Design Refinements|West Plaza

Preview:

DESCRIPTION

Design Refinements|West Plaza. 60% Proposed Plan. GOALS:. Classic industrial architecture Define the space Identify pedestrian/ vehicle conflicts. Design Refinements|West Plaza. 90 % Proposed Plan. Design Refinements|West Plaza. Elevator & Stairway. Design Refinements|West Plaza. - PowerPoint PPT Presentation

Citation preview

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West Plaza60% Proposed Plan

• Classic industrial architecture

• Define the space• Identify pedestrian/

vehicle conflicts

GOALS:

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West Plaza90% Proposed Plan

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaElevator & Stairway

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaElevator & Stairway

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaElevator & Stairway

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaElevator & Stairway

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaElevator & Stairway

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaRailings

Pedestrian

Stairway Vehicle

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|West PlazaBike Rack

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East Plaza60% Proposed Plan

• Simplified circulation• Programmable spaces• Engage the space• Allow art opportunities

GOALS:

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaDesign Process

• Simplified circulation• Programmable spaces• Engage the space• Allow art opportunities

GOALS:

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East Plaza90% Proposed Plan

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaSeat Walls

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaRailings

PedestrianStairway

Vehicle

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaRailings

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaWay finding & Signage

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaWay finding & Signage

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaWay finding & Signage

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaPlanting

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaPlanting

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Design Refinements|East PlazaPlanting

SR 519 Intermodal Access ProjectPhase 2: South Atlantic Corridor

Timeline

a.b.

a. Preliminary & Final Design March 200930% presentation to SDC - November 20, 200860% presentation to SDC - January 15, 200990% presentation to SDC - February 19, 2009

b. Construction Civil Package June 2009(landscape & urban design)

c. Bridge Structures July 2009d. Construction Complete June 2010

c.d.

Recommended