PHASE 1. ALL PHASE 1A WORK MUST BE PERFORMED
AFTER HOURS, WITH CLEAN UP PRIOR TO NEXT BUSINESS DAY TO ALLOW ACCESS FOR DAILY ON-GOING SALES ACTIVITY.
WEEK 10 WEEK 11
GENERAL NOTES
EXPRESS SALES SERVICE WILL CONTINUE OPERATIONTHROUGHOUT CONSTRUCTION PERIOD. COORDINATEWITH EXPRESS MANAGER REGARDING HOURS OFOPERATION, AND MAINTAIN PUBLIC ACCESS TO STORE ATALL TIMES.
CONTRACTOR TO CONSTRUCT FULLY SEALEDTEMPORARY CONSTRUCTION BARRIER BETWEEN PHASEDCONSTRUCTION AND SALES OPERATIONS. PROVIDESUPPLEMENTAL UTILITIES AND HVAC VENTILATION ASREQUIRED TO ACCOMMODATE BUSINESS OPERATIONSDURING CONSTRUCTION. REFERENCE DETAIL 2/A-101.
CONTRACTOR TO TRANSPORT DEMOLISHED MATERIALSOFF BASE AND LEGALLY DISPOSE OF THEM.
PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN AND ITEMS TO BE SALVAGED.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONSTO CONFIRM THE EXTENT OF DEMOLITION, TYPES OFCONSTRUCTION & MATERIALS USED AND CRITICALDIMENSIONS PRIOR TO BID.
CONTRACTOR TO MAINTAIN CONTINUOUS ACCESS TO ALLSIGNED EXITS WHEN THE STORE IS OPEN.
CONTRACTOR TO MAINTAIN PUBLIC ACCESS TO SUBWAYDURING NORMAL BUSINESS HOURS.
MAINTAIN CONTINUOUS EMPLOYEE ACCESS TOADMINISTRATION AREA AND MERCHANDISE PROCESSINGAREAS (MPA) AT ALL TIMES.
CONTRACTOR TO COORDINATE WITH EXCHANGEMANAGER AND FACILITIES MAINTENANCE OPERATIONS(FMO), REGARDING PHASING SCHEDULE
EXISTING FIXTURES, EQUIPMENT, CASEWORK, CASHREGISTER STANDS AND AUDIO/VISUAL EQUIPMENT TO BEREMOVED / RELOCATED BY THE EXCHANGE.
FMO REQUIRES 3 DAYS NOTICE PRIOR TO THE START OFEACH PHASE TO RELOCATE FIXTURES.
REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL DEMOLITION REQUIREMENTS THAT MAY NOTBE SHOWN ON ARCHITECTURAL SHEETS.
COORDINATE LOCATIONS OF WALL REMOVAL WITH NEWCONSTRUCTION PLANS.
PATCH ALL WALLS AND FLOORS ADJACENT TO DEMOLITIONOR EQUIPMENT REMOVAL. PREP FOR NEW FINISHES ASNOTED IN DRAWINGS.
PATCH / REPAIR EXISTING WALLS AS REQUIRED TO LEVEL 4FINISH AND BE FLUSH WITH ADJACENT WALL SURFACESWITH NO VISIBLE SEAMS.
VERIFY STRUCTURAL SHORING OF BEARING MEMBERSPRIOR TO DEMOLITION.
DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.
DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.
FIXTURES & EQUIPMENT SHOWN ARE EF/EI UNLESS NOTEDOTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULESFOR INSTALLATION RESPONSIBILITY.
CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL &MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURESAND EQUIPMENT. REFERENCE ELECTRICAL ANDMECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.
VERIFY ALL EQUIPMENT MEASUREMENTS AND PLACEMENTWITH EXCHANGE.
REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS AND PLUMBINGCONNECTIONS.
REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.
PROVIDE SOLID BLOCKING IN ALL WALLS WHERE FIXTURESAND EQUIPMENT WILL BE WALL MOUNTED.
REFER TO FINISH SCHEDULE/LEGEND ON DRAWING SHEETA-251 & A-401 FOR ADDITIONAL INFORMATION ONFLOOR/WALL/CEILING FINISHES.
REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.
CONTRACTOR TO FURNISH AND INSTALL QUANTITY OF (2)TEMPORARY TOILET FACILITIES AND (1) TEMPORARY HANDWASHING STATION FOR USE BY PUBLIC AND STAFF DURINGRENOVATION OF EXISTING PUBLIC TOILET ROOM. LOCATEFACILITIES TO ALLOW EASY ACCESS BY PUBLIC AND STAFF.COORDINATE LOCATION WITH STORE MANAGER.
EXCHANGE VENDOR TO PROVIDE ALL REFURBISHMENTWORK ASSOCIATED WITH COOLER/FREEZER UNITS.
CONTRACTOR RESPONSIBLE TO REMOVE AND REINSTALLALL CEILING MOUNTED SPEAKERS.
EXCHANGE LP ONLY TO BE RESPONSIBLE FOR REMOVALAND REINSTALLATION OF ALL SECURITY CAMERAS ANDSECURITY SYSTEMS INCLUDING CABLING. CONTRACTORTO PROVIDE ELECTRICAL WIRING AS NEEDED.
REFERENCE PHOTO SHEETS FOR ADDITIONALINFORMATION.
E = EXCHANGEV = VENDORC = CONTRACTOR
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
SCOPE & SEQUENCE OVERVIEW
RETAIL SALES:CONTRACTOR TO REMOVE EXISTING VCT FLOOR FINISH,WALL BASE AND WALL FINISHES. EXCHANGE TO REMOVE /RELOCATE / REINSTALL ALL FIXTURES, EQUIPMENT, & DECOR.
NEW WALL BASE, WALL & CEILING FINISH. EXISTINGCONCRETE SLAB TO BE DIAMOND POLISHED FINISH. OPENSTRUCTURE CEILING, MECHANICAL & ELECTRICAL ELEMENTSTO BE PAINTED. NEW FIXTURES, CASEWORK ANDEQUIPMENT FURNISHED AND INSTALLED BY EXCHANGE.
SNACK AVENUE:EXCHANGE TO REMOVE EXISTING CASEWORK & EQUIPMENT.
NEW WALL FINISH, EF/EI CASEWORK & EQUIPMENT.
TOILET ROOM:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, PLUMBINGFIXTURES AND ACCESSORIES.
NEW PORCELAIN TILE FLOOR FINISH, TILE BASE, WALL TILE,CEILING FINISH, PLUMBING FIXTURES, AND ACCESSORIES.NEW PLUMBING FIXTURES TO BE INSTALLED IN EXISTINGLOCATIONS.
BREAK ROOM:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, ANDCASEWORK. REMOVE EXISTING ACOUSTICAL PANEL CEILINGTILES. EXISTING CEILING GRID TO REMAIN. CREATE OPENINGFOR DOOR TO NEW EMPLOYEE TOILET ROOM.
NEW FLOOR FINISH. WALL BASE, WALL FINISH, ANDACOUSTICAL CEILING PANELS. CLEAN / PAINT EXISTINGCEILING GRID. NEW 3-COMPARTMENT SINK, WALL SHELVINGAND WORK TABLE FOR SNACK AVENUE PREP TO BEFURNISHED BY EXCHANGE. CONTRACTOR TO INSTALL SINKAND WALL SHELVING. NEW DOOR AND FRAME FOR ENTRY TOEMPLOYEE TOILET ROOM.
JANITOR ROOM:REMOVE EXISTING HOT WATER HEATER AND REPLACE WITHNEW. REFERENCE MECHANICAL DRAWINGS.
PHASE 1
OFFICE & STORAGE:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, ANDACOUSTICAL PANEL CEILING TILES. EXISTING CEILING GRID TOREMAIN, AND BE REVISED FOR NEW TOILET ROOM ADDITION.REMOVE DOOR AND FRAME TO STORAGE ROOM, OPENINGTO REMAIN. EXCHANGE TO REMOVE / RELOCATE / REINSTALLALL FIXTURES, EQUIPMENT & DECOR.
GRIND AND SEAL EXISTING CONCRETE SLAB, NEW WALL BASEAND PAINTED WALL FINISH. REPAIR OPENING TO STORAGEROOM. PAINT GYP BD CEILING IN STORAGE ROOM. NEWACOUSTICAL CEILING TILES IN OFFICE.
NEW CONSTRUCTED TOILET ROOM:
NEW TILE FLOOR FINISH, TILE BASE, WALL TILE AND PAINTEDGYP BD. CEILING. NEW PLUMBING FIXTURES ANDACCESSORIES.
NOTE: REFERENCE GENERAL & KEY NOTES, ELEVATIONSAND SCHEDULES ON INDIVIDUAL DRAWING SHEETS FORADDITIONAL INFORMATION.
PHASE 5
LEGEND
NO WORK THIS AREA
PHASE 1a
PHASE 2 PHASE 3 PHASE 4
MAIN ENTRY & SUBWAY FRONT CUSTOMER AREA:REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, WALLFINISH AND DECOR. EXCHANGE TO REMOVE / RELOCATE /REINSTALL FIXTURES AND EQUIPMENT.
NEW WALL BASE AND PAINTED WALL FINISH. EXISTINGCONCRETE SLAB TO BE DIAMOND POLISHED. PAINT GYP BDCEILING IN ENTRY, AND OPEN STRUCTURE IN RETAIL SALES.
NOTE: WORK IN THIS AREA TO BE PERFORMED AFTERHOURS. DATE AND DURATION TO BE DETERMINED. THISAREA MUST BE CLEANED UP PRIOR TO START OF BUSINESSEACH DAY TO ALLOW ACCESS FOR DAILY SALES ACTIVITY.
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
As indicated
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-100
PHASING PLAN
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
3/16" = 1'-0"A-100
1 PHASING PLANNORTH
Not to ScalePHASING SCHEDULE
Revision Schedule
Revision #
Revision
Description Revision Date
GENERAL NOTES1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
EXPRESS SALES SERVICE WILL CONTINUE OPERATIONTHROUGHOUT CONSTRUCTION PERIOD. COORDINATEWITH EXPRESS MANAGER REGARDING HOURS OFOPERATION, AND MAINTAIN PUBLIC ACCESS TO STORE ATALL TIMES.
CONTRACTOR TO CONSTRUCT FULLY SEALED TEMPORARYCONSTRUCTION BARRIER BETWEEN PHASEDCONSTRUCTION AND SALES OPERATIONS. PROVIDESUPPLEMENTAL UTILITIES AND HVAC VENTILATION ASREQUIRED TO ACCOMMODATE BUSINESS OPERATIONSDURING CONSTRUCTION. REFERENCE DETAIL 2/A-101.
CONTRACTOR IS RESPONSIBLE FOR PROPERLYREMOVING AND DISPOSING OF EXISTING BUILDINGMATERIOAL THAT MAY CONTAIN ASBESTOS ORHAZARDOUS FIBERS. SEE ASBESTOS MITIGATIONREPORT FOR PROCEDURES AND LOCATIONS.
CONTRACTOR TO TRANSPORT DEMOLISHED MATERIALSOFF BASE AND LEGALLY DISPOSE OF THEM.
COORDINATE LOCATIONS OF SLAB REMOVAL WITH NEWCONSTRUCTION PLANS, ELECTRICAL AND MECHANICALDRAWINGS. CONCRETE CUTS SHOULD OCCUR ATCENTERLINES OF WALLS WHEREVER POSSIBLE.
PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN AND ITEMS TO BE SALVAGED.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONSTO VERIFY THE EXTENT OF DEMOLITION, TYPES OFCONSTRUCTION & MATERIALS USED AND CRITICALDIMENSIONS PRIOR TO BID.
CONTRACTOR TO MAINTAIN CONTINUOUS ACCESS TO ALLSIGNED EXITS WHEN THE STORE IS OPEN.
CONTRACTOR TO MAINTAIN CONTINUOUS EMPLOYEEACCESS TO ADMINISTRATION AREA AND MERCHANDISEPROCESSING AREAS (MPA) AT ALL TIMES.
CONTRACTOR TO COORDINATE WITH EXCHANGEMANAGER AND FACILITIES MAINTENANCE OPERATIONS(FMO), REGARDING PHASING SCHEDULE.
EXISTING FIXTURES, EQUIPMENT, CASEWORK, CASHREGISTER STANDS AND AUDIO / VISUAL EQUIPMENT INRETAIL SALES AREA TO BE REMOVED / RELOCATED BYTHE EXCHANGE.
FMO REQUIRES 3 DAYS NOTICE PRIOR TO THE START OFEACH PHASE TO RELOCATE FIXTURES.
REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL DEMOLITION REQUIREMENTS THAT MAY NOTBE SHOWN ON ARCHITECTURAL SHEETS.
PATCH ALL WALLS AND FLOORS ADJACENT TODEMOLITION OR EQUIPMENT REMOVAL. PREP FOR NEWFINISHES AS NOTED IN DRAWINGS.
PATCH / REPAIR EXISTING WALLS AS REQUIRED TO LEVEL4 FINISH AND BE FLUSH WITH ADJACENT WALLSURFACES WITH NO VISIBLE SEAMS OR BLEMISHES.
VERIFY STRUCTURAL SHORING OF BEARING MEMBERSPRIOR TO DEMOLITION.
DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS.
DIMENSIONS ARE TO FACE OF FINISH, GRID LINES, ANDCENTERLINE OF COLUMNS U.N.O.
FIXTURES & EQUIPMENT SHOWN ARE EF/EI UNLESSNOTED OTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULESFOR INSTALLATION RESPONSIBILITY.
CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL& MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREXCHANGE FURNISHED/EXCHANGE INSTALLED FIXTURESAND EQUIPMENT. REFERENCE ELECTRICAL ANDMECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.
VERIFY ALL EQUIPMENT MEASUREMENTS ANDPLACEMENT WITH EXCHANGE.
CONTRACTOR TO VERIFY THAT ALL CEILING ELEMENTS,LIGHT FIXTURES AND ELECTRICAL EQUIPMENT IN THECEILING MEET SEISMIC BRACING REQUIREMENTS. ANYISSUES SHOULD BE REPORTED TO AE IMMEDIATELY.
REFERENCE MECHANICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL FLOOR DRAINS, SINKS ANDPLUMBING CONNECTIONS.
REFERENCE ELECTRICAL DRAWINGS FOR LOCATION ANDPLACEMENT OF ALL POWER OUTLETS AND CONNECTIONS.
PROVIDE SOLID BLOCKING IN ALL WALLS WHEREFIXTURES AND EQUIPMENT WILL BE WALL MOUNTED.
REFER TO ELEVATIONS, FINISH SCHEDULE AND FINISHLEGEND ON DRAWING SHEETS A-251 & A-401 FORADDITIONAL INFORMATION AND LOCATION OF NEWFINISHES.
REFER TO ELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.
CONTRACTOR TO FURNISH AND INSTALL QUANTITY OF (2)PORTABLE CHEMICAL TOILETS AND QUANTITY OF (1)HAND WASHING STATION FOR USE BY PUBLIC AND STOREEMPLOYEES DURING RENOVATION OF EXISTING PUBLICTOILET ROOM. LOCATE SO AS TO PROVIDE EASY ACCESSBY PUBLIC. COORDINATE LOCATION WITH STOREMANAGER.
EXCHANGE VENDOR TO PROVIDE ALL REFURBISHMENTWORK ASSOCIATED WITH COOLER/FREEZER UNITS.
CONTRACTOR RESPONSIBLE TO REMOVE AND REINSTALLALL CEILING MOUNTED SPEAKERS.
EXCHANGE LP ONLY TO BE RESPONSIBLE FOR REMOVALAND REINSTALLATION OF ALL SECURITY CAMERAS ANDSECURITY SYSTEMS INCLUDING CABLING. CONTRACTORTO PROVIDE ELECTRICAL WIRING AS NEEDED.
ALL FIRE EXTINGUISHERS AND CABINETS TO REMAINUNLESS NOTED OTHERWISE.
REFERENCE PHOTO SHEETS FOR ADDITIONALINFORMATION.
E = EXCHANGEV = VENDORC = CONTRACTOR
KEY NOTES
1
2
3
4
5
REMOVE EXISTING VCT FLOOR FINISH, AND WALL BASE.PREP SURFACES TO RECEIVE NEW BASE BID POLISHEDCONCRETE FLOOR FINISH, WALL BASE, WALL & CEILINGFINISH. REFERENCE SPECIFICATION SECTION 03 35 40 FORINFORMATION REGARDING SLAB REPAIR AND JOINT FILLERREPLACEMENT. EXCHANGE TO REMOVE / RELOCATE ALLEXISTING FIXTURES, CASEWORK, CASH REGISTERS, AUDIO /VISUAL, EQUIPMENT AND DECOR UNLESS NOTEDOTHERWISE.
REMOVE EXISTING VCT FLOOR FINISH, AND WALL BASE.PREP SURFACES TO RECEIVE NEW BASE BID POLISHEDCONCRETE FLOOR FINISH, WALL BASE, WALL AND CEILINGFINISH.
REMOVE EXISTING VCT FLOOR FINISH, WALL BASE,ACOUSTICAL PANEL CEILING TILES AND CASEWORK.EXISTING CEILING GRID TO REMAIN. EXISTINGREFRIGERATOR TO BE RELOCATED. EXCHANGE TORELOCATE EMPLOYEE LOCKERS. PREP FLOOR TORECEIVED SEALER ON EXISTING CONCRETE SLAB.
REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, WALLFINISHES, PLUMBING FIXTURES AND ACCESSORIES. NEWPLUMBING FIXTURES TO BE INSTALLED IN EXISTINGLOCATION. INFILL WALLS WHERE EXISTING RECESSEDACCESSORIES ARE LOCATED, TO BE FLUSH WITHADJACENT WALL SURFACE. PREP SURFACES FOR NEWFINISHES.
EXCHANGE TO REMOVE AND REINSTALL EXISTING SNACKAVENUE CASEWORK, EQUIPMENT AND DECOR.
REMOVE EXISTING WING WALL. VERIFY ELECTRICALCONNECTIONS AND RE-ROUTE OR ABANDON ASNECESSARY. PATCH/REPAIR ADJACENT FLOOR AND WALLFINISH.
REMOVE EXISTING HOT WATER HEATER AND REPLACEWITH NEW. REFERENCE MECHANICAL DRAWINGS FORINFORMATION.
EXCHANGE TO REMOVE EXISTING UPRIGHT COOLERS.
EXISTING SANDWICH COOLER AND DELI EXPRESS COOLERTO BE RELOCATED BY EXCHANGE. REFERENCE NEWEQUIPMENT PLAN FOR LOCATION.
REMOVE EXISTING DOOR AND FRAME. OPENING TOREMAIN. PATCH AND REPAIR OPENING TO BE FLUSH WITHADJACENT SURFACES.
REMOVE PORTION OF WALL TO PREPARE FOR NEW DOOR& FRAME.
EXISTING DOORS & HARDWARE TO BE REMOVED.REPLACE DOORS & HARDWARE WITH NEW IN EXISTINGFRAMES. ALL FRAMES TO BE REFURBISHED AND PAINTEDP-1 UNLESS NOTED OTHERWISE. EXTERIOR DOOR & FRAMETO BE PAINTED TO MATCH EXISTING.
RELOCATE FIRE EXTINGUISHER CABINET. REFERENCE NEWCONSTRUCTION PLAN FOR LOCATION.
REMOVE EXISTING VCT FLOOR FINISH, WALL BASE, ANDACOUSTICAL PANEL CEILING TILES. EXISTING CEILING GRIDTO REMAIN, BUT BE REMOVED AND RECONFIGURED INAREA OF NEW TOILET ROOM CONSTRUCTION. EXCHANGETO REMOVE / REINSTALL ALL EQUIPMENT, FURNISHINGSAND SHELVING. GRIND EXISTING CONCRETE SLAB ANDSEAL.
NOT USED
EXCHANGE TO REMOVE ALL SHELVING AND FIXTURES.EXISTING UTILITIES PANELS/BOXES TO REMAIN. EXISTINGCEILING & LIGHT FIXTURE TO REMAIN. THIS ROOM WILLBECOME ENTRY TO NEW TOILET ROOM. PATCH/REPAIR ALLEXISTING SURFACES AND PREP FOR NEW FINISHES.
REMOVE EXISTING FLOOR FINISH, WALL BASE, WALLFINISHES AND ACOUSTICAL PANEL CEILING TILES. EXISTINGCEILING GRID TO REMAIN. EXISTING DRINKING FOUNTAIN TOREMAIN.
REMOVE EXISTING SLAT WALL. PATCH/REPAIR WALL TOLEVEL 4 FINISH AND PREP FOR PAINT.
CLEAN & REPAINT EXISTING DOORS & FRAMES. REPAIR ASNECESSARY. DO NOT PAINT METAL KICK PLATES.
6
7
9
LEGEND
NO WORKTHIS AREA
8
10
11
12
13
14
15
16
17
18
19
X/A-XXX PHOTO KEYINDICATOR
1
2
3
4
5
6
A B C D E F
SUBWAYNO WORKTHIS AREA
1
RETAIL SALES
103
BREAKROOM
105
HALL
104
TOILET
106
OFFICE/MANAGER
107
STORAGE
108
2
VESTIBULE
101
3
4
14
5
6
MPANO WORKTHIS AREA
FREEZER COOLER
JANITOR
109
7
ELEC.
6
REF.
8
9
10
11
12
19
19
19
13
15
16
17
FULL HEIGHT WALL TO REMAIN
WH
18
WALL FINISH THIS SIDE TO REMAIN
19
19
12
1/A-103
2/A-103
3/A-103
4/A-103 5/A-103 6/A-103
7/A-1038/A-103
9/A-103
1/A-104
2/A-104
3/A-104
4&5/A-104
6/A-104
7&8/A-104
CLG
CONST.SIDE
FL
WIRE TO GRID/SUPPORTPROTECT FINISH
VERT. 4'-0" O.C. MAX
6 MIL. POLY
MTL. STUD
TAPE
DIAGONAL/VERTICALBRACE. USE SANDBAGSAT FLOOR TO KEEP INPOSITION. NO ANCHORSINTO FLOOR ALLOWED
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
As indicated
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-101
DEMO PLAN
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
NORTH 3/16" = 1'-0"A-101
1 DEMO PLAN
3" = 1'-0"A-101
2 TEMPORARY DUST BARRIER
Revision Schedule
Revision #
Revision
Description Revision Date
ALCO SMALLTOOL TABLE
PE
PP
ER
IDG
E F
AR
MS
HO
CK
WA
VE
3'3'
25'-9"
6'
6'3'5'3'5'-31_2
"3'5'3'5'3'5'3'
6'
7'-71_2
"
7'-31_2
"
6'
6'-2"
6'
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MA
SS
DIS
PL
AY
PA
LL
ET
MA
SS
DIS
PL
AY
PA
LL
ET
MA
SS
DIS
PL
AY
PA
LL
ET
MA
SS
DIS
PL
AY
PA
LL
ET
MA
SS
DIS
PL
AY
PA
LL
ET
MA
SS
DIS
PL
AY
PA
LL
ET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
TOBA
CCO
ACC
91031
91
01
8
91007
91
01
8
91064
TOBACCOSINGLE PACKS
TO
BA
CC
OC
AR
TO
NS
SMOKELESS
TO
BA
CC
OC
AR
TO
NS
NE
WM
AN
CIG
AR
HU
MID
OR
IMPULSE
RACK w/
BEVERAGE
COO
LER
IMPULSE
RACK w/
BEVERAGE
COO
LER
MP
900
36
92501
92
08
6
92
017
5
92
02
3
92
00
9
92
01
4
92
02
4
92
07
4
92
08
3
98122
93
52
7
93
09
8
93
50
2
92
010
3
98718
92914
NO POG NO POG NO POG
NO POGNO POG90053
92
09
1
90
15
49
01
87
99
17
1
92
02
1
93
60
9
IMP
UL
SE
LEVEL 3
MINI SPIRITIMPULSE
12
EX
PR
ES
SC
AN
DY
16
EX
PR
ES
SC
HIP
S
8 EX
PR
ES
SM
EA
T S
NA
CK
S
8 EX
PR
ES
SB
RE
AK
FA
ST
FO
OD
S
4 EX
PR
ES
SM
EA
L S
OLU
TIO
NS
8 NU
TR
ITIO
NB
AR
S
8 SW
EE
T A
ND
SA
LT
Y S
NA
CK
S
4 CO
OK
IES
&C
RA
CK
ER
S
4
EXPRESSBARWARE
4 CL
EA
NIN
G &
LA
UN
DR
Y
12
EX
PR
ES
SH
BC
8 EX
PR
ES
S P
AP
ER
, TR
AS
H B
AG
SF
OO
D W
RA
PS
& C
UP
S
8 EX
PR
ES
SB
RE
AD
12
EXPRESSWARM SHELF
3
NEW FEATUREITEM ENDCAP
3
OPERATIONBE-FIT
3
EXPRESSSPECIAL
3
SPIRIT OFTHE MONTH
3
WINE OFTHE MONTH3
POSAPREPAID CARDS
24
WIN
E
24
SP
IRIT
S
24
SP
IRIT
S
8 MIX
ER
S
24
WIN
E
4 EX
PR
ES
SA
UT
O A
CC
ES
16
WA
RM
BE
ER
24
WIN
E
24
SP
IRIT
S
4 AU
TO
MO
TIV
EW
INT
ER
4 EX
PR
ES
S C
OO
LE
RS
INS
L B
OT
TLE
S/G
RIL
LS
4 EX
PR
ES
SD
RY
GR
OC
ER
IES
4 EX
PR
ES
SP
AP
ER
PR
OD
.
CA
SE
ST
AC
KIN
G A
RE
A A
LO
NG
WA
LL
WARM BEER AND DRINKS STACK-OUTS
f/TC
ST
AN
DA
RDTA
NDEM
f/TC
1S
Use EitherBeverage Air#MT12-C orTrue #GDM12
54" H
IGH
FIX
TU
RE
54" H
IGH
FIX
TU
RE
Use EitherBeverage Air#MT12-C orTrue #GDM12
72" H
IGH
FIX
TU
RE
72" H
IGH
FIX
TU
RE
72" H
IGH
FIX
TU
RE
72" H
IGH
FIX
TU
RE
4S
1S
54" H
IGH
FIX
TU
RE
1
2
3
4
5
6
A B C D E F
A-251
3
2
1
4RETAIL SALES
103
BREAKROOM
105
OFFICE/MANAGER
107
TOILET
106
HALL
104
STORAGE
108
VESTIBULE
101
SUBWAYNO WORKTHIS AREA
NO WORKTHIS AREA
7777
A-102A-102A-102A-102 A-401A-401A-401A-401
1111
A-102A-102A-102A-102 A-401A-401A-401A-401
1
2
3
4
FREEZER COOLER
CG-1
CG-1
CG-1
CG-1
CG-1
PAINT ALL COLUMNS P-1
JANITOR
109
108A
STAFFTOILET
110
1' - 3"
ALIGN
REF
4
5
6
CG-1
CG-1
END NEW WALL FINISH ATTHIS OUTSIDE CORNER
END NEW WALL FINISH ATEDGE OF SUBWAY CONCEPT
NO NEWFINISHTHIS SIDEOF WALL
END NEWFINISH ATTHIS OUTSIDECORNER
EXISTING WOODTOP CAP TO REMAIN
CG-1
WH
105A
106A
7
7
CG-1
CG-1
CG-1
8
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
PROTECT ALL EXISTING CONSTRUCTION, ITEMS TOREMAIN, AND ITEMS TO BE SALVAGED.
REFER TO ALL OTHER DISCIPLINES TO COORDINATEADDITIONAL CONSTRUCTION REQUIREMENTS THAT MAYNOT BE SHOWN ON ARCHITECTURAL SHEETS.
EXISTING FIXTURES, EQUIPMENT, CASEWORK, CASHREGISTER STANDS AND AUDIO / VISUAL EQUIPMENTLOCATED IN RETAIL SALES AREA TO BE REMOVED /RELOCATED BY THE EXCHANGE.
PATCH ALL WALLS AND FLOORS AS REQUIRED TO LEVEL4 FINISH AND TO BE FLUSH WITH ADJACENT WALLSURFACES WITH NO VISIBLE SEAMS.
SEE PHASING PLAN A-100 FOR SCHEDULE ANDINFORMATION..
PROTECT UNDERSLAB UTILITIES, LOCATED BELOW CONC.SLAB TO BE REMOVED THAT ARE TO REMAIN INSERVICE.
REFERENCE DEMO PLAN AND DOOR SCHEDULE FORINFORMATION ON DOORS/FRAMES TO REMAIN, AND NEWDOOR/HARDWARE INFORMATION.
ALL OUTSIDE CORNERS, ON WALLS AND COLUMNS, INRETAIL SALES AREA TO RECEIVE CORNER GUARDS CG-1.
PAINT ALL COLUMNS IN RETAIL SALES AREA P-1, UNLESSNOTED OTHERWISE ON DRAWINGS AND ELEVATIONS.
FIXTURES AND EQUIPMENT SHOWN ARE EF/EI UNLESSNOTED OTHERWISE, AND ARE FOR REFERENCE ONLY.REFERENCE FLOOR PLANS AND EQUIPMENT SCHEDULESFOR INSTALLATION RESPONSIBILITY.
CONTRACTOR TO PROVIDE ALL NECESSARY ELECTRICAL& MECHANICAL CONNECTIONS AND FINAL HOOK-UPS FOREF/EI FIXTURES AND EQUIPMENT. REFERENCEELECTRICAL AND MECHANICAL DRAWINGS FORADDITIONAL INFORMATION.
REFER TO ROOM FINISH SCHEDULE, FINISH LEGEND ANDINTERIOR ELEVATIONS ON SHEETS A-251 & A-401 FORINFORMATION ON NEW FINISHES AND LOCATIONS.
ALL WALL FINISH TRANSITIONS TO OCCUR AT NEARESTINSIDE CORNER OR REVEAL JOINT U.N.O.
E = EXCHANGEV = VENDORC = CONTRACTOR
KEY NOTES1 NEW STORE FIXTURES EF/EI.
NEW 3-COMPARTMENT SINK AND WORK TABLE.RELOCATE EXISTING REFRIGERATOR. EMPLOYEELOCKERS TO BE RELOCATED BY EXCHANGE.
NEW PLUMBING FIXTURES AND ACCESSORIES.
RELOCATED FIRE EXTINGUISHER
EXISTING SANDWICH COOLER TO REMAIN
EXISTING DELI EXPRESS COOLER TO REMAIN
NEW DOOR & HARDWARE IN EXISTING FRAME. REPAIRAND REPAINT FRAME P-1 UNLESS NOTED OTHERWISE.
NEW DOOR & FRAME
LEGEND
NO WORK THIS AREA
2
3
4
5
6
7
8
STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE.
GRAB BAR / RAILING with3 SCREWS at EACHCONNECTION
STEEL STUDS - REFERTO WALL TYPE DETAILS
6"x 18 GA STEEL BACKINGSTUD. NOTCH BACKINGSTUD AROUND WALLSTUDS.3 STUD MINIMUM SPAN.
(2) #8 SCREWS PERWALL STUD
NOTE: MAXIMUMWEIGHT SHALL BE 250LBS
1/2"
1/2"
LOCATION OF CLEAT orHANGER
STEEL STUDS - REFERTO WALL TYPE DETAILS
(2) #8 SCREWS PERWALL STUD
STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE.
6"x 18 GA STEEL METAL BACKING FOR ALLWALL MOUNTED ITEMS. 2 STUD MINIMUMSPAN. IF LENGTH OF CLEAT OR HANGERENDS BETWEEN STUDS, THE BACKING ISTO EXTEND TO THE NEXT STUD.
NOTE: MAXIMUMWEIGHT SHALL BE 150LBS
VERIFY HEIGHT with SUPPLIER
1/2"
1/2"
CENTERLINE OF CLEATor HANGER
STUD SPACING at 16" O.C.UNLESS NOTEDOTHERWISE. 3 STUDMINIMUM SPAN.
BACKING PLATE: 12"WIDE X 18 GA. STEELPLATE FASTENEDFLUSH TO STUD WITH (2)#10 SHEET METALSCREWS PER STUD
STEEL STUDS - REFER TO WALLTYPE DETAILS
FOR STUD SPACING LARGER THAN16" O.C., USE 7/8" HAT CHANNEL FORINTERMEDIATE SUPPORT
NOTE: THIS DETAIL OCCURS AT WALL LOCATIONS THAT REQUIRE METAL BACKING.REFER TO SPECIFICATIONS.
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
As indicated
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-102
FLOOR PLAN - DOORSCHEDULE - DETAILS
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
3/16" = 1'-0"A-102
1 FLOOR PLANNORTH
DOOR SCHEDULE
ROOM NAME MARK
DOOR FRAME
HDW NOTESNO OF LEAFS
SIZE (NOM)
MATL MATLWIDTH HEIGHT THK
BREAKROOM 105A 1 3' - 0" 7' - 0" 2" WD - RED OAK HM - EXISTING 02 FIELD VERIFY FRAME OPENINGS PRIOR TO ORDERING NEW DOORS
TOILET 106A 1 3' - 0" 7' - 0" 2" WD - RED OAK HM - EXISTING 01 FIELD VERIFY FRAME OPENINGS PRIOR TO ORDERING NEW DOORS
STORAGE 108A 1 3' - 0" 7' - 0" 2" HM HM - EXISTING 01 FIELD VERIFY FRAME OPENINGS PRIOR TO ORDERING NEW DOORS
Revision Schedule
Revision #
Revision
Description Revision Date
1RETAIL SALES - WEST
REMOVE EXISTING
VCT FLOOR FINISH.
PREP FLOORS FOR
BASE BID POLISHED
CONCRETE.
LIGHT FIXTURES
TO REMAIN
PAINT EXPOSED
STRUCTURE AND
ALL MECHANICAL &
ELECTRICAL
ELEMENTS
ALL FIXTURES &
EQUIPMENT TO BE
REMOVED AND
RELOCATED BY
EXCHANGE
2SNACK AVENUE - SOUTHWEST
EXISTING SNACK
AVENUE EQUIPMENT
AND CASEWORK TO
REMAIN. EXCHANGE
TO REMOVE &
REINSTALL .
EXCHANGE TO REMOVE
& REINSTALL ALL
AUDIO/VISUAL
EQUIPMENT & DECOR
EXISTING DELI
EXPRESS & SANDWICH
COOLER TO BE REMAIN
IN THIS LOCATION
3SNACK AVENUE - WEST
REMOVE WING WALL.
RELOCATE FIRE
EXTINGUISHER CABINET.
REMOVE VCT FLOOR FINISH
REMOVE WALL BASE
PAINTED FINISHES
TO GO TO DECK
PAINTED FINISHES TO
GO TO DECK
4RETAIL SALES - SOUTH
5RETAIL SALES - SOUTHEAST
6RETAIL SALES - NORTH
7RETAIL SALES - SOUTHEAST
8RETAIL SALES - NORTHEAST
9RETAIL SALES - NORTH
EXCHANGE TO
REMOVE
EXISTING
FREEZERS
NEW PAINTED
FINISHES TO GO
TO DECKWALL TO REMAIN
COOLER & FREEZER
TO REMAIN. DO NOT
PAINT.
REMOVE & REPLACE
WALL BASE WITH
NEW
NEW PAINTED
FINISHES TO GO
TO DECK
LIGHT FIXTURES TO REMAIN
FIXTURES TO
BE REMOVED /
RELOCATED
BY EXCHANGE
AUDIO/VISUAL
EQUIPMENT TO BE
REMOVED /
REINSTALLED BY
EXCHANGE
PAINT COLUMNS P-1
SUBWAY - NO WORK
BEYOND THIS POINT
LINE DENOTING BEGINNING OF SUBWAY CONCEPT
REMOVE VCT FLOOR FINISH
REMOVE WALL BASE
NEW CORNER GUARDS
END NEW WALL &
FLOOR FINSH WORK
AT THIS POINT
STRUCTURE ABOVE SUBWAY TO BE PAINTED
ALL FINISHES, FIXTURES
& EQUIPMENT FOR
SUBWAY CONCEPT TO
REMAIN
PARTIAL HEIGHT
WALL AT SUBWAY TO
REMAIN. WALL
FINISH ON THIS SIDE
AND WOOD TOP CAP
TO REMAIN
REMOVE EXISTING SLATWALL
FULL HEIGHT WING WALL TO REMAIN
ADD TS-1
TRANSITION
STRIP. TILE TO
CONCRETE.
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1/4" = 1'-0"
LAW
Checker
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-103
PHOTO SHEET
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
Revision Schedule
Revision #
Revision
Description Revision Date
1RETAIL SALES - WEST
FULL HEIGHT WALL TO REMAIN
PARTIAL
HEIGHT WALL
TO BE
REMOVED.
VERIFY
ELECTRICAL
ELEMENTS.
2RETAIL SALES - NORTH
3BREAK ROOM - WEST
4TOILET ROOM - WEST
5TOILET ROOM - NORTH
6OFFICE - NORTH
7STORAGE - NORTH
8STORAGE - NORTH
FIXTURES TO
BE REMOVED /
RELOCATED BY
EXCHANGE
ELECTRICAL
ELEMENTS ON BACK
SIDE OF PARTIAL
HEIGHT WALL TO BE
REMOVED
CONTRACTOR TO
REMOVE EXISTING
COUNTERTOP &
CASEWORK.
REFRIGERATOR &
LOCKERS TO BE
RELOCATED BY
EXCHANGE.
CONTRACTOR TO
SUPPLY
ELECTRICAL
REQUIREMENTS
FOR NEW
REFRIGERATOR
LOCATION
EXCHANGE TO
REMOVE /
RELOCATE ALL
FIXTURES,
FURNISHINGS AND
DECORREMOVE VCT
FLOOR FINISH &
WALL BASE
REMOVE VCT FLOOR
FINISH, WALL BASE,
PLUMBING FIXTURES &
ACCESSORIES. NEW
TOILET & LAVATORY TO
BE INSTALLED IN SAME
PLACE. NEW
ACCESSORIES.
URINAL TO BE
REMOVED AND
REPLACED WITH
NEW IN SAME
LOCATION
EXISTING DOOR TO
STORAGE ROOM TO
BE REMOVED.
FRAME TO REMAIN
AREA OF NEW TOILET
ROOM CONSTRUCTION.
EXCHANGE TO REMOVE
ALL FURNISHINGS,
FIXTURES AND
EQUIPMENT. REMOVE
FLOOR FINISH, WALL
BASE AND MODIFY
ACOUSTICAL PANEL
CEILING AND GRID TO
ACCOMMODATE NEW
CONSTRUCTION
REQUIREMENTS.
EXISTING UTILITY
BOXES/PANELS TO
REMAIN.
EXCHANGE TO
REMOVE ALL
WALL FIXTURES
AND SHELVING
GRIND AND SEAL
EXISTING
CONCRETE
FLOOR
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1/4" = 1'-0"
LAW
Checker
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-104
PHOTO SHEET
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
Revision Schedule
Revision #
Revision
Description Revision Date
B C D
RB-1, TYP
P-1 P-1
P-1
P-1
P-1
ANGLED
P-1P-1
SUBWAY
NO WORK
THIS AREA
SUBWAY BULKHEAD
NO WORK BEYOND THIS POINT
SUBWAY
FINISH THIS
SIDE OF WALL
TO REMAIN
EXISTING WALL BUMPER RAIL TO
REMAIN. REPAIR / REPAINT P-1
PAINT WINDOW SILLS P-1, TYP CG-1 CG-1
2
3
4
SUBWAY
NO WORK THIS AREA
P-1 THIS SIDE OF WALL ONLY
RB-1CG-1 DO NOT PAINT COOLER
P-2 TO DECK
CG-1
END P-2 AT THIS
INSIDE CORNER
P-1
WRAP P-2 TO OUTSIDE
CORNER WHERE SUBWAY
FINISHES BEGIN
RB-1
B
CDE
RB-1, TYP NEW CASEWORK EF/EI
7'-0" P-3
P-4 TO DECK
P-2 TO DECK
WALL BEYOND PAINT P-1DO NOT PAINT COOLER, TYP DO NOT PAINT COOLER CG-1
HALL
BEYOND
P-1
WING WALL P-1 WRAP TO INSIDE CORNERS
P-3 & P-4 TO THIS INSIDE CORNER
RELOCATED FIRE
EXTINGUISHER
CABINET
1234
EXISTING CASEWORK TO REMAIN
P-1 WRAP TO
THIS INSIDE
CORNER
7'-0" P-3
TO DECK
P-4
RB-1 CG-1 RB-1 CG-1
P-1 P-1
CG-1
P-1
P-4P-4
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1/4" = 1'-0"
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-251
INTERIORELEVATIONS, FINISHLEGEND & FINISHSCHEDULE
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
1/4" = 1'-0"A-102 A-251
1 103 RETAIL SALES - NORTH
1/4" = 1'-0"A-102 A-251
2 103 RETAIL SALES - EAST
1/4" = 1'-0"A-102 A-251
3 103 RETAIL SALES - SOUTH
1/4" = 1'-0"A-102 A-251
4 103 RETAIL SALES - WEST
FINISH LEGENDSPEC ITEM REF. MANUFACTURER COLOR FINISH / DESCRIPTION
03 30 00 SEALED CONCRETE SC-1 - NATURAL -
03 35 10 POLISHED CONCRETE PC-1 - NATURAL DIAMOND POLISHED
06 64 00 FIBER REINFORCED PANELS FRP-1 MARLITE - STANDARD FRP S100-S2S SMOOTH TEXTURE
09 30 00 CERAMIC TILE CT-1 DAL TILE - SEMI GLOSS K175 BISCUIT TOILET ROOMS - 3" x 6" WALL TILE - STAGGERED BOND INSTALL
09 30 00 CERAMIC TILE BASE CTB-1 DAL TILE - SEMI GLOSS K175 BISCUIT TOILET ROOMS - A-3601 6" x 6" COVE BASE
09 30 00 GROUT GT-1 LATICRETE - EPOXY GROUT 78 STERLING SILVER FLOOR GROUT
09 30 00 GROUT GT-3 LATICRETE - SANDED GROUT 78 STERLING SILVER WALL GROUT
09 30 00 PORCELAIN TILE PT-1 DAL TILE - FABRIQUE P690 GRIS LINEN TOILET ROOMS - 12" x 12" UNPOLISHED - GRID PATTERN - QUARTERTURN BASKETWEAVE
09 30 00 PORCELAIN TILE PT-2 DAL TILE - LODGE P303 PICO BONITO OPTION 1 FLOORING - UNPOLISHED 12" X 12"
09 30 00 PORCELIAN TILE BASE PTB-1 DAL TILE - LODGE P303 PICO BONITO OPTION 1 BASE - S-36C9T 6" x 12" COVE BASE
09 30 00 TRANSITION STRIP TS-1 SCHLUTER SYSTEMS - RENO RAMP ANODIZED ALUMINUM TILE TO CONCRETE TRANSITION
09 51 23 ACOUSTICAL CEILING TILE ACT-1 USG - 562 FISSURED WHITE 2' x 4', CLASS A DONN/DXLA GRID, WHITE
09 65 13 RUBBER BASE RB-1 JOHNSONITE - 4" W/ TOE 179 STEEL -
09 65 13 RUBBER BASE RB-2 JOHNSONITE - 4" W/ TOE 48 GRAY -
09 91 00 PAINT P-1 SHERWIN WILLIAMS - HARMONY SW6127 IVORIE SATIN FINISH
09 91 00 PAINT P-2 SHERWIN WILLIAMS - HARMONY SW6531 INDIGO SATIN FINISH - SOFFIT ABOVE WALK-IN COOLER / FREEZER
09 91 00 PAINT P-3 SHERWIN WILLIAMS - HARMONY SW6314 LUXURIOUS RED SATIN FINISH - SNACK AVENUE - FLOOR TO 6'-6" AFF
09 91 00 PAINT P-4 SHERWIN WILLIAMS - HARMONY SW6601 TANAGER SATIN FINISH - SNACK AVENUE - 6'-6" AFF TO CEILING
09 91 00 PAINT P-5 SHERWIN WILLIAMS - HARMONY SW7043 WORLDLY GRAY TOILET ROOM WALLS - SEMI GLOSS FINISH
09 91 00 PAINT P-6 SHERWIN WILLIAMS - HARMONY SW7042 SHOJI WHITE CEILINGS - SEMI GLOSS FINISH
09 91 00 PAINT P-7 SHERWIN WILLIAMS - HARMONY SW6106 KILIM BEIGE SATIN FINISH
09 91 00 PAINT P-8 SHERWIN WILLIAMS - HARMONY SW6165 CONNECTED GRAY SATIN FINISH - EXPOSED CEILING
09 91 00 PAINT P-9 SHERWIN WILLIAMS - HARMONY SW7006 EXTRA WHITE SEMI-GLOSS FINISH
10 26 00 CORNER GUARDS CG-1 POLYCARBONATE CLEAR 1 1/2" x 1 1/2" TO 4'-0" A.F.F.
ROOM FINISH SCHEDULEROOM
NO NAME FLOOR BASE
WALL FINISH CEILINGFINISH
CEILINGHEIGHT COMMENTSNORTH EAST SOUTH WEST
101 VESTIBULE PC-1* RB-1 P-1 P-1 P-1 P-1 P-6 OPEN PAINT ALL CEILING STRUCTURE, MECHANICAL ANDELECTRICAL ELEMENTS
103 RETAIL SALES PC-1* RB-1 P-1 P-1 / P-2 P-1 / P-2 / P-3 / P-4 P-1 / P-3 / P-4 P-8 *BASE BID FLOORING: POLISHED CONCRETE. OPTION 1FLOORING PORCELAIN TILE PT-2 WITH PTB-1 BASE
104 HALL PC-1* RB-1 - P-1 P-1 P-1 ACT-1
105 BREAKROOM SC-1 RB-2 FRP-1 P-7 P-7 FRP-1 / P-7 ACT-1
106 TOILET PT-1 / GT-1 CTB-1 / GT-1 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-6
107 OFFICE/ MANAGER SC-1 RB-2 P-7 P-7 P-7 P-7 ACT-1
108 STORAGE SC-1 RB-2 P-9 P-9 P-9 P-9 ACT-1
109 JANITOR EXIST EXIST EXIST EXIST EXIST EXIST EXIST
110 STAFF TOILET PT-1 / GT-1 CTB-1 / GT-1 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-5 / CT-1 / GT-2 P-6 9'-0"
Revision Schedule
Revision #
Revision
Description Revision Date
PE
PP
ER
IDG
E F
AR
MS
HO
CK
WA
VE
6'
6'-2"
6'
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
MASS DISPLAY
PALLET
92009
8
2 DOORS
BAGGED
1S
3
4
5
A B
4 5
6 7
8
9
9B
12A
13
15C
15A
15B
22A
22B
25A
26
36 34
RETAIL SALES
103
BREAKROOM
105
A-4013
A-401
2
A-401
637 37
46A
24C
24A
24D
16B
66
EXISTING ICEE
MACHINE
EXIS
TIN
G C
OU
NTER
& C
ASEW
OR
K T
O R
EM
AIN
REF.
5
3
4
RELOCATEDREFRIGERATOR
90
5
75
42
46A
21
24B 64
24A
6424D24C
B
OPEN
CG-1 RB-1
TO
DEC
K
P-4
CASEWORK EF/EI
15C
15A
15B
P-1 WRAP TO
THIS INSIDE
CORNER
SOFFIT ABOVE
COOLER P-2
CG-1
FEC
12A
46A46A
3
13
9B
9 8 777
6
5
4
EXISTING CASEWORK TO REMAIN
P-1 WRAP TO THIS
INSIDE CORNER
7'-0
" P
-3P-4
TO
DEC
K
RB-1 CG-1
CG-1
24D
24A
24C
22B
22A
16B14A
25A
26
24B
64
24A
24C
24D
6
?
B
RB-2
FRP-1
36 34
37 37
RELOCATED
REFRIGERATOR
5
A B
A-401
8
11
10
9
TOILET
106
STORAGE
108
STAFFTOILET
110
JANITOR
109
OFFICE/MANAGER
107
DF
1' -
3"
ALIGN
A-40115
12
13
14
6" MTL. STUD TO DECKACOUSTICAL INSULATION
5/8" WATER RESISTANT GYP BD.(1) SIDE5/8" GYP BD. (1) SIDE
SUSPENDED GYP BD.CEILING AT 9'-0" AFF.
PAINT P-6
EXISTING CEILING TOREMAIN. PAINT P-6
108A
105A
CT-1/GT-2, TYP
CTB-1/GT-1, TYP
P-5, TYP
5
6
11
9
7
8
14
9
10
2
3
1
WALL MOUNT SINK - CF/CI
MIRROR 2'-0" X 3'-0" - CF/CI
SURFACE MOUNTED AUTOMATIC SOAP DISPENSERBATTERY OPERATED - EF/CI
FLOOR MOUNT TOILET - CF/CI
AUTOMATIC TOUCHLESS PAPER TOWEL DISPENSER - EF/CI
SEMI-RECESSED TRASH RECEPTACLE - CF/CI
TOILET PAPER DISPENSER - EF/CI
SANITARY NAPKIN DISPOSAL - CF/CI
HORIZONTAL & VERTICAL GRAB BAR - CF/CI
BABY CHANGING TABLE - EF/CI
SEAT COVER DISPENSER - EF/CI
1
TOILET FIXTURE LEGEND
2
3
4
6
7
8
9
13
14
5
3'-4
"
2'-1
0"
1'-6
"3'-4
"
6" 2'-0" 4'-0" 6"
3'-4"
3'-5
1/2
"
2'-1
"
2'-2
"
T.O
. LED
GE
2'-7
"
SIDESHORTBACK
3'-4
"
2'-3
"3'-7
"
2'-1
0"
1'-6
" AD
A
765 10321 8 9 9 13 14
6'-0"
P-7
RB-2, TYP
5
3
PAINT DOOR &
FRAME P-6
90
RB-2
FRP-1
4'-0"
P-7
OPEN
7'-0
" TYP
P-5, TYPCT-1 / GT-2,
TYP
CTB-1 / GT-1,
TYP
10
2
3
1
514
8
7
DRAWN BY:DRAWN BY:DRAWN BY:DRAWN BY:
CHECKED BY:CHECKED BY:CHECKED BY:CHECKED BY:
DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:DESIGN TYPE:
DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:DESIGN PHASE:
DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:DATE SUBMITTED:
PROJECT:PROJECT:PROJECT:PROJECT:
DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:DRAWING TITLE:
DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:DESIGN SIZE:
EXCHANGE
SCALE:SCALE:SCALE:SCALE: SSSSHHHHEEEEEEEETTTT::::
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
1111 2222 3333 4444 5555 6666
AAAA
BBBB
CCCC
DDDD
EEEE
As indicated
LAW
KJM
100% BID DOCUMENTS
SEPTEMBER 19, 2014
A-401
ENLARGED PLANS,ELEVATIONS &SCHEDULES
JBLM - McCHORDEXPRESSIMAGE UPGRADE
BUILDING 545
PN: 4915-12-006
NORTH
SNACK AVENUE EQUIPMENT SCHEDULE
ITE
M #
QT
Y
DESCRIPTION MANUFACTURER MODEL
SIZE ELECTRICAL PLUMBING
FU
RN
ISH
ED
INS
TA
LLE
D
REMARKSWID
TH
DE
PT
H
HE
IGH
T
VO
LT
S
PH
AS
E
AM
PS
CW
HW
WA
ST
E
4 2 STAINLESS STEEL 2.5 LITRE AIRPOT BUNN 32125.0000 6.3" 9" 14.6" E V
5 1 TWO-POSITION AIRPOT RACK BUNN UNIV-2 APR 7.5" 24.1" 14.1" E V
6 5 COFFEE SERVER BUNN TF 1.5 Gallon 9" 13.8" 14.8" A V
7 3 TF SERVER STAND BUNN 39795.0000 9.3" 12.9' 8.8" E V
8 1 TWIN INFUSION COFFEE BREWER BUNN ICB-TWIN 20" 25.3" 26.2" 120/240 1 25 3/8" E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
9 1 HOT BEVERAGE DISPENSER BUNN IMIX-14 19.2" 24" 32.6" 120 1 15 1/4" E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
9B 1 IMIX-14 HOT BEVERAGE DISPENSER BUNN 43800.0102 19.2 24 32.6 120 15 1/4" E V REFERENCE CUT SHEET FOR ADDITIONAL PLUMBING INFORMATION
12A 1 WUNDER-BAR VARIETY TEA DISPENSER COCA COLA WB-RT-4-N 10.7" 13.7" 19" 100-240 1.5 3/8" E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
13 1 ULTRA-2 HOPPER GOURMET ICE SYSTEM BUNN 34000.0000 16" 24.5" 31.9" 120 15 E V REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
14A 1 CARBONATED BEVERAGE DISPENSER - ICEE ICEE 563 - (3) HEAD 21.5 32.38 41.4 215-245 1 30 30PSI
E E 60 Hz - 3 WIRE, NEMA #L-620R
15A 1 POST MIX BEVERAGE DISPENSER LANCER IBD 4500 - 38-4530-GRNC 30" 30.5" 34" 115 1 15 3/8" 1.5" E V
15B 1 ICE MACHINE BIN ADAPTER LANCER FOR PART # 82-9999-010311 E V
15C 1 ICE MAKER FOR 15A - MODULAR CRESCENT CUBER HOSHIZAKI KMD-700MAH 30" 24.75" 28" 208-230 20 1.5" 3/4" E V INTEGRAL AIR-COOLER CONDENSER - REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
16B 1 MICROWAVE DELI EXPRESS RFS12MPS 21.75" 20.25" 14.25" 120 15.8 V E REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
21 1 WIRE RACK CHIP DISPLAYER STAR MFG. GOODWEST 7.75" 16" 20" V E 3 LEVEL BLACK WIRE RACK
22A 1 CHILI CHEESE DISPENSER STAR MFG. GOODWEST CHILI CHEESE DISPLAYER 9" 17" 23" 120 1.7 V E SINGLE-DISPENSER
22B 1 CHEESE DISPENSER STAR MFG. GOODWEST CHEESE DISPLAYER 9" 17" 23" 120 1.7 V E SINGLE-DISPENSER
24A 2 HOT DOG ROLLER GRILL APW WYOTT HRS-50S 34.75" 18.625" 11.25" 120 1 11 E E SLANTED SURFACE - REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
24B 1 HOT DOG BUN CABINET APW WYOTT BC-50 34.688" 18.625" 6.375" E E
24C 2 HOT DOG SNEEZE GUARD APW WYOTT SG-50 35.5" 19.5" 9" E E
24D 2 LG. GRILL EASEL WITH CHANNEL FOOD CONCEPTS FITS APW 50 COUNT GRILL 34.688" 6.375" V E
25A 1 INTERNATIONAL DELIGHT CREAM DISPENSER WHITE WAVE 210 13.75" 18" 27.5" V E
26 1 SUGAR MACHINE BUNN LS2 DUAL PORT 9.5" 14" 21" V E
34 1 STAINLESS STEEL WORK TABLE W/ SHELF 48 30 36 E E
36 1 3-COMPARTMENT SINK 90 31 34 E C
37 2 SMART WALL SYSTEM METRO SMARTWALL PLUS 48" 14" E C
42 1 BAG-IN-BOX (BIB) LANCER 85-1803-3512 39" 11" E E
46A 1 FROZEN BEVERAGE BLENDING BAR MINUS FOURTY TECH. CORP. FRLB5-2 44.5" 31" 56" 120 6.5 1/4" 5/8" V E REFERENCE CUT SHEET FOR ADDITIONAL REQUIREMENTS
64 2 ROLLER GRILL RISER FRITO LAY 1961402 E E
75 1 HIGH FLOW WATER FILTER EVERPURE EV9437-11 7" 16.2" 28.5" 208 1 19.2 0.25"
E C
90 1 HAND SINK EAGLE GROUP HSA-10-FA-P 17.25" 15.25" 42" .5" .5" 1.5" E C
1/4" = 1'-0"A-102 A-401
1 ENLARGED SNACK AVENUE PLAN
1/4" = 1'-0"A-401 A-401
2 SNACK AVENUE - SOUTH 1/4" = 1'-0"A-401 A-401
3 SNACK AVENUE - WEST 1/4" = 1'-0"A-401 A-401
6 105 BREAK ROOM - NORTH
1/2" = 1'-0"A-102 A-401
7 ENLARGED TOILET ROOM PLAN
1/4" = 1'-0"A-401 A-401
8 106 TOILET - NORTH 1/4" = 1'-0"A-401 A-401
9 106 TOILET - EAST 1/4" = 1'-0"A-401 A-401
10 106 TOILET - SOUTH 1/4" = 1'-0"A-401 A-401
11 106 TOILET - WEST
1/4" = 1'-0"
TYPICAL FIXTURE MOUNTING HEIGHTSNORTH
1/4" = 1'-0"A-401 A-401
4 105 BREAK ROOM - SOUTH 1/4" = 1'-0"A-401 A-401
5 105 BREAK ROOM - WEST
1/4" = 1'-0"A-401 A-401
12 110 TOILET - NORTH 1/4" = 1'-0"A-401 A-401
13 110 TOILET - EAST 1/4" = 1'-0"A-401 A-401
14 110 TOILET - SOUTH
1/4" = 1'-0"A-401 A-401
15 110 TOILET - WEST
Revision Schedule
Revision #
Revision
Description Revision Date
Recommended