*CIAP-PDCB CONSOLIDATED CONSTRUCTORS
PERFORMANCE SUMMARY REPORT (CPES REPORTS)
8TH RELEASE
(ON-GOING/COMPLETED PROJECTS) FROM JANUARY 1, 2006- DECEMBER 30, 2008
*You may access this report on this website http://www.gppb.gov.ph
1
BACKGROUND: This report is prepared in connection with the
implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of Contractors Performance of the Implementing Rules and Regulations (IRR) of RA No. 9184 (Government Procurement Reform Act). Item 4 - Submission and Dissemination of Evaluation Results of Section 12, specifically mandated PDCB to consolidate the CPES evaluation results of all ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. USES OF CPES INFORMATION:
The CPES rating and other information is designed to serve the information needs of the following: a) government agencies undertaking infrastructure projects; b) industry planners and decision makers, c) constructors, d) project owners, e) banking and financing institutions, f) insurance companies, g) consulting firms, h) professional associations, and i) embassies.
Information on contractors CPES ratings shall be used for
the following purposes: a) Pre-qualification/Eligibility Screening of Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Incentives/Awards, and in adopting measure to further improve performance of contractors in the prosecution of government projects.
REPORT COVERAGE:
This report contains CPES rating and other project-related information of on-going and completed foreign assisted (FA) and locally funded (LF) infrastructure projects being undertaken by either local, foreign or joint venture constructors. The projects presented in these report covers: road, bridge, housing, building, ports and harbor, irrigation and flood control, and water supply projects.
REPORT CONTENTS:
Presented in this report are the names of constructors arranged alphabetically with the corresponding project classification. Information available in this report comprises three (3) parts, as follows: 1) Constructor General Information; 2) Project Data; and 3) CPES Rating.
Part 1 of the report includes the name of constructor/s and
PCAB License Number.
Information contained in Part 2 pertains to the project name, Implementing Agency, contract amount, and status of project (on-going or completed).
CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB)
5/F Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati ave. Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791
CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from Jan. 1, 2006-Dec. 30, 2008
2
Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental, safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.
SOURCES OF INFORMATION
Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and
Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority (NHA), Philippine Ports Authority (PPA), Pasig River Rehabilitation Commission (PRRC), Bases Conversion Development Authority (BCDA), Polytechnic University of the Philippines (PUP), Development Bank of the Philippines (DBP) and Philippine Tourism Authority (PTA) covering the period January 1, 2006 – December 30, 2008
As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter
may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.
For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned
implementing agencies listed below:
Melrose Pailma (DPWH) Wilfredo C. Borbor (DOTC) Arnaldo C. Reyes (DOST) Tess Pantalla (NIA)
Tel No. 304-3511 Tel No. 726-3508 Tel No. 837-2071 loc: 2120 Tel No. 927-0923
Ma. Otelia F. Eclavea (NHA) Arnold Villegas (PPA) Amy Gamay (PRRC) Bong Fortunado (BCDA) Tel No. 928-4561 Tel No. 527-8356 loc: 356 Tel No. 433-3444 Tel No. 816-6666 Angela Israel (PUP) Marie Cielo Veran (DBP) Aniversario Partolan (PTA) Tel No. 713-1488 Tel No. 818-9511 loc: 2632 Tel Nos: 523-5667 ; 525-3769
For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at pdcb_ciap@yahoo.com.ph. You may access this report on this website http://www.gppb.gov.ph.
3
CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES
I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood
Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit.
2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing
Office reported 100% completion.
II. CRITERIA FOR EVALUATION
Amended Guidelines as Approved by NEDA InfraCom 27 August 2008
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Materials 0.20 Time 0.15 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety and 0.07 Health (ESH) Resources Deployment 0.05 TOTAL 1.00
4
As approved by NEDA InfraCom 19 May 2005
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 TOTAL 1.00
As approved by NEDA InfraCom
30 January 1998
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Time 0.50 Time 0.10 TOTAL 1.00 Facilities 0.03 Environmental, Safety
and Health (ESH) 0.07 Resources Deployment 0.10 TOTAL 1.00
5
III. CPES RATING & ITS QUALITATIVE DESCRIPTION
CPES Implementing Guidelines as Approved on 27 August 2008
As Approved on May 2005 and 30 January 1998
*CPES RATING Ranges Rating Qualitative Description
>96% Outstanding
>89% but < 96% Very Satisfactory >82% but < 89% Satisfactory >75% but < 82% Unsatisfactory < 75% Poor
*CPES RATING Ranges Rating Qualitative Description
>90% Outstanding
>80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor
6
*CAUSES OF DELAY
CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS
C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds
C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation
of utilities, (i.e. PLDT, MERALCO posts and other similar cases)
7
*CAUSES OF DELAY OTHER-RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural calamities; occurrence of flooding/ siltation on site; unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
121 Construction 21686 Const. of Cemented Footbridge, Sapang Bayan III 0.946 C 0.304 0.285 0.300 - - - 88.90 91.06%
Outstanding
121 Construction 21686 Const. of MPB @ Bulacan State University Compound III 0.945 O 0.356 0.225 0.100 0.030 0.035 0.100 84.60 -
121 Construction Corporation (Formerly: 121
Construction)21686 Const. of MPB NCR 3.341 C 0.393 0.149 0.300 - - - 84.20 *84.20%
V. Satisfactory
121 Construction Corporation (Formerly: 121
Construction)21686 Const. of MPB NCR 3.821 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
121 Construction Corporation (Formerly: 121
Construction)21686 Impvt. of MPB at Sta. Maria Agro-
Industrial High School III 1.717 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
2H2L Construction 16293 Conc. of Road @ Package 3-2 XI 0.565 C 0.343 0.300 0.300 - - - 94.30 *94.30% Oustanding
2H2L Construction 16293 Const. (Completion) of Sch. Bldg. @ dela Paz E/S IV-A 0.791 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
2H2L Construction 16293 Const. of MPB @ Jacinto St. XI 0.471 C 0.365 0.300 0.300 - - - 96.50 *96.50% Oustanding
2H2L Construction 16293 Widening of Antipolo-Teresa Road IV-A 19.224 C 0.261 0.300 0.300 - - - 86.10 80.34%
V. Satisfactory
2-R Construction & Supply 15304 Impvt./Rehab. of PMA Road, PMA Cut=off Road 1&2 CAR 4.811 C 0.260 0.200 0.300 - - - 76.00 *76.00%
Satisfactory
2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road I 2.410 C 0.338 0.200 0.300 - - - 83.80 *83.80%
V. Satisfactory
310 Construction Specialist Corporation 4875 Asphalt Overlay of Tigaon-Goa-
Lagonoy Road V 47.945 C 0.450 - 0.500 - - - 95.00 95.12% Outstanding
310 Construction Specialist Corporation 4875 Const. of Tumana Bridge (Phase
III) NCR 26.854 C 0.221 0.190 0.300 - - - 71.10 79.38% Satisfactory
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 1
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
310 Construction Specialist Corporation 4875
Estrella-Pantaleon Bridge Approaches (Across Pasig
River)NCR 38.627 C 0.376 0.200 0.300 - - - 87.60 83.22%
V. Satisfactory
3E Construction 19588Completion of Multi-Purpose
Bldg., (Water District, Phase IV) Tankulan
X 2.365 C 0.335 0.136 0.000 - - - 47.10 71.44% Satisfactory
3K Builders 27277 Const. of 1 Unit 1 CL Dullao E/S II 0.410 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
3K Builders 27277 Const. of Curifang FMR II 0.277 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding
3K Builders 27277 Const. of FMR @ Brgy. Bobonan I 0.478 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
3K Builders 27277 Const. of Multi-Purpose Building I 0.480 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building (Gymnasium) II 1.194 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building @ MIT II 0.478 C 0.297 0.300 0.300 - - - 89.70 *89.70%
V. Satisfactory
3K Rock Engineering 27908 Completion of One (1) CL, Secondary School Building II 0.182 C 0.349 - 0.500 - - - 84.90 *84.90%
V. Satisfactory
3K Rock Engineering 27908 Const. of Cultural Tourism Center, Saguday NHS II 0.954 C 0.233 0.200 0.300 - - - 73.30 81.14%
V. Satisfactory
3K Rock Engineering 27908 Const. of Flood Control, Sangbay II 0.954 C 0.321 0.204 0.300 - - - 82.50 *82.50%
V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School II 0.578 C 0.375 0.218 0.300 - - - 89.30 *89.30%
V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S II 1.622 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 2
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
3K Rock Engineering 27908 Const./Impvt. of Nat'l Road along Echague-Jones Maddela Road II 2.722 C 0.319 0.200 0.300 - - - 81.90 *81.90%
V. Satisfactory
3-L Construction 16745 Concreting of Barangay Road V 0.550 O 0.344 0.300 0.100 0.010 0.028 0.100 88.20 -
3-L Construction 16745 Const. of Multi-Purpose Hall, Lupi H/S V 0.469 C 0.393 0.182 0.300 - - - 87.50 *87.50%
V. Satisfactory
3RB Construction & Supply 19541 Const. of Almine-Bagacay Road, Almine Section V 4.625 O 0.184 0.059 0.100 0.015 0.027 0.100 48.50 -
3RB Construction & Supply 19541 Const./Rehab. of Water Supply, Level 1 and II System IV-A 1.921 C 0.288 0.200 0.300 - - - 78.80 73.94%
Satisfactory
3RB Construction & Supply 19541Road Upgrading along DM Jct.-Leg.-Sto. Domingo-Tab.-Cam.
Sur Bdry., Tiwi-Tabaco SectionV 19.233 O 0.382 0.203 0.100 0.020 0.019 0.067 79.10 -
3RB Construction and Supply 19541 Const. of Municipal High School
Building IV-A 9.130 C 0.382 0.183 0.300 - - - 86.50 84.82% V. Satisfactory
3RB Construction and Supply 19541 Rehabilitation of Canal Network
(phase 1) NIA-V 11.008 O 0.276 0.200 0.100 0.018 0.033 0.200 82.70 -
3RB Construction and Supply 19541 Rehabilitation of Canal Network
(phase 2) NIA-V 8.856 O 0.291 0.200 0.100 0.018 0.033 0.200 84.20 -
3S Builders 18009 Completion of Drainage System VII 0.634 C 0.333 0.300 0.300 - - - 93.30 91.50% Outstanding
4 A's Construction 9446 Conc. of Road II 1.926 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory
4 A's Construction 9446 Const. of 2 Storey 4 Classroom School Bldg. @ Gosi E/S II 1.077 C 0.312 0.258 0.300 - - - 87.00 *87.00%
V. Satisfactory
4 A's Construction 9446 Repair/Rehab. of Saint Paul Vocational H/S II 0.189 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 3
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
4B Construction Corporation 23445 Upgrading and Concreting of
Subic-Philseco Road III 41.616 O 0.366 0.256 0.070 0.030 0.061 0.033 81.60 -
4B Construction and Corporation 23445 Rehab. of Olongapo-Bugallon
Road, San Marcelino Section III 4.675 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
525 Construction 28532 Repair & Impvt. of Daang Maharlika Road III 14.801 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
525 Construction 28532 Road Conc., Taal Bocaue III 1.899 C 0.357 0.289 0.300 - - - 94.60 *94.60% Outstanding
525 Construction 28532 Road Rehabilitation at Mapulang Lupa III 0.944 C 0.382 0.300 0.300 - - - 98.20 *98.20%
Outstanding
558 Builders & Construction Supply 25751 Conc. Sarangani-Davao del Sur
Coastal Road (Taluya Section) XII 9.435 C 0.346 0.300 0.000 - - - 64.60 67.68% Fair
558 Builders & Construction Supply 25751 Const. of FMR Lower Mainit XII 0.465 C 0.160 0.300 0.300 - - - 76.00 63.74%
Fair
558 Builders & Construction Supply 25751 Const. of Maligang River Flood
Control XII 2.217 C 0.278 0.300 0.000 - - - 57.80 61.28% Fair
558 Builders & Construction Supply 25751 Const. of MPB (Mini Gym) @
Padada Central E/S XI 1.420 C 0.387 0.260 0.300 - - - 94.70 82.66% V. Satisfactory
558 Builders & Construction Supply 25751 Const. of Public Market @
Poblacion Alabel XII 2.818 O 0.333 0.159 0.050 0.030 0.037 0.100 70.90 -
722 Construction 21923 Conc. of Road @ at Brgy. Palo Alto IV-A 2.400 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V. Satisfactory
722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S III 2.290 O 0.342 0.300 0.100 0.030 0.019 0.100 89.10 -
722 Construction 21923 Const. of Water System @ Northville II NCR 1.424 C 0.278 0.177 0.300 - - - 75.50 *75.50%
Satisfactory
722 Construction 21923Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada
Section III 3.807 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 4
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
722 Construction 21923Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos
Road (Barihan Section)III 4.957 C 0.361 0.200 0.300 - - - 86.10 *86.10%
V. Satisfactory
722 Construction 21923 Repair/Rehab. of Road, Brgy. Perez III 0.618 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
739 Builders 31174 Completion of MPB, Brgy. Capangpangan I 1.518 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
739 Builders 31174 Conc. of Caparacadan Road I 0.189 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory
739 Builders 31174 Const. of MPB @ Brgy. Sabang I 4.750 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory
739 Builders 31174 Const. of MPB @ San Lorenzo Village I 1.087 C 0.261 0.200 0.300 - - - 76.10 *76.10%
Satisfactory
739 Builders 31174 Const. of Repair of Villamar Bridge I 0.474 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
739 Builders 31174 Repair of Bantay West E/S I 0.380 C 0.240 0.300 0.300 - - - 84.00 *83.90% V. Satisfactory
747 Builders & Trader 16892 Conc./Impvt. of Manila East Road IV-A 6.236 C 0.275 0.200 0.300 - - - 77.50 83.44% V. Satisfactory
747 Builders & Trader 16892 Impvt. of Roads with Drainage System along Dalaging Bukid St. NCR 14.255 C 0.276 0.200 0.300 - - - 77.60 *77.60%
Satisfactory
747 Builders & Trader 16892Impvt./Dredging/Rehab. of
Baybay Sapa (along Lopezville Subd.)
IV-A 4.797 C 0.250 0.300 0.300 - - - 85.00 80.26% V. Satisfactory
747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank IV-A 14.367 O 0.378 0.180 0.100 0.008 0.037 0.100 80.30 -
747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank IV-A 14.368 O 0.321 0.300 0.100 0.030 0.037 0.100 88.80 -
747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. NCR 9.589 C 0.355 0.200 0.300 - - - 85.50 78.96%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 5
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
8 R's Construction 22997 Barangay Hulo Linear Park Project (EPA - LPP - 19) PRRC 22.542 O 0.311 0.270 0.100 0.015 0.042 0.100 83.80 -
811 Trading & Construction 21215Const. of MPB at Sitio
Simbahan, Brgy. Bagong Bayan II
IV-B 0.477 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory
811 Trading & Construction 21215
Const. of Two (2) Storey Bldg. Six (6) Classroom Sch. Bldg. @ Dona Asuncion Reyes Memorial
E/S
IV-B 0.948 C 0.304 0.300 0.300 - - - 90.40 91.73% Outstanding
811 Trading & Construction 21215 Rehab. & Impvt. Along CSR, km. 132+347-km. 140+536 IV-B 4.709 C 0.342 0.300 0.300 - - - 94.20 *94.20%
Outstanding
811 Trading & Construction 21215 Rehab. of Mansalay-Bulalacao Road IV-B 1.408 O 0.328 0.276 0.100 0.022 0.016 0.100 84.20 *84.20%
V.Satisfactory
811 Trading & Construction 21215 Repair/Rehab. of National Roads & Bridges, Mansalay Section IV-B 4.710 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V. Satisfactory
888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ. Road, Calatrava-San Agustin Road (Intermittent Section)
IV-B 9.999 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
A. Ballesta Construction 8446 Const. of One (1) Cl School Building VIII 0.360 C 0.442 - 0.500 - - - 94.20 61.02%
Fair
A. Ballesta Construction 8446 Const. of Road Network along E. Balite Boulevard Ext. VIII 14.393 C 0.242 0.200 0.300 - - - 74.20 61.12%
Fair
A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road II 9.648 C 0.344 0.200 0.300 - - - 84.40 82.84%
V. Satisfactory
A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria CAR 3.626 O 0.158 0.120 0.100 0.015 0.035 0.100 52.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 6
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria CAR 3.626 O 0.326 0.240 0.070 0.015 0.049 0.067 76.70 -
A. De Guia Construction 18228Const. of Naguilian-San
Marcelino Road (Sitio Kasisiitan-Alibadabab E/S Sect.)
II 10.031 C 0.281 0.300 0.300 - - - 88.10 85.16% V. Satisfactory
A. De Guia Construction 18228 Improvement of Buluan-Daga Road CAR 7.519 C 0.179 0.300 0.000 - - - 47.90 34.28%
Poor
A. De Guia Construction 18228 Regravelling of Various FMR II 0.919 C 0.258 0.200 0.300 - - - 75.80 *75.80% Satisfactory
A. De Guia Construction 18228 Widening of Ballacayu-Simanu Road II 2.751 C 0.270 0.200 0.300 - - - 77.00 75.71%
Satisfactory
A. Munas Integrals Builders & Trading 32003 Const./Rehab. of MPB @ Block
4, Kaingin 1 NCR 3.803 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
A. Seva Construction 20124 Const. of Building at San Fernando H/S V 0.468 C 0.358 0.200 0.300 - - - 85.80 83.91%
V. Satisfactory
A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater PUP 1.389 O 0.340 0.240 0.100 0.030 0.029 0.100 83.90 -
A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater PUP 1.389 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 O 0.400 0.300 0.100 0.015 0.025 0.100 94.00 -
A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 O 0.397 0.289 0.100 0.030 0.032 0.100 94.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 7
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.A. De Vera Construction 6191 Const. of 1 CL School Bldg. VII 0.415 C 0.382 0.100 0.300 - - - 78.20 85.69% V. Satisfactory
A.A. De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S VII 4.175 C 0.367 0.300 0.300 - - - 96.70 94.18%
Outstanding
A.A. De Vera Construction 6191 Const. of Loon South CES-SPED Center Bldg. VII 2.780 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer
and Drainage System at Northwing and Eastwing
PUP 1.241 O 0.400 0.300 0.100 0.030 0.019 0.100 94.90 -
A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer
and Drainage System at Northwing and Eastwing
PUP 1.241 O 0.385 0.300 0.100 0.030 0.038 0.100 95.30 -
A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer
and Drainage System at Northwing and Eastwing
PUP 1.241 C 0.400 0.300 0.300 - - - 100.00 100.00% Outstanding
A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 O 0.395 0.285 0.070 0.020 0.022 0.067 85.90 -
A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 O 0.386 0.300 0.100 0.015 0.044 0.100 94.50 -
A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.C. Rivero Construction & Dev't. Corporation 5122 Const. of Candaguit Bridge VI 9.922 C 0.347 0.200 0.300 - - - 84.70 88.89%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 8
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.C. Rivero Construction & Dev't. Corporation 5122
Const./Replacement of Caliban Bridge (Phase 2) along Bacolod-
Murcia-D.S. Benedicto-San Carlos City National Road
VI 7.289 C 0.379 0.300 0.300 - - - 97.90 90.22% Outstanding
A.C. Rivero Development Corporation 5122 Widening of Cabalagnan Bridge I VI 7.946 C 0.323 0.200 0.300 - - - 82.30 81.31%
V. Satisfactory
A.D. Construction 6946 Const. of MPB IV-A 0.944 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory
A.D. Construction 6946 Const. of Sch. Bldg. at Nato E/S V 0.372 C 0.372 0.171 0.300 - - - 84.30 *84.30% V. Satisfactory
A.D. Construction 6946 Rehab. of Panganiban Drainage V 4.212 C 0.288 0.300 0.300 - - - 88.80 77.82% Satisfactory
A.D. Gonzales Jr. Construction and Trading
Company Inc.10012 Const. of BGHMC Acute
Psychiatric Unit Bldg. CAR 21.206 O 0.345 0.300 0.100 0.008 0.022 0.100 87.50 -
A.D. Gonzales Jr. Construction and Trading
Company Inc.10012 Impv't./Rehab. of San Ahustin-
San Joaquin Road III 4.752 O 0.307 0.195 0.100 0.022 0.032 0.100 75.60 -
A.D.L. Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School IV-B 0.481 C 0.360 0.200 0.300 - - - 86.00 84.11%
V. Satisfactory
A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road VI 18.918 C 0.228 0.300 0.300 - - - 82.80 82.80% V. Satisfactory
A.D.P. Const. & Supply 3466Const. of Bugasong-Valderrama Road, Liaures Section (Alternate
Route)VI 14.426 C 0.335 0.087 0.300 - - - 72.20 81.05%
V. Satisfactory
A.D.P. Const. & Supply 3466 Const. of Magballo Bridge (Phase III) VI 10.561 O 0.356 0.300 0.070 0.030 0.030 0.067 85.30 -
A.D.P. Const. & Supply 3466 Reconst. of Dumaguete North Road VII 18.881 O 0.338 0.238 0.070 0.030 0.032 0.033 74.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 9
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR VI 13.743 O 0.328 0.300 0.100 0.024 0.035 0.100 88.70 -
A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR VI 13.922 O 0.325 0.240 0.070 0.023 0.032 0.067 75.70 -
A.D.S. San Juan Construction 12853 Const. of St. Benedict MPB NCR 1.721 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
A.E. Belleza Builders 22646 Const. of Day Care Center, Phase I V 0.379 C 0.415 - 0.500 - - - 91.50 84.78%
V. SatisfactoryA.F.G. Construction and
Construction Supply 17161 Conc. of Road @ Brgy. Mansilingan VI 1.861 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
A.F.G. Construction and Construction Supply 17161
Const. of Diversion/By Pass Road along Kalibo-Iloilo Highway, Banga Section
VI 14.461 C 0.351 0.300 0.300 - - - 95.10 90.90% Outstanding
A.F.G. Construction and Construction Supply 17161 Rehab. of Dumaguete North
Road VII 4.894 C 0.324 0.200 0.300 - - - 82.40 73.10% Satisfactory
A.J. Lava Builders 22265 Const. of the Makinabang Baliuag FMR III 4.769 C 0.296 0.300 0.300 - - - 89.60 *89.60%
V. Satisfactory
A.J. Lava Builders 22265 Rehab. of Road @ Brgy. San Isidro IV-A 1.922 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
A.J. Lava Builders 22265Repair & Rehab. of Daang
Maharlika Road (Guiguinto & Plaridel Section)
III 9.930 C 0.257 0.211 0.300 - - - 76.80 *76.80% Satisfactory
A.J. Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway III 9.927 C 0.255 0.300 0.300 - - - 85.50 *85.50%
V. Satisfactory
A.J. Taylan Const. Corp./BSP & Co., Inc. (J.V.) JV-020104 Const. of Gasgas Bridge under
JICA Bridge Projects along Rural I 63.299 O 0.343 0.275 0.050 0.030 0.055 0.067 82.00 -
A.J. Taylan Construction Corporation 2336 Const. of San Mateo Bridge I 16.502 C 0.236 0.269 0.300 - - - 80.50 *80.50%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 10
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.J. Taylan Construction Corporation 2336 Const. of Seawall II 14.173 C 0.323 0.226 0.000 - - - 54.90 74.58%
Satisfactory
A.J. Taylan Construction Corporation 2336 Impvt. of Ilocos Norte-Kalinga
Apayao Road I 19.283 C 0.215 0.200 0.300 - - - 71.50 77.80% Satisfactory
A.L. Dare Construction 11932Const./Rehab./Replacement/ Completion/ and Repair of
Plaridel E/SNCR 1.718 O 0.324 0.168 0.100 0.020 0.047 0.100 75.90 -
A.L. Dare Construction 11932 Impv't. of Balaybay Farm-to-Market Road Brgy. Balaybay III 0.930 O 0.288 0.225 0.100 0.015 0.032 0.067 72.70 -
A.L. Dare Construction 11932 Impvt./Rehab. of Brgy. Roads @ Sindalan and Dolores III 4.753 C 0.313 0.200 0.300 - - - 81.30 *81.30%
V. Satisfactory
A.L. Gantuangco Construction 30872 Benolho CIS NIA 3.720 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
A.L. Salazar Construction, Inc. 3899 Conc. of Taytay (Pancol)-El Nido
National Road IV-B 28.821 C 0.300 0.300 0.300 - - - 90.00 *90.00% V. Satisfactory
A.L. Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong
Bukawe, Phase II IV-A 14.346 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
A.L. Salazar Construction, Inc. 3899 Rehab./Const. of Port Barton-
Kemdeng Road IV-B 9.122 O 0.322 0.045 0.100 0.030 0.033 0.067 59.70 -
A.L.R. Construction 24110 Const. of 2 CL S/B @ Dungon E/S IV-B 0.852 O 0.329 0.236 0.100 0.015 0.032 0.100 81.20 81.20%
V.Satisfactory
A.L.R. Construction 24110Const. of Schl. Bldg. 2 Storey, 4 CL @ Gulod NHS, Brgy. Gulod
Phase I) IV-A 0.960 C 0.254 0.200 0.300 - - - 75.40 *75.40%
Satisfactory
A.L.R. Construction Corporation 24110 Const. of Pedestrian Overpass
along Calamba-Sto. Tomas IV-A 9.601 C 0.352 0.200 0.300 - - - 85.20 83.22% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 11
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.M. Ayunan Construction 13983 Const. of MPB at Datu Usman E/S XII 1.908 C 0.319 0.182 0.300 - - - 80.10 65.40%
Fair
A.M. Donceras Construction 30528
Const. of Arteche-Lapinig Road, Sta.960-160-Sta.961-260 with
exceptionsVIII 8.008 C 0.247 - 0.000 - - - 24.70 48.28%
Poor
A.M. Oreta & Co. Inc. / IBC Int'l Builders Corp. (JV) JV-05-011 Const. of Ibajay Bridge &
Approaches VI 138.616 C 0.370 0.278 0.000 - - - 64.80 78.74% Satisfactory
A.M. Robles Construction 28056 Conc. of FMR, Brgy. Colo I 1.926 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
A.M. Robles Construction 28056 Const. of Multi-Purpose Bldg. @ Brgy. Minuyan III 2.850 O 0.356 0.248 0.100 0.030 0.035 0.100 86.90 -
A.M.P. Construction 16574 Const. of 2 Cl , CLSU III 0.657 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Lomboy E/S III 0.637 C 0.363 0.178 0.300 - - - 84.10 *84.10%
V. Satisfactory
A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Talavera CES III 0.640 C 0.316 0.255 0.300 - - - 87.10 *87.10%
V. Satisfactory
A.M.P. Construction 16574 Const. of 2-Cl S/B @ Tabacao H/S III 0.737 C 0.403 - 0.500 - - - 90.30 90.30%
Outstanding
A.M.P. Construction 16574 Const. of Multi-Purpose Bldg. @ Zaragosa Nat'l. H/S III 2.807 C 0.295 0.217 0.300 - - - 81.20 66.71%
Fair
A.M.P. Construction 16574 Const. of Multi-Purpose Building at Poblacion Sison I 1.349 C 0.297 0.235 0.300 - - - 83.20 *83.20%
V. Satisfactory
A.P. Palacios Construction 29021 Completion/Conc. of Road, Buhangin to ANSHS Road III 2.170 C 0.347 0.206 0.300 - - - 85.30 *85.30%
V. Satisfactory
A.P. Palacios Construction 29021 Conc. of Road from Brgy. Bacong to Brgy. San Jose III 0.702 C 0.316 0.300 0.300 - - - 91.60 *92.50%
Outstanding
A.P. Palacios Construction 29021 Concreting of Provincial Road, Brgy. Matawe III 3.239 C 0.286 0.300 0.300 - - - 88.60 *88.60%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 12
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.P. Palacios Construction 29021 Concreting of Road III 0.935 C 0.425 - 0.500 - - - 92.50 *92.50% Outstanding
A.P. Palacios Construction 29021 Const. of Drainage System, Public Market (Ph-2) III 0.934 C 0.284 0.274 0.300 - - - 85.80 *85.80%
V. Satisfactory
A.P. Palacios Construction 29021 Const. of Flood Control (Gabion Type) @ Brgy. Caragsacan III 0.930 C 0.340 0.200 0.300 - - - 84.00 *88.20%
V. Satisfactory
A.P.B. Construction 17055 Conc. of Kisad Road (km. 249+303 - km. 249+399) CAR 2.807 C 0.313 0.224 0.300 - - - 83.70 *83.70%
V. Satisfactory
A.P.B. Construction 17055 Road Opening at Middle Quirino Hill Brgy. CAR 0.953 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
A.P.O. General Construction 7010 Completion of School Bldg.,
Happy Hollow E/S CAR 0.638 O 0.373 0.240 0.100 0.023 0.018 0.100 85.40 -
A.Q. Dominguez Construction & Supply 19843 Con. of Casanicolan-Sn.
Marcelino Road I 0.964 O 0.318 0.180 0.100 0.023 0.041 0.100 76.20 -
A.R. & Mark Builders 31673 Const. of 1 CL Sch. Bldg. @ Talahiron ES X 0.495 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
A.R. Cruz Construction, Inc. (Formerly: AR Cruz Const.) 12157 Concreting of Callaguip
Barangay Road I 0.707 C 0.264 - 0.500 - - - 76.40 *76.40% Satisfactory
A.R. Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-
Canigaran Road IV-B 9.697 O 0.383 0.240 0.100 0.030 0.045 0.100 89.80 -
A.R. Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-
Canigaran Road IV-B 9.697 C 0.332 0.300 0.300 - - - 93.20 91.16% Outstanding
A.R. Lustre Jr. Construction 7680 Completion of 2-Storey Building
@ BSU Matungao Branch III 1.403 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 13
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.R. Lustre Jr. Construction 7680
Concreting of Puerto Princesa Sabang Rd., (Underground
River)IV-B 9.468 C 0.372 0.300 0.300 - - - 97.20 93.96%
Outstanding
A.R. Lustre Jr. Construction 7680 Const. of Bobosawen-Apurawan
FMR IV-B 46.650 O 0.353 0.249 0.100 0.030 0.070 0.100 90.20 -
A.R. Lustre Jr. Construction 7680 Const. of Culasian Bridge IV-B 10.076 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
A.R. Lustre Jr. Construction 7680
Const. of Std. 2-Cl School Bldg. @ Santor E/S & Rehab. of Sch.
Bldg. @ Mambog E/SIII 1.119 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
A.R. Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge,
PPSR IV-B 20.378 C 0.374 0.200 0.300 - - - 87.40 85.06% V. Satisfactory
A.R. Lustre Jr. Construction 7680
Const./Rehab. of Iwahig-Tacduan Diversion Road
National Highway IV-B 11.430 C 0.289 0.239 0.300 - - - 82.80 82.80%
V. Satisfactory
A.R.L. Construction 27645 Conc. of Brgy. Road Caniogan III 0.956 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
A.R.L. Construction 27645 Package IV-MRA-08 Asphalt Overlay of Road @ Poblacion III 0.500 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
A.R.L. Construction 27645 Repair/Rehabilitation of Tatalon Street, Brgy. Ugong NCR 2.312 C 0.389 - 0.500 - - - 88.90 *88.90%
V. Satisfactory
A.R.L. Construction 27645 Riprapping of Access Road @ Poblacion III 0.477 C 0.240 0.300 0.300 - - - 84.00 *84.00%
V. Satisfactory
A.R.L. Construction 27645 Upgrading of A.T. Santiago Brgy. Viente Reales NCR 0.897 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
A.R.L. Construction 27645 Upgrading of Sapang Bakaw Road, Brgy. Lawang Bato NCR 1.881 C 0.333 0.300 0.300 - - - 93.30 88.80%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 14
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
A.S. Obquia Construction 19844 Completion of MPB VII 0.175 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding
A.S.V. Construction Supply and Services 13490 Const. of Daang Liputan FMR III 0.471 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
A.V. Construction Supply 13202 Const. of 4-Cl, 2-Storey School Building IV-A 2.617 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. SatisfactoryA.Y.U. Engineering and
Construction 25632 Conc. of Road at Brgy. Dumoy XI 9.435 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
A.Y.U. Engineering and Construction 25632 Const. of 1 Cl 1 Storey Sch.
Bldg. @ Gasco E/S XI 0.434 C 0.375 0.157 0.300 - - - 83.20 *83.20% V. Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building XI 0.657 C 0.415 - 0.500 - - - 91.50 87.51%
V. Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building
@ Purok Rivera XI 0.472 C 0.325 - 0.500 - - - 82.50 83.69% V. Satisfactory
AAA Structures & Builders, Inc. 30935 Conc./Impv't. of Magsaysay
Brgy. Road II 0.878 C 0.270 - 0.500 - - - 77.00 *77.00% Satisfactory
AB Vision Engineering Construction 19845 Const. of MPB XI 1.607 C 0.393 0.300 0.300 - - - 99.30 * 99.30%
Outstanding
Aboitiz Construction Group, Inc. 2608 C.P. PY-D Structural Overlay of
Patnongon-Nabas Road ADB 166.347 C 0.323 0.200 0.000 - - - 54.80 71.86% Satisfactory
Aboitiz Construction Group, Inc/Kumagai Gumi
Co. Ltd. (J.V.)
SLI-SN-003884
Cebu South Road Improvement Project CP-1 (Talisay-Jct. Toledo
Sect.)VII 513.289 O 0.332 0.300 0.000 0.030 0.065 0.100 82.70 -
Abu Construction 22313 Const. of Tantangan RCDG Bridge XII 3.858 C 0.323 0.237 0.300 - - - 86.00 83.48%
V. Satisfactory
Abu Construction 22313 Rehab. of Potable Water System @ Brgy. Saravia XII 0.873 C 0.338 0.300 0.300 - - - 93.80 87.57%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 15
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Abulug Construction 5593 Construction of Canal and Canal Structures (LMC-ARIP-10-06) II 4.877 C 0.400 0.300 - - - - 70.00 70.00%
Fair
Abulug Construction Co., Inc. 5593 Matuno-Sto. Domingo CIS NIA 3.126 O 0.3515 0.1619 0.1 0.03 0.035 0.2 87.84 -
Abulug Construction Company, Inc. 5593 Conc. of Jct. Cadcadir-Cabugao
Road II 8.199 C 0.269 0.300 0.300 - - - 86.90 84.92% V. Satisfactory
Abulug Construction Company, Inc. 5593 Conc. of Jct. Claveria-Dibalio-
Luzon Road II 9.648 O 0.352 0.240 0.100 0.030 0.033 0.100 85.50 -
Abulug Construction Company, Inc. 5593 Conc. of Larion-Cabbo Road,
Tuguegarao City & Penablanca II 13.884 C 0.358 0.200 0.300 - - - 85.80 84.30% V. Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Colony Road II 2.894 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Abulug Construction Company, Inc. 5593 Const. of Dagupan MPB CAR 0.442 C 0.226 0.184 0.300 - - - 71.00 *71.00%
SatisfactoryAbulug Construction
Company, Inc. 5593 Const. of Public Market (Phase II) II 1.446 O 0.356 0.240 0.100 0.030 0.033 0.100 85.90 -
Abulug Construction Company, Inc. 5593 Const. of Punta Seawall II 0.298 C 0.310 0.200 0.300 - - - 81.00 79.26%
SatisfactoryAbulug Construction
Company, Inc. 5593 Const./Completion of Cabaruan Bridge II 0.383 C 0.178 0.271 0.300 - - - 74.90 *74.90%
Satisfactory
Abulug Construction Company, Inc. 5593 Lucban River Control Project II 3.858 O 0.371 0.240 0.100 0.022 0.023 0.100 85.60 -
Abulug Construction Company, Inc. 5593 Lucban River Control Project II 3.858 O 0.333 0.160 0.100 0.030 0.033 0.133 78.90 -
Abulug Construction Company, Inc. 5593 Matuno- Sto. Domingo CIS NIA 3.126 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -
Abulug Construction Company, Inc. 5593 Reblocking along MNR II 19.296 C 0.295 0.215 0.300 - - - 81.00 82.08%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 16
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Abulug Construction Company, Inc. 5593 Regravelling of Allasitan-
Biduang-Nagattatan Road II 1.923 C 0.300 0.200 0.300 - - - 80.00 78.38% Satisfactory
Abulug Construction Company, Inc. 5593 Rehab. of Abra-Kalinga Road.
Km. 423+500-Km. 426+500 CAR 1.878 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
Abulug Construction Company, Inc. 5593 Rehab. of Drainage Canal
Bangued-Pidigan Section CAR 2.385 C 0.288 0.300 0.300 - - - 88.80 68.82% Fair
Abulug Construction Company, Inc. 5593 Rehab. of Multi-Purpose Hall CAR 0.944 O 0.246 0.184 0.300 - - - *73.00 -
Abulug Construction Company, Inc. 5593 Repair of Cristina H/S and
Rehab. of Bucay C/S CAR 0.474 O 0.381 0.264 0.100 0.020 0.029 0.100 89.40 -
Abulug Construction Company, Inc. 5593 Repair/Impv't. of Calog-Luna-
Pudtol Road II 1.180 C 0.293 0.218 0.300 - - - 81.10 81.16% V. Satisfactory
Abulug Construction Company, Inc. 5593 Replacement of Langagan
Bridge along MNR II 4.814 C 0.370 0.201 0.300 - - - 87.10 86.20% V. Satisfactory
Abulug Construction Company, Inc. 5593
Restoration of Damaged Roadways along BAMR (Sinking
Pavement @ Logac Section)II 1.392 C 0.316 - 0.500 - - - 81.60 *81.60%
V. Satisfactory
Abulug Developers and Builders Co., Inc.
(Formerly: F. Vargas Construction)
2366 Retrofitting of Pamplona Bridge, Manila North Road II 10.291 O 0.320 0.240 0.100 0.030 0.033 0.067 79.00 -
Aca Construction & Supply 10784 Conc. of Esperanza Road I 0.382 C 0.262 0.300 0.300 - - - 86.20 * 86.20% V. Satisfactory
Accuracy Builders Enterprise 27507 River Impvt. of Cabalisian River,
Brgy. Sta. Lucia I 4.485 C 0.400 - 0.500 - - - 90.00 * 90.00% V. Satisfactory
ACJ Construction Resources 10635
Conc. of Paco-Roxas-Arakan Valley National Road, (Luhong-
Kiyaab Section)XII 12.751 C 0.365 0.102 0.300 - - - 76.70 *76.70%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 17
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
ACJ Construction Resources 10635
Const. of Malaang PSG Bridge inc. Conc. Paving of Bridsge
Approaches along Davao-Cotabato Road
XII 42.684 C 0.376 0.200 0.300 - - - 87.60 84.02% V. Satisfactory
ACJ Construction Resources 10635 Const. of Mayor Ricardo L. Ipong
Memorial National H/S XII 4.634 C 0.355 0.300 0.300 - - - 95.50 86.19% V. Satisfactory
ACJ Construction Resources 10635 Const. of MPB XII 9.634 C 0.335 0.270 0.300 - - - 90.50 83.22%
V. Satisfactory
ACJ Construction Resources 10635
Const. of Saguing Bridge along Davao-Cotabato Rd., Including Approaches and Gap Section
XII 9.328 C 0.283 0.297 0.300 - - - 88.00 90.16% Outstanding
ACJ Construction Resources 10635 Const./Impvt of Jct. Meocad-
Salasang-Katipunan Road XII 28.842 C 0.337 0.300 0.300 - - - 93.70 94.18% Outstanding
ACJ Construction Resources 10635 Rechanneling of Malamote River XII 1.443 C 0.375 0.188 0.300 - - - 86.30 *86.30%
V. Satisfactory
Acme Builders Corporation 6442 Clearing and Rehab. of Mangonbangon & Burayan River VIII 9.635 C 0.312 0.200 0.300 - - - 81.20 *81.20%
V. Satisfactory
Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI VIII 48.160 O 0.352 0.300 0.100 0.022 0.045 0.100 91.90 -
Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI VIII 48.160 O 0.394 0.261 0.000 0.022 0.038 0.100 81.50 -
Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.383 O 0.323 0.196 0.100 0.030 0.050 0.100 79.90 -
Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.384 O 0.389 0.225 0.100 0.030 0.043 0.067 85.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 18
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Acme Builders Corporation 6442 Rehab. of Guimbal Bridge along Iloilo-Antique Road VI 33.372 C 0.267 0.200 0.300 - - - 76.70 78.59%
Satisfactory
Acme Builders Corporation 6442 Rehab. of Mahayahay Creek VIII 6.709 O 0.360 0.160 0.100 0.020 0.023 0.200 86.30 -
Acme Builders Corporation/B. Vicencio
Const. (JV)JV-07-067
Conc. of Oras-San Policarpio-Arteche Road, Brgy. Baras-Arteche (Poblacion) Section
VIII 59.291 C 0.338 0.300 0.300 - - - 93.80 93.02% Outstanding
Acme Builders Corporation/B. Vicencio
Const. (JV)JV-07-067
Const. of Palo East By-Pass Road (Const. of Bernard Reed II
Bridge) VIII 57.823 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -
ACO Construction 13105Conc. of Liloy-Zamboanga del Norte-Ipil-Zamboanga Sibugay
Rd. Ph. IIX 14.306 O 0.362 0.240 0.100 0.030 0.035 0.100 86.70 -
ACO Construction 13105 Repair of OB-Gyne Zamboanga City Medical Center IX 5.704 C 0.121 0.200 0.300 - - - 62.10 *62.10%
Fair
Adelfa & Charlie Enterprises 11569
Completion/Continuation of Unfinished/Ongoing Bridges, Calaguise Steel Bridge along
Sambolawan-Calaguise-Calubian Road
VIII 34.810 C 0.338 0.200 0.300 - - - 83.80 82.15% V. Satisfactory
Adelfa & Charlie Enterprises 11569 Conc. of Sambulawan-Calaguise-
Calubian Road VIII 4.744 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
Adelfa & Charlie Enterprises 11569 Const. of Buho II Bridge VIII 5.597 C 0.384 0.300 0.300 - - - 98.40 93.42%
Outstanding
Adelfa & Charlie Enterprises 11569 Const. of Imbornal Bridge VIII 4.239 C 0.371 0.300 0.300 - - - 97.10 *97.10%
OutstandingAdelfa & Charlie
Enterprises 11569 Const. of Palid Bridge VIII 5.281 C 0.348 0.300 0.300 - - - 94.80 *94.80% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 19
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Adelfa & Charlie Enterprises 11569 Mapuyo CIS NIA 1.485 C 0.375 0.180 0.300 - - - 85.50 85.50%
V.SatisfactoryAdelfa & Charlie
Enterprises 11569 Rehab. of Palompon-Villaba Road VIII 9.490 C 0.383 0.220 0.300 - - - 90.30 87.24%
V. Satisfactory
Adelfa & Charlie Enterprises 11569
Repair of Roads along Tabango-Villaba-Palompon Road & Sto.
Rosario-Villaba RoadVIII 9.641 C 0.336 0.200 0.300 - - - 83.60 87.60%
V. Satisfactory
Adfil / RIDCorporation Joint Venture
SL1-SN-004956
Repair/Rehab. of Patin-ay Bridge along Agusan-Davao Road XIII 24.375 O 0.373 0.300 0.030 0.030 0.059 0.100 89.20 -
Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches XIII 26.210 O 0.375 0.240 0.100 0.030 0.059 0.100 90.40 -
Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches XIII 26.210 C 0.348 0.200 0.300 - - - 84.80 88.70%
V. Satisfactory
Adfil Corporation 14437 Conc. of Agusan-Surigao Road (Ampayon Section) XIII 4.691 C 0.367 0.300 0.300 - - - 96.70 94.96%
Outstanding
Adfil Corporation 14437 Conc. of Butuan City-Pianing/Tandag Road XIII 4.012 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road XIII 28.452 O 0.373 0.205 0.100 0.030 0.065 0.100 87.30 -
Adfil Corporation 14437 Conc. of Gap along La Paz-Loreto Road XIII 4.791 C 0.367 0.200 0.300 - - - 86.70 81.12%
V. Satisfactory
Adfil Corporation 14437 Const. of Cabadbaran River Dike (Downstream) XIII 9.413 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Adfil Corporation 14437 Const. of Cabadbaran River Dike (Upstream) XIII 9.548 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 20
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) XIII 22.141 C 0.360 0.300 0.300 - - - 96.00 96.00%
Outstanding
Adfil Corporation 14437 Const. of Taguibo Flood Control XIII 14.413 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Adfil Corporation 14437 Const. of Waloe Bridge XIII 9.199 C 0.339 0.200 0.300 - - - 83.90 90.92% Outstanding
Adfil Corporation 14437 Improvement of Masao River Flood Control, Phase III XIII 4.590 C 0.500 0.567 - - - - 106.70 94.70%
Outstanding
Adfil Corporation 14437 Impvt. of Agusan-Surigao Road (Ampayon Section) XIII 9.290 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
Adfil Corporation 14437Impvt. of Lake Mainit
Circumferential Road, Brgy. Colorado Section
XIII 9.525 C 0.172 0.233 0.300 - - - 70.50 *70.50% Satisfactory
Adfil Corporation 14437 Rehab. of Camagong Flood Control XIII 9.440 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
Adfil Corporation 14437 Rehab./Impvt. of Sagal-ang Manubiray FMR X 13.894 C 0.358 0.278 0.300 - - - 93.60 73.32%
Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Road along
Agusan-Misamis RoadXIII 9.634 O 0.307 0.234 0.100 0.030 0.065 0.100 83.60 -
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Road along
Agusan-Surigao RoadXIII 9.635 O 0.358 0.200 0.100 0.030 0.065 0.100 85.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 21
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Adfil Corporation 14437
Repair/Reconst. of Butuan City-Cagayan de Oro-Iligan Road
(Agusan-Misamis Oriental Road) inc. Bridge
XIII 19.198 O 0.379 0.240 0.100 0.030 0.065 0.100 91.40 -
Adfil Corporation 14437
Repair/Reconst. Of Butuan City-Cagayan de Oro-Iligan Road
(Agusan-Misamis Oriental Road) inc. Bridge
XIII 19.198 O 0.370 0.220 0.100 0.030 0.032 0.100 85.20 -
Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road XIII 9.633 O 0.357 0.200 0.100 0.030 0.043 0.100 83.00 -
Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032
DPWH Component Project under the HELP for Catubig
Agricultural Project (HCAAP)VIII 448.581 O 0.392 0.300 0.050 0.030 0.055 0.100 92.70 -
Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032
DPWH Component Project under the HELP for Catubig
Agricultural Project (HCAAP)VIII 448.581 O 0.367 0.300 0.050 0.030 0.051 0.100 89.80 -
Adige-Sta. Clara (JV) JV-06-032DPWH Component Project under
the HELP for Catubig Agricultural Project (HCAAP)
VIII 448.581 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -
Adige-Sta. Clara (JV) JV-06-032DPWH Component Project under
the HELP for Catubig Agricultural Project (HCAAP)
VIII 519.663 O 0.350 0.299 0.100 0.030 0.060 0.067 90.60 -
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) III 1.907 C 0.334 0.200 0.300 - - - 83.40 83.61%
V. Satisfactory
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase IV) III 1.907 O 0.342 0.240 0.100 0.030 0.025 0.100 83.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 22
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Adimre Construction 25534Const. of Std. 1-Cl School Bldg.
@ N. Clemena E/S, Bulihan & Bagbaguin E/S
III 0.868 C 0.318 0.300 0.300 - - - 91.80 82.63% V. Satisfactory
ADL General Construction 30604 Conc. of San Antonio Palpaltogan CAR 0.285 C 0.303 0.000 0.300 - - - 60.30 *60.30%
Fair
Adroit Construction 11169 Const. of 1 CL @ San Pascual E/S III 0.475 C 0.299 0.245 0.300 - - - 84.40 *84.40%
V. Satisfactory
Adroit Construction 11169 Const. of 2 CL @ Cumabol E/S III 0.749 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
Adroit Construction 11169 Const. of 4 CL, Central Luzon State University III 1.800 C 0.319 0.300 0.300 - - - 91.90 *91.90%
Outstanding
Advanced Foundation Construction Systems
Corp.15449
Const. of Baguio Flyover & Approaches (Phase V), BGH-
Rotonda Marcos Highway-Gov. Pack-Kisad Road, Kennon Road
Jct.
CAR 61.894 C 0.385 0.300 0.300 - - - 98.50 93.10% Outstanding
Advanced Foundation Construction Systems
Corp.15449
Const. of Subic-Cawag Bridge I, along Subic-Cawag-Balaybay
RoadIII 47.952 O 0.331 0.300 0.100 0.030 0.040 0.100 90.10 -
AG Construction 7921 Conc. of Wright Park Grounds CAR 0.936 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory
Agafer Construction 7912 Conc. of Centro 2 II 0.963 C 0.284 0.204 0.300 - - - 78.80 *78.80% Satisfactory
Agafer Construction 7912 Const. of Cagayan River Control II 14.241 O 0.334 0.160 0.100 0.022 0.028 0.200 84.40 -
Agafer Construction 7912 Const. of Cagayan River Control II 14.241 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB
(Phase III) VIII 1.896 C 0.373 0.187 0.300 - - - 86.00 79.07% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 23
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of
Engineering Campus V 16.149 O 0.380 0.263 0.100 0.030 0.023 0.100 89.60 -
Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of
Engineering Campus V 16.149 O 0.375 0.279 0.100 0.030 0.023 0.100 90.70 -
AJYSC Marketing 26924 Const. of Batodo Bridge and Approaches Batodo Arc XII 22.822 C 0.279 0.200 0.300 - - - 77.90 81.22%
V. Satisfactory
AJYSC Marketing 26924 Const. of River Bank Protection Allah River (Kolambog Section) XII 2.874 C 0.266 0.300 0.300 - - - 86.60 82.22%
V. Satisfactory
AJYSC Marketing 26924Const./Widening of Matin-ao
Bridge & Widening of Approaches
XII 3.848 C 0.351 0.115 0.300 - - - 76.60 81.82% V. Satisfactory
AJYSC Marketing 26924 Impvt. of Highway Jct. Malandag-Allae FMR, Malungon ARC XII 18.364 C 0.330 0.300 0.300 - - - 93.00 80.16%
V. Satisfactory
AJYSC Marketing 26924 Matin-ao Bridge along Marbel-Tupi-Makar Road XII 7.513 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
AJYSC Marketing 26924Road Upgrading (Gravel to
concrete) along Surallah-Lake Sebu-Maitum Road
XII 16.035 O 0.295 0.245 0.100 0.030 0.038 0.100 80.80 -
AJYSC Marketing 26924Road Upgrading (Gravel to
concrete) along Surallah-Lake Sebu-Maitum Road
XII 16.034 O 0.305 0.300 0.100 0.030 0.056 0.100 89.10 -
AJYSC Marketing 26924Road Upgrading (Gravel to
concrete) along Surallah-Lake Sebu-Maitum Road
XII 16.034 O 0.388 0.300 0.000 0.030 0.038 0.100 85.60 -
AJYSC Marketing 26924Widening/Conc. of Kalandagan Bridge I, along Dulawan-Marbel
RoadXII 11.332 C 0.352 0.200 0.300 - - - 85.20 84.90%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 24
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Akela Builders 26444 Const./Rehab. of MPB @ Novaliches Proper NCR 1.335 C 0.386 0.291 0.300 - - - 97.70 *97.70%
Outstanding
AKH Construction and Trading Corporation 20759 Const. of MPB @ Brgy. 177 NCR 4.745 C 0.399 0.300 0.300 - - - 99.90 *99.90%
Outstanding
AKH Construction and Trading Corporation 20759 Proposed Rehab./Repair of
Drainage System NCR 1.915 C 0.242 0.200 0.300 - - - 74.20 *74.20% Satisfactory
AKH Construction and Trading Corporation 20759 Rehab. of Taft Ave. NCR 1.915 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
AKH Construction and Trading Corporation 20759 Rehab./Reconst. of Damaged
Pavement of Legarda St. NCR 6.713 C 0.346 0.235 0.300 - - - 88.10 *88.10% V. Satisfactory
AKN Construction Corp. (Formerly: AKN Const.) 11845 Concreting of Quirino Avenue,
Brgy. La Huerta San Isidro NCR 4.766 O 0.339 0.300 0.300 - - - 93.90 -
AKN Construction Corporation (Formerly:
AKN Const.)11845
Proposed Impvt. of Road inc. Drainage System along
Magallanes St., Brgy. TunasanNCR 19.089 O 0.391 0.180 0.100 0.030 0.047 0.100 84.80 -
Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) VII 4.536 C 0.352 0.300 0.000 - - - 65.20 58.48%
Poor
Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-Carmen Road (Loboc Section) VII 4.492 C 0.316 0.042 0.000 - - - 35.80 55.18%
Poor
Al Chris Construction 12406 Conc. of Maribojoc-Antequera Road VII 9.142 C 0.337 0.100 0.300 - - - 73.70 71.24%
Satisfactory
Al Chris Construction 12406 Const. of 1-Cl School Bldg., Ipo, Anda, Bohol VII 0.435 C 0.439 - 0.000 - - - 43.90 71.62%
Satisfactory
Al Chris Construction 12406 Const. of Two (2) CL Sch. Bldg. w/o Toilet, San Roque H/S VII 0.841 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 25
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
AL Chris Construction 12406 Tagbilaran Airport Development Project NIA 5.756 C 0.390 0.200 0.300 - - - 89.00 89.00%
Satisfactory
Al Fahdel Construction & Engineering 17953
Concreting of Iligan-Bukidnon Road Bonbonan Digkilaan &
Rogongon Sections,X 2.238 O 0.211 0.300 0.100 0.020 0.023 0.100 75.40 -
Al Hussein Construction 18438Cluster III-Const. of Various
Projects in Salvador Inasagan & Sudlon
X 4.242 C 0.297 0.300 0.300 - - - 89.70 81.44% V. Satisfactory
Al Hussein Construction 18438 Completion of Malaapo Bridge & Approaches X 5.380 C 0.325 0.300 0.300 - - - 92.50 82.12%
V. Satisfactory
Al Hussein Construction 18438 Const. of Cagascas Bridge and Approaches X 11.983 C 0.380 0.300 0.300 - - - 98.00 98.00%
Outstanding
Al Hussein Construction 18438Const. of Kapatagan Drainage
System along Iligan-Aurora Road
X 3.682 C 0.285 0.200 0.300 - - - 78.50 79.28% Satisfactory
Al Hussein Construction 18438 Rehab. of Linamon-Zamboanga Road, Baroy Section X 4.525 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
Al Niño Construction Supply 18378 Construction of Diversion Work NIA 4.048 C 0.381 0.124 0.100 0.018 0.029 0.200 85.20 85.20%
V.Satisfactory
Alajeño Construction and Supplies 28713 Const. of MPB (Municipal Bldg.)
Phase I IX 4.595 C 0.373 0.164 0.300 - - - 83.70 75.30% Satisfactory
Alajeño Construction and Supplies 28713 Const. of Sch. Bldg. @ Antonio
NHS IX 0.481 C 0.209 0.200 0.300 - - - 70.90 75.45% Satisfactory
Alajeño Construction and Supplies 28713 Const. of Spring Development IX 1.208 C 0.394 0.016 0.300 - - - 71.00 *71.00%
Satisfactory
Alberich Builders 27987 Repair/Impvt. of Masarawang-Mabatano-Pamasan Road V 0.956 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 26
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alberto Uy Construction & Development 20924 Const. of 1 CL @ Labasan NHS IV-B 0.437 C 0.348 0.143 0.300 - - - 79.10 79.31%
Satisfactory
Alberto Uy Construction & Development 20924 Const. of 1 CL Sch. Bldg. @
Carmundo NHS IV-B 0.470 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding
Alberto Uy Construction & Development 20924 Const. of Bongabong River
Front (Phase II) IV-B 4.707 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of Drainage Canal IV-B 1.889 C 0.358 0.200 0.300 - - - 85.80 89.40%
V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of Protection Dike at
Mapang IV-B 0.471 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Albeva Konstrukt & Development Corporation 25480 Const. of NIA Central office
Covered Court NIA 6.660 O 0.274 0.300 0.100 0.030 0.038 0.100 84.20 -
Alcel Construction 15129 Asphalt Overlay along Pangasinan-Zambales Road I 9.497 C 0.215 0.300 0.300 - - - 81.50 76.76%
Satisfactory
Alcel Construction 15129 Completion of MPB, PSU Bamban I 0.474 C 0.292 0.200 0.300 - - - 79.20 *79.20%
Satisfactory
Alcel Construction 15129 Conc. of FMR, Brgy. Licsi I 0.568 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Alcel Construction 15129 Const. of MPB, Phase VI I 0.812 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory
Alcel Construction 15129 Impvt. of Pangasinan-Zambales Road I 27.954 C 0.266 0.300 0.300 - - - 86.60 *86.60%
V. Satisfactory
Alcel Construction and Supply 15129
Asphalt Overlay along Manila North Road Km. 299+100 to Km. 299+300 with exception and San Fernando access road to Poro Pt. Km. 269+715-Km. 270+042
I 0.947 C 0.304 0.200 0.300 - - - 80.40 74.34% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 27
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alcel Construction and Supply 15129 Const. of Multi-Purpose Building
@ Poblacion I 0.948 C 0.386 0.200 0.300 - - - 88.60 87.62% V. Satisfactory
Aldana Construction 21736 Const. of 1 Unit 3 CL School Building at SEPNAS I 1.135 C 0.357 0.300 0.300 - - - 95.70 84.50%
V. Satisfactory
Aldana Construction 21736 Const. of 4-Cl Sta. Ana Elementary School Building I 2.892 C 0.376 - 0.500 - - - 87.60 *87.60%
V. Satisfactory
ALE Builders Construction and Development Corp. 5180 Const. of MPB at Brgy. 34 & 35 NCR 4.666 C 0.325 0.122 0.300 - - - 74.70 81.35%
V. Satisfactory
ALE Builders Construction and Development Corp. 5180
Proposed Repair/Rehab. of Epifanio Delo Santos Elem.
SchoolNCR 1.444 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
Alebon Genuine Merchandising 26300
Conc. of By-Pass Road & Lined Canal w/ spillway along By Pass
RoadX 4.089 C 0.170 0.300 0.000 - - - 47.00 67.16%
Fair
Alex V. Pamatong Trading & Construction 13290
Cagayan De Oro Convention Center Access Road Brgy.
IndahagX 7.434 C 0.274 0.284 0.300 - - - 85.80 67.46%
Fair
Al-Fahdel Construction & Engineering 17953
Conc. of Iligan-Bukidnon Road, Sta. Felomina-Bobonon-
Digkilaan-Rogongon, Lambaguhon Sect.
X 9.027 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. at
Kulasihan Primary School X 0.417 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Al-Fahdel Construction & Engineering 17953 Const. of Tugar Bridge X 4.678 C 0.314 0.300 0.300 - - - 91.40 83.39%
V. Satisfactory
Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga
Road, Maigo Section X 13.491 O 0.358 0.240 0.100 0.030 0.032 0.100 86.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 28
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alfalfa Construction 29712
Conc./Widening of Banaue-Mayoyao-Aguinaldo-A. Lista Bdry. Road (Ibayong-Guihob
Section)
CAR 1.901 C 0.310 0.000 0.300 - - - 61.00 *61.00% Fair
Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. Province Road CAR 7.590 O 0.335 0.240 0.100 0.010 0.020 0.067 77.20 -
Alfalfa Construction 29712 Repair/Rehab. of Poblacion-Boliwong Road CAR 0.378 C 0.397 0.071 0.300 - - - 76.80 *76.80%
Satisfactory
Alfalfa Construction 29712Restoration of Road along
Banaue-Mayoyao-Aguinaldo-A Lista-Isabela Bdry. Road
CAR 4.277 O 0.398 0.290 0.070 0.030 0.030 0.100 91.80 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162Completion of Binalbagan
Bridge 2 - Km. 66+910 along Hinigaran-Isabela Road
VI 44.631 O 0.328 0.240 0.100 0.030 0.040 0.100 83.80 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162Completion of Binalbagan
Bridge 2 - Km. 66+910 along Hinigaran-Isabela Road
VI 44.631 O 0.333 0.240 0.100 0.030 0.045 0.100 84.80 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162Completion of Binalbagan
Bridge 2 - Km. 66+910 along Hinigaran-Isabela Road
VI 44.631 O 0.378 0.220 0.100 0.010 0.038 0.067 81.30 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Completion of Isio Bridge VI 46.478 O 0.397 0.300 0.100 0.023 0.059 0.100 97.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162Conc. of Road at Bacolod-Murcia-D.S. Benedicto-San Carlos Road,
D.S. Benedicto VI 11.986 C 0.329 0.300 0.300 - - - 92.90 *92.90%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 29
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Concreting of Bacolod-Murcia-D.S. Benedicto Road VI 4.644 C 0.300 0.289 0.300 - - - 88.90 66.34%
Fair
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Const. of Libas-Panaquiao Bridge VI 25.628 C 0.311 0.300 0.300 - - - 91.10 90.47%
Outstanding
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's Construction &
Const. Supply)
17162 Road Upgrading, Jct. Palencia-Boy Scout, Campsite Road VI 64.700 O 0.319 0.300 0.100 0.015 0.032 0.067 83.30 -
Alfie's Construction 17162 Const. and Improvement of Taloc Main Drainage NIA 5.289 C 0.350 0.161 0.300 - - - 81.05 81.05%
Unsatisfactory
Alfrego Builders & Supply 19284 Conc. of Road at Alambre XI 0.933 C 0.342 0.300 0.300 - - - 94.20 85.74% V. Satisfactory
Alfrego Builders & Supply 19284 Conc. of Road at Mercedes XI 0.935 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding
Alfrego Builders & Supply 19284
Conc. of Road from Davao-Agusan National Road Jct.
passing through Iliong up to Purok Communal
XI 1.882 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Algamon Construction 30704 Const. of Sch. Bldg., Cantilan East Elem. Sch. XIII 1.848 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Algimar Construction 15232 Conc. of Lubi-Binoog Road IV-B 9.398 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Algimar Construction 15232 Concreting of Moyot Street V 4.624 C 0.362 - 0.500 - - - 86.20 78.28% Satisfactory
Algimar Construction 15232 Const. of 1-Unit Classroom Modified School Building V 0.367 O 0.325 0.300 0.100 0.030 0.022 0.100 87.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 30
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod V 9.597 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
Algimar Construction 15232Const. of Lined Canal with Cover
from Quezon St. infornt of MNCHS, JZES and Jollibee Store
V 3.798 C 0.297 0.200 0.300 - - - 79.70 78.50% Satisfactory
Algimar Construction 15232 Const. of MPB at DECS Compound V 1.918 C 0.373 0.200 0.300 - - - 87.30 *86.08%
V. Satisfactory
Algimar Construction 15232 Const. of Multi-Purpose Building (Phase II) V 4.626 O 0.334 0.300 0.100 0.030 0.035 0.100 89.90 -
Algimar Construction 15232 Const. of Multi-Purpose Building @ DECS Compound V 4.790 O 0.396 0.225 0.100 0.030 0.041 0.100 89.20 -
Algimar Construction 15232 Const. of Sta. Cruz NHS V 0.441 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory
Algimar Construction 15232 Gravelling of San Fernando South Road V 1.841 C 0.220 0.200 0.300 - - - 72.00 *72.00%
Satisfactory
Algimar Construction 15232 Rehab. of Sitio Calumpang-Malinta Road V 0.955 C 0.363 0.300 0.300 - - - 96.30 *96.30%
Outstanding
Algimar Construction 15232 Rehabilitation of San Fernando North Road V 1.859 C 0.442 - 0.500 - - - 94.20 *94.20%
Outstanding
Algimar Construction 15232 Repair of Calapi Bridge V 1.898 C 0.381 0.100 0.300 - - - 78.10 79.84% Satisfactory
Algon Engineering Construction Corporation 270 Asphalt Overlay of Davao-
Cotabato By Pass Road XI 12.771 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 31
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Algon Engineering Construction Corporation 270
Const. of Hulid Bridge & Approaches along-Cateel-
Compostela Secondary Nat'l Rd.XI 11.798 O 0.320 0.256 0.100 0.030 0.048 0.100 85.40 -
Algon Engineering Construction Corporation 270
CP 5: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Caraga-Baganga Section
XI 172.481 O 0.380 0.239 0.100 0.030 0.055 0.100 90.40 -
Algon Engineering Construction Corporation 270
Impv't./Conc. of La Fortuna Tagum Terminal-Capitol,
Canocotan RoadXI 34.314 C 0.303 0.300 0.300 - - - 90.30 88.56%
V. Satisfactory
Algon Engineering Construction Corporation 270 Repair and Rehab. of Toril-
Bayabas-Eden Road XI 4.816 C 0.366 0.300 0.300 - - - 96.60 94.26% Outstanding
Allen Construction 12584 Conc. of Agbanawag-Cabucbucan Road III 1.885 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Allen Construction 12584 Conc. of Estrella-Cabubucan Road III 1.885 C 0.371 0.200 0.300 - - - 87.10 *87.10
V. Satisfactory
Allen Construction 12584 Const. of 2 CL, Guimba National High Sch. III 0.751 C 0.352 0.300 0.300 - - - 95.20 *95.20%
Outstanding
Allen Construction 12584 Const. of School Building @ CLSU (Mini Amphi-Theatre) III 0.937 O 0.385 0.212 0.100 0.015 0.032 0.100 84.40 -
Allencon Development Corporation 12302 Asphalt Overlay of Janiuay-
Lambunao Nat'l. Road VI 1.918 C 0.421 - 0.500 - - - 92.10 92.10% Outstanding
Allencon Development Corporation 12302
Asphalt Pavement along Guimaras Circumferential Road, Brgy. East Valencia-Brgy. Lebas
VI 4.604 C 0.310 0.100 0.300 - - - 71.00 *71.00% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 32
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Allencon Development Corporation 12302
Asphalt Pavement along Guimaras Circumferential Road,
Brgy. M. Chavez Sect., San Lorenzo Sect.
VI 4.604 C 0.353 0.300 0.300 - - - 95.30 *95.30% Outstanding
Allencon Development Corporation 12302 Asphalting of Magamay-
Napandong Road VI 2.825 C 0.249 0.300 0.300 - - - 84.90 *84.90% V. Satisfactory
Allencon Development Corporation 12302
Asphalting of Priority Road Section, San Antonio-Calaya
RoadVI 3.547 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
Alleyway Construction 15310 Conc. With Drainage Impvt. Along F. Cayco St. & vicinity NCR 5.646 C 0.265 0.200 0.300 - - - 76.50 79.02%
Satisfactory
Alleyway Construction 15310 Const. of MPB @ So. Cabading IV-A 1.437 C 0.346 0.213 0.300 - - - 85.90 *85.90% V. Satisfactory
Alleyway Construction 15310 Const. of School Building in Tondo, Manila, Centex E/S NCR 1.859 C 0.272 0.300 0.300 - - - 87.20 89.72%
V. Satisfactory
Alleyway Construction 15310 Rehab./Impvt. of Antipolo Circumferential Road "A" IV-A 9.994 C 0.313 0.300 0.300 - - - 91.30 *91.30%
Outstanding
Allied Trade Resources Multi Purpose Cooperative 31667 Rehab./Impvt. of MPB @ Brgy.
Ising XI 2.356 C 0.301 0.233 0.300 - - - 83.40 87.53% V. Satisfactory
Almakar Builders & Metal Works 21929 Completion of 2 CL Sch. Bldg. at
Gahak Marulas E/S IV-A 0.669 C 0.344 0.300 - - - - 64.40 *64.40% Fair
Almakar Builders & Metal Works 21929
Const. of 2 Storey 4 Classroom School Bldg., @ Jimenez E/S
Wawa IIV-A 2.891 C 0.166 0.229 0.300 - - - 69.50 *69.50%
Fair
Almakar Builders & Metal Works 21929 Const. of Concrete Pathway IV-A 0.258 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 33
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alnino Construction & Supply 18378
Const. of Access Road to RORO Terminal, Guiron-San Antonio
SectionV 4.750 C 0.201 0.200 0.300 - - - 70.10 *70.10%
Satisfactory
Alnino Construction & Supply 18378 Const. of Buenavista Seawall V 4.751 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
Alnino Construction & Supply 18378 Const. of Multi-Purpose Building V 0.960 C 0.296 0.200 0.300 - - - 79.60 *79.60%
Satisfactory
Alnino Construction & Supply 18378 Const. of River Bank Protection
at Brgy. Macawayan V 2.400 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
Alnino Construction & Supply 18378 Repair of FMR at Brgy.
Cabiguhan V 0.960 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
Alnino Construction & Supply 18378 Repair of Gabaldon Bldg. @ San
Roque E/S V 0.190 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory
Alnino Construction & Supply 18378 Repair of Patag FMR V 2.400 C 0.291 0.186 0.300 - - - 77.70 *77.70%
SatisfactoryAlnor Construction &
Const. Supplies 26705 Completion of MPB at Brgy. Cagdianao XIII 0.463 C 0.301 0.200 0.300 - - - 80.10 *80.10%
V. Satisfactory
Alnor Construction & Const. Supplies 26705 Completion of PNP Bldg. XIII 1.853 C 0.367 0.200 0.300 - - - 86.70 75.25%
Satisfactory
Alnor Construction & Const. Supplies 26705 Const. of 2 Cl Magpayang NHS XIII 0.801 C 0.235 0.194 0.300 - - - 72.90 83.19%
V. SatisfactoryAlnor Construction & Construction Supplies 26705 Completion of PNP Bldg. XIII 1.852 O 0.354 0.240 0.100 0.030 0.015 0.100 83.90 -
Alnor Construction & Construction Supplies 26705
Conc. of Kinalablaban Bridge Approaches and Road, Surigao-
Davao Coastal RoadXIII 7.643 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
Alnor Construction & Construction Supplies 26705 Const. of MPB @ Brgy.
Binocaran XIII 0.926 C 0.377 0.200 0.300 - - - 87.70 87.67% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 34
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alnor Construction & Construction Supplies 26705 Const. of School Building XIII 0.458 O 0.350 0.250 0.030 0.022 0.027 0.100 77.90 -
Alnor Construction & Construction Supplies 26705 Const./Widening of Dinagat-
Loreto Road (Tag-abaca Sect.) XIII 14.390 C 0.375 0.300 0.000 - - - 67.50 61.74% Fair
Alnor Construction & Construction Supplies 26705 Reconst./Widening of Dinagat-
Loreto Road (Tag-abaca Sect.) XIII 14.390 O 0.306 0.146 0.000 0.030 0.030 0.067 57.90 -
Alpha Ryder Construction & Supplies 12197 Concreting of Salvacion-Carjela
Road V 0.569 C 0.299 - 0.500 - - - 79.90 *79.90% Satisfactory
Alpha Ryder Construction and Supplies 12197 Conc. of Jamislagan-Buhatan
Road V 4.682 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
Alpha Ryder Construction and Supplies 12197 Const. of Dancalan Bridge &
Approaches V 11.709 C 0.361 0.200 0.300 - - - 86.10 85.08% V. Satisfactory
Alpha Tech Builders 26072 Asphalt Overlay of Gutlang-Alumbijud Road VII 0.915 C 0.376 0.300 0.300 - - - 97.60 *97.60%
Outstanding
Alpha Tech Builders 26072 Asphalt Overlay of Tabayag-Lapay Road VII 0.915 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Alpha Tech Builders 26072 Conc. of Taloot RORO Road VII 4.628 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding
Alpha Tech Builders 26072 Const. of Philippine Science High School Dormitory Ph 1 VII 4.625 C 0.310 0.300 0.300 - - - 91.00 84.56%
V. Satisfactory
Alphin Trading & Construction 26260 Conc. of FMR (Sonquil Section) I 0.289 C 0.335 0.200 0.300 - - - 83.50 *83.50%
V. Satisfactory
Alphin Trading & Construction 26260
Conc./Impvt. of Sta. Barbara-Malasiqui-Bayambang Road,
Sapanga SectionI 4.694 C 0.298 0.300 0.300 - - - 89.80 *89.80%
V. Satisfactory
Alphin Trading & Construction 26260 Const. of Ventinilla MPB I 1.034 C 0.357 0.300 0.300 - - - 95.70 *95.70%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 35
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alphin Trading & Construction 26260 Rehab. of Barangobong Bridge II I 1.068 C 0.295 0.300 0.300 - - - 89.50 86.02%
V. Satisfactory
Alphin Trading & Construction 26260 Repair/Impvt. of San Carlos-
Calasiao Road I 2.891 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding
Alphin Trading and Construction 26260 Const. of 1-Unit 1Cl Bldg. @
Nagsaling E/S I 0.385 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory
Alphin Trading and Construction 26260 Const. of Multi-Purpose Bldg. @
Tuliao E/S I 0.963 C 0.388 0.300 0.300 - - - 98.80 96.42% Outstanding
Alraf Construction & Enterprises 17297
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment II Manguso-
Mulawin Section
IX 36.137 C 0.365 0.200 0.300 - - - 86.50 88.27% V. Satisfactory
Alraf Construction & Enterprises 17297
Impvt./Conc. of Isabela-Maluso National Road, Bañas-Garlayan
SectionIX 7.605 C 0.219 0.300 0.300 - - - 81.90 80.61%
V. Satisfactory
Alraf Construction & Enterprises 17297 Impvt./Widening of Sangali Nat'l
Road IX 6.592 C 0.243 0.300 0.300 - - - 84.30 *84.30% V. Satisfactory
Alro Construction & Development Corp. 18361
Conc. of Bulusan Lake Road with Drainage & Slope
ProtectionV 9.504 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge V 13.202 C 0.400 0.200 0.300 - - - 90.00 87.90%
V. Satisfactory
Alro Construction & Development Corp. 18361 Rehabilitation of Barangay
Coguit-San Isidro Brgy. Road V 3.706 C 0.406 - 0.500 - - - 90.60 *90.60% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 36
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Al's Enterprise and Construction 9721
Const. of All Weather FMR along Cabay-Caisawan Road (Sta.3+000-Sta.1+600)
VIII 4.512 C 0.220 - 0.500 - - - 72.00 *72.00% Satisfactory
Al's Enterprise and Construction 9721 Const. of MPB @ Brgy. Sabang
South VIII 1.431 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory
Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe
Abrigo Memorial Hospital) VIII 4.775 O 0.354 0.240 0.000 0.022 0.019 0.067 70.20 -
Al's Enterprise and Construction 9721
Rehab./Impvt. of Asphalt Pav't. along San Julian-Borongan
Road SectionVIII 9.530 C 0.233 0.200 0.300 - - - 73.30 *73.30%
Satisfactory
Alt Construction 32365 Const. of Access Road to RORO Terminal, Sta. Fe-Guiron Section V 4.754 C 0.251 0.200 0.300 - - - 75.10 *75.10%
Satisfactory
Alt Construction 32365Const. of Sorsogon State
College Flood Control/Drainage System
V 4.800 C 0.375 0.177 0.300 - - - 85.20 *85.20% V. Satisfactory
Alt Construction 32365Rehab. of Malusak Bridge & Approaches along Talaba-
Summit-Panaon National RoadIVA 1.726 C 0.294 0.231 0.300 - - - 82.50 *82.50%
V. Satisfactory
Alzam Enterprises 19113Conc. of Additional 2 Lanes
along Quimpo Boulevard ABS-CBN to Ecoland
XI 7.001 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
Alzam Enterprises 19113Const. of River Dike along Talomo River from Purok 9
going downstreamXI 4.704 O 0.390 0.160 0.100 0.020 0.043 0.200 91.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 37
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alzam Enterprises 19113
Demolition/Reconst. of Approaches & Dranaige incl.
Bridge Protection Works, Reconst. of Gov. Generoso
(Bankerohan) Br.
XI 30.557 C 0.358 0.300 0.300 - - - 95.80 89.95% V. Satisfactory
Alzam Enterprises 19113 Impv't/Conc. of Biao Guianga-Biao Escuela Road XI 4.799 C 0.339 0.300 0.300 - - - 93.90 91.86%
Outstanding
Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road XI 19.280 O 0.338 0.288 0.100 0.008 0.050 0.067 85.10 -
Alzam Enterprises 19113Road Impvt./Conc. of Additional
Two Lanes along Maa Rd. Section
XI 18.870 C 0.329 0.300 0.300 - - - 92.90 87.14% V. Satisfactory
Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section XI 28.921 O 0.374 0.300 0.100 0.030 0.060 0.067 93.10 -
Alzam Enterprises 19113Widening/ Impvt. of Davao-
Agusan Road, Ilang Tibungco Section
XI 9.420 C 0.347 0.300 0.300 - - - 94.70 94.64% Outstanding
Alzen Engineering & Construction Supplies 13911
Conc. of Kidapawan-Calunasan-M'lang National Road inc. ROW
Acquisition (Magsaysay-Kalaisan Section)
XII 7.314 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Ilomavis
Tourist Road (Mua-an Section) XII 5.760 C 0.301 0.288 0.300 - - - 88.90 88.48% V. Satisfactory
Alzen Engineering & Construction Supplies 13911
Conc. of Kidapawan-Magpet-Pangao-An Road (Sumawan-
Gubatan Section)XII 11.338 C 0.270 0.287 0.300 - - - 85.70 85.58%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 38
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Alzen Engineering & Construction Supplies 13911 Const. of Drainage Canal along
Cotabato-Davao Road Old XII 2.412 C 0.375 - 0.500 - - - 87.50 82.22% V. Satisfactory
Alzen Engineering & Construction Supplies 13911 Const./Impvt. of Binoongan-
Napaliko-Katipunan Road XII 24.050 C 0.322 0.300 0.300 - - - 92.20 92.98% Outstanding
AMA Construction 10015 Const. of MPB, Brgy. Victoria XIII 0.737 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory
Ameg Construction & Supply 21556 Conc. of Gogon-Tiris Road V 0.944 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. SatisfactoryAmeg Construction &
Supply 21556 Repair/Impvt. of DPWH Bldg. V 1.910 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory
AMJC Construction 21002 Const. of 3-CL School Building @ Ilocos Norte NHS I 1.044 C 0.367 0.100 0.000 - - - 46.70 66.51%
Fair
Amopia Construction and Supplies 27511 Conc. of Davao-Cotabato Road,
KPES-UCCP Section both sides XII 9.398 C 0.291 0.100 0.000 - - - 39.10 57.76% Poor
Amopia Construction and Supplies 27511 Conc. of FMR at Purok 4 XII 0.457 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. Satisfactory
Amopia Construction and Supplies 27511 Conc. of Kidapawan-Ilomavis
Tourist Road XII 8.079 O 0.337 0.240 0.000 0.030 0.035 0.067 70.90 -
Angel & Sam Construction 19968 Const. of PSHS CVC ACA Bldg I and Dorm Bldg I Phase I DOST 5.544 C 0.347 0.289 0 - - - 76.34 76.34%
Satisfactory
Angel & Sam Construction & General Merchandise 19968
Cluster I-Const. of Various School Buildings @ Cagayan de
Oro City NHSX 2.673 C 0.370 0.300 0.000 - - - 67.00 79.74%
Satisfactory
Angel & Sam Construction & General Merchandise 19968
Conc. of Cadre Rd. Camp Evangelista Main Road going to
Hospital SectionX 9.548 C 0.305 0.200 0.300 - - - 80.50 87.04%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 39
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Angel & Sam Construction & General Merchandise 19968 Const. of 4 Cl School Bldg. @
Kauswagan E/S X 1.682 C 0.362 0.200 0.300 - - - 86.20 86.37% V. Satisfactory
Angel & Sam Construction & General Merchandise 19968 Const. of School Bldg. @
Minadanao Polytechnic College X 0.929 C 0.362 0.200 0.300 - - - 86.20 64.57% Fair
Angel & Sam Construction & General Merchandise 19968 Provision of Concrete Line Canal X 0.768 C 0.333 - 0.500 - - - 83.30 86.69%
V. Satisfactory
Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS IV-B 0.568 O 0.280 0.240 0.070 0.030 0.043 0.100 76.30 -
Anilos Trading & Construction 31557 Const. of 3 units 3 CL Sch. Bldg.
w/ CR, Palawan Natl. H/S IV-B 1.293 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory
Anilos Trading & Construction 31557 Const. of MPB (H.E.) in ASMES
Brgy. 1 IV-B 0.651 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
Anilos Trading & Construction 31557 Const. of MPB @ Poblacion IV-B 1.919 C 0.330 0.300 0.300 - - - 93.00 *93.00%
Outstanding
Anilos Trading & Construction 31557 Const. of Puerto Princesa Pilot
E/S IV-B 1.540 C 0.393 0.200 0.300 - - - 89.30 82.93% V. Satisfactory
Anilos Trading & Construction 31557 Const. of MPB (Phase II) Brgy.
Inagawan IV-B 0.934 C 0.315 0.161 0.300 - - - 77.60 *77.60% Satisfactory
Anilos Trading & Construction 31557 Const./Impvt. of Multi-Purpose
Buidling, Phase 1, 2-CL IV-B 1.897 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Annasor Construction & Trading 30825 Const. of MPB III 1.909 C 0.391 0.300 0.000 - - - 69.10 58.18%
Poor
Annasor Construction & Trading 30825 Impvt./Rehab. of Porac District
Hospital III 1.898 C 0.220 0.249 0.300 - - - 76.90 *76.90% Satisfactory
Anrol Construction 10136 Const. of Storey 2 CL School Building @ Dulong Bayan E/S IV-A 6.014 O 0.361 0.227 0.100 0.030 0.011 0.100 82.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 40
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Anrol Construction 10136 Rehab. of San Mateo-Rodriguez Road IV-A 9.587 C 0.265 0.284 0.300 - - - 84.90 *84.90%
V. SatisfactoryAntonio V. Nidea
Construction 6382 Conc. of Camalig-Inarado-Gapo-Peñaranda Road V 9.430 C 0.323 0.221 0.300 - - - 84.40 80.86%
V. SatisfactoryAntonio V. Nidea
Construction 6382 Opening/Const. of Banao-Calpi Road V 19.176 C 0.397 0.294 0.300 - - - 99.10 *99.10%
OutstandingAntonio V. Nidea
Construction 6382 Repair/Rehab. of Sala-Cagbulacao Road V 4.675 C 0.332 0.300 0.300 - - - 93.20 87.44%
V. Satisfactory
Antonio V. Nidea Construction 6382 Repair/Restoration of Awang
River Control, Awang River V 9.499 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-
Sabang Road V 14.358 C 0.386 0.282 0.300 - - - 96.80 75.02% Satisfactory
AOG Construction 29758 Conc. of Basak-Rizal-Matinao Rizal FMR VIII 9.437 C 0.303 0.200 0.300 - - - 80.30 83.30%
V. Satisfactory
AOG Construction 29758 Conc. Paving of Dongon-Laboon Road VIII 14.176 C 0.244 0.300 0.300 - - - 84.40 *84.40%
V. Satisfactory
AOG Construction 29758 Const. of Amambahag Bridge VIII 7.596 C 0.363 0.300 0.300 - - - 96.30 78.06% Satisfactory
AOG Construction 29758 Const. of Basak II UK Bridge VIII 3.342 C 0.385 0.200 0.300 - - - 88.50 82.08% V. Satisfactory
AOG Construction 29758 Const./Impvt. of Rizal-Matin-ao FMR (Basak-Matin-ao Phase IV) VIII 11.276 C 0.296 0.200 0.300 - - - 79.60 82.60%
V. Satisfactory
AP Mercado Trading and Construction 25269 Rehabilitation of Lateral D (Sta.
0+000-4+666) NIA-I 7.483 C 0.250 0.300 0.300 - - - 85.00 85.09% V.Satisfactory
AP Mercado Trading and Construction 25269 Road Surfacing along Lat D (Sta.
12+957-17+068) NIA-I 1.502 C 0.240 0.300 0.300 - - - 84.00 84.00% V.Satisfactory
APB Construction 17055 Completion of MPB CAR 1.908 O 0.398 0.300 0.100 0.023 0.032 0.100 95.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 41
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
APD Construction 17467 Addalam River Irrigation Project NIA 7.466 O 0.3369 0.1871 0.03 0.03 0.041 0.2 82.48 -
APD Construction 17467Conc. of Cordon-Aurora Bdry. National Road (Maddela Jct.-
Dumabato Sect.)II 4.774 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
APD Construction 17467Conc. of Ilagan-Delfin-Albano-Mallig National Road, Olango
SectionII 7.719 C 0.363 0.300 0.300 - - - 96.30 *96.30%
Outstanding
APD Construction 17467Conc. of Ilagan-Delfin-Albano-
Mallig National Road, Villa Cacho Section
II 11.868 C 0.335 0.300 0.300 - - - 93.50 89.78% V. Satisfactory
APD Construction 17467Conc. of Naguilian-San
Marcelino Road (Alibadbad Section)
II 9.648 C 0.376 0.202 0.300 - - - 87.80 *87.80% V. Satisfactory
APD Construction 17467 Conc. of Villa Sur Brgy. Road II 2.720 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding
APD Construction 17467Concrete Reblocking along
Cabatuan-Enrile Road (MBC) Km. 406+00-Km. 407+500
II 1.566 C 0.284 0.300 0.300 - - - 88.40 85.10% V. Satisfactory
APD Construction 17467 Const. of MPB at San Mateo (Phase VI) II 1.891 C 0.392 0.208 0.300 - - - 90.00 *90.00%
V. Satisfactory
APD Construction 17467 Const. of Pigalo Bridge (Phase II) II 2.820 C 0.362 0.200 0.300 - - - 86.20 86.95%
V. Satisfactory
APD Construction 17467Const./Impvt. (Reblocking) along
Santiago City-Baluarte Isabela/Quirino Bdry.
II 6.531 C 0.335 0.300 0.300 - - - 93.50 93.86% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 42
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
APD Construction 17467
Const./Impvt./Rehab. of Cordon-Diffun-Maddela-Aurora (CDMA)
Road & ist related Roads & Bridges (Cab-Diffun Section)
Cualo Blvd Road
II 0.959 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-04-06) NIA-II 5.490 C 0.400 0.300 0.000 - - - 70.00 *70.00%
Fair
APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-06-06) NIA-II 2.529 C 0.400 0.300 0.000 - - - 70.00 70.00%
Fair
APD Construction 17467
Impvt. of Cordon-Diffun-Maddela-Aurora (CDMA) Bdry. Road & its related Roads & Bridges (Rehab.
Of Ramos Bridge Phase II)
II 2.604 C 0.371 0.243 0.300 - - - 91.40 *91.40% Outstanding
APD Construction 17467Impvt./Conc. of Cordon-Aurora
Bdry. Road (Maddela Jct.-Dumabato Section)
II 13.274 C 0.366 0.262 0.300 - - - 92.80 *92.80% Outstanding
APD Construction 17467 Repair/Impvt./Reblocking along Jct. Mangandingay-Saguday Rd. II 9.576 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
APO General Construction 7010 Completion of School Bldg., Happy Hollow E/S CAR 0.638 O 0.307 0.262 0.300 - - - 86.90 -
Aqualine Construction 11555 Allen CIS (Irrigation) NIA 2.547 C 0.353 0.176 0.300 - - - 82.90 *82.90% V.Satisfactory
Aqualine Construction 11555 Const. of Limopoca CIP NIA-VII 3.232 C 0.321 0.300 0.300 - - - 92.10 92.10%
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 43
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Aquino-Dela Cruz Engineering & Construction 16751
Conc./Impvt. of San Carlos-Calasiao Road (Bolingit-Cruz
Section)I 9.162 C 0.285 0.300 0.300 - - - 88.50 *88.50%
V. Satisfactory
Aquino-Dela Cruz Engineering & Construction 16751 Const. of 1 Cl Sch. Bldg. @ Matic-
Matic E/S I 0.386 C 0.384 0.300 0.300 - - - 98.40 *98.40% Outstanding
AR Adlawan Construction 13108Asphalting along Cebu Toledo
Wharf Road, Km.28+180-Km.28+460
VII 1.067 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory
AR Adlawan Construction 13108 Conc. of Cebu-Toledo Wharf Road VII 34.318 C 0.322 0.300 0.300 - - - 92.20 85.14%
V. Satisfactory
AR Adlawan Construction 13108 Const. of 2 CL Sch. Bldg. @ Can-Asujan NHS VII 34.320 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
AR Adlawan Construction 13108 Const. of Lower Calajo-an Pakigne Bridge VII 0.949 C 0.302 0.300 0.300 - - - 90.20 *90.20%
Outstanding
Arcinue Commercial 6746 Const. of Modified Conventional Type Single Storey S/B I 0.703 C 0.356 0.300 0.300 - - - 95.60 85.45%
V. Satisfactory
Arcinue Commercial 6746Const. of Modified Conventional
Type Single Storey S/B at Tagudtud NHS
I 0.827 C 0.292 0.300 0.300 - - - 89.20 *89.20% V. Satisfactory
Arcinue Commercial 6746 Const. of 2 CL Sch. Bldg. Anduyan NHS I 0.899 C 0.373 0.207 0.300 - - - 88.00 83.73%
V. Satisfactory
Arcinue Commercial 6746 Const. of 2 CL School Bldg. @ Lloren E/S I 0.764 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
Arcinue Commercial 6746Const. of Mangato Bridge under Austrian Assisted DPWH Const.
ProjectI 27.553 O 0.323 0.289 0.000 0.030 0.033 0.067 74.20 -
Arcinue Commercial 6746Const. of MangatoBridge under Austrian Assisted DPWH Const.
ProjectI 27.553 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -
Arcinue Commercial 6746 Const. of Maypalic Bridge I 12.048 C 0.292 0.200 0.000 - - - 49.20 61.59% Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 44
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Arcinue Commercial 6746Const. of Modified Conventional Type Single Storey Sch. Bldg. @
Bail E/SI 0.607 C 0.396 0.100 0.300 - - - 79.60 *79.60%
Satisfactory
Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union I 0.990 C 0.286 - 0.500 - - - 78.60 85.88%
V. Satisfactory
Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union I 0.656 C 0.310 - 0.500 - - - 81.00 69.24%
Fair
Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road, Brgy. Paoay Section I 31.831 O 0.331 0.293 0.100 0.024 0.037 0.100 88.50 -
Arcinue Commercial 6746 Impvt./Conc. Paving of Lingayen-Binmaley By-Pass Road I 14.434 O 0.287 0.205 0.100 0.030 0.037 0.100 75.90 -
Arcinue Commercial 6746 Impvt./Repair/Rehab. of Pangasinan-Zambales Road I 9.468 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Arcinue Commercial 6746 Opening of Farm-to-Market Road, Brgy. Namonitan I 0.478 C 0.386 0.289 0.300 - - - 97.50 *97.50%
Outstanding
Arcinue Commercial 6746Rehab. & Impvt. of Cabaroan Bridge along San Juan-San
Gabriel RoadI 1.897 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Arcinue Commercial 6746Rehab./Reconst. of Damaged
Nat'l Road, San Fernando-Bagulin Road
I 19.219 C 0.363 0.200 0.300 - - - 86.30 83.96% V. Satisfactory
Arcinue Commercial 6746 Replacement of Cuenca NHS I 0.899 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Arellano General Construction 31694 Const. of Multi-Purpose Building IV-A 2.120 C 0.356 0.300 0.300 - - - 95.60 79.22%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 45
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Argealis Construction 16122Construction of Fence for the San Fernando Runway Strip
(Western Portion)BCDA 3.747 C 0.310 0.300 0.300 - - - 91.02 *91.02%
V.Satisfactory
Argealis Construction 16122 Construction of PPMC Motorpool Shed PPA 1.200 C 0.342 0.300 0.300 - - - 94.19 94.19%
Outstanding
Arik Construction 32786 Conc. of Shoulder along Daet-Bagasbas Airport Road V 0.467 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Arky Construction and Supply 32692 Const. of Circ. Road, Brgy.
Ibinigay-Bagumbayan V 4.750 C 0.325 0.200 0.300 - - - 82.50 82.38% V. Satisfactory
Arky Construction and Supply 32692 Repair & Rehab. of Revetment
(Flood Control) V 0.475 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Arky Construction and Supply 32692 Repair & Rehab. of Revetment
(Flood Control) V 0.948 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Armando U. Khong General Contractor 16163 Proposed Completion of Malibay
Bridge along EDSA (Phase I) NCR 14.169 C 0.339 0.300 0.300 - - - 93.90 83.46% V. Satisfactory
Armando U. Khong General Contractor 16163 Proposed Repair/Rehab. of
Araulio High School NCR 14.384 C 0.316 0.300 0.300 - - - 91.60 *91.60% Outstanding
Armando U. Khong General Contractor 16163 Upgrading/Conc. with Drainage
Impvt. of M. dela Fuente St. NCR 15.936 C 0.365 0.268 0.300 - - - 93.30 94.20% Outstanding
ARN Builders 18930 Conc. of Altavas Diversion Road VI 16.521 C 0.328 0.200 0.300 - - - 82.80 85.11% V. Satisfactory
ARN Builders 18930 Const. of Banica Bridge VI 12.540 O 0.385 0.300 0.000 0.030 0.060 0.067 84.20 -
ARN Builders 18930 Const. of Dumalag Bridge VI 16.494 C 0.341 0.114 0.300 - - - 75.50 81.70% V. Satisfactory
ARN Builders 18930CP 5: Impvt./Conc. of Kapalong-
Talaingod-Valencia Bukidnon Road, Brgy. Sto. Niño Phase II
XI 172.550 O 0.400 0.300 0.100 0.024 0.055 0.067 94.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 46
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
ARN Builders 18930
CP 8: Const. of Six (6) Bridges inc. Approaches along Kapalong-
Talaingod-Valencia Bukidnon Road
XI 123.199 O 0.384 0.282 0.100 0.030 0.055 0.100 95.10 -
ARN Builders 18930 Rehab./Reconstruction of Aklan East Road VI 19.283 O 0.330 0.240 0.100 0.030 0.055 0.100 85.50 -
ARN Builders 18930 Rehab./Reconstruction of Aklan East Road VI 19.283 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -
Arrowhead Construction 22697 Concreting of Road & Const. of Drainage at Liyang III 2.837 C 0.385 0.300 0.300 - - - 98.50 85.12%
V. Satisfactory
Arsvi Construction 23518 Construction of Multi-Purpose Bldg. IV-A 4.821 C 0.387 0.240 0.300 - - - 92.70 88.29%
V. SatisfactoryArt Star Construction and
Enterprises 18416 Const. of Water System Project @ Brgy. Bungro I 2.243 C 0.304 0.300 0.300 - - - 90.40 78.94%
Satisfactory
Art-Star Construction & Enterprises 18416 Const. of Multi-Purpose Bldg.
(Phase II) I 6.109 C 0.278 - 0.500 - - - 77.80 *77.80% Satisfactory
Art-Star Construction & Enterprises 18416 Rehab. of Multi-Purpose
Building I 1.430 C 0.367 0.143 0.300 - - - 81.00 81.84% V. Satisfactory
Asanco General Merchandising &
Construction30517 Const. of Multi-Purpose
Building, Poblacion IV-B 0.465 C 0.390 0.221 0.300 - - - 91.10 83.61% V. Satisfactory
ASC Construction 26788 Construction of Canal and Canal Structures (LMC-ARIP-08-06) NIA-II 3.448 C 0.400 0.300 0.000 - - - 70.00 70.00%
Fair
ASC Construction and Concrete Products 26788 Addalam River Irrigation Project NIA 5.013 C 0.308 0.240 0.300 84.77 *84.77%
V. Satisfactory
ASC Construction and Concrete Products 26788
Const. of (9) Nine Units Academic School Building @
Libertad NHSII 0.384 C 0.286 0.300 0.300 - - - 88.60 88.18%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 47
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building
@ Enrile Vocational H/S II 1.449 C 0.271 0.058 0.300 - - - 62.90 70.01% Satisfactory
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building
@ Lemu H/S II 0.963 O 0.337 0.000 0.100 0.000 0.027 0.067 53.10 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building
@ Lemu H/S II 0.963 O 0.345 0.258 0.100 0.030 0.038 0.100 87.10 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose
Building, Cagumitan E/S II 0.943 C 0.444 - 0.500 - - - 94.40 84.42% V. Satisfactory
ASC Construction and Concrete Products 26788 Const./Completion of Secondary
Sch. Bldg. @ Cagayan NHS II 0.784 O 0.388 0.135 0.100 0.020 0.011 0.100 75.40 -
ASC Construction and Concrete Products 26788 Const./Completion of Secondary
Sch. Bldg. @ Cagayan NHS II 0.784 O 0.372 0.184 0.100 0.015 0.018 0.100 78.90 -
ASC Construction and Concrete Products 26788
Reha./Impvt. of National Road along Cagayan-Apayao Road,
Solana SectionII 1.896 O 0.315 0.212 0.100 0.030 0.028 0.100 78.50 -
ASC Construction and Concrete Products 26788
Reha./Impvt. of National Road along Cagayan-Apayao Road,
Solana SectionII 1.896 O 0.283 0.300 0.000 0.023 0.028 0.067 70.10 -
ASC Construction and Concrete Products 26788 Rehab. of Manila North Road
(MNR) II 4.821 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Conc. along Ilocos Norte-Apayao
Road I 11.226 C 0.340 0.200 0.300 - - - 84.00 85.20% V. Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059
Const. of First Floor of the Proposed Three (3) Storey Bldg.,
Ilocos Norte NHSI 8.356 C 0.334 0.200 0.000 - - - 53.40 74.22%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 48
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Asian Pearl Construction & Dev't. Corp. 9059 Const. of Gabaldon Bldg. &
Grounds @ Ilocos Norte NHS I 7.594 O 0.349 0.300 0.100 0.020 0.060 0.100 92.90 -
Asian Pearl Construction & Dev't. Corp. 9059 Impvt./Rehab. of Paoay Flood
Control I 1.422 C 0.238 0.300 0.300 - - - 83.80 80.98% V. Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Rehab. of Gabaldon Bldg. at
Ilocos Norte NHS I 7.596 C 0.355 0.278 0.300 - - - 93.30 *93.30% Outstanding
Asian Pearl Construction & Dev't. Corp. (Formerly:
Asian Pearl Enterprises)9059 Const. of Gabaldon Bldg. &
Grounds @ Ilocos Norte NHS I 7.594 C 0.322 0.300 0.300 - - - 92.20 92.66% Outstanding
Asian Pearl Enterprises 9059 Concreting of Magnuang Barangay Road I 1.424 C 0.320 - 0.500 - - - 82.00 *82.00%
V. Satisfactory
Asugas Builders 32764 Const. & Completion of MPB (Municipal Bldg.) Phase II IX 2.300 C 0.355 0.133 0.300 - - - 78.80 *78.80%
Satisfactory
Atlanta Construction Company, Inc. 31290
Const./Rehab./Replacement/ Completion/ and Repair of Elem.
And Secondary Sch. Bldg.at Sugod P/S
X 5.214 C 0.373 0.200 0.300 - - - 87.30 84.01% V. Satisfactory
Atlantic Construction 24232 Const. of 1 CL Std. Sch. Bldg. at Manaring E/S II 0.473 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
Atlantic Construction 24232 Const. of 1 H/S CL at Brgy. Cabannungan II 0.421 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Atlantic Construction 24232 Const. of Sta. Maria MPB II 3.816 O 0.308 0.240 0.100 0.030 0.037 0.067 78.20 -
Atlantic Construction 24232Rehab./Impvt. of Road Jct.
Santiago-Tuguegarao to Sta. Maria Town Proper
II 4.765 O 0.349 0.240 0.100 0.030 0.033 0.067 81.90 -
Atlantic Construction 24232 Repair/Maintenance of Baculud River Control (Phase I) II 0.743 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 49
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Atlantic Construction 24232 Repair/Rehab. of Sta. Maria E/S II 0.380 C 0.347 0.116 0.300 - - - 76.30 *76.30% Satisfactory
Atlantic Construction 24232Road Concreting of Brgys.
Quibal, San Andres, Visitacion, San Roque and San Juan
II 4.772 O 0.339 0.240 0.100 0.030 0.033 0.067 80.90 -
Atlantic Construction 24232 Road Concreting of Sto. Tomas-Bagutari II 2.865 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
Atlantic Erectors Builders Inc. / Brostan Construction
& Development
JV-99-167 / 12360
Construction of Diversion Dam & Intake Barrel NIA-II 232.105 C 0.381 0.300 0.000 - - - 68.10 69.20%
Fair
Atlantic Erectors Builders Inc. / Brostan Construction
& Development
JV-99-167 / 12360
Construction of Main Canal, Laterals & Appurtenant NIA-II 73.392 O 0.385 0.248 0.000 0.023 0.047 - 70.30 -
ATR Construction 15968 Conc. of Roads at Quirino District XI 1.884 C 0.195 0.300 0.300 - - - 79.50 *79.50%
Satisfactory
ATR Construction 15968 Const. of Drainage along Digos-Makar Road XI 4.701 C 0.393 0.200 0.300 - - - 89.30 90.68%
Outstanding
Avatar Constructions Company 31455 Completion of Brgy. Aurelio
MPB XIII 2.892 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory
Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road
(San Jose-Mahayahay Section) XIII 10.411 C 0.374 0.200 0.300 - - - 87.40 76.48% Satisfactory
Avatar Constructions Company 31455 Conc. of Mahayahay-Glenville
Road XIII 4.578 C 0.373 0.200 0.300 - - - *87.30 *87.30% V. Satisfactory
Avatar Constructions Company 31455 Const. of Aurelio-Mahayhay
Road XIII 3.153 C 0.369 0.247 0.300 - - - 91.60 85.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 50
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Avatar Constructions Company 31455 Const./Conc. of Don Ruben-Sta.
Cruz XIII 1.087 C 0.379 0.244 0.300 - - - 92.30 *92.30% Outstanding
Avatar Constructions Company 31455 Const./Conc. of San Juan Road XIII 2.596 C 0.283 0.300 0.300 - - - 88.30 *88.30%
V. Satisfactory
Avatar Constructions Company 31455
Rehab./Reconst. of Damaged Paved National Road along
Dinagat-Loreto Road (San Jose Section)
XIII 5.717 O 0.377 0.141 0.070 0.030 0.032 0.067 71.70 -
Aylan Construction and Trading 11884 Rehab. of Commonwealth E/S &
GSIS E/S NCR 3.818 C 0.228 0.300 0.300 - - - 82.80 *82.80% V. Satisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Flora Ylagan
H/S NCR 0.710 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Azul Builders 21870 Conc. of Roads at Brgy. Sta. Cruz III 0.948 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
Azul Builders 21870Const. of Multi-Purpose Bldg., Sapang Palay NHS (Phase II)
Sapang Palay CityIII 3.035 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
Azul Builders 21870Package 4: Concreting of Road,
G4 Between Citrus & Lawang Pare
III 0.473 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road III 9.566 O 0.349 0.300 0.070 0.030 0.032 0.067 84.80 -
B. Bernardo Construction 6196 Impvt./Rehab. of Sta. Maria-Norzagaray Road III 14.198 O 0.391 0.225 0.100 0.030 0.035 0.100 88.10 -
B. Bernardo Construction 6196 Rehab. of Amang Rodriguez Ave. NCR 14.343 C 0.319 0.277 0.300 - - - 89.60 *89.60% V. Satisfactory
B. Bernardo Construction 6196 Rehab. of Sumulong Highway NCR 19.220 C 0.266 0.298 0.300 - - - 86.40 *86.40% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 51
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
B. Valencerina Trading & Construction 22147 Completion of MPB NCR 1.903 C 0.375 0.252 0.300 - - - 92.70 *92.70%
Outstanding
B. Valencerina Trading & Construction 22147 Conc. of FMR, Brgy. San Pedro I 1.637 C 0.243 0.200 0.300 - - - 74.30 *74.30%
Satisfactory
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Bldg., @
Brgy. Tañong NCR 1.431 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose bldg., @
Tayabas West E/S IV-A 0.476 O 0.400 0.240 0.100 0.020 0.009 0.067 83.60 -
B. Valencerina Trading & Construction 22147 Rehab. of Road @ Brgy. Ampid I IVA 0.957 C 0.293 0.200 0.300 - - - 79.30 *79.30%
Satisfactory
B. Valencerina Trading & Construction 22147 Rehab. of Road @ Sitio Anawin
at Brgy. San Isidro IVA 0.957 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
B. Valencerina Trading & Construction 22147 Rehab. of Sch. Bldg. @ Brgy.
San Rafael IV-A 0.960 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory
B. Vicencio Construction 9687 Conc. of Calbayog Diversion Road, Sta. 0+000-Sta. 0+500 VIII 11.132 C 0.380 0.300 0.000 - - - 68.00 82.76%
V. Satisfactory
B. Vicencio Construction 9687Conc. of Calbayog Diversion Road, Sta. 16+477.95 - Sta.
15+257.96VIII 18.795 O 0.317 0.232 0.100 0.030 0.028 0.100 80.70 -
B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 O 0.340 0.238 0.100 0.030 0.037 0.100 84.50 -
B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 O 0.308 0.236 0.100 0.030 0.038 0.100 81.20 -
B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 O 0.344 0.145 0.100 0.030 0.042 0.100 76.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 52
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
B. Vicencio Construction 9687Conc. of Naval-Caibiran Cross Country Road (Mohon-Pulang
Yuta Section)VIII 18.920 O 0.313 0.300 0.100 0.030 0.037 0.100 88.00 -
B. Vicencio Construction 9687Conc. of Naval-Caibiran Cross Country Road (Mohon-Pulang
Yuta Section)VIII 18.920 O 0.352 0.196 0.100 0.010 0.054 0.100 81.20 -
B. Vicencio Construction 9687Conc. of Naval-Caibiran Cross Country Road (Mohon-Pulang
Yuta Section)VIII 18.920 O 0.344 0.229 0.100 0.023 0.047 0.100 84.30 -
B. Vicencio Construction 9687 Const. of Maasin Shore Protection/Seawall VIII 3.809 O 0.300 0.100 0.100 0.000 0.022 0.200 72.20 -
B. Vicencio Construction 9687Const. of Tagbilaran City-San
Jose St. Drainage Project (Outfall)
VII 14.174 C 0.294 0.300 0.300 - - - 89.40 89.34% V. Satisfactory
B. Vicencio Construction 9687Const./Opening of Calbayog
Diversion Road, Monbon-Naga Road Section
VIII 13.715 C 0.400 0.236 0.395 - - - 103.10 93.92% Outstanding
B. Vicencio Construction 9687 Const./Replacement of Tabugon Bridge VIII 9.439 C 0.394 0.240 0.300 - - - 93.40 *93.40%
Outstanding
B. Vicencio Construction 9687 Rechanneling of Subang Daku River VIII 4.718 C 0.250 - 0.500 - - - 75.00 82.98%
V. Satisfactory
B. Vicencio Construction 9687Rehab. of Daang Maharlika Highway, Calbayog-Allen
SectionVIII 19.150 C 0.193 0.200 0.300 - - - 69.30 82.53%
V. Satisfactory
B. Vicencio Construction 9687
Rehab. of Sambulawan-Calaguise-Calubian Road, (Conc. of Calaguise Section) Tigbauan
Sect.
VIII 17.942 O 0.344 0.240 0.100 0.030 0.042 0.100 85.60 -
B. Vicencio Construction 9687 Rehab./Repair of Liloan Steel Bridge VIII 15.838 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 53
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
B. Vicencio Construction 9687Rehab.Impvt. of Calbayog-Catarman Road, Calbayog-
Sinidman Sect. VIII 9.330 C 0.368 0.200 0.300 - - - 86.80 82.78%
V. Satisfactory
B.A. Lagazo Builders 22056 Concrete Paving of Belado St. (Phase II) II 0.951 C 0.263 0.300 0.300 - - - 86.30 82.76%
V. Satisfactory
B.C.T. Trading and Construction 15199 Conc. of PPNR (Sandoval-Iraan
Section) IV-B 28.841 C 0.277 0.300 0.300 - - - 87.70 86.36% V. Satisfactory
B.C.T. Trading and Construction 15199 Improvement/Concreting of
Puerto Princesa South Road IV-B 4.729 C 0.338 0.200 0.300 - - - 83.80 80.98% V. Satisfactory
B.C.T. Trading and Construction 15199
Replacement of Solomon Bridge along Puerto Princesa South
RoadIV-B 12.529 C 0.328 0.200 0.300 - - - 82.80 83.10%
V. Satisfactory
B.C.T. Trading and Construction 15199 Replacement of Umalad Bridge
along Langogan-Roxas Road IV-B 28.813 C 0.337 0.300 0.000 - - - 63.70 71.50% Satisfactory
B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section VI 8.819 C 0.014 0.100 0.300 - - - 41.40 58.77%
Poor
B.E. Construction 2730 Conc. of Concepcion-Ajuy Road VI 4.761 C 0.252 0.100 0.300 - - - 65.20 74.18% Satisfactory
B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.087 O 0.370 0.225 0.100 0.015 0.040 0.100 85.00 -
B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.667 O 0.250 0.240 0.100 0.022 0.056 0.100 76.80 -
B.E. Construction 2730 Const. of Iloilo City Technical Vocational Colleges VI 4.821 C 0.354 0.069 0.300 - - - 72.30 81.89%
V. Satisfactory
B.E. Construction 2730 Const. of Lanag River Control VI 14.450 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 54
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
B.E. Construction 2730 Const. of Leonora Salapandan NHS Phase II VI 0.948 C 0.400 0.100 0.300 - - - 80.00 60.96%
Fair
B.E. Construction 2730 Const. of MPB at UP Visayas Gender Studies Center Bldg. VI 11.446 C 0.388 0.200 0.000 - - - 58.80 75.25%
Satisfactory
B.E. Construction 2730 Const. of MPB Phase II @ Leganes E/S VI 0.950 C 0.373 0.248 0.300 - - - 92.10 68.37%
Fair
B.E. Construction 2730 Const. of Multi-Purpose Building, Leon National H/S VI 1.901 C 0.311 0.126 0.300 - - - 73.70 75.10%
Satisfactory
B.E. Construction 2730 Const. of Multi-Purpose Workshop @ Balantang E/S VI 0.625 C 0.425 - 0.000 - - - 42.50 64.20%
Fair
B.E. Construction 2730 Const. of Sch. Bldg. @ Melchor L. Nava NHS VI 1.753 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
B.E. Construction 2730Impv't. of Metro Iloilo
Circumferential Road, Zarraga Section
VI 3.853 C 0.350 - 0.500 - - - 85.00 80.02% V. Satisfactory
B.F.T. Construction 14424 Const. of 2-Cl @ Magpapalayok H/S III 0.559 C 0.445 - 0.500 - - - 94.50 84.00%
V. Satisfactory
B.G. Giron Construction & Supply 15197 Const. of 1 CL Sch. Bldg. at Sto.
Cristo Primary School III 0.426 C 0.385 0.153 0.300 - - - 83.80 *83.80% V. Satisfactory
B.G. Giron Construction & Supply 15197 Const. of FMR @ Brgy. Malupa III 1.421 C 0.280 0.300 0.300 - - - 88.00 79.90%
Satisfactory
B.G. Giron Construction & Supply 15197 Const. of MPB & other Facilities
@ Brgy. Rizal III 1.422 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
B.Q. Construction & Supply 10217 Const. of Urdaneta Flood Control Drainage, Phase I I 11.773 C 0.333 0.300 0.300 - - - 93.30 93.30%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 55
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
B.R.G. Construction 21931Const. of Two (2) Units, Storey Multi-Purpose Building with 12 stalls each (Phase I) @ NVAT
II 4.174 O 0.305 0.250 0.100 0.030 0.027 0.100 81.20 -
B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk XIII 1.912 C 0.364 0.204 0.300 - - - 86.80 84.94% V. Satisfactory
B.S.U. Construction, Inc. 8457Impvt. of Tandawan Road Sect. along Surigao-Davao Coastal
RoadXIII 9.550 C 0.358 0.200 0.300 - - - 85.80 87.24%
V. Satisfactory
B.S.U. Construction, Inc. 8457Rehab./Reconst. of Damaged
Pavement along Surigao-Davao Coastal Road, Lingig Section
XIII 4.798 C 0.364 0.199 0.300 - - - 86.30 86.36% V. Satisfactory
B.S.U. Construction, Incorporated 8457 Conc./Reblocking along JNR-
Barobo-Agusan sur Boundary XIII 9.594 C 0.287 0.300 0.300 - - - 88.70 92.78% Outstanding
B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.
Pandan III 0.934 C 0.308 0.285 0.300 - - - 89.30 *89.30% V. Satisfactory
B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.
Pulong Maragul III 0.941 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
Baby E Construction 19773 Repair/Rehab. of Drainage Canal III 2.857 C 0.253 0.200 0.300 - - - 75.30 *75.30% Satisfactory
Baby Santiago Construction & Supply 31662 Const. of Multi-Purpose Building IV-A 1.925 C 0.274 0.300 0.000 - - - 57.40 42.42%
Poor
Bacho Construction & Design Engineering 15945 Const. of MPB IX 0.187 C 0.391 0.263 0.300 - - - 95.40 *95.40%
Outstanding
Badoc Builders 31564 Concreting of Badio Norte Barangay Road I 0.747 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
Badoc Builders & Supply (Formerly: Badoc Builders) 31564 Conc. of FMR, Brgy. Tartarabang I 1.444 C 0.283 0.200 0.300 - - - 78.30 *78.30%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 56
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Baicamar Construction and Supplies 19248 Repair/Impvt. of Bonbon Road XIII 4.458 C 0.246 0.204 0.300 - - - 75.00 *75.00%
Satisfactory
Bap Construction 16215 Asphalt Overlay of Brgy. Mabini Road (Intermittent Section) IV-A 1.927 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Bap Construction 16215 Conc. of Road at Brgy. Luta Sur IV-A 0.482 C 0.371 0.216 0.300 - - - 88.70 *88.70% V. Satisfactory
Bap Construction 16215 Conc. of San Juan-San Andres Road IV-A 1.927 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Satisfactory
BAQUE Corporation 15235 Construction of Ramps/Approaches in Tarlac BCDA 103.233 O 0.365 0.300 0.000 - - - 66.54 80.35%
V.Satisfactory
Barillo Construction & Enterprises 23836 Conc. of Lower Taway Road IX 0.951 C 0.279 0.221 0.300 - - - 80.00 *80.00%
Satisfactory
Barillo Construction & Enterprises 23836 Const. of MPB at Brgy. Suclema IX 0.375 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Barillo Construction & Enterprises 23836 Repair/Concreting of Roads at
Malvar Street IX 0.706 O 0.394 0.300 0.100 0.030 0.035 0.100 95.90 -
Barillo Construction & Enterprises 23836 Repair/Rehab./Impvt. of Dagohoy
St. IX 0.759 C 0.312 0.230 0.300 - - - 84.20 *84.20% V. Satisfactory
Barit Builders and Construction 30095 Const./Completion of MPB @
Isabela National H/S II 0.936 C 0.317 - 0.500 - - - 81.70 82.05% V. Satisfactory
Barman Construction Corp. 7974Const. of Abaton-Bridge and Approaches (Phase II) Brgy.
ParangIV-B 11.745 O 0.314 0.300 0.100 0.030 0.037 0.100 88.10 -
Barman Construction Corp. 7974 Const. of Abaton-Maidlang II Bridge IVB 9.615 O 0.313 0.300 0.100 0.023 0.042 0.100 87.80 -
Barman Construction Corp. 7974Const./Rehab. of Mahabang
Parang FMR, Mahabang Parang ARC
IV-B 17.832 C 0.310 0.300 0.300 - - - 91.00 88.78% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 57
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Barman Construction Corporation 7974
Conc. of East Coast Road, Calapan-Mansalay Section,
Mabaho Section IV-B 28.868 O 0.357 0.293 0.050 0.030 0.033 0.067 83.00 -
Bascon Bros & Dev. Corp. 31387 Rehab. of Poblacion Water System II 1.927 C 0.382 0.200 0.300 - - - 88.20 85.82%
V. Satisfactory
Batch 81 Engineering & Construction 31311 Completion of MPB, Brgy.
Nansuagao I 0.950 C 0.308 0.200 0.300 - - - 80.80 *80.08% V. Satisfactory
Batch 81 Engineering & Construction 31311 Const. of 2 CL Bldg. at
Banaoang PS I 0.832 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Completion of Matabao Bridge XIII 9.243 C 0.394 0.200 0.300 - - - 89.40 88.14%
V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Completion of Ngilan Bridge
along Agusan-Surigao Road XIII 8.545 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510
Const. of Drainage Facilities alogn Agusan-Misamis Oriental
Road, XIII 3.628 C 0.372 - 0.500 - - - 87.20 *87.20%
V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Const. of MPB XIII 2.787 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Const. of MPB (covered court) XIII 1.875 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510
Rehab. of Ngilan Bridge along Daang Maharlika Highway (Agusan-Surigao Section)
XIII 9.104 C 0.337 0.300 0.300 - - - 93.70 87.82% V. Satisfactory
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Replacement of Matabao Bridge XIII 9.468 O 0.338 0.291 0.100 0.030 0.051 0.100 91.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 58
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
BBC Construction (Formerly: BBC Sand &
Gravel)16510 Replacement of Matabao Bridge XIII 9.468 O 0.387 0.272 0.000 0.030 0.030 0.067 78.60 -
BCT Trading & Const./F. Alarcon Const. Corp/ JV 17612 San Vicente Airport
Development Project DOTC 81.790 C 0.424 0.200 0.300 - - - 92.40 92.40% Very Satisfactory
BCT Trading and Construction 15199
Const./ Completion of San Miguel NHS 5 CL (Two storey 6
CL) IV-B 2.952 C 0.446 0.500 94.60 83.54%
V. Satisfactory
BCT Trading and Construction 15199
Improvement of Plaridel-Sitio Apis Road, Plaridel-Jose Rizal
ARCIV-B 20.211 C 0.144 0.195 0.300 - - - 63.90 78.42%
Fair
BCT Trading and Construction 15199 San Vicente Airport
Development Project DOTC 48.138 C 0.451 0.200 0.300 - - - 95.10 95.10% Very Satisfactory
BDL Santos Construction and Supply 17535
Repair/Rehab. of Damaged River Control (Cadacan River), Anog-
Sangkayan SectionV 4.728 C 0.210 0.064 0.300 - - - 57.40 *57.40%
Poor
Bedun Construction 15130Const./Impv't. of Batangas-Lobo Road, Malapad na Parang-San
Miguel Section IV-A 9.497 C 0.315 0.200 0.300 - - - 81.50 75.32%
Satisfactory
Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. II 2.337 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. II 2.377 C 0.338 0.200 0.300 - - - 83.80 81.56%
V. Satisfactory
Bell Construction 27851 Completion of MPB Arcillana Compound NCR 0.931 C 0.389 0.107 0.300 - - - 79.60 *79.60%
Satisfactory
Belvic Enterprises & Construction 25337 Const. of Drainage System @
Poblacion IX 0.485 C 0.186 0.218 0.300 - - - 70.40 *70.40% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 59
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Bendimil Construction and Development Corp. 6135 Const. of Pedestrian Overpass IX 4.603 C 0.346 0.260 0.000 - - - 60.60 78.60%
Satisfactory
Bendimil Construction and Development Corp. 6135 Impvt./Gravelling of Siocon-
Sirawai Road (Sirawai Side) IX 47.894 O 0.158 0.225 0.000 0.030 0.033 0.067 51.30 -
Benny's Trading & Construction 8762 Conc. of Irawan-Tagburos Road IV-B 5.245 C 0.366 0.300 0.300 - - - 96.60 58.74%
Poor
Benny's Trading & Construction 8762 Const. of 2 CL Sta. Monica E/S IV-B 0.698 C 0.437 - 0.500 - - - 93.70 83.06%
V. Satisfactory
Benny's Trading & Construction 8762 Const. of Sidewalk Pavement IV-B 0.329 C 0.336 0.000 0.300 - - - 63.60 *63.60%
Fair
Berson's Construction & Trading 31181 Impvt./Concrete Paving of Brgy.
Road, Sitio Sipitan-Bocboc East I 9.615 C 0.236 0.200 0.300 - - - 73.60 80.86% V. Satisfactory
Berson's Construction & Trading 31181
Impvt./Concrete Paving of Camiling-Wawa Road & Drainage
StructuresI 9.641 C 0.288 0.276 0.300 - - - 86.40 85.98%
V. Satisfactory
Bestech Construction & Development Corporation 17725
Emergency Repair of Tigaon-Goa-San Jose-Lagonoy via San
Vicente Rd.V 1.316 O 0.344 0.158 0.100 0.020 0.023 0.133 77.80 -
Bet Construction & Supply 31764Impvt./Conc. of Pangasinan-
Tarlac Road (Socony Jct.-Lingayen Section)
I 9.453 C 0.294 0.200 0.300 - - - 79.40 80.12% V. Satisfactory
Bet Construction of Supply 31764 Concreting of Marcos Highway Road I 0.749 C 0.332 0.222 0.300 - - - 85.40 *85.40%
V. Satisfactory
Beta Construction 9829 Conc. of Brgy. Road @ Balogo V 0.800 C 0.244 0.189 0.300 - - - 73.30 *73.30% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 60
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Beta Construction 9829 Conc. of Brgy. Road @ LRV Site Road V 0.480 C 0.345 0.183 0.300 - - - 82.80 *82.80%
V. Satisfactory
Beta Construction 9829 Conc. of Tarusanan Road V 1.880 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
Beta Construction 9829 Road Concreting of Dominorog Road V 1.405 C 0.269 0.300 0.300 - - - 86.90 *86.90%
V. Satisfactory
Better Work Construction 24432Completion of Multi-Purpose
Bldg., DENR Regional office XII Brgy. Zone IV
XII 1.428 C 0.368 0.225 0.300 - - - 89.30 92.24% Outstanding
Bevel Construction 16423 Improvement/Concreting of Cantaan Barangay Road X 0.920 O 0.240 0.300 0.100 0.030 0.032 0.100 80.20 -
Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-
Baras Section V 4.769 O 0.399 0.293 0.100 0.018 0.015 0.067 89.20 -
Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-
Baras Section V 4.769 O 0.354 0.244 0.100 0.020 0.023 0.067 80.80 -
Bicol Goldrock Construction Corporation 32376 Const. of Bagamanoc Seawall V 4.800 C 0.293 0.200 0.300 - - - 79.30 76.54%
Satisfactory
Bicol Goldrock Construction Corporation 32376 Road Conc. At San Jose Road V 1.891 C 0.271 0.300 0.300 - - - 87.10 *87.10%
V. Satisfactory
Bien Marian Construction Corporation 21871 Construction of 2 Storey 4 CL @
Sitio Tapayan E/S IV-A 4.180 C 0.283 0.298 0.300 - - - 88.10 83.76% V. Satisfactory
Bigfoot Construction and Supply 24769 Conc. of Bais-Kabankalan Road
km. 83+000 - km. 85+000 VII 2.254 C 0.336 0.200 0.300 - - - 83.60 *83.60% V. Satisfactory
Bigfoot Construction and Supply 24769 Conc. of Basak-Nasig-id FMR VII 0.903 C 0.190 0.300 0.300 - - - 79.00 *79.00%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 61
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Bigfoot Construction and Supply 24769 Conc. of Calayugan Brgy. Road VII 0.426 C 0.330 0.300 0.300 - - - 93.00 *93.00%
Outstanding
Bigfoot Construction and Supply 24769 Const. of Drainage along DSR VII 4.684 C 0.380 0.190 0.300 - - - 87.00 84.72%
V. Satisfactory
Bigfoot Construction and Supply 24769 Const. of Mantiquil-Tamlang
Road VII 4.708 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory
Bigfoot Construction and Supply 24769 Const. of River Control Dike
along Canaway River VII 4.680 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
Bigfoot Construction and Supply 24769
Const./Installation of Water System a)Deepwell, Brgy.
Palanas, Tanjay City b)Water Supply, Brgy. Penabonan,
Mabinay
VII 0.996 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
Bill Hill Construction and Supply 18046 Completion of Roofing of Multi
Purpose Hall @ Brgy. Mabini XIII 0.182 C 0.400 0.240 0.300 - - - 94.00 *94.00% Outstanding
Bill Hill Construction and Supply 18046 Conc. of Brgy. Villafranca XIII 5.731 C 0.332 0.300 0.300 - - - 93.20 88.49%
V. SatisfactoryBill Hill Construction and
Supply 18046 Conc. of Capalayan-Mapawa-Quezon Road (Phase 38) XIII 11.814 O 0.359 0.300 0.030 0.030 0.035 0.067 82.10 -
Bill Hill Construction and Supply 18046
Conc. of Lake Mainit Circ. Road, Phase 14, Mainit to Matin-ao
SectionXIII 9.261 C 0.310 0.200 0.300 - - - 81.00 *81.00%
V. Satisfactory
Bill Hill Construction and Supply 18046 Conc. of Magsaysay Road XIII 0.916 C 0.290 0.170 0.300 - - - 76.00 83.86%
V. Satisfactory
Billco Construction 18191 Conc. Reblocking along Surigao-Agusan Road XIII 0.955 C 0.354 0.200 0.300 - - - 85.40 80.24%
V. Satisfactory
Billco Construction 18191 Const. of Don Ruben Seawall (Phase III) XIII 2.690 C 0.370 0.300 0.000 - - - 67.00 79.24%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 62
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Bimbo Construction & Supply (Formerly: Bimbo
Const.)25022 Repair/Improvement of Milaor
Revetment V 2.837 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding
Blimex Construction & Supply 27259 Const. of 4 Cl School Bldg. @
Patalinhug E/S XII 1.659 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
Blue Dragon Construction 11524 Const. of Candon Flood Control, MNR I 8.248 C 0.341 0.200 0.300 - - - 84.10 82.78%
V. Satisfactory
BMJ Construction 14571
Completion of Sto. Tomas-Cabagan Overflow Bridge
(Phase V), Cansan-Bagutari Overflow Bridge
II 14.394 C 0.267 0.300 0.300 - - - 86.70 91.56% Outstanding
BMJ Construction 14571
Completion of Sto. Tomas-Cabagan Overflow Bridge
(Phase IV), Cansan-Bagutari Overflow Bridge
II 9.092 C 0.267 0.300 0.300 - - - 86.70 86.34% V. Satisfactory
BMJ Construction 14571Conc. of Ilagan-Bagao-Palanan
National Road (Fuyo-Rang-ayan-Ayan Gap)
II 9.360 C 0.345 0.292 0.300 - - - 93.70 *93.70% Outstanding
BMJ Construction 14571Conc. of Ilagan-Delfin Albano-Mallig National Road (Pilitan-
Paragu Sect.)II 9.649 C 0.282 0.200 0.300 - - - 78.20 *78.20%
Satisfactory
BMJ Construction 14571 Concreting of Sto. Tomas-D. Albano Road (Gap Section) II 9.649 C 0.261 - 0.500 - - - 76.10 79.25%
Satisfactory
BMJ Construction 14571 Const. of 2-CL School Building @ Magassi High School II 0.632 C 0.291 0.300 0.300 - - - 89.10 89.45%
V. Satisfactory
BMJ Construction 14571 Rehab. of Cansan-Cabagan-Sto. Tomas Road II 4.674 C 0.307 0.200 0.300 - - - 80.70 79.56%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 63
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
BMJ Construction 14571Rehab. of Pinacanauan Br. App.
"A" & River Bank Protection works
II 11.699 C 0.363 0.300 0.300 - - - 96.30 88.24% V. Satisfactory
BMJ Construction 14571 Rehab. of Sto. Tomas-Delfin Albano Road II 4.679 C 0.020 0.300 0.000 - - - 32.00 63.80%
Fair
BMJ Construction 14571 Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road II 14.366 C 0.268 0.300 0.300 - - - 86.80 86.80%
V. Satisfactory
BMJ Construction 14571 Road Concreting of Garita Brgy. Road (Phase II) II 0.472 C 0.321 0.300 0.300 - - - 92.10 89.04%
V. Satisfactory
BMK Construction 8292 Const. of Mitura Bridge along Urdaneta-Manaoag Road I 24.737 O 0.300 0.300 0.000 0.020 0.025 0.067 71.20 -
BMK Construction 8292Impvt./Rehab. of Urdaneta Jct,-
Dagupan-Lingayen Road via Zambales, Tapuac Section
I 19.259 C 0.350 0.200 0.300 - - - 85.00 85.30% V. Satisfactory
BMK Construction 8292Rehab./Reconst. of Damaged
National Road, Alaminos-Lucap Road
I 7.599 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
BMK Construction 8292
Repair/Rehabilitation of Drainage System along old
Judge de Venecia Sr. Ave., 3 Rows Cross Drainage along
Calasiao Road
I 4.821 C 0.351 - 0.500 - - - 85.10 85.19% V. Satisfactory
BN Builders & Construction Supply 28232 Concreting of Purok 3, Patin-ay XIII 2.825 C 0.203 0.200 0.300 - - - 70.30 83.62%
V. Satisfactory
BN Builders & Construction Supply 28232 Const. of Two (2) Storey MPB
(Completion) XIII 0.948 C 0.353 - 0.500 - - - 85.30 *85.30% V. Satisfactory
BNG Construction and General Services 18503 Completion of Brgy. Oslao MPB XIII 1.485 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 64
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
BNG Construction and General Services 18503 Conc. of Caglanipa Brgy. Road XIII 1.900 C 0.337 0.209 0.300 - - - 84.60 *84.60%
V. Satisfactory
BNG Construction and General Services 18503 Concreting of San Francisco-
Malimono Road Phase XXIV XIII 4.455 C 0.390 0.200 0.300 - - - 89.00 83.48% V. Satisfactory
BNG Construction and General Services 18503 Const. of MPB @ Brgy. 7 XIII 0.939 C 0.276 0.000 0.300 - - - 57.60 *57.60%
PoorBNG Construction and
General Services 26705 Const. of Surigao Del Norte National High School XIII 0.371 C 0.369 0.116 0.300 - - - 78.50 85.43%
V. Satisfactory
BNG Construction and General Services 18503 Const. of Various MPB @ Brgy.
Siana XIII 0.916 C 0.379 0.244 0.300 - - - 92.30 74.17% Satisfactory
BNR Construction & Development Corporation 12903
Completion of Putat Bridge I (Phase IV) along Toledo-Tabuel San Remigio Road Km.103.503
(approach)
VII 3.092 C 0.350 0.290 0.300 - - - 94.00 *94.00% Outstanding
BNR Construction & Development Corporation 12903 Concreting of Farm-to-Market
Road VII 0.949 C 0.372 - 0.500 - - - 87.20 79.82% Satisfactory
BNR Construction and Development Corporation 12903 Conc. Cebu-Toledo Wharf Road
(Nautical Highway) VII 27.753 C 0.363 0.200 0.300 - - - 86.30 87.35% V. Satisfactory
BNR Construction and Development Corporation 12903
Const. of Drainage Facilities with Cub and Gutter at Open-Airport
Road (Realigned to Const. of Drainage Facilities at Open-
Airport Road)
VII 1.845 C 0.386 0.300 0.300 - - - 98.60 92.06% Outstanding
BNR Construction and Development Corporation 12903 Const. of Pedestrian Overpass at
Talamban VII 4.295 O 0.353 0.300 0.100 0.030 0.060 0.100 94.30 -
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building VII 0.942 C 0.384 0.100 0.300 - - - 78.40 82.74% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 65
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building (Cultural Center) VII 0.927 C 0.206 0.200 0.300 - - - 70.60 70.46% Satisfactory
BNYU Enterprises & Construction 27725
Concrete Paving of Cortes-Balilihan-Macaas Road (Broken
Section)VII 7.425 C 0.343 0.300 0.000 - - - 64.30 76.15%
Satisfactory
BNYU Enterprises & Construction 27725 Concreting of Maribojoc-
Antequera Road VII 4.770 O 0.346 0.034 0.100 0.023 0.025 0.100 62.80 -
BNYU Enterprises & Construction 27725 Concreting of Maribojoc-
Antequera Road VII 4.770 O 0.307 0.191 0.100 0.023 0.025 0.100 74.60 -
BNYU Enterprises & Construction 27725
Impvt. (Conc.) of Catigbian-Balilihan-Tagbilaran Road
(Broken Section)VII 7.426 C 0.361 0.300 0.000 - - - 66.10 *66.10%
Fair
BNYU Enterprises & Construction 27725 Repair/Improvement of Multi-
Purpose Building VII 0.933 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory
BNYU Enterprises and Construction 27725 Talibon Small Reservoir
Irrigation Project NIA 4.990 O 0.328 0.173 0.100 0.030 0.047 0.200 87.80 -
Bonibal Construction 9371 Asphalt Overlay of Mariveles Talaga Bay Road III 6.944 C 0.314 0.200 0.300 - - - 81.40 *81.40%
V. Satisfactory
Bonibal Construction 9371 Impv't. of Daan Pare Road III 1.870 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding
Bonifacio M. Carlos Construction 3303
Completion of Multi-Purpose Bldg., Purok Matahimik Brgy.
San PedroIV-B 0.326 C 0.443 - 0.500 - - - 94.30 94.30%
Outstanding
Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South
Road IV-B 13.698 C 0.298 0.300 0.300 - - - 89.80 91.60% Outstanding
Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South
Road, Calategas Section IV-B 5.671 C 0.346 0.300 0.300 - - - 94.60 88.84% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 66
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Bonimar Construction Enterprises 23760 Const. of 1 CL Sch. Bldg. @
Bolaen E/S I 0.493 C 0.336 0.251 0.300 - - - 88.70 *88.70% V. Satisfactory
Bonimar Construction Enterprises 23760 Const. of 1 CL Standard Sch.
Bldg. @ Salomague NHS I 0.493 C 0.320 0.278 0.300 - - - 89.80 *89.80% V. Satisfactory
Bonimar Construction Enterprises 23760 Const. of 1 CL Std. Sch. Bldg. @
Binmaley School of Fisheries I 0.507 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
Borderline Construction and Supply 24433
Conc. of Dualing-New-Panay-Midsayap Road (Sta. Cruz-
Katalicanan Section)XII 4.779 C 0.358 0.126 0.300 - - - 78.40 79.42%
Satisfactory
Borderline Construction and Supply 24433 Const. of MPB XII 0.287 C 0.334 0.239 0.300 - - - 87.30 *87.30%
V. Satisfactory
Borderline Construction and Supply 24433 Const. of Water System XII 0.467 C 0.385 0.215 0.300 - - - 90.00 *90.00%
V. Satisfactory
Borderline Construction and Supply 24433
Rehab./Impvt. of Bukidnon-Cotabato Road, Poblacion
SectionXII 4.653 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
BPDG Construction & Trading 16167 Const. of MPB at Brgy. San Jose
Proper III 3.612 C 0.357 0.300 0.300 - - - 95.70 *95.70% Outstanding
BRG Construction 21931 PSHS CVC Academic Bldg. Phase III DOST 6.482 C 0.375 0.300 0.300 - - - 97.50 97.50%
Outstanding
Brillantes Construction 26447 Const. of Multi-Purpose Building (Phase I) X 0.940 C 0.400 0.209 0.690 - - - 97.63 97.63%
Outstanding
Brillantes Construction 26447Provision of Line Canal at
Nabangunan Section along Jct. Dologan-Busco-Quezon Road
X 0.275 C 0.354 0.300 0.300 - - - 95.40 88.50% V. Satisfactory
Brillantes Construction 26447Provision of Lined Canal along
Jct. Dologan-Busco-Quezon Road, Nabanganan Section
X 0.462 C 0.381 0.200 0.300 - - - 88.10 86.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 67
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Brima Construction and Enterprises 8746 Rehab./Impvt./Conc. of Tubod-
Ganassi National Road X 9.142 C 0.287 0.300 0.300 - - - 88.70 86.06% V. Satisfactory
Bros Construction and Supply 10507 Conc. of Surigao-Davao Coastal
Road (Bad-as SDN Section) XIII 6.509 C 0.320 0.215 0.300 - - - 83.50 79.72% Satisfactory
Bros Construction and Supply 10507 Concreting of NRJ Osmeña-
Magkiangkan Road XIII 0.943 C 0.430 - 0.500 - - - 93.00 90.78% Outstanding
Bros Construction and Supply 10507 Concreting of San Jose-Trento
Road Section XIII 8.078 C 0.347 0.200 0.300 - - - 84.70 83.89% V. Satisfactory
Bros Construction and Supply 10507 Const./Rehabilitation of San
Francisco By-Pass Road XIII 0.886 O 0.400 0.173 0.100 0.018 0.023 0.100 81.40 -
Bros Construction and Supply 10507 Rehab. of Balingasag By-Pass
Road X 4.640 C 0.314 0.200 0.300 - - - 81.40 81.22% V. Satisfactory
Bros Construction and Supply 10507
Repair/Rehab. of Damaged Slope Protection Structure due to
Erosion along Roadside of ICBRX 2.593 C 0.331 0.200 0.300 - - - 83.10 *83.10%
V. Satisfactory
Bros Construction and Supply 10507 Repair/Rehab. of del Monte
PSCG Bridge XIII 1.635 C 0.152 0.300 0.000 - - - 45.20 58.91% Poor
Brostan Consruction & Development 12360 Completion/Extension of Multi-
Purpose Building II 0.652 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Brostan Construction & Development 12360 Conc. of Pila-Poblacion Road IV-A 9.630 C 0.298 0.215 0.300 - - - 81.30 *81.30%
V. Satisfactory
Brostan Construction & Development 12360 Conc. of Road II 2.885 C 0.268 0.300 0.300 - - - 86.80 87.88%
V. Satisfactory
Brostan Construction & Development 12360 Conc. of Road, Leading to Eco-
Tourism Project (Caliraya Lake) IVA 19.298 C 0.291 0.300 0.300 - - - 89.10 93.96% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 68
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Brostan Construction & Development 12360 Const. of MPB (Phase I),
Cagayan State University II 9.640 O 0.304 0.240 0.070 0.024 0.033 0.100 77.10 -
Brostan Construction & Development 12360 Const. of MPB (Phase I),
Cagayan State University II 9.640 O 0.316 0.240 0.100 0.030 0.037 0.100 82.30 -
Brostan Construction & Development 12360 Const. of MPB, Isabela State
University II 0.756 C 0.341 - 0.000 - - - 34.10 48.45% Poor
Brostan Construction & Development 12360 Const. of Multi-Purpose Bldg. @
Victoria, Alicia, Isabela II 0.691 C 0.302 - 0.500 - - - 80.20 88.78% V. Satisfactory
Brostan Construction & Development 12360 Impvt./Rehab. of Jct. Dumabato-
Baligui Road II 19.280 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory
Brostan Construction & Development 12360 Rehab. of Burgos-Aurora FMR II 3.365 C 0.400 0.225 0.300 - - - 92.50 *92.50%
Outstanding
Brostan Construction & Development 12360 Rehab. of Calapan South Road &
East Coastal Road IVB 0.952 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Brostan Construction & Development 12360 Rehab. of Farm to Market Road II 0.657 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Brostan Construction & Development 12360 Rehab. of FMR II 1.438 C 0.240 0.300 0.300 - - - 84.00 *84.00%
V. Satisfactory
Brostan Construction & Development 12360 Rehab. of Nat'l Road along Jct.
Oscariz-Ramon Putia Section II 9.629 C 0.390 0.200 0.300 - - - 89.00 *89.00% V. Satisfactory
Brostan Construction & Development 12360 Rehab. of Roads along Gamu-
Roxas Road II 11.564 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
Brostan Construction & Development 12360
Rehab. of Roads along Santiago-Tuguegarao Road (Conc.
Reblocking)II 19.274 C 0.357 0.200 0.000 - - - 55.70 72.32%
Satisfactory
Brostan Construction & Development 12360 Rehab. of Sibunag Bridge along
Guimaras Circumferential Road VI 2.178 C 0.389 0.100 0.300 - - - 78.90 *78.90% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 69
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Brostan Construction & Development 12360 Rehab./Impv't. of Sotero Nuesa-
Simimbaan Road II 4.699 C 0.312 - 0.500 - - - 81.20 85.88% V. Satisfactory
Brostan Construction & Development 12360 Rehab./Reconst. of Damaged
Nat'l Road II 15.235 C 0.341 0.275 0.000 - - - 61.60 78.40% Satisfactory
Brostan Construction & Development 12360
Rehab./Replacement of Damaged Bridges along CDMA
Road, Pinaripad BridgeII 13.472 C 0.400 0.300 0.000 - - - 70.00 71.44%
Satisfactory
Brostan Construction & Development 12360
Repair/Rehab. of Farm to Market Road, Brgy. San Leonardo-
PinaripadII 4.054 C 0.363 0.300 0.300 - - - 96.30 96.30%
Outstanding
Brostan Construction & Development 12360
Replacement of Laoag Bridge along Jct. Ipil-Quirino Bdry.
RoadII 4.792 C 0.338 0.200 0.300 - - - 83.80 85.36%
V. Satisfactory
BS Chang Builders 22745 DBM South Linear Park PRRC 7.088 C 0.46 0.0815 0.300 - - - 84.15 *84.15% V. Satisfactory
BS Chang Builders 22745 DBM South Linear Park III PRRC 2.235 C 0.42 0.200 0.300 - - - 92.00 *92.00% Outstanding
Busilac Builders Inc. 7701 ACA Bldg. 2 DOST 9.651 C 0.389 0.300 0.300 - - - 98.90 98.90% Outstanding
Busilac Builders, Incorporated 7701 Conc. of Batac-Pinili Road,
Batac Section I 21.291 O 0.327 0.240 0.100 0.018 0.047 0.067 79.90 -
Busilac Builders, Incorporated 7701 Concreting of Various Roads
(Sulquiano & Purungganan) I 0.939 O 0.360 0.246 0.100 0.030 0.035 0.100 87.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 70
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Busilac Builders, Incorporated 7701 Const. of Drainage along MNR,
San Nicolas-Nangalisan Section I 6.641 C 0.239 0.300 0.300 - - - 83.90 80.84% V. Satisfactory
BYA Builders and Construction Supply 24158 Const. of One (1) Cl Schl. Bldg.
@ Ipil NHS VIII 0.442 C 0.363 0.297 0.300 - - - 96.00 *96.00% Outstanding
BYA Builders and Construction Supply 24158
Impvt./Rehab. of Nat'l Road along Tacloban-Baybay South
RoadVIII 0.940 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
C & F Construction & Development Corporation 3509
Rehab. of Sandiat Bridge & Approaches along Santiago-
Tuguegarao RoadII 3.779 C 0.271 0.205 0.300 - - - 77.60 *77.60%
Satisfactory
C & F Construction & Development Corporation 3509 Repair/Rehab. of Bocaue-San
Jose Road III 9.860 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
C & F Construction & Development Corporation 3509 Widening & Impvt. of Quirino
Highway III 4.749 C 0.246 0.245 0.300 - - - 79.10 *79.10% Satisfactory
C & F Construction & Development Corporation 3509
Widening/Rehab. of Quirino Highway, Gumaoc-Tungkong-Mangga, San Jose Del Monte
City.
III 9.433 C 0.456 - 0.500 - - - 95.60 87.62% V. Satisfactory
C D U Construction 13915 Conc. of Laoang-Calomotan Road VIII 19.065 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -
C D U Construction 13915 Conc. of Pangpang-Palapag-Mapanas-Gamay-Lapinig Road VIII 9.517 C 0.331 0.200 0.300 - - - 83.10 *83.10%
V. Satisfactory
C D U Construction 13915Repair/Rehab. of Ferry Terminal-
Allen Road (Roadslip) Daang Maharlika
VIII 3.835 C 0.282 0.200 0.300 - - - 78.20 84.26% V. Satisfactory
C D U Construction 13915Repair/Rehab. of Laoang-
Calomotan (Road Slip) Km. 790+800 to Km. 797+013
VIII 4.719 C 0.366 0.300 0.300 - - - 96.60 92.34% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 71
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C E K Construction and Water Supply 13713 Completion of School Bldg. at
Binwang E/S XII 0.274 C 0.310 0.200 0.300 - - - 81.00 *81.00% V. Satisfactory
C E K Construction and Water Supply 13713 Const. of MPB at Paligue XI 0.953 C 0.368 0.223 0.300 - - - 89.10 *89.10%
V. Satisfactory
C E K Construction and Water Supply 13713 Const. of MPB, Brgy. Lamlahak XII 0.668 O 0.297 0.240 0.100 0.030 0.028 0.067 76.20 -
C. Brotonel Construction 9727Completion of the Const. of Taal Lake Circ. Road (Talisay-Laurel-
Agoncillo Section)IV-A 9.644 O 0.308 0.300 0.100 0.030 0.033 0.100 87.10 -
C. Brotonel Construction 9727 Impvt. of MPB IV-A 0.192 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding
C. Dy Builders and General Merchandise (Formerly: CD
Construction)17003 Const. of 10 units CL, Mancahan
NHS X 4.670 O 0.326 0.271 0.100 0.030 0.047 0.067 84.10 -
C. E. Padilla Construction 11278Partial Const. of 3-Storey
Medical and Parking Bldg. with Roofdeck
PRRC 94.626 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory
C. Lara Construction 17304 Const. of 1 Storey 2 CL Modified SB at Ajong NHS VII 0.871 C 0.282 0.300 0.300 - - - 88.20 86.38%
V. Satisfactory
C.A. Betalac Construction & Gen. Mdse. 28222
Partial Const. of Academic Classroom at Ma. Z. Bayya
Memorial E/SXII 0.480 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
C.B. Tampengco Construction & Supply 18505 Const. of Multi-Purpose at Brgy.
80, Zone 7 NCR 2.136 O 0.366 0.250 0.100 0.023 0.041 0.100 88.00 -
C.B. Tampengco Construction and Supply 18505 Completion of MPB at Brgy.
Marulas NCR 1.044 C 0.369 0.231 0.300 - - - 90.00 *90.00% V. Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. (Partial) of MPB IV-A 4.800 C 0.385 0.265 0.300 - - - 95.00 *95.00%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 72
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C.B. Tampengco Construction and Supply 18505 Const. of 2 Cl Sch. Bldg. @ San
Mateo H/S IV-A 0.962 O 0.286 0.267 0.100 0.030 0.032 0.100 81.50 -
C.B. Tampengco Construction and Supply 18505 Const. of Conc. Pathwalk in Sch.
Grounds of Caruhatan West E/S NCR 0.949 C 0.205 0.248 0.300 - - - 75.30 *75.30% Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. of Health Center at Brgy.
Canlalay IV-A 0.960 C 0.312 0.231 0.300 - - - 84.30 75.83% Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. of MPB (Public Market) @
Brgy 186 NCR 4.682 C 0.280 0.200 0.300 - - - 78.00 88.29% V. Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. of Multi-Purpose at Brgy.
NBBS, Navotas, Metro Manila NCR 2.836 C 0.342 0.300 0.300 94.20 90.70% Outstanding
C.B. Tampengco Construction and Supply 18505 Const. of Two (2) CL Sch. Bldg.
@ Mariveles H/S III 0.877 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
C.B. Tampengco Construction and Supply 18505 Impvt. of V. Ilustre St., Brgy. Don
Manuel NCR 1.878 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
C.C.M. Construction 11043 Completion of Cogon Night High School Building VII 1.112 O 0.343 0.221 0.100 0.010 0.029 0.100 80.30 -
C.C.M. Construction 11043 Completion of Cogon Night School Building VII 1.112 O 0.378 0.240 0.100 0.010 0.029 0.100 85.70 -
C.C.M. Construction 11043Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon)
RoadVII 13.714 O 0.346 0.225 0.100 0.030 0.043 0.100 84.40 -
C.C.M. Construction 11043Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon)
RoadVII 13.714 O 0.336 0.247 0.100 0.030 0.054 0.100 86.70 -
C.C.M. Construction 11043Conc. Paving of Jct. (TNR)
Maribojoc-Antequera-Catagbacan (Loon) Road
VII 4.485 C 0.371 0.000 0.300 - - - 67.10 78.32% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 73
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C.C.M. Construction 11043 Const. Brgy. Lumangog Road VII 2.806 O 0.283 0.225 0.100 0.030 0.038 0.100 77.60 -
C.C.M. Construction 11043
Rehab. of Settled Approaches of Damaiao and Taguimtim Bridges
along Bohol Circumferential Road
VII 2.842 C 0.391 0.200 0.300 - - - 89.10 81.72% V. Satisfactory
C.D. Valbuena Construction 26794 Const. of Foot Bridge, Brgy. Malinao Ilaya IV-A 0.142 C 0.305 0.263 0.300 - - - 86.80 *86.80%
V. Satisfactory
C.D. Valbuena Construction 26794 Const. of Water Supply System at Brgy. Bagong Anyo IV-A 0.574 C 0.377 0.300 0.300 - - - 97.70 *97.70%
Outstanding
C.E. Padilla Construction 11278 PUP Linear Park Project PRRC 19.989 C 0.311 0.270 0.100 - - - 68.10 68.10% Fair
C.F. Trinidad / 2H2L Construction Joint Venture JV-07-059 Widening of Taytay Diversion
Road IVA 19.223 C 0.341 0.300 0.300 - - - 94.10 85.16% V. Satisfactory
C.F. Trinidad Construction 9199 Const. of Box Culvert at P. Gomez Extension IV-A 1.050 C 0.363 0.200 0.300 - - - 86.30 *86.30%
V.Satisfactory
C.F. Trinidad Construction 9199 Dredging/Riprapping of Angono River IV-A 2.882 C 0.368 0.268 0.300 - - - 93.60 *93.20%
Outstanding
C.F. Trinidad Construction 9199 Riprapping of Creek, beside Ferretville Subdivision IV-A 3.840 C 0.218 0.300 0.300 - - - 81.80 77.72%
Satisfactory
C.G.I. Construction 10606 Conc. of FMR @ Brgy. Daang Bago III 0.470 C 0.297 0.300 0.300 - - - 89.70 *89.70%
V. Satisfactory
C.G.I. Construction 10606 Const. of Road @ General Luna III 0.475 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
C.J. Maramat Construction 6007Completion of SLU-SVP Brgy.
Bakakeng Multi-Purpose Building
CAR 1.427 C 0.368 0.300 0.300 - - - 96.80 85.32% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 74
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C.J. Maramat Construction 6007 Const. of Multi-Purpose Building at BGH Compound Brgy. CAR 1.414 C 0.372 0.300 0.300 - - - 97.20 91.88%
Outstanding
C.J. Maramat Construction 6007Const. of Two (2) Storey
Reinforce Concrete Municipal Bldg.
I 11.288 O 0.295 0.269 0.100 0.015 0.035 0.100 81.40 -
C.L. Carandang Enterprises 29494 Conc. of Masbate-Milagros Road V 13.855 C 0.260 0.300 0.300 - - - 86.00 76.768% Satisfactory
C.L. Carandang Enterprises 29494 Concreting of Jct. Mandaon-Mandaon Road V 9.590 O 0.339 0.300 0.100 0.008 0.028 0.067 84.20 -
C.L. Carandang Enterprises 29494 Const. of Flood Control Project @ Tugbo V 0.939 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
C.L. Carandang Enterprises 29494 Const. of MPB at DILG Compound V 0.379 C 0.369 0.200 0.300 - - - 86.90 *86.90%
V. Satisfactory
C.L. Carandang Enterprises 29494 Rehab. of Dayao-Bugtong FTMR V 4.791 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
C.L. Carandang Enterprises 29494 Rehab. of Jct., Crossing-Mandaon Road V 18.810 C 0.277 0.200 0.300 - - - 77.70 *77.70%
Satisfactory
C.L. Carandang Enterprises 29494 Rehab./Impvt./Const. of DEO V 2.886 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
C.L. Carandang Enterprises 29494Replacement/Reblocking of Concrete Pavement along Masbate-Cataingan Road
V 9.488 C 0.298 0.300 0.300 - - - 89.80 82.48% V. Satisfactory
C.M. Dancel Const. & Supply / FRD Const. (JV) JV-03-106 Const. of Tulnagan Bridge I 19.981 C 0.326 0.300 0.300 - - - 92.60 84.08%
V. Satisfactory
C.M. Dancel Construction & Supply 12640 Const. of Drainage along MNR,
Nangalisan Section I 2.742 C 0.372 0.200 0.300 - - - 87.20 84.62% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 75
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C.M. Dancel Construction & Supply 12640 Impvt. of Pasuquin-Sapat Air
Station Road I 19.284 C 0.248 0.187 0.300 - - - 73.50 76.08% Satisfactory
C.M. Dancel Construction & Supply 12640 ReConst. of River Control
Protection I 4.725 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
C.M. Dancel Construction & Supply 12640
Rehab./Reconst. of Damaged Nat'l Road, MNR, Maoini-
Baduang Road I 18.963 O 0.400 0.300 0.100 0.015 0.020 0.100 93.50 -
C.M. De Villa Construction & Supply (Formerly: C.M.
De Villa Const.)22778 Conc. of Roads in Sitio Kay
Reyna IV-A 0.471 C 0.304 0.221 0.300 - - - 82.50 *82.50% V. Satisfactory
C.M. Pancho Construction Incorporated 183
Bohol Circumferential Road Improvement Project, CP-2,
Candijay-Jagna-Valencia Sect.Sat. 169+240-Sta. 221+040
PJHL 856.115 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
C.M. Pancho Construction Incorporated 183 Bridge Replacement Sixth Road
Project Bridge Component CP-M I 86.581 C 0.341 0.200 0.300 - - - 84.10 81.46% V. Satisfactory
C.M. Pancho Construction Incorporated 183 Const. of Aloragat Bridge &
Approaches I 51.651 O 0.389 0.300 0.100 0.030 0.061 0.100 98.00 -
C.M. Pancho Construction Incorporated 183
Const. of Daang Hari Extension Aguinaldo-Highway-Coastal
RoadIVA 9.568 C 0.314 0.300 0.300 - - - 91.40 *91.40%
Outstanding
C.M. Pancho Construction Incorporated 183
Rehab. of Surigao-Davao Coastal Road, Jct. Bacuag-
Claver SectionXIII 661.069 O 0.351 0.300 0.100 0.030 0.060 0.100 94.10 -
C.M. Pancho Construction Incorporated 183
Rehab. of Surigao-Davao Coastal Road, Jct. Bacuag-
Claver SectionXIII 661.069 O 0.338 0.300 0.070 0.030 0.070 0.100 90.80 -
C.R. Domingo Construction 2992 Conc. of Naguilian-San Mariano Road (Binatug Section) II 9.646 C 0.333 0.200 0.300 - - - 83.30 82.16%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 76
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C.S. Garcia Construction 1901 Const./Rehab. of Sch. Bldg. F. De Mesa E/S NCR 1.427 C 0.386 0.300 0.300 - - - 98.60 *98.60%
Outstanding
C.S. Garcia Construction 1901 Rehab. of Sagbat-Pililla Diversion Road IV-A 9.598 C 0.364 0.286 0.300 - - - 95.00 *95.00%
Outstanding
C.S. Rayos Construction & General Services 9790 Completion of Ternate-Nasugbu
Road, Calayo-Looc Section IV-A 23.966 C 0.370 0.290 0.300 - - - 96.00 85.56% V. Satisfactory
C.S. Rayos Construction & General Services 9790
Const. (Concreting) of Ternate-Nasugbu Road, Ternate-
Kaybiang SectionIV-A 28.934 C 0.321 0.300 0.300 - - - 92.10 85.56%
V. Satisfactory
C.S. Rayos Construction & General Services 9790 Const./Impvt. of Bauan-Mabini
Circ. Road IV-A 9.496 C 0.220 0.195 0.300 - - - 71.50 *71.50% Satisfactory
C.V. Construction & Development 8334 Conc. of Road @ Sampaguita
East St. Purok NHA 2 XI 0.564 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
C.V. Construction & Development 8334 Const. of 1 Cl 1 Storey Sch.
Bldg. @ Saloy H/S XI 0.433 C 0.329 0.247 0.300 - - - 87.60 *87.60% V. Satisfactory
C.V. Construction & Development 8334 Const./Completion of Doña
Helene Bridge 1 & Approaches XIII 7.007 O 0.317 0.156 0.070 0.015 0.032 0.067 65.70 -
C.V. Construction & Development 8334 Const./Completion of Doña
Helene Bridge 1 & Approaches XIII 7.007 O 0.353 0.300 0.000 0.030 0.050 0.067 80.00 -
C.V. Construction & Development 8334
Impv't/Conc. of Additional Two (2) Lanes along Davao City
Diversion Road (Airport Section)XI 15.407 O 0.387 0.240 0.100 0.024 0.048 0.100 89.90 -
C.V. Construction & Development 8334
Impv't/Conc. of Additional Two (2) Lanes along Davao City
Diversion Road (Airport Section)XI 15.407 O 0.387 0.300 0.100 0.030 0.047 0.100 96.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 77
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
C.V. Construction & Development 8334
Impv't/Conc. of Additional Two (2) Lanes along Davao City
Diversion Road (Airport Section)XI 15.407 C 0.345 0.200 0.300 - - - 84.50 89.69%
V. Satisfactory
C.V. Construction & Development 8334
Replacement of Sayug Bailey Bridge to RCBC (Jct. del Carmen-
Sta. Monica-San Isidro Road)XIII 9.548 C 0.353 0.212 0.000 - - - 56.50 62.98%
Fair
CA Miguel Construction, Incorporated 10221 Conc. of Brgy. Roads IVA 1.917 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
CA Miguel Construction, Incorporated (Formerly:
C.A. Miguel Const.)10221 Const. of MPB @ J.E. Pama St. NCR 0.373 C 0.326 0.200 0.300 - - - 82.60 *82.60%
V. Satisfactory
Caana Construction 12905 Repair/Rehab. of Manila High Sch. NCR 0.962 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
Cager Construction & Supply 21743
Site Development Const. of Standard Day Care Center KV1
(Package 8)PRRC 2.116 O 0.378 0.300 0.100 0.023 0.028 0.100 92.90 -
Camia Construction 20506 Completion of Matuyem Bridge (Phase II) II 4.695 C 0.373 0.215 0.000 - - - 58.80 71.34%
Satisfactory
Camia Construction 20506 Completion of Public Market II 1.096 C 0.328 0.239 0.300 - - - 86.70 78.65% Satisfactory
Camia Construction 20506 Conc. of Dugo-San Vicente Road with Drainage II 5.630 O 0.352 0.264 0.030 0.020 0.023 0.033 72.20 -
Camia Construction 20506 Conc. of Simpatuyo Brgy. Road II 0.942 C 0.281 0.187 0.300 - - - 76.80 *76.80% Satisfactory
Camia Construction 20506 Const. of Balluyan Bridge, Phase II CAR 2.830 C 0.330 0.214 0.300 - - - 84.40 88.42%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 78
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Camia Construction 20506 Const. of Caglayan Flood Control Phase II CAR 2.360 C 0.316 0.195 0.300 - - - 81.10 80.80%
V.Satisfactory
Camia Construction 20506 Const. of Conner National High School CAR 0.473 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V.Satisfactory
Camia Construction 20506
Maint./Rehab. & Impvt. of Nat'l Arterial Sec. Roads Public
Infratructure along Cagayan-Apayao Road, Tuao Pob. Sect.
II 4.998 C 0.324 0.195 0.300 - - - 81.90 *81.90% V.Satisfactory
Camia Construction 20506 Maint./Rehab. Along Apayao (Calanasan-Ilocos Norte Road) CAR 4.588 O 0.325 0.240 0.100 0.030 0.040 0.067 80.20 -
Camia Construction 20506 Repair/Rehab of Priority FMR (Municipal Wide) CAR 1.856 C 0.217 0.200 0.300 - - - 71.70 *71.70%
Satisfactory
Camia Construction 20506 Replacement/Const. of Malabanig Bridge CAR 15.218 C 0.385 0.200 0.300 - - - 88.50 87.12%
V.Satisfactory
Candace Construction 12084Const. & Repair/Rehab. of
Various School Bldgs. (Clustered-1) 1st Batch CY 2004
IX 0.359 C 0.450 - 0.500 - - - 95.00 *95.00% Outstanding
Carlo Joseph Construction 21017 Const. of 1 unit 1Cl Sch. Bldg. @ Lubao Vocational School III 0.285 C 0.324 0.195 0.300 - - - 81.90 *81.90%
V. Satisfactory
Carlo Joseph Construction 21017 Const. of Lined Canal, San Vicente (Part of Package 17) III 2.090 C 0.398 0.204 0.300 - - - 90.20 *90.20%
V. Satisfactory
Carlo Joseph Construction 21017 Improvement of Public Market (Porac Mall) III 2.366 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Carlyz Construction 19776 Const./Repair of DepEd Division Office Phase II CAR 0.946 C 0.205 0.200 0.300 - - - 70.50 *70.50%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 79
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Carlyz Construction 19776Widening/Conc. of Banaue-
Mayoyao Alfonso Lista-Isabela Boundary Road, Kinakin Section
CAR 1.895 C 0.378 0.200 0.300 - - - 87.80 88.20% V. Satisfactory
Carrascal Integrated Enterprises 4764 Completion of Carrascal MPB XIII 1.844 C 0.394 0.200 0.300 - - - 89.40 *89.40%
V. Satisfactory
Carrascal Integrated Enterprises 4764 Completion of Madrid District
Hospital (Phase III) XIII 3.629 C 0.357 0.254 0.300 - - - 91.10 86.20% V. Satisfactory
Carrascal Integrated Enterprises 4764 Completion of MPB XIII 3.635 C 0.366 0.200 0.300 - - - 86.60 93.11%
OutstandingCarrascal Integrated
Enterprises 4764 Completion of Public Market XIII 1.844 C 0.393 0.200 0.300 - - - 89.30 87.55% V. Satisfactory
Carrascal Integrated Enterprises 4764 Conc.of Sibahay-Nurcia Section
(SDCR) XIII 19.285 O 0.355 0.200 0.100 0.030 0.054 0.100 83.90 -
Carrascal Integrated Enterprises 4764 Const. of Abacahan Bridge XIII 10.214 C 0.324 0.200 0.300 - - - 82.40 84.08%
V. Satisfactory
Carrascal Integrated Enterprises 4764 Const. of Adlay Bridge and
Approaches XIII 23.683 C 0.305 0.300 0.300 - - - 90.50 *90.50% Outstanding
Carrascal Integrated Enterprises 4764 Const. of Kayawyawan and
Approaches Bridge 1 XIII 13.806 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
Carrascal Integrated Enterprises 4764 Improvement of Coastal Road
Lanuza XIII 4.551 C 0.370 0.201 0.300 - - - 87.10 85.96% V. Satisfactory
Carry-on Construction 8014 Const. of MPB at Brgy. NBBS NCR 2.850 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Carry-on Construction 8014 Const./Impvt. of MPB NCR 1.916 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 80
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Carlyz Construction 19776Widening/Conc. of Banaue-
Mayoyao Alfonso Lista-Isabela Boundary Road, Kinakin Section
CAR 1.895 O 0.400 0.300 0.100 0.000 0.019 0.050 86.90 -
Casigayan Construction 26796 Const. of MPB, KASC (Phase I) CAR 0.945 C 0.316 0.195 0.300 - - - 81.10 *81.10% V. Satisfactory
Cauayan United Enterprises and Builders 8816 Construction of Canal and Canal
Structures (LMC-ARIP-09-06) NIA-II 1.983 C 0.329 0.133 0.000 0.015 0.028 0.200 70.50 70.51% Satisfactory
Cauayan United Enterprises and Const.
Builders/Brostan Const. & Dev. (JV)
JV-07-168Conc. of Ilagan-Delfin Albano-Mallig National Road (Manano
Section)II 19.290 O 0.372 0.225 0.100 0.010 0.047 0.100 85.40 -
Cauayan United Enterprises and
Construction Builders8816 Conc. of Ilagan-Delfin Albano-
Mallig Road (Olango Section) II 9.648 C 0.335 0.196 0.300 - - - 83.10 *83.10% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Const. of 1 Cl Sch. Bldg. @
Daramuangan E/S II 0.319 C 0.366 0.174 0.300 - - - 84.00 *84.00% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Const. of 5-Units Deep Well
(Light Duty Type), Minate I II 0.184 C 0.260 0.200 0.300 - - - 76.00 *76.00% Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Const. of Flood Control Project II 4.821 O 0.360 0.160 0.100 0.010 0.047 0.200 87.70 -
Cauayan United Enterprises and
Construction Builders8816 Impvt./Rehab. Along Cabatuan-
Enrile Road II 6.717 C 0.286 0.262 0.300 - - - 84.80 *84.80% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 81
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Cauayan United Enterprises and
Construction Builders8816
Impvt./Rehab. Along Cauayan-Cabatuan Road, Cauayan-Luna-
CabatuanII 14.346 C 0.390 0.225 0.300 - - - 91.50 *91.50%
Outstanding
Cauayan United Enterprises and
Construction Builders8816 Impvt./Rehab. Along Gamu-
Roxas Road II 9.646 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Cauayan United Enterprises and
Construction Builders8816 Impvt./Rehab. of Baguio Country
Club Km. 252+768-Km. 254+155 CAR 6.844 C 0.385 0.200 0.300 - - - 89.50 *88.50% V.Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Impvt./Rehab. of Cauayan-
Cabatuan Road II 0.947 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816 Rehab. of FMR at Muñoz West-
Sinamar Road II 0.944 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
Cauayan United Enterprises and
Construction Builders8816
Repair/Rehab. of Alaminos-Bolinao Road, Km. 321+204 -
Km. 323+000I 9.647 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. Satisfactory
Cavacon Corporation (Formerly: Cagayan Valley
Const. Corp.)2622
Const. (Conc.) of Daang Hari Ext. inc. RROW Acquisition, Jct. Molino Blvd. to Aguinaldo
Highway Jct., Imus Section
IV-A 28.895 O 0.327 0.300 0.050 0.030 0.055 0.067 82.90 -
Cavacon Corporation (Formerly: Cagayan Valley
Const. Corp.)2622
Const. (Conc.) of Daang Hari Ext. inc. RROW Acquisition, Jct. Molino Blvd. to Aguinaldo
Highway Jct., Imus Section
IV-A 31.784 C 0.325 0.300 0.300 - - - 92.50 87.07% V. Satisfactory
Cavacon Corporation (Formerly: Cagayan Valley
Const. Corp.)2622 Const. of Ditale Bridge and
Approaches, Brgy. Ditale III 50.474 O 0.338 0.300 0.100 0.024 0.054 0.100 92.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 82
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Cavacon Corporation (Formerly: Cagayan Valley
Const. Corp.)2622 Const. of Ditale Bridge and
Approaches, Brgy. Ditale III 50.474 O 0.353 0.269 0.070 0.030 0.059 0.067 84.80 -
Cavacon Corporation (Formerly: Cagayan Valley
Const. Corp.)2622 Rehabilitation/ Widening
(Concreting) of Paliparan Road IV-A 21.226 O 0.226 0.250 0.100 0.022 0.059 0.100 75.70 -
Cavat Capitol Merchandising &
Construction3112 Conc. of Cagayan-Apayao
National Road, Tuao-Rizal Sect. II 11.859 O 0.356 0.292 0.000 0.030 0.033 0.100 81.10 -
Cavat Capitol Merchandising &
Construction3112 Conc. of Cagayan-Apayao
National Road, Tuao-Rizal Sect. II 11.859 O 0.287 0.240 0.050 0.030 0.033 0.067 70.70 -
Cavat Capitol Merchandising &
Construction3112 Conc. of Naruangan-Culong
Road II 6.266 O 0.319 0.240 0.050 0.030 0.033 0.067 73.90 -
Cavite Ideal International Const. & Development
Corp.5599
Contract Package I, Baguio-Pangawan, Kayapa Section
under Cordillera Road Improvement Project (Baguio-
Aritao Road Improvement Project)
PJHL 1,562.663 O 0.386 0.240 0.100 0.030 0.061 0.100 91.70 -
Cavite Ideal International Const. & Development
Corp.5599
Contract Package I, Baguio-Pangawan, Kayapa Section
under Cordillera Road Improvement Project (Baguio-
Aritao Road Improvement Project)
PJHL 1,562.663 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -
Cavite Ideal International Const. & Development
Corp.5599
CP II, Abuyog-Silago Sect. Under the Arterial Road Links Dev't. Proj., Phase IV (Himayangan-
Silago-Abuyog Road and Liloan-San Ricardo Road Projects)
PJHL 942.477 C 0.353 0.300 0.300 - - - 95.30 94.66% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 83
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Cavite Ideal International Const. & Development
Corp.5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East &
West Service Roads and Pasong Tamo Ext.
URPO 524.467 O 0.367 0.300 0.100 0.030 0.060 0.100 95.70 -
Cavite Ideal International Const. & Development
Corp.5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East &
West Service Roads and Pasong Tamo Ext.
URPO 629.011 O 0.345 0.300 0.100 0.030 0.047 0.100 92.20 -
Cavite Ideal International Const. & Development
Corp.5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport Integrated CP4, SLEX East &
West Service Roads and Pasong Tamo Ext.
URPO 629.011 O 0.360 0.300 0.100 0.030 0.042 0.100 93.20 -
Cavite Ideal International Const. & Development
Corp.5599 Naga-Toledo Road Project
ARLDP Phase IV PJHL 802.856 C 0.378 0.300 0.300 - - - 97.80 97.02% Outstanding
CBN Construction & Supply 16851 Const. and Improvement of
Sibud Main Drainage NIA 6.299 O 0.369 0.216 0.150 0.030 0.064 0.050 87.86 -
CBN Construction & Supply 16851 Conc. of Jct. San Enrique-
Pontevedra By-Pass Road VI 9.245 C 0.367 0.200 0.300 - - - 86.70 85.59% V. Satisfactory
CBN Construction & Supply 16851
Replacement of Dilapidated Concrete/Concrete Paving of Jct. Dan Enriave-Pontevedra By Pass
Rd.
VI 4.542 C 0.371 0.300 0.300 - - - 97.10 90.92% Outstanding
CBN Construction & Supply 16851 Road Upgrading, Jct. Palencia-
Ara Al Campsite Road VI 6.510 C 0.319 0.214 0.300 - - - 83.30 84.62% V. Satisfactory
CBN Construction and Supply 16851
Replacement of Dilapidated Concrete/Concrete Paving of
Bago-Mailum-Mambucal-Canla-on Road
VI 6.141 C 0.301 0.100 0.300 - - - 70.10 80.42% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 84
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
CCM Construction 11043 Tagbilaran Airport Development Project DOTC 6.704 C 0.456 0.200 0.300 - - - 95.60 95.60%
Very Satisfactory
CDC Construction and Supplies 28275 Completion of MPB @
Pamatawan III 0.470 C 0.294 0.194 0.300 - - - 78.80 *78.88% Satisfactory
CDC Construction and Supplies 28275 Const. of 1 Cl 1 Storey Sch.
Bldg. @ Manggahan E/S (Partial) III 0.492 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding
CDC Construction and Supplies 28275 Const. of 3 CL 1 Storey Sch.
Bldg. @ Balaybay E/S (Partial) III 1.319 C 0.346 0.290 0.300 - - - 93.60 *93.60% Outstanding
CDC Construction and Supplies 28275 Const. of 3 CL Sch. Bldg. @ San
Rafael E/S III 1.721 C 0.359 0.276 0.300 - - - 93.50 81.88% V. Satisfactory
CDC Construction and Supplies 28275 Const. of Box Culvert at Tambac-
Viga I 1.140 C 0.260 0.300 0.300 - - - 86.00 *86.00% V. Satisfactory
CDC Construction and Supplies 28275 Const. of MPB (Phase I) III 1.317 C 0.303 0.197 0.300 - - - 80.00 *80.00%
Satisfactory
CDC Construction and Supplies 28275 Const. of Multi-Purpose Bld., @
RMTI, RMTI Compound III 4.658 C 0.241 0.300 0.300 - - - 84.10 72.20% Satisfactory
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building
(Phase I) I 0.948 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
CDC Construction and Supplies 28275 Const. of Sch. Bldg. @
Candelaria Sch. Of Fisheries III 0.490 C 0.306 0.300 0.300 - - - 90.60 *90.60% Outstanding
CDC Construction and Supplies 28275 Construction of Multi-Purpose
Building National High School III 1.853 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
CDC Construction and Supplies 28275 Repair/Rehab. Along Olongapo-
Bugallon Road III 9.800 C 0.304 0.000 0.300 - - - 60.40 *60.40% Fair
CDC Contruction and Supplies 28275 Const. of Multi-Purpose Bldg.
Ramon Magsaysay Tech. Inst. III 4.658 O 0.193 0.180 0.100 0.030 0.020 0.100 62.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 85
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
CDC Contruction and Supplies 28275 Const. of Multi-Purpose Building I 0.949 C 0.352 - 0.500 - - - 85.20 *85.20%
V. Satisfactory
CDU Construction 13915 Const. of One CL School Building, Tarangnan NHS VIII 0.382 C 0.385 0.100 0.300 - - - 78.50 *78.50%
Satisfactory
C.E. Padilla Construction 11278 Guadalupe Viejo Linear Park cum Revetment Wall Project PRRC 49.604 O 0.390 0.297 0.100 0.030 0.049 0.100 96.60 -
Cebu 7H Technochem Industries, Inc. 31578 Impvt./Rehab. Along JCT. (TER)
Loay Interior Road VII 8.806 C 0.180 0.300 0.300 - - - 78.00 *78.00% Satisfactory
Cebu 7H Technochem Industries, Inc. 31578 Rehab. of Loay Interior Road/
Loboc-Bilar-Carmen Section VII 9.640 C 0.386 - 0.500 - - - 88.60 89.74% V. Satisfactory
Cebu Haydter Construction 31630Const. of Drainage System @ Brgys. San Nicolas and Basak
PardoVII 0.958 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
Cebu Young Construction 3195 Const. of Multi-Purpose Building @ Inayawan E/S VII 0.956 C 0.383 0.300 0.300 - - - 98.30 92.56%
Outstanding
Cedan Construction 10172 Asphalt Overlay along Olongapo-Bugallon Road Iba Section, Iba III 9.498 C 0.398 0.300 0.300 - - - 99.80 *99.80%
Outstanding
Cedan Construction 10172 Const. of Magsaysay Bridge I 4.799 C 0.365 0.300 0.300 - - - 96.50 79.16% Satisfactory
Cedan Construction 10172 Rehab. of La Paz Multi-Purpose Building III 1.408 C 0.427 - 0.500 - - - 92.70 *92.70%
Outstanding
Cedan Construction 10172 Rehab./Impvt. of Mogpog-Sta. Cruz Road (Phase I) IV-B 14.243 C 0.265 0.200 0.300 - - - 76.50 *76.50%
Satisfactory
Cedan Construction 10172
Rehab./Reconst. of Damaged National Road, Pangasinan-
Zambales Road (Sual & Infanta Sect.)
I 21.229 C 0.212 0.201 0.300 - - - 71.30 *71.30% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 86
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Cedan Construction 10172 Repair of Dikes along Alusiis Creek III 28.517 C 0.213 0.300 0.300 - - - 81.30 80.34%
V. Satisfactory
Cedar Construction 24865 Const. of Multi-Purpose Building III 0.948 C 0.317 0.300 0.300 - - - 91.70 85.40% V. Satisfactory
Cedar Construction 24865 Impvt. of Angeles-Porac-Dinalupihan Road III 9.601 C 0.236 0.300 0.300 - - - 83.60 90.26%
Outstanding
Cedar Construction 24865Impvt./Rehab. of Brgy. Roads at
Quebiawan, San Agustin & Dolores
III 6.656 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
Cedar Construction 24865 Impvt./Rehab. of Cabalantian Road III 6.674 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
Cedar Construction 24865Repair/Rehab. of Jose Abad
Santos Ave. (Formerly Gapan-Olongapo Road)
III 4.728 C 0.341 0.225 0.300 - - - 86.60 *86.60% V. Satisfactory
Cedar Construction 24865
Repair/Rehab. of Jose Abad Santos Ave. (Formerly Gapan-
Olongapo Road) Bacolor to City of San Fernando
III 4.771 C 0.346 0.226 0.300 - - - 87.20 *87.20% V. Satisfactory
Celso C. Ferrer Contractor 10643Conc. of Bambang-Kasibu-Quezon-Solano Road (San
Fernando Sect.)II 47.758 O 0.366 0.240 0.100 0.030 0.033 0.067 83.60 -
Celso C. Ferrer Contractor 10643 Impvt./Conc. of Baler-Casiguran Road (Lobbot-Gupa Section) III 47.860 C 0.314 0.300 0.300 - - - 91.40 93.92 %
Outstanding
Central Mindanao Const. Multi-Purpose Cooperative 23697 Completion of 1-Unit PWSP XII 1.862 C 0.440 - 0.500 - - - 94.00 87.10%
V. Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of Footbridge XII 0.231 C 0.394 - 0.500 - - - 89.40 86.64%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 87
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of Kisante CES Multi
Purpose Bldg. XII 0.238 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of MPB @ Pilot Provincial
Science and Technology H/S XII 1.907 O 0.211 0.300 0.100 0.030 0.016 0.067 72.40 -
Central Mindanao Const. Multi-Purpose Cooperative 23697
Slope Protection along Marbol River (Marbol Bridge),
Kidapawan Magpet-Pangao-an Road
XII 1.149 C 0.200 0.300 0.300 - - - 80.00 * 80.00% Satisfactory
Cesar T. Carpio Construction 20833 Const. of Two (2) CL School
Building @ Cawayan E/S VIII 0.861 C 0.349 0.200 0.300 - - - 84.90 77.97% Satisfactory
Cesar T. Carpio Construction 20833
Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-
Canjumadal Road
VIII 9.295 O 0.240 0.225 0.100 0.030 0.037 0.100 73.20 -
Cesar T. Carpio Construction 20833
Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-
Canjumadal Road
VIII 9.295 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -
Cesar T. Carpio Construction 20833 Reflectorized Road Pavement
Markings & Road Signs VIII 0.957 C 0.400 0.000 0.300 - - - 70.00 *70.00% Fair
Cesar T. Carpio Construction 20833 Repair/Rehab. of Catarman-
Calbayog Road VIII 9.594 O 0.364 0.240 0.100 0.030 0.032 0.100 86.60 -
CGGA Builders & Enterprises 23762 Completion of Multi-Purpose
Building VIII 0.232 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
CGGA Builders & Enterprises 23762 Conc. of Shoulder at Manlurip
Arthur Park Road VIII 1.897 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
CGGA Builders & Enterprises 23762 Const. of Cabibihan Bridge VIII 4.960 C 0.245 0.200 0.300 - - - 74.50 72.10%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 88
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
CGGA Builders & Enterprises 23762
Rehab. of Layog Bridge Approach along Maharlika
HighwayVIII 4.603 C 0.334 0.223 0.300 - - - 85.70 *85.70%
V. Satisfactory
CGI Construction 11346
Improvement of CICs in the Municipality of Ocampo,
Camarines Sur, namely; Gatibo, Hibago & San Antonio
NIA-V 2.362 C 0.400 0.300 0.000 - - - 70.00 *70.00% Fair
Cha Construction and Supply 28420 Const. of 2-CL School Bldg. V 0.923 C 0.444 - 0.500 - - - 94.40 78.34%
Satisfactory
Cha Construction and Supply 28420 Const. of 2-Rooms School Bldg. V 0.468 C 0.402 - 0.500 - - - 90.20 *90.20%
Outstanding
Cha Construction and Supply 28420 Const. of Multi-Purpose Building
at Camarines Sur H/S V 2.080 C 0.396 0.120 0.300 - - - 81.60 *81.60% V. Satisfactory
Cha Construction and Supply 28420 Repair of One CL Sch. Bldg., La
Purisima E/S V 0.283 C 0.387 0.200 0.300 - - - 88.70 *88.70% V. Satisfactory
Cha Construction and Supply 28420 Road Concreting at San Lucas-
Poro Access Road V 1.405 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding
Cha Construction and Supply 28420 Road Concreting at Talidtid-Sta.
Cruz V 1.891 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
Cha Construction and Supply 28420 Road Concreting of Bonot-Sta.
Rosa Road V 1.891 C 0.297 0.200 0.300 - - - 79.70 *79.70% Satisfactory
Charlmelday Construction Supply & Services 32181 Rehabilitation of Sta. Cruz RIS NIA 4.531 C 0.364 0.18 0.300 - - - 84.40 84.40%
V. Satisfactory
Charlz Construction 8709 Completion of Brgy. Azucena MPB XIII 0.961 C 0.328 0.200 0.000 - - - 52.80 71.91%
Satisfactory
Charlz Construction 8709 Completion of MPB @ Brgy. 18 X 0.456 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 89
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Charlz Construction 8709Conc. of N.G. Escario Extension
(from Gorordo Ave. to Arch. Reyes Ave.)
VII 7.715 O 0.309 0.300 0.100 0.030 0.040 0.100 87.90 -
Charlz Construction 8709Conc. of N.G. Escario Extension
(from Gorordo Ave. to Arch. Reyes Ave.)
VII 7.715 O 0.330 0.200 0.100 0.023 0.033 0.100 78.60 -
Charlz Construction 8709 Const. of 2 Units, 2 Storey, 10 CL @ Taptap E/S Bldg. VII 13.360 O 0.365 0.225 0.100 0.030 0.045 0.100 86.50 -
Charlz Construction 8709 Const. of 2-Cl Building @ Taglimao ES X 0.849 O 0.400 0.300 0.100 0.030 0.026 0.100 95.60 -
Charlz Construction 8709 Const. of 3 CL for the Camaman-an NHS X 1.402 C 0.348 0.184 0.300 - - - 83.20 *83.20%
V. Satisfactory
Charlz Construction 8709Const. of 3 Storey, 9 Cl
Secondary Sch. Bldg. @ Adlaon NHS
VII 5.711 C 0.364 0.300 0.300 - - - 96.40 88.35% V. Satisfactory
Charlz Construction 8709Const. of Covered Canal,
Misamis Oriental-Bukidnon-Agusan Road
X 4.729 C 0.290 0.200 0.300 - - - 79.00 81.64% V. Satisfactory
Charlz Construction 8709Const. of MPB Manolo Fortich
Municipal Hall Phase X, Calanawan
X 4.728 C 0.363 0.200 0.300 - - - 86.30 83.13% V. Satisfactory
Charlz Construction 8709
Const. of Pedestrian Overpass (Skywalk) across Imus St., near
Sikatuna St. Jct., Brgy. Zapatera-T. Padilla
VII 4.695 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Charlz Construction 8709 Const. of Tertiary Sch. Bldg. (NBCC Phase II) X 2.360 C 0.262 0.157 0.300 - - - 71.90 73.44%
Satisfactory
Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang
RoadX 22.146 O 0.291 0.151 0.100 0.023 0.045 0.100 71.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 90
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang
RoadX 22.155 O 0.308 0.056 0.100 0.030 0.065 0.100 65.90 -
Charlz Construction 8709 Const. of Two (2) Storey DPWH Office Building X 2.888 O 0.323 0.300 0.100 0.030 0.018 0.067 83.80 -
Charlz Construction 8709 Const. of Two-Storey DPWH Office Bldg. X 2.878 C 0.393 0.200 0.300 - - - 89.30 84.19%
V. Satisfactory
Charlz Construction 8709 Rehab./ Impv't. of DPWH 3rd DEO Bldg., Dicklum X 0.789 C 0.373 0.300 0.300 - - - 97.30 93.10%
Outstanding
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
X 38.539 O 0.243 0.300 0.050 0.030 0.047 0.033 70.30 -
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
X 38.539 O 0.263 0.300 0.100 0.030 0.050 0.100 84.30 -
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
X 38.527 O 0.316 0.300 0.100 0.015 0.041 0.100 87.20 -
Charlz Construction 8709Replacement of Datu Bailey
Bridge to RCBC (Jct. Osmeña-Pilar Road)
XIII 11.567 C 0.328 0.300 0.000 - - - 62.80 69.70% Fair
Chedmaryl Construction & Supplies 27073 Const./Repair of MPB VI 1.903 C 0.289 0.000 0.300 - - - 58.90 76.75%
Satisfactory
Che-Riss Constructon & Trading 26557 Riprapping of Creek IVA 1.918 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 91
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Chiara Construction 8736Const. of 18 lm. RCDG Bridge at
San Fernando City By Pass Road
I 9.409 O 0.333 0.266 0.100 0.030 0.025 0.067 82.10 -
Chiara Construction 8736Const. of 18 lm. RCDG Bridge at
San Fernando City By Pass Road
I 9.408 O 0.306 0.240 0.100 0.030 0.047 0.100 82.30 -
Chiara Construction 8736Const. of 18 lm. RCDG Bridge at
San Fernando City By Pass Road
I 9.399 O 0.289 0.215 0.100 0.022 0.027 0.100 75.30 -
Chiara Construction 8736Const. of Two (2) Storey
Building / Library at Tarlac State University, Lucinda Campus
III 14.416 O 0.388 0.180 0.100 0.030 0.022 0.100 82.00 -
Chiara Construction 8736 Retrofitting of Kalibo Bridge Phase III VI 9.013 C 0.313 0.300 0.300 - - - 91.30 *91.30%
Outstanding
Chief Construct Trading & Supplies, Inc. 30094
Road Conc. of Provincial Road Cacarong Matanda-Pandi &
Daungan, Guiguinto, Bagong Silang
III 0.952 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory
China Geo-Engineering (Phil.) Corporation
SL2-SN-00054
Casecnan Multi-Purpose Irrigation & Power Project NIA 1,108.222 O 0.342 0.175 0.100 0.030 0.056 0.200 90.30 -
China Geo-Engineering (Phil.) Corporation
SL2-SN-00054
Const. of Super Diversion Canal(Sta. 19+200 to Sta.
26+600)NIA-III 1215.409 O 0.343 0.200 0.100 0.024 0.042 0.200 90.90 -
China Geo-Engineering (Phils.) Corp. FC-03-020
Baguio-Aritao Road Impvt. Project CP II, Pangawan-Aritao-
Kayapa SectionPJHL 858.809 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
China Geo-Engineering (Phils.) Corporation FC-03-021 Casecnan Multi-purpose
Irrigation & Power Project-IC NIA 1.242 C 0.340 0.300 0.300 - - - 93.96 93.96% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 92
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
China Geo-Engineering (Phils.) Corporation
SL2-SN-000459
MWCR-CP VI, Mamburao-Abra De Ilog Section PJHL 858.783 C 0.316 0.300 0.300 - - - 91.60 95.38%
Outstanding
China Harbour Engineering Company FC-98-264 CP5, Cervantes-Mankayan-
Abatan, Phase V PJHL 682.000 O 0.369 0.300 0.100 0.030 0.051 0.100 95.00 -
China International Water & Electric Company
SL1-SN-004851
Bago River Irrigation System Rehabilitation & Improvement
Project (Rehabilitation, Improvement and Cons. Of BRIS
Facilities)
NIA-VI 731.862 O 0.317 0.244 0.050 0.024 0.033 0.033 70.00 -
China International Water & Electric Corp.
FC-05-0003
IFCP Phase II, Package II, Impvt. Of Jaro Mouth, Iloilo River &
Upper Ignore CreekMFCP-I 556.925 O 0.368 0.200 0.100 0.030 0.065 0.200 96.30 -
China International Water & Electric Corp. FC-03-028
IFCP Phase II, Package II, Impvt. of Jaro Mouth, Iloilo River &
Upper Ingore CreekMFCP-I 507.803 O 0.383 0.200 0.100 0.030 0.060 0.200 97.30 -
China International Water & Electric Corp.
FC-05-0003
IFCP Phase II, Package II, Impvt. Of Jaro Mouth, Iloilo River &
Upper Ingore CreekMFCP-I 549.395 O 0.383 0.200 0.100 0.030 0.061 0.200 97.40 -
China International Water & Electric Corp. FC-03-028
Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan
River Impv't. (East Bank) & Cut-off Channel
NIA 889.009 C 0.392 0.288 0.300 - - - 98.00 98.63% Outstanding
China International Water & Electric Corp. FC-03-028 Rehab. of Malalag-Malita-Jose
Abad Santos Road IBRD 533.694 C 0.393 0.300 0.300 - - - 99.30 97.53% Outstanding
China International Water & Electric Corporation
SL1-SN-004851
Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 820.162 O 0.345 0.247 0.100 0.030 0.028 0.067 81.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 93
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
China International Water & Electric Corporation
SLI-SN-004852
Casecnan Multi-purpose Irrigation & Power Project NIA 476.722 C 0.376 0.300 0.300 - - - 93.05 93.05%
Outstanding
China International Water and Electric Company
FC-06-004 FC-05-003
Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 731.861 O 0.317 0.244 0.05 0.024 0.033 0.033 70.10 -
China International Water and Electric Corporation
SL1-SN-004851
Bago River Irrigation System Rehabilitation Project NIA 7.037 O 0.349 0.153 0.000 0.024 0.033 0.133 69.20 69.20%
Fair
China National Constructional and
Agricultural Machinery Import and Export
Corporation (CAMC)
NO LICENSE
Banaoang Pump Irrigation Project NIA USD 38.475
M O 0.387 0.059 0.070 0.024 0.028 0.133 70.10 -
China Road & Bridge Construction
SL2-SN-000479
CP 1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) PJHL 952.564 O 0.386 0.300 0.100 0.030 0.035 0.100 95.10 -
China Road & Bridge Corporation
SL2-SN-000479
Const./Impv't. of CP VIII, Bayawan-Kalumboyan Road
Project, Sta. 0+000-Sta.17+369.88RRNDP 211.007 C 0.368 0.300 0.300 - - - 96.80 94.22%
Outstanding
China Road & Bridge Corporation
SL-I-SN-004585/FC-
03-029
Contract Package I, Himayangan Silago Sect., Arterial road links
Dev't. Project, Phase IVPJHL 914.127 C 0.346 0.300 0.300 - - - 0.95 94.60%
Outstanding
China Road & Bridge Corporation
SL-2-SN-000631
Contract Package III, Calbayog-Gatanguit Road Sect., Arterial
road links Dev't. Project, Phase VI
PJHL 1,397.424 O 0.398 0.300 0.100 0.030 0.070 0.100 99.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 94
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
China Road & Bridge Corporation
SL-2-SN-000631
Contract Package III, Calbayog-Gatanguit Road Sect., Arterial
road links Dev't. Project, Phase VI
PJHL 1,397.424 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -
China Road & Bridge Corporation
SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)
Km.175+423-Km.204+609/Km.0+000-
Km.50+537
PJHL 952.564 O 0.373 0.300 0.100 0.030 0.057 0.100 96.00 -
China Road & Bridge Corporation
SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)
Km.175+423-Km.204+609/Km.0+000-
Km.50+537
PJHL 1,135.918 O 0.352 0.300 0.100 0.030 0.070 0.100 95.20 -
China Road & Bridge Corporation
SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)
Km.175+423-Km.204+609/Km.0+000-
Km.50+537
PJHL 1,135.918 O 0.349 0.300 0.100 0.030 0.070 0.100 94.90 -
China State (Phils.) Construction Eng'g. Corp. FC-02-072
CP 2, Catarman-Calbayog via Lope de Vega Road under the
Arterial Road Links Development Project, Phase V
PJHL 643.720 C 0.349 0.300 0.300 - - - 94.90 92.07% Outstanding
China State (Phils.) Construction Eng'g. Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
URPO 486.343 O 0.271 0.250 0.100 0.020 0.060 0.100 80.10 -
China State (Phils.) Construction Eng'g. Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
URPO 486.343 O 0.360 0.243 0.100 0.030 0.047 0.100 88.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 95
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
China State (Phils.) Construction Eng'g. Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
URPO 606.345 O 0.340 0.300 0.050 0.030 0.056 0.067 84.30 -
China State (Phils.) Construction Eng'g. Corp. FC-98-270 Const. of Package 6PY-1 ADB 706.209 C 0.466 - 0.500 - - - 96.60 92.04%
Outstanding
China State (Phils.) Construction Engineering
Corp.
SL1-SN-004314/FC-
02-072
CP 2, Catarman-Calbayog via Lope de Vega Road under the
Arterial Road Links Development Project, Phase V
PJHL 621.279 O 0.388 0.300 0.100 0.030 0.047 0.100 96.50 -
China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)
SL1-SN-004611/FC-
03-045
Metro Manila Urban Transport Integration Project (MMURTRIP),
Phase I, Package 3: Marikina Bridge and Access Road
URPO 1,178.833 C 0.387 0.300 0.300 - - - 98.70 94.56% Outstanding
China State Construction Engineering Corporation FC-02-039 Casecnan Multi-purpose
Irrigation & Power ProjectCasecnan
MIPP 562.647 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
China State Construction Engineering Corporation FC-02-039
CP 1, Alegria-Santiago Sect. Under the PJHL, Mindanao Sect.
Rehab. Project, Phase IIPJHL 540.791 C 0.384 0.300 0.300 - - - 98.40 96.56%
Outstanding
Chivas Construction 28316 Rehabilitation of Abra-Kalinga Road, Km.434+960-Km.435+260 CAR 1.872 O 0.371 - 0.500 - - - 87.10 -
CHL Construction and Development Enterprises,
Inc.15001
Conc./Widening of Marbel-Tupi-Makar Road (Glamang-Silway 8
Section)XII 8.674 C 0.385 0.214 0.300 - - - 89.90 88.22%
V. Satisfactory
CHL Construction and Development Enterprises,
Inc.15001 Const. of Circumferential Road
(Western Section) XII 3.822 C 0.328 0.285 0.300 - - - 91.30 *91.30% Outstanding
Cholo Construction & Trading 32138 Const./Conc./Rehab./Completion
of San Miguel Brgy. Road III 0.472 C 0.328 0.200 0.300 - - - 82.80 81.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 96
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Cholo Construction & Trading 32138 Const./Repair/Completion of San
Juan FMR III 0.952 C 0.298 0.300 0.300 - - - 89.80 *89.80% V. Satisfactory
Cholo Construction & Trading 32138 Const./Repair/Completion of San
Vicente Brgy. Road III 0.380 C 0.339 0.300 0.300 - - - 93.90 *93.90% Outstanding
Chris-James Construction 11202Conc. Reblocking along Ferry Terminal-San Juan Section,
Ferry Terminal-Caglanipao Rd. VIII 6.921 C 0.165 0.300 0.300 - - - 76.50 60.60%
Fair
Chris-James Construction 11202 Repair/Rehab. of Roadslip along Maharlika Highway VIII 4.678 O 0.267 0.145 0.100 0.015 0.013 0.100 64.00 -
Christian Ian Construction Corporation 8191 Completion of Sports Complex
@ North Cental E/S III 52.383 O 0.399 0.300 0.100 0.030 0.040 0.100 96.90 -
Christian Ian Construction Corporation 8191
Impvt./Widening of McArthur Highway Phase III, Package IV, Replacement of Tiaong Bridge
III 38.596 C 0.240 0.180 0.300 - - - 72.00 *72.00% Satisfactory
Christian Ian Construction Corporation 8191
Rehab./Replacement of San Luis Bridge and Approaches along San Luis-Sto. Domingo Road
III 113.144 O 0.382 0.201 0.100 0.030 0.037 0.100 85.00 -
Cielito A. Bay-ag Construction 19032
Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road,
Tadji-Runruno Section, Km. 312+300-Km.312+380
II 0.954 C 0.339 0.300 0.300 - - - 93.90 86.76% V. Satisfactory
Cielito A. Bay-ag Construction 19032 Const. of FMR @ Brgy. Yaway II 0.282 C 0.309 0.200 0.300 - - - 80.90 *80.90%
V. Satisfactory
Cielito A. Bay-ag Construction 19032 Const./Completion of Multi-
Purpose Bldg. at Kayapa H/S II 0.909 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #1)II 234.155 O 0.400 0.296 0.100 0.030 0.060 0.100 98.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 97
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #1)II 198.304 O 0.350 0.263 0.100 0.030 0.032 0.100 87.50 -
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #2)II 234.155 O 0.391 0.300 0.100 0.030 0.061 0.067 94.90 -
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfina Albano
RoadII 198.304 O 0.380 0.000 0.100 0.030 0.033 0.100 64.30 -
Ciriaco Corporation 6932Const. of Domalandan Bridge, Lingayen-Labrador Road (SA
#4 & #5)I 216.544 C 0.383 0.300 0.300 - - - 98.30 97.16%
Outstanding
Ciriaco Corporation 6932Const. of Domalandan Bridge, Lingayen-Labrador Road (SA
#4)I 77.193 C 0.354 0.300 0.300 - - - 95.40 93.72%
Outstanding
Ciriaco Corporation 6932
Reconstruction of Governor Generoso I (Bankerohan) Bridge over Davao River along Davao-
Cotabato Road McArthur Highway
XI 206.649 C 0.376 0.300 0.300 - - - 97.60 94.66% Outstanding
Clifford Construction Corporation 3724 Completion of Janipaan Bridge,
Phase II VI 12.494 C 0.365 0.300 0.300 - - - 96.50 96.11% Outstanding
Clifford Construction Corporation 3724 Completion of Pasanghilan
Bridge VI 6.431 C 0.348 0.300 0.000 - - - 64.80 70.50% Satisfactory
Clifford Construction Corporation 3724 Conc. of Iloilo East-West Road,
San Rafael-Passi Section VI 19.094 C 0.364 0.200 0.300 - - - 86.40 85.20% V. Satisfactory
Clifford Construction Corporation 3724
Conc. of Jct. Bancal-Leon-Antique Bdry. Road, Alimodian-
Leon SectionVI 4.833 C 0.294 0.226 0.300 - - - 82.00 85.30%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 98
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Clifford Construction Corporation 3724 Const. of Altavas Bridge VI 15.755 C 0.349 0.230 0.000 - - - 57.90 69.92%
Fair
Clifford Construction Corporation 3724 Const. of Dumga Bridge VI 13.932 C 0.311 0.200 0.300 - - - 81.10 84.73%
V. Satisfactory
Clifford Construction Corporation 3724 Const. of Padanghilan Bridge
(Phase I) VI 4.868 C 0.333 0.300 0.300 - - - 93.30 87.14% V. Satisfactory
Clifford Construction Corporation 3724 Retrofitting/Underpinning of
Kalibo Bridge (Phase I) VI 4.801 C 0.356 0.300 0.300 - - - 95.60 92.72% Outstanding
CLTG Builders 16852 Concrete Revetment of Sasa Creek along Davao-Agusan Road XI 3.770 C 0.214 0.300 0.300 - - - 81.40 80.32%
V. Satisfactory
CLTG Builders 16852 Concreting of Road @ Purok Sagrada Familia, Brgy. Indangan XI 1.413 C 0.299 - 0.500 - - - 79.90 87.58%
V. Satisfactory
CLTG Builders 16852 Impv't/Conc. of Toril-Bayabas-Eden Road XI 2.788 C 0.340 0.300 0.300 - - - 94.00 92.80%
Outstanding
CLV Enterprises 18512 Completion of MPB (Phase III) X 0.267 C 0.367 0.231 0.300 - - - 89.80 *89.80% V. Satisfactory
CLV Enterprises 18512 Const. MPB (Phase II) @ Mabuhay X 0.942 O 0.328 0.300 0.100 0.015 0.032 0.067 84.20 -
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Const. of Bayan-Cabahian Farm-
to-Market Road XIII 13.790 O 0.347 0.200 0.100 0.030 0.056 0.100 83.30 -
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Const./Widening of Dinagat-
Loreto Road (Busay-Pangi Sect.) XIII 2.500 C 0.320 0.300 0.000 - - - 62.00 67.88% Faiir
CM Tan Construction (Formerly: CM Tan Const.
Supplies)28087 Upgrading of Kong Street XIII 3.954 C 0.364 - 0.500 - - - 86.40 *86.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 99
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Coastland Construction and Development Corp. 11487 Conc. of Bilawan Road XI 0.945 C 0.262 0.300 0.300 - - - 86.20 83.68%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Conc. of Mati-Maragusan Road
(Tawas-Taguibo Section) XI 14.021 O 0.287 0.289 0.100 0.030 0.060 0.100 86.60 -
Coastland Construction and Development Corp. 11487 Concreting of Magsaysay Road XI 1.130 O 0.361 0.240 0.100 0.020 0.051 0.100 87.20 -
Coastland Construction and Development Corp. 11487
Const./Impvt. of Poblacion-Pintatagan Section along Mati-
Tagum RoadXI 9.441 C 0.274 0.285 0.300 - - - 85.90 84.10%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Impvt. of Manikling-Sigaboy
Road (Talisay-Launion Section) XI 6.931 C 0.256 0.277 0.300 - - - 83.30 90.44% Outstanding
Coastland Construction and Development Corp. 11487
Maint./Rehab. & Impv't. of National Roads of Davao
Oriental-Surigao del Sur Road, Piso Sect.
XI 9.784 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory
Cofejok Construction and Supply 27493 Competion of Multi-Purpose
Bldg., Lamba XII 1.036 C 0.360 0.300 0.300 - - - 96.00 90.19% Outstanding
Cofejok Construction and Supply 27493 Completion of MPB at Brgy.
Estrella XII 1.190 C 0.33 0.261 0.300 - - - 89.10 *89.10% V. Satisfactory
Cofejok Construction and Supply 27493
Completion of Multi-Purpose Building (Mini Gym) @ Tres de
MayoXII 1.420 O 0.331 0.227 0.100 0.020 0.040 0.100 81.80 -
Cofejok Construction and Supply 27493 Completion of Multi-Purpose
Building @ Pamantingan XII 0.289 C 0.315 0.300 0.300 - - - 91.50 *91.50% Outstanding
Cofejok Construction and Supply 27493 Const. of 1 CL Sch. Bldg. at San
Emmanuel NHS XII 0.492 C 0.399 0.131 0.300 - - - 83.00 *83.00% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of 2-Cl, Academic Bldg.
@ Davao del Sur NHS XI 0.658 C 0.393 - 0.500 - - - 89.30 90.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 100
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Cofejok Construction and Supply 27493
Const. of 2-Storey Academic Bldg. @ Sta. Cruz NHS, Package
IR-XI 1.468 C 0.309 - 0.500 - - - 80.90 82.72%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB XI 1.714 C 0.332 0.200 0.300 - - - 83.20 88.03%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB @ Esperanza
NHS XII 0.922 C 0.33 0.257 0.300 - - - 88.70 86.04% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB @ New Panay
NHS XII 0.920 C 0.365 0.267 0.300 - - - 93.20 82.00% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB at Bayya E/S XII 0.481 C 0.374 0.072 0.300 - - - 74.60 81.46%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of Sch. Bldg. at Brgy.
Biwang E/S XII 0.461 C 0.281 0.072 0.300 - - - 65.30 *65.30% Fair
Cofejok Construction and Supply 27493 Impvt. of MPB, Poblacion XII 1.881 O 0.310 0.240 0.070 0.030 0.032 0.100 78.20 -
Cofejok Construction and Supply 27493 Renovation of Multi-Purpose
Bldg., Brgy. Poblacion CES XII 1.283 C 0.371 0.152 0.300 - - - 82.30 82.30% V. Satisfactory
Cofejok Construction and Supply 27493 Repair of MPB @ Municipal Trial
Court Poblacion XII 0.288 O 0.351 0.240 0.100 0.030 0.021 0.100 84.20 -
Colina Construction 18841 Const. of 1 unit School Building V 0.461 C 0.286 0.200 0.300 - - - 78.60 *78.60% Satisfactory
Collera's Construction 13246 Conc. of Sta. Fe-San Isidro-Pulak Road VIII 4.748 O 0.310 0.272 0.100 0.030 0.033 0.100 84.50 -
Collera's Construction 13246 Concrete Paving of Sta. Fe-San Isidro-Pulak Road VIII 4.748 C 0.333 0.300 0.300 - - - 93.30 88.02%
V. Satisfactory
Collera's Construction 13246 Concreting of Critical Portion of National Circumferential Road VIII 3.832 C 0.418 - 0.500 - - - 91.80 61.32%
Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 101
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Collera's Construction 13246Const. of Multi-Purpose Building
(ABC Hall) @ Palo Municipal Compound
VIII 1.446 C 0.388 0.300 0.300 - - - 98.80 *98.80% Outstanding
Collera's Construction 13246 Const. of Multi-Purpose Building (Inner Court) VIII 1.900 C 0.347 0.300 0.300 - - - 94.70 89.24%
V. Satisfactory
Collera's Construction 13246 Rehab. of Government Center Road Network VIII 9.640 C 0.370 0.200 0.300 - - - 87.00 86.76%
V. Satisfactory
Compass Rose Builders 27024 Conc. of Bua FMR CAR 0.189 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory
Compass Rose Builders 27024 Const. of Poblacion Water System Phase II CAR 0.939 C 0.365 0.000 0.300 - - - 66.50 *66.50%
Fair
Compass Rose Builders 27024Repair/Rehab. of Flood Control
along Kennon-Agat-National Road
CAR 4.619 C 0.244 0.235 0.300 - - - 77.90 *77.90% Satisfactory
Compass Rose Builders 27024 Repair/Rehab. of Pacalso E/S CAR 0.286 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge X 16.558 C 0.368 0.300 0.300 - - - 96.80 87.50%
V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge
Approaches and Access Road X 29.128 C 0.356 0.252 0.300 - - - 90.80 88.82% V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge XIII 28.876 C 0.286 0.300 0.300 - - - 88.60 90.61%
Outstanding
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along
Surigao-Davao Coastal Road XIII 81.615 O 0.286 0.300 0.100 0.030 0.059 0.100 87.50 -
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-La Paz Bridge
along SDCR (Alternate Route) XIII 106.050 O 0.276 0.300 0.070 0.030 0.059 0.100 83.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 102
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Concepcion Basic Builders, Incorporated 5255 Repair/Rehab. of Patin-ay Bridge
2, Agusan-Davao Road XIII 10.468 C 0.370 0.293 0.300 - - - 96.30 94.53% Outstanding
Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase I II 0.961 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase II II 0.770 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
Congimar Mechanical Services 31490 Repair/Rehab. of District
Hospital @ Bayambang I 0.373 C 0.287 0.300 0.300 - - - 88.70 89.61% V. Satisfactory
Constructicons, Inc. 31632 Conc. of Unisan-Panaon-Talaba-Summit Road IV-A 5.106 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
Constructicons, Inc. 31632 Rehab./Const. (Conc.) of Talaba-Summit-Panaon National Road IV-A 3.855 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538
Conc. of Bual Bridge Approaches including Slope Protection along Makilala Jct.
National Road
XII 7.625 C 0.347 0.200 0.300 - - - 84.70 85.42% V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538
Const. of 1 unit 1 CL Modified Sch. Bldg., @ Ray Buenaventura
Sabulao Memorial E/SXII 0.515 C 0.374 0.233 0.300 - - - 90.70 *90.70%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Access Road Dep-Ed XII 0.433 C 0.323 0.249 0.300 - - - 87.20 *87.20%
V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.070 0.030 0.028 0.133 86.10 -
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.000 0.015 0.023 0.000 63.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 103
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 O 0.400 0.200 0.000 0.030 0.027 0.133 79.00 -
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Gabaldon Bldg. at
M'lang Pilot Central School XII 0.463 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538 Const. of MPB @ DTI Training
Center XII 0.477 C 0.378 0.300 0.300 - - - 97.80 *97.80% Outstanding
Constructor's Development Multi-Purpose Cooperative 31538
Const./ Completion of Multi-Purpose Bldg., at Senior Citizens
KinsanteXII 0.228 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538
Const./Completion of Multi-Purpose Pavement Kampo Uno,
SaguingXII 0.159 C 0.371 0.300 0.300 - - - 97.10 *97.10%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538
Const./Completion of Multi-Purpose School Building (2-
Span Covered Court), Phase IIXII 0.466 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538 Const./Completion of PWSP @
Purok 6 (Calzado) XII 0.528 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Crazy Cut Construction 18324 Completion of Baguio Health Center CAR 1.905 C 0.378 0.300 0.300 - - - 97.80 92.76%
Outstanding
Crazy Cut Construction 18324 Conc. of Outlook Drive, km. 254+887-Km. 254.987 CAR 2.892 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V.Satisfactory
Crazy Cut Construction 18324 Const. of Wanga FMR, Tetep-an CAR 4.786 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 104
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Crazy Cut Construction 18324
Rehab. of Drainage Chanum Street & Lake Drive of Balili River Control along Manuel
Roxas St. & Flood Control along Brgy. Amparo Heights Camp 7
CAR 0.311 C 0.311 0.271 0.300 - - - 88.20 *88.20% V. Satisfactory
Crazy Cut Construction 18324 Repair of Maba-ay NHS Bldg. CAR 0.738 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory
CRDC Construction 29738 Repair/Rehab. of Various Sch. Bldgs., Tabiawan E/S IX 0.027 O 0.201 0.300 0.100 0.015 0.070 0.100 78.60 -
Crest Construction 15240 Const. of San Pedro Bridge (Phase 1) II 4.782 C 0.343 0.300 0.300 - - - 94.30 94.72%
Outstanding
Crest Construction 15240 Const. of San Pedro Bridge (Phase II) II 14.322 C 0.371 0.200 0.300 - - - 87.10 87.55%
V. Satisfactory
Crishelle Construction 17108 Completion of Multi-Purpose Building IV-B 0.369 C 0.396 0.238 0.300 - - - 93.40 *93.04%
Outstanding
Crishelle Construction 17108 Concreting of Brgy Roads @ Brgy. Pancol IV-B 0.458 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
Crishelle Construction 17108 Concreting of Palawan South Road with Exception IV-B 4.371 C 0.258 0.200 0.300 - - - 75.80 77.00%
Satisfactory
Crishelle Construction 17108 Const. of Line Canal IV-B 0.185 C 0.380 0.500 88.00 88.00% V. Satisfactory
Crishelle Construction 17108 Const. of Puerto Princesa Pilot E/S Phase II IV-B 1.077 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road IV-B 18.990 O 0.280 0.167 0.100 0.030 0.033 0.100 71.00 -
Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road IV-B 18.990 O 0.226 0.231 0.100 0.030 0.027 0.100 71.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 105
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Crishelle Construction 17108
Repair of Slip & Installation of Slope Protection, Roxas-Taytay National Road Km. 174+885 &
Km. 174+895 & Km. 175+365-Km. 1755+385
IV-B 2.128 O 0.360 0.300 0.100 0.030 0.023 0.100 91.30 -
Crishelle Construction 17108Strengthening of General Luna Bridge along Puerto Princesa
South Road (PPSR)IV-B 4.792 C 0.285 0.200 0.300 - - - 78.50 78.50%
Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of 1 unit 2 Cl Sch. Bldg.
@ Kawag III E/S XII 0.939 C 0.381 0.100 0.300 - - - 78.10 *78.10% Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of 1 unit Sch. Bldg. @
Madanding NHS XII 0.462 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of MPB XII 2.892 C 0.315 0.264 0.300 - - - 87.90 *87.90%
V. Satisfactory
CS Construction and Supply (Formerly: CS
Construction)24237 Const. of MPB @ Brgy. Makat XII 0.463 C 0.385 0.300 0.300 - - - 98.50 *98.50%
Outstanding
CS Construction and Supply (Formerly: CS
Construction)24237 Road Upgrading, Panyalam
Section XII 14.306 O 0.186 0.300 0.100 0.030 0.027 0.100 74.30 -
CSR Construction and Supply (Formerly: CSR
Const.)14427 Const. of Rizal Flood Control IV-B 0.278 C 0.293 0.298 0.300 - - - 89.10 *89.10%
V.Satisfactory
CSR Construction and Supply ( Formerly: CSR
Const.)14427 Const. of Agnipa Multi-Purpose
Building IV-B 1.807 C 0.384 0.200 0.300 - - - 88.40 79.37% Satisfactory
CSR Construction and Supply ( Formerly: CSR
Const.)14427 Const. of Macario Molino
National High School IV-B 0.673 C 0.389 0.000 0.300 - - - 68.90 66.24% Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 106
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
CTC Builder and Supplies Inc./Sunwest Const. & Dev.
Corp. (JV)JV-06-070 Const. of Dancalan Bridge V 57.031 O 0.367 0.240 0.050 0.020 0.019 0.067 76.30 -
CTC Builder and Supplies Inc./Sunwest Const. & Dev.
Corp. (JV)JV-06-070 Const. of Dancalan Bridge V 57.031 O 0.400 0.240 0.100 0.020 0.023 0.033 81.60 -
CTC Builder and Supplies Incorporated 12088
Asphalt Overlay of Daan Maharlika, Abuyog, Sorsogon
City-CasiguranV 22.210 C 0.367 0.200 0.300 - - - 86.70 80.40%
V. Satisfactory
CTC Builder and Supplies Incorporated 12088 Const. of Bucalbucalan Seawall V 0.941 C 0.275 0.200 0.300 - - - 77.50 *77.50%
Satisfactory
CTC Builder and Supplies Incorporated 12088 Rehab. of Buhatan Bridge,
Sorsogon-Casiguran Road V 9.403 C 0.264 0.200 0.300 - - - 76.40 81.68% V. Satisfactory
Culasi Gen. Mdsg. And Construction Services 22157 Const. of 2-CL Building at San
Roque E/S VI 0.735 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory
Currimao Integrated Builders Corporation 8738 Concreting of Sta. Cruz Road I 3.339 C 0.332 0.297 0.300 - - - 92.90 *92.90%
Outstanding
CVAP Construction 20410 Const. of Lined Canal V 0.139 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
CVAP Construction 20410 Repair/Repainting of Bicol Medical Center V 0.716 C 0.395 0.200 0.300 - - - 89.50 *89.50%
V. Satisfactory
D. Morales Engineering Works 8531 Const. of Multi-Purpose
Pavement VIII 0.473 C 0.368 0.221 0.300 - - - 88.90 *88.90% V. Satisfactory
D. Morales Engineering Works 8531 Construction of Multi-Purpose
Pavement VIII 0.473 C 0.307 0.144 0.300 - - - 75.10 *75.10% Satisfactory
D.C.E. Construction 29347 Const. of 3CL School Building @ Amulung H/S, Bayabat II 1.060 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 107
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
D.C.E. Construction 29347 Const. of Conner Public Market CAR 4.611 C 0.375 0.290 0.300 - - - 96.50 87.14% V. Satisfactory
D.C.E. Construction 29347 Const. of Dagupan Flood Control CAR 4.766 C 0.398 0.200 0.300 - - - 89.80 86.62% V. Satisfactory
D.C.E. Construction 29347Implementation of Various
Projects under Package 9, Conc. of Gen. Luna-Mayangao Streets
CAR 1.888 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
D.C.E. Construction 29347Impv't. Concreting of Tabuk-
Tinglayan Road Bantay-Pinagan Section
CAR 4.763 O 0.325 0.240 0.070 0.023 0.037 0.067 76.20 -
D.C.E. Construction 29347Impv't. Concreting of Tabuk-
Tinglayan Road Bantay-Pinagan Section
CAR 4.763 O 0.319 0.289 0.050 0.015 0.038 0.033 74.40 -
D.C.M. Construction 5641Const. of Agus III Bridge
(Pumping Bridge) & Approaches, Phase III
X 19.418 O 0.351 0.300 0.100 0.030 0.016 0.100 89.70 -
D.C.M. Construction 5641Const. of Agus III Bridge
(Pumping Bridge) & Approaches, Phase III
X 19.418 O 0.358 0.300 0.100 0.015 0.018 0.100 89.10 -
D.G. Chico Trading & Construction Corporation 8748 Const. of MPB NCR 4.769 C 0.348 0.225 0.300 - - - 87.30 86.25%
V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of Maligaya NHS III 0.855 C 0.353 0.214 0.300 - - - 86.70 *86.70%
V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. Camp
Tinio III 2.574 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. San
Gregorio III 1.390 C 0.317 0.282 0.300 - - - 89.90 *89.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 108
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
D.G. Sarmenta Construction 13024 Const. of MPB at Old Capital III 1.892 C 0.306 0.200 0.300 - - - 80.60 *80.60%
V. Satisfactory
D.G. Sarmenta Construction 13024
Const. of Multi-Purpose Bldg., (Gymnasium) Brgy. Bakod
BayanIII 1.655 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
D.G. Sarmenta Construction 13024 Rehab. of Peñaranda Flood
Control along Peñaranda River III 3.276 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory
D.G. Sarmenta Construction 13024 Rehab. of Tambo-Magpapalayok
Road III 7.398 C 0.293 0.300 0.300 - - - 89.30 *89.30% V. Satisfactory
D.G.O. Construction 6788 Completion of MPB @ Sto. Niño Brgy. CAR 0.938 C 0.308 0.206 0.300 - - - 81.40 *81.40%
V. Satisfactory
D.J.D. Construction 32217 Conc. of Enrile St. II 0.937 C 0.342 0.286 0.300 - - - 92.80 92.80% Outstanding
D.J.D. Construction 32217 Installation of two (2) lines RCCP, Magapit Mission Road II 0.348 C 0.400 0.100 0.300 - - - 80.00 * 80.00%
Satisfactory
D.K. Jocson Construction 6896Const. of Flood Control Project,
Approach "A" of Malabong Bridge
VI 8.455 C 0.343 0.200 0.300 - - - 84.30 82.20% V. Satisfactory
D.K. Jocson Construction 6896 Const. of One (1) Unit 3-CL SB @ Ramon Torres NHS VI 0.988 C 0.386 0.300 0.300 - - - 98.60 85.58%
V. Satisfactory
D.K. Jocson Construction 6896 Rehab./Conc. of Isabela-Guihulngan Road VI 14.306 C 0.283 0.200 0.300 - - - 78.30 80.34%
V. Satisfactory
D.L. Aureo Construction 24894 Const. of Multi-Purpose Building VIII 0.207 C 0.359 0.277 0.300 - - - 93.60 *93.60% Outstanding
D.L. Aureo Construction 24894 Const. of Seawall Barugo Boulevard VIII 0.376 C 0.292 0.200 0.300 - - - 79.20 *79.20%
Satisfactory
D.L. Aureo Construction 24894 Repair/Rehab. of 3 Cl Elem. Sch. Bldg. @ Panalaron C/S VIII 0.897 C 0.392 0.183 0.300 - - - 87.50 *87.50%
V. Satisfactory
D.M. Catignas Enterprises 20149 Asphalt Overlay of Road Zone III, IV, VI, VII IVA 1.911 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 109
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
D.M. Catignas Enterprises 20149 Const. of MPB at Brgy. San Isidro IVA 0.478 C 0.391 0.200 0.300 - - - 89.10 *89.10%
V. Satisfactory
D.M. Catignas Enterprises 20149 Const./Rehab. of Drainage System along CSCF Jct. IVA 1.504 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V.Satisfactory
D.M. House Const. Inc. 25810Asphalt Overlay along Gapan-San Fernando-Olongapo Road,
San Benito SectionIII 4.801 C 0.287 0.207 0.300 - - - 79.40 *79.40%
Satisfactory
D.M. House Const. Inc. 25810 Const. of Road III 2.340 C 0.227 0.300 0.300 - - - 82.70 *82.70% V.Satisfactory
D.M. House Const. Inc. 25810 Const./Rehab. of Capitangan E/S III 0.940 C 0.339 0.173 0.300 - - - 81.20 *81.20% V.Satisfactory
D.M. House Const. Inc. 25810 Impvt./Rehab. of Roman Expressway III 72.568 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
D.M. House Const. Inc. 25810Rehab. & Impv't. of Angeles-
Porac-Floridablanca-Dinalupihan Road
III 14.925 C 0.215 0.293 0.300 - - - 80.80 *80.80% V.Satisfactory
D.M. House Const. Inc. 25810Repair/Rehab. of Slope
Protection along along Tenejero River Control
III 1.494 C 0.357 0.137 0.300 - - - 79.40 *79.40% Satisfactory
D.M. House Const. Inc. 25810Repair/Rehab. of Slope
Protection along Pentor-Balsik River Sta. Isabel Section)
III 1.417 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
D.M. Wenceslao & Associates, Inc. 150
Widening of R-10 Road Project Marala Bridge and its
ApproachesNCR 68.073 C 0.153 0.200 0.000 - - - 35.30 64.66%
Fair
D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Montalban Heights NHS IVA 5.000 C 0.377 0.200 0.300 - - - 87.70 *87.70%
V. Satisfactory
D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Morong NHS IVA 5.000 C 0.372 0.280 0.300 - - - 95.20 90.09%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 110
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
D.R. Robles Construction 28559 Const. of River Control @ Brgy. J.P. Rizal IV-A 2.866 C 0.267 0.200 0.300 - - - 76.70 77.54%
Satisfactory
D.R. Robles Construction 28559 Rehab. of Assencion, Zarzuela, Sagada Sts. & Various Roads NCR 9.548 C 0.228 0.300 0.300 - - - 82.80 *82.80%
V. Satisfactory
D.R. Robles Construction 28559 Rehab. of San Jose-Rodriguez-Quezon City Road IV-A 9.582 C 0.328 0.200 0.300 - - - 82.80 *82.80%
V.Satisfactory
D.R. Robles Construction 28559 Repair and Maintenance of Sagbat-Pililia Diversion Road IV-A 1.705 C 0.373 0.300 0.300 - - - 97.30 87.10%
V. Satisfactory
D.R. Robles Construction 28559 Riprapping of Angono River (Phase IV) IV-A 2.881 C 0.293 0.300 0.300 - - - 89.30 *89.30%
V. Satisfactory
D.S.B. Construction and Supply 16126 Rehabilitation/Renovation of
Multi-Purpose Building NCR 3.772 C 0.388 0.300 0.300 - - - 98.80 84.45% V. Satisfactory
D.V. Salud Construction 6564 Construction of a 3-storey School Building SLB-LPO 18.889 C 0.387 0.300 0.300 - - - 98.70 98.70%
Outstanding
D.W. G & A Developers 27573 Const. of Flood Control @ Hibalyo VII 0.906 O 0.213 - 0.200 0.000 0.031 0.250 69.40 -
D.W. G & A Developers 27573 Const. of Seawall VII 0.458 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
D.W. G & A Developers 27573 Const./Repair of Seawall at Guihulngan VII 0.365 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Outstanding
Dadoy Freight Services Construction & Supply 28465 Conc. of San Andres-Calatrava
Road (Agpudlos Section) IV-B 0.914 O 0.341 0.135 0.100 0.030 0.022 0.100 72.80 -
Dadoy Freight Services Construction & Supply 28465 Const. of RSC Alumni Library
Building IV-B 0.571 C 0.309 0.278 0.300 - - - 88.70 * 88.70% V. Satisfactory
Dadoy Freight Services Construction & Supply 28465
Repair & Rehab. of access roads to Tugdan Airport to Poblacion
AlcantaraIV-B 9.998 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 111
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Daewoo Engineering & Construction Company,
Ltd.FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood Control Project,
Phase II
NIA 1,156.435 O 0.367 0.195 0.100 0.030 0.065 0.200 95.70 -
Daewoo Engineering & Construction Company,
Ltd.FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood Control Project,
Phase II
NIA 1,156.435 O 0.364 0.200 0.100 0.030 0.065 0.200 95.90 -
Daewoo Engineering & Construction Company,
Ltd.FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River Flood Control Project,
Phase II
NIA 1,480.299 O 0.365 0.200 0.100 0.030 0.070 0.200 96.50 -
Daewoo Engineering & Construction Company,
Ltd.
FC-03-047/SL2-
SN-000411
CP II, Phil-Japan Friendship Highway Mindanao Section
Rehab. Project, Phase II, (Km.130+100-Km.1376+805.34
PJHL 1,559.690 O 0.350 0.300 0.050 0.030 0.048 0.100 87.80 -
Daewoo Engineering & Construction Company,
Ltd.
SL2-SN-000543/FC-
98-113
Metro Manila Flood Control Project-West of Mangahan
Floodway, CP1NIA 740.742 O 0.316 0.200 0.100 0.024 0.061 0.200 90.10 -
Daewoo Engineering & Construction Company,
Ltd.
FC-98-113/SL2-
SN-000543
Metro Manila Flood Control Project-West of Mangahan
Floodway, CP1, MFCP I 725.017 O 0.305 0.200 0.100 0.030 0.061 0.200 89.60 -
Daewoo Engineering & Construction Company,
Ltd.
SL2-SN-000544/FC-
01-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
PJHL 1,559.690 O 0.388 0.300 0.070 0.030 0.070 0.067 92.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 112
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Daewoo Engineering & Construction Company,
Ltd.FC-03-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
XIII 1,559.690 O 0.393 0.295 0.050 0.030 0.070 0.067 90.50 -
Daewoo Engineering & Construction Company,
Ltd.FC-03-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
PJHL 1,586.357 O 0.350 0.300 0.100 0.030 0.056 0.100 93.60 -
Daewoo Engineering & Construction, Ltd. FC-03-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
PJHL 1,586.357 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -
Dahl Construction 8931 Completion of Concepcion Elementary School NCR 3.813 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Dahl Construction 8931Const./Completion of MPB in
Brgy. Paso de Blas, Bagbaguin and Mapulang Lupa
NCR 1.507 C 0.304 0.200 0.300 - - - 80.40 *80.40% V.Satisfactory
Dahl Construction 8931 Rehab./Impvt. of Taytay Diversion Road IV-A 14.403 O 0.345 0.300 0.100 0.030 0.040 0.100 91.50 -
Dahl Construction 8931 Repair/Rehab. of C-3 Road inc. Drainage NCR 14.239 C 0.071 0.300 0.300 - - - 67.10 *67.10%
Fair
Dakay Construction & Development Corporation 8838 Dapitan Port Development
Project PPA 222.922 C 0.39 0.300 0.300 - - - 98.67 98.67% Outstanding
Dalanon Construction Refregiration Supply &
Service11205
Conc./Widening of Dulawan-Marbel Road (New Carmen Sect.
with Bridge Exception)XII 9.583 C 0.336 0.285 0.300 - - - 92.10 *92.10%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 113
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Dalanon Construction Refregiration Supply &
Service11205 Road Upgrading along Sewod-
Bunay Section XII 18.937 O 0.344 0.300 0.100 0.030 0.032 0.100 90.60 -
Dalebo Construction & General Merchandise 32699 Const. of Drainage System at
San Rafael III IVA 0.239 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory
Damico Buildes & Supplies 30355 Const. of one (1) CL Sch. Bldg. at Aranguren E/S III 0.438 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
Damico Buildes & Supplies 30355 Const. of Water System at Brgy. Sta. Juliana III 0.472 C 0.309 0.300 0.300 - - - 90.90 89.64%
V. Satisfactory
Damico Buildes & Supplies 30355 Const./Completion/Repair and Rehab. Of MPB at PNRC III 0.904 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
Danfran Construction 28088Const. of MPB (for Police
Station) and other impvt. Within the area
NCR 1.190 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding
Danimerh Construction and Supply 17376 Const. of MPB (Block Tienda),
Poblacion Montevista XI 1.701 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Danvic Construction 24439 Conc. of Additional 2 lanes along Davao City Diversion Road XI 3.516 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Danvic Construction 24439 Const. of MPP for Package 1-D (Brgy. Dumoy & Brgy. Ballok) XI 0.753 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
Danvic Construction 24439 Const./Rehab. of School Bldg. @ Bucana E/S XI 1.408 C 0.383 0.300 0.300 - - - 98.30 *98.30%
Outstanding
Danvic Construction 24439Rehab./Impvt. of DPWH Davao
City 1st DEO Bldg. inc. Employees Quarters
XI 7.544 O 0.393 0.300 0.100 0.030 0.058 0.100 98.10 -
Darynn Construction & Supply 22322 Const. of 2 Cl Academic Sch.
Bldg. @ Dongan Pekong E/S XI 0.704 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 114
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Darynn Construction & Supply 22322 Const. of MPB at Bitaug XI 1.714 O 0.257 0.296 0.100 0.030 0.045 0.100 82.80 -
Darynn Construction & Supply 22322 Const. of MPB at Brgy. 76-A XI 0.752 C 0.356 0.240 0.300 - - - 89.60 *89.60%
V. Satisfactory
Davao Concrete Products 12090Conc. of Additional 2 lanes along
F. Torres Jct. Bajada DCNHS Section
XI 4.621 C 0.270 0.300 0.300 - - - 87.00 92.28% Outstanding
Davao Concrete Products 12090 Conc. of Additional 2 lanes along Surigao-Davao Coastal Road XI 9.819 C 0.276 0.300 0.300 - - - 87.60 87.60%
V.Satisfactory
Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road XI 14.165 C 0.318 0.225 0.300 - - - 84.30 *84.30%
V. Satisfactory
Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road, Kaputian Sect. XI 19.287 C 0.346 0.300 0.300 - - - 94.60 87.58%
V. Satisfactory
Davao Concrete Products 12090 Const. of 3 Cl Academic @ Digos City NHS XI 1.247 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
Davao Concrete Products 12090 Const. of Flood Control Moralizon High School XI 4.245 C 0.240 0.300 0.300 - - - 84.00 84.48%
V. Satisfactory
Davao Concrete Products 12090 Const. of Hagonoy National High School (Padada Annex) XI 1.271 C 0.247 0.200 0.300 - - - 74.70 *74.70%
Satisfactory
Davao Concrete Products 12090 Impvt./Conc. Inawayan-Baracatan Road, Toril District XI 14.922 O 0.315 0.300 0.100 0.010 0.040 0.100 86.50 -
Davao Concrete Products 12090 Impvt./Rehab. of Agusan River Channel XI 14.448 C 0.345 0.300 0.300 - - - 94.50 88.98%
V. Satisfactory
Davao Concrete Products 12090Protection Works @ Pier 1& Pier 2 of Lasang Bridge along Davao
Road (Daang Maharlika)XI 8.489 C 0.294 0.300 0.300 - - - 89.40 88.74%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 115
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Davao Concrete Products 12090 Repair/Rehab. of MPB at Brgy. 76-A XI 18.880 O 0.383 0.300 0.100 0.030 0.052 0.100 96.50 -
Davao Concrete Products 12090 Repair/Rehab. of MPB Bldg. (DAPECOL Hospital) XI 4.151 O 0.396 0.287 0.100 0.030 0.038 0.100 95.10 -
Davao Concrete Products 12090Widening of Cotabato-Davao
National Road, Pob. Pagalungan Section
XII 5.436 C 0.323 0.300 0.000 - - - 62.30 54.71% Poor
Davao Contractors Development Cooperative
(DACODECO)28542 Conc. of Bucac Road Section
along Bucac-Marcelina Road XIII 2.810 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)28542 Conc. of Road at Brgy. Subasta XI 0.944 C 0.395 0.300 0.300 - - - 99.50 *99.50%
Outstanding
Davao Contractors Development Cooperative
(DACODECO)28542
Const. of 2 CL Mod. Single Storey School Bldg., At Manat
NHS Kao AnnexXI 0.802 C 0.351 0.200 0.300 - - - 85.10 62.70%
Fair
Davao Contractors Development Cooperative
(DACODECO)28542 Const. of Lined Canal XII 0.468 C 0.390 0.300 0.300 - - - 99.00 *99.00%
Outstanding
Davao Contractors Development Cooperative
(DACODECO)28542 Const. of MPB (Phase II) XIII 0.552 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)28542 Const. of MPB, Brgy. Mabini XII 0.667 O 0.306 0.240 0.100 0.030 0.028 0.100 80.40 -
Davao Contractors Development Cooperative
(DACODECO)28542 Const. of N.N.C.H.S. Bldg.
(Phase V) XI 2.828 O 0.385 0.176 0.100 0.030 0.035 0.100 82.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 116
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Davao Contractors Development Cooperative
(DACODECO)28542
Const. of one (1) unit concrete Multi-Purpose/Workshop Bldg.
@ Guadalupe CESXIII 1.514 C 0.368 0.300 0.000 - - - 66.80 *66.80%
Fair
Davao Contractors Development Cooperative
(DACODECO)28542 Const./Rehab. of Health Center
Building @ Brgy. Magupising XI 0.610 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding
Davao Contractors Development Cooperative
(DACODECO)28542 Impvt. of Riverbank Protection of
Hanipaan Bridge (Box Culvert) XIII 4.785 C 0.360 0.300 0.000 - - - 66.00 66.90% Fair
Davao Contractors Development Cooperative
(DACODECO)28542
Rehab. of San Benito-Sta. Monica Road Section, along
Dapa-Del Carmen-San Benito-Sta. Monica-Burgos-San Isidro
Road
XIII 4.815 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)28542
Rehab./Impvt. of DPWH Davao del Norte DEO Bldg. inc.
Employees QuartersXI 9.642 O 0.382 0.249 0.100 0.030 0.035 0.100 89.60 -
Davao Contractors Development Cooperative
(DACODECO)28542
Repair/Rehab. Damaged Roadway Nabunturan-Mainit
Park RoadXI 2.408 C 0.304 0.232 0.300 - - - 83.60 84.98%
V. Satisfactory
Davao Contractors Development Cooperative
(DACODECO)28542 Repair/Rehab. of Tugpan PSCG
Bridge XIII 3.810 C 0.369 0.200 0.000 - - - 56.90 66.62% Fair
Davao Engineers Contractors Cooperative
(DECK)30944 Const. of 1 CL 1 Storey Bldg. @
Quezon E/S XI 0.465 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
Davao Engineers Contractors Cooperative
(DECK)30944 Const. of MPB at Brgy. Ma-a XI 0.375 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
Davao L.A. Parts & Hardware Corporation 27208 Conc. Reblocking of Digos
Diversion Road XI 4.821 C 0.360 0.300 0.300 - - - 96.00 95.34% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 117
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Davao L.A. Parts & Hardware Corporation 27208 Const./Rehab. of FMR XI 2.824 C 0.301 0.219 0.300 - - - 82.00 *82.00%
V. Satisfactory
Davhez Trading and Construction 9833 Const./Completion of Las Pinas
Nat'l High School (Main) NCR 0.709 C 0.317 0.200 0.300 - - - 81.70 *81.70% V. Satisfactory
Davhez Trading and Construction 9833 Repair/Rehab. of School Bldg. at
Moonwalk E/S Phase 5 NCR 2.946 C 0.268 0.200 0.300 - - - 76.80 *76.80% Satisfactory
Daybreak Enterprises Engineering & Construction 30174
Package II-Const. of Multi-Purpose Building on Various
LocationVIII 1.275 O 0.269 0.225 0.100 0.020 0.032 0.100 74.60 -
Deabsres Construction & Supply 10392 Const. of 1 unit 7m x 9m Sch.
Bldg. @ Umingan NHS I 0.491 C 0.348 0.200 0.300 - - - 84.80 *84.80% V. Satisfactory
Deabsres Construction & Supply 10392 Const. of 6 Units S/B @ San
Vicente E/S I 0.428 C 0.369 0.256 0.300 - - - 92.50 83.89% V. Satisfactory
Decks Construction, Inc. 25860 Const. of MPB at Apitong IV-B 0.668 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Dela Cruz Construction and Supply 20775 Const. of Two (2) Cl, Bldg., San
Jose Pili H/S V 0.962 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Design Setter Construction Corporation 32136 Const. of Overpass in Agusan
NHS, Agusan Phase I X 0.280 C 0.287 0.200 0.300 - - - 78.70 85.42% V. Satisfactory
Dhayang Construction Firm 12805 Const. of MPB, Brgy. Lanzuran IX 2.333 C 0.312 0.176 0.300 - - - 78.80 *78.80% Satisfactory
Digos Tesston Construction & Supplies 8921 Const. of FMR @ Baracata-Atan-
Awe-Sebulan Road XI 4.710 O 0.395 0.273 0.100 0.030 0.054 0.100 95.20 -
Digos Tesston Construction & Supplies 8921 Impv't/Conc. of Lacson-Lamanan
Road XI 3.850 O 0.368 0.300 0.100 0.030 0.058 0.100 95.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 118
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921
Conc. of Additional 2-Lanes along Davao-Cotabato Road,
Talomo Intersection and Talomo Bridge Section
XI 5.394 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Const./Completion of DPWH-DCSDEO Bldg., Tugbok District XI 9.635 O 0.376 0.279 0.100 0.030 0.047 0.050 88.20 -
Digos Tesston Construction & Supplies
(Formerly: ACT Construction)
8921 Impv't/Conc. of Lacson-Lamanan Road XI 3.850 C 0.355 0.300 0.300 - - - 95.50 95.50%
Outstanding
Dimson (Manila), Inc. 112 Const. of Jones 2 Bridge and Approaches II 111.929 C 0.354 0.300 0.300 - - - 95.40 86.02%
V. Satisfactory
Dimson (Manila), Inc. 112 Improvement/Widening of MNR Package I, Meycauayan III 88.097 O 0.390 0.300 0.100 0.030 0.038 0.067 92.50 -
Diplahan Commercial & Construction 32037 Conc. of Tinungtungan along
Kauswagan-Lindag Road IX 0.953 C 0.272 0.300 0.300 - - - 87.20 90.86% Outstanding
Diplahan Commercial & Construction 32037 Const. of MPB (Covered Court) IX 0.931 C 0.302 0.300 0.300 - - - 90.20 61.50%
Fair
Diplahan Commercial & Construction 32037 Const. of MPB @ Poblacion
Malangas IX 0.128 C 0.343 0.162 0.300 - - - 80.50 *80.50% V. Satisfactory
Dipolog Top Construction and Devt. Corp. 6678 Const. of MPB IX 0.425 C 0.349 0.200 0.300 - - - 84.90 76.92%
Satisfactory
Dipolog Top Construction and Devt. Corp. 6678
Road Upgrading of Dipolog-Punta Dansullan-Sergio Osmeña
RoadIX 9.438 C 0.351 0.300 0.300 - - - 95.10 *95.10%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 119
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
DL Enterprises 18155 Conc. of Ozamis City-Oroquieta City Road, Sinacaban Section X 19.014 O 0.275 0.300 0.000 0.030 0.047 0.100 75.20 -
DL Enterprises 18155 Conc. of Tudela Road (Municipal Ground) X 0.952 C 0.327 0.200 0.300 - - - 82.70 86.18%
V. Satisfactory
DL Enterprises 18155 Conc./Rehab. of FMR @ Sta. Cruz, Boniao & Maguiles Road IX 9.127 C 0.318 0.184 0.300 - - - 80.20 80.44%
V. Satisfactory
DL Enterprises 18155 Concreting of Roads at Brgy. Kinuman Sur X 0.952 C 0.329 0.282 0.300 - - - 91.10 87.92%
V. Satisfactory
DL Enterprises 18155
Const. of Classrooms @ Northern Mindanao State
College of Science & Technology
X 1.906 C 0.305 0.300 0.300 - - - 90.50 79.02% Satisfactory
DL Enterprises 18155 Const. of Road X 1.906 O 0.200 0.300 0.070 0.030 0.047 0.067 71.40 -
DL Enterprises 18155 Const. of Road X 1.906 O 0.267 0.240 0.100 0.015 0.040 0.067 72.90 -
DL Enterprises 18155 Const. of Tangub City-Don Victoriano Road X 22.914 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -
DL Enterprises 18155 Resurfacing of Unpaved Shoulder X 1.121 C 0.320 0.300 0.300 - - - 92.00 72.26%
Satisfactory
DMJ Construction & Supply 17211Asphalt Overlay along Amungan-
Palauig-Banlog Road, Iba Section
III 9.553 C 0.354 0.300 0.300 - - - 95.40 *95.40% Outstanding
DMJ Construction & Supply 17211 Asphalt Overlay along Olongapo-Bugallon Road III 13.576 C 0.355 0.194 0.300 - - - 84.90 *84.90%
V. Satisfactory
DMJ Construction & Supply 17211 Asphalt Overlay of Cabangan-Dolores Section III 9.554 C 0.364 0.207 0.300 - - - 87.10 *87.10%
V. Satisfactory
DMJ Construction & Supply 17211 Completion of RMTU Admin. Bldg. III 1.911 C 0.284 0.300 0.300 - - - 88.40 *88.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 120
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
DMJ Construction & Supply 17211
Completion/ Continuation of Unfinshed On-going Bridge
Matain Bridge along Olongapo-Bugallom Road-Phase II, Matain
III 10.706 C 0.301 0.261 0.300 - - - 86.20 89.08% V. Satisfactory
DMJ Construction & Supply 17211 Const. of 6 CL @ Uacon E/S III 4.243 C 0.330 0.290 0.300 - - - 92.00 *92.00% Outstanding
DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 O 0.366 0.273 0.100 0.030 0.039 0.067 87.50 -
DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 O 0.346 0.200 0.100 0.030 0.032 0.100 80.80 -
DMJ Construction & Supply 17211 Impvt./Conc. of Dingalan National Road III 18.803 C 0.355 0.194 0.300 - - - 84.90 *84.90%
V. Satisfactory
DMJ Construction & Supply 17211 Rehab. of Amungan-Palauig-Banlog Rd., Palauig Section III 19.011 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road III 18.817 C 0.302 0.201 0.300 - - - 80.30 *80.60%
V. Satisfactory
DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road III 18.815 C 0.311 0.022 0.300 - - - 63.30 *63.30%
FairDMM Construction
Indsutries 31136 Const. of 6 Cl Sch. Bldg., Sta. Paz E/S (Pinamudlan E/S) VIII 2.283 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. SatisfactoryDMM Construction
Indsutries 31136 Redecking of Divisoria Bridge VIII 3.763 C 0.354 0.200 0.300 - - - 85.40 *85.40% V.Satisfactory
Dofel Construction 16333 Const. of FMR @ Lantian IX 1.861 C 0.310 0.265 0.300 - - - 87.50 67.76% Fair
Dofel Construction 16333 Const. of Molave Vocational Technical School Building IX 0.371 O 0.347 0.300 0.100 0.030 0.041 0.100 91.80 -
Domarax Construction and Development 5502 Const. of 1 Cl @ Claudia P.
Pimentel Memorial E/S XIII 0.443 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 121
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Domarax Construction and Development 5502
Impvt. of Road Slip and other related activities, (Gamut-San
Miguel Sect.)XIII 3.850 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Domvee Construction Corporation 19872
Rehab./Completion of CCR, Guinsiliban Sagay Road Section along Camiguin Circumferential
Road
X 1.850 C 0.320 0.300 0.000 - - - 62.00 53.81% Poor
Donber Construction & Supply 15334 Improvement of MASSBA PIS V 1.191 C 0.359 0.180 0.300 - - - 83.90 *83.87%
V. Satisfactory
Double L Construction & Development Enterprises 9834 Completion of MPB VII 1.282 C 0.270 0.241 0.300 - - - 81.10 *81.10%
V. Satisfactory
Double L Construction & Development Enterprises 9834
Conc. of Brgy. Roads a)Brgy. Cangmating, Sibulan b)Brgy.
Naiba, San JoseVII 0.944 C 0.254 0.300 0.300 - - - 85.40 *85.40%
V. Satisfactory
Double L Construction & Development Enterprises 9834 Conc. of Multi-Purpose
Pavement at Brgy. Poblacion VII 0.475 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
Double L Construction & Development Enterprises 9834 Const. of Flood Control @
Maragondong VII 0.445 C 0.362 0.100 0.300 - - - 76.20 *76.20% Satisfactory
Double L Construction & Development Enterprises 9834 Const. of River Control, Brgy.
Tandayag VII 0.473 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Double L Construction & Development Enterprises 9834 Const. of Water System (Phase I) VII 9.497 C 0.307 0.300 0.300 - - - 90.70 93.04%
Outstanding
Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport
Road (Intermittent Section) VII 10.385 O 0.332 0.241 0.070 0.015 0.043 0.100 80.10 -
Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport
Road (Intermittent Section) VII 10.395 O 0.362 0.236 0.000 0.022 0.048 0.067 73.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 122
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Double L Construction & Development Enterprises 9834 Widening of Dumaguete North
Road at Intermittent Section VII 21.558 C 0.306 0.284 0.300 - - - 89.00 *89.00% V. Satisfactory
Double L Construction and Development Enterprises 9834 Concreting of Bunga Brgy. Road VII 0.827 O 0.306 0.300 0.100 0.030 0.040 0.100 87.60 -
Double L Construction and Development Enterprises 9834
Const. of Ayuquitan Bridge & Approaches, Km.13.922 along
Dumaguete North RoadVII 10.417 C 0.242 0.300 0.000 - - - 54.20 72.24%
Satisfactory
Double R Double M Construction 25385 Const. of Cagayan River Control
@ Catayauan II 9.640 C 0.400 0.200 0.300 - - - 90.00 72.48% Satisfactory
Double R Double M Construction 25385
Reblocking of Road & Const. of Shoulder & Drainage with
SidewalkII 0.938 C 0.374 0.099 0.300 - - - 77.30 *77.30%
Satisfactory
Doulos Construction 30759Road Upgrading along Kalinga-Cagayan Road, Calanan-Enrile
SectionCAR 3.664 O 0.257 0.196 0.100 0.008 0.030 0.067 65.80 -
DQT Builders 7950 Conc. of Boac-Mogpog Nat'l Road (Bantauyan Section) IV-B 4.272 C 0.292 0.300 0.300 - - - 89.20 *89.20%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Infanta-Marikina Road,
Km. 130+843-Km. 130+078 IV-A 14.467 C 0.337 0.300 0.300 - - - 93.70 91.72% Outstanding
DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Kay Duke FMR IV-B 0.380 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Const./Repair of Mabuhay MPB IV-B 0.380 C 0.310 0.200 0.300 - - - 81.00 *81.00%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950
Impvt. of Lucena Bdry.-Tayabas-Lucban-Sampaloc-Mauban Road
(Sampaloc Side)IV-A 19.199 O 0.269 0.300 0.100 0.030 0.030 0.100 82.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 123
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
DQT Builders Corporation (Formerly:DQT Builders) 7950
Rehab. of Balagasan Bridge & App. Along Talaba-Summit-
Panaon National RoadIV-A 2.305 C 0.379 0.200 0.300 - - - 87.90 *87.90%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impv't of Infanta-
Dinahican Road IV-A 14.468 C 0.324 0.200 0.300 - - - 82.40 82.40% V.Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impvt. of MSR-Diversion
Road IV-A 18.216 C 0.381 0.300 0.300 - - - 98.10 93.96% Outstanding
DQT Builders Corporation (Formerly:DQT Builders) 7950
Rehab./Reconstruction and Concrete Paving of Catanauan-Buenavista Nat'l Road Phase I-
Buenavista Sect.
IV-A 14.460 C 0.347 0.300 0.300 - - - 94.70 93.50% Outstanding
DQT Builders Corporation (Formerly:DQT Builders) 7950 Widening/Asphalting of Luyang-
Poo-Lazi National Road VII 6.473 C 0.359 0.300 0.000 - - - 65.90 75.53% Satisfactory
DSB Construction and Supply 16126 Conc. of Bical Road V 14.163 O 0.325 0.236 0.100 0.020 0.023 0.100 80.40 -
DSB Construction and Supply 16126 Conc. of Bical Road V 14.163 O 0.318 0.240 0.070 0.030 0.028 0.067 75.30 -
DSB Construction and Supply 16126 Conc. of Mt. Mayon Park Road V 4.721 C 0.293 0.300 0.300 - - - 89.30 *89.30%
V. Satisfactory
DSB Construction and Supply 16126 Const. of San Lorenzo Lined
Canal V 0.375 C 0.345 0.100 0.300 - - - 74.50 *74.50% Satisfactory
DSB Construction and Supply 16126 Const. of Virac Seawall V 8.645 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
DSB Construction and Supply 16126 Repair/Rehab. of Virac Seawall V 4.736 C 0.370 0.200 0.300 - - - 87.00 79.74%
Satisfactory
DSB Construction and Supply 16126 Repair/Restoration of Concrete
Dike at Bulawan River V 14.260 C 0.340 0.200 0.300 - - - 84.00 84.00% V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 124
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
DSB Construction and Supply 16126 Repair/Restoration of Concrete
Revetment of Baclayon V 9.500 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
DSB Construction and Supply 16126 Road Opening of Tanawan-
Cumagingking Falls V 28.505 C 0.372 0.286 0.300 - - - 95.80 93.52% Outstanding
DSB Construction and Supply, Inc. (Formerly: DSB
Const. & Supply)16126 Const. of Multi-Purpose Center,
Tabaco NHS V 5.786 O 0.310 0.240 0.100 0.030 0.022 0.100 80.20 -
DSB Construction and Supply, Inc. (Formerly: DSB
Const. & Supply)16126 Const. of Multi-Purpose Center,
Tabaco NHS V 5.787 C 0.369 0.200 0.300 - - - 86.90 82.21% V. Satisfactory
DSO Enterprises 10733 Completion of School Bldg. IV-A 0.955 C 0.322 0.227 0.300 - - - 84.90 *84.90% V. Satisfactory
DSO Enterprises 10733 Conc. of CSCF Jct. Road, Pagsanjan Section IV-A 5.254 C 0.357 0.200 0.300 - - - 85.70 89.18%
V. Satisfactory
DSO Enterprises 10733 Const. of FMR @ Sitio Tanliwan IV-A 0.955 C 0.268 0.300 0.300 - - - 86.80 *86.80% V. Satisfactory
DSO Enterprises 10733 Const. of FMR at Sitio Bunliw IV-A 0.477 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory
Dungan Constructors & Trading 19301 Conc. of FMR @ Brgy. Buhilit III 0.611 C 0.341 0.196 0.300 - - - 83.70 *83.70%
V. Satisfactory
Duragold Trading & Const. -CDO Branch 31929 Const. of One (1) Storey Multi-
Purpose Bldg. X 0.471 C 0.392 0.300 0.300 - - - 99.20 92.13% Outstanding
Duros Development Corp. 22729
Impvt./Asphalting and Widening of Cebu-Toledo Wharf Road (Central Nautical Highway), Tabunok-Lagtang Section
VII 19.575 C 0.218 0.300 0.300 - - - 81.80 79.64% Satisfactory
Duros Development Corp. 22729 Repair/Rehab. & Widening of Cansaga Bridge VII 11.388 C 0.400 0.100 0.300 - - - 80.00 86.54%
V. Satisfactory
DVB Construction 23769 Const. of Drainage Canal @ Brgy. Manloy VIII 0.188 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 125
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Impv't./Widening of Bacolod South Kabankalan Road,
Km.4+953 - Km.5+420VI 17.790 C 0.276 0.300 0.000 - - - 57.60 78.04%
Satisfactory
Dynamic Builders & Construction Co., (Phil.),
Inc.24712 Reblocking of Bacolod
Circumferential Road VI 19.046 C 0.249 0.200 0.300 - - - 74.90 79.72% Satisfactory
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Repair & Maintenance Road, Highways & Bridges at Bacolod
Circumferential Rd. VI 19.040 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Widening/Impvt. of Bacolod South Kabankalan Road,
Km.5+200 - Km.5+775.5 with exception
VI 9.538 C 0.370 0.290 0.300 - - - 96.00 96.56% Outstanding
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Widening/Impvt. of Bacolod South Kabankalan Road,Tangub
Section, Km.5+775.5- Km.5+937.5 with exception
VI 9.384 O 0.390 0.225 0.100 0.023 0.047 0.067 85.20 -
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Widening/Impvt. of Bacolod South Kabankalan Road,Tangub
Section, Km.5+775.5- Km.5+937.5 with exception
VI 9.384 O 0.385 0.248 0.100 0.030 0.050 0.100 91.30 -
Dynamic Builders & Construction Co., (Phil.),
Inc.24712
Widening/Impvt. of Bacolod South Kabankalan Road,Tangub
Section, Km.5+775.5- Km.5+937.5 with exception
VI 9.476 O 0.288 0.225 0.100 0.015 0.047 0.050 72.50 -
E & D Construction 32064Conc. Widening of Cotabato-Alla-
Marbel-General Santos Road, Malagapas Section
XII 4.824 C 0.345 0.300 0.000 - - - 64.50 73.23% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 126
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E & L Reyes Construction 15338 Conc. of Brgy. II Municipal Road VII 0.932 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
E & L Reyes Construction 15338 Conc. of Maya-Daanbantayan Road, Agujo Section VII 3.779 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
E & L Reyes Construction 15338 Const. of 1-unit 2 Cl High Sch. Bldg. at Samboan NHS VII 0.826 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
E & L Reyes Construction 15338 Const. of Getafe Public Market VII 1.895 O 0.368 0.300 0.100 0.010 0.018 0.100 89.60 -
E & L Reyes Construction 15338 Const. of President C.P. Garcia H/S VII 0.452 C 0.334 0.300 0.300 - - - 93.40 85.00%
V. Satisfactory
E & L Reyes Construction 15338 Rehab. (Conc.) of Maria Antonia Village Road VII 0.740 C 0.313 0.300 0.300 - - - 91.30 *91.30%
Outstanding
E and D Construction 32064Conc. Widening of Cotabato-Alla-
Marbel-General Santos Road, Malagapas Section
XII 4.784 O 0.327 0.221 0.100 0.010 0.023 0.100 78.10 -
E and D Construction 32064Conc. Widening of Cotabato-Alla-
Marbel-General Santos Road, Malagapas Section
XII 4.784 O 0.346 0.240 0.100 0.022 0.025 0.067 80.00 -
E and D Construction 32064 Const. of MPB (DENR Building) XII 0.939 O 0.311 0.231 0.100 0.023 0.029 0.067 76.10 -
E and D Construction 32064 Const./Conc. of Lagundungan-Buaya-Buaya Road XII 4.815 C 0.343 0.200 0.300 - - - 84.30 79.92%
Satisfactory
E E I Corporation 333
NAIA Expressway and its Related Roads Project, Phase I, Package IV-A, Sales St. Viaduct
and Ramp Structure (MSE Retaining Wall)
URPO 368.005 O 0.360 0.300 0.100 0.030 0.065 0.100 95.50 -
E M L Construction & Trading 10151 Const. of Jetty Protection Walls
at the Mouth of Kalaklan River III 19.107 C 0.267 0.300 0.300 - - - 86.70 80.04% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 127
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E M L Construction & Trading 10151 Impvt. of San Antonio-
Floridablanca Road III 4.758 C 0.371 0.300 0.300 - - - 97.10 *97.1% Outstanding
E M L Construction & Trading 10151 Rehab./Impvt./Asphalt Overlay of
Angeles-Magalang Road III 9.478 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
E M L Construction & Trading 10151 Repair/Rehab. of Porac Public
Market III 2.402 C 0.302 0.291 0.300 - - - 89.30 *89.30% V. Satisfactory
E S De Guzman Construction 17494 Const. of NVSU Multi-Purpose
Bldg., Phase III II 0.369 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
E S De Guzman Construction 17494 Const. of Pob. South MPB II 0.277 C 0.228 0.200 0.300 - - - 72.80 72.73%
SatisfactoryE S De Guzman
Construction 17494 Const. of Quirino MPB II 0.464 C 0.386 0.238 0.300 - - - 92.40 *92.40% Outstanding
E S De Guzman Construction 17494 Replacement of Oriwong Bridge
and Approaches II 7.123 C 0.398 0.300 0.000 - - - 69.80 80.18% V. Satisfactory
E. Cañeda Construction 22168 Conc. of Bogo-Polambato Wharf Road VII 9.313 C 0.296 0.110 0.300 - - - 70.60 *70.60%
Satisfactory
E. Cañeda Construction 22168 Road Conc. of Danglag-Garing Road VII 0.458 C 0.282 0.200 0.300 - - - 78.20 *78.20%
Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Sipocot-Cabusao Road V 8.555 C 0.376 0.190 0.300 - - - 86.60 89.00%
V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of MPB @ Bonot V 0.948 C 0.389 0.138 0.300 - - - 82.70 85.85%
V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of Water System V 2.808 C 0.391 0.300 0.300 - - - 99.10 94.90%
Outstanding
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Reblocking of Road to Libmanan
form Daang Maharlika V 9.498 C 0.309 0.233 0.300 - - - 84.20 84.92% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 128
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E. Gardiola Construction 17542
Asphalt Overlay/Rehab. of Manila-Batangas Rd., Malvar
Section, Brgy. San Fernando & Santiago Phase II
IVA 19.290 C 0.246 0.287 0.300 - - - 83.30 *83.30% V. Satisfactory
E. Gardiola Construction 17542 Const. of C-5 Ext. Proj., from SLEX to Sucat Road NCR 95.556 C 0.295 0.300 0.300 - - - 89.50 86.26%
V. Satisfactory
E. Gardiola Construction 17542 Impv't. of Road at Nangkaan-Ki Santol Road Phase II IVA 9.644 C 0.276 0.200 0.300 - - - 77.60 80.12%
V. Satisfactory
E. Gardiola Construction 17542Impvt./Rehab. Along San
Celestino-San Francisco-Sto. Toribio Rd.
IVA 9.642 C 0.362 0.254 0.300 - - - 91.60 *91.60% Outstanding
E. Gardiola Construction 17542 Impvt./Rehab. of Batangas-Quezon Road IVA 19.236 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Carmen Road III 9.553 C 0.284 0.300 0.300 - - - 88.40 *88.40%
V.Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Circumferential Road III 9.553 C 0.293 0.300 0.300 - - - 89.30 *89.30%
V.Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Aplaya Sect. IVA 19.293 O 0.283 0.300 0.100 0.030 0.033 0.100 84.60 -
E. Garcia Construction and E. Garcia Gravel and Sand 7243 Naga Airport Development
Project PMS 43.333 O 0.373 0.300 0.150 0.020 0.063 0.050 95.60 -
E. Guadiz Construction 27172Const. of 2-CL at Guilermo A.
Barsatan School of Arts & Trades
CAR 0.558 C 0.361 0.300 0.000 - - - 66.10 76.04% Satisfactory
E. Guadiz Construction 27172Const. of Marag Valley
Agricultural and Trade High School
CAR 0.559 C 0.344 0.300 0.000 - - - 64.40 81.34% V. Satisfactory
E. Lapus Enterprises 10813 Const. of Balangkas Road NCR 3.514 C 0.330 0.200 0.300 83.00 87.80% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 129
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E. Lapuz Enterprises 10813 Const. of MP Building @ Sto. Tomas E/S III 3.029 C 0.385 0.176 0.300 - - - 86.10 *86.10%
V. Satisfactory
E. Lapuz Enterprises 10813
Impvt./Rehab. of Roads in Western Samar, Oquendo-Pilar Road, Sta. 00+000-Sta. 05+405
with exceptions
VIII 2.865 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory
E. R. Venzon Construction 19013 PSHS BRC ACA I & DORM I PSHS 8.413 O 0.3994 0.233 0.100 0.020 0.030 0.070 85.24 -
E. Simba Marketing and Construction Supply 16398 Completion of MPB at Brgy. 36-D XI 0.939 C 0.345 0.268 0.300 - - - 91.30 *91.30%
Outstanding
E. Simba Marketing and Construction Supply 16398
Conc. of Sarangani-Davao del Sur Coastal Road (Kalatungan
Sect.)XII 5.645 C 0.311 0.300 0.000 - - - 61.10 60.30%
Fair
E.A. Igno Construction & Trading 32517 Construction of Classroom @
De Ocampo Elementary School IV-A 0.382 C 0.310 0.200 0.300 - - - 81.00 *81.00% V. Satisfactory
E.A. Igno Construction & Trading 32517 Impvt. of MPB IV-A 0.478 C 0.374 0.291 0.300 - - - 96.50 *96.50%
Outstanding
E.A. Sancho Construction 5648 Const. of Adiangao Bridge # 1 and Approaches (Phase I) V 5.536 O 0.323 0.273 0.100 0.020 0.023 0.100 83.90 -
E.A. Sancho Construction 5648 Impvt.(Conc.) of Bolao-Balite-Cawaynan-Canayuman Road V 4.145 C 0.350 0.200 0.300 - - - 85.00 83.38%
V. Satisfactory
E.A. Sancho Construction 5648Impvt.(Conc.) of Cagliling-Matang-Buenavista-Union-
Salvacion RoadV 3.791 O 0.314 0.238 0.100 0.020 0.028 0.100 80.00 -
E.B.J.R. Construction 19780 Const. of 15 units Multi-Purpose Pavements (Ripang MPP) CAR 0.093 C 0.333 0.000 0.300 - - - 63.30 76.20%
Satisfactory
E.B.J.R. Construction 19780 Const. of Talifugo-Manag FMR CAR 0.458 C 0.377 0.240 0.300 - - - 91.70 *91.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 130
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project
Phase V, Estancia-Ajuy SectionPJHL 381.914 O 0.376 0.296 0.050 0.030 0.056 0.033 84.10 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project
Phase V, Estancia-Ajuy SectionPJHL 496.473 O 0.252 0.300 0.100 0.030 0.046 0.100 82.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project,
Estancia-Ajuy SectionPJHL 530.586 O 0.337 0.300 0.100 0.030 0.051 0.100 91.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906
CP III, Iloilo East Coast-Capiz Road Improvement Project,
Estancia-Ajuy SectionPJHL 530.586 O 0.377 0.300 0.100 0.030 0.056 0.100 96.30 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 CP IV, Gatanguit-Calbiga Road
Sect. Phase IV PJHL 1,458.041 O 0.367 0.300 0.100 0.030 0.051 0.100 94.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 CP IV, Gatanguit-Calbiga Road
Sect. Phase VI PJHL 1,458.041 O 0.372 0.300 0.100 0.018 0.065 0.100 95.50 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 CP IV, Gatanguit-Calbiga Road
Sect. Phase VI PJHL 1,466.751 O 0.350 0.300 0.100 0.030 0.065 0.100 94.50 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna
Const.)11906 Road Leading to Subic Public
Market III 14.028 C 0.231 0.200 0.300 - - - 73.10 *73.10% Satisfactory
E.C. Samonte Construction 31019 Conc. of Sirawal Boulevard IX 1.846 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory
E.C. Samonte Construction 31019 Const. of MPB (Gymnasium) Phase III IX 0.944 C 0.370 0.274 0.300 - - - 94.40 *94.40%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 131
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.C. Samonte Construction 31019 Impv't./Conc. Along Liloy-Labason Road (Lopoc Sect.) IX 2.771 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
E.C. Samonte Construction 31019Repair (w/ Const.) of Sitio
Binculan Road to Poblacion via Lumay
IX 0.926 C 0.306 0.024 0.300 - - - 63.00 78.78% Satisfactory
E.C. Timbancaya Enterprises 15244 Const. of 1 Cl @ Montevista E/S IV-B 0.367 C 0.348 0.300 0.300 - - - 94.80 *94.80%
OutstandingE.C. Timbancaya
Enterprises 15244 Const. of 1 Cl at Alimanguan NHS IV-B 0.368 C 0.354 0.133 0.300 - - - 78.70 *78.70%
Satisfactory
E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 O 0.297 0.200 0.100 0.023 0.033 0.200 85.30 -
E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 O 0.201 0.163 0.100 0.020 0.022 0.200 70.60 -
E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 O 0.217 0.120 0.030 0.020 0.032 0.067 48.60 -
E.D. Angas Construction 32106 Const./Impvt. of Multi Purpose Center VII 0.944 C 0.302 0.282 0.300 - - - 88.40 *88.40%
V. Satisfactory
E.D. Angas Construction 32106 Const./Repair of School Bldg. @ Campalanas H/S VII 0.469 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -
E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-
Egana-Sibalom Road VI 4.137 O 0.257 0.189 0.100 0.030 0.020 0.100 69.60 -
E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-
Egana-Sibalom Road VI 4.137 O 0.259 0.221 0.100 0.030 0.041 0.100 75.10 -
E.D. Denosta Construction & Supply 28355 Const. of 2 CL Tigbalua E/S VI 0.889 C 0.275 0.200 0.300 - - - 77.50 *77.50%
Satisfactory
E.D. Solano Construction & Engineering Services 14758 Const. of MPB (Brgy. Hall) Phase
2 @ Brgy. Pogo Grande I 0.668 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 132
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.D. Tabangay Consruction 31978Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo
SectionIV-B 9.100 C 0.295 0.264 0.300 - - - 85.90 *85.90%
V. Satisfactory
E.D. Tabangay Consruction 31978 Const. of 1 Cl @Panitian National High School IV-B 0.424 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
E.D. Tabangay Consruction 31978 Const. of MPB Candawaga IV-B 0.408 C 0.318 0.268 0.300 - - - 88.60 *88.60% V. Satisfactory
E.D. Tabangay Consruction 31978 Const. of San Juan High School IV-B 0.424 C 0.379 0.300 0.300 - - - 97.90 72.00% Satisfactory
E.D. Tabangay Consruction 31978
Const./Repair of CY Dep-Ed Sch. Bldg. Projects, Various
Municipalities in Southern Palawan (Const of 1 CL S/B,
Narra NHS)
IV-B 0.549 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
E.D. Tabangay Consruction 31978 Rehab. of Cross-Country Road IV-B 1.866 C 0.240 0.300 0.300 - - - 84.00 87.48% Satisfactory
E.D. Tabangay Const. / Bonifacio M. Carlos Const.
(JV)JV-07-099 Impvt. of Quezon-Punta Baja
Road IVB 18.950 O 0.320 0.150 0.100 0.030 0.033 0.100 73.30 -
E.D. Tabangay Const. / Bonifacio M. Carlos Const.
(JV)JV-07-099 Impvt. of Quezon-Punta Baja
Road IVB 18.950 O 0.265 0.231 0.100 0.030 0.038 0.100 76.40 -
E.G. Canabe Construction 27358 Const. of 1-CL Sch. Bldg. at A.S. Melgar NHS VIII 0.499 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
E.G. Canabe Construction 27358Const. of One (1) Storey 4-CL
H/S Bldg. Carigara NHS (Jugaban Annex),
VIII 1.888 C 0.375 0.221 0.300 - - - 89.60 *89.60% V. Satisfactory
E.H. Mantuhac Construction 21334
Const. of 1 unit 1 CL Modified Standard Sch. Bldg., Madugo
E/SVII 0.440 C 0.281 0.147 0.300 - - - 72.80 *72.80%
Satisfactory
E.H. Mantuhac Construction 21334 Const. of 1 unit 1 CL Sch. Bldg.
@ Sinsing NHS VII 0.482 C 0.245 0.200 0.000 - - - 44.50 *44.50% Poor
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 133
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.H. Mantuhac Construction 21334
Const./Rehab./Replacement / Completion & Repair of Elem. &
Secondary SB, Matabang HSVII 0.488 C 0.187 0.300 0.300 - - - 78.70 *78.70%
Satisfactory
E.I. Templonuevo & Asso. Inc. 1090 Const. of Brgy Laguinbanwa
Road VI 2.409 C 0.301 0.286 0.300 - - - 88.70 86.06% V. Satisfactory
E.K.C. Construction & Aggregates 14833
Const. of Galap Bridge I and its Approaches Gurel-Bokod-
Kabayan-Abatan Road, LooCAR 13.979 C 0.378 0.300 0.300 - - - 97.80 90.60%
Outstanding
E.K.C. Construction & Aggregates 14833 Impvt. of Baguio-Bontoc-Banaue
Road CAR 13.750 O 0.329 0.240 0.000 0.020 0.035 0.033 65.70 -
E.K.C. Construction & Aggregates 14833 Repair/Rehab. Along Abatan-
Mankayan Road CAR 0.337 C 0.386 0.000 0.300 - - - 68.60 *68.60% Fair
E.L. Gomez Construction 31522 Rehab. of MPB @ Brgy. Lourdes Northwest III 0.189 C 0.387 0.145 0.300 - - - 83.20 *83.20%
V. Satisfactory
E.L. Torres Construction and Trading 31406 Completion of MPB along Zone
15 NCR 0.949 O 0.315 0.300 0.100 0.023 0.018 0.067 82.30 -
E.L. Torres Construction and Trading 31406 Repair of Roads & Drainage
along P. Jacinto St. NCR 0.555 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
E.L.R. Everybody's Construction 6336
Rehab./Reconst. of Damaged National Roads, Banay-Banay-Cuenca-Mojon Road, Lipa City
Section
IV-A 9.644 C 0.340 0.270 0.300 - - - 91.00 *91.00% Outstanding
E.M. Angeles Enterprises 10150 Const. of MPB at Brgy. Talon 2 NCR 1.912 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory
E.M. Aragon Enterprises 3314 Conc./Widening of Manila-Cavite Road IV-A 9.580 C 0.381 0.200 0.300 - - - 88.10 88.10%
V.Satisfactory
E.M. Aragon Enterprises 3314Const. (Conc.)/Widening of
Governor's Drive, Dasmariñas-Carmona Road
IV-A 35.578 O 0.269 0.288 0.050 0.030 0.042 0.100 77.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 134
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.M. Aragon Enterprises 3314Const. (Conc.)/Widening of
Governor's Drive, Dasmariñas-Carmona Road
IV-A 35.578 O 0.331 0.300 0.050 0.030 0.042 0.100 85.30 -
E.M. Bayatan Construction 21332 Const. of MPB Phase III @ NVPH II 1.745 C 0.312 0.200 0.300 - - - 81.20 *81.20% V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Pawak P/S, 1 CL Sch. Bldg. II 0.406 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Phil. Science High Sch. Bldg. II 1.877 C 0.308 0.239 0.300 - - - 84.70 84.70%
V.Satisfactory
E.M. Bayatan Construction 21332 Const. of Quirino MPB II 0.470 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Solano MPB II 0.939 C 0.371 0.200 0.300 - - - 87.10 85.98% V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Sta. Rosa MPB II 0.470 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory
E.M. Cuerpo 30963 San Joaquin Ferry Station and Linear Park Project PRRC 22.333 O 0.378 0.231 0.100 0.010 0.025 0.100 84.40 -
E.M. Cuerpo, Inc. 30963 Guadalupe Ferry Station Project PRRC 11.379 O 0.358 0.284 0.100 0.000 0.035 0.100 87.70 -
E.M. Palomares Construction 23471 Const. of Multi-Purpose Building I 0.950 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
E.M. Palomares Construction 23471
Impvt. of Gangal-Bazar-Sallapadan Bo. FMR Sallapadan
ARCCAR 12.255 C 0.286 0.300 0.300 - - - 88.60 80.04%
V. Satisfactory
E.P. Manantan Construction and
Development Corp.6457 Conc./Reblocking of Agusan-
Davao Road XI 9.949 O 0.368 0.225 0.100 0.010 0.050 0.100 85.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 135
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.P. Manantan Construction and
Development Corp.6457
Const./Rehab./Replacement/Completion and Repair of Elem. Sch.
Bldg. at Luis Lina PSXI 2.035 C 0.322 0.273 0.300 - - - 89.50 *89.50%
V. Satisfactory
E.P. Manantan Construction and
Development Corp.6457 Impvt./Conc. of 4 lanes at
Tuganay Bridge & Approaches XI 7.699 C 0.336 0.200 0.300 - - - 83.60 83.60% V.Satisfactory
E.P. Manantan Construction and
Development Corp.6457
Rehab./Impv't. (Conc.) of La Fortuna-Tagum Terminal-Capitol-
Canocotan-Laureta Sect. XI 14.975 C 0.297 0.300 0.300 - - - 89.70 87.12%
V. Satisfactory
E.P.L. General Construction 15559 Conc. of Road, Zone 6, New San Roque V 0.937 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
E.P.L. General Construction 15559 Const. of 1Cl Sch. Bldg. @ Calabanga H/S V 0.439 C 0.335 0.237 0.300 - - - 87.20 *87.20%
V. Satisfactory
E.P.L. General Construction 15559
Const. of 2 Storey Sch. Bldg. with CR, roof Deck Complete
Electrical Fixtures and Paintings, Bell-San Francisco E/S
V 3.327 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
E.P.M. Construction 13307 Const. of 1 Storey 2 Cl Sch. Bldg. @ Luck E/S IV-A 0.858 C 0.334 0.300 0.300 - - - 93.40 *93.40%
Outstanding
E.R. Dela Cruz Construction & Supply 32158 Const. of Classroom @ Sto.
Rosario E/S III 0.951 C 0.337 0.168 0.300 - - - 80.50 * 80.50% V. Satisfactory
E.R. Dela Cruz Construction Supply 32158 Conc. of Brgy. Malabago Road III 0.944 C 0.286 0.200 0.300 - - - 78.60 *78.60%
Satisfactory
E.S.L. Builders and Parts Supply 9014 Const. of MPB @ Brgy. Camilmil IV-B 0.668 C 0.345 0.300 0.300 - - - 94.50 86.10%
V. Satisfactory
E.S.R. Construction and Supplies 10451 Gadakinsur CIP MOPIO 10.740 O 0.360 0.160 0.100 0.020 0.040 0.200 88.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 136
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
E.S.R. Construction and Supplies 10451 Gadakinsur Communal Irrigation
Project, Package II MOPIO 13.049 O 0.371 0.160 0.050 0.010 0.050 0.200 84.11 -
E.T. Latawan Construction 13919 Const. of Tigil-Betwagan FMR CAR 4.765 C 0.361 0.254 0.300 - - - 91.50 93.00% Outstanding
E.T. Latawan Construction 13919 Impvt. of Mt. Data Bridge along Baguio-Bontoc CAR 9.263 C 0.371 0.100 0.300 - - - 77.10 74.72%
Satisfactory
E.T.V.R. Trading and Construction 14581
Conc. of CNR, San Teodoro-Puerto Galera Road, Hasmin
SectionIV-B 16.260 C 0.360 0.200 0.300 - - - 86.00 90.02%
Outstanding
E.T.V.R. Trading and Construction 14581 Rehab./Impvt. of DPWH Office
Bldg., Regional Office XI 19.250 O 0.389 0.300 0.100 0.030 0.058 0.100 97.70 -
E.U. Jingco Construction 31486 Proposed Access Road-PUP Main SPO 2.487 O 0.399 0.154 0.070 0.023 0.023 0.033 70.20 -
E.U. Jingco Construction 31486 Proposed Access Road-PUP Main SPO 2.487 C 0.400 0.241 0.300 - - - 94.10 94.10%
V. Satisfactory
EA-EC Constuction 15737 Completion of MPB V 0.376 C 0.340 0.200 0.300 - - - 84.00 81.48% V. Satisfactory
EA-EC Constuction 15737 Const. of 1 CL Rm. Modified Sch. Bldg. V 0.531 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
EA-EC Constuction 15737 Const. of Flood Control V 2.088 C 0.307 0.100 0.300 - - - 70.70 *70.70% Satisfactory
Earl Construction 8461 Const. of 2 Storey MPB @ Block 38 Brgy. Addition Hills NCR 19.096 C 0.361 0.300 0.300 - - - 96.10 85.95%
V. Satisfactory
Eastern Construction Company, Inc. 2225 Completion of MPB @ Cainta
Green Park IVA 2.395 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 137
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
EBJR Construction 19780 Const. of Baluan-Mawigui-Allanguigan Road CAR 1.413 C 0.280 0.300 0.300 - - - 88.00 91.18%
Outstanding
EC Samonte Construction 31019 Conc. of Sirawai Boulevard (Phase II) IX 1.908 C 0.298 0.052 0.300 - - - 65.00 75.02%
Satisfactory
EC Samonte Construction 31019 Const. of Liloy-Siocon Road, Dansalan-Lopoc IX 28.654 O 0.304 0.238 0.100 0.030 0.025 0.067 76.40 -
ECDA Construction 7013 Channeling Works @ Sta. Lucia Creek III 0.473 C 0.298 0.257 0.300 - - - 85.50 *85.50%
V.Satisfactory
ECDA Construction 7013 Rehab. of Road Network Poblacion Floridablanca III 0.474 C 0.313 0.100 0.300 - - - 71.30 *71.30%
Satisfactory
Ecpiatos Construction and Supply 31540 Const. of Caramcam Bridge XIII 3.693 C 0.213 0.300 0.300 - - - 81.30 76.47%
Satisfactory
Ed Fabro Construction 18726Rehab. of Damaged Cover & Sidewalk of North & South
Central Sch.I 0.760 C 0.301 0.200 0.300 - - - 80.10 *80.10%
V. Satisfactory
Ed Fabro Construction 18726Rehab. of Multi-Purpose Pavement @ PNR, Biday-
Mameltac and BangbangolanI 1.882 O 0.376 0.200 0.100 0.030 0.022 0.100 82.80 -
Ed Ting Builders and Construction Supply 26199 Const. of San Jose-Trento Road
Boundary XIII 9.180 C 0.186 0.300 0.000 - - - 48.60 65.13% Fair
Eddie G. Guillen Builders 14174 Conc. of Appari Airport Road II 2.150 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
Eddie G. Guillen Builders 14174 Conc. of Dugo-San Vicente Road with Drainage II 13.174 C 0.355 0.200 0.300 - - - 85.50 87.72%
V. Satisfactory
Eddie G. Guillen Builders 14174 Conc. of M. Antiporda Road, Municipal St. II 0.945 C 0.249 0.168 0.300 - - - 71.70 *71.70%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 138
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Eddie G. Guillen Builders 14174Conc. Paving of Jct. Dibalio-
Calanasan Road, Phase VI, San Antonio Section
II 4.512 C 0.297 0.300 0.300 - - - 89.70 87.66% V. Satisfactory
Eddie G. Guillen Builders 14174 Concrete Reblocking along Dugo-San Vicente Road II 14.215 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -
Eddie G. Guillen Builders 14174 Concreting of Road Leading to Cagayan State University II 2.849 C 0.321 0.210 0.300 - - - 83.10 82.08%
V. Satisfactory
Eddie G. Guillen Builders 14174 Const. of Tupang River Control II 4.699 C 0.373 0.300 0.300 - - - 97.30 75.10% Satisfactory
Eddmari Construction and Trading 20301 Sct. Ranger Housing Project,
Phase IV NHA 46.983 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -
Eddmari Construction and Trading 20301
Asphalting of Arayat-Apalit-Masantol Setback Levee
(Candaba-San Luis-Apalit-San Simon-Macabebe & Masantol
Section
III 9.510 C 0.309 0.200 0.300 - - - 80.90 *80.90% V. Satisfactory
Eddmari Construction and Trading 20301 Concreting of Laon FMR IV-B 0.239 C 0.444 - 0.500 - - - 94.40 *94.40%
Outstanding
Eddmari Construction and Trading 20301 Concreting of Road, Brgy.
Minuyan 4 III 0.473 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Eddmari Construction and Trading 20301 Concreting of San Matias Brgy.
Road III 0.475 C 0.324 0.184 0.300 - - - 80.80 *80.80% V. Satisfactory
Eddmari Construction and Trading 20301 Const./Repair/Rehab. of Sta. Rita
Brgy. Road III 0.381 C 0.258 0.230 0.300 - - - 78.80 *78.80% Satisfactory
Eddmari Construction and Trading 20301
Maintenance/Rehab. & Impv't. of Nat'l Arterial Secondary Roads, Apalit-Macabebe-Masantol Road
III 0.951 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 139
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Eddmari Construction and Trading 20301 Repair of Slope Protection of
San Miguel Bridge III 9.534 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory
Edelcriz Construction 30864 Conc. of Road @ Brgy. Bagong Buhay 1 III 0.954 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Edelcriz Construction 30864 Conc. of Road @ Brgy. Sapang Palay, Proper Sitio Lote III 0.446 C 0.253 0.300 0.300 - - - 85.30 *85.30%
V. Satisfactory
Edelsons Builders, Inc. 24826 Rehab. of Road at Brgy. San Isidro IV-A 0.956 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V. Satisfactory
Edison Lumber and Construction 31333 Const. of 1-Classroom School
Building I 0.480 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory
Edriel Enterprises 32500 Const. of Bislig Flood Control V 1.915 C 0.282 0.200 0.300 - - - 78.20 *78.20% Satisfactory
EDT Construction 10225 Maintenance/Rehab. & Impv't. of GSO Road III 0.980 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
Edward Lui Construction 8459 Completion of MPB at Brgy. Sawang Calero VII 0.959 O 0.383 0.300 0.100 0.030 0.027 0.100 94.00 -
E E I Corporation 333
NAIA Expressway and its Related Roads Project, Phase I,
CP-II, Skyway Interchange Ramps 1 & 4
URPO 601.681 C 0.328 0.300 0.300 - - - 92.80 91.71% Outstanding
EFC Enterprises 11795Completion of Pieta Bridge along Dasmariñas-Carmona
RoadIVA 11.093 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
EFC Enterprises 11795 Conc. Blocking of EDSA (Northbound) NCR 8.876 C 0.149 0.200 0.300 - - - 64.90 *64.90%
Fair
EFC Enterprises 11795 Conc. of A. P. Reyes Ave. NCR 9.539 C 0.310 0.300 0.300 - - - 91.00 *91.00% Oustanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 140
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
EFC Enterprises 11795Const. of Las Piñas-Muntinlupa-
San Pedro Road (Including Drainage System) Phase VI
NCR 13.571 C 0.355 0.200 0.300 - - - 85.50 89.94% V. Satisfactory
EFC Enterprises 11795 Const. of MPB @ Brgy. San Vicente IVA 1.921 C 0.349 0.200 0.300 - - - 84.90 85.32%
V. Satisfactory
EFC Enterprises 11795 Const. of Quirino Ave. near Don Galo La Huerta Bridge NCR 9.617 C 0.270 0.290 0.300 - - - 86.00 92.54%
Outstanding
EFC Enterprises 11795 Maeztranza Linear Park Project PRRC 22.850 O 0.350 0.260 0.100 0.030 0.065 0.100 90.50 -
EG & I Construction Corporation 16225 Const. of Argao River Control VII 0.185 C 0.334 0.300 0.300 - - - 93.40 *93.40%
Outstanding
EG & I Construction Corporation 16225 Impvt./Rehab. of Argao-Moalboal
Road (Taloot-Anahaw Sect.) VII 4.694 C 0.309 0.300 0.300 - - - 90.90 *90.90% Outstanding
EG & I Construction Corporation 16225 Impvt./Rehab. of Various Sts. At
Lamacan VII 4.782 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding
EG & I Construction Corporation 16225
Rehab./Reconst. of Damaged National Roads Generated from
Pavement Management Sys., along Bacalso Ave. (NBA-Cebu
South Rd.)
VII 15.873 C 0.367 0.211 0.300 - - - 87.80 *87.80% V. Satisfactory
EG & I Construction Corporation 16225 Const. of Access Road to RORO
Port (Phase I) VII 4.742 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
EGB Construction 13722 Conc. of Jct. Nat'l to Sta. Victoria Road II 13.098 C 0.306 0.294 0.300 - - - 90.00 88.68%
V. Satisfactory
EGB Construction 13722 Conc./Impvt. of Cabannungan 1st Brgy. Road II 0.942 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 141
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
EGB Construction 13722Concrete Paving of Ilagan-Delfin Albano-Mallig Road, Sta. Isabel
Norte SectionII 1.852 O 0.312 0.284 0.300 - - - 89.60 -
EGB Construction 13722 Const. of MPB II 1.923 C 0.378 0.248 0.300 - - - 92.60 87.56% V. Satisfactory
EGB Construction 13722 Const. of MPB II 1.926 C 0.385 0.200 0.300 - - - 88.50 87.63% V. Satisfactory
EGB Construction 13722Const. of School Building
(Clustered 15 Units) 1-CL@ Bimonton E/S
II 0.384 O 0.346 0.281 0.100 0.030 0.023 0.100 88.00 -
EGB Construction 13722Const. of Various School Bldg., 3CL Sch. Bldg. Cabagan Pilot
School II 0.790 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
EGB Construction 13722Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road, Ilagan-
Delfin Albano II 9.439 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
EGB Construction 13722 Rehab./Reconst. of Damaged National Roads II 19.132 O 0.365 0.300 0.050 0.030 0.033 0.100 87.80 -
EGB Construction 13722 Rehab./Reconst. of Damaged National Roads II 19.132 O 0.366 0.240 0.000 0.030 0.033 0.067 73.60 -
EGB Construction 13722 Road Conc. of Cabisera II 3.815 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
EGB Construction 13722 Road Concreting of Bliss to Namnama II 1.925 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
EJR Builders and Construction Supply 24255 Completion of Multi-Purpose
Building I 1.424 C 0.376 0.100 0.300 - - - 77.60 83.20% V. Satisfactory
EJR Builders and Construction Supply 24255 Conc. of Road @ Nayom I 0.475 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 142
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
El Nido Construction & Trading 25814 Const. of 1Cl Dumarao BHS IVB 0.378 O 0.286 0.300 0.100 0.020 0.035 0.100 84.10 -
El Nido Construction & Trading 25814 Const. of Pinagupitan-Daungan
FMR IVB 1.860 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory
El Nido Construction & Trading 25814
Repair/Restoration of Tabuan Road Sect. & Inst. of Box Culvert
& Slope Protection IVB 6.413 C 0.303 0.300 0.300 - - - 90.30 *90.30%
Outstanding
Eleazar V. Adlawan Construction 576 Conc. of Panglao National Road VII 19.049 C 0.337 0.200 0.300 - - - 83.70 89.04%
V. Satisfactory
Eleazar V. Adlawan Construction 576 Const. of Seawall, Brgy. South
Poblacion VII 4.778 C 0.211 0.300 0.300 - - - 81.10 79.06% Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Barangay Road, Sogod-
Sto. Domingo V 0.458 C 0.281 0.226 0.300 - - - 80.70 *80.70% V. Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Drainage System along
Inascan-Paulog Road V 9.576 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Multi-Purpose Building V 0.280 C 0.394 0.200 0.300 - - - 89.40 *89.40%
V. Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of P. Basas Elem. School
Building V 0.453 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
Elkan Konstrak & Aggregates 26220 Seal/Widening/Rehab./Impv't. of
Road Shoulder along MSR V 0.230 C 0.364 0.200 0.300 - - - 86.40 86.40% V.Satisfactory
EM Paule Construction and Trading 19006 Const. of 1-unit 1 CL Sch. Bldg.
@ Maydolong NHS VIII 0.373 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory
EMMROS Construction 27065Resurfacing of MWCR,
Pagbahan-Talabaan Section, Km.391+134-Km.392+500
IV-B 0.573 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding
EMQ Designs and Construction 16128 Concreting/Improvement of
Binocot FMR Bunsuran IV-B 0.446 C 0.278 0.284 0.300 - - - 86.20 *86.20% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 143
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
EMS Sarmiento Construction 29097
Const. of Caban 1 Bridge and its Approaches along Danao-Getafe
Rd.VII 4.265 C 0.306 0.300 0.300 - - - 90.60 91.68%
Outstanding
EMS Sarmiento Construction 29097 Impvt. (Conc. Paving) of Danao-
Getafe Road VII 9.470 C 0.359 0.300 0.300 - - - 95.90 94.64% Outstanding
EMS Sarmiento Construction 29097 Talibon Small Reservoir
Irrigation Project NIA 5.170 O 0.385 0.176 0.030 0.030 0.047 0.200 86.80 -
ENC Enterprises 29819 Const. of Multi-Purpose Bldg., Sta. Clara Sur IV-A 0.477 O 0.398 0.300 0.100 0.030 0.011 0.067 90.60 -
Enrique A. Flores Jr. Contractor 2421 Rehab./Conc. of Roads @ Irisan
Brgy. CAR 2.863 C 0.221 0.200 0.300 - - - 72.10 *72.10% Satisfactory
EP Manantan Construction & Development Corp. 6457 Conc./Reblocking of Agusan-
Davao Road XI 9.949 O 0.338 0.000 0.100 0.008 0.043 0.100 58.90 -
EPN Builders and Developers 30341 Const. MPB @ Roxas East C/S
(Phase II) II 1.926 C 0.392 0.200 0.300 - - - 89.20 84.72% V. Satisfactory
EPN Builders and Developers 30341 Const. of MPB ( Phase I) @
Andres Bonifacio II 0.566 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
EPN Builders and Developers 30341 Const. of MPB (Community
Center) II 0.189 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
EPN Builders and Developers 30341
Const. of One Unit Classroom School Building @ San
Leonardo E/SII 0.416 C 0.379 0.228 0.300 - - - 90.70 84.89%
V. Satisfactory
EPN Builders and Developers 30341 Const. of School Bldg. @ San
Leonardo E/S II 0.527 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 144
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
EPN Builders and Developers 30341 Const. of School Bldg. at
Bannawag II 0.476 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
EPN Builders and Developers 30341
Repair/Rehab. of Eroded Embankment & Damaged Slope Protection @ Babanuang Bridge
along Santiago-Tuguegarao Road
II 0.964 C 0.280 0.200 0.300 - - - 78.00 81..84% V. Satisfactory
EPN Builders and Developers 30341
Repair/Rehab. of Tungcab Bridge Approach "B" along Cordon-Aurora Bdry. Road
II 0.964 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Equi-Parco Construction Co. 14332 Asphalt Overlay along Butuan
City-Cagayan de Oro-Iligan Road XIII 14.450 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Equi-Parco Construction Co. 14332
Conc. of Agusan del Norte-Surigao del Sur (Cabadbaran-
Puting Bato Section)XIII 95.698 O 0.393 0.272 0.100 0.030 0.050 0.100 94.50 -
Equi-Parco Construction Co. 14332 Conc. of Agusan-Bukidnon
National Road XIII 15.034 O 0.376 0.225 0.100 0.030 0.048 0.100 87.90 -
Equi-Parco Construction Co. 14332 Conc. of Kinabjangan By-Pass
National Secondary Road XIII 13.876 O 0.331 0.225 0.100 0.030 0.048 0.100 83.40 -
Equi-Parco Construction Co. 14332 Const. of Jagupit Flood Control
& Highway Restoration XIII 14.317 C 0.325 0.020 0.300 - - - 64.50 83.22% V. Satisfactory
Equi-Parco Construction Co. 14332
Const. of Palapay Bridge and Approaches, Gingoog Claveria
RoadX 21.713 C 0.359 0.300 0.300 - - - 95.90 92.84%
Outstanding
Equi-Parco Construction Co. 14332
Impvt. of JSH-Bagontaas-Lurogan-MVC-Lilingayeon Road,
MVC SectionX 24.697 C 0.370 0.230 0.300 - - - 90.00 85.44%
V. Satisfactory
Equi-Parco Construction Co. 14332
Impvt./Conc. of Aglayan-Zamboanguita Road, Managoc
SectionX 66.953 C 0.361 0.300 0.300 - - - 96.10 91.00%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 145
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Equi-Parco Construction Co. 14332 Impvt./Conc. of Gingoog-
Claveria-Villanueva Road X 19.064 C 0.383 0.300 0.300 - - - 98.30 *98.30% Outstanding
Equi-Parco Construction Co. 14332 Nasipit Port Expansion Project PPA 215.144 O 0.3984 0.3 0.1 0.03 0.07 0.1 99.84 -
Equi-Parco Construction Co. 14332 Rechannelization of Mamkas
River XIII 14.455 C 0.213 0.022 0.300 - - - 53.50 73.84% Satisfactory
Equi-Parco Construction Co. 14332 Rehab. of Puyo River Flood
Control (Downstream) XIII 14.303 C 0.469 - 0.500 - - - 96.90 *96.90% Outstanding
Equi-Parco Construction Co. 14332 Rehab./Reconst. Of Butuan City-
Masao Port Road XIII 19.276 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory
Equi-Parco Construction Co. 14332
Repair & Rehab. of Butuan-Cagayan de Oro-Iligan Road
(Agusan-Misamis Oriental Road)XIII 14.457 C 0.343 0.300 0.300 - - - 94.30 94.42%
Outstanding
Equi-Parco Construction Co. 14332
Repair & Rehab. of Butuan-Cagayan de Oro-Iligan Road (Sta. 1240+746-Sta. 1241+276
with exceptions)
XIII 14.454 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Equi-Parco Construction Co. 14332
Road Upgrading (Gravel to concrete) Jct., SH Bangcud-Mailag By Pass Road (Mailag
Section)
X 12.329 C 0.372 0.300 0.300 - - - 97.20 93.48% Outstanding
Equi-Parco Construction Company 14332 Const. of Amontay Flood Control XIII 9.317 O 0.398 0.200 0.100 0.030 0.051 0.200 97.90 -
Equi-Parco Construction Company 14332 Improvement of Butuan City-
Masao Port Road XIII 4.674 C 0.295 0.284 0.300 - - - 87.90 93.18% Outstanding
Equi-Parco Construction Company 14332 Masao Flood Control XIII 14.451 C 0.472 - 0.500 - - - 97.20 *97.20%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 146
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Equi-Parco Construction Company 14332 Nasipit Port Expansion Project FCMD 217.925 C 0.400 0.300 0.300 - - - 99.44 99.44%
Outstanding
Eric Van P. Sesbreno Construction 26243 Conc. of Tactac-Atbu Road II 0.479 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Eric Van P. Sesbreno Construction 26243 Const. of Aritao NHS, 2-Storey
Bldg., 8-CL School Building II 4.817 C 0.363 0.200 0.300 - - - 86.30 75.28% Satisfactory
Eric Van P. Sesbreno Construction 26243 Const. of Imugan MPB
(Gymnasium) II 0.902 C 0.222 0.300 0.300 - - - 82.20 *82.20% V. Satisfactory
Eric Van P. Sesbreno Construction 26243 Const. of MPB at Villaflores II 0.286 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Ermy Construction 15741 Concreting of Brgy. Road at Brgy. Sindalan City III 0.478 C 0.360 0.221 0.300 - - - 88.10 *88.10%
V. Satisfactory
Ermy Construction 15741 Const. of 3 CL at San Isidro E/S III 1.136 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding
Ermy Construction 15741 Impvt./Rehab. of Cabetican Road III 1.906 C 0.291 0.300 0.300 - - - 89.10 *89.10% V. Satisfactory
Ermy Construction and Trading (Formerly:Ermy
Construction)15741 Rehab. of Brgy. Road at St. Niño III 0.956 C 0.312 0.300 0.300 - - - 91.20 *91.20%
Outstanding
ESD Cruz Construction & Supply 32368 Const. of Conc. Drainage @
Brgy. Sto. Niño VIII 0.241 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
ESD Cruz Construction & Supply 32368 Repair of Secondary Sch. Bldg.,
Rawis NHS VIII 0.648 C 0.379 0.100 0.300 - - - 77.90 *77.90% Satisfactory
ESD Cruz Construction & Supply 32368
Repair/Rehab. of National Road (Pangpang-Mapanas-Gamay-
Lapinig RoadVIII 9.789 O 0.320 0.240 0.100 0.015 0.030 0.100 80.50 -
ESEK Construction Corporation 12871 Completion of Malanday E/S NCR 4.772 O 0.329 0.300 0.100 0.030 0.041 0.100 90.00 -
Eser Enterprises-Burot 23902 Const. of 1 Cl Sch. Bldg. @ Capas East CES III 0.424 C 0.362 0.275 0.300 - - - 93.70 *93.70%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 147
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Eser Enterprises-Burot 23902 Const. of MPB at Sitio Tarvet III 0.564 C 0.234 0.200 0.300 - - - 73.40 *73.40% Satisfactory
ESN Construction and Trading 32720 Impvt. of Roads (Tibagan) III 0.475 C 0.277 0.200 0.300 - - - 77.70 *77.70%
SatisfactoryESN Construction and
Trading 32720 Impvt. of Roads (Tilapayong) III 0.477 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
ESR Construction and Supplies 10451 Conc. of Mahayag-Dumingag
Road (Kaangayan Section) IX 13.931 C 0.270 0.257 0.300 - - - 82.70 85.84% V. Satisfactory
ESR Construction and Supplies 10451 Concreting of Roads at Brgy.
Canicapan X 0.949 C 0.331 0.280 0.300 - - - 91.10 88.52% V. Satisfactory
ESR Construction and Supplies 10451 Construction of 109 Duplex
Housing Units
NHA-Cagayan De Oro
25.295 O 0.390 0.171 0.100 0.024 0.030 0.100 81.44 -
ESR Construction and Supplies 10451 Siloy ARC (Rehab. of Purok 1, 2,
3, 4, 5 Circumferntial) X 8.341 C 0.329 0.200 0.300 - - - 82.90 *82.90% V.Satisfactory
ETM Construction 16285 Conc. of Brgy. Road, Purok 1 Brgy. San Jose III 0.437 C 0.363 0.108 0.300 - - - 77.10 *77.10%
Satisfactory
Euluz Construction and Supply 32080
Const./Rehab. of Drainage System and Gutter along KG and
K-9thNCR 1.433 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Sstisfactory
Euluz Construction and Supply 32080 Const./Rehab. of MPB NCR 2.254 C 0.318 0.251 0.300 - - - 86.90 *86.90%
V. Sstisfactory
Express Construction 29649 Conc./Impvt. of Sto. Tomas Ext. NCR 1.456 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
F & A Construction and Supplies 29524 Completion of MPB XIII 4.547 C 0.359 0.300 0.300 - - - 95.90 67.34%
Fair
F & A Construction and Supplies 29524
Impvt. of Road Slip and other related activities, Cortes-Igang
Sect.XIII 2.885 C 0.231 0.265 0.300 - - - 79.60 *79.60%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 148
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
F & J General Construction and Supply Corporation 31963
Repair/Rehab./Impvt. of Roadways (Inst. Of Road Traffic
Safety Devices), Nueva Ecija-Aurora Road (Dimani to
Dimabayo Sect.)
III 4.625 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory
F. Gurrea Construction 6995 Sibunag Port Improvement Project FCMD 101.207 C 0.397 0.300 0.300 - - - 99.70 99.65%
Outstanding
F. Gurrea Construction, Inc. 6995Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 12.603 C 0.258 0.300 0.300 - - - 85.80 85.80%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995
Asphalt Overlay along Guimaras Central Road Brgy. Bugnay-San
Miguel SectionVI 5.715 C 0.380 0.200 0.300 - - - 88.00 88.30%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Asphalt Paving of Lambunao-
Pototan Road VI 9.540 O 0.364 0.225 0.100 0.022 0.059 0.100 87.00 -
F. Gurrea Construction, Incorporated 6995 Completion of Anahawon VI 9.423 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -
F. Gurrea Construction, Incorporated 6995
Conc. of Oton-Mambog-Caboloan-Abilay-San Jose-San
Miguel Road leading to International Airport
VI 57.850 O 0.291 0.212 0.100 0.023 0.048 0.100 77.40 -
F. Gurrea Construction, Incorporated 6995 Const. of Diclum Bridge VI 13.665 C 0.387 0.200 0.300 - - - 88.70 86.99%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Const. of Pociento Bridge VI 12.443 C 0.289 0.300 0.000 - - - 58.90 71.11%
Satisfactory
F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center X 349.995 O 0.333 0.240 0.050 0.030 0.065 0.033 75.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 149
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center X 289.732 O 0.363 0.300 0.000 0.030 0.065 0.100 85.80 -
F. S. Sugay Construction & Supplies 28489 Const. of MPB at Poblacion IV-B 2.005 C 0.381 0.200 0.300 - - - 88.10 85.30%
V. Satisfactory
F. Vargas Construction 2366Cagayan River Basin Bank
Protection Works, San Vicente Section
II 13.722 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
F. Vargas Construction 2366 Const. of Bunot Bridge and its Approaches CAR 12.586 C 0.364 0.200 0.300 - - - 86.40 92.10%
Outstanding
F. Vargas Construction 2366 Const. of Cadondongan Bridge II 6.754 C 0.346 0.200 0.300 - - - 84.60 86.64% V. Satisfactory
F. Vargas Construction 2366 Const. of Guising Bridge & Approaches II 18.407 C 0.361 0.200 0.300 - - - 86.10 86.31%
V. Satisfactory
F. Vargas Construction 2366
Const. of Permanent Bridge Support & Rehab. of Existing
Pony Truss of Magapit Suspension Bridge
II 13.168 C 0.400 0.200 0.300 - - - 90.00 84.18% V. Satisfactory
F. Vargas Construction 2366 Const. of Tupang Bridge & Approaches II 15.951 C 0.356 0.200 0.000 - - - 55.60 72.28%
Satisfactory
F.A. Construction 9837 Const. of 1 CL Bldg. @ Sta.Lucia and Dapdap E/S III 0.840 C 0.347 0.265 0.300 - - - 91.20 *91.20%
Outstanding
F.A. Construction 9837 Const. of MPB (Covered Court) III 1.886 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding
F.C. Martinez Construction 31243 Const. of 1 CL, Murcon E/S III 0.410 C 0.352 0.164 0.300 - - - 81.60 *81.60% V. Satisfactory
F.C. Martinez Construction 31243 Const. of Four (4) Classroom, San Felipe H/S III 1.331 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 150
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
F.F. Cruz and Company, Incorporated 123 Construction of Magsaysay
Viaduct CARBDP 496.818 C 0.387 0.300 0.300 - - - 98.70 98.47% Outstanding
F.F. Cruz and Company, Incorporated 123 San Juan Port Development
Project PPA 45.336 O 0.397 0.300 0.000 0.030 0.065 0.033 82.50 -
F.F. Galang Construction 26801 Const. of Multi-Purpose Building IV-B 0.745 C 0.395 0.206 0.300 - - - 90.10 85.34% V. Satisfactory
F.F. Galang Construction 26801 Const. of Multi-Purpose Building (Bleacher), Brgy. Punta Baja IV-B 0.279 C 0.328 0.200 0.300 - - - 82.80 79.93%
Satisfactory
F.F. Rosales Construction 8814 Const. of Eco-Tourism Road IV-A 8.908 C 0.332 0.200 0.300 - - - 83.20 83.68% V. Satisfactory
F. Gurrea Construction, Inc 6995 Sibunag Port Improvement Project PPA 92.203 O 0.352 0.300 0.070 0.030 0.065 0.067 88.42 -
F.L. Reguyal Construction 3315 Completion of Along-Along Bridge, Phase IV III 2.848 O 0.272 0.300 0.100 0.020 0.050 0.100 84.20 -
F.L. Reguyal Construction 3315 Const. of 2-CL @ Eastern Cabu E/S III 0.614 C 0.359 0.300 0.300 - - - 95.90 *95.90%
Outstanding
F.L. Reguyal Construction 3315 Const. of MPB Brgy. San Mariano III 1.872 C 0.349 0.289 0.300 - - - 93.80 *93.80%
Outstanding
F.L. Reguyal Construction 3315Const. of Single Barrel Box
Culvert along Sta. Rosa-Tarlac Road
III 0.951 C 0.400 0.200 0.300 - - - 90.00 88.20% V. Satisfactory
F.L. Reguyal Construction 3315Repair/Rehab. of Gapan-
Peñaranda-Fort Magsaysay Road
III 7.303 C 0.301 0.200 0.300 - - - 80.10 *80.10% V. Satisfactory
F.P. De Guzman Construction, Inc. 10296
Concreting of Pathways @ Brgy. 391, Brgy. 392, Soler St. &
VicinityNCR 3.713 C 0.285 0.200 0.300 78.50 74.78%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 151
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
F.P. De Guzman Construction, Inc. 10296
Const. of School Bldg. @ Smokey Mountain Resettlement
AreaNCR 13.999 C 0.369 0.200 0.300 - - - 86.90 83.66%
V. Satisfactory
F.P. De Guzman Construction, Inc. 10296 Rehab. of MPB @ Brgy. 393,
Zone 40 NCR 1.709 C 0.343 0.300 0.300 - - - 94.30 88.56% V. Satisfactory
F.V. Chua Construction and Supply 27267 Const. of MP Building at Brgy.
Tiaong III 0.237 C 0.390 0.138 0.300 - - - 82.80 *82.80% V. Satisfactory
F.V. Chua Construction and Supply 27267
Road Conc. At Camachilihan & Tumana-Talampas, Bustos,
Banga 1st & Tabang III 1.520 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
Fairchild Builders & Developers Inc. (Formerly:
Fairchild Marketing & Const.)
10024 Concreting of Tabango & Liling Bridge Approaches VIII 4.766 C 0.379 0.300 0.300 - - - 97.90 93.64%
Outstanding
Fairchild Builders & Developers, Inc. 10024 Const. of River Bank Protection
at San Joaquin VIII 1.928 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Fairchild Builders & Developers, Inc. 10024 Const. of Tabunok II Bridge @
Brgy. Tabunok VIII 4.071 C 0.267 0.300 0.300 - - - 86.70 84.24% V. Satisfactory
Fairchild Builders & Developers, Inc. 10024 Const./Impvt. Of Malitbog (MPB)
Livelihood Center VIII 6.673 C 0.398 0.200 0.300 - - - 89.80 84.41% V. Satisfactory
Fairchild Builders & Developers, Inc. 10024 Const./Rehab./Impvt. Of
Drainage System @ Brgy. 87 VIII 1.899 C 0.358 0.200 0.300 - - - 85.80 *85.80% V. Satisfactory
Fatima Builders 27939Const. & Repair of School Building @ Lazi National
Agricultural SchoolVII 0.944 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
Fatima Builders 27939 Repair of Municipal Water System VII 0.940 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Fatima Builders 27939 Repair/Rehab. of FMR at Pisong A VII 0.463 C 0.328 0.261 0.300 - - - 88.90 *88.90%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 152
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
FEAJ Construction and General Services 13609 Completion of MPB IV-B 0.954 C 0.349 0.200 0.300 - - - 84.90 *84.90%
V. Satisfactory
FEAJ Construction and General Services 13609 Concreting of Road, Dulangan 1-
2 IV-B 1.899 O 0.235 0.300 0.100 0.022 0.035 0.100 79.20 -
FEAJ Construction and General Services 13609 Concreting of Road, Dulangan 1-
2 IV-B 1.899 C 0.304 0.200 0.300 - - - 80.40 79.68% Satisfactory
Feldan Construcion & Enterprises 30572
Const. of 1 CL Sch. Bldg. at Mansilingan Agro Industrial
SchoolVI 0.500 C 0.325 0.117 0.300 - - - 74.20 72.80%
Satisfactory
Feldan Construcion & Enterprises 30572
Const. of 1 CL Sch. Bldg. at MansilinganAgro Industrial
SchoolVI 0.500 O 0.345 0.106 0.100 0.020 0.051 0.100 72.20 -
Ferdstar Builders Contractors 4965
Conc. of El Nido-Bataraza Road (Aboabo-Bataraza Sect.) (Isumbo
Section)IV-B 18.228 C 0.319 0.293 0.300 - - - 91.20 88.98%
V. Satisfactory
Ferdstar Builders Contractors 4965 Const. Brgy. Roads @ Brgys,
Capaya & Pulung Maragul III 0.469 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding
Ferdstar Builders Contractors 4965 Const. of Anao Bridge along San
Jose Malino-Anao Road III 19.015 C 0.350 0.300 0.300 - - - 95.00 83.72% V. Satisfactory
Ferdstar Builders Contractors 4965 Const. of Brgy. Road @ Brgy.
Cutcut III 1.884 C 0.313 0.285 0.300 - - - 89.80 *89.80% V.Satisfactory
Ferdstar Builders Contractors 4965 Const. of Kipot Bridge VI 8.141 C 0.346 0.300 0.000 - - - 64.60 73.90%
Satisfactory
Ferdstar Builders Contractors 4965 Impvt./Rehab. of Brgy. Roads at
Calulut & Baliti III 4.757 C 0.318 0.219 0.300 - - - 83.70 *83.70% V. Satisfactory
Fernz Construction Corporation 28238 Const. of Farm to Market Road X 2.830 C 0.266 0.200 0.300 - - - 76.60 78.04%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 153
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Fernz Construction Corporation 28238 Const. of MPB, Relocation Site X 1.401 C 0.357 0.195 0.300 - - - 85.20 *85.20%
V. Satisfactory
Fernz Construction Corporation 28238 Impvt. of FMR, Brgy. Lumbia to
Brgy. Taglimao X 2.794 C 0.303 0.200 0.000 - - - 50.30 70.34% Satisfactory
Ferreze Const. Supply & Manufacturing 26968
Impvt./Conc. Paving of Isabela-Maluso Nat'l Road @ Maluso
Proper SectionIX 1.682 C 0.336 0.299 0.000 - - - 63.50 70.40%
Satisfactory
Ferreze Const. Supply & Manufacturing 26968 Rehab. of Brgy. Mercedes Road IX 4.733 O 0.380 0.200 0.100 0.030 0.025 0.100 83.50 -
FFJJ Construction 16712Conc. of Davao del Sur-
Sarangani Coastal Road, Kitayo-Balangonan Section
XI 28.900 O 0.274 0.241 0.100 0.022 0.035 0.067 73.90 -
FFJJ Construction 16712 Const. of 2-CL School Building @ Molopolo Annex XI 0.721 O 0.315 0.240 0.100 0.020 0.041 0.100 81.60 -
FFJJ Construction 16712
Const. of Kiblis Bridge with Bridge and Approaches,
Sarangani-Sultan Kudarat Coastal Road
XII 21.574 O 0.392 0.300 0.070 0.030 0.032 0.067 89.10 -
FFJJ Construction 16712
Const. of Kiblis Bridge with Bridge and Approaches,
Sarangani-Sultan Kudarat Coastal Road
XII 21.574 O 0.342 0.273 0.000 0.030 0.028 0.067 74.00 -
FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches XI 18.593 O 0.300 0.300 0.100 0.015 0.035 0.100 85.00 -
FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches XI 18.593 O 0.304 0.240 0.070 0.015 0.035 0.100 76.40 -
FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches XI 22.868 O 0.280 0.240 0.070 0.012 0.025 0.100 72.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 154
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches XI 22.868 O 0.307 0.151 0.100 0.030 0.030 0.067 68.50 -
FFJJ Construction 16712 Const. og Kinangan Bridge and Approaches XI 12.593 O 0.292 0.300 0.100 0.022 0.030 0.100 84.40 -
FFJJ Construction 16712 Const./Replacement of Malalag Bridge XI 14.265 O 0.356 0.197 0.100 0.030 0.060 0.100 84.30 -
FFJJ Construction 16712 Const./Replacement of Malalag Bridge XI 14.265 O 0.335 0.285 0.100 0.030 0.023 0.100 87.30 -
FFJJ Construction 16712Impvt./Conc. of Jct. Mana-
Ticulon-Lagumi-Little Baguio Road
XI 19.250 O 0.335 0.300 0.050 0.030 0.023 0.067 80.50 -
FFJJ Construction 16712 Repair of Jones Timbol CES XI 0.150 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding
FGM Builders Resources & Development Corp. 31807 Completion of Daniel Aguinaldo
NHS XI 0.474 C 0.299 0.300 0.300 - - - 89.90 *89.90% V. Satisfactory
FGM Builders Resources & Development Corp. 31807 Rehab. of MPB at R.O. Quimpo
E/S XI 0.465 C 0.287 0.212 0.300 - - - 79.90 *79.90% Satisfactory
FH Gopiteo Construction & Supply 21336 Const. of Lined Canal @ Brgy.
Kalkam XII 0.882 C 0.388 0.300 0.300 - - - 98.80 91.48% Outstanding
Fiat Construction Services 5463
Cluster A-2004: Const. of Various School Building under
the 2nd Congressional District of Oriental
X 8.449 C 0.293 0.300 0.000 - - - 59.30 65.58% Fair
Fiat Construction Services 5463Conc. of SDCR: Cortes-Tandag-Marihatag Road, (Unaban-Sumo-
sumo)XIII 130.968 O 0.293 0.215 0.100 0.030 0.032 0.100 77.00 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with
Roof Deck for DBM Building Sp. Bldgs. 224.176 O 0.264 0.243 0.100 0.030 0.070 0.067 77.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 155
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with
Roof Deck for DBM Building Sp. Bldgs. 229.100 O 0.335 0.270 0.100 0.030 0.038 0.100 87.30 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with
Roof Deck for DBM Building Sp. Bldgs. 445.429 O 0.372 0.300 0.100 0.030 0.061 0.067 93.00 -
Filipinas Construction Supply 11644 Repair/Rehab. of Bukal Sur E/S IV-A 0.335 C 0.248 0.271 0.300 - - - 81.90 81.06%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Conc. of Tablac Road I 1.609 C 0.208 0.300 0.300 - - - 80.80 *80.80%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Const. of Banayoyo Road I 0.934 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
First Northway Development and
Construction Corporation11645
Repair and Maintenance of Candon-Salcedo Road, Various
SectionsI 0.983 C 0.264 0.300 0.300 - - - 86.40 *86.40%
V. Satisfactory
First Northway Development and
Construction Corporation11645 Sulvec Port Road I 6.358 O 0.320 0.240 0.100 0.022 0.027 0.100 80.90 -
Flordes Construction & Trading 16916 Conc. of Brgy. Road, Mulawin F.
Homes III 1.334 C 0.370 0.200 0.300 - - - 87.00 *87.00% V. Satisfactory
Flordes Construction & Trading 16916 Conc. of Sta. Trinidad St., Old
Panaderos NCR 0.945 C 0.351 0.300 0.300 - - - 95.10 *95.10% Outstanding
Flordes Construction & Trading 16916 Conc. with Drainage Impvt.
Along Juan Luna St. NCR 4.744 C 0.370 0.146 0.300 - - - 81.60 83.94% V. Satisfactory
Flordes Construction & Trading 16916 Conc./Reblocking of G. Tuazon
St. NCR 4.696 C 0.353 0.200 0.300 - - - 85.30 82.66% V. Satisfactory
Flordes Construction & Trading 16916 Const. of MPB, Brgy. Maharlika III 2.381 C 0.364 0.300 0.300 - - - 96.40 *96.40%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 156
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Flordes Construction & Trading 16916 Const. of Sch. Bldg. (9 CL)
Carlos P. Garcia High School NCR 7.192 C 0.288 0.300 0.300 - - - 88.80 *88.80% V. Satisfactory
Flordes Construction & Trading 16916 Drainage Improvement with
Concreting/Upgrading NCR 2.303 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding
Flordes Construction & Trading 16916 Proposed Repair/Rehab. Of Jose
Vicencio Health Center NCR 1.929 C 0.343 0.253 0.300 - - - 89.60 *89.60% V. Satisfactory
Flordes Construction & Trading 16916 Proposed Repair/Rehab. Of
Roads & Alleys in Manila NCR 1.435 C 0.270 0.257 0.300 - - - 82.70 *82.70% V. Satisfactory
Flordes Construction & Trading 16916 Proposed Road Rehab. along
Pandacan & Sta. Mesa NCR 4.719 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding
Flordes Construction & Trading 16916 Repair/Rehab. of
Roofing/Renovation of MPB NCR 1.420 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding
Flordes Construction & Trading 16916
Repair/Rehab. of Roofing/Renovation of Stage and Repair of Toilet @ Pio del
Pilar E/S
NCR 2.150 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding
Flordes Construction & Trading 16916 Road & Drainage Rehab. @
Brgy. 599, Narra St. NCR 1.895 O 0.350 0.240 0.100 0.023 0.035 0.100 84.80 -
Floriane Construction and Supply 12261 Completion of MPB, Brgy.
Maanas X 0.755 C 0.338 0.100 0.300 - - - 73.80 *73.80% Satisfactory
Floriane Construction and Supply 12261 Conc. of Multi-Purpose
Pavement X 0.936 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
Floriane Construction and Supply 12261 Const. of FMR at Kitambis-
Valdeconcha Road X 0.940 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory
Floriane Construction and Supply 12261 Const. of River Control at
Mambayaan (Phase 2) X 4.644 C 0.339 0.200 0.300 - - - 83.90 82.04% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 157
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Floriane Construction and Supply 12261 Const./Impvt./Completion of
MPB X 0.324 C 0.358 0.300 0.300 - - - 95.80 *95.80% Oustanding
Floriane Construction and Supply 12261 Const./Rehab. of Roads,
Kitambis-Mimbuwahan X 0.939 C 0.207 0.300 0.300 - - - 80.70 *80.70% V. Satisfactory
Floriane Construction and Supply 12261
Rehab. of Butuan-Cagayan de Oro-City-Iligan Road,
Lagonglong By Pass RoadX 9.535 C 0.361 0.251 0.300 - - - 91.20 82.83%
V. Satisfactory
FM2 Trading & Enterprises 19044 Conc. of FMR, Brgy. Luna St. I 0.960 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
FM2 Trading & Enterprises 19044 Const. of Drainage System @ Brgy. Caranglaan I 0.767 C 0.306 0.221 0.300 - - - 82.70 *82.70%
V. Satisfactory
FNR Construction 7051 Restoration of Multi-Purpose Building I 5.601 C 0.385 0.100 0.000 - - - 48.50 55.43%
Poor
Fojas Builders Enterprises 31869 Const. of 2 CL Sch. Bldg., San Antonio E/S IV-A 0.955 C 0.346 0.300 0.000 - - - 64.60 83.29%
V. Satisfactory
Footprints Construction 16713 Const. of Pedestrian Overpass @ Palomoc Titay IX 2.856 C 0.176 0.200 0.300 - - - 67.60 72.52%
Satisfactory
Foremost Builders 23774Const. / Rehab. / Replacement /
Completion & Repair of Sch. Bldg. @ Ma-a NHS
XI 0.440 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding
Fortrica Builders 24220 Concreting of FMR @ Brgy. Calingcuan III 0.625 C 0.287 0.300 0.300 - - - 88.70 *88.70%
V. Satisfactory
Fortstone Construction Enterprises 31668 Const. of 6 CL 2 Storey Bldg. at
Mariano Peralta H/S XI 3.727 C 0.252 0.200 0.000 - - - 45.20 70.68% Satisfactory
Fortstone Construction Enterprises 31668 Const. of Multi-Purpose Bldg. At
DPWH-Region XII XII 1.832 O 0.361 0.300 0.100 0.015 0.007 0.067 85.00 -
Fortstone Construction Enterprises 31668 Const. of Nueva Villa Flood
Control XI 3.872 C 0.353 0.172 0.300 - - - 82.50 80.79% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 158
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Fortstone Construction Enterprises 31668 Rehab. of MPB (City Jail) XII 0.960 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Fortunato T. Sanchez 407 Asphalt Overlay (Pier to City Hall) XIII 4.729 C 0.275 0.200 0.300 - - - 77.50 78.58%
Satisfactory
Fortunato T. Sanchez 407 Asphalt Overlay along Surigao Wharf Road XIII 3.640 C 0.323 0.281 0.300 - - - 90.40 91.60%
Outstanding
Fortunato T. Sanchez 407 Concreting of Road XIII 5.770 C 0.330 0.200 0.300 - - - 83.00 82.72% V. Satisfactory
Four Brothers Construction 31614 Const. of MPB, Brgy. West Buyagan CAR 0.476 C 0.285 0.200 0.300 - - - 78.50 *78.50%
Satisfactory
Four J Construction 15104 Conc. of Road @ So. Nazareneville IV-A 1.918 C 0.297 0.244 0.300 - - - 84.10 *84.10%
V. Satisfactory
Four J Construction 15104 Const. of Box Culvert @ Brgy. Dalig IVA 0.956 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Four J Construction 15104 Const. of MPB @ UPS V Area I NCR 0.476 C 0.340 0.200 0.300 - - - 84.00 83.30% V. Satisfactory
Four J Construction 15104 Const. of Multi-Purpose Building at Emilio Jacinto E/S NCR 2.976 C 0.292 0.300 0.300 - - - 89.20 83.67%
V. Satisfactory
Four J Construction 15104 Impvt. of Cainta River IV-A 3.836 C 0.339 0.269 0.300 - - - 90.80 85.52% V. Satisfactory
Four J Construction 15104 Impvt. of Valenzuela General Hospital Bldg. NCR 0.937 C 0.372 0.300 0.300 - - - 97.20 94.89%
Outstanding
Four J Construction 15104 Repair & Impvt. of McArthur Highway NCR 9.387 C 0.334 0.300 0.300 - - - 93.40 91.72%
Outstanding
Four J Construction 15104 Widening of Quezon Avenue NCR 21.722 O 0.376 0.240 0.100 0.018 0.042 0.100 87.60 -
Four Side Construction and Supply 24446
Rep./Maint/of Looc Ferrol Road Km. 103+500 (Tuburan Sect. Box
Culvert)IV-B 0.516 C 0.388 0.000 0.300 - - - 68.80 *68.80%
Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 159
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Foz Designs, Builds and Supplies 32814 Const. of 1 unit Classroom Sch.
Bldg. V 0.482 C 0.246 0.200 0.300 - - - 74.60 *74.60% Satisfactory
Foz Designs, Builds and Supplies 32814 Const. of Sorsogon 2nd DEO V 0.960 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
Framecon Builders 22482 Const. of Drainage Canal at Brgy. Mangino III 0.475 C 0.250 0.200 0.300 - - - 75.00 *75.00%
Satisfactory
Framecon Builders 22482 Repair/Impvt. of Mallorca-Tabuating Road III 1.853 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -
FRD Construction 10227 Const. of 1 Unit 1 CL Sch. Bldg. @ Marlinao HS VIII 0.496 O 0.369 0.240 0.000 0.020 0.016 0.067 71.20 -
FRD Construction 10227 Const. of 1 Unit 1 CL School Bldg. @ Dao E/S VIII 0.498 C 0.383 0.106 0.300 - - - 78.90 *78.90%
Satisfactory
FRD Construction 10227 Reconst. of Soom Bridge along Tagbilaran East Road VII 13.241 C 0.237 0.300 0.300 - - - 83.70 81.06%
V. Satisfactory
FRD Construction 10227 Rehab./Impvt. of Laoang-Calomotan Rd. VIII 9.315 C 0.318 0.300 0.300 - - - 91.80 87.18%
V. Satisfactory
FRD Construction 10227 Repair/Rehab. of Lilo-an-Sogod Bdry. Mahaplag Road VIII 9.343 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
FRD Construction 10227 Upgrading (Conc.) of Wright-Taft-Borongan Road VIII 33.774 O 0.347 0.237 0.100 0.030 0.027 0.100 84.10 -
Freden Construction 22665 Const. of Lined Canal XII 1.865 O 0.284 0.200 0.100 0.030 0.032 0.200 84.60 -
Freden Construction 22665 Const. of Lined Drainage along Makar-Kiamba Road XII 1.900 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
Freden Construction 22665Const. of Makar Drainage
Protecting Makar Port (Labangal Section)
XII 1.422 C 0.300 0.300 0.300 - - - 90.00 88.38% V. Satisfactory
Full Blast Trading and Construction 29548 Const./Rehab. of Multi-Purpose
Building @ Brgy. Poblacion III 0.944 C 0.397 0.300 0.300 - - - 99.70 *99.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 160
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Fullido's Construction and Enterprises 20347 Const. of 1 CL Sch. Bldg. (7m x
9m) Corella H/S VII 0.410 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
Fullido's Construction and Enterprises 20347 Const. of CVSCAFT School
Building VII 0.929 C 0.388 0.100 0.300 - - - 78.80 84.89% V. Satisfactory
FVCS Construction & Supply 32518 Repair/Maintenance of Panacan
Revetment IV-B 0.645 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
G & P Builders, Incorporated 3960
Construction of CDO 3rd Bridge & Access Road Phase I,
KauswaganX 35.267 C 0.295 0.300 0.300 - - - 89.50 80.47%
V. Satisfactory
G. Uymatiao Jr. Construction 6663 Conc. of Brgy. Daro Road VII 0.474 C 0.357 0.000 0.300 - - - 65.70 78.72%
Satisfactory
G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-
Cantupa Sect. (DNR) VII 18.296 O 0.260 0.230 0.100 0.030 0.052 0.100 77.20 -
G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-
Cantupa Sect. (DNR) VII 18.296 O 0.356 0.226 0.100 0.030 0.038 0.067 81.70 -
G. Uymatiao Jr. Construction 6663 Const./Widening of Box Culvert VII 1.382 C 0.363 0.200 0.300 - - - 86.30 *86.30%
V. Satisfactory
G.C.I. Construction 11346 Conc. of Brgy. Bagadion Danawan-San Vicente FMR V 2.852 C 0.250 0.300 0.300 - - - 85.00 73.30%
Satisfactory
G.C.I. Construction 11346 Conc. of Baras-Gigmoto Road (San Vicente Section) V 9.628 O 0.362 0.231 0.100 0.030 0.030 0.100 85.30 -
G.C.I. Construction 11346 Conc. of Cagmanaba Road V 1.911 C 0.301 0.279 0.300 - - - 88.00 *88.00% V. Satisfactory
G.C.I. Construction 11346 Conc. of Nabua-Balatan Road (Tapayas-Cabanban Sect.) V 9.357 C 0.318 0.200 0.300 - - - 81.80 82.67%
V. Satisfactory
G.C.I. Construction 11346 Conc. of Roads at San Jose Road V 1.911 C 0.274 0.300 0.300 - - - 87.40 *87.40%
V. Satisfactory
G.C.I. Construction 11346 Conc. of San Isidro V 9.454 C 0.319 0.218 0.300 - - - 83.70 *83.70% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 161
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
G.C.I. Construction 11346 Concreting of Tierra Nevada-Lupi Road V 0.955 C 0.292 0.100 0.300 - - - 69.20 75.68%
Satisfactory
G.C.I. Construction 11346 Const. of Buhi-Lidong Road V 28.220 C 0.261 0.200 0.300 - - - 76.10 83.30% V. Satisfactory
G.C.I. Construction 11346 Const. of MPB (Executive Building) V 2.837 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
G.C.I. Construction 11346 Const. of Road @ Tagbong-Binobong Road V 4.777 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon
to Brgy. CalzadaV 19.160 O 0.332 0.232 0.100 0.020 0.023 0.100 80.70 -
G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon
to Brgy. CalzadaV 19.160 O 0.352 0.238 0.100 0.030 0.028 0.100 84.80 -
G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon
to Brgy. CalzadaV 19.160 O 0.314 0.286 0.100 0.020 0.019 0.100 83.90 -
G.C.I. Construction 11346 Const. of San Vicente Drainage System V 2.362 C 0.308 0.200 0.300 - - - 80.80 *80.80%
V.Satisfactory
G.C.I. Construction 11346Const./Rehab. of San Vicente-Gutan-Lubac-Angub Rd. Phase
IVII 48.192 C 0.342 0.201 0.300 - - - 84.30 83.46%
V. Satisfactory
G.C.I. Construction 11346Const./Road Opening of San Vicente-Gutan-Luban-Aguib
Road (P III)II 28.095 C 0.289 0.228 0.300 - - - 81.70 75.76%
Satisfactory
G.C.I. Construction 11346 Impvt./Conc. of Goa-Tinambac Road V 9.553 C 0.245 0.279 0.300 - - - 82.40 82.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 162
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
G.C.I. Construction 11346Installation of Sheet Piles & Conc. of Training Levee inc.
Earthdike, Traversia RevetmentV 39.000 C 0.351 0.200 0.300 - - - 85.10 79.67%
Satisfactory
G.C.I. Construction 11346Libmanan-Cabusao
Embankment (Poblacion Revetment)
V 10.523 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -
G.C.I. Construction 11346 Rehab./Impvt. of Nabua-Balatan Road Cabanban Section V 0.468 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
G.C.I. Construction 11346 Repair/Rehab. of National Road, San Andres-Caramoan Section V 28.326 C 0.346 0.300 0.300 - - - 94.60 91.72%
Outstanding
G.C.I. Construction 11346 Repair/Restoration of Damaged Dike Maipon R.C. V 14.385 O 0.384 0.200 0.000 0.030 0.032 0.133 77.90 -
G.C.I. Construction 11346Repair/Restoration of Damaged
Rd. Pavement along Balogo-Nasisi
V 28.860 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
G.C.I. Construction 11346 Road Conc. at Palestina Road V 1.891 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory
G.D.L. Construction / E.C. de Luna Construction
Corporation Joint VentureJV-07-094
Rehab./Reconst. of Damaged Paved Nat'l Road at Gen. Alejo
Santos Highway III 150.985 O 0.312 0.300 0.100 0.030 0.050 0.067 85.90 -
G.F. Falcis Construction & Supply 26147 Const. of Brgy. 9 River Control VI 0.945 O 0.387 0.200 0.100 0.030 0.052 0.200 96.90 -
G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building VI 3.850 O 0.225 0.240 0.100 0.023 0.013 0.100 70.10 -
G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building VI 3.848 O 0.348 0.170 0.100 0.030 0.035 0.100 78.30 -
G.F. Rovero Merchandising 27268 Conc. of Altavas-Jamindan Road VI 0.961 C 0.381 0.116 0.300 - - - 79.70 *79.70% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 163
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
G.F. Rovero Merchandising 27268 Const./Impvt. of Multi Purpose Pavement @ Poblacion VI 4.817 C 0.232 0.200 0.300 - - - 73.20 80.16%
V. Satisfactory
G.F. Rovero Merchandising 27268 Rehab. of New Buswang Prov'l. Road at New Buswang VI 0.988 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
G.F. Rovero Merchandising 27268 Repair/Rehab. of Quarters/Office Building VI 6.645 C 0.278 0.300 0.300 - - - 87.80 89.83%
V. Satisfactory
G.G. Uy Construction 32319 Rehabilitation of Main Canal (Sta. 13+150-Sta. 16+600 I 12.410 C 0.250 0.300 0.300 - - - 85.00 84.84%
V.Satisfactory
G.O. Marron General Contractor 6844 Completion of MPB @ Balaoan I 1.881 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
G.O. Marron General Contractor 6844 Conc. Paving of Sitio
Nagbayugan Feeder Road I 1.881 C 0.383 0.260 0.300 - - - 94.30 71.68% Satisfactory
G.O. Marron General Contractor 6844 Const. of MPB, Brgy. Central
East I I 0.940 C 0.272 0.300 0.300 - - - 87.20 75.65% Satisfactory
G.O. Marron General Contractor 6844 Const. of Multi-Purpose Bulding
at Bacsil I 0.936 O 0.367 0.221 0.100 0.030 0.047 0.067 83.20 -
G.O. Marron General Contractor 6844 Const./Rehab. of MPB I 4.674 C 0.333 0.300 0.300 - - - 93.30 79.60%
Satisfactory
G.R. Quirong Construction 9019 Const. of MPB at Brgy. Rizal VIII 0.470 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory
G.V. Burton Builders 21700 Const. of MPB (Phase I) @ Tidang Village II 0.286 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
Gacutan Construction 10789 Alibadabad CPIP II 2.560 C 0.272 0.159 0.300 - - - 73.10 73.10% Satisfactory
Gacutan Construction 10789 Conc. of Ilocos Norte-Abra Road I 11.649 C 0.339 0.200 0.300 - - - 83.90 83.42% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 164
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gacutan Construction 10789 Conc. of Tandang Sora St. II 9.564 C 0.329 0.202 0.300 - - - 83.10 *83.10% V. Satisfactory
Galeno Construction, Inc. 3427Completion of Camindangan
Bridge along Candoni-Sipalay Road
VI 11.899 O 0.294 0.300 0.100 0.030 0.059 0.100 88.30 -
Galeno Construction, Inc. 3427Completion of Camindangan
Bridge along Candoni-Sipalay Road
VI 11.899 O 0.319 0.240 0.100 0.023 0.051 0.100 83.30 -
Galeno Construction, Inc. 3427Completion of Camindangan
Bridge along Candoni-Sipalay Road
VI 11.954 O 0.307 0.300 0.100 0.023 0.040 0.067 83.70 -
Galeno Construction, Inc. 3427 Const. of Magballo Bridge (Phase I) VI 7.547 T 0.333 0.300 0.000 - - - 63.30 69.24%
Fair
Galeno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II VI 6.838 C 0.259 0.256 0.000 - - - 51.50 58.58%
Poor
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Carmen-
Patag-Bulua Road X 14.462 C 0.259 0.286 0.300 - - - 84.50 *84.50% V. Satisfactory
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre
Highway Alae-Kisolon Road X 9.644 O 0.370 0.240 0.070 0.030 0.045 0.067 82.20 -
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre
Highway Alae-Kisolon Road X 9.644 O 0.377 0.300 0.000 0.030 0.045 0.067 81.90 -
Gampik Construction & Development Inc. 8019
Const. of Babak-Samal-Kaputian Road, IGACOS, Island Garden
City of SamalXI 9.392 C 0.350 0.300 0.300 - - - 95.00 85.34%
V. Satisfactory
Gampik Construction & Development Inc. 8019
Impvt./Rehab of Marbel-Allah-Valley-Cotabato Road,
Ampatuan-Talayan SectionXII 14.372 C 0.371 0.300 0.300 - - - 97.10 92.78%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 165
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gampik Construction & Development Inc. 8019 Impv't./Rehab./Asphalt Overlay
of Initao-Naawan Road Sect. X 14.462 C 0.384 0.300 0.000 - - - 68.40 71.34% Satisfactory
Gampik Construction & Development Inc. 8019
Provision of Slope Protection @ Sinuda Slip and Repair of
Bituminous PavementX 2.027 C 0.377 0.300 0.300 - - - 97.70 78.53%
Satisfactory
Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road XI 14.130 C 0.343 0.272 0.300 - - - 91.50 84.27%
V. Satisfactory
Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road,
Tuganay-Sto. Niño Sect. XI 9.984 C 0.307 0.300 0.300 - - - 90.70 85.18% V.Satisfactory
Garnic Construction 22861Package 3: Const. of MP
Building (2nd Floor Only) @ Brgy. Bulac
III 0.756 C 0.359 0.253 0.300 - - - 91.20 *91.20% Outstanding
Gaver General Merchandising 24186
Rehab. of Multi-Purpose Pavement in Pastrana Park
(Phase III)VI 4.819 C 0.394 0.278 0.300 - - - 97.20 97.20%
Outstanding
Gawanato Construction 28687 Const. of Line Canal @ Talaga IV-A 0.191 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
GCI Construction 11346 Concreting of Tierra Nevada-Lupi Road V 0.955 O 0.300 0.250 0.100 0.015 0.035 0.100 80.00 -
GCI Construction 11346 Repair/Rehab of LCPIS V 11.652 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90 72.90% Satisfactory
GCMG Construction 9743 Completion of Sagay Public Market X 1.845 C 0.375 0.300 0.300 - - - 97.50 90.85%
Outstanding
GCMG Construction 9743 Const./Conc. of Manduao Road X 0.930 C 0.334 0.200 0.300 - - - 83.40 78.90% Satisfactory
G-Cube Construction 17219 Concrete Reblocking of Del Monte Avenue, Quezon City NCR 4.891 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
GED Construction 13614 Const. of Road @ San Antonio I 0.475 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 166
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
GED Construction 13614 Const. of Secondary Sch. Bldg. @ Cato MNHS I 0.485 C 0.273 0.200 0.300 - - - 77.30 * 77.30%
Satisfactory
Geed Construction 10823 Impvt. of Surigao-Davao Coastal Road along Cabanahan XIII 12.464 C 0.320 0.200 0.300 - - - 82.00 77.08%
Satisfactory
Geety Realty & Dev. Corporation 30447
Asphalt Overlay of Imus Road (Sta.1+606 - Sta.2+523 w/
exception) VII 9.647 C 0.330 0.250 0.300 - - - 88.00 *88.00%
V. Satisfactory
Geety Realty & Dev. Corporation 30447 Const. of River Control
(Revetment) Candulawan VII 4.446 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
Geety Realty & Development Corporation 30447 Rehabilitation of Canlumampao VII 9.598 O 0.333 0.300 0.070 0.030 0.033 0.100 86.60 -
Gem Construction & Supply 29732 Const. of Brgy. Road @ Brgy.
Manggas IV-A 0.964 C 0.339 0.200 0.300 - - - 83.90 * 83.90% V. Satisfactory
Gemma Construction Supply 5044
Cluster I - Const. of Various School Bldg., Project CY 2003
Oringo E/S, Brgy. Dadiagas Heights
XII 0.686 C 0.361 0.254 0.300 - - - 91.50 87.51% V. Satisfactory
Gemma Construction Supply 5044 Const. of Bridge XII 3.687 O 0.360 0.239 0.100 0.030 0.023 0.100 85.20 -
Gemma Construction Supply 5044 Const. of Drainage Canal from
Poblacion to San Pablo XII 0.950 C 0.267 0.300 0.300 - - - 86.70 81.60% V. Satisfactory
Gemma Construction Supply 5044 Const. of MPB (Phase I) XII 4.767 O 0.347 0.240 0.100 0.030 0.044 0.067 82.80 -
Gemma Construction Supply 5044
Const. of Multi-Purpose Building @ Purok Marcos, Sta. Cruz
Tampakan realigned to Const. of Multi-Purpose Building
XII 0.903 O 0.397 0.300 0.100 0.030 0.018 0.100 94.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 167
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gemma Construction Supply 5044
Const. of Sinawal Flood Control Protecting Makar-Tupi-Marbel
RoadXII 1.390 C 0.305 0.300 0.300 - - - 90.50 88.22%
V. Satisfactory
Gemma Construction Supply 5044 Const./Renovation/Completion
of DPWH Regional Office XII XII 4.998 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Gemma Construction Supply 5044 Repair/Rehab. Along Dulawan-
Marbel Road XII 9.620 C 0.262 0.237 0.300 - - - 79.90 *79.90% Satisfactory
Gemma Construction Supply 5044
Widening/Conc. of Calean Bridge along Dulawan-Marbel
RoadXII 9.497 C 0.369 0.200 0.300 - - - 86.90 86.90%
V.Satisfactory
Geneson Construction & Supply 13728
Rehab. w/ Asphalt Overlay, Crack & Joint Sealing @ Onyx
St.NCR 1.887 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Geneson Construction & Supply 13728 Repair/Rehab. of Road and
Drainage Improvement NCR 2.373 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
Genetian Builders 18052 Const. of 1 Cl Sch. Bldg. @ Pioneer NHS San Pedro Annex IX 0.500 C 0.178 0.138 0.300 - - - 61.60 *61.60%
Fair
Geovan Marketing 10824 Const. of Agbalili River Control VI 4.815 C 0.277 0.300 0.300 - - - 87.70 83.38% V. Satisfactory
Gerezsons Resources Corporation 20699 Const. of 1 CL Sch. Bldg. Tolosa
NHS VIII 0.519 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Gerezsons Resources Corporation 20699 Const. of Drainage Canal @ Pob.
1 VIII 0.275 C 0.336 0.200 0.300 - - - 83.60 *83.60% V. Satisfactory
Gerezsons Resources Corporation 20699 Const. of Inopacan Seawall VIII 9.297 C 0.133 0.300 0.300 - - - 73.30 *73.30%
Satisfactory
Gershli Construction & Supply 28480 Conc. of Road @ Brgy. Sico IV-A 0.189 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Gershli Construction & Supply 28480 Const. of FMR at Brgy. Santor IV-A 1.926 C 0.321 0.200 0.300 - - - 82.10 *82.10%
V . Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 168
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gershli Construction & Supply 28480 Const. of MPB at Brgy. Wawa IV-A 3.372 C 0.310 0.286 0.300 - - - 89.60 *89.60%
V. Satisfactory
Gershli Construction & Supply 28480
Const. of Multi Purpose Building/Structure in Brgy.
BilaranIV-A 0.479 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
Gershli Construction & Supply 28480 Impvt. of MPB, Cuenca C/S IV-A 0.289 C 0.345 0.277 0.300 - - - 92.20 *92.20%
Outstanding
Gershli Construction and Supply 28480 Const. of Multi-Purpose Bldg., @
(Talipapa) Brgy. 2-A IV-A 0.478 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Gershli Construction and Supply 28480 Const. of Reinforced Concrete
Box Culvert IV-A 0.191 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
GES Construction 30299 PICAS-San Vicente CIS, Phase 7, Contingency PIO 531.923 C 0.349 0.219 0.300 - - - 86.80 86.80%
V.Satisfactory
GES Construction 30299 Taripa CIS PIO 1.012 O 0.359 0.238 0.100 0.015 0.029 0.100 84.14 -
Geto Construction 17689 Concreting of Interior Roads IV-A 1.910 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
Gicar Construction 12624Conc. of Line Canal along Surigao-Wharf Road km.
1122+270 to km. 1122+560XIII 0.962 C 0.311 0.300 0.300 - - - 91.10 89.90%
V. Satisfactory
Gicar Construction 12624Conc. of Line Canal with Slope
Protection along Surigao-Agusan Road
XIII 1.927 C 0.388 0.166 0.300 - - - 85.40 84.38% V. Satisfactory
Gicar Construction 12624 Conc. of Surigao City-San Juan Coastal Road XIII 28.595 O 0.322 0.300 0.100 0.030 0.065 0.100 91.70 -
Gicar Construction 12624 Const. of Kag-ayongan Bridge and Approaches Phase I XIII 10.274 C 0.376 0.205 0.300 - - - 88.10 86.93%
V. Satisfactory
Gicar Construction 12624 Const. of Navarro Bridge & Approaches XIII 8.029 C 0.363 0.176 0.300 - - - 83.90 79.64%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 169
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gicar Construction 12624Const./Widening of Dinagat-
Loreto Road (Sto. Niño-Diegas Section)
XIII 14.424 C 0.358 0.300 0.000 - - - 65.80 70.60% Satisfactory
Gicar Construction 12624 Impvt./Conc. of Lantay-Maraboc-Pangantucan Road X 14.274 C 0.345 0.119 0.300 - - - 76.40 74.36%
Satisfactory
Gicar Construction 12624 Replacement of San Isidro Bridge XIII 14.151 C 0.300 0.300 0.300 - - - 90.00 90.00%
OutstandingGilbert D. Lim "GDL" Enterprise & Services 25499 Conc. of Bolod-Bolod-Catmon
Road VIII 4.650 C 0.210 0.200 0.300 - - - 71.00 *71.00% Satisfactory
Gind Construction and Enterprises 18679 Repair of Multi-Purpose Building
@ Poblacion Este I 0.567 C 0.363 0.200 0.300 - - - 86.30 87.56% V. Satisfactory
Giovanni Construction 12168 Conc. of Jct. Agusan-Misamis Nat'l Highway XIII 9.193 C 0.354 0.200 0.300 - - - 85.40 88.28%
V. Satisfactory
GJD Construction & Supply 25866 Const. of 2 CL Sch. Bldg. @ Titay NHS Malagandis Annex IX 0.871 C 0.332 0.230 0.300 - - - 86.20 68.91%
Fair
GJD Construction & Supply 25866 Const. of MPB @ Poblacion IX 0.475 C 0.372 0.181 0.300 - - - 85.30 *85.30% V. Satisfactory
GJD Construction & Supply 25866 Const. of Pedestrian Overpass @ Tigbungabong IX 2.859 C 0.175 0.300 0.300 - - - 77.50 65.14%
Fair
GJE Builders 18286 Conc. of Coral-San Francisco Road w/ Box Culvert III 4.709 C 0.283 0.300 0.300 - - - 88.30 87.76%
V. Satisfactory
GJE Builders 18286 Conc. of FMR @ Brgy. Bawa III 0.614 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory
GJE Builders 18286 Conc. of Purok 5 Road III 1.675 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
GJE Builders 18286 Const. of 1 CL Sch. Bldg. at San Juan de Valdez E/S III 0.423 C 0.290 0.257 0.300 - - - 84.70 *84.70%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 170
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
GJE Builders 18286 Paving/Upgrading of Romulo Highway, Sta. Ignacia Section III 2.737 C 0.318 0.291 0.300 - - - 90.90 *90.90%
Outstanding
GLCT Construction 30657Completion/Continuation of
Unfinished Matain Bridge along Olongapo-Bugallon Road
III 5.519 C 0.328 0.149 0.300 - - - 77.70 78.66% Satisfactory
GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge III 13.950 C 0.364 0.300 0.300 - - - 96.40 96.40% Outstanding
Global V Builders / HITRI Construction joint venture 29763
Boracay Environmental Infrastucture Project Drainage
SystemPTA 94.176 S 0.366 0.300 0.000 0.024 0.047 0.101 83.80 -
GNE Construction 21764
Conc. of Liloy-Labason Road (Osukan Sect.) Realigned to
Labason-Gutalac, Zamboanga del Norte
IX 4.631 C 0.395 0.291 0.300 - - - 98.60 94.22% \Outstanding
GNE Construction 21764 Const. of Modified 2 CL Sch. Bldg. E/S IX 0.765 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
GNE Construction 21764 Const. of MPB, Poblacion IX 0.935 C 0.373 0.147 0.300 - - - 82.00 *82.00% V. Satisfactory
GNGC Enterprises 29124
Conc. of Armstrong Ave. & Conc. & Drainage Impvt. of
Sunset St. (Package II) @ Brgy. Moonwalk & Brgy. San Antonio
NCR 3.305 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory
Go Solid Builders, Inc. 32885Const. of 2 CL Secondary Sch. Bldg. @ Tacloban City National
High Sch.VIII 0.949 C 0.352 0.200 0.300 - - - 85.20 *85.20%
V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold
Rich Const.)16489 Const. of Classrooms at City
High School Annex CAR 7.531 C 0.390 0.130 0.300 - - - 82.00 *82.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 171
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gold Rich Construction &Trading (Formerly: Gold
Rich Const.)16489 Const. of MPB @ Brgy. Gabriela
Silang CAR 1.909 C 0.396 0.195 0.300 - - - 89.10 *89.10% V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold
Rich Const.)16489 Rehab./Impvt. of Ferguson Road CAR 6.626 C 0.396 0.109 0.300 - - - 80.50 *80.50%
V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold
Rich Const.)16489 Rehab./Impvt. of Kennon Drive,
Kennon Road CAR 6.626 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold
Rich Const.)16489 Rehab./Impvt. of Outlook Drive CAR 6.626 C 0.391 0.107 0.300 - - - 79.80 *79.80%
Satisfactory
Goldbern Construction 28509Repair / Rehabilitation of
Buildings 9 & 10 @ Bagong Lipunan Condominium (BLC)
NCR 1.690 C 0.393 0.300 0.300 99.30 *99.30% Outstanding
Golden Ridge Enterprises 29946 Masao Port Expantion Project PPA 91.102 C 27.982 30.000 30.000 - - - 86.61 86.61% V.Satisfactory
Goldfin Construction 21343 Completion of Multi-Purpose Building VII 1.324 O 0.255 0.251 0.100 0.022 0.019 0.100 74.70 -
Goldfin Construction 21343Const. Additional Floor and
Repair/Repair of existing MPB (TESDA)
IX 4.718 C 0.385 0.257 0.300 - - - 94.20 81.57% V. Satisfactory
Goldfin Construction 21343 Const. of 1 unit, 4 Storey, 20 CL Tisa II E/S Bldg. VII 13.363 C 0.370 0.248 0.300 - - - 91.80 84.17%
V. Satisfactory
Goldfin Construction 21343 Const. of Camp Lapu-Lapu E/S VII 2.938 C 0.362 0.300 0.300 - - - 96.20 85.77% V. Satisfactory
Goldrich Construction 16489 Masantol River Wharf (Phase 2) Improvement Project PPA 16.879 O 0.362 0.240 0.100 0.015 0.035 0.067 81.84 -
Goldrich Construction and Trading 16489 Const. of MPB @ Brgy. Gabriela
Silang CAR 1.909 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 172
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Goldrich Construction and Trading 16489
Impvt. of Bontoc-Tinglayan Road (Package 2), km. 396+500-km.
398+400CAR 12.407 C 0.338 0.200 0.300 - - - 83.80 78.52%
Satisfactory
Goldrich Construction and Trading 16489 Impvt. of Pico-Lamtang Road CAR 5.742 C 0.330 0.292 0.300 - - - 92.20 92.20%
Outstanding
Goldrich Construction and Trading (Formerly: Goldrich Const.)
16489Rehab. of Kennon Road, Km.
242+966-Km. 243+066 and Km. 245+268-Km. 245+563
CAR 9.361 C 0.322 0.265 0.300 - - - 88.70 *88.70% V. Satisfactory
Goldrock Construction & Development Corp. 5389 Const. of Ilog-ilog Bridge, Rizal-
Panalingaan Road IV-B 15.616 C 0.291 0.279 0.300 - - - 87.00 83.04% V. Satisfactory
Goldrock Construction & Development Corp. 5389
Rehab. of El Nido-Taytay Road (Brgy. Mabini-Brgy. Sandoval
Section)IV-B 14.155 C 0.372 0.200 0.300 - - - 87.20 86.42%
V. Satisfactory
Goldrock Construction & Development Corp. 5389 Rehab. of Taytay Road (Sitio
Igang-Brgy. Pamantolon Sect.) IV-B 14.157 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory
Goldrock Construction & Development Corp. 5389 Rehab./Impvt. of Quezon-Punta
Baja Road IV-B 14.229 O 0.317 0.159 0.100 0.030 0.033 0.100 73.90 -
Goldrock Construction & Development Corp. 5389 Rehab./Impvt. Of Quezon-Punta
Baja Road IV-B 14.229 O 0.299 0.234 0.100 0.030 0.043 0.100 80.60 -
Gonzalo Construction 1826Impvt. along Acop-Kapangan-
Kibungan-Bakun Road, km 290+100 - Km. 294+700 (VS)
CAR 19.130 C 0.314 0.200 0.300 - - - 81.40 76.24% Satisfactory
Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 O 0.364 0.300 0.100 0.030 0.021 0.100 91.50 -
Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 O 0.337 0.289 0.030 0.030 0.056 0.067 80.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 173
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Gonzalo Construction 1826 Replacement/ Const. of Man-asok Bridge & Approaches CAR 9.305 C 0.355 0.000 0.300 - - - 65.50 80.14%
V. Satisfactory
Gonzalodo Enterprises 30681Conc. of Bogo-Curva-Madellin-Daanbantayan Road, Antipolo
SectionVII 7.600 C 0.309 0.200 0.300 - - - 80.90 *80.90%
V. Satisfactory
Gonzalodo Enterprises 30681 Impvt. of MPB VII 1.885 C 0.349 0.200 0.300 - - - 84.90 72.09% Satisfactory
Gonzalodo Enterprises 30681 Impvt. of MPB, Lapu-lapu Central School VII 0.921 C 0.314 0.200 0.300 - - - 81.40 *81.40%
V. Satisfactory
Good Fortune International, Inc. 9246 Const. of Arevalo-Sooc Bridge &
Approaches VI 7.237 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -
Good Fortune International, Inc. 9246 Improvement of Mandurriao-San
Miguel-Alimodin-Maasim Road VI 11.564 O 0.313 0.231 0.050 0.023 0.035 0.067 71.90 -
Good Fortune International, Inc. 9246 Improvement of Mandurriao-San
Miguel-Alimodin-Maasin Road VI 11.564 O 0.304 0.237 0.100 0.030 0.028 0.100 79.90 -
Good Fortune International, Incorporated 9246 Const. of Arevalo-Sooc Bridge &
Approaches VI 7.237 C 0.281 0.300 0.300 - - - 88.10 87.62% V. Satisfactory
Good Fortune International, Incorporated 9246 Const. of Bayunan Bridge VI 17.477 O 0.257 0.233 0.100 0.030 0.060 0.100 78.00 -
Good Fortune International, Incorporated 9246 Const. of Bayunan Bridge VI 17.477 O 0.339 0.300 0.100 0.030 0.065 0.067 90.10 -
Good Fortune International, Incorporated 9246 Const. of Odol Bridge VI 12.223 C 0.383 0.300 0.000 - - - 68.30 77.11%
Satisfactory
Good Medal Construction and Supplies 19309 Const. of Drainage System @
San Isidro V 0.143 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 174
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Good Speed Construction & Services 20572 Asphalt Overlay at Brgy. Halang
going to Brgy. Real IV-A 1.921 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory
Goodvibe Builders, Inc. 32686 Conc. of FMR @ Nancayasan I 0.475 C 0.223 0.300 0.300 - - - 82.30 *82.30% V. Satisfactory
Gospa Construction 15353 Impvt./Rehab. of MPB NCR 0.480 C 0.349 0.257 0.300 - - - 90.60 *90.60% Outstanding
Gowil Builders 18733 Conc. of FMR @ Brgy. Awihao VII 0.953 C 0.324 0.175 0.300 - - - 79.90 81.46% V. Satisfactory
Gowil Builders 18733 Const. of MPB, Bry. Cabitoonan VII 1.429 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Gowil Builders 18733 Repair/Rehab. of Roads at N. Bacalso Ave. VII 4.795 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
GP Construction 18653 Const. of MPB V 1.872 C 0.390 0.200 0.300 - - - 89.00 85.92% V. Satisfactory
GP Construction 18653 Const. of Spillway V 0.378 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
GPJ Construction 10613 Conc. of Makati Ave. (Phase III) NCR 0.712 C 0.398 0.300 0.300 - - - 99.80 *99.80% Outstanding
Grace Construction Corporation 3771 Asphalt Overlay along Ozamis-
Oroquieta Road X 9.634 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory
Grace Construction Corporation 3771
Completion of Tagoloan Parallel Bridge & Approaches along Butuan-Cagyan de Oro-Iligan
Road (SA #3)
X 54.184 O 0.396 0.300 0.100 0.030 0.055 0.100 98.10 -
Grace Construction Corporation 3771 Conc. of Oroquieta-Calamba Mt.
Road X 2.863 C 0.294 0.300 0.300 - - - 89.40 85.02% V. Satisfactory
Grace Construction Corporation 3771
Const. of 108 m Steel Truss Bridge with one Pier Steel
ComponentsIX 62.851 O 0.331 0.291 0.100 0.022 0.033 0.100 87.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 175
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Grace Construction Corporation 3771
Const. of Cagayan de Oro City 3rd Bridge & Approaches Phase
VX 16.854 C 0.395 0.300 0.300 - - - 99.50 86.56%
V. Satisfactory
Grace Construction Corporation 3771 Const. of Cagayan de Oro Third
Bridge & Access Road Phase VI X 72.905 O 0.365 0.251 0.050 0.030 0.045 0.067 80.80 -
Grace Construction Corporation 3771 Const. of Cagayan de Oro Third
Bridge & Access Road Phase VI X 72.905 O 0.365 0.300 0.100 0.030 0.035 0.100 93.00 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and
Approaches IX 69.136 O 0.338 0.300 0.100 0.030 0.043 0.067 87.80 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and
Approaches IX 69.136 O 0.293 0.193 0.100 0.024 0.037 0.100 74.70 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and
Approaches IX 69.136 O 0.284 0.293 0.000 0.030 0.042 0.100 74.90 -
Grace Construction Corporation 3771 Const. of Limpapa Bridge &
Approaches IX 60.097 O 0.226 0.240 0.100 0.030 0.047 0.100 74.30 -
Grace Construction Corporation 3771 Const. of Opao Bridge &
Approaches IX 71.415 O 0.361 0.203 0.100 0.030 0.035 0.100 82.90 -
Grace Construction Corporation 3771 Const. of Tagoloan Bridge &
Approaches X 38.345 O 0.340 0.300 0.100 0.030 0.045 0.100 91.50 -
Grace Construction Corporation 3771 Const. of Tagoloan Bridge &
Approaches X 38.345 O 0.353 0.162 0.100 0.030 0.035 0.100 78.00 -
Grace Construction Corporation 3771 Const. of Upper Makar Bridge I XII 8.582 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 176
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Grace Construction Corporation 3771
Const./Impv't. (PCCP) of CP-D: Sect. A-Monte Alegre Jct.-Aurora Road Sect. B-Monte Alegre Jct.-
Molave Road
KFAED 310.371 C 0.378 0.300 0.000 - - - 67.80 81.29% V. Satisfactory
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Manay-Caraga Section, Phase I
XI 192.466 O 0.347 0.300 0.100 0.030 0.037 0.100 91.40 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Manay-Caraga Section, Phase I
XI 192.466 O 0.367 0.300 0.100 0.030 0.030 0.100 92.70 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Manay-Caraga Section, Phase I
XI 192.466 O 0.246 0.300 0.100 0.030 0.060 0.100 83.60 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Manay-Caraga Section, Phase II
XI 178.716 O 0.324 0.300 0.100 0.030 0.060 0.100 91.40 -
Grace Construction Corporation 3771
Impvt./Conc. Paving of Dapitan City-Dakak Road, along Dapitan City-Dakak Coastal Loop Road
Phase II
IX 18.631 C 0.367 0.200 0.300 - - - 86.70 77.64% Satisfactory
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan
City-Dakak Road, Phase I IX 48.030 O 0.400 0.300 0.100 0.018 0.051 0.100 96.90 -
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan
City-Dakak Road, Phase I IX 48.038 O 0.329 0.229 0.100 0.030 0.038 0.100 82.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 177
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan
City-Dakak Road, Phase I IX 48.038 O 0.360 0.270 0.100 0.030 0.042 0.100 90.20 -
Grace Construction Corporation 3771
Impvt./Rehab. of Butuan-Cagayan de Oro-Iligan Road,
Salay-Dampil, Lagonglong Section, Looc
X 9.592 C 0.242 0.237 0.300 - - - 77.90 *77.90% Satisfactory
Grace Construction Corporation 3771
Maint./Rehab. & Imp. of National Arterial & Secondary Rd.,
Oroquieta-Plaridel-Calamba-Sapang Dalaga Rd.
X 4.780 C 0.301 0.300 0.300 - - - 90.10 88.54% V. Satisfactory
Grace Construction Corporation 3771
Rehab./Impvt. of Sayre Highway, PCC to Damulog Section
(Selective Section)X 18.538 C 0.383 0.200 0.300 - - - 88.30 81.10%
V. Satisfactory
Grace Construction Corporation/Ulticon Builders, Inc. (JV)
JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
XI 226.982 O 0.354 0.300 0.050 0.030 0.060 0.067 86.10 -
Grace Construction Corporation/Ulticon Builders, Inc. (JV)
JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
XI 226.982 O 0.373 0.300 0.050 0.030 0.065 0.067 88.50 -
Grace Construction Corporation/Ulticon Builders, Inc. (JV)
JV-05-061Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
XI 226.982 O 0.356 0.300 0.070 0.030 0.037 0.067 86.00 -
Grace Llan Const. & General Mdse. 1847 Const. of 2 Storey 8 Cl Sch.
Bldg. @ BNHS IV-A 14.247 C 0.389 0.231 0.300 - - - 92.00 79.40% Satisfactory
Graia Const. & Supply (Formerly: Graia Const. &
Supplies30826
Impvt./Rehab. of Mc-Donald Junction-Aguinaldo via Talaba
RoadIV-A 14.449 C 0.344 0.300 0.300 - - - 94.40 *94.40%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 178
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Granby Trading & Construction 27554 Conc. of Bayanan-Tiguihan Pola
Port Access Road IVB 4.748 O 0.235 0.240 0.100 0.030 0.032 0.100 73.70 -
Granby Trading & Construction 27554 Concreting of Brgy. Road @
Brgy. Sabang IV-A 1.917 C 0.386 0.200 0.300 - - - 88.60 88.55% V. Satisfactory
Granby Trading & Construction 27554 Const. of Malvar Public Market IV-A 3.855 C 0.347 0.200 0.300 - - - 84.70 88.55%
V. Satisfactory
Grand Builders 6845 Conc. of Tubod-Ganassi Road X 10.832 C 0.300 0.300 0.000 - - - 60.00 76.92% Satisfactory
Grand Builders 6845 Rehab. of Linamon-Zamboanga Road, Tubod Section X 9.057 C 0.306 0.300 0.000 - - - 60.60 75.60%
Satisfactory
Grand Tower Engineering Technology 31946
Const. of Library & Multi-Purpose HE Type Building (P-I)
BNHS AnnexX 0.471 C 0.343 0.300 0.300 - - - 94.30 83.59%
V. Satisfactory
Grand Tower Engineering Technology 31946 Const. of MPB @ Nabag-o X 0.471 C 0.346 0.300 0.300 - - - 94.60 66.46%
Fair
Great Lakes Enterprises 31429 Const. of Melgar Seawall IV-B 4.775 C 0.267 0.200 0.300 - - - 76.70 81.14% V. Satisfactory
Greco Construction and Supply 21884 Rehab./Asphalting along MSDR
West Service Road NCR 4.825 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory
Green Horizons Landscapers and Developers, Inc.
18802Conc. of Calapan South Road
(Conc./Impvt. of Pasi II & Happy Valley Section)
IV-B 28.906 C 0.205 0.287 0.300 - - - 79.20 82.86% V. Satisfactory
Green Horizons Landscapers and Developers, Inc.
18802Conc. of CNR San Teodoro-
Puerto Galera Road, Tamaraw Section
IV-B 19.165 C 0.363 0.300 0.300 - - - 96.30 91.02% Outstanding
Green Horizons Landscapers and Developers, Inc.
18802 Const. of MPB @ Sitio IV Agua IV-B 1.899 C 0.351 0.200 0.300 - - - 85.10 85.10% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 179
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Greenwall Construction 14457 Repair/Impvt./Rehab. of San Luis-Ma. Aurora-Catañeda Road III 4.624 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Greg Construction and Trading 19455 Const. of Classrooms at Dr.
Arcadio NHS NCR 4.770 C 0.253 0.200 0.300 - - - 75.30 78.31% Satisfactory
Greyrock Construction 9296 Reconst. of Zamboanga City-Labuan-Limpapa Road IX 12.273 O 0.369 0.240 0.100 0.030 0.045 0.100 88.40 -
Guinhalinan Construction & Concrete Aggregates
Supplies28965 Completion of Baywalk XIII 1.910 C 0.320 0.300 0.300 - - - 92.00 92.00%
Outstanding
Guinhalinan Construction & Concrete Aggregates
Supplies28965 Const. of Flood Control
Structures along Shoreline XIII 1.920 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
Guinhalinan Construction & Concrete Aggregates
Supplies28965 Rehab. of Tabon-Labisma-
Lawigan Road XIII 3.745 C 0.332 0.200 0.300 - - - 83.20 84.10% V. Satisfactory
Guinhalinan Construction & Concrete Aggregates
Supplies28965 Completion of Baywalk XIII 1.913 O 0.271 0.300 0.100 0.030 0.070 0.067 83.80 -
GVN Builders 29577 Rehab. of MPB @ Cupang West III 1.410 C 0.320 0.153 0.300 - - - 77.30 *77.30% Satisfactory
GVR Construction & Supply 31603 Const. of MPB (Atty. G.R.
Banaag RCYDC) XIII 0.959 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
H R B Construction 10528 Const./Impvt. of Multi-Purpose Bldg. @ Gubat V 0.141 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
H R B Construction 10528 Opening of Salvacion-Del Rosario Road V 4.703 C 0.267 0.300 0.300 - - - 86.70 79.20%
Satisfactory
H.G. Lopez Construction 17691 Const. of Dagupan MPB CAR 0.466 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 180
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
H.G. Lopez Construction 17691 Const. of Multi-Purpose Building (Phse II) Town Proper I 2.817 C 0.396 0.300 0.300 - - - 99.60 86.86%
V. Satisfactory
H.G. Lopez Construction 17691Const. of Road Leading to Christ the Redeemer, Brgy.1 (Lubrins
Hts.) I 1.099 O 0.328 0.238 0.100 0.022 0.018 0.100 80.60 -
H.G. Lopez Construction 17691 Const. of TESDA MPB CAR 1.906 C 0.350 0.200 0.300 - - - 85.00 88.15% V. Satisfactory
H.L.J. Construction & Enterprises 18080 Completion of Road Cementing
and Drainage Canal VII 0.474 C 0.328 0.200 0.300 - - - 82.80 83.04% V. Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Balasan-Carles Road,
Guinticgan-Abong Sction VI 15.755 C 0.226 0.285 0.300 - - - 81.10 85.80% V. Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-
Lapus, Fairways Sect.) VI 17.915 O 0.259 0.253 0.100 0.015 0.016 0.067 71.00 -
H.L.J. Construction & Enterprises 18080 Conc. of Datag-Kamulayan FMR VII 1.267 C 0.291 0.300 0.300 - - - 89.10 *89.10%
V. Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Iloilo-Capiz Road (New
Route) VI 18.190 C 0.348 0.300 0.300 - - - 94.80 91.04% Outstanding
H.L.J. Construction & Enterprises 18080
Conc. of Jct. Bearins along Tapi-Magballo Road (Bantayan Section) at Brgy. Bantayan
VI 4.743 C 0.247 0.300 0.000 - - - 54.70 71.32% Satisfactory
H.L.J. Construction & Enterprises 18080
Conc. of Jct. Bearins-Salong Tapi-Magballo Road (Magballo
Section) at Brgy. MagballoVI 4.662 C 0.268 0.300 0.000 - - - 56.80 72.16%
Satisfactory
H.L.J. Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road,
Brgy. DancalanVI 2.957 O 0.329 0.300 0.100 0.015 0.022 0.067 83.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 181
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
H.L.J. Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road,
km. 105+447 - km. 105+777VI 3.047 O 0.336 0.213 0.100 0.008 0.022 0.067 74.60 -
H.L.J. Construction & Enterprises 18080
Concrete Paving of Brgy. Carol-an-Ayungon Farm-to-Market
RoadVI 1.518 C 0.228 0.200 0.300 - - - 72.80 77.12%
Satisfactory
H.L.J. Construction & Enterprises 18080
Const. of 1 CL @ @ Hermenegilda F. Gloria Memorial
H/SVII 0.432 C 0.301 0.300 0.300 - - - 90.10 90.45%
Outstanding
H.L.J. Construction & Enterprises 18080 Const. of 1 Unit 1 CL School
Bldg. @ Daan Banua E/S VI 0.378 C 0.380 0.245 0.300 - - - 92.50 91.59% Outstanding
H.L.J. Construction & Enterprises 18080 Const. of Naiba-Maningcao Road VII 0.940 O 0.308 0.234 0.100 0.008 0.025 0.100 77.50 -
H.L.J. Construction & Enterprises 18080 Const. of Pedestrian Overpass VII 4.522 C 0.398 0.300 0.300 - - - 99.80 94.25%
Outstanding
H.L.J. Construction & Enterprises 18080 Const. of Sac-sac Road Lined
Canal VII 1.373 C 0.300 0.300 0.300 - - - 90.00 *90.00% Outstanding
H.L.J. Construction & Enterprises 18080 Const. of San Jose (Canaway)
River Control Project VII 4.666 C 0.330 0.200 0.300 - - - 83.00 79.88% Satisfactory
H.L.J. Construction & Enterprises 18080
Impvt. of Roads leading to the Twin Springs Project, Brgy. Bunga to Brgy. Baslay Road
VII 9.311 O 0.323 0.236 0.100 0.030 0.027 0.067 78.30 -
H.P.L. General Construction 22289 Concreting of Various Municipal
and Barangya Roads II 1.708 O 0.329 0.240 0.100 0.022 0.030 0.100 82.10 -
H.S. Oaminal Construction & General Merchandise 10578 Completion of Dormitory Bldg. I
Phase I DOST 5.829 O 0.320 0.300 0.128 0.017 0.043 0.023 83.10 -
H.T.L. Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road II 14.459 O 0.302 0.231 0.100 0.030 0.033 0.067 76.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 182
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
H.T.L. Construction 3962 Redecking of Ipil Bridge along Daang Maharlika II 11.560 O 0.361 0.240 0.070 0.010 0.028 0.067 77.60 -
Haidee Construction and Development Corp./Al-B
Const. (JV)
SL2-SN-00774 / JV-
06-078
Impvt./Widening of Mc Arthur Highway, Phase III (Package III),
Replacement of Labangan Bridge No. 7
III 115.799 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Haidee Construction and Development Corporation 10365 Completion of Friendship Bridge
& Approaches, Phase V III 23.917 O 0.303 0.300 0.100 0.030 0.040 0.100 87.30 -
Haidee Construction and Development Corporation 10365 Const. of Friendship Bridge &
Approaches, Phase III III 23.478 O 0.274 0.204 0.100 0.030 0.054 0.100 76.20 -
Halrey Construction, Inc. 2267 Const. (Conc.) of Marikina-Infanta Rd. P-II, Rizal Side IV-A 43.396 C 0.347 0.200 0.300 - - - 84.70 84.70%
V.Satisfactory
Halrey Construction, Inc. 2267Geometric
Improvement/Rehab./Reblocking of Portions of EDSA Q.C.
NCR 9.530 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Halrey Construction, Inc. 2267
Impvt./Conc. Blocking of Katipunan Ave. & E. Rodriguez Jr. C-5 (Shuster St. to Ortigas
Ave.)
NCR 14.314 C 0.329 0.300 0.300 - - - 92.90 95.48% Outstanding
Halrey Construction, Inc. 2267Rehab. (Concrete Blocking) of
EDSA from Quezon Ave. to Annapolis (South Bound)
NCR 9.554 C 0.382 0.300 0.300 - - - 98.20 96.88% Outstanding
Halrey Construction, Inc. 2267 Rehab./Reconst. (Conc.) of Naic-Jct.-Caylabne Road IV-A 28.922 O 0.328 0.300 0.100 0.030 0.028 0.100 88.60 -
Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329
Const./Impv't. (PCCP) of C.P.A. Sect. A-Tukuran Rd., Dobliston
Jct. & Sect. B-Kapatagan-Dobliston Jct. Road
KFAED 633.001 C 0.304 0.300 0.300 - - - 90.40 89.65% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 183
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329
CP-A: Const./Impvt. of Kapatagan-Dobliston Jct. Road
(Addendum)KFAED 1,305.817 O 0.396 0.300 0.100 0.030 0.056 0.100 98.20 -
Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329
CP-A: Const./Impvt. of Kapatagan-Dobliston Jct. Road
(Addendum)KFAED 202.745 O 0.341 0.300 0.100 0.030 0.060 0.100 93.10 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of
Tigum & Aganan RiverMFCP I 1,194.106 O 0.391 0.200 0.100 0.030 0.055 0.200 97.60 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of
Tigum & Aganan RiverMFCP I 1,194.106 O 0.400 0.300 0.100 0.030 0.047 0.100 97.70 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of
Tigum & Aganan RiverMFCP I 1,305.817 O 0.360 0.200 0.100 0.030 0.065 0.200 95.50 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of
Tigum & Aganan RiverMFCP I 1,305.817 O 0.355 0.200 0.100 0.030 0.070 0.200 95.50 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-000445
Bohol Cicumferential Road Impv't. Project CP-1, Valencia-
Tagbilaran-Calape SectionPJHL 1,000.084 C 0.382 0.300 0.300 - - - 98.20 97.60%
Outstanding
Hanjin Heavy Industries & Construction Co. Ltd.
SLN-SN-000452
Bohol Irrigation Project, Stage 2 (BHIP2-C-2) BHIP 608.709 C 0.331 0.300 0.300 - - - 93.10 93.10%
Outstanding
Hanjin Heavy Industries & Construction Co. Ltd. FC-98-216 CP MN-A: Iligan-Aurora Road 6th
Road Project ADB 714.824 C 0.385 0.300 0.300 - - - 98.50 96.85% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 184
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Hanjin Heavy Industries & Construction Co. Ltd. FC-98-329 CP-A Section A: Const./Impv't. of
Tukuran-Dobliston Road KFAED 577.304 O 0.368 0.297 0.050 0.030 0.042 0.100 88.70 -
Hanjin Heavy Industries & Construction Co. Ltd. FC-98-329 CP-A Section A: Const./Impv't. of
Tukuran-Dobliston Road KFAED 577.304 O 0.330 0.300 0.100 0.030 0.054 0.100 91.40 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-00556
CP-III, Reconst. of Four (4) Bridges along Arterial Roads
Project, Phase IV (Baroro Bridge)
PJHL 128.692 O 0.363 0.300 0.070 0.030 0.050 0.067 88.00 -
Hanjin/Kurimoto JV SL2-SN-000452 Bohol Irrigation Project, Stage 2 NIA-IV 1561.392 C 0.380 0.300 0.300 - - - 98.00 98.00%
Outstanding
Hausland Construction 32378 Const. of MPB at Minuyan Proper Towerville E/S III 1.422 C 0.232 0.300 0.300 - - - 83.20 *83.20%
V. Satisfactory
Hazama/ Taisei/ Nippon Steel HTN JV
S-05-09-001
Subic-Clark-Tarlac Expressway Project BCDA 9,097.880 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.352 0.300 0.070 0.024 0.047 0.033 82.58 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.357 0.300 0.070 0.030 0.042 0.000 79.90 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.350 0.293 0.050 0.024 0.047 0.067 83.07 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.354 0.300 0.070 0.030 0.060 0.033 84.70 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.335 0.295 0.070 0.030 0.051 0.033 81.49 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 185
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.385 0.289 0.070 0.018 0.051 0.067 88.08 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.373 0.275 0.070 0.030 0.047 0.033 82.79 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.378 0.298 0.050 0.030 0.047 0.033 83.62 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.365 0.296 0.050 0.012 0.051 0.033 80.69 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.362 0.299 0.050 0.023 0.056 0.067 85.58 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.362 0.295 0.050 0.030 0.047 0.033 81.69 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.389 0.299 0.070 0.030 0.042 0.033 86.40 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 O 0.378 0.293 0.070 0.024 0.042 0.067 87.41 -
Hazama-Taisei-Nippon Steel (HTN JOINT
VENTURE)FC-04-025
Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access Roads and
Interchange
JBIC 596.889 O 0.348 0.300 0.050 0.030 0.038 0.067 83.25 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 186
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Hazama-Taisei-Nippon Steel (HTN JOINT
VENTURE)FC-04-025
Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access Roads and
Interchange
BCDA 596.889 O 0.385 0.297 0.050 0.030 0.061 0.067 88.95 -
HCM Construction Corporation 19382 Const. of Las Piñas-Muntinlupa-
San Pedro Link Road NCR 9.519 C 0.369 0.300 0.300 - - - 96.90 *96.90% Outstanding
HCM Construction Corporation 19382 Const. of Road/Bridge NCR 14.374 O 0.374 0.300 0.100 0.022 0.063 0.100 95.90 -
HCM Construction Corporation 19382 Const. of Road/Bridge NCR 14.374 O 0.384 0.300 0.100 0.030 0.051 0.100 96.50 -
HCM Construction Corporation 19382 Slope Protection of Creek @
Brgy. Pulang Lupa & Manuyo NCR 9.600 C 0.376 0.300 0.300 - - - 97.60 94.84% Outstanding
Henry S. Oaminal Const. & General Merchandise 10578 Conc. of Jct. (LIR) Carmen-
Sagbayan-Bacane Road VII 22.646 O 0.293 0.222 0.000 0.020 0.032 0.100 66.70 -
Herbert Malmis General Merchandise & Contractor,
Inc.4593 Concrete Paving of Tagbilaran-
Sikatuna Road VII 6.495 C 0.359 0.300 0.300 - - - 95.90 86.60% V. Satisfactory
Herefold Builders Construction and Supply 20789 Conc. of Road at Sinala-Gulibay IV-A 3.059 C 0.324 0.189 0.300 - - - 81.30 *81.30%
V. Satisfactory
Herefold Builders Construction and Supply 20789 Impvt. of MPB IV-A 0.099 O 0.335 0.300 0.100 0.030 0.023 0.067 85.50 -
HG III Construction & Dev't. Corp. 947 NBP Resettlement Project,
Phase III NHA 155.483 O 0.16 0.24 0.1 0.02 0.018 0.1 63.75 -
HG III Construction and Dev't Corp. 947 Sct. Ranger Housing Project,
Phase III NHA 49.688 O 0.395 0.300 0.100 0.030 0.047 0.100 97.19 -
HGG Builders and Supply 17824 Completion of Academic Bldg. Phase 3 DOST 13.127 C 0.374 0.299 0.300 - - - 97.32 97.32%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 187
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
HGG Builders and Supply 17824 Completion of Dormitory Bldg. Phase 3 DOST 17.342 O 0.362 0.226 0.030 0.030 0.040 0.067 75.50
HGG Builders and Supply 17824 Conc. of Brgy. Road, Andaya Highway Jct. to Municipal Hall V 0.926 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
HGG Builders and Supply 17824 Const. of Conc. Drainage Canal, Brgy. Bigajo Norte V 0.946 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
HGG Builders and Supply 17824 Const. of Multi-Purpose Building V 1.929 C 0.400 0.249 0.300 - - - 94.90 89.93% V. Satisfactory
HGG Builders and Supply 17824 Const. of Public Market, Brgy. Barcelona V 1.891 C 0.359 0.200 0.300 - - - 85.90 *85.90%
V. Satisfactory
HG-III Construction and Dev't. Corp. 8431 Land Development of Scout
Ranger Housing Project, Ph. 3 NHA 49.597 C 0.385 0.299 0.300 - - - 98.40 98.40% Outstanding
Hibiscus Trading and Construction Services 28280
Completion of Pedestrian Overpass Across
Commonwealth Ave.NCR 1.873 C 0.267 0.300 0.300 - - - 86.70 85.98%
V. Satisfactory
Hibiscus Trading and Construction Services 28280
Package 8: a) Renovation/Improvement of Multi-Purpose Bldg. Brgy.
Socorro: b) Completion of Multi-Purpose Bldg. Brgy. Masagana
NCR 1.590 C 0.282 0.277 0.300 - - - 85.90 86.32% V. Satisfactory
Hibiscus Trading and Construction Services 28280 Repair/Rehab. of Multi-Purpose
Building NCR 2.687 C 0.294 0.300 0.300 - - - 89.40 88.14% V. Satisfactory
Hilmarc's Construction Corporation 2748 Rehab. of Rizal MPB, Sports
Center (Phase II) NCR 38.595 C 0.314 0.300 0.300 - - - 91.40 91.40% Outstanding
Hi-point Construction Corporation 30744 Rehab./Conc. of Roads VIII 4.563 C 0.125 0.200 0.300 - - - 62.50 *62.50%
Fair
Hi-point Construction Corporation 30744
Repair/Rehab. of Catarman-Mondragon Road along
Catarman BridgeVIII 9.600 O 0.364 0.240 0.100 0.030 0.029 0.067 83.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 188
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Hi-point Construction Corporation 30744
Repair/Rehab. of Catarman-Mondragon Road along
Catarman BridgeVIII 9.600 O 0.247 0.240 0.100 0.030 0.030 0.100 74.70 -
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Completion of Tokyo Bridge along Catanduanes Circ. Road V 14.379 O 0.400 0.298 0.100 0.020 0.019 0.100 93.70 -
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const. of MPB BUPC Admin. Center (Phase II) V 15.759 C 0.367 0.200 0.300 - - - 86.70 88.66%
V. Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const. of Sabang MPB V 9.556 O 0.400 0.225 0.100 0.030 0.030 0.100 88.50 -
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const. of Sabang MPB V 9.556 O 0.400 0.240 0.100 0.020 0.016 0.067 77.60
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const./Widening of Washington Drive to Lakandul Drive V 9.550 C 0.372 0.101 0.300 - - - 77.30 *77.30%
Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Dredging of Panganiran River V 19.188 C 0.388 - 0.500 - - - 88.80 *88.80% V. Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Opening/Const. of Tagoytoy-Taladong Road (Phase I) V 14.249 C 0.363 0.262 0.300 - - - 92.50 91.84%
Outstanding
Hi-Tri Development Corporation 1758 Impvt. of Masbate-Malinta &
Masbate-Mobo Road V 10.387 C 0.188 0.135 0.300 - - - 62.30 *62.30% Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 189
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Hi-Tri Development Corporation 1758
Rehab./Impvt. Along Pili-Tigaon-Albay Bdry. Road, km. 472+080
to km. 480+000V 4.680 C 0.221 0.300 0.300 - - - 82.10 *82.10%
V. Satisfactory
HLC Construction and Development Corporation 8775 Rehab./Impvt. of Panabo Coastal
Road, Arieta Section XI 11.096 O 0.375 0.300 0.070 0.030 0.065 0.067 90.70 -
HLJ Construction & Enterprises 18080 Concreting of Roads VI 0.892 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
HLJ Construction & Enterprises 18080 Const. of Pedestrian Bridge @
Hibbard Avenue VII 4.472 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -
Hoger Construction 24128 Repair/Rehab. of Jct. Buenavista-Lawaan Rd. VIII 3.342 C 0.301 0.200 0.300 - - - 80.10 *80.10%
V. Satisfactory
Homeworld Engineering 14725
Rehab./Reconst. of Damaged Paved Nat'l Roads Generated
from PMS/HDM-4, Sum-ag-Abunan Road
VI 30.687 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -
Hony Trading and Construction 26898
Const., Rehab., Replacement, Completion & Repair of
Elementary & Secondary Sch. Bldg. at CP Teresa E/S
NCR 2.384 C 0.376 0.183 0.300 - - - 85.90 *85.90% V. Satisfactory
Horamabi Builders 24129Asphalt Overlay of Jct. Layac-Balanga-Mariveles Port Road
(Orion Section)III 1.924 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
Horamabi Builders 24129 Const. of MPB @ Bataan NHS III 1.881 C 0.253 0.300 0.300 - - - 85.30 77.53% Satisfactory
Horamabi Builders 24129Const. of One (1) CL School
Building @ Balanga Integrated Sch.
III 0.422 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
Horamabi Builders 24129 Const. of One (1) CL School Building @ Marina Bay E/S III 0.472 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 190
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Horamabi Builders 24129Const. of Two (2) Classroom Sch. Bldg. @ E.C. Bernabe
National HSIII 0.887 O 0.366 0.300 0.100 0.030 0.019 0.100 91.50 -
Horamabi Builders 24129 Rehab. of Sch. Bldg. at Pablo Roman High School III 0.754 C 0.323 0.300 0.300 - - - 92.30 *92.30%
Outstanding
Horamabi Builders 24129Repair & Rehab. of Gov. J.J. Linao Road, Balanga City to
Bagac SectionIII 9.446 C 0.273 0.205 0.300 - - - 77.80 *77.80%
Satisfactory
Houserock Builders and Trading 18822 Rehab./Impvt. Along A.H. Lacson
Ave. NCR 0.933 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
HPL General Construction 22289 Completion of DPWH-NVSDEO Bldg. II 2.700 C 0.363 0.200 0.300 - - - 86.30 86.30%
V. Satisfactory
HPL General Construction 22289 Completion of Multi-Purpose Building II 0.426 C 0.327 0.250 0.300 - - - 87.70 82.38%
V. Satisfactory
HPL General Construction 22289 Concreting of Various Municipal and Brgy. Roads II 1.708 C 0.323 0.300 0.300 - - 92.30 89.48%
V. Satisfactory
HPL General Construction 22289 Const. of Tupang River Control II 1.871 C 0.373 0.300 0.300 - - - 97.30 71.92% Satisfactory
HPL General Construction 22289Const./Replacement of
Camanauan Bridge, along Dugo-San Vicente Road (DVSR)
II 4.240 O 0.396 0.217 0.100 0.030 0.028 0.067 83.80 -
HPL General Construction 22289Const./Replacement of
Camanauan Bridge, along Dugo-San Vicente Road (DVSR)
II 4.240 O 0.380 0.210 0.030 0.022 0.023 0.067 73.20 -
HRB Construction 10528 Road Concreting of Sta. Cruz-Ratay (CSSAC School Campus) V 0.620 C 0.357 0.300 0.300 - - - 95.70 *95.70%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 191
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
HVC Sagittarius Commercial and
Construction12954 Completion of Multi-Purpose
Bldg., XII 2.751 C 0.375 0.292 0.300 - - - 96.70 86.31% V. Satisfactory
HVC Sagittarius Commercial and
Construction12954
Conc. of Sarangani Davao del Sur Coastal Road, Kalatungan-
Punsad SectionXII 9.429 O 0.316 0.277 0.100 0.030 0.043 0.067 83.30 -
HVC Sagittarius Commercial and
Construction12954 Const. of MPB @ Brgy. Sinolon XII 0.759 C 0.281 0.300 0.300 - - - 88.10 84.74%
V. Satisfactory
Hypro Construction and Development Corporation 32745 Const. of Mompong Flood
Control IV-B 4.825 C 0.284 0.300 0.300 - - - 88.40 *88.40% V. Satisfactory
I & E Construction 10410 Improvement/Rehab. of city Streets (Rueda & Navarro Sts.) VIII 1.908 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. IV-A 9.552 O 0.361 0.225 0.070 0.003 0.028 0.100 78.70 -
I & E Construction 10410 Impvt./Conc. of Marikina-Infanta Road (marcos Hi-way) P-III IV-A 14.354 C 0.347 0.200 0.300 - - - *84.70 84.70%
V. Satisfactory
I & E Construction 10410 Impv't./Rehab. of Roadside Lopez-Buenavista Road IV-A 4.728 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
I & E Construction 10410
Repair/Rehab./Impvt. of Nat'l Roads along Bagahupi-
Babatngon Road, Tanauan-Dagami Road, Mainit-San Miguel
Santoil Road
VIII 24.097 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
I M B Construction 13259 Conc. Paving of Brgy. Catmon-Daan VII 0.926 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. IV-A 9.552 C 0.336 0.200 0.300 - - - 83.60 80.66% V. Satisfactory
I & E Construction 10410 Impvt. of Drainage along Maharlika Highway VIII 3.779 C 0.379 0.200 0.300 - - - 87.90 87.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 192
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
I & E Construction 10410 Impvt./Rehab. of Dr. Damian Reyes Road-Boac Side (Phase I) IV-B 14.239 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Satisfactory
I & E Construction 10410Impvt./Rehab. of Tanauan-
Dagami-Burauen Road, San Miguel- Barugo Road
VIII 19.296 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
I & E Construction 10410 Rehab./Impvt. of Old Road MSR , Brgy. San Antonio IV-A 19.204 C 0.287 0.200 0.300 - - - 78.70 *78.70%
Satisfactory
I.F. Blanco's Construction 25350 Conc. of Lumangbayan-Pili Road IV-B 9.410 C 0.361 0.300 0.300 - - - 96.10 87.64% V. Satisfactory
I.F. Blanco's Construction 25350 Conc. of Zone 1, Marfrancisco Road IV-B 9.485 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
I.F. Blanco's Construction 25350 Const. of 1 CL Sch. Bldg. @ Sinampad P/S IV-B 0.479 C 0.384 0.200 0.300 - - - 88.40 82.24%
V. Satisfactory
I.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road IV-B 4.710 C 0.298 0.230 0.300 - - - 82.80 86.80%
V. Satisfactory
I.F. Blanco's Construction 25350 Const. of Orconuma River Control (Gabion Type) IV-B 4.714 C 0.287 0.257 0.300 - - - 84.40 *84.40%
V. Satisfactory
I.M. Construction Corporation 20074 Concrete Reblocking along Gov.
A. Pascual St. NCR 4.744 O 0.336 0.300 0.100 0.030 0.047 0.100 91.30 -
IBC International Builders Corporation 8576
Asphalt Overlay along Mambusao-Imbug Road, Km.
97+200-Km. 98+000VI 9.941 C 0.332 0.200 0.300 - - - 83.20 *83.20%
V. Satisfactory
IBC International Builders Corporation 8576 Asphalt Overlay at Iloilo-Capiz
Road (New Route) VI 11.400 C 0.345 0.276 0.300 - - - 92.10 *92.10% Outstanding
IBC International Builders Corporation 8576
Asphalt Overlay of Barotac Nuevo-Dumangas-Dacutan
Coastal RoadVI 9.310 C 0.326 0.233 0.300 - - - 85.90 87.64%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 193
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
IBC International Builders Corporation 8576
Asphalting of Priority Gravel Road Gap along Guimaras
Circumferential RoadVI 2.722 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
IBC International Builders Corporation 8576 Completion of Cabano Bridge
(Final) VI 4.776 C 0.355 0.253 0.300 - - - 90.80 *90.80% Outstanding
IBC International Builders Corporation 8576 Conc. of Iloilo-Capiz Road (Old
Route) VI 28.319 O 0.367 0.225 0.030 0.023 0.045 0.067 75.70 -
IBC International Builders Corporation 8576 Conc. of Mandurriao-Pacquiad
Road VI 4.811 C 0.315 0.300 0.300 - - - 91.50 91.50% Outstanding
IBC International Builders Corporation 8576 Conc. of Oton-Pakiad Road VI 9.176 C 0.343 0.066 0.300 - - - 70.90 74.98%
Satisfactory
IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 O 0.400 0.300 0.070 0.030 0.030 0.067 89.70 -
IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 O 0.400 0.300 0.030 0.030 0.033 0.067 86.00 -
IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 O 0.400 0.300 0.030 0.030 0.043 0.067 87.00 -
IBC International Builders Corporation 8576 Rehab. of Batiano Bridge @
Molo Blvd. VI 4.375 C 0.286 0.300 0.300 - - - 88.60 86.56% V. Satisfactory
IBC International Builders Corporation (Formerly: IBC
Iloilo Builders Corp.)8576 Asphalt Overlay of M. Laserma
Street-C. Laserma Street VI 2.404 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
IBC International Builders Corporation (Formerly: IBC
Iloilo Builders Corp.)8576 Cabano Bridge along Guimaras
Circumferential Road VI 6.258 O 0.273 0.268 0.100 0.030 0.040 0.100 81.10 -
IBC International Builders Corporation (Formerly: IBC
Iloilo Builders Corp.)8576 Cabano Bridge along Guimaras
Circumferential Road VI 6.258 O 0.274 0.300 0.100 0.030 0.037 0.100 84.10 -
IBC International Builders Corporation (Formerly: IBC
Iloilo Builders Corp.)8576 Const. of Cuartero Bridge
(Phase I) VI 9.661 C 0.290 0.240 0.300 - - - 83.00 *83.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 194
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
IBC International Builders Corporation (Formerly: IBC
Iloilo Builders Corp.)8576 Const. of Two (2) Storey Iloilo
Hall of Justice Building VI 12.629 C 0.368 0.191 0.300 - - - 85.90 87.41% V. Satisfactory
Icalina Builders and Construction Supply 26889 Const. of Multi-Purpose
Pavement Zone II X 0.932 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory
Icalina Builders and Construction Supply 26889
Const. of Slope Protection along Misamis Oriental-Ma. Cristina Bdry. Road, Nunucan Section
X 4.234 C 0.309 0.200 0.300 - - - 80.90 82.34% V. Satisfactory
Icalina Builders and Construction Supply 26889 Rehab./Impvt./Conc. of Tubod
Ganassi National Road X 4.574 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding
IDI Trading & Contractor 29006 Completion of Multi-Purpose Building III 0.762 C 0.377 0.279 0.300 - - - 95.60 *95.60%
OutstandingIKM Builders &
Construction Supply 30252 Const. of 2 Storey Extension Bldg. (RHUI) IV-A 4.812 C 0.292 0.255 0.300 - - - 84.70 *84.70%
V. Satisfactory
IKM Builders & Construction Supply 30252
Rehab./Reconst. of Damaged National Road, Batangas-Lobo Road, Dagatan-Laurel Section
IV-A 9.647 C 0.255 0.300 0.300 - - - 85.50 *85.50% V. Satisfactory
ILG Enterprises 31985 Conc. of Public Market Road and Parking along Brgy. Biñan IV-A 0.955 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V. Satisfactory
ILG Enterprises 31985 Const. of FMR at Sitio III (Balugbog) IV-A 2.873 C 0.361 0.300 0.300 - - - 96.10 *96.10%
Outstanding
ILG Enterprises 31985Const./Rehab. of Drainage
System along CSCF Jct. Paete Section
IV-A 2.434 C 0.320 0.300 0.300 - - - 92.00 85.10% V. Satisfactory
IM Construction Corporation 20074 Conc. Blocking of Susano Road NCR 2.873 C 0.367 0.300 0.300 - - - 96.70 *96.70%
Outstanding
IM Construction Corporation 20074 Conc./Impvt. of Road along MH
del Pilar St. NCR 9.480 C 0.361 0.300 0.300 - - - 96.10 *96.10% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 195
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
IM Construction Corporation 20074 Concrete Reblocking along Gov.
A. Pascual St. NCR 4.744 C 0.347 0.300 0.300 - - - 94.70 92.66% Outstanding
IM Construction Corporation 20074 Const. of Pedestrian Overpass at
IBP Road NCR 2.866 C 0.277 0.300 0.300 - - - 87.70 *87.70% V. Satisfactory
IM Construction Corporation 20074
Impvt. of Roads with Drainage System along Dalagang Bukid
St. NCR 14.259 C 0.208 0.200 0.300 - - - 70.80 *70.80%
Satisfactory
IM Construction Corporation 20074
Impvt./Widening (Conc.) of Boni Serrano Ave., Marikina Side to
Quezon City SideNCR 13.637 C 0.364 0.300 0.300 - - - 96.40 91.33%
Outstanding
IM Construction Corporation 20074 Rehab./Impvt. of Kalayaan Ave.
District II NCR 9.545 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding
IM Construction Corporation 20074 Rehab./Reblocking of General
Luis St. NCR 2.862 C 0.317 0.300 0.300 - - - 91.70 *91.70% Outstanding
IM Construction Corporation 20074 Widening of North Avenue NCR 8.605 C 0.329 0.300 0.300 - - - 92.90 *92.90%
Outstanding
IMB Construction 13259 Const. of Multi-Purpose Building VII 0.938 C 0.306 0.200 0.300 - - - 80.60 *80.60%
V. Satisfactory
Interchain Builders 28734 Const. of FMR @ Brgy. Magallanes-Brgy. Pating V 0.931 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
Interior-Philworks Const. Joint Venture JV-04-014
CP1, Ligao-Pio Duran Setion, Arterial Road Links Devt. (Phase
V)V 328.190 C 0.231 0.300 0.300 - - - 83.10 84.28%
V. Satisfactory
International Builders Corporation (IBC) 8576 Fort San Pedro Improvement
Project PPA 181.489 O 0.364 0.275 0.100 0.030 0.053 0.100 92.20 -
Irving Doyle T. Paras Construction 27362 Conc. of Caraycaray-Cabungan-
Libtong FMR VIII 0.944 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
Irving Doyle T. Paras Construction 27362 Const. of River Control VIII 4.339 C 0.267 0.300 0.300 - - - *86.70 86.70%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 196
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Isaga Builders 8652 Const. of Conner Central National High School CAR 0.864 C 0.326 0.265 0.300 - - - 89.10 84.97%
V. Satisfactory
Isaga Builders 8652 Const. of Sta. Marcela MPB CAR 1.439 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory
Isaga Builders 8652 Rehab. of National Road along Abbut-Conner-Kabugao Road CAR 9.344 O 0.341 0.240 0.100 0.008 0.040 0.100 72.90 -
Isaga Builders 8652Repair & Maintenance of Nat'l
Road & Bridges, Abbut-Conner-Kabugao Road
CAR 4.711 C 0.323 0.261 0.300 - - - 88.40 82.40% V. Satisfactory
Isaga Builders 8652 Repair/Rehab. of Calafug-Lipay-Masico FMR CAR 0.470 C 0.373 0.275 0.300 - - - 94.80 93.36%
Outstanding
Isaga Builders 8652 Repair/Rehab. of Priority FMR (Municipal wide) CAR 1.394 C 0.178 0.225 0.300 - - - 70.30 *70.30%
Satisfactory
ISH Construction Inc. 30407 Const. of one unit 3-Storey Elementary School Bldg., Pkg. 2 SLB 16.059 C 0.330 0.300 0.000 - - - 63.00 63.00%
Fair
ISH Construction Inc. 30407Construction of one(1) unit 3-
storey Elementary School Building, Package 2
NHA 16.059 O 0.22 0.25 0.05 0.015 0.017 0.067 61.90 -
ISH Construction Inc. 30407 Construction of Three-Storey School Building (12 Classrooms) SLB 17.201 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Scholl Building NHA 16.404 O 0.338 0.138 0.100 0.030 0.070 0.100 77.52 -
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Scholl Building NHA 17.762 C 0.394 0.295 0.300 - - - 98.94 83.95%
V.Satisfactory
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Elementary School Bldg. SLB-LPO 18.839 C 0.298 0.293 0.300 - - - 89.10 89.10%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 197
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Italian-Thai Development Public Company Limited FC-03-043
CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't. Project (Himayangan-
Silago-Abuyog Road & Liloan-San Ricardo Road Project)
Phase IV
PJHL 1,010.701 C 0.374 0.300 0.300 - - - 97.40 93.74% Outstanding
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.620 O 0.381 0.300 0.100 0.030 0.070 0.100 98.10 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 O 0.351 0.300 0.100 0.030 0.070 0.100 95.10 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 O 0.369 0.300 0.100 0.030 0.070 0.100 96.90 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 18.300 C 0.400 0.300 0.300 100.00 100%
Outstanding
ITP Construction, Inc. 9392 Sct. Ranger Housing Project, Phase I NHA 51.850 O 0.400 0.300 0.100 0.030 0.032 0.100 96.23 -
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 17.202 O 0.378 0.262 0.070 0.020 0.053 0.067 84.93 -
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 17.202 O 0.395 0.286 0.030 0.020 0.053 0.033 81.62 -
ITP Construction, Inc. 9392 Sct. Ranger Housing Village Project. Phase I NCL 51.777 C 0.261 0.300 0.300 - - - 86.10 86.10%
V.Satisfactory
Ivahrick Contractors 13688 Const. of Flood Control NCR 2.857 O 0.280 0.119 0.100 0.030 0.005 0.200 73.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 198
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ivy Michelle Trading & Construction 24093
Conc. of El Nido-Bataraza Road (Aboabo-Bataraza Sect.),
Marangas-Bonobono SectionIV-B 22.097 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
Ivy Michelle Trading & Construction 24093
Conc. of El Nido-Bataraza Road (PPC-Narra-Aboabo Sect.), San
Isidro/Calategas SectionIV-B 23.990 C 0.185 0.293 0.300 - - - 77.80 84.52%
V. Satisfactory
Ivy Michelle Trading & Construction 24093
Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo
SectionIV-B 11.395 C 0.226 0.299 0.300 - - - 82.50 *82.50%
V. Satisfactory
Ivy Michelle Trading & Construction 24093 Conc. of Quezon-Aramaywan
Road (Tabon Section) IV-B 24.965 O 0.344 0.236 0.100 0.030 0.048 0.100 85.80 -
Ivy Michelle Trading & Construction 24093 Concreting of PPNR Roxas
Taytay-El Nido National Road IV-B 3.508 C 0.233 0.300 0.300 - - - 83.30 87.02% V. Satisfactory
Ivy Michelle Trading & Construction 24093 Const. of 1 Cl Sch. Bldg. @
Narra NHS IV-B 0.435 C 0.335 0.118 0.300 - - - 75.30 *75.30% Satisfactory
Ivy Michelle Trading & Construction 24093
Const. of 1-CL, New Barbacan E/S, Roxas North (part of CY 2004 DepEd School Building
Program Clustered)
IV-B 0.381 C 0.390 0.285 0.300 - - - 97.50 83.92% V. Satisfactory
Ivy Michelle Trading & Construction 24093 Const. of Aramaywan-Berong-
Puerto Princesa Road IV-B 19.097 C 0.339 0.200 0.300 - - - 83.90 79.40% Satisfactory
J & A Pimentel Construction 7953 Completion of MPB Tago (Phase
V) XIII 9.231 C 0.319 0.200 0.300 - - - 81.90 80.75% V. Satisfactory
J & A Pimentel Construction 7953 Completion of MPB Tandag
(Phase V) XIII 9.387 C 0.338 0.200 0.300 - - - 83.80 85.55% V. Satisfactory
J & A Pimentel Construction 7953 Conc. of Junction Cortes-Nurcia
Section (SDCR) XIII 19.280 O 0.307 0.224 0.070 0.030 0.027 0.100 75.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 199
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J & A Pimentel Construction 7953 Const. of Balibadon 4 Bridge XIII 18.988 O 0.377 0.240 0.100 0.030 0.022 0.100 86.90 -
J & A Pimentel Construction 7953 Const. of Balibadon I Bridge XIII 5.785 C 0.223 0.200 0.300 - - - 72.30 81.36%
V. Satisfactory
J & A Pimentel Construction 7953 Const. of Bocawe Bridge &
Approaches XIII 11.180 C 0.266 0.200 0.300 - - - 76.60 80.20% V. Satisfactory
J & A Pimentel Construction 7953 Const. of Cagmino Bridge &
Approaches XIII 11.830 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
J & A Pimentel Construction 7953
Impvt. of Bank Protection of Anibongan Bailey Bridge along
SCDRXIII 5.174 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
J & A Pimentel Construction and Supply 7953 Const. of Banahaw Bridge Phase
VI XIII 19.263 O 0.343 0.300 0.050 0.022 0.032 0.067 81.40 -
J & A Pimentel Construction and Supply 7953 Const. of Multi-Purpose Building
Phase III XIII 4.522 C 0.362 0.300 0.300 - - - 96.20 81.15% V. Satisfactory
J & A Pimentel Construction and Supply 7953 Const. of Tandag Multi-Purpose
Bldg. Phase II XIII 4.546 C 0.131 0.300 0.300 - - - 73.10 75.41% Satisfactory
J & S Escuadra Construction & Supply 20077 Const. of 2 units CL @ Hagonoy
NHS Annex XI 0.952 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
J D E Construction 19173 Const. of Two (2) unit CL @ West City Central School X 0.932 C 0.371 0.200 0.300 - - - 87.10 82.62%
V. Satisfactory
J D E Construction 19173 Impvt. of Waterways, Sapang Creek along ICBR X 4.667 C 0.354 0.200 0.300 - - - 85.40 83.72%
V. Satisfactory
J L A Construction & Supplies 24503 Const. of MPB at Almendras E/S XI 1.710 C 0.353 0.300 0.300 - - - 95.30 91.03%
Outstanding
J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project NHA 45.895 O 0.336 0.291 0.000 0.030 0.042 0.033 73.20 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 200
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project NHA 44.812 O 0.315 0.287 0.000 0.030 0.042 0.067 74.10 74.10%
Satisfactory
J. C. Baac Construction Corporation 25974 Impvt./Rehab. of Balbalan-
Pinukpuk Road CAR 26.052 O 0.323 0.234 0.100 0.020 0.030 0.067 77.40 -
J. C. Baac Construction Corporation 25974
Impvt./Rehab. of Bontoc-Lubuagan-Tabuk Road (Gongon
Sect.)CAR 13.257 C 0.370 0.300 0.300 - - - 97.00 78.40%
Satisfactory
J. C. Baac Construction Corporation 25974 Replacement/Const. of Langso
Bridge CAR 7.699 C 0.291 0.200 0.000 - - - 49.10 67.97% Fair
J. Custorio Construction 16237Rehab./Conc. Paving along
Bantayan-Malobago-Pagsang-an-Genagdanan Road
VIII 0.477 C 0.247 0.200 0.300 - - - 74.70 *74.70% Satisfactory
J. Custorio Construction 16237 Rehab./Impv't. of DPWH-Northern Samar 2nd DEO VIII 0.246 C 0.396 0.158 0.300 - - - 85.40 *85.40%
V. Satisfactory
J.B. Alarcon Enterprises 18849 Completion of Approaches and Revetment of Gen. Luna Bridge IVA 3.105 C 0.340 0.200 0.300 - - - 84.00 87.42%
V. Satisfactory
J.B. Alarcon Enterprises 18849 Const. of 2 CL Sch. Bldg. @ Cavinti E/S IVA 0.681 C 0.370 0.200 0.300 - - - 87.00 86.72%
V. Satisfactory
J.B. De Jesus Builders and Design Services 22867 Const. of FMR at Brgy. San
Agustin III 4.693 C 0.318 0.204 0.300 - - - 82.20 *82.20% V. Satisfactory
J.D. Legaspi Construction 9608 Baseco Linear/Community Park cum Revetment Wall PRRC 139.778 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -
J.D. Legaspi Construction 9608
CP 7: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Baganga Section Phase II
XI 191.035 O 0.211 0.300 0.100 0.030 0.060 0.100 80.10 -
J.D. Legaspi Construction 9608 Pasig River Ferry Service Station PRRC 7.303 O 0.280 0.180 0.100 0.020 0.020 0.100 70.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 201
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J.E. Arradaza Construction & Supply 25353 Const. of Duguan Communal
Irrigation Project NIA-II 2.338 C 0.326 0.300 0.300 - - - 92.60 92.60% Outstanding
J.E. Arradaza Construction & Supply 25353 Const. of Public Market-Building
Phase II VIII 1.421 C 0.375 0.212 0.300 - - - 88.70 *88.70% V. Satisfactory
J.E. Arradaza Construction & Supply 25353 Const. of Multi Purpose
Pavement at Brgy. Banilad VII 0.478 C 0.336 0.217 0.300 - - - 85.30 *85.30% V. Satisfactory
J.E. Manalo & Company, Inc. 422 Zamboanga Port Expansion
Project PPA 282.050 O 0.400 0.300 0.100 0.030 0.059 0.100 98.92 -
J.G. & P Enterprises 5090 Const. of Pedestrian Foot Bridge along Gov. Drive (FCIE) IV-A 3.823 C 0.302 0.200 0.300 - - - 80.20 *80.20%
V. Satisfactory
J.G. & P Enterprises 5090Rehab. And Impvt. Along Kawit-Noveleta Diversion Road, Kawit
SectionIV-A 10.345 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V. Satisfactory
J.G. & P Enterprises 5090 Ripraping of Imus River Brgy. Salinas IV-A 0.961 C 0.279 0.300 0.300 - - - 87.90 *87.90%
V. Satisfactory
J.G. Garcia Construction 21054 Construction of Multi-Purpos Bldg. @ Maasin E/S I 0.772 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &
Approaches (Phase I)Sp.
Bridges 174.420 O 0.352 0.180 0.030 0.030 0.065 0.067 72.40 -
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &
Approaches (Phase I)Sp.
Bridges 174.420 O 0.332 0.269 0.000 0.030 0.061 0.067 75.90 -
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge &
Approaches (Phase I)Sp.
Bridges 174.420 O 0.344 0.240 0.100 0.030 0.061 0.067 84.20 -
J.H. Pajara Construction Corp. 1890 Const. of Dalibubon Bridge,
along Ipil-Jones-San Agustin II 239.834 C 0.393 0.284 0.000 - - - 67.70 79.96% Satisfactory
J.H. Pajara Construction Corp. 1890
CP 6, Restoration of Patapat Viaduct under the Arterial Road
Links Dev. Project, Phase VPJHL 187.597 O 0.379 0.300 0.100 0.030 0.070 0.100 97.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 202
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J.H. Pajara Construction Corp. 1890
NAIA Expressway & its Related Road Projects Phase I Package-
IVA Sales St. Viaduct Ramp Structure (M & E Retaining Wall)
URPO 348.561 C 0.302 0.300 0.000 - - - 60.20 68.66% Fair
J.I. Etac Construction & Supply 32722
Reconst. of Daang Maharlika (SM) San Isidro-San Juan
SectionVIII 9.606 C 0.343 0.200 0.300 - - - 84.30 68.76%
Fair
J.I. Viacrusis Construction 14382 Completion of 4CL, Storey School Building Balic-balic E/S III 0.889 C 0.378 0.242 0.300 - - - 92.00 84.51%
V. Satisfactory
J.I.L. Trading & Construction Co. 14634 Const. of Brgy Road @ Brgy.
Kayumanggi IVA 1.921 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory
J.M. Luciano Const., Inc./Dimson (Manila), Inc.
(JV)
JV-03-023/SLN-004452
Phil-Japan Friendship Highway Mindanao Section Rehabiltation
Project, Phase 1 (Contract Package 7 & 8)
PJHL 754.879 C 0.265 0.300 0.300 - - - 86.50 87.01% V. Satisfactory
J.M. Luciano Construction Inc. (Formerly: J.M. Luciano
Const.)2083
Impvt./Conc. of SCDR Cortes-Tandag-Marihatag Road, Tandag-
Marihatag SectionXIII 77.202 C 0.318 0.300 0.300 - - - 91.80 90.12%
Outstanding
J.M. Maligaya Construction & Construction Supply 15018 Asphalt Overlay of Pob. 3 IV-A 0.285 C 0.270 0.300 0.300 - - - 87.00 *87.00%
V. Satisfactory
J.M. Maligaya Construction & Construction Supply 15018
Concreting of Farm-to-Market Road @ Brgy. Asis II (Sitio
Magsili)IV-A 0.380 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
J.M. Morales Construction & Supply (Formerly: J.M.
Morales Const.)15574 Impvt. of MPB III 5.780 C 0.387 0.270 0.300 - - - 95.70 70.64%
Satisfactory
J.M. Morales Construction & Supply (Formerly: J.M.
Morales Const.)15574 Upgrading/Rehab. of Lubao
Diversion Road III 4.777 C 0.369 0.183 0.300 - - - 85.20 *85.20% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 203
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J.N. Dela Torre Construction 24978 Const. of Canangcaan Road
(ARISP), Phase II, Sofronio IV-B 6.219 C 0.376 0.200 0.300 - - - 87.60 86.40% V. Satisfactory
J.N. Dela Torre Construction 24978 Const. of Multi-Purpose Building
(PNP), Brgy. Poblacion IV-B 0.466 C 0.361 0.200 0.300 - - - 86.10 83.86% V. Satisfactory
J.N. Dela Torre Construction 24978
Const. of PPSR, Narra-Aboabo Road Balitien Bridge I & II
ApproachIV-B 5.553 C 0.297 0.292 0.300 - - - 88.90 88.90%
V.Satisfactory
J.N. Dela Torre Construction 24978 Impvt. of MPB @ Pinaglabanan IV-B 0.365 C 0.282 0.218 0.300 - - - 80.00 *80.00%
SatisfactoryJ.P. Aquino & Bros.
(Engineers, Developers, Architects, Builders)
13231 Const. of 1 CL Sch. Bldg. at Bamban Gabaldon Elem. Sch. III 0.426 C 0.344 0.232 0.300 - - - 87.60 *87.60%
V. Satisfactory
J.Q.G. Construction 10530 Conc. of Maluid-San Andres Road (Sitio Malinis) III 1.660 C 0.293 0.210 0.300 - - - 80.30 *80.30%
V. Satisfactory
J.Q.G. Construction 10530 Conc. of San Isidro-Penal Colony-Jct. Yapang Road IV-B 23.812 C 0.355 0.300 0.300 - - - 95.50 82.03%
V. Satisfactory
J.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S III 1.091 C 0.313 0.300 0.300 - - - 91.30 81.99% V. Satisfactory
J.Q.G. Construction 10530
Traffic Management along Manila North Road (MNR) Package I along MNR from
Meycauayan to Malolos
III 46.677 C 0.337 0.300 0.300 - - - 93.70 93.70% Outstanding
J.R.C.F. Construction 31641 Const. of Multi-Purpose Building @ Various Sts. Brgy. Roxas NCR 0.662 C 0.396 0.300 0.300 - - - 99.60 *99.60%
Outstanding
J.S. General Contractor 15258 Const. of MPB, Brgy. 7 IV-A 0.476 C 0.356 0.267 0.300 - - - 92.30 *92.30% Outstanding
J.S. General Contractor 15258 Const. of Multi-Purpose Bldg. @ Brgy. Maranan I IV-A 0.475 O 0.344 0.200 0.100 0.030 0.027 0.100 80.10 -
J.S. General Contractor 15258 Const. of Water Supply System @ Pantihan 1,2, & 3 IV-A 0.575 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 204
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J.S. General Contractor 15258 Drainage Impvt. Along Banaba Cerca IV-A 1.905 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
J.S. General Contractor 15258 Improvement of School Building at Cavite State University IV-A 0.950 O 0.353 0.240 0.100 0.030 0.047 0.100 87.00 -
J.S. General Contractor 15258 Rehab. of Sch. Bldg., Cavite State University Gabaldon Bldg. IV-A 1.431 C 0.347 0.200 0.300 - - - 84.70 85.05%
V. Satisfactory
J.S. Layson & Co., Inc. (Formerly: J.S. Layson
Construction)2653
Reconstruction of Nanga Bridge, Km. 25+500 along Iloilo-Antique
RoadVI 19.050 C 0.361 0.200 0.300 - - - 86.10 77.22%
Satisfactory
J.T. Gamolo Construction 15759Cementing of Road from Mountain View College to
Bagontaas X 0.916 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
J.T. Gamolo Construction 15759 Completion of Quezon NHS X 2.790 C 0.397 0.300 0.300 - - - 99.70 95.82% Outstanding
J.T. Gamolo Construction 15759 Concreting of Dologon Busco-Quezon Road (Maramag Sect.) X 4.688 C 0.335 0.300 0.300 - - - 93.50 94.40%
Outstanding
J.T. Gamolo Construction 15759 Const. of Sayre Nat'l Highway (Don Carlos Section) X 14.008 C 0.244 0.300 0.300 - - - 84.40 83.89%
V. Satisfactory
J.T. Gamolo Construction 15759
CP A, Provision of Slope Protection, Const./Installation of Gabions & Const. of Retaining
Wall along Sayre Highway Alae-Kisolon Road
X 9.339 C 0.386 0.300 0.300 - - - 98.60 91.14% Outstanding
J.V. Lagon Construction Corporation 11561 Widening of Kapingkong Bridge
Bo. 2, XII 13.377 C 0.287 0.179 0.000 - - - 46.60 65.68% Fair
J.V. Loreto Const. & Dev't. Corp. 13120 Conc. of Villaba-Leyte Road,
Leyte III VIII 28.880 C 0.174 0.200 0.300 - - - 67.40 76.06% Satisfactory
J.V. Loreto Const. & Dev't. Corp. 13120 Const. of Marcasa Bridge VIII 9.370 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 205
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
J.V. Loreto Const. & Dev't. Corp. 13120 Construction of PMO-Tacloban
Port Operation Bldg. PPA 79.644 O 0.3999 0.299 0.03 0.03 0.053 0.067 87.81 -
J.V. Loreto Const. & Dev't. Corp. 13120 Rehab. Along Daang Maharlika
Road VIII 50.156 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
J.V. Loreto Const. & Dev't. Corp. 13120 Rehab./Repair of Bernard Reed
Bridge VIII 9.404 C 0.381 0.023 0.300 - - - 70.40 *70.40% Satisfactory
Jadestress Builders 9753 Impvt. of Talobatibe-Jose Panganiban Road V 9.390 O 0.322 0.283 0.100 0.030 0.033 0.100 86.80 -
Jager Construction & Supply 13619 Const. of Multi Purpose Building
@ San Pablo III 0.467 C 0.363 0.300 0.300 - - - 96.30 82.79% V. Satisfactory
Jagon Builders 24748 Const. of Academic Classroom at Plainview E/S NCR 1.702 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
Jagon Builders 24748 Const./Completion of MPB @ Eshudama Sub. NCR 1.423 C 0.340 0.150 0.300 - - - 79.00 *79.00%
Satisfactory
Jagon Builders 24748
Partial Completion of School Bldg. and Const. of Sch.
Facilities @ Garbriela Silang Annex I
NCR 7.510 C 0.315 0.288 0.300 - - - 90.30 76.65% Satisfactory
Jagon Builders 24748Upgrading/Conc. of Road with
Drainage Impvt. Along Lapu-lapu Ave.
NCR 9.495 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory
Jag-Vail Construction & Supply 24055 Const. of Potenciano Gregorio
Multi-Purpose Building V 1.156 C 0.390 0.300 0.300 - - - 99.00 *99.00% Outstanding
Jag-Vail Construction & Supply 24055
Seal Widening/Conc. of Shoulder along Daang Maharlika, Oas
Diversion RoadV 0.438 C 0.331 0.106 0.300 - - - 73.70 *73.70%
Satisfactory
Jaime B. Ching Enterprises 4256Completion of Guintubhan
(Bagroy) Bridge along Binalbagan-Isabel Road
VI 19.164 O 0.389 0.240 0.100 0.030 0.045 0.067 87.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 206
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jaime B. Ching Enterprises 4256Completion of Guintubhan
(Bagroy) Bridge along Binalbagan-Isabel Road
VI 19.164 O 0.215 0.240 0.100 0.030 0.042 0.100 72.70 -
Jaime B. Ching Enterprises 4256 Const. (Conc.) of Marikina-Infanta Rd. P-II, Laguna Side IV-A 48.422 C 0.384 0.200 0.300 - - - 88.40 89.72%
V. Satisfactory
Jaime B. Ching Enterprises 4256 Const. and Improvement of Taloc Main Drainage NIA 5.013 O 0.355 0.281 - 0.030 0.064 0.033 76.33 -
Jalse Construction 13839 Const. of FMR , Lumbia-Canitoan Road X 1.889 O 0.359 0.300 0.100 0.030 0.048 0.100 93.70 -
Jameetrix Construction 19176Conc. of Additional 2-lanes along Davao City Diversion
Road, Buhangin-Maa SectionXI 9.236 C 0.350 0.300 0.300 - - - 95.00 95.00%
Outstanding
Jameetrix Construction 19176 Conc. of Road at Brgy. Magtuod, Matina-Biao Road XI 9.435 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
Jan Sha Construction & Supply 19462 Rehabilitation of Mataoroc CIS,
Taisan CIS & Tariric CIS NIA-V 1.763 C 0.323 0.244 0.300 - - - 86.70 *86.70% V.Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Banganan Flood
Control II 2.884 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory
Jann-Norris Construction and Supplies 31814
Rehab./Impvt. of Road protection along Daang Maharlika, Bonfal-
Solano Sect.II 4.644 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Japuz-Jansol Enterprises 22869 Completion of Maac North Poblacion National Road X 4.822 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
Japuz-Jansol Enterprises 22869 Const. / Completion of Mahinog Municipal Bldg., X 3.257 C 0.360 0.300 0.300 - - - 96.00 88.09%
V. Satisfactory
Japuz-Jansol Enterprises 22869 Const. of Agoho MPB X 1.861 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 207
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Japuz-Jansol Enterprises 22869Const. of Lined Canal along National Road (Poblacion
Letecia & Poblacion San Roque)X 2.106 C 0.244 0.300 0.300 - - - 84.40 *84.40%
V. Satisfactory
Japuz-Jansol Enterprises 22869 Const./Impv't. of Yumbing Multi-Purpose Building X 1.395 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
Japuz-Jansol Enterprises 22869 Const./Rehab. of San Roque-Mahinog NHA Water System X 9.541 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
Jargon Construction & Supply 23474 Completion of MPB at Brgy.
Kernam (Brgy. Hall) XII 0.480 O 0.305 0.300 0.100 0.030 0.013 0.100 84.80 -
Jargon Construction & Supply 23474 Completion of MPB, Brgy.
Mapantig XII 1.248 C 0.399 0.199 0.300 - - - 89.80 *89.80% V. Satisfactory
Jargon Construction & Supply 23474
Conc. of Sarangani-Davao del Sur Coastal Road, Punsad
Section.XII 5.658 C 0.392 0.300 0.000 - - - 69.20 70.94%
Satisfactory
Jargon Construction & Supply 23474
Conc. of Sarangani-Davao del Sur Coastal Road, Taluya-
Gumasa SectionXII 14.145 O 0.398 0.238 0.100 0.030 0.043 0.100 90.90 -
Jargon Construction & Supply 23474 Const. of 1 unit Sch. Bldg. at
Kalawag II XII 0.372 C 0.372 0.075 0.300 - - - 74.70 *74.70% Satisfactory
Jargon Construction & Supply 23474 Const. of MPB (Brgy. Stage) at
Brgy. Baluntay XII 0.193 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory
Jargon Construction & Supply 23474 Const. of Valdez Street XII 0.939 C 0.311 0.200 0.300 - - - 81.10 88.42%
V. Satisfactory
Jargon Construction & Supply 23474 Molo Flood Control XII 1.888 C 0.326 0.300 0.300 - - - 92.60 91.70%
Oustanding
Jargon Construction & Supply 23474
Rehab. of Sarangani-Sultan Kudarat Coastal Road (Malisbong Section)
XII 4.746 O 0.267 0.300 0.100 0.015 0.021 0.100 80.30 -
Jargon Construction & Supply 23474 Rehab. of Sitio Niño-Sitio
Taclobo @ Brgy. Upper Mainit XII 3.660 C 0.000 0.000 0.300 - - - 30.00 38.64% Poor
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 208
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jaro Builders and Construction Supply 25560 Const. of MPB @ San Vicente
East IV-B 0.474 C 0.343 0.300 0.300 - - - 94.30 *94.30% Oustanding
Jaro Builders and Construction Supply 25560
Replacement of Slope Protection along National Rd., Minas-
Macatoc Sect.IV-B 1.566 C 0.217 0.000 0.300 - - - 51.70 *51.70%
Poor
Jasa Builders 31330 Conc. of Road at Sitio Camambugan I 0.473 C 0.266 0.300 0.300 - - - 86.60 *86.60%
V. Satisfactory
Jasa Builders 31330 Const. of 1 Cl Sch. Bldg. @ Magalong NHS I 0.436 C 0.279 0.173 0.300 - - - 75.20 *75.20%
Satisfactory
Jasa Builders 31330 Const. of MPB @ Agno C/S I 0.758 C 0.238 0.200 0.300 - - - 73.80 *73.80% Satisfactory
Jasa Builders/Alcel Construction (JV) JV-07-071
Rehab./Reconst. of Damaged Paved Nat'l Roads, Bani-Agno
RoadI 18.998 C 0.247 0.109 0.300 - - - 65.60 78.17%
Satisfactory
Jasmarc Builders and Construction Supply, Co. 31801 Const. of MPB @ Brgy. Mahayag XI 1.177 O 0.316 0.300 0.100 0.020 0.053 0.100 88.90 -
Jasmig Construction Supply 26069
Conc. of Road, Brgy. Dayap to Brgy. Butucan & Brgy. Bulihan
to Brgy. LoocIV-A 4.774 C 0.363 0.300 0.300 - - - 96.30 *96.30%
Outstanding
Jasmig Construction Supply 26069 Const. of 2 Storey 6 CL RGR
Type S/B @ Bonifacio E/S IV-A 8.547 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
Jasmig Construction Supply 26069 Const. of Brgy. MPB @ San
Fernando IV-A 0.287 C 0.293 0.300 0.300 - - - 89.30 * 89.30% V. Satisfactory
Jasmig Construction Supply 26069 Const. of MPB (PICPA Bldg.) IV-A 0.474 C 0.371 0.200 0.300 - - - 87.10 * 87.10%
V. SatisfactoryJasmig Construction
Supply 26069 Const. of Open Canal @ Brgy. Coliat IV-A 0.964 C 0.312 0.200 0.300 - - - 81.20 *81.20%
V.Satisfactory
Jasmig Construction Supply 26069 Impvt./Rehab. of Catandala Road
and Dumantay-Mahacot Road IV-A 9.648 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
Jasmin Construction 9561 Rehab. of Quezon-Carangonhan Road V 2.371 O 0.350 0.240 0.100 0.020 0.023 0.100 83.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 209
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jaykris Enterprises 30906 Conc. of Datu Panas St. IX 0.960 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory
Jaykris Enterprises 30906 Const. of Road at Lanote St. IX 0.932 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Jaykris Enterprises 30906 Rehab. of Road (Installation of Street Light) IX 0.275 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Jay-mar Builder 7900 Const. of MPB @ SAV 12 Brgy. San Isidro NCR 1.426 C 0.348 0.300 0.300 - - - 94.80 *94.80%
Outstanding
Jay-mar Builder 7900 Const. of Two (2) Storey Sch. Bldg., Tambo E/S, Brgy. Tambo NCR 1.906 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
Jay-mar Builder 7900 Repair of Sidewalk/Roads of San Nicolas St. NCR 1.424 O 0.333 0.000 0.100 0.030 0.032 0.100 59.50 -
JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-03-06) NIA-II 4.919 C 0.360 0.200 0.000 0.020 0.060 0.200 84.00 84.15%
V.Satisfactory
JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-07-06) NIA-II 4.684 C 0.400 0.300 0.000 - - - 70.00 70.00%
Fair
JBRC Construction 26019 Impvt. of Bago-Manarang Road I 1.896 C 0.394 0.295 0.300 - - - 98.90 *98.90% Outstanding
JCA Builders & Supply 20358 Rehab. of FMR, Little Panay-Kasilak Road XI 2.864 C 0.200 0.300 0.300 - - - 80.00 68.72%
Fair
JCA Builders & Supply 20358Repair/Rehab. of Road @
Package 2, 02634 (A) Brgy. Cabantian
XI 2.359 O 0.211 0.225 0.000 0.030 0.025 0.000 49.10 -
JCW Construction 32161 Const./Impvt. of Silago Terminal Bldg. Complex VIII 0.469 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
JDC Builders 32048 Rehab./Impvt. of MPB (Covered Court) Phase II VIII 1.918 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 210
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
JDC Builders - Branch 32048 Const. of Multi-Purpose Pavement at Brgy. Monte Alegre VIII 0.473 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Jeada Construction 17869 Conc. of Sorsogon Diversion Road V 5.988 C 0.222 0.200 0.300 - - - 72.20 *72.20%
Satisfactory
Jeada Construction 17869Improvement/Rehabilitation of
Shore Protection alongside NHA, Sea Breeze Homes
V 6.745 O 0.377 0.300 0.100 0.024 0.028 0.100 92.90 -
Jecel Construction Supply 21956Const. / Rehab. / Replacement /
Completion & Repair of E/S Bldg. @ Sixto Babao E/S
XI 0.833 C 0.276 0.300 0.300 - - - 87.60 84.38% V. Satisfactory
Jecel Construction Supply 21956 Const. of MPB @ San Miguel XI 0.952 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Jecel Construction Supply 21956 Const. of MPB @ Upper Limonzo XI 0.952 C 0.371 0.220 0.300 - - - 89.10 86.23% V. Satisfactory
Jeff Construction 14774Conc. of Bagong Silang-
Capalonga National Secondary Rd.
V 9.450 O 0.330 0.240 0.100 0.023 0.045 0.100 83.80 -
Jeff Construction 14774 Const. of Naboongan Bridge, Approaches & Detour V 15.665 O 0.329 0.300 0.070 0.030 0.028 0.067 82.40 -
Jegma Construction & Dev't. Corporation 14775 Conc. of Liloy, Zamboanga del
Norte-Ipil Zamboanga, Sibugay IX 14.314 O 0.358 0.240 0.070 0.030 0.030 0.033 76.10
Jegma Construction & Dev't. Corporation 14775
Rehab./Reconst. of Damaged Paved Nat'l Roads, Camp Lapu-
lapu RoadVII 14.318 C 0.346 0.200 0.300 - - - 84.60 86.70%
V. Satisfactory
Jegma Construction & Dev't. Corporation 14775 Repair/Rehab. of Natalio Bacalso
Ave. VII 9.950 C 0.292 0.210 0.300 - - - 80.20 *80.20% V. Satisfactory
Jegma Construction and Development Corporation 14775 Repair/Maintenace of
Trancentral Highway VII 19.096 O 0.363 0.300 0.100 0.030 0.070 0.100 96.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 211
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jejor's Construction Corporation 5143 Rehab./ Impv't. of CCR, MAAC-
Kalipagas Section X 8.994 C 0.272 0.200 0.300 - - - 77.20 82.78% V. Satisfactory
Jejor's Construction Corporation 5143 Rehab./Impvt. Of Camiguin Circ.
Road, Tangub Sect. X 9.554 C 0.400 0.300 0.300 - - - 100.00 94.90% Outstanding
Jejor's Construction/Allado Construction-JV JV-06-052 Proposed Reclamation of Back-
up Area PPA 31.729 O 35.156 25.758 0.070 0.030 0.040 0.100 84.91 -
Jemak Construction & Supply 32056 Conc. of Eco-Tourism @ Brgy.
Guisguis IV-A 8.878 C 0.368 0.200 0.300 - - - 86.80 83.68% V. Satisfactory
Jemak Construction & Supply 32056
Conc. of Mauban-Sampaloc-Lucban-Tayabas Circ. Road,
Phase IXIV-A 33.748 C 0.303 0.300 0.300 - - - 90.30 *90.30%
Outstanding
Jemak Construction & Supply 32056 Const. of MPB at Callejon NHS IV-A 1.341 C 0.392 0.227 0.300 - - - 91.90 83.99%
V. Satisfactory
Jemak Construction & Supply 32056 Rehab./Impvt. of MSR-Jct.
Tiaong-Dolores Road IV-A 14.389 C 0.366 0.300 0.300 - - - 96.60 87.78% V. Satisfactory
Jemak Construction & Supply 32056
Rehab./Reconst. and Conc. Paving of Catanauan-Buenavista
National Road (Phase II-Buenavista Sect.)
IV-A 14.456 C 0.335 0.300 0.300 - - - 93.50 88.40% V. Satisfactory
Jenzab Construction & Design 30654 Completion of MPB VII 0.883 C 0.282 0.200 0.300 - - - 78.20 *78.20%
SatisfactoryJenzab Construction &
Design 30654 Completion of various MPB @ Catmon-daan VII 1.326 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. SatisfactoryJenzab Construction &
Design 30654 Const. of 1 Cl Sch. Bldg @ Simeon Ayuda E/S VII 0.386 C 0.265 0.300 0.300 - - - 86.50 83.77%
V. SatisfactoryJenzab Construction &
Design 30654 Road Conc. At Brgy. Can-Ibuang VII 1.328 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Jenzab Construction & Design 30654 Road Conc. At Brgy. Sta.
Catalina, Bagong Daan VII 0.741 C 0.168 0.300 0.300 - - - 76.80 *76.80% Satisfactory
Jepa Construction and Supplies 30375
Const. of One (1) CL Sch. Bldg. @ R.E. Cayetano MES, Brgy.
Malaya BEPZIII 0.485 C 0.297 0.087 0.300 - - - 68.40 *68.40%
Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 212
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jepa Construction and Supplies 30375 Repair/Rehab. of Multi-Purpose
Pavement III 0.456 C 0.332 0.209 0.300 - - - 84.10 *84.10% V. Satisfactory
Jerber Trading and Construction 19713 Conct. of One (1) CL S/B at
Magpapalayok E/S III 0.468 C 0.317 0.200 0.300 - - - 81.70 *81.70% V. Satisfactory
Jerber Trading and Construction 19713
Const. of Multi-Purpose Building/ Structure @ Brgy. Valle
CruzIII 0.468 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Jerber Trading and Construction 19713 Rehab. of Gapan-Peñafrancia-
Fort Magsaysay Road III 4.727 C 0.307 0.207 0.300 - - - 81.40 *81.40% V. Satisfactory
Jerry R. Santiago Construction 18453 Const. of MPB at NEUST,
Sumacab Campus III 3.783 C 0.283 0.200 0.300 - - - 78.30 *78.30% Satisfactory
Jervie Const. & Supply Corp. 7022 Completion of MPB @ Brgy.
Bulwang VI 0.959 C 0.375 0.240 0.000 - - - 61.50 75.78% Satisfactory
Jessie Construction Services 29878 Const. of Atok MPB CAR 0.480 C 0.351 0.147 0.300 - - - 79.80 79.80%
Satisfactory
Jet Construction Supply 7063 Concreting of Ajuy-Concepcion Road VI 9.626 C 0.345 0.200 0.300 - - - 84.50 74.48%
Satisfactory
Jetver Trading & Construction 25501 Const. of MPB @ Brgy.
Poblacion IV-B 0.479 C 0.359 0.200 0.300 - - - 85.90 82.89% V. Satisfactory
Jetver Trading & Construction 25501 Const. of Sch. Bldg., Tagusao
NHS (1 CL) IV-B 0.947 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
JFAP Construction 21706 Const./Rehab. of Ormoc-Margen-Sitio Palimpinon Box Culvert VIII 0.381 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
JFAP Construction 21706
Const./Rehab./Impv't. of Multi-Purpose Bldg. Ormoc City
Center for Sports & Development
VIII 0.480 C 0.374 0.241 0.300 - - - 91.50 *91.50% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 213
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jhall Marketing & Services 15760 Conc. of Carles-Balasan Road, Guinticgan Section VI 5.099 C 0.280 0.211 0.300 - - - 79.10 *79.10%
Satisfactory
Jhall Marketing & Services 15760 Const. of MPB in Sto. Rosario VI 1.369 C 0.279 0.300 0.300 - - - 87.90 86.36% V. Satisfactory
Jhall Marketing & Services 15760 Upgrading/Conc. of Capinang-San Dionisio Road VI 9.545 O 0.362 0.222 0.100 0.022 0.043 0.100 84.90 -
JHI Construction & Supply 19317 Const. of MPB (Phase V) I 0.948 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory
JHI Construction & Supply 19317 Impvt. of Viray-Depalo River Control Project I 4.823 C 0.367 - 0.500 - - - 86.70 *86.70%
V. Satisfactory
JHJ Construction 3781 Completion of Codingle Bridge VI 4.452 C 0.200 0.200 0.300 - - - 70.00 75.64% Satisfactory
JHJ Construction 3781Const. of Capiz State University
Auditorium, Capiz State University Main Campus
VI 5.708 C 0.348 0.300 0.300 - - - 94.80 85.21% V. Satisfactory
JHJ Construction 3781 Const. of Maragubdob Bridge VI 7.999 C 0.400 0.200 0.300 - - - 90.00 86.10% V. Satisfactory
JHJ Construction 3781Const./Completion of DepEd
Bldg. (Roof Deck Roofing) Phase I
VI 0.949 C 0.364 0.100 0.300 - - - 76.40 *76.4% Satisfactory
Jim-Jake Const. & Supply 23377 Conc. of Legazpi Road I 0.288 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Jireh Construction & Supply 8240 Const. of Libtong-Mobo Bridge,
Phase XVI @ Estancia-Mobo VI 4.906 C 0.362 0.293 0.300 - - - 95.50 *95.50% Outstanding
Jireh Construction & Supply 8240
Const./Impv't. of Sitio-Agtinga-Madrona Estate FMR, Camili
ARCIV-B 17.443 C 0.232 0.267 0.000 - - - 49.90 70.48%
Satisfactory
Jirk Construction 29918 Const. of Cagayan River Control II 9.469 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 214
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jirk Construction 29918 Const. of Drainage Canal II 1.412 C 0.211 0.200 0.300 - - - 71.10 *71.10% Satisfactory
Jirk Construction 29918 Const. of Drainage Canal @ Bagumbayan and Tucalana II 0.435 C 0.260 0.104 0.300 - - - 66.40 *66.40%
Fair
JJ & J Construction & General Supply 3023 Rehabilitation of Owak Isidro
Communal Irrigation System NIA-VII 2.377 O 0.342 0.300 0.300 - - - 94.20 -
JJ & J Construction and General Supply 30231 Const. of MPB at Brgy. Bacayan VII 0.479 C 0.300 0.000 0.300 - - - 60.00 *60.00%
PoorJJ & J Construction and
General Supply 30231 Const. of Multi-Purpose Building @ Brgy. Dumlog VII 1.138 C 0.366 0.300 0.300 - - - 96.60 91.46%
Outstanding
JJ & J Construction and General Supply 30231 Const. of Triple Box Culvert VII 2.874 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
JJ & J Construction and General Supply 30231 Const./Conc. of 2 lanes Access
Road to New City Hall (Phase I) VII 4.748 C 0.329 0.300 0.300 - - - 92.90 84.50% V. Satisfactory
JJ & J Construction and General Supply 30231 Const./Conc. of 4 lanes Access
Road to New Toledo City Hall VII 4.748 O 0.312 0.300 0.030 0.030 0.035 0.067 77.40 -
JJ & J Construction and General Supply 30231 Impvt. of Sapangdaku Riverwall VII 1.898 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
JJA Construction and Supply 22676 Conc. of Calanan Jct.-Pinukpuk
Jct. Road CAR 4.599 C 0.341 0.013 0.300 - - - 65.40 81.24% V. Satisfactory
JJA Construction and Supply 22676 Const. of Dapasen Community
Erosion Control CAR 0.192 C 0.147 0.300 0.300 - - - 74.70 *74.70% Satisfactory
JJA Construction and Supply 22676 Impvt./Conc. of Mapaway-Appas
via Ipil Road CAR 1.107 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
JL Construction 31720 Impvt. of MPB and Drainage System CAR 0.953 C 0.308 0.200 0.300 - - - 80.80 *80.80%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 215
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
JLP Construction & Supply (Formerly: JLP Construction)
26983Rehab. of 4 Cl Sch.Bldg.
(Gabaldon Type) @ Solsona South E/S
I 2.842 C 0.345 0.300 0.300 - - - 94.50 86.73% V. Satisfactory
JLP Construction Supply 26983 San Ildefonso Ilocos Sur (Girls Dormitory) DOST 3.960 C 0.308 0.234 0.300 - - - 84.20 84.20%
Very Satisfactory
JLV Construction & Supply 9953 Const. of Multi-Purpose Building IV-A 0.960 C 0.259 0.300 0.300 - - - 85.90 84.36% V. Satisfactory
JLV Construction & Supply 9953 Const. of School and MPB @ Batuan CENTEX IV-A 1.430 C 0.262 0.268 0.300 - - - 83.00 *83.00%
V. Satisfactory
JLV Construction & Supply 9953 Const. of Taliba-Tejero FMR IV-A 0.949 C 0.250 0.300 0.300 - - - 85.00 *85.00% V. Satisfactory
JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 C 0.306 0.210 0.300 - - - 81.60 *81.60% V. Satisfactory
JLV Construction & Supply 9953Impvt./Rehab. of Multi-Purpose
Building @ Brgy. Pantay Matanda
IV-A 3.858 C 0.294 0.217 0.300 - - - 81.10 84.67% V. Satisfactory
J-Marbela Construction and Supply 24268 Const. of 3 Cl Sch. Bldg. @ San
Roque E/S V 1.146 C 0.334 0.120 0.300 - - - 75.40 *75.40% Satisfactory
J-Marbela Construction and Supply 24268 Land Dev't. of Calabanga
Resettlement Project NIA-V 9.977 O 0.267 0.289 0.000 0.030 0.020 0.000 60.60 -
J-Marbela Construction and Supply 24268 Opening/Impvt. of San Roque-
Carangonhan Brgy. Road V 9.623 C 0.361 0.265 0.300 - - - 92.60 *92.60% Outstanding
JMLD Construction 22679 Conc. of Road at Zone 6, Grijalvo V 0.279 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
JMT Construction 14186 Conc. of Dapa-Cancohoy del Carmen Road (Sta. Fe Sect.) XIII 7.638 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 216
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
JMT Construction 14186 Const. of Jagupit-Lilang FMR XIII 4.563 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road XIII 9.522 C 0.365 0.300 0.000 - - - 66.50 73.48%
Satisfactory
JMT Construction 14186 Replacement of San Isidro Bridge (Phase II) XIII 19.280 C 0.371 0.200 0.300 - - - 87.10 82.18%
V. Satisfactory
JMU Construction 6877 Const. of MPB (Gym Phase I) II 4.822 C 0.260 0.200 0.300 - - - 76.00 76.00% Satisfactory
JMU Construction 6877 Const. of MPB (Muicipal Hall / Annex Bldg.) II 0.482 C 0.359 0.200 0.300 - - - 85.90 *85.90%
V. Satisfactory
JMU Construction 6877 Const. of Multi-Purpose Building (Gymnasium) II 1.888 O 0.317 0.300 0.070 0.015 0.027 0.050 77.90 -
JMU Construction 6877Construction of 1 CL Std. Sch.
Building @ San Juan Integrated School
II 0.483 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory
JNA Construction 10615 Const. of FMR Cluster 1, Brgy. Poblacion III III 0.773 C 0.315 0.300 0.300 - - - 91.50 *91.50%
Outstanding
J'ner Cepada Construction 30212 Concrete Paving of Barangay Cambooc Road VIII 0.471 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Satisfactory
J'ner Cepada Construction 30212 Const. of Libas MPB VIII 0.995 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory
J'ner Cepada Construction 30212Repair/Impvt. of National Road
along Ilag-Liloan Section, Libagon-Liloan Road Section
VIII 4.761 C 0.346 0.242 0.300 - - - 88.80 *88.80% V. Satisfactory
Jobel Enterprises 19799 Const. of Drainage System IV-A 0.476 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Jobel Enterprises 19799 Const. of MPB IV-A 0.477 C 0.270 0.226 0.300 - - - 79.60 *79.60% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 217
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jobel Enterprises 19799 Const. of One (1) CL School Building @ Coralan E/S IV-A 0.466 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
Jobel Enterprises 19799 Impvt./Rehab. of Bridge Approaches, CSCF Jct. IV-A 2.887 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
John Arne Construction 24621 Const. of Pinamungajan Public Market, Cebu (Phase VII) VII 2.089 C 0.284 0.178 0.300 - - - 76.20 76.78%
Satisfactory
John Dee B. Bustamante Construction 30458 Conc. of Ipil-ipil St. III 0.743 C 0.239 0.300 0.300 - - - 83.90 *83.90%
V. Satisfactory
John Dee B. Bustamante Construction 30458 Conct. of 2 CL School Bldg.
Carmen T. Valenzuela E/S III 0.801 C 0.346 0.186 0.300 - - - 83.20 *83.20% V. Satisfactory
John Dee B. Bustamante Construction 30458
Const. of Drainage System along Burgos Ext. (Gloria St. to
Baclaran)III 0.473 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
John Ray Developer & Supplies 20795 Conc. of Kidapawan-Magpet-
Pangao-an Road, Mateo Section XII 5.607 C 0.353 0.277 0.300 - - - 93.00 *93.00% Outstanding
John Ray Developer & Supplies 20795
Const. of Drainage Canal along Cotabato-Davao Road (Central
Marketing/Metro Bank Side)XII 4.508 C 0.351 0.300 0.300 - - - 95.10 89.70%
V. Satisfactory
John Ray Developer & Supplies 20795
Const./Completion (Repair/Rehab.) of MPB @ BPI
BalindogXII 0.466 O 0.300 0.240 0.100 0.030 0.023 0.100 79.30 -
John Ray Developer & Supplies 20795 Rehab./Impv't. of Cotabato 1st
District Engineering office Bldg., XII 0.964 C 0.390 0.265 0.300 - - - 95.50 *95.50% Outstanding
Jojo Construction & Dev't. Corp. (Formerly: Jojo
Const.)13174
Impvt. of Flood Control &Drainage along MSR-Tiaong
Section IV-A 2.381 C 0.394 0.200 0.300 - - - 89.40 86.16%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 218
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jomar Builders & Supply 9138 Conc. of Municipal Streets, Brgy. 1, 2, 3, & 4 V 0.941 C 0.298 0.200 0.300 - - - 79.80 *79.80%
Satisfactory
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building V 0.953 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building @ Brgy. Bagumbayan V 0.469 C 0.286 0.100 0.300 - - - 68.60 77.63%
Satisfactory
Jomar Builders & Supply 9138 Rehab./Impvt. of DPWH Camarines Norte DEO V 1.885 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Jomarcann General Construction 30599 Const. Flood Control along
Ambalanga River CAR 4.763 C 0.305 0.300 0.300 - - - 90.50 88.04% V. Satisfactory
Jomarcann General Construction 30599
Const. of Flood Control along Balili River, Km. 253+000 - Km.
255+000CAR 9.623 C 0.230 0.200 0.300 - - - 73.00 *73.00%
Satisfactory
Jomarcann General Construction 30599
Repair & Maintenance of Laoag-Sarrat-Piddig-Solsona Road, km.
493+000-km. 501+000, Sarrat Sect.
I 4.646 C 0.344 0.200 0.300 - - - 84.40 75.73% Satisfactory
Jometron Engineering & Construction 23147 Conc. of Donsol-Banuang Road V 6.465 C 0.333 0.194 0.300 - - - 82.70 82.70%
V.Satisfactory
Jometron Engineering & Construction 23147 Const. of Castilla Flood Control V 4.778 C 0.373 0.200 0.300 - - - 87.30 84.36%
V. Satisfactory
Joni Construction 26023 Completion of Boys Dormitory & Perimeter Fence DOST 7.049 C 0.307 0.287 0.300 - - - 89.40 89.40%
Very Satisfactory
Joni Construction 26023 Const. of 1 CL Secondary Sch. Bldg. at Babatngon NHS VIII 0.503 C 0.334 0.200 0.300 - - - 83.40 *83.40%
V. Satisfactory
Joni Construction 26023 Repair/Maintenance of Burayan Revetment VIII 1.190 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 219
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Jorvivs Construction 6527 Const. of 2 Storey 6 CL Malaybalay City Central School X 4.242 C 0.393 0.226 0.000 - - - 61.90 72.15%
Satisfactory
Jorvivs Construction 6527
Const. of Tertiary School Bldg. Northern Bukidnon Community
College (Const. of 3-Storey Bldg. Phase I)
X 4.744 C 0.372 0.300 0.000 - - - 67.20 80.06% V. Satisfactory
Joselle Construction 16243 Conc. of Brgy. 2 @ Osmeña Ave. XIII 2.350 C 0.342 0.200 0.300 - - - 84.20 83.54% V. Satisfactory
Joselle Construction 16243 Const./Completion of Multi-Purpose Building XIII 0.914 C 0.388 0.300 0.300 - - - 98.80 *98.80%
Outstanding
Joy Construction 14386 Const of 1-Unit, 1-CL School Building IX 0.362 C 0.385 0.257 0.300 - - - 94.20 82.09%
V. Satisfactory
Joy Construction 14386Const. & Repair/Rehab. of
Various School Bldg. (Clustered-2) 2nd Batch CY 2004
IX 0.657 C 0.378 0.000 0.300 - - - 67.80 82.22% V. Satisfactory
Joy Construction 14386 Const. of 1 unit 2 Cl at Port Holand E/S IX 0.675 C 0.277 0.188 0.000 - - - 46.50 54.27%
Poor
Joy Construction 14386 Const. of 1-Unit 1-CL School Building @ Tumahubong CES IX 0.366 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Joy Construction 14386 Impvt./Conc. of Isabela -Maluso National Road, Batungal Section IX 7.590 C 0.233 0.300 0.300 - - - 83.30 79.22%
Satisfactory
Joy-Ann Construction and Supplies 23148 Const. of MPB at Aduana St. City
Proper VI 2.887 C 0.333 0.284 0.000 - - - 61.70 59.88% Poor
JQD Construction and General Services 18852 Const. of Maasin City MPB
(Training Center) VIII 7.189 C 0.337 0.200 0.300 - - - 83.70 83.03% V. Satisfactory
JR Contractor 9638 Const. of Drainage System, V 0.951 C 0.267 0.200 0.300 - - - 76.70 78.44% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 220
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
JR Contractor 9638 Const./Rehab. of Water Supply V 1.664 O 0.393 0.200 0.100 0.015 0.018 0.100 82.60 -
JRPF Construction & Trading 31899 Const. of MPB @ Telabastagan
E/S III 0.836 C 0.392 0.200 0.300 - - - 89.20 *89.20% V. Satisfactory
JRPF Construction & Trading 31899 Const. of Pandacaqui
Resettlement E/S III 1.901 O 0.243 0.252 0.100 0.023 0.038 0.100 76.00 *76.00% Satisfactory
JSG Construction Company, Inc. 9350 Impvt./Rehab. of Argao-Moalboal
Road, Intermittent Section VII 9.601 C 0.338 0.300 0.300 - - - 93.80 *93.80% Outstanding
JSG Construction Company, Inc. 9350
Impvt./Rehab. of Bangad-Fort Magsaysay Road, Cabanatuan
City & Sta. RosaIII 19.143 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
JSG Construction Company, Inc. 9350 Impvt./Rehab. of Lipa-Mataas na
Kahoy Road, Lipa Section IVA 14.458 C 0.289 0.208 0.300 - - - 79.70 83.54% V. Satisfactory
JSG Construction Company, Inc. 9350
Impvt./Rehab. of Natalio Bacalso Ave. Dalaguete-Boljo-on Section
(Phase 2)VII 9.600 C 0.231 0.300 0.300 - - - 83.10 *83.10%
V. Satisfactory
JSG Construction Company, Inc. 9350 Impvt./Rehab. of Roads at Brgy.
San Isidro IVA 19.280 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
JSG Construction Company, Inc. 9350
Impvt./Rehab. of Tanauan-Dagami Road, Cansamada -
District IV Sect. with exceptions VIII 19.296 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
JSG Construction Company, Inc. 9350
Rehab./Impvt. Along Calubian-San Isidro-Tabango-Villaba-
Palompon Road, Km. 1005+346 - Km. 1028+355with exceptions
VIII 19.288 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 221
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
JSG Construction Company, Inc. 9350
Rehab./Impvt. Along Lemon-Leyte-Biliran Road, Km.
0997+000 - Km. 1004+778 with exceptions
VIII 19.288 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
JSG Construction Company, Inc. 9350
Rehab./Impvt. Along St. Rosario-Villaba Road, Km. 1003+370 -
Km. 1014+196 with exceptionsVIII 19.288 C 0.391 0.200 0.300 - - - 89.10 *89.10%
V. Satisfactory
JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads,
Maasin-Malitbog Road VIII 14.399 C 0.355 0.142 0.300 - - - 79.70 *79.70% Satisfactory
JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads,
Malitbog-Bontoc Road VIII 14.394 C 0.376 0.125 0.300 - - - 80.10 *80.10% V. Satisfactory
JUF Construction 17987 Const. of Brgy. Road @ Brgy. San Rufino VIII 0.952 C 0.365 0.262 0.300 - - - 92.70 *92.70%
Outstanding
JUF Construction 17987
Impvt. Along Nabang-Bagaho Road Section, Calbayog-
Catarman via Lope de Vega Road
VIII 4.819 C 0.205 0.290 0.300 - - - 79.50 *79.50% Satisfactory
JUF Construction 17987
Rehab. of Damaged Portion of Cagmanipis Bridge along
Maharlika Highway, Calbayog-Allen Road Section
VIII 4.820 C 0.314 0.200 0.300 - - - 81.40 *81.40% V. Satisfactory
JUF Construction 17987
Repair/Rehab. of Caglanipao Bridge, Daang Maharlika,
Calbayog-Allen Road, Brgy. Caglanipao Tinambacan District
VIII 9.645 C 0.369 0.100 0.300 - - - 76.90 *76.90% Satisfactory
JUF Construction 17987Repair/Rehab. of Calbayog-
Catarman Road (Km. 784+739 to Km. 809+270)
VIII 9.643 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 222
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Juldan Builders 22810 Conc. of San Leonardo-Peñaranda-Gen. Tinio Road III 7.458 C 0.315 0.200 0.300 - - - 81.50 81.50%
V.Satisfactory
Julita Builders 13936
Conc. Paving of Critical Portion of National Circ. Rd., Culaba-
Caibiran Rd. (Maurang-Manlabang Rd. Sect.)
VIII 4.761 C 0.242 0.200 0.300 - - - 74.20 79.18% Satisfactory
Julita Builders 13936 Const. of Multi-Purpose Building @ Brgy. Parasan VIII 0.289 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) VIII 1.928 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) VIII 0.949 C 0.366 0.055 0.300 - - - 72.10 82.25%
V. Satisfactory
Juncynth Construction General Services 18385 Const. of MPB @ Brgy.
Anahawan (Phase I) VIII 0.469 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
Juncynth Construction General Services 18385 Const. of Bontoc MPB VIII 0.950 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
Jupa Construction 23577Lined Canal along Allen-
Catarman Road (Lavezares-Enriquita Section)
VIII 1.444 C 0.233 0.300 0.300 - - - 83.30 *83.30% V. Satisfactory
JV Lagon Construction Corporation 11561
Conc. of Sarangani Davao del Sur Coastal Road, Pangyan-
Dungon SectionXII 9.424 O 0.363 0.237 0.030 0.030 0.038 0.067 76.50 -
JV Lagon Construction Corporation 11561
Concreting of Chua Sect. along Isulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino-
Lebak Road
XII 10.267 O 0.358 0.300 0.050 0.030 0.023 0.067 82.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 223
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
JV Lagon Construction Corporation 11561
Const. of Approach & Riverbed Protection of Sinawal Bridge II
along GSC Circumferential RoadXII 2.518 C 0.353 0.300 0.000 - - - 65.30 70.79%
Satisfactory
JV Lagon Construction Corporation 11561 Widening of Kapingkong Bridge XII 13.377 O 0.370 0.300 0.000 0.030 0.023 0.000 72.30 -
JYP General Construction 32985 Const./Rehab. of Pongo-Mangga Small Scale Mining FMR CAR 0.312 C 0.218 0.200 0.300 - - - 71.80 *71.80%
Satisfactory
K.D.C.M. Construction 29023 Conc. of Abra-Kalinga Road (Cagaluan-Ableg Sect.) CAR 8.952 C 0.377 0.200 0.300 - - - 87.70 88.00%
V. Satisfactory
K.D.C.M. Construction 29023 Const. of Binwaan Bridge (Phase II) CAR 5.961 C 0.328 0.300 0.300 - - - 92.80 *92.80%
Outstanding
K.D.C.M. Construction 29023Const. of Flood Control
Structures along Chico River from Calanan to Cabaruan
CAR 4.816 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Kajima Corporation SL2-SN-000286
Lower Agusan Dev't. Project, Stage 1, Phase II, Package IV
Masao River Improvements and Const. of Urban Drainage
System
CARBDP 912.171 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -
Kajima Corporation SL2-SN-000286
Masao River Improvement & Const. of Urban Drainage
System CP IV (Lower Agusan Development Project - Stage I,
Phase II)
CARBDP 1,083.477 C 0.382 0.300 0.300 - - - 98.20 99.00% Outstanding
Kajima Corporation FC-04-023
Const. of Cebu South Coastal Road Project, Segment 3B-2,
MCDP III, Subway Tunnel Section
MCDP III 1,264.367 O 0.358 0.300 0.100 0.030 0.065 0.100 95.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 224
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Kajima Corporation FC-04-023
Const. of Cebu South Coastal Road Project, Segment 3B-2,
MCDP III, Subway Tunnel Section
MCDP III 1,264.367 O 0.356 0.300 0.100 0.030 0.070 0.100 96.00 -
Kajima Corporation FC-04-023
Const. of Cebu South Coastal Road Project, Segment 3B-2,
MCDP III, Subway Tunnel Section
CSCRP-MCDP 1,264.367 O 0.365 0.300 0.100 0.030 0.070 0.100 96.50 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV FC-04-023 Subic-Clark-Tarlac Expressway
Project-Package 1 BCDA-III 13968.698 C 0.384 0.300 0.070 0.030 0.065 0.067 91.55 83.27% V.Satisfactory
Kalantas Construction & Development Corporation 23915 Conc. of Kinalablaban Bridge
Approaches XIII 17.074 C 0.217 0.200 0.300 - - - 71.70 72.78% Satisfactory
Kalantas Construction & Development Corporation 23915 Rehabilitation of Dughan-Gamut
FMR XIII 1.733 C 0.000 0.073 0.300 - - - 37.30 66.40% Fair
Kamagong Builders & Developers Corporation 1720 Const. of Molino Blvd. By Pass
(Inc. RROW Acquisition) IV-A 20.032 C 0.353 0.200 0.300 - - - 85.30 84.46% V. Satisfactory
Kamagong Builders & Developers Corporation 1720 Rehab. of Kawit-Noveleta
Diversion Road IV-A 14.448 C 0.308 0.300 0.300 - - - 90.80 83.48% V. Satisfactory
Kane Construction, Inc. 2888 Completion of 2 Storey 2 CL SB @ BCNHS-Main CAR 1.442 C 0.373 0.249 0.300 - - - 92.20 91.43%
Outstanding
Karangyan Builders & Traders 22622
Const. of 2-Classroom Building @ Polytechnic College of
CalapanIV-B 0.951 C 0.366 0.300 0.300 - - - 96.60 81.34%
V. Satisfactory
Karpa Builders and Trading 33003 Const. of MPB Town Plaza III 0.476 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory
Kasanga Construction 17024 Const. of MPB at Caagutayan IV-B 0.666 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
Kasanga Construction 17024 Const. of MPB at Panggalaan IV-B 0.668 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 225
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Kawi Construction 25844 Completion of Lengey MPB (Phase IV) CAR 2.389 C 0.336 0.200 0.000 - - - 53.60 67.11%
Fair
Kawi Construction 25844 Completion of MPB Phase III CAR 0.960 C 0.244 0.080 0.000 - - - 32.40 71.74% Satisfactory
KCS Construction & Supply 19641 Conc. of Cemetery Road, Brgy. Catabangan Proper V 0.460 C 0.323 0.119 0.300 - - - 74.20 *74.20%
Satisfactory
KCS Construction & Supply 19641 Conc. of Road at Cabuyao Road V 1.912 C 0.272 0.300 0.300 - - - 87.20 *87.20% V. Satisfactory
Kent Construction 8655 Conc. Paving of Dapa-Union Road (One Lane) XIII 5.732 O 0.233 0.200 0.050 0.030 0.032 0.067 61.20 -
Kent Construction 8655 Const. of MPB (Phase 2) XIII 0.480 C 0.374 0.200 0.000 - - - 57.40 71.82% Satisfactory
Kent Construction 8655 Jct. Osmeña-Pilar Road XIII 5.787 O 0.239 0.230 0.070 0.030 0.032 0.067 66.80 -
Kenwood Construction Enterprises 22186 Conc. of FMR at Brgy. Tarece I 0.471 C 0.256 0.300 0.300 - - - 85.60 82.48%
V. Satisfactory
Kenwood Construction Enterprises 22186 Const. of 12 Cl Building with CR I 4.816 C 0.310 0.200 0.300 - - - 81.00 81.00%
V.Satisfactory
Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Covered
Court @ Lomboy E/S I 2.357 C 0.332 0.300 0.300 - - - 93.20 87.55% V. Satisfactory
Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Gym
(Phase 1) I 2.892 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
Kenwood Construction Enterprises 22186 Const. of Water System @ Brgy.
Leet I 2.411 O 0.333 0.225 0.100 0.010 0.037 0.067 77.20 -
Kenwood Construction Enterprises 22186 Rehab. of Acop-San Angel-
Salvacion Road I 9.637 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of Flood
Control/Concrete Canal X 0.800 C 0.391 0.300 0.300 - - - *99.10 99.10% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 226
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of MPB X 0.913 O 0.311 0.240 0.100 0.030 0.028 0.100 80.90 -
Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of MPB X 0.913 C 0.264 0.300 0.300 - - - 86.40 82.55%
V. Satisfactory
KGD Builders 21960 Const. of 2-CL Lanton E/S XII 0.796 C 0.384 0.178 0.300 - - - 86.20 *86.20% V. Satisfactory
KGD Builders 21960 Const. of Water System @ Purok Pag-asa 2 XII 0.752 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
KGD Builders 21960 Drilling and Const. of Deepwell (Rotary Drilling) XII 1.124 C 0.385 0.200 0.300 - - - 88.50 85.98%
V. Satisfactory
Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Conc. of Access Road (Jct.
Agusan-Davao Road) XI 4.245 C 0.331 0.200 0.300 - - - 83.10 87.84% V. Satisfactory
Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Impvt. of Brgy. San Isidro-Brgy.
Mabini FMR XI 1.882 O 0.218 0.247 0.100 0.008 0.048 0.100 72.10 -
Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Impvt. of Highway Jct.-Lantog
Bandera Road XI 4.712 O 0.227 0.300 0.100 0.008 0.048 0.100 78.30 -
Kim Harold Trading Manufacturing and Const. 28019 Conc. of PPNR, Taytay El Nido
Rd. (Canduyog-Bato Section) IV-B 14.097 O 0.338 0.240 0.100 0.030 0.056 0.067 83.10 -
Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL in Central Taytay
Naional High School IV-B 0.369 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL Roxas North
Central Sch. IV-B 0.376 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 227
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Kim Harold Trading Manufacturing and Const. 28019 Repair/Maintenance of
Kaylubong I River Waterways IV-B 0.431 C 0.320 0.000 0.300 - - - 62.00 *62.00% Fair
Kim Harold Trading Manufacturing and
Const./Orani Builders & Suuply (JV)
28019 Conc. of PPNR, Taytay El Nido Rd. (Canduyog-Bato Section) IV-B 14.097 C 0.270 0.300 0.300 - - - 87.00 84.66%
V. Satisfactory
Kim-Harold Trading, Manufacturing &
Construction28019 Rehab. of Roxas-Taytay-El Nido
Rd., PPNR IV-B 1.828 C 0.309 0.144 0.300 - - - 75.30 77.94% Satisfactory
Kimphil Construction 21890 Const. of Calapan South Road, Banti Section IV-B 1.408 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
Kimphil Construction 21890 Const. of Calapan South Road, Himpararay Section IV-B 2.351 O 0.348 0.300 0.100 0.007 0.028 0.100 88.30 -
King's Builders & Development Corporation 29199 Const. of 1-CL @ Vicente Ylagan
National High School IV-B 0.764 C 0.287 0.244 0.300 - - - 83.10 *83.10% V. Satisfactory
King's Builders & Development Corporation 29199 Const. of Calapan South Road
(San Francisco Sect.) IV-B 1.409 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
King's Builders & Development Corporation 29199 Const. of Hospital Building at
Poblacion IV-B 2.836 C 0.311 0.200 0.300 - - - 81.10 81.31% V. Satisfactory
King's Builders & Development Corporation 29199 Const. of Line Canal at Brgy.
Sta. Teresita IV-B 0.941 C 0.279 0.229 0.300 - - - 80.80 77.26% Satisfactory
King's Builders & Development Corporation 29199 Const. of Orcunoma River
Control IV-B 9.413 C 0.296 0.269 0.300 - - - 86.50 85.00% V. Satisfactory
King's Builders & Development Corporation 29199 Improvement of Sta. Teresita
Section Road IV-B 0.937 C 0.458 - 0.500 - - - 95.80 92.56% Outstanding
King's Builders & Devt. Corp. / Orient Star Const.
(J.V.)29199 Impvt./Repair of Orconuma Dike IV-B 4.729 C 0.312 0.200 0.300 - - - 81.20 81.20%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 228
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Kirskat Venture 32042 Completion of Multi Purpose Gymnasium DOST 61.723 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -
Kirskat Venture 32042 Completion of Multi-Purpose Gynasium DOST 61.723 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -
Kirskat Venture 32042 Completion of PSHS WVC Gynasium DOST 8.544 C 0.392 0.300 0.300 - - - 99.16 99.16%
Outstanding
Kirskat Venture 32042 Const. of Lupgupan Bridge along Iloilo-Capiz Road VI 9.631 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
Kirskat Venture 32042 Const. of Maayon River Control VI 3.197 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Kirskat Venture 32042Const. of Panay River Control, Brgy. Punta Tabuc-Roxas City, Iloilo-Capiz Road (New Route)
VI 3.656 C 0.345 0.200 0.300 - - - 84.50 87.14% V. Satisfactory
Kirskat Venture 32042 Const. of Side Slope Protection along Iloilo-Capiz (Old Route) VI 4.815 C 0.288 0.200 0.300 - - - 78.80 86.00%
V. Satisfactory
KLDS Trading and Construction 28091
Const. of 2 Storey 2 Classroom Schoolbuilding w/ CR @ Amuyong Elem. School
IV-A 1.333 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
KLDS Trading and Construction 28091 Const. of 2 Storey MPB IV-A 0.478 C 0.375 0.257 0.300 - - - 93.20 *93.20%
Outstanding
KLDS Trading and Construction 28091 Drainage Impvt. Along Brgy.
Alulod IV-A 5.281 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory
KLDS Trading and Construction 28091 Rehab./Impvt. of Drainage Canal
along Silang By-Pass Road IV-A 0.803 C 0.360 0.300 0.300 - - - 96.00 85.32% V. Satisfactory
Kobey Construction/B.E. Construction (JV) JV-06-065
Const. of Slope Protection of PalaypayBridge along Bugasong-
Valderrama RoadVI 4.782 O 0.340 0.160 0.100 0.022 0.048 0.200 87.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 229
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Krenz Construction & Trading 19907 Const. of MPB @ Pamantasan ng
Lungsod ng Maynila NCR 7.460 C 0.393 0.300 0.300 - - - 99.30 89.36% V. Satisfactory
Krisjohn Construction and Supply Corporation 31901 Repair/Rehab. of San Francisco
River Control V 0.905 C 0.400 0.200 0.300 - - - 90.00 87.84% V. Satisfactory
Kuntel Construction 10234 Concreting of Road along Magsunday Bridge III VI 0.956 C 0.287 0.185 0.300 - - - 77.20 82.30%
V. Satisfactory
Kuntel Construction 10234 Rehab./Conc. of Himamaylan Road Section VI 8.040 C 0.323 0.200 0.300 - - - 82.30 84.82%
V. Satisfactory
Kuntel Construction 10234Widening/Impvt. Of Bacolod
South Kabankalan Road (Bacolod City Sect.)
VI 7.874 C 0.299 0.200 0.300 - - - 79.90 77.18% Satisfactory
KV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS NIA-V 3.189 C 0.371 0.180 0.300 - - - 85.10 *85.14%
V. Satisfactory
KV Construction and Supply 17509 Const. of Sahing Flood Control
along MWCR IVB 12.012 C 0.240 0.200 0.300 - - - 74.00 75.92% Satisfactory
KV Construction and Supply 17509
Rehab. of Galocan Bridge along Manila South Road, Malangad-
BasudV 11.441 C 0.400 0.154 0.300 - - - 85.40 *85.40%
V. Satisfactory
KVC Construction 28959Conc. of Baguio-Bontoc- Mt. Data Road (Bun-ayan-Pakya
Sect.)CAR 9.783 C 0.234 0.200 0.000 - - - 43.40 54.58%
Poor
KVC Construction 28959 Conc. of Baguio-Itogon Road CAR 13.008 O 0.340 0.211 0.100 0.020 0.025 0.067 76.30 -
KVC Construction 28959 Const. of Tocucan Bridge CAR 4.041 C 0.359 0.200 0.300 - - - 85.90 77.74% Satisfactory
KVC Construction 28959Impvt. Along Acop-Kapangan-Kibungan Road (km. 278+300 -
km. 280+760)CAR 6.704 C 0.347 0.000 0.300 - - - 64.70 64.70%
Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 230
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
KVC Construction 28959 Rehab. Along Acop-Kapangan-Kibungan Road CAR 9.565 C 0.368 0.200 0.300 - - - 86.80 80.08%
V. Satisfactory
KVC Construction 28959 Rehab. Along Kennon Road CAR 8.412 C 0.372 0.192 0.300 - - - 86.40 78.54% Satisfactory
KVC Construction 28959 Repair/Rehab. Along Alapang-Labueg Road CAR 0.284 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
KVCC Construction 27179 Rehab. of Brgy. Imelda-Brgy. Poblacion Road VIII 1.906 O 0.332 0.236 0.100 0.023 0.035 0.100 82.60 -
Kwikbuilt Construction 24577Const. of Std. 1 unit 1Cl Sch. Bldg. @ Paglaum NHS NOSof
Ext. VI 3.181 C 0.335 0.300 0.300 - - - 93.50 *93.50%
Outstanding
Kyro Builders 19567 Conc. of Roads at Sta. Cruz III 0.936 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
Kyro Builders 19567 Const. of Multi-Purpose Building/Health Center III 7.488 C 0.348 0.200 0.300 - - - 84.80 75.21%
Satisfactory
L & L Construction 15108 Const. of MPB, Brgy. Luyong Bonbon X 0.964 C 0.388 0.226 0.300 - - - 91.40 *91.40%
Outstanding
L & L Construction 15108 Conc. of Initao Road X 0.960 C 0.325 0.300 0.000 - - - 62.50 *62.50% Fair
L. Baltonado Construction & Development Corporation 25250 Conc. of Tabing-Kawayan-
Sta.Rosa-Lawis-Tabango Road VIII 4.738 C 0.385 0.200 0.300 - - - 88.50 88.50% V.Satisfactory
L. Baltonado Construction & Development Corporation 25250 Conc. Paving of San Isidro-
Tabango Road VIII 2.846 C 0.364 0.200 0.300 - - - 86.40 *86.40% V. Satisfactory
L. Baltonado Construction & Development Corporation 25250 Const. of Multi-Purpose Building
(Bleacher & Gym) VIII 1.444 C 0.343 0.276 0.300 - - - 91.90 *91.90% Outstanding
L. P. O. Enterprises 20730 Const, of River Control in Brgy, Dela Paz IV-A 0.477 O 0.264 0.240 0.100 0.030 0.016 0.100 75.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 231
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
L.A. Arizola Construction & Supply 31060 Conc. of Fatima-Malabog Road XI 2.694 C 0.306 0.300 0.300 - - - 90.60 90.60%
Outstanding
L.A. Arizola Construction & Supply 31060 Conc. of Road @ Brgy. Maa XI 9.441 C 0.346 0.300 0.300 - - - 94.60 *94.60%
Outstanding
L.A. Arizola Construction & Supply 31060 Const. of 1 Cl 1 Storey Sch.
Bldg. @ Mulig NHS XI 0.452 C 0.275 0.300 0.300 - - - 87.50 *87.50% V. Satisfactory
L.A. Arizola Construction & Supply 31060
Impvt./Conc. of Additional 2 lanes from Church of Later Day
Saints up to CarmenXI 4.129 C 0.277 0.300 0.300 - - - 87.70 87.70%
V. Satisfactory
L.A. Arizola Construction & Supply 31060 Road Conc. @ Sitio Tamayong XI 0.914 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
L.A. Clamor Construction 26413 Const. of 2 CL Sch. Bldg. at Canda NHS IV-A 2.013 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. Satisfactory
L.A. Clamor Construction 26413 Const. of MPB @ Brgy. Buenavista West IV-A 0.669 C 0.389 0.300 0.300 - - - 98.90 *98.90%
Outstanding
L.C. Construction 7024 Const. of One (1) unit Modified Sch. Bldg., Lantian Elem. Sch. IX 0.490 C 0.356 0.156 0.300 - - - 81.20 *81.20%
V. Satisfactory
L.C. Ting Construction 23666Conc. of Additional Lane along Iligan-Cagayan de Oro-Butuan City Libertad-Bancasi Section
XIII 9.466 C 0.297 0.300 0.300 - - - 89.70 79.20% Satisfactory
L.C. Ting Construction 23666 Conc. of Lake Mainit Circumferential Road XIII 9.618 O 0.331 0.200 0.100 0.030 0.059 0.100 82.00 -
L.C. Ting Construction 23666
Conc. of Surigao-Davao Coastal Road Hinatuan-Bislig (Tagasaka
Section) (Sta.1438+673.577-Sta.1439+415.61)
XIII 9.365 C 0.254 0.300 0.300 - - - 85.40 89.12% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 232
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
L.C. Ting Construction 23666Const. of Damaged Flood Control Structure along
Napaliran RiverX 9.033 C 0.304 0.300 0.300 - - - 90.40 80.95%
V. Satisfactory
L.C. Ting Construction 23666 Const. of Matho Bridge and Approaches XIII 14.368 C 0.330 0.300 0.000 - - - 63.00 70.86%
Satisfactory
L.C. Ting Construction 23666 Const. of MAT-I Bridge and Approaches XIII 11.822 O 0.342 0.300 0.100 0.030 0.038 0.100 91.00 -
L.C. Ting Construction 23666 Const. of Olave Bridge and Approaches XIII 18.338 O 0.314 0.284 0.050 0.030 0.038 0.100 81.60 -
L.C. Ting Construction 23666 Rehab. of Amontay Bailey Bridge XIII 5.765 C 0.225 0.300 0.300 - - - 82.50 *82.50%
V. Satisfactory
L.C. Ting Construction 23666Rehab. of Libertad Bridge along
Butuan City-Misamis Oriental Rd.
XIII 10.856 C 0.323 0.300 0.300 - - - 92.30 91.16% Outstanding
L.C. Ting Construction 23666Rehab./Const.of Mamkas River
Control @ Sitio Siringan Kitcharao
XIII 9.534 C 0.345 0.300 0.300 - - - 94.50 80.16% V. Satisfactory
L.C. Ting Construction / Davao L.A. Parts &
Hardware Corporation Joint Venture
JV-07-102Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Manay SectionXI 47.225 O 0.272 0.298 0.100 0.030 0.055 0.067 82.20 -
L.D. Barcelona Construction and Supply 20963 Road Concreting at E.B.
Magalona VI 0.906 C 0.328 0.196 0.300 - - - 82.40 82.64% V. Satisfactory
L.G. Lasacar Construction 11960 Const. of Cross-Country Road at Catarman-Mambajao Section X 9.293 C 0.280 0.300 0.300 - - - 88.00 72.22%
Satisfactory
L.G. Lasacar Construction 11960Const./Improvement of Cross
Country Road, Catarman-Mambajao Section
X 4.368 C 0.349 0.008 0.300 - - - 65.70 84.24% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 233
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
L.G. Lasacar Construction 11960 Rehab./Conc. of Upper Tupsan Brgy. Road X 0.920 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
L.L.A. Builders 15075 Const. of MPB IV-A 1.154 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding
L.M.G. Construction 5719 Daang Maharlika (LZ) III 18.916 O 0.334 0.180 0.100 0.020 0.028 0.100 76.20 -
L.M.G. Construction 5719
Repair/Rehab./Impvt. of Roadways (Inst. of Road Traffic Safety Devices), SLMAC Road
(So. Dimotol-By PassRd..)
III 4.624 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory
L.M.G. Construction 5719 Repair/Rehab./Impvt. of San Jose-Lupao Road III 7.023 C 0.229 0.300 0.300 - - - 82.90 *82.90%
V. Satisfactory
L.N. Salvador Construction 16661 Completion of MPB at Pola Central E/S IV-B 4.803 C 0.361 0.200 0.300 - - - 86.10 85.12%
V. Satisfactory
L.N. Salvador Construction 16661 Const. of Drainage System at Malayas-Poblacion IV-B 4.642 C 0.337 0.221 0.300 - - - 85.80 86.13%
V. Satisfactory
L.P.O. Enterprises 20730 Consst. of MPB at Market Area IV-A 1.920 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory
L.P.O. Enterprises 20730
Const. (Rehab., Replacement, Completion and Repair) of Two (2) Storey (4) Classroom Sch.
Bldg. at San Mateo E/S
IV-A 4.647 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Don Jose IV-A 4.045 C 0.364 0.200 0.300 - - - 86.40 83.32%
V. Satisfactory
L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Pedro Guevarra MNHS IV-A 3.632 C 0.365 0.279 0.300 - - - 94.40 *94.40%
Outstanding
L.P.O. Enterprises 20730 Const. of 2 Storey 4 Cl Sch. Bldg. @ San Isidro NHS IV-A 5.549 O 0.356 0.297 0.100 0.030 0.027 0.100 *91.00 -
L.P.O. Enterprises 20730 Const. of FMR @ Brgy. Gatid IV-A 0.955 C 0.361 0.295 0.300 - - - 95.60 *95.60% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 234
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
L.P.O. Enterprises 20730 Const. of River Control in Brgy. Dela Paz IV-A 0.477 O 264.000 240.000 0.100 0.030 0.016 0.100 75.00 -
L.P.O. Enterprises 20730 Const./Rehab. of School Bldg. @ Los Banos Community NHS IV-A 1.915 O 0.300 0.300 0.100 0.030 0.027 0.100 85.70 -
L.R. Tiqui Builders, Inc. 13810
Impv't. / Widening of Manila North Road (MNR) Package III
Km.44+00-Km.51+330 with exception,
III 91.249 C 0.397 0.300 0.300 - - - 99.70 96.85% Outstanding
L.R. Tiqui Builders, Inc. 13810 Conc. of Goa-Digdigon-San Isidro Road V 14.041 C 0.211 0.200 0.300 - - - 71.10 78.12%
Satisfactory
L.R. Tiqui Builders, Inc. 13810
Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)
Meycauayan to Mabalacat, Pampanga (Phase IV) Package 1
III 188.051 O 0.376 0.300 0.100 0.030 0.060 0.100 96.60 -
L.R. Tiqui Builders, Inc. 13810
Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)
Meycauayan to Mabalacat, Pampanga (Phase IV) Package II
III 70.394 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -
L.R. Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo
Highway and other related road Phase II
IV-A 60.022 O 0.336 0.240 0.100 0.024 0.028 0.100 82.80 -
L.R. Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo
Highway and other related road Phase II
IV-A 60.022 O 0.274 0.300 0.100 0.030 0.028 0.100 83.20 -
L.R. Tiqui Builders, Inc. 13810NCR/Bulacan Bdry.-Bigte-Ipo
Dam Road inc. Replacement of Kay Tialo Bridge
III 47.641 O 0.358 0.300 0.100 0.030 0.048 0.100 93.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 235
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
L.R. Tiqui Builders, Inc. 13810
Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near
NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.
NCR 27.065 O 0.314 0.216 0.100 0.030 0.030 0.100 79.00 -
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810 Const .of Palilihan Bridge No. 1
and Approaches III 46.781 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810 Const. (Conc.) of Marikina-
Infanta Rd. P-III, Laguna Side IV-A 53.040 C 0.296 0.200 0.300 - - - 79.60 85.90% V. Satisfactory
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810 Const. of Plaridel By Pass
including connecting Roads III 28.425 C 0.284 0.300 0.300 - - - 88.40 88.28% V. Satisfactory
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810
Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near
NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.
NCR 27.066 O 0.368 0.240 0.100 0.030 0.033 0.067 83.80 -
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders13810 Roads and Drainage Impvt.
Along T. Santiago St. NCR 9.428 C 0.241 0.200 0.300 - - - 74.10 *74.10% Satisfactory
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui
Builders)13810
Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near
NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.
NCR 27.066 O 0.367 0.240 0.100 0.018 0.051 0.100 *87.60 -
L.S. Abelar Construction 31560 Const. of 2 CL School Bldg. @ Wakas Elem. Sch. IV-A 1.083 C 0.359 0.250 0.300 - - - 90.90 *90.90%
Outstanding
L.S. Abelar Construction 31560 Const. of Footbridge @ Brgy. Tanauan IV-A 0.237 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
L.S. Abelar Construction 31560 Impvt. of Drainage Canal IV-A 0.096 C 0.250 0.200 0.300 - - - 75.00 * 75.00% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 236
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
L.S. Visorde Construction & Trading 32026 Completion of MPB @ Brgy.
Tignoan IV-A 0.481 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory
L.S.D. Construction & Supplies 8980 Asphalt Overlay of Manila North
Road (Bamban & Capas Section) III 9.489 C 0.296 0.295 0.300 - - - 89.10 *89.10% V.Satisfactory
L.S.D. Construction & Supplies 8980 Conc. of San Miguel-Cadre Road III 7.577 C 0.308 0.290 0.300 - - - 89.80 *89.80%
V.Satisfactory
L.S.D. Construction & Supplies 8980 Conc. of Sta. Cruz Road III 2.891 C 0.354 0.194 0.300 - - - 84.80 78.68%
Satisfactory
L.S.D. Construction & Supplies 8980 Const. of 1 Cl Sch. Bldg @
Balibago II E/S III 0.377 O 0.320 0.254 0.100 0.030 0.029 0.100 83.30 -
L.S.D. Construction & Supplies 8980 Const. of 2 CL Sch. Bldg. @
Maliwalo H/S (Annex) III 0.811 C 0.386 0.150 0.300 - - - 83.60 *83.60% V.Satisfactory
L.V. Capule Construction 15578 Completion of Conc. of Road & Drainage @ Fausta III 2.838 C 0.366 0.300 0.300 - - - 96.60 92.46%
Outstanding
La Greta Construction 33080 Impvt.of MPB at Brgy. Progreso IV-A 0.142 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding
LA Milagrosa Enterprises 17404 Conc. of Cabu-an Brgy. Road X 1.850 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
LA Milagrosa Enterprises 17404 Conc. of Yumbing Road X 0.926 C 0.288 0.217 0.300 - - - 80.50 *80.50% V. Satisfactory
LA Milagrosa Enterprises 17404 Rehab./Conc. of Balite Brgy. Road X 0.755 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
Labb Construction 13524Conc. Paving of Jct. Dat-an,
Carmen-Sierra Bullones-Pilar-Alicia Road
VII 9.113 C 0.382 0.200 0.300 - - - 88.20 74.82% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 237
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Labb Construction 13524Const. of Bridges along
Concepcion-Danao-Buenavista Carmen Road
VII 9.564 O 0.343 0.238 0.100 0.030 0.037 0.100 84.80 -
Labb Construction 13524 Impvt./Conc. Paving of Jct. LIR Loay-Loboc-Carmen Road VII 8.760 C 0.317 0.300 0.300 - - - 91.70 88.16%
V. Satisfactory
Labb Construction 13524 Reconst. of Napo Bridge along Dauis-Panglao Road VII 6.502 C 0.361 0.300 0.300 - - - 96.10 86.50%
V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Brgy. Road VIII 0.467 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Lanao Brgy. Road VIII 1.889 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Maria Socorro Bridge VIII 0.944 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Tomas Oppus MPB VIII 2.823 C 0.378 0.200 0.300 - - - 87.80 87.17%
V. Satisfactory
Lady of Assumption Enterprises 25360 Const./Impvt. of Canturing River
Control VIII 0.472 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory
Lady of Assumption Enterprises 25360 Rehab./Impvt. of Bato-Bontoc
Road VIII 3.781 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory
Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.
Sanito IX 9.495 O 0.171 0.192 0.000 0.030 0.037 0.067 49.70 -
Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.
Sanito IX 9.495 O 0.280 0.146 0.030 0.023 0.030 0.133 64.20 -
Lambayong Construction and Supply 20800 Rehabilitation of Manin Canal
(Sta. 16+626-21+714) NIA-I 12.594 C 0.250 0.300 0.300 - - - 85.00 84.87% V.Satisfactory
Lanao Builder & Enterprises 15982
Construction of PSHS-CVC Academic Bldg. I and Dormitory
Bldg. I Phase IDOST 9.59 O 0.3455 0.300 0.05 0.02 0.030 0.100 84.55 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 238
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lanao Builder & Enterprises 15982 PSHS CVC Academic Bldg. 1
Dormitory Bldg. 1 Ph. 1 DOST 9.59 O 0.68 0.300 - - - - 98.00 -
Lanao Builder and Enterprises 15982 Conc. of Bacolod-Pagayawan-
Munai-Tangkal Road X 4.645 C 0.280 0.200 0.300 - - - 78.00 82.98% V. Satisfactory
Lanao Builder and Enterprises 15982 Conc. of Bito Abaga National
Road X 9.551 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Lanao Builder and Enterprises 15982
Conc. of Iligan-Bukidnon Road, Sta. Filomena-Bonbonon,
Digkilaan-RogongonX 27.643 C 0.365 0.200 0.300 - - - 86.50 88.80%
V. Satisfactory
Lanao Builder and Enterprises 15982 Conc. of San Manuel Road X 0.139 C 0.367 0.300 0.300 - - - 96.70 *96.70%
Outstanding
Lanao Builder and Enterprises 15982 Conc./Impvt. of Tubod-Ganassi
Road X 13.785 C 0.299 0.300 0.300 - - - 89.90 87.74% V. Satisfactory
Lanao Builder and Enterprises 15982 Const. of MPB @ Brgy. Lower
Sta. Cruz X 0.189 C 0.369 0.300 0.300 - - - 96.90 *96.90% Outstanding
Lanao Builder and Enterprises 15982
Const./Impv't. of Bacolod-Pagayawan-Munai-Tangkad
RoadX 11.988 C 0.361 0.300 0.300 - - - 96.10 86.14%
V. Satisfactory
Lanao Builder and Enterprises 15982
Impvt. of Iligan-Aurora Road (Raw-an-Magpaytao-Lanipao-
Abaga Sect.)X 9.386 C 0.387 0.300 0.300 - - - 98.70 90.60%
Outstanding
Lanao Builder and Enterprises 15982 Impvt./Const. of Maranding
Drainage along Nat'l Highway X 4.692 C 0.362 0.200 0.300 - - - 86.20 85.54% V. Satisfactory
Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga
Roads, Kauswagan Section X 9.053 O 0.333 0.240 0.100 0.030 0.032 0.100 83.50 -
Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga
Roads, Linamon Section X 4.517 C 0.358 0.300 0.300 - - - 95.80 86.98% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 239
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lanao Builder and Enterprises 15982
Rehab./Reconst. of Damaged National Road along Linamon-Zamboanga Road, Donggo-an
Section
X 17.145 O 0.381 0.240 0.100 0.030 0.038 0.100 88.90 -
Lanao Builder and Enterprises 15982
Widening of Kapatagan Road along Linamon-Zamboanga
National RoadX 7.429 O 0.378 0.240 0.100 0.030 0.038 0.100 88.60 -
Lanao Builder and Enterprises 15982
Widening of Kapatagan Road along Linamon-Zamboanga
National RoadX 7.429 O 0.353 0.240 0.100 0.024 0.045 0.100 86.20 -
Lanao Builders and Enterprises 15982 Completion of ACA Bldg. I
(Phase 3) DOST 11.364 O 0.382 0.300 0.000 0.030 0.063 0.050 82.50 -
Lanao Builders and Enterprises 15982 Completion of ACA Bldg., I
Phase (Construction) DOST 11.364 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -
Landmark Builders 7400 Completion of MPB (OPD, DOPH XI 0.472 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding
Landmark Builders 7400 Completion of MPB @ Brgy. Matiao (GSP) XI 1.132 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
Landmark Builders 7400 Concreting of Madang Road XI 9.446 C 0.356 0.200 0.300 - - - 85.60 87.49% V. Satisfactory
Landmark Builders 7400 Const. of MPB (Gymnasium) XI 2.800 O 0.317 0.244 0.000 0.015 0.023 0.067 66.60 -
Landmark Builders 7400Const./Completion of Manolo
Fortich Municipal Hall Bldg. (P-IX)
X 7.590 C 0.380 0.300 0.300 - - - 98.00 93.73% Outstanding
Landmark Builders 7400 Package 11, Const. of Multi-Purpose Bldg. (Gymnasium) XI 3.766 C 0.361 0.241 0.300 - - - 90.20 73.68%
Satisfactory
Landmark Builders 7400 Repair/Const. of Don Mariano E/S (H.E.) Bldg. XI 0.289 C 0.358 0.067 0.300 - - - 72.50 86.22%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 240
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building IV-A 2.407 O 0.287 0.195 0.100 0.020 0.058 0.100 76.00 -
Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building IV-A 2.407 O 0.388 0.300 0.000 0.030 0.047 0.067 83.20 -
Langit Construction 23462Construction of Two (2) Storey, Four (4) CL S/B @ Paliparan III
E/SIV-A 1.694 C 0.308 0.200 0.300 - - - 80.80 77.37%
Satisfactory
Larsen-Dutcher Constractor 29172 Rehab. of Roads, Brgy. Viente
Reales NCR 1.884 C 0.278 0.200 0.300 - - - 77.80 *77.80% Satisfactory
Larsen-Dutcher Constractor 29172 Repair of MPB NCR 0.470 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
LB Builders Center 14115 Conc. Paving of Calubian-San Isidro Road VIII 2.844 C 0.365 0.200 0.300 - - - 86.50 86.50%
V.Satisfactory
LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Cagnocot E/S VIII 0.469 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Villanueva E/S VIII 0.469 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Satisfactory
Leadtek Construction Inc. 25978Const. of (1) Classroom (1) Unit School Building D. Moises E/S,
MalingawanXII 0.382 C 0.361 0.000 0.300 - - - 66.10 66.10%
Poor
Leadtek Construction Inc. 25978 Const. of Sinanguyan NHS X 0.595 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -
Leadway Construction & Development Corp. (LCDC) 4378 Const. of MPB (Covered Court) III 1.871 C 0.253 0.293 0.300 - - - 84.60 *84.60%
V. Satisfactory
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Conc. of Jaro-Dagami-Burauen-
La Paz Road VIII 18.890 C 0.284 0.199 0.300 - - - 78.30 83.04% V. Satisfactory
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Conc. of Jaro-Dagami-Burauen-
La Paz Road, Jaro Section VIII 12.280 C 0.317 0.200 0.300 - - - 81.70 83.92% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 241
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Conc. of Sta. Fe-Magtangtang to
Francisco Dagohoy Caves VII 4.740 C 0.288 0.300 0.300 - - - 88.80 88.47% V. Satisfactory
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Rehab. of Palo-Carigara-Ormoc
Road VIII 18.889 O 0.381 0.239 0.100 0.015 0.020 0.100 85.50 -
Leda Construction Incorporated (Formerly:
Leda Const.)12229
Rehab./Impvt. of Palo-Carigara-Ormoc-Baybay-Maasin Road, Palo-Carigara-Ormoc-Baybay-
Maasin Road Section
VIII 11.338 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
Leda Construction Incorporated (Formerly:
Leda Const.)12229 Rehab./Impvt. of Seawall VII 10.881 O 0.384 0.103 0.100 0.030 0.027 0.200 84.40 -
Legacy Construction 22465 Const. and Improvement of Punta Taytay Main Drainage NIA 5.936 O 0.344 0.192 0.150 0.030 0.057 0.050 82.29 -
Legacy Construction 22465Widening/Impvt. of Bacolod
South Kabankalan Road (Tangub Sect.)
VI 7.870 O 0.259 0.237 0.100 0.030 0.045 0.100 77.10 -
Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches
along Viga-Panganiban Road V 17.346 O 0.381 0.200 0.000 0.008 0.023 0.100 71.20 -
Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches
along Viga-Panganiban Road V 17.346 O 0.354 0.300 0.100 0.020 0.023 0.100 89.70 -
Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches
along Viga-Panganiban Road V 17.346 O 0.200 0.300 0.100 0.023 0.019 0.100 74.20 -
Legazpi Premium Development Corporation 20701 Channelization of Lower Mabini
River V 13.377 C 0.389 - 0.500 - - - 88.90 *88.90% V. Satisfactory
Legazpi Premium Development Corporation 20701 Completion of Tokyo Bridge and
Approaches V 32.570 C 0.356 0.092 0.300 - - - 74.80 72.40% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 242
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Legazpi Premium Development Corporation 20701 Const. of Tilod Bridge
Approaches & Detour V 15.684 C 0.388 0.235 0.300 - - - 92.30 86.84% V. Satisfactory
Legazpi Premium Development Corporation 20701 Dredging of Hicming River
(Downstream) V 19.177 C 0.375 - 0.500 - - - 87.50 89.72% V. Satisfactory
Legazpi Premium Development Corporation 20701 Opening/Const. of Taladong-
Caguiba Road (Phase II) V 14.250 O 0.352 0.263 0.100 0.022 0.033 0.100 87.00 -
Legazpi Premium Development Corporation 20701 Opening/Const. of Taladong-
Caguiba Road (Phase II) V 14.250 O 0.369 0.086 0.100 0.020 0.033 0.067 67.50 -
Legazpi Premium Development Corporation 20701 Road Conc./Impvt. of Magallang-
Mararag Road V 14.387 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Legazpi Premium Development Corporation 20701
Vconst. of Viga-Piot Bridge & Approaches along Viga-
Panganiban RoadV 17.346 O 0.300 0.240 0.100 0.015 0.035 0.100 79.00 -
Lehci Construction 24196 Conc. Paving of Tigbao-Sta. Fe-San Miguel Rd. VIII 8.548 C 0.317 0.200 0.300 - - - 81.70 82.72%
V. Satisfactory
Lehci Construction 24196Const. of MPB at Eastern
Visayas State University, Phase III
VIII 3.374 C 0.370 0.100 0.300 - - - 77.00 *77.00% Satisfactory
Lehci Construction 24196 Const. of Seawall at Cogon VIII 0.962 C 0.376 0.200 0.300 - - - 87.60 *87.60% V.Satisfactory
Lehci Construction 24196 Repair/Rehab. of Mahayahay Creek VIII 4.747 C 0.288 0.200 0.300 - - - 78.80 79.88%
Satisfactory
Lenvoisa Construction 216721
Financing and Development of the Fifty (50) Hectares Reserved
Area for Socialized Housing under a Joint Venture arrangement (Phase II)
NHA 154.223 O 0.382 0.300 0.100 0.024 0.042 0.100 94.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 243
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lenvoisa Construction, Incorporated 216721
Financing and Dev't. of the fifty(50) hectares reserved area
for socialized housing under joint venture arrangement,
Phase II
NHA 154.223 O 0.39 0.3 0.1 0.03 0.06 0.1 98.00 -
Lenvoisa Construction, Incorporated 216721 NBP Resettlement Project,
Phase II NHA 154.223 O 0.382 0.3 0.1 0.024 0.042 0.1 94.80 -
Leo-J Construction Services 27248 Const. of Slope Protection along
Maculcol River Downstream III 4.753 C 0.373 0.120 0.300 - - - 79.30 *79.30% Satisfactory
Leymarc Construction 22094 Completion of Zamboanguita Shoreline Protection VII 0.889 C 0.252 0.300 0.300 - - - 85.20 *85.20%
V. Satisfactory
Leymarc Construction 22094 Conc. of Roads (Brgy. Cansaging) VII 0.414 C 0.351 0.300 0.300 - - - 95.10 *95.10%
Outstanding
Leymarc Construction 22094 Const. of 1 unit 1 Cl Sch. Bldg. @ Sta. Catalina North C/S VII 0.701 C 0.386 0.100 0.300 - - - 78.60 *78.60%
Satisfactory
Leymarc Construction 22094 Const. of Dumaguete Flood Control, Dumaguete North Road VII 4.717 C 0.293 0.184 0.300 - - - 77.70 79.74%
Satisfactory
Leza Construction and Supply 25565 Const. of 1 CL School Bldg. @
Buenlag NHS I 0.494 C 0.334 0.200 0.300 - - - 83.40 87.74% V. Satisfactory
Leza Construction and Supply 25565 Const. of Drainage Canal System
at Tuliao I 4.822 O 0.267 0.200 0.100 0.020 0.028 0.133 74.80 -
Leza Construction and Supply 25565 Const. of MPB at Turac E/S I 1.928 C 0.273 0.300 0.300 - - - 87.30 *87.30%
V. Satisfactory
Leza Construction and Supply 25565
Repair and Rehab. of Pagal Bridge along Carmen Jct.-
Bayambang-San Carlos-Manat Road
I 0.481 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding
LGC Trucking and Construction 14464 Const. of Andanan Flood Control
Phase II XIII 9.374 O 0.350 0.200 0.100 0.030 0.043 0.200 92.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 244
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
LGC Trucking and Construction 14464 Const. of Lugom Bridge along
Circumferential Road XIII 9.223 C 0.231 0.199 0.300 - - - 73.00 73.48% Satisfactory
LGC Trucking and Construction 14464 Impvt. of Bank Protection of
Mapaga RCDG Bridge XIII 6.591 C 0.320 0.200 0.300 - - - 82.00 85.06% V. Satisfactory
Liberty Builders and Development Corporation 7224 Restoration of the Burnt Bureau
of Immigration Main Bldg. Sp. Bldgs 30.029 O 0.337 0.239 0.100 0.023 0.045 0.100 84.40 -
Liberty Builders and Development Corporation 7224 Restoration of the Burnt Bureau
of Immigration Main Bldg. Sp. Bldgs 30.029 O 0.392 0.300 0.070 0.030 0.027 0.067 88.60 -
Librius Construction and Suppply Corporation 23580
Const. of 2 Storey RGR Type School Building @ Batangas
NHS IV-A 8.596 C 0.385 0.200 0.300 - - - 88.50 86.05%
V. Satisfactory
Ligao Sto. Niño 9279 Rehabilitation of Canal Network (package 1) NIA-V 10.323 O 0.283 0.200 0.100 0.018 0.033 0.200 83.40 -
Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao
Resettlement Project NHA 9.974 O 0.299 0.262 0.1 0.03 0.019 0.1 81.00 -
Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao
Resettlement Project V 9.969 C 0.330 0.300 0.300 - - - 93.00 93.00% V.Satisfactory
Lim General Contractor 8482 Conc. of Buenavista-Cawayan Road (Cawayan Side) V 28.798 C 0.336 0.239 0.300 - - - 87.50 77.54%
Satisfactory
Lim General Contractor 8482 Conc. of Masbate-Cataingan Road, Balatucan-Uson Sect. V 9.498 C 0.288 0.200 0.300 - - - 78.80 77.72%
Satisfactory
Lim General Contractor 8482 Const. of Bagumbayan Bridge, Approaches, and Detour V 15.940 C 0.241 0.200 0.300 - - - 74.10 76.20%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 245
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lim General Contractor 8482 Const. of Buyo Bridge, Approaches & Detour V 19.200 C 0.199 0.123 0.300 - - - 62.20 70.87%
Satisfactory
Lim General Contractor 8482Const. of Jct. Guinhayan-Malbog-
Sta. Fe Road (leading to San Jose Island)
IV-B 18.798 C 0.317 0.200 0.300 - - - 81.70 83.86% V. Satisfactory
Lim General Contractor 8482 Const. of Luya Bridge V 15.827 C 0.341 0.300 0.300 - - - 94.10 89.18% V. Satisfactory
Lim General Contractor 8482 Const. of San Fernando North Road, San Fernando Section V 11.000 C 0.235 0.135 0.300 - - - 67.00 73.42%
Satisfactory
Lim General Contractor 8482 Const. of San Fernando South Road, Batuan Section V 11.250 C 0.195 0.109 0.300 - - - 60.40 71.68%
Satisfactory
Lim General Contractor 8482 Preventive Maintenance of Masbate-Cataingan Road V 9.496 C 0.377 0.100 0.300 - - - 77.70 81.18%
V. Satisfactory
Lim General Contractor 8482
Rehab./Reconst. of Damaged National Road along San
Fernando North Rd., San Jacinto Section
V 18.898 O 0.270 0.236 0.000 0.030 0.022 0.067 62.50 -
Lim General Contractor 8482 Rehab./Reconst. of Tablas Circ. Road, Alcantara-Looc Section IV-B 18.798 O 0.307 0.240 0.100 0.030 0.038 0.100 81.50 -
Lim General Contractor 8482 Replacement of Damaged Bridge V 14.100 C 0.342 0.200 0.300 - - - 84.20 78.26% Satisfactory
Limar Construction 10203 Const. of Manlumay Bridge VIII 3.807 C 0.300 0.300 0.300 - - - 90.00 89.76% V. Satisfactory
Limestone Construction and Development
Corporation4453
Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-Km.384+320)cDivisoria Norte-
San Bernabe Sect.
II 8.200 C 0.256 0.300 0.300 - - - 85.60 82.54% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 246
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Limokun Builders & Supply 30997 Impvt./Rehab. of Porac-Guagua Road III 4.771 C 0.355 0.115 0.300 - - - 77.00 *77.00%
Satisfactory
Linear Construction Corporation 3575 NBP Resettlement Project,
Phase IV NHA 148.89 O 0.392 0.232 0.1 0.024 0.04 0.1 88.80 -
Liong-Co Construction & Construction Supply 28361
Completion of Miputak-Turno By Pass Road with Drainage
ComponentsIX 4.716 O 0.256 0.156 0.100 0.030 0.037 0.200 77.90 -
Liong-Co Construction & Construction Supply 28361 Conc. of FMR at Purok Gampis IX 0.951 C 0.344 0.285 0.300 - - - 92.90 *92.90%
Outstanding
Liong-Co Construction & Construction Supply 28361 Const. of MPB (Covered Court)
at Sicayab E/S IX 2.268 C 0.392 0.200 0.300 - - - 89.20 89.20% V.Satisfactory
Liong-Co Construction & Construction Supply 28361 Const. of Multi Purpose Day
Care IX 0.550 C 0.304 0.300 0.300 - - - *90.40 90.40% Outstanding
Liong-Co Construction & Construction Supply 28361
Const./Completion of Multi-Purpose Building (Perimeter
Fence)IX 0.089 C 0.302 0.300 0.300 - - - 90.20 *90.20%
Outstanding
Liong-Co Construction & Construction Supply 28361 Const./Rehab. of Various School
Building Project (Clustered) IX 0.277 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory
Lisa Construction 24134Asphalt Overlay along
Cabanatuan Circumferential Road
III 0.952 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding
Lisa Construction 24134 Const. of Flood Control at San Vicente III 2.835 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
LJPM Builders & Construction Supply 29981
Rehab./Impvt. of National Road along Amaga-Liloan Road
SectionVIII 3.735 O 0.378 0.242 0.070 0.020 0.032 0.067 80.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 247
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
LJPM Builders & Construction Supply 29981
Rehab./Impvt. of National Road along Amaga-Liloan Road
SectionVIII 3.735 O 0.380 0.240 0.100 0.020 0.037 0.100 87.70 -
LJPM Builders & Construction Supply 29981 Repair of Abuyog District
Hospital VIII 0.470 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory
LJPM Builders & Construction Supply 29981 Repair of Multi-Purpose
Building, DTI Compound VIII 0.961 C 0.377 0.200 0.300 - - - 87.70 88.47% V. Satisfactory
Llaban Construction & Trucking 29504
Conc. of Dualing-New Panay-Midsayap Road, (Lawili-Arizona
Section) XII 9.523 C 0.355 0.119 0.300 - - - 77.40 77.70%
Satisfactory
Llaban Construction & Trucking 29504 Const. of 1 Cl Bldg., San Pedro
E/S XII 0.476 C 0.309 0.300 0.300 - - - 90.90 *90.90% Outstanding
Llaban Construction & Trucking 29504 Const. of Hanging Bridge XII 1.309 C 0.340 0.300 0.300 - - - 94.00 79.12%
SatisfactoryLlaban Construction &
Trucking 29504 Const. of MPB @ Brgy. Upper Glad 1 XII 0.286 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
LLM Concrete Products 14235 Completion of MPB at Brgy. Magugpo West XI 1.884 C 0.336 0.056 0.300 - - - 69.20 79.14%
Satisfactory
LLM Concrete Products 14235 Const. of 1 CL Academic Bldg. @ Kapoc XI 0.322 C 0.332 0.300 0.300 - - - 93.20 93.34%
Outstanding
LLM Concrete Products 14235 Const. of Matanao National High School XI 0.865 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
LLM Concrete Products 14235 Const. of MPB @ Goma, Digos City realigned to Conc. of FMR XI 0.944 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
LLM Concrete Products 14235 Const. of MPB @ Poblacion XI 1.885 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory
LLM Concrete Products 14235 Const. of Multi-Purpose (Brgy Hall) Bato XI 0.755 C 0.378 0.300 0.300 - - - 97.80 92.90%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 248
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
LLM Concrete Products 14235Const. of Slope Protection along
Buclad-Poblacion-Asuncion Sect.
XI 3.845 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory
LLM Concrete Products 14235 Const. of Tagum Drainage along Agusan-Davao Road XI 2.830 C 0.230 0.300 0.300 - - - 83.00 *83.00%
V. Satisfactory
LLM Concrete Products 14235 Const./Rehab.of MPB @ Brgy. Ising XI 2.453 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
LM Construction and General Marketing 9213 Const. of CY 2004 School
Building Projects XIII 0.818 O 0.373 0.244 0.100 0.020 0.013 0.100 85.00 -
LM Construction and General Marketing 9213 Const. of CY 2004 School
Building Projects XIII 0.818 O 0.350 0.200 0.100 0.030 0.041 0.100 82.10 -
LMD Construction 9410 Const./Impvt. MPB (Municipal Hall) @ Poblacion San Miguel IX 4.595 C 0.348 0.247 0.300 - - - 89.50 86.07%
V. Satisfactory
LMD Construction 9410Impvt./Conc. Paving of
Kagawasan-Pitogo Road (Kagawasan Section)
IX 4.595 C 0.353 0.300 0.300 - - - 95.30 71.36% Satisfactory
Lo Tone Construction & Supply 23385 Land Development of Anislag
Resettlement Project (Phase II) NHA-V 39.895 O 0.326 0.261 0.050 0.023 0.028 0.033 72.10 -
Lo Tone Construction & Supply 23385 Land Development of Tagaytay
Resettlement Project NHA 49.924 O 0.376 0.249 0.1 0.018 0.033 0.1 87.60 -
Longwide Builders 20196 Const. of Public Market @ Brgy. Sumo-Sumo XIII 0.549 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Lorgen Construction 20197 Conc./Impvt. of F.P. Felix Ave. (formerly Imelda Ave.) IV-A 6.255 C 0.289 0.200 0.300 - - - 78.90 85.38%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 249
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lo Tone Construction 23385 Land Dev't. of Anislag Resettlement Project, Phase II NHA 39.894 C 0.356 0.300 0.000 - - - 65.60 65.60%
Fair
Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin.
Center (Phase 1) V 9.505 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory
Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin.
Center (Phase II) V 15.759 O 0.399 0.239 0.100 0.030 0.027 0.100 89.50 -
Lo Tone Construction & Supply 23385 Const. of Multi-Purpose Hall-
Phase II V 1.851 C 0.346 0.300 0.300 - - - 94.60 85.92% V. Satisfactory
Lo Tone Construction & Supply 23385 Dredging of Bato River
(Katipunan-Kilikilihan) V 19.180 C 0.492 - 0.500 - - - 99.20 65.60% Fair
Lo Tone Construction & Supply 23385 Impvt. of Pag-asa Drainage
System V 4.762 C 0.333 0.200 0.300 - - - 83.30 84.32% V. Satisfactory
Lo Tone Construction & Supply 23385
Rehab. Works Including Removal of Slides along
Catanduanes Circumferential Road
V 12.167 C 0.378 0.288 0.300 - - - 96.60 93.30% Outstanding
Lo Tone Construction & Supply 23385 Rehab./Impv't. of Calayucay-Sula
Road V 3.840 C 0.385 0.272 0.300 - - - 95.70 *95.70% Outstanding
Lo Tone Construction & Supply 23385 Rehab./Impvt. of Hinipaan-Cahan
Road V 19.260 C 0.390 0.293 0.300 - - - 98.30 *98.30% Outstanding
Lo Tone Construction & Supply 23385 Road Impv't./Widening of
Integrated Bus Terminal IX 4.640 C 0.232 0.000 0.300 - - - 53.20 78.76% Satisfactory
Lo Tone Construction & Supply 23385 Road Opening of Damacan-
Cagbulacao Road V 28.493 O 0.400 0.293 0.100 0.020 0.023 0.100 93.60 -
Lo Tone Construction & Supply 23385
Road Rehab./Impv't. of Bato, Bula, Minabalac (Excl.
acquisition of Roads/Traffic Signs & Safety Devices
V 9.407 C 0.258 0.300 0.300 - - - 85.80 86.64% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 250
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lo Tone Construction & Supply 23385 Widening/Impvt. of Catanduanes
Circ. Road (Codon Section) V 14.375 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Lo Tone Construction & Supply 23385
Widening/Impvt. of Catanduanes Circ. Road (Tibang-Puting
Baybay Section)V 28.495 C 0.393 0.293 0.300 - - - 98.60 90.14%
Outstanding
Lotrim Construction Inc. 12273 Const. of Banaybanay Public Market XI 2.504 C 0.372 0.300 0.300 - - - 97.20 92.93%
Outstanding
Lotrim Construction Inc. 12273 Const. of MPB @ Flores Subd. XI 0.752 C 0.379 0.226 0.300 - - - 90.50 *90.50% Outstanding
Lotrim Construction Inc. 12273 Const. of MPB @ Rizal E/S XI 0.657 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding
Lotrim Construction Inc. 12273 Rehab. of MPB XI 4.715 C 0.361 0.200 0.300 - - - 86.10 *86.10% V.Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Six CL @ Maragusan
NHS XI 6.560 C 0.337 0.300 0.300 - - - 93.70 89.01% V. Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Three (3) Storey DBM
Regional Office Bldg. XIII 18.638 C 0.397 0.200 0.300 - - - 89.70 88.53% V. Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const./Impvt. of Drainage at J.P.
Laurel St. to Davao Beach Club XI 4.717 C 0.344 0.200 0.300 - - - 84.40 86.74% V. Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Impvt./Conc. if Calinan-Bagiuo-
Cadalian Road XI 18.801 O 0.263 0.300 0.100 0.030 0.048 0.100 84.10 -
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab. of Davao-Cotabato Road
Kinuskusan Section XI 19.279 O 0.220 0.300 0.100 0.020 0.050 0.100 79.00 -
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab./Impvt. of DPWH Davao
del Sur 2nd DEO Bldg. XI 9.449 O 0.317 0.240 0.100 0.030 0.029 0.050 76.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 251
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Lubo Construction & Development 30508 Const. of MPB @ Calamagui 1st II 0.921 O 0.356 0.214 0.100 0.022 0.035 0.100 82.70 -
Lubo Construction & Development 30508 Const./Rehab. of Ilagan North
Central School II 1.192 C 0.336 0.200 0.300 - - - 83.64 78.21% Satisfactory
Lucban Builders and Construction Supply
Incorporated31336 Completion of MPB @ Paaralang
Elementarya ng Lucban IV-A 3.370 C 0.303 0.000 0.300 - - - 60.30 *60.30% Fair
Lucban Builders and Construction Supply
Incorporated31336 Const. of Daungan River Control IV-A 3.371 C 0.320 0.200 0.300 - - - 82.00 81.82%
V. Satisfactory
Lucky Armn's Construction & Enterprises 23434 Conc. of Shoulder at Picas San
Jose DZR Airport Road VIII 1.898 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Lug Square Construction 26623Conc. of Nueva Vizcaya-Ifugao-Mt. Province Bdry. Rd. (Hingyon
Section)CAR 2.846 C 0.362 0.217 0.300 - - - 87.90 *87.90%
V. Satisfactory
Lug Square Construction 26623 Widening/Conc. Along Banaue-Mayoyao Road (Tulaed Section) CAR 1.888 O 0.345 0.239 0.050 0.015 0.025 0.033 70.70 -
Lumel Glenn Construction 26817 Conc. of Sitio Tabtabong Road IV-B 1.413 C 0.209 0.300 0.300 - - - 80.90 *80.90% V. Satisfactory
Lumel Glenn Construction 26817 Const. of Drainage Canal @ Don Pedro IV-B 1.875 O 0.324 0.212 0.100 0.022 0.016 0.100 77.40 -
Lumel Glenn Construction 26817 Rehab. of Calapan South Road IV-B 3.782 C 0.358 0.200 0.300 - - - 85.80 87.48% V. Satisfactory
LUYM Construction and Development Corporation 24098
Const. of San Jose St. Drainage System-Outfall 1 of the Drainage
Facility of the Bohol Circ. Rd along C.P. Garcia Ave.
VII 14.038 C 0.307 0.189 0.300 - - - 79.60 77.86% Satisfactory
LVRO Construction & Supply 18116 Concreting of Brgy. 3, Bliss
Road XIII 2.786 C 0.384 0.300 0.000 - - - 68.40 80.76% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 252
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
LVRO Construction and Supply 18116 Conc. of Bay-ang-Calamba
Provincial Road XIII 2.893 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory
LVRO Construction and Supply 18116 Conc. of Brgy. Sangay-
Provincial Road XIII 1.927 C 0.302 0.200 0.300 - - - 80.20 *80.20% V. Satisfactory
LVRO Construction and Supply 18116 Const. of 1 Cl Sch. Bldg. @
Tinago E/S XIII 0.385 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
LVRO Construction and Supply 18116 Const. of Concepcion-Mt. Zion
FMR XIII 4.553 C 0.389 0.295 0.300 - - - 98.40 74.70% Satisfactory
LVRO Construction and Supply 18116 Const. of Culit Integrated School XIII 0.486 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
LVRO Construction and Supply 18116
Const. of Jct. Bolod-Bolod-Albor Road (Albor-San Antonio
Section)XIII 6.620 C 0.321 0.200 0.300 - - - 82.10 *82.10%
V. Satisfactory
LVRO Construction and Supply 18116 Const./Rehab. of Cabadbaran
River Dike XIII 2.841 C 0.248 0.200 0.300 - - - 74.80 *74.80% Satisfactory
LVRO Construction and Supply 18116 Impvt./Conc. of New Public
Market XIII 0.950 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
LVRO Construction and Supply 18116
Reconst. of Quezon-Mapawa-Capalyan-Espina-Navarro Road-
Arellano DistrictXIII 4.100 C 0.321 0.200 0.300 - - - 82.10 82.10%
V. Satisfactory
LVRO Construction and Supply 18116 Repair/Rehab. Along Dinagat-
Loreto Road XIII 9.649 O 0.307 0.168 0.100 0.023 0.038 0.100 73.60 -
LVRO Construction and Supply 18116 Surigao-Davao Coastal Road,
Panhutungan Section XIII 4.300 C 0.341 0.200 0.300 - - - 84.10 82.42% V. Satisfactory
LXS Builders & Supplies 25172 Const. of 1 CL School Bldg. @ Hermosa E/S I 0.493 C 0.323 0.200 0.300 - - - 82.30 87.90%
V. Satisfactory
LXS Builders & Supplies 25172 Const. of Drainage System at Mariposa Creek I 0.668 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 253
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M A M Construction & Trading (Formerly: MAM
Construction)19915 Const. of St. Tomas NHS III 0.901 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
M A M Construction & Trading (Formerly: MAM
Construction)19915 Repair and Rehab. of San Pablo
ES III 0.191 C 0.326 0.300 0.300 - - - 92.60 *92.60% Outstanding
M F Construction 22192 Completion of Multi-Purpose Building @ Tigbawan, Phase 2 VII 1.882 C 0.267 0.300 0.300 - - - 86.70 87.54%
V. Satisfactory
M M Construction 12012Conc. of Bambang-Kasibu-
Quezon-Solano Road (Labni Section)
II 14.225 O 0.370 0.240 0.100 0.030 0.033 0.067 84.00 -
M M Construction 12012
Rehab./Reconst. of Damaged National Roads, Daang
Maharlika, Poblacion Villaflores Section
II 14.468 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -
M. Montesclaros Enterprises, Inc. 6506
Asphalt Overlay/Patching of Bituminous Pavement @ Sayre
HighwayX 9.338 C 0.387 0.200 0.300 - - - 88.70 84.80%
V. Satisfactory
M. Montesclaros Enterprises, Inc. 6506 Conc. of Bukidnon-Davao Road
(Dologon-Busco-Quezon Sect.) X 67.179 C 0.360 0.200 0.300 - - - 86.00 86.00% V. Satisfactory
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at
Kipolot-Palacapao Section X 14.111 O 0.400 0.294 0.100 0.030 0.038 0.100 96.20 -
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at
Kipolot-Palacapao Section X 14.101 O 0.383 0.300 0.100 0.030 0.045 0.100 95.80 -
M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao X 9.375 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -
M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao X 9.375 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 254
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M. Montesclaros Enterprises, Inc. 6506 Const. of Sayre National
Highway X 33.060 C 0.293 0.300 0.300 - - - 89.30 90.23% Outstanding
M. Montesclaros Enterprises, Inc. 6506
Patching/Asphalt Overlay along Bukidnon-Davao City Road,
Camp I- Kiuntod SectionX 4.689 C 0.380 0.300 0.300 - - - 98.00 *98.00%
Outstanding
M. Montesclaros Enterprises, Inc. 6506
Repair/Rehab. of Proposed Development of DPWH Ver
Overview Bldg.X 9.375 C 0.399 0.300 0.300 - - - 99.90 93.85%
Outstanding
M. Montesclaros Enterprises, Inc. 6506
Road Upgrading (Gravel to Concrete) based on GTRSTB
(HDM4 Analysis) along Kibawe-Kadingilan-Kalilangan Road
X 4.823 O 0.300 0.240 0.100 0.030 0.035 0.100 80.50 -
M. Montesclaros Enterprises, Inc. 6506
Road Upgrading (Gravel to Concrete) ct. SH Impasugong-
Patulangan By-Pass Road (Patulangan Section)
X 18.991 O 0.337 0.259 0.100 0.030 0.055 0.100 88.10 -
M.B. Ang Construction and Supply 25001
Conc. of Caibiran-Cabucgayan National Circ. Road (Uson-
Gamay Section)VIII 3.725 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -
M.C. Torio Construction 10534 Alibadabad CPIP NIA-II 2.193 C 0.300 0.296 0.300 - - - 89.60 85.47% V. Satisfactory
M.C. Torio Construction 10534 Const. of MPB (Community Center) II 0.283 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project NIA-II 8.706 C 0.298 0.240 0.300 - - - 83.80 82.3%
V.Satisfactory
M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Brgy.
Calangain III 0.948 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding
M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Poblacion III 2.845 C 0.380 0.279 0.300 - - - 95.90 *95.90%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 255
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M.C.B. Zamora Construction & Supplies 32006 Impvt./Rehab. of Pathwalk along
Porac River III 2.846 C 0.275 0.245 0.300 - - - 82.00 *82.00% V. Satisfactory
M.C.B. Zamora Construction & Supplies 32006 Rehab. of Pasbul-San Nicolas
2nd Road III 4.743 C 0.361 0.224 0.300 - - - 88.50 *88.50% V. Satisfactory
M.G. Jacinto Construction 20617 Const. of Multi-Purpose Building (Learning Center) II 0.750 C 0.382 0.280 0.300 - - - 96.20 75.06%
Satisfactory
M.G. Salazar Const. Corp./Candace Const. (JV) JV-03-064
Impv't./Conc. Paving of Basilan Circumferential Rd., Isabela-
Maluso Rd.IX 36.385 O 0.296 0.300 0.050 0.030 0.051 0.100 82.70 -
M.G. Samidan Construction 16779 Const. of Bolinawen Flood Control CAR 1.051 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
M.G. Samidan Construction 16779 Const. of Kin-iway-Tambo-an Tribal ARC, FMR CAR 21.993 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
M.G. Samidan Construction 16779Improvement of Access Road to
Tourism Hubs & Spokes as defined by DOT
CAR 12.222 O 0.298 0.298 0.300 - - - 89.60 -
M.G. Samidan Construction 16779
Improvement of Benguet-Bontoc (Mt. Province)-Tinglayan
(Kalinga) Road Mt. Data Bontoc Section
CAR 8.188 C 0.384 0.300 0.300 - - - 98.40 89.10% V. Satisfactory
M.G. Samidan Construction 16779Impvt. of Baguio-Bontoc-Banaue Road, Conc. of Mt. Data-Bontoc Road, Km. 352+980-Km. 355+621
CAR 18.506 C 0.348 0.100 0.300 - - - 74.80 81.58% V. Satisfactory
M.G. Samidan Construction 16779
Impvt. of Benguet-Bontoc (Mr. Prov.)-Tinglayan-Lubuagan (Kalinga) Road At-Ato-Circle
Section
CAR 7.286 C 0.374 0.300 0.300 - - - 97.40 92.33% Outstanding
M.G. Samidan Construction 16779
Widening/Conc. of Mt. Data-Bontoc Road, Lukib-Sadsadan
Section, Km. 349+210 - Km. 350+243
CAR 13.139 C 0.369 0.200 0.300 - - - 86.90 80.96% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 256
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M.G.G. Construction & Supply 31228 Const. of MPB (Hall) III 1.233 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V.Satisfactory
M.H. Southern Construction 5841 Const. of Dungon Seawall XII 4.653 C 0.261 0.288 0.000 - - - 54.90 75.90% Satisfactory
M.H. Southern Construction 5841 Const. of Multi-Purpose Building XII 0.370 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding
M.H. Southern Construction 5841 Const. of Public Market @ Pob. Malungon XII 9.102 C 0.370 0.224 0.300 - - - 89.40 71.96%
Satisfactory
M.J. Apin Builders 12179 Const. of 1-Cl School Building @ Bacolod National High School V 0.378 C 0.300 0.000 0.300 - - - 60.00 56.01%
Poor
M.J. Apin Builders 12179 Const. of Sch. Bldg. Patong E/S V 0.468 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory
M.P. Villegas Construction 16683 Const. of DOST Reg. IV-A Food and Safety & Quality DOST 9.379 O 0.358 0.062 0.150 0.030 0.054 0.050 70.40 -
M.P. Villegas Construction 16683 Const. of DOST Reg. IV-A Food and Safety & Quality DOST 9.379 O 0.352 0.286 0.150 0.030 0.057 0.050 92.49 -
M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of Critical Portion of FTMR IV-A 0.470 C 0.245 0.300 0.300 - - - 84.50 *84.50%
V. Satisfactory
M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of FMR, Brgy. Sapaan to
San Andres-Labak IV-A 0.383 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory
M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Const. of MPB, Gumaca MAPC
MPCI IV-A 0.946 C 0.181 0.300 0.300 - - - 78.10 *78.10% Satisfactory
M.R. Santiago Construction 27329 Conc. of Road, Brgy. Maguinao III 0.947 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 257
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M.R. Santiago Construction 27329 Const. of MPB @ San Roque E/S III 0.950 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
M.R. Santiago Construction 27329 Rehab. of Camias-Sibut Road III 5.709 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding
M.R. Vargas Construction 8215 M'lang Airport Development Project DOTC 13.458 O 0.360 0.293 0.150 0.023 0.050 0.033 90.90 -
M.R.C. Bechaida Construction & Supply 32821 Conc. of Masagongsong Bridge
Approaches VIII 1.867 O 0.370 0.232 0.100 0.015 0.037 0.100 85.40 -
M.S. Ramos Construction 31684Const. of two (2) Storey, 4CL
School Bldg., @ Heritage Homes Brgy. Loma de Gato
III 3.283 C 0.378 0.200 0.300 - - - 87.80 85.77% V. Satisfactory
M.S. Ramos Construction 31684 Const./Rehab. of FMR at Brgy. Ligas III 0.380 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
M.S. Ramos Construction 31684 Impvt./Rehab of Mac Arthur Highway including drainage NCR 9.425 C 0.300 0.200 0.300 - - - 80.00 85.40%
V. Satisfactory
M.S. Ramos Construction 31684 Impvt./Rehab. of Roads Brgy. Pulong Buhangin III 2.857 C 0.353 0.200 0.300 - - - 85.30 85.30%
V. Satisfactory
M.S. Ramos Construction 31684 Rehab. of Rizal-Bulacan Boundary-Bigte Road III 5.038 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
M.V. Caldo Engineering Construction and Supplies 16938 Concreting with Drainage
Improvement of Hondradez St. NCR 1.781 C 0.371 - 0.500 - - - 87.10 87.10% V. Satisfacroty
M.V. Caldo Engineering Construction and Supplies 16938
Const. / Rehab. / Replacement / Completion and Repair of
Plaridel E/SNCR 0.959 C 0.327 0.300 0.300 92.70 *92.70%
Outstanding
M.V. Caldo Engineering Construction and Supplies 16938 Const. of MPB, Brgy. 385 NCR 0.576 C 0.345 0.200 0.300 84.50 *84.50%
V. Satisfactory
M.V. Caldo Engineering Construction and Supplies 16938 Const.Rehab. of Shallow
Well/Artesian Well @ Zone 13-24 NCR 0.932 C 0.222 0.300 0.300 82.20 81.84% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 258
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M.V. Confirm Construction & Development Inc. 32469 Const. of Six (6) Cl @ Santor E/S IVA 2.892 C 0.345 0.103 0.300 - - - 74.80 *74.80%
Satisfactory
M.V. Sabalburo Construction and Supply 32561 Completion of Antero P.
Hermosa E/S I 0.388 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
M.V. Sabalburo Construction and Supply 32561 Repair of Cabusligan School
Bldg., Cabusligan E/S I 0.949 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
M.Y. Reyes Builders & Development Corporation 26386 Const. of Multi-Purpose Covered
Court NHA 4.698 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -
M.Y. Reyes Builders & Development Corporation 26386 Construction of One Unit 3-
Storey School Building NHA 17.198 O 0.353 0.300 0.100 0.020 0.018 0.100 89.00 -
M.Y. Reyes Builders & Dev't. Corporation 26386 Construction of a 3-storey
School Building NCL 17.363 C 0.397 0.300 0.300 - - - 99.7 99.70% Outstanding
M2R Construction 13431Asphalt Overlay along Olongapo-Bugallon Road, Phase 3, Panan
SectionIII 0.979 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
M2R Construction 13431 Const. of Multi-Purpose Building @ Palauig C/S III 1.061 C 0.481 - 0.500 - - - 98.10 88.23%
V. Satisfactory
M2R Construction 13431 Const. of Slope Protection East Dirita Bridge III 4.753 C 0.284 0.158 0.300 - - - 74.20 *74.20%
Satisfactory
M2R Construction 13431 Genaro Magsaysay Bldg., Batonlapoc E/S III 1.140 C 0.367 0.071 0.300 - - - 73.80 81.43%
V. Satisfactory
M2R Construction 13431 Improvement/Rehab. of Water Supply III 0.935 O 0.400 0.022 0.100 0.020 0.025 0.100 66.70 -
M2R Construction 13431 Various Water System III 1.955 C 0.302 - 0.500 - - - 80.20 80.20% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 259
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
M3A Construction 32123 Const. of Roads V 4.776 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
M3A Construction 32123 Road Concreting of Bagong Sirang V 14.469 C 0.299 0.200 0.300 - - - 79.90 * 79.90%
Satisfactory
Ma. Gina M. Pador Construction 25600 Conc. of Concepcion Sur Nat'l
Road IV-B 0.933 C 0.256 0.300 0.300 - - - 85.60 *85.60% V. Satisfactory
Ma. Gina M. Pador Construction 25600
Repair/Maint. of Ferrol-Odiongan Road (Tubigon Section) Km.
120+800IV-B 0.139 C 0.337 0.200 0.300 - - - 83.70 85.20%
V. Satisfactory
Ma-an Construction Corporation 28751 Rehab./Impvt. of DPWH Leyte
2nd DEO VIII 4.746 O 0.379 0.197 0.100 0.010 0.020 0.100 80.60 -
Ma-an Construction Corporation 28751 Repair/Rehab. of Wright-Taft
Road VIII 2.614 C 0.375 - 0.500 - - - 87.50 *87.50% V. Satisfactory
Mac Builders 7249Conc. of Calubian-San Isidro-
Tabango-Villaba Road (Tabango-Tabing Sect.)
VIII 17.943 O 0.352 0.238 0.100 0.030 0.042 0.100 86.20 -
MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge
(Completion) VIII 58.313 O 0.293 0.300 0.100 0.030 0.030 0.067 82.00 -
MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge
(Completion) VIII 58.313 O 0.372 0.300 0.030 0.022 0.055 0.033 81.20 -
MAC Builders / Ubas Construction (JV) JV-05-021
Impvt. of Allen-Malaga Section along Maharlika Highway, Ferry
Terminal-AllenVIII 46.652 O 0.354 0.240 0.000 0.022 0.054 0.067 73.70 -
Mac-Morales General Merchandise &
Construction Supply2287 Conc. of FMR in Brgy. San Isidro
Ibaba IV-A 0.471 C 0.296 0.218 0.300 - - - 81.40 *81.40% V. Satisfactory
Madyaw Construction & Dev't. Corp. 29598
Completion of Azpetia Bridge along NRJ-Awa-Prosperidad-
Lianga RoadXIII 6.724 O 0.279 0.280 0.100 0.030 0.043 0.100 83.20 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 260
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Madyaw Construction & Dev't. Corp. 29598 Completion of San Luis
Footbridge, Old Poblacion XIII 5.722 O 0.324 0.300 0.100 0.030 0.032 0.100 88.60 -
Madyaw Construction & Dev't. Corp. 29598 Conc. of Bayugan-San Luis-
Talacogon Circ. Road XIII 9.456 C 0.310 0.046 0.300 - - - 65.60 70.82% Satisfactory
Madyaw Construction & Dev't. Corp. 29598 Const. of Phil. Normal University
MPB XIII 2.353 C 0.322 0.200 0.300 - - - 82.20 86.77% V. Satisfactory
Madyaw Construction & Dev't. Corp. 29598 Const. of San-Isidro-
Hinimbangan FMR XIII 19.235 C 0.293 0.300 0.300 - - - 89.30 89.30% V. Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Mapantad-Licop Road XI 0.943 C 0.350 0.200 0.300 - - - 85.00 87.16%
V. Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Poblacion Road at
Brgy. Central XI 0.943 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding
Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road
(Checote-Monserat Sect.) XI 19.283 C 0.092 0.200 0.300 - - - 59.20 79.36% Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road
(Lilisan Sect.) XI 19.282 O 0.316 0.300 0.100 0.030 0.045 0.100 89.10 -
Maer Summit Konstruck Co. 25262 Conc. of Tua-tua Road XI 1.415 C 0.359 0.200 0.300 - - - 85.90 87.46%
V. Satisfactory
Maer Summit Konstruck Co. 25262 Const. of MPB (Legislative Bldg.,
Phase II) XI 1.887 C 0.388 0.300 0.300 - - - 98.80 94.53% Outstanding
Maer Summit Konstruck Co. 25262
Impvt. of Davao Oriental-Surigao Sur Coastal Road (Banaybanay
Section)XI 10.324 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
Maer Summit Konstruck Co. 25262 Impvt. of Lanca-Luban Road XI 2.830 C 0.217 0.200 0.300 - - - 71.70 *71.70%
Satisfactory
Maer Summit Konstruck Co. 25262 Impvt. of Lavigan-Impog Road XI 1.884 C 0.279 0.200 0.300 - - - 77.90 *77.90%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 261
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Maer Summit Konstruck Co. 25262 Impvt. of Manikling-Lavugan
Road (Lavigan-Talisay Sect.) XI 14.464 C 0.347 0.200 0.300 - - - 84.70 82.12% V. Satisfactory
Maer Summit Konstruck Co. 25262
Rehab. of Davao or.-Surigao Coastal Road, Banaybanay-Mati
Section (Phase I)XI 19.289 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of DOSCST Nursing
Blsg., Guang-Guang XI 2.359 C 0.386 0.200 0.300 - - - 88.60 87.97% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Const. of MPB (Covered Court) XI 1.251 O 0.294 0.250 0.100 0.015 0.023 0.100 78.20 -
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Improvement of CDC - Poblacion
FMR (ARSIP II) XI 11.869 C 0.310 0.011 0.300 - - - 62.10 74.97% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit
Konstrukt)25262 Impv't./Rehab. of Don Enrique
Lopez-Don Salvador Lopez FMR XI 7.364 C 0.384 - 0.500 - - - 88.40 88.40% V. Satisfactory
Mafil Enterprises 27226 Provision of Line Canal @ Km. 1546, 450-Km.1546.73 X 0.280 C 0.411 - 0.500 - - - 91.10 91.10%
Outstanding
Mafil Enterprises 27226Provision of Line Canal along Jct. Dologon-Busco-Quezon
Road Buni-Buni SectionX 0.278 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
Maghuyop Construction 21641 Conc. of FMR VII 1.925 C 0.343 0.300 0.300 - - - 94.30 86.98% V. Satisfactory
Maghuyop Construction 21641 Concreting of Road VII 2.784 C 0.345 0.222 0.300 - - - 86.70 83.88% V. Satisfactory
Maghuyop Construction 21641 Const. of 2 CL Sch. Bldg. w/o CR Guinacot H/S VII 0.853 C 0.352 0.256 0.300 - - - 90.80 88.98%
V. Satisfactory
Maghuyop Construction 21641 Const. of 4 Cl Sch. Bldg. at Pondol E/S VII 1.435 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 262
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Maghuyop Construction 21641 Reconstruction of Balilihan Central Elem. School VII 3.525 O 0.358 0.300 0.100 0.030 0.070 0.100 95.80 -
Maghuyop Construction 21641 Renovation of Multi Purpose Pavement VII 0.093 C 0.364 0.000 0.300 - - - 66.40 *66.40%
Fair
Magna Rich Trading & Construction 29108 Const. of FMR Brgy. San
Antonio IV-A 0.955 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Magscon Construction 25362 Const. of Multi-Purpose Building @ Brgy. Padu Grande I 0.189 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
Mainbest Enterprise 26127 Completion of Multi-Purpose Building (Gymnasium), Gamis II 1.283 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Makapa Corporation 30029 Const. of Multi-Purpose Building V 1.380 C 0.391 0.300 0.300 - - - 99.10 83.77% V. Satisfactory
Makapa Corporation 30029 Const. of Sampaloc Seawall @ Sitio Little Mahingan V 3.803 C 0.400 0.000 0.300 - - - 70.00 78.50%
Satisfactory
Makapa Corporation 30029 Const./Impvt. of Cawayan River Control V 9.452 C 0.365 0.195 0.300 - - - 86.00 84.14%
V. Satisfactory
Makapa Corporation 30029 Rehab./Impvt. of Cawayan River Control V 4.728 C 0.306 0.300 0.300 - - - 90.60 *90.60%
Outstanding
Makapa Corporation 30029 Rehab./Retrofitting of Cawayan Bridge along Maharlika Highway V 19.016 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Makapa Corporation 30029 Repair/Rehab. of Cawayan River Control V 9.497 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
Makati Development Corporation 2313 Const. of 10th & 11th Aveneus of
Bonifacio Triangle Project BCDA 52.800 O 0.316 0.300 0.100 0.020 0.047 0.100 88.28 -
Makati Development Corporation 2313 Const. of 10th and 11th Avenues
of Bonifacio Triangle BCDA 52.800 O 0.377 0.275 0.070 0.023 0.045 0.100 88.94 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 263
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Makati Development Corporation 2313
Const. of 34.5 KVA UPDS along 26th St., 32nd St. & McKinley
Parkway, Phase 3BCDA 12.084 O 0.400 0.300 0.100 0.020 0.045 0.067 93.17 -
Mak-Well Enterprises 25003 Const. of MPB at Brgy. Pansol IV-A 2.674 C 0.423 - 0.500 - - - 92.30 92.30% Outstanding
Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. @ Los Banos Park IV-A 1.049 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. Barangay Batong Malake IV-A 0.955 C 0.433 - 0.500 - - - 93.30 *93.30%
Outstanding
Mak-Well Enterprises 25003 Const./Repair/Rehab. of MPB at Brgy. Tadlac IV-A 2.880 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
Malihan Enterprises 6963 Concreting of Road, Brgy. San Antonio IV-A 0.954 C 0.467 - 0.500 - - - 96.70 *96.70%
Outstanding
MAM Construction & Trading 19915 Const. of Three 3-CL Building @
Bucanan Elem. School III 1.410 O 0.400 0.300 0.100 0.020 0.018 0.100 93.80 -
MAM Construction & Trading (Formerly: MAM
Construction)19915 Conc./Upgrading of Angeles-
Porac-Dinalupihan Road III 5.689 C 0.282 0.272 0.300 - - - 85.40 *85.40% V. Satisfactory
MAM Construction & Trading (Formerly: MAM
Construction)19915 Const. of 2CL Sch. Bldg. at Sta.
Rita E/S III 0.765 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
MAM Construction & Trading (Formerly: MAM
Construction)19915 Const. of Elem. School Bldg. at
Sta. Cruz ES III 0.786 C 0.383 0.276 0.300 - - - 95.90 *95.90% Outstanding
MAM Construction & Trading (Formerly: MAM
Construction)19915 Repair and Rehab. of San Pedro
ES III 0.384 C 0.338 0.300 0.300 - - - 93.80 *93.80% Outstanding
Mamsar Enterprises Agro-Industrial Corporation 15885
Cluster B 2004: Const. of Various 2004 School Bldg. (Opol
NSTS.)under the 2nd Congressional District, Misamis
Oriental
X 9.049 O 0.308 0.300 0.100 0.030 0.032 0.100 87.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 264
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &
Approaches X 16.484 C 0.380 0.300 0.300 - - - 98.00 86.64% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Bridge I along Ma. Cristina-Misamis
Oriental Rd., Brgy. San Roque-Hinaplanon
X 13.667 C 0.317 0.300 0.300 - - - 91.70 94.08% Outstanding
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Nunucan Bridge
Phase III, Brgy. Suarez X 7.608 C 0.425 - 0.500 - - - 92.50 88.96% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Const. of Mambu-ao Bridge &
Approaches X 22.223 C 0.353 0.293 0.300 - - - 94.60 89.66% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Const./Impvt. of Water Supply
Projects XIII 10.392 C 0.311 0.200 0.300 - - - 81.10 87.28% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Const.of Iligan-Bukidnon Road
(Digkila-an-Rogongon Sect.) X 7.769 C 0.276 - 0.500 - - - 77.60 77.48% Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Iligan-Bukidnon Road
Brgy. San Roque X 8.037 C 0.444 - 0.500 - - - 94.40 93.86% Outstanding
Maningo Enterprises 13330 Const. of 2 Storey 6 CL E/S Bldg. VII 4.767 C 0.227 0.200 0.300 - - - 72.70 *72.70% Satisfactory
Maningo Enterprises 13330 Const. of 4-Cl, 2-Storey S/B @ Bangkal NHS VII 1.962 C 0.218 0.230 0.300 - - - 74.80 74.80%
Satisfactory
Maningo Enterprises 13330 Road Asphalting/Conc. @ Brgy. Malubog VII 0.478 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Oustanding
Manuel A. Dela Torre Jr. Builders 31024 Conc. of Fatima V III 0.949 C 0.344 0.300 0.300 - - - 94.40 *94.40%
Outstanding
Manuel A. Dela Torre Jr. Builders 31024 Conc. of Road, Brgy Maasin III 0.379 C 0.380 0.286 0.300 - - - 96.70 *96.70%
Outstanding
Map Alviola Construction 31951 Const. of Flood Control (Seawall) VII 0.943 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
Map Alviola Construction 31951 Const. of Water System VII 0.165 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 265
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mar Castillo Const. Supply Gravel & Sand 21073 Const. of Lined Canal @ Sta.
Maria IV-A 0.283 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Marianito Villegas E/S XII 0.680 C 0.381 0.300 0.300 - - - 98.10 *98.10%
Outstanding
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Surallah NHS XII 0.783 C 0.381 0.300 0.300 - - - *98.10 98.10% Outstanding
Marbel Dynamic Builders 6150 Const. of Koronadal NCHS Annex, Bacongco Campus XII 1.734 O 0.329 0.240 0.100 0.030 0.035 0.067 80.10 -
Marbel Dynamic Builders 6150Const. of Ladol flood Control
Protecting Sarangani-Davao del Sur Coastal Road
XII 1.234 O 0.323 0.200 0.000 0.010 0.021 0.133 68.70 -
Marbel Dynamic Builders 6150 Const. of MPB @ Brgy. Assumption XII 0.190 C 0.360 0.200 0.300 - - - 86.00 * 86.00%
V. Satisfactory
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg. @ Brgy. Liberty XII 0.759 C 0.276 0.216 0.300 - - - 79.20 *79.20%
Satisfactory
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg., Brgy. Lake Seloton XII 0.760 C 0.330 0.200 0.300 - - - 83.00 84.19%
V. Satisfactory
Marbel Dynamic Builders 6150 Impvt. of MPB at Poblacion XII 0.961 C 0.275 0.200 0.300 - - - 77.50 *77.50% Satisfactory
Marcbilt Construction, Inc. 21844 Rehab./Reconst. (Conc.) of Dasmariñas-Carmona Road IV-A 28.920 O 0.341 0.202 0.100 0.030 0.037 0.100 81.00 -
Marcons Builder 8044 Const. of DPWH Building CAR (Phase IV) CAR 8.553 O 0.363 0.240 0.100 0.030 0.051 0.100 88.40 -
Marcons Builder 8044 Const. of DPWH Regional Office Building (Phase V) CAR 24.059 O 0.376 0.300 0.100 0.030 0.047 0.100 95.30 -
Marcons Builder 8044 Const. of U.P. College Baguio Multi-Purpose Bldg. CAR 1.448 C 0.350 - 0.500 - - - 85.00 65.61%
Fair
Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road CAR 12.707 C 0.318 0.100 0.000 - - - 41.80 58.56%
Poor
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 266
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Marcons Builder 8044 Rehab./Impvt./Const. of DPWH Building (Phase III) CAR 14.475 C 0.357 0.267 0.300 - - - 92.40 92.05%
Outstanding
Marcphil Construction 10949 Conc. of Dangay Port Road IV-B 0.937 C 0.417 - 0.500 - - - 91.70 84.38% V. Satisfactory
Marcphil Construction 10949 Conc. of Port Road, Proper Bansud IV-B 1.889 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Marcphil Construction 10949 Conceting of San Jose-Kaligtasan Road IV-B 0.945 C 0.398 - 0.500 - - - 89.80 89.80%
V. Satisfactory
Marcphil Construction 10949 Impvt./Repair of San Mariano-Tauga Road IV-B 1.860 C 0.170 0.276 0.300 - - - 74.60 *74.60%
Satisfactory
Marcris Enterprises 32820
Repair and Rehab. of Ilang Bridge along Carmen Jct.-
Bayambang San Carlos-Manat Road
I 0.963 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
Marcus Construction 12601 Conc. of Midsayap-Makar Road, Salunayan-Tumbras Section XII 19.109 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
Marcus Construction 12601Const. of Drainage Canal from Buluan Bridge II to Libungan
River, Phase I, II & IIIXII 14.285 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V.Satisfactory
Marcus Construction 12601 Const. of Multi-Purpose Bldg. (ABC Hall) Phase I XII 0.932 C 0.470 - 0.500 - - - 97.00 76.49%
Satisfactory
Marcus Construction 12601Const. of Multi-Purpose Bldg.,
(DSWD Crisis Intervention Bldg.) Brgy. Pob. (Realigned to Singao)
XII 0.909 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
Marcus Construction 12601 Const. of Multi-Purpose Building @ Brgy. Capiton XII 1.906 C 0.350 0.300 0.300 - - - 95.00 83.24%
V. Satisfactory
Marcus Construction 12601Proposed Conc. of Liloy-Siocon
Road, Imelda-San Roque-Gutalac Sect.
IX 19.128 O 0.327 0.223 0.100 0.012 0.029 0.100 79.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 267
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Marcus Construction 12601Proposed Conc. of Liloy-Siocon
Road, Imelda-San Roque-Gutalac Sect.
IX 19.128 O 0.293 0.222 0.100 0.030 0.047 0.100 79.20 -
Marcus Construction 12601Proposed Impv't./Conc. of
Labason-Gutalac Nat'l. Rd., Antonio-Labason River Sect.
IX 3.913 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Marcus Construction 12601Reblocking/Conc. Along
Cotabato-Davao Road, Sadaan Sect.
XII 4.625 O 0.325 0.200 0.100 0.030 0.047 0.100 80.20 -
Marcus Construction 12601
Rehab./Impvt. of Banisilan-Guiling-Alamada-Libungan Road, (Kapayawe-Grebona
Section)
XII 4.742 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
Marcus Construction 12601
Repair/Maintenance of Libungan Flood Control (Slope Protection
Upstream of Approach "B" of Libungan Bridge) Phase II
XII 1.315 C 0.325 0.300 0.300 - - - 92.50 *92.50% Outstanding
Mar-Deb Construciton & Development 6715 Completion of 2-Storey Multi-
Purpose Building (Phase IV) II 0.936 C 0.306 0.300 0.300 - - - 90.60 86.12% V. Satisfactory
Mar-Deb Construciton & Development 6715 Concreting of PNP Regional
Training Center Road, Minante I II 0.561 C 0.341 - 0.500 - - - 84.10 84.10% V. Satisfactory
Mar-Deb Construciton & Development 6715 Const. of Angad Bridge &
Approaches Angad II 7.906 C 0.459 - 0.500 - - - 95.90 86.72% V. Satisfactory
Mar-Deb Construciton & Development 6715 Gravelling of FMR II 0.470 C 0.354 - 0.500 - - - 85.40 85.40%
V. Satisfactory
Mar-Deb Construciton & Development 6715
Impv't./Gravelling/Concreting along CDMA Boundary and its
related RoadsII 3.396 C 0.312 - 0.500 - - - 81.20 71.42%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 268
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mar-Deb Construciton & Development 6715
Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-
Km.372+649)II 9.573 O 0.366 0.295 0.100 0.030 0.035 0.100 92.60 -
Mar-Deb Construciton & Development 6715 Widening/Regravelling of FMR
Munoz East II 0.940 C 0.367 - 0.500 - - - 86.70 84.60% V. Satisfactory
Mar-deb Construction & Development 6715 Cagayan River Basin Protection
Works, Macate Section II 19.269 C 0.259 0.300 0.300 - - - 85.90 *85.90% V. Satisfactory
Mar-deb Construction & Development 6715
Completion of Turod-Banquero Concrete Overflow Bridge
PhaseIIIII 9.879 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -
Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan
National Road, Cabatuan Section II 9.412 C 0.342 0.200 0.300 - - - 84.20 87.02% V. Satisfactory
Mar-deb Construction & Development 6715 Conc. of Jct. Ipil-Quirino Bdry.
Road II 27.182 C 0.354 0.200 0.300 - - - 85.40 87.38% V. Satisfactory
Mar-deb Construction & Development 6715
Const. of 2 Cl Sch. Bldg. @ Reina Mercedes Vocational
SchoolII 0.817 C 0.390 0.178 0.300 - - - 86.80 *86.80%
V. Satisfactory
Mar-Deb Construction & Development 6715 Const. of Bank Protection
Works, Phase III II 16.225 C 0.375 - 0.500 - - - 87.50 91.10% Oustanding
Mar-deb Construction & Development 6715 Const. of Bintacan Bridge &
Approaches II 24.964 O 0.382 0.300 0.030 0.030 0.019 0.033 79.40 -
Mar-Deb Construction & Development 6715 Const. of Centro Multi-Purpose
Building II 0.090 C 0.321 0.236 0.300 - - - 85.70 *85.70% V. Satisfactory
Mar-deb Construction & Development 6715 Const. of MPB (Phase II) @
Cauayan City C/S II 0.941 C 0.331 0.074 0.300 - - - 70.50 66.23% Fair
Mar-deb Construction & Development 6715 Const./Completion of MPB @
San Mateo II 0.953 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
Mar-deb Construction & Development 6715 Construction of Bintacan Bridge
& Approaches II 24.964 O 0.348 0.300 0.000 0.023 0.051 0.067 78.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 269
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mar-deb Construction & Development 6715 Construction of Bintacan Bridge
& Approaches II 24.964 C 0.393 0.300 0.000 - - - 69.30 77.32% Satisfactory
Mar-deb Construction & Development 6715 Impvt./Rehab. of Cauayan-
Cabatuan Road II 9.559 C 0.292 0.200 0.300 - - - 79.20 82.44% V. Satisfactory
Mar-deb Construction & Development 6715 Impvt./Rehab. of Daang
Maharlika Road (Widening) II 4.778 C 0.298 0.300 0.300 - - - 89.80 88.90% V. Satisfactory
Mar-Deb Construction & Development 6715
Reblocking of Concrete Pavement along Jct. Cauayan-Cabatuan Road (Intermittent
Section)
II 0.623 C 0.317 - 0.500 - - - 81.70 *81.70% V. Satisfactory
Mar-deb Construction & Development 6715
Reblocking of Concrete Pavement along Santiago-
Tuguegarao Rd.II 4.741 C 0.328 0.200 0.300 - - - 82.80 *82.80%
V. Satisfactory
Mar-deb Construction & Development 6715 Rehab./Reconst. of Santiago-
Tuguegarao Road II 11.473 O 0.392 0.240 0.100 0.030 0.047 0.100 90.90 -
Mar-deb Construction & Development 6715 Repair/Rehab.of Pigalo Bridge
(Phase III) II 4.790 C 0.319 0.200 0.300 - - - 81.90 84.12% V. Satisfactory
Mar-deb Construction & Development 6715 Widening of Cauayan-Cabatuan
Road (Luna Section) II 3.344 O 0.394 0.240 0.100 0.030 0.042 0.100 90.60 -
Margarita Construction 20201 Asphalt Overlay @ Brgy. Sucol IV-A 0.480 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
Margarita Construction 20201 Const. of 3-Cl School Building (FFHNAS) III 1.415 C 0.479 - 0.500 - - - 97.90 94.68%
Outstanding
Margarita Construction 20201 Rehab. of Norzagaray-Bigte Road III 5.709 C 0.257 0.300 0.300 - - - 85.70 *85.70%
V. Satisfactory
Margarita Construction 20201 Upgrading of Banga Road III 2.838 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
Marier Construction & Supply 22878 Const. of One Unit 2 CL Sch.
Bldg. at Siare Jhon HRN NHS IX 0.948 C 0.335 0.287 0.300 - - - 92.20 *92.20% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 270
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Marigold Development Corporation 4707 Const. of Multi-Purpose Building
@ Brgy. New Era NCR 1.432 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding
Marigold Development Corporation 4707 Construction of Multi-Purpose
Building @ Brgy. Baesa NCR 1.145 C 0.319 0.202 0.300 - - - 82.10 *82.10% V. Satisfactory
Marilag Construction 22813 Const. of Multi-Purpose @ Talangka E/S IV-A 0.240 C 0.339 0.300 0.300 - - - 93.90 *93.90%
Outstanding
Marilag Construction 22813 Const. of Multi-Purpose Bldg., (Senior Citizen) IV-A 0.478 C 0.380 0.200 0.300 - - - 88.00 *88.00%
V. Satisfactory
Marilag Construction 22813 Const. of Multi-Purpose Bldg., @ San Jose IV-A 0.287 C 0.398 0.224 0.300 - - - 92.20 *92.20%
Outstanding
Marknest Construction 16818 Concreting of Barangay Road III 0.475 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
Marknest Construction 16818 Const. of 2-Storey Bldg. with 12 Rooms Sindalan E/S III 1.418 C 0.427 - 0.500 - - - 92.70 87.94%
V. Satisfactory
Marknest Construction 16818 Const. of MPB @ Bo. Obrero E/S NCR 4.755 C 0.387 0.174 0.300 - - - 86.10 *86.10% V. Satisfactory
Marknest Construction 16818 Const./Repair/Completion of Water Supply III 0.954 C 0.381 0.258 0.300 - - - 93.90 *93.90%
Outstanding
Marknest Construction and Trading (Formerly:
Marknest Construction)16818 Const. of MPB at Nueva Victoria III 0.952 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
Marquin Construction 13332 Conc. of Roads at Brgy. Cogon VII 0.882 C 0.314 0.184 0.300 - - - 79.80 *79.80% Satisfactory
Marquin Construction 13332 Const. of 3 CL SB @ Guinsay NHS VII 1.825 C 0.310 0.262 0.300 - - - 87.20 75.37%
Satisfactory
Marquin Construction 13332 Const. Rehab. of SB at Ramon Durano Sr. Science & Tech. VII 0.894 C 0.361 0.300 0.300 - - - 96.10 *96.10%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 271
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Marquin Construction 13332 Proposed Const. of Line Canal VII 0.963 O 0.316 0.200 0.100 0.022 0.025 0.200 86.30 -
Marquin Construction 13332 Road Conc. @ St. James Poblacion VII 0.461 C 0.390 0.100 0.300 - - - 79.00 *79.00%
Satisfactory
Martha Construction Supply & General
Merchandise25827 Repair of Unpaved Shoulder II 0.418 C 0.326 0.200 0.300 - - - 82.60 *82.60%
V. Satisfactory
Mar-Vel Construction 23722 Completion of Multi-Purpose Building (LSPC) IV-A 0.475 C 0.383 0.150 0.300 - - - 83.30 *83.30%
V. Satisfactory
Mar-vel Construction 23722 Conc. of Drainage System along MSR Daang Maharlika Road IV-A 0.960 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
Mar-vel Construction 23722 Conc. of Road @ Brgy. Real IV-A 0.289 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
Mar-vel Construction 23722 Conc. of Road @ Brgy. Uno going to Brgy. Rizal IV-A 4.801 C 0.298 0.200 0.300 - - - 79.80 *79.80%
Satisfactory
Mar-Vel Construction 23722 Conc./Rehab. of Barangay Road IV-A 3.848 C 0.194 - 0.500 - - - 69.40 *69.40% Fair
Mar-vel Construction 23722 Const. Impv't. of Water Supply System IV-A 2.464 C 0.386 0.283 0.300 - - - 96.90 *96.90%
Outstanding
Mar-vel Construction 23722Const. of Flood Control
System/Riprapping @ Brgy. Estrella
IV-A 2.880 C 0.225 0.300 0.300 - - - 82.50 *82.50% V. Satisfactory
Mar-vel Construction 23722 Const. of MPB @ Brgy. Puypuy IV-A 0.480 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Mar-vel Construction 23722 Const. of Roads at Brgy. Bucal IV-A 0.334 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory
Mar-vel Construction 23722Const./Impvt. of Flood Control
and Drainage @ Brgy. Tulo-Makiling Maharlika Highway
IV-A 0.286 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 272
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mar-vel Construction 23722 Impv't. of Calauan-Nagcarlan Road IV-A 4.674 C 0.380 0.200 0.300 - - - 88.00 *88.00%
V. Satisfactory
Mar-vel Construction 23722 Impvt./Rehab. of Flood Control IV-A 0.959 C 0.176 0.300 0.300 - - - 77.60 76.22% Satisfactory
Masbate-Iloilo Const. & Trading Corporation 26579 Const. of Multi-Purposee
Building @ Cabatuan H/S VI 1.446 C 0.398 0.200 0.300 - - - *89.80 89.80% V. Satisfactory
Mash Construction 20806 Const. of 1 CL at Plaridel Elem. School IV-A 0.333 C 0.459 - 0.500 - - - 95.90 95.90%
Outstanding
Mash Construction 20806 Const. of MPB at Brgy. Mabini IV-A 1.444 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Masulot Construction 10716 Widening of Cotabato-Allah-Gen. Santos Road including sidewalk XII 3.107 C 0.395 - 0.500 - - - 89.50 81.88%
V. Satisfactory
Matco Builders 12929Const./Repair/Rehab. of Brgy.
Rds. @ Brgy. Balibago & Ninoy Package II
III 3.768 C 0.411 - 0.500 - - - 91.10 91.10% Outstanding
Maverick & Wee Eng Joint Venture JV-07-105
CP 8: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Baganga-Cateel
Section
XI 191.290 O 0.381 0.240 0.100 0.030 0.060 0.100 91.10 -
Maverick Builders 14466 Impv't/Conc. of Compostela-Cateel Road XI 66.371 C 0.365 0.300 0.300 - - - 96.50 97.10%
Outstanding
Maverick Builders Incorporated (Formerly:
Maverick Builders)14466
Rehab. of Davao-Or.-Surigao Coastal Road Banaybanay-Mati
Section (Phase II)XI 19.290 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
Mayhaligue Cosntruction & Supply 29586 Const. of Dapdap MPB II 0.470 C 0.398 0.200 0.300 - - - 89.80 *89.80%
V. Satisfactory
Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 O 0.400 0.060 0.070 0.030 0.000 0.000 56.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 273
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 O 0.397 0.131 0.050 0.015 0.016 0.033 64.20 -
Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 C 0.400 0.284 0.300 - - - 98.40 98.40%
Outstanding
MBB Construction 11363 Concreting of Manila North Road Km. 343+000 - Km.344+000 I 9.597 C 0.371 0.200 0.300 - - - 87.10 83.26%
V. Satisfactory
MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. I 14.140 O 0.261 0.240 0.100 0.030 0.037 0.100 76.80 -
MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. I 14.140 O 0.251 0.115 0.030 0.022 0.025 0.067 51.00 -
MBB Construction 11363 Const. of MPB I 9.460 C 0.298 0.250 0.300 - - - 84.80 70.80% Satisfactory
MBB Construction 11363 Const. of Santa Seawall I 19.211 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
MBB Construction 11363 Const. of Victory Bridge I 9.357 C 0.303 - 0.500 - - - 80.30 75.92% Satisfactory
MBB Construction 11363 Impv't. of Vigan-Sta. Catalina Road I 19.298 C 0.315 0.200 0.300 - - - 81.50 83.39%
V. Satisfactory
MBB Construction 11363 MNR, Candon-Santiago Section I 18.920 O 0.338 0.034 0.100 0.022 0.022 0.067 58.30 -
MBB Construction 11363 Package III-Completion of Multi-Purpose Bldg., @ ISPSC I 0.946 C 0.352 - 0.500 - - - 85.20 85.20%
V. Satisfactory
MBB Construction 11363 Rehab. of Conc. Pavement along MNR, Candon Section I 9.449 C 0.221 0.300 0.300 - - - 82.10 83.66%
V. Satisfactory
MBB Construction 11363 Rehab./Reconst. of Vigan Airport Road I 19.014 C 0.037 0.200 0.300 - - - 53.70 83.52%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 274
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
MBB Construction 11363Rehab./Reconst.of Damaged Nat'l Road, Candon-Salcedo
RoadI 18.990 O 0.305 0.160 0.100 0.008 0.022 0.067 66.20 -
MBB Construction 11363 Renovation of Narvacan Municipal Bldg. I 0.946 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
MBB Construction 11363 Sta. Maria-Burgos Road I 1.698 O 0.277 0.240 0.100 0.022 0.027 0.067 73.30 -
MBD General Const./Duragold Trading &
Const. (JV)JV-05-014 Const. of Sagayon Bridge &
Approaches X 23.811 C 0.396 0.300 0.300 - - - 99.60 89.88% V. Satisfactory
MBD General Construction 9991 Conc. of Calamba-Baliangao Road X 16.180 O 0.312 0.000 0.050 0.023 0.035 0.100 52.00 -
MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road X 7.146 O 0.258 0.085 0.100 0.023 0.025 0.100 59.10 -
MBD General Construction 9991Const. /Cementing of
Circumferential Rd., from Purok Brgy. Mobod to Brgy. Villaflor
X 0.811 C 0.294 0.300 0.300 - - - 89.40 85.38% V. Satisfactory
MBD General Construction 9991Const. of Dalacon Bridge &
Approaches along Oroquieta-Calamba Mt. Rd.
X 15.545 C 0.279 0.138 0.300 - - - 71.70 81.30% V. Satisfactory
MBF Construction 9803 Concreting of Municipal Street, Siaton, Negros Oriental VII 2.027 C 0.299 - 0.500 - - - 79.90 73.12%
Satisfactory
MBF Construction 9803 Repair/Rehab./Impv't. of FMR, Licoan VII 0.486 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
MC Torio Construction 10534 Construction of Canal and Canal Structures (LMC-ARIP-01-06) NIA-II 4.070 C 0.400 0.300 - - - - 70.00 *70.00%
Fair
MCB Construction & Supply 12128 Conc. of FMR @ Doyong I 4.723 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 275
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
MCB Construction & Supply 12128 Const. of Water System @ Brgy.
Doyong Nagsaing & Ambuetel I 4.820 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory
MCGR Engineering Services 22202 Concreting of Various Roads VIII 0.965 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
MCGR Engineering Services 22202 Repair/Rehab. of Rizal Avenue
Extension VIII 2.846 C 0.283 0.200 0.300 - - - 78.30 84.48% V. Satisfactory
Mcguire Industrial Development Co. 31302 Concreting of FMR IV-A 0.467 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
MCL Construction / RND Const. (JV) JV-03-116 Impv't./Conc. of Sitio Malasin
FMR San Macario Sur ARC I 7.749 C 0.284 - 0.500 - - - 78.40 72.58% Satisfactory
ME3 Construction 31364 Asphalting of Daang Maharlika (Surigao-Agusan Road Section) XIII 4.813 C 0.384 0.205 0.300 - - - 88.90 *88.90%
V. Satisfactory
ME3 Construction 31364 Impvt./Rehab. of Butuan-Malaybalay Road XIII 4.804 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
Meditech Trade & Development 16545
Const./Rehab. of Multi-Purpose Pavement along McArthur
Highway, Mabini, Gacutan and Plaza del Rosario St.
III 2.809 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
Meditech Trade & Development 16545 Impvt. Along Ipil-Quirino Bdry.
Road, Jones-San Agustin II 9.590 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
Meditech Trade & Development 16545 Impvt. of Macalelon-Gen Luna
Road IV-A 19.282 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
Meditech Trade & Development 16545 Impvt. of Quezon-Guimba Road,
Manacsac Section III 14.044 C 0.293 0.200 0.300 - - - 79.30 *79.30% Satisfactory
Meditech Trade & Development 16545 Impvt./Rehab. Along Gamu-
Roxas Road II 9.566 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
Meditech Trade & Development 16545 Impv't./Rehab./Const. of MSR-
Pagbilao Sect. IV-A 4.728 C 0.417 - 0.500 - - - 91.70 91.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 276
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Meditech Trade & Development 16545 Reblocking/Impvt. of Roman
Expressway, Batangas II Section III 18.899 C 0.387 0.277 0.300 - - - 96.40 *96.40% Outstanding
Meditech Trade & Development 16545
Rehab. of Catanauan-Lopez Road (Additional Safety Warning
Device) km. 252+000 - km. 255+000
III 4.820 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Meditech Trade & Development 16545
Repair/Rehab. & Installation of Reflectorized Pavm't Stud along
Malicboy-P. Burgos-Unisan-Pototanin Rd. & Mulanay San
Narciso Rd.
IV-A 9.643 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
Meditech Trade & Development 16545 Repair/Rehab. of Dinagat-Loreto
Road XIII 4.489 C 0.331 - 0.500 - - - 83.10 *83.10% V. Satisfactory
Meditech Trade & Development 16545 Repair/Rehab. of Road leading to
Mt. Samat Shrine IV-A 9.254 C 0.279 0.300 0.300 - - - 87.90 *87.90% V. Satisfactory
Mega Builders Corporation (Formerly: Gem Const. &
Supply)29732
Repair/Rehab. of Multi-Purpose/Academic Bldg., Batangas State University
IV-A 1.319 O 0.357 0.278 0.100 0.030 0.031 0.100 89.60 -
Mega M Builders 20515 Conc. of Line Canal, Brgy. Sta. Ana IV-A 4.823 C 0.257 0.300 0.300 - - - 85.70 *85.70%
V.Satisfactory
Mega M Builders 20515 Const. of Farm-to-Market Road IV-A 0.373 C 0.417 - 0.500 - - - 91.70 *91.70% Outstanding
Mega M Builders 20515 Const. of Multi-Purpose Hall @ Del Remedio (DPWH-Compound) IV-A 0.704 C 0.439 - 0.500 - - - 93.90 84.59%
V. Satisfactory
Mega M Builders 20515 Const./Rehab. of Road, Brgy. Sta. Ana IV-A 4.823 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
Mega M Builders 20515 Impvt. of FMR at Brgy. San Gregorio IV-A 0.335 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 277
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mega Plus Construction 28322 Const. of Multi-Purpose Building @ Brgy. Quiot VII 0.958 C 0.358 0.300 0.300 - - - 95.80 85.65%
V. Satisfactory
Mega Plus Construction 28322 Rehab./ of Multi-Purpose Bldg., @ Sitio Opra, Brgy. Kalunasan VII 0.767 C 0.403 - 0.500 - - - 90.30 90.30%
Outstanding
Megashine Builders Corporation (Formerly: Gem Const. & Supply)
29732Repair/Rehab. of Multi-
Purpose/Academic Bldg., Batangas State University
IV-A 1.319 C 0.361 0.246 0.300 - - - 90.70 89.93% V. Satisfactory
Megila Const. & Development Supply 19262 Completion of Catalunan
Pequeno E/S XI 0.471 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory
Megila Const. & Development Supply 19262 Completion of MPB at Brgy. 18-B XI 0.468 C 0.390 0.146 0.300 - - - 83.60 *83.60%
V. Satisfactory
Megila Const. & Development Supply 19262
Const / Rehab. / Replacement / Completion & Repair of E/S
Bldg. @ Kapitan Tomas Monteverde E/S
XI 0.883 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding
Megila Const. & Development Supply 19262 Const. of 2CL, 2 Storey Bldg., @
Matina Aplaya E/S, Matina XI 1.440 O 0.382 0.300 0.100 0.030 0.064 0.100 97.60 -
Megila Construction and Development Supply 19262 Const. of MPB @ Leon Garcia
NHS XI 1.406 C 0.348 0.300 0.300 - - - 94.80 87.10% V. Satisfactory
Megila Construction and Development Supply 19262 PSHS SMC Perimeter Fence DOST 975.931 C 0.371 0.300 0.000 - - - 67.10 67.10%
Fair
Mel-Jean Const. Corp./ C.S. Rayos Const. & General
ServicesJV-04-004
Const. impv't. of Ternate-Nasugbu Road, Papaya-Hamilo
SectionIV-A 28.923 C 0.381 0.200 0.300 - - - 88.10 88.40%
V. Satisfactory
Mel-Jean Construction Corp. (Formerly: Mel-Jean
Enterprises)16344 Const. of Balintawak Barangay
Hall IVA 1.432 C 0.435 - 0.500 - - - 93.50 *93.50% Outstanding
Mel-Jean Construction Corporation 16344 Conc. & Const. of Bridge at So.
Matuod-Inilahan Road IV-A 9.638 C 0.336 0.200 0.300 - - - 83.60 76.40% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 278
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mel-Jean Construction Corporation 16344
Const. of 2 Storey RGR Type School Bldg., @ Don Juan
Pastor Memorial National H/S, Brgy. Talaibon
IV-A 8.596 O 0.356 0.205 0.100 0.030 0.023 0.067 78.10 -
Mel-Jean Construction Corporation 16344
Const. of 2 Storey RGR Type School Bldg., @ Don Leon
Memorial National H/S, Brgy. Mabalanoy
IV-A 8.506 O 0.364 0.235 0.100 0.030 0.023 0.067 81.90 -
Mel-Jean Construction Corporation 16344
Impvt./Upgrading of Sablayan-Penal Colony Road, Tabtaban
SectionIVB 9.630 O 0.284 0.239 0.100 0.030 0.043 0.067 76.30 -
Mel-Jean Construction Corporation 16344 Rehab. of Rosario-San Juan
Road IV-A 9.618 C 0.279 0.200 0.300 - - - 77.90 80.84% V. Satisfactory
Mel-Jean Construction Corporation 16344
Rehab./Reconst. of Damaged National Roads, Batangas-Lobo
Road, Bacao SectionIV-A 19.298 O 0.303 0.300 0.100 0.030 0.028 0.100 86.10 -
Melrobe Builders & Const. Supplies 29752
Const. of 1 Cl. Mod. FFCCCII Type Bldg. SB-06 Banaybanay,
Dinagsaan E/SXI 0.385 C 0.378 0.300 0.300 - - - 97.80 *97.80%
Outstanding
Melrobe Builders & Const. Supplies 29752 Const. of MPB @ Brgy.
Pintatagan XI 1.416 C 0.308 0.200 0.300 - - - 80.80 88.50% V. Satisfactory
Melrobe Builders & Const. Supplies 29752 Const. of MPB CES and Sigaboy
AVHS, Brgy. Poblacion Sigaboy XI 1.813 C 0.368 0.100 0.300 - - - 76.80 79.04% Satisfactory
Melrobe Builders & Const. Supplies 29752 Const. of MPB CES under
Package 1A, Brgy. Central XI 2.143 O 0.396 0.098 0.100 0.030 0.023 0.050 69.70 -
Melrobe Builders & Const. Supplies 29752 Const. of San Isidro MPB (Phase
II) XI 1.889 O 0.337 0.240 0.100 0.020 0.038 0.100 83.50 -
Melrobe Builders & Const. Supply 29752 Package IV, Const. of MPB,
Brgy. Corporacion XI 2.786 C 0.396 0.231 0.300 - - - 92.70 85.49% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 279
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Melrobe Builders & Const. Supply 29752 Const. of Caganganan Multi-
Purpose Building XI 1.605 C 0.375 0.300 0.300 - - - 97.50 94.35% Outstanding
Mel's Construction and Concrete Products 32212 Rehab. of Gonzalo St. CAR 0.273 C 0.295 0.200 0.300 - - - 79.50 *79.50%
Satisfactory
Meltech Construction 14551 Const. of Two (2) Storey, 2 CL Sch. Bldg. III 1.896 C 0.287 0.200 0.300 - - - 78.70 *78.70%
Satisfactory
Menjer Construction 22815 Construction of Perimeter Fence DOST 8.853 O 0.349 0.242 0.150 0.018 0.025 0.033 81.70 -
MEP Construction 18759 Completion of Baguio Health Center CAR 1.904 C 0.472 - 0.500 - - - 97.20 *97.20%
OutstandingMercado Concrete
Products 4898 Asphalting of Road @ Brgy. Ermita VII 1.156 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. SatisfactoryMercado Concrete
Products 4898 Const. of Lilingayon Elementary School X 0.422 C 0.377 0.235 0.300 - - - 91.20 *91.20%
Outstanding
Mercado Concrete Products 4898 Const. of Multi-Purpose Building X 0.471 C 0.355 - 0.500 - - - 85.50 *85.50%
V. Satisfactory
Mercedita Benasas General Mdse. 31745
Completion/Conc. of Capt. Cario Road with Slope Protection &
Lined CanalIV-B 0.956 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Mercedita Benasas General Mdse. 31745
Conc. of Sablayan-Sta. Cruz Road, Cabacungan-Pag-asa
SectionIV-B 9.554 C 0.358 0.200 0.300 - - - 85.80 63.42%
Fair
Mercedita Benasas General Mdse. 31745 Concreting Brgy. Crlo Brgy.
Road IV-B 1.862 O 0.344 0.200 0.100 0.030 0.022 0.100 79.60 -
Mercedita Benasas General Mdse. 31745 Repair / Reconst. of Pinamanaan
Flood Control IV-B 7.719 C 0.288 0.285 0.300 - - - 87.30 82.38% V. Satisfactory
Mesgo Construction 30677 Const. of Flood Control & Access Road Land Fill X 0.944 C 0.341 0.300 0.300 - - - 94.10 88.82%
V. Satisfactory
Mesgo Construction 30677 Repair of MPB VII 0.479 C 0.229 0.300 0.300 - - - 82.90 *82.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 280
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Meta Construction 28882 Repair/Rehab. of Ipil Bridge @ Daang Maharlika II 0.725 C 0.284 0.123 0.300 - - - 70.70 *70.70%
Satisfactory
Meta Construction 28882Repair/Rehab. of Lined Canal along Jct. Ipil-Quirino Bdry.
RoadII 0.501 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
Meta Construction 28882 Repair/Rehab. of Sch. Bldg. @ Baptists E/S II 0.287 C 0.265 0.200 0.300 - - - 76.50 *76.50%
Satisfactory
Meta Construction 28882Repair/Rehab. of Scoured
Shoulders along Jct.Ipil-Panang-Quirino Bdry. Road, Dappig
II 0.257 C 0.214 0.223 0.300 - - - 73.70 *73.70% Satisfactory
Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. NCR 4.789 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. @
San Vicente E/S NCR 3.829 C 0.276 0.200 0.300 - - - 77.60 *77.60% Satisfactory
MGBJ Rising Construction & Land Developer 18656 Conc. of Brgy. Road @ Brgy.
Poblacion XII 1.228 C 0.308 0.190 0.300 - - - 79.80 *79.80% Satisfactory
MGBJ Rising Construction & Land Developer 18656 Conc. of Road Network at PNP
Office 12 Command XII 2.376 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
MGBJ Rising Construction & Land Developer 18656
Concreting of Additional 2 Lanes along Marbel-Tupi-Makar Rd.
Upper Tupi Sect.XII 2.320 C 0.452 - 0.500 - - - 95.20 95.20%
Outstanding
MGBJ Rising Construction & Land Developer 18656 Const. of Lined Canal Bololmala XII 0.912 C 0.473 - 0.500 - - - 97.30 47.30%
Poor
MGBJ Rising Construction & Land Developer 18656 Impv't. of Drainage along Digos-
Makar Road, Lagao Section XII 0.695 C 0.313 0.207 0.300 - - - 82.00 84.94% V. Satisfactory
MGDJ Construction 29352 Const. of MPB @ Brgy. Quezon IV-A 1.444 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 281
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
MGDJ Construction 29352 Const. of MPB @ Brgy. Rizal IV-A 1.433 C 0.361 0.203 0.300 - - - 86.40 *86.40% V. Satisfactory
MGDJ Construction 29352 Const. of Multi-Purpose Bldg. At Brgy. 1 IV-A 0.957 C 0.451 - 0.500 - - - 95.10 95.10%
Outstanding
MGDJ Construction 29352 Const. of Multi-Purpose Building IV-A 1.340 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory
MGDJ Construction 29352 Impvt. of Brgy. MPB @ Pob. 3 IV-A 0.191 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding
MGDJ Construction 29352 Impvt. of MPB, Tanauan School of Fisheries IV-A 0.192 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
MGDJ Construction 29352 Rehab. of Batangas-Lobo Road (Revetment) IV-A 0.964 C 0.257 0.296 0.300 - - - 85.30 86.68%
V. Satisfactory
Micah Construction and Supply 26625 Const. of Multi-Purpose Bldg., at
Brgy. Sasa XI 0.942 C 0.393 - 0.500 - - - 89.30 89.34% V. Satisfactory
Micah Construction and Supply 26625 Package IV-Const. of 2-Cl, 2-Cl
SB @ Tugbok SPED XI 0.617 O 0.381 0.253 0.100 0.030 0.042 0.100 90.60 -
Michelle Const. Corp. 22204 Bobon, Seawall VIII 0.609 C 0.333 - 0.500 - - - 83.30 83.30% V. Satisfactory
Midnorth Luzon Construction and
Development Corp.31783 Const. of 2 Cl @ Maba-ay NHS
Bldg. (Lesseb Annex) CAR 0.716 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Milestone 888 Construction, Inc. 31224 Conc. of Domingo Municipal St. II 0.472 C 0.293 0.218 0.300 - - - 81.10 76.18%
Satisfactory
Min Construction 14656 Conc. Const. of Gil Sanchez Lumbuyan FMR IX 1.854 C 0.354 - 0.500 - - - 85.40 75.44%
Satisfactory
Min Construction 14656Conc. of Liloy-Siocon Road (Labason Proper-Osukan
Section)IX 19.130 C 0.375 0.191 0.300 - - - 86.60 84.74%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 282
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Min Construction 14656 Conc. of Liloy-Siocon Road with RCBC, Patawag Section IX 11.456 C 0.357 0.137 0.300 - - - 79.40 82.40%
V. Satisfactory
Min Construction 14656Const. of Drainage System along
Labason Seawall including Impv't. of existing Canal
IX 0.776 C 0.402 - 0.500 - - - 90.20 89.30% V. Satisfactory
Min Construction 14656Const. of Liloy-Siocon Road inc.
RCBC Dansalan-Labason Poblacion By-Pass Road
IX 19.130 O 0.251 0.238 0.100 0.030 0.025 0.067 71.10 -
Min Construction 14656 Const. of MPB (Tribal Hall) IX 0.925 C 0.268 0.182 0.300 - - - 75.00 80.46% V.Satisfactory
Min Construction 14656 Const. of Tribal Hall at Poblacion IX 0.943 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Min Construction 14656 Impvt. of Imelda-Alicia Nat'l Road IX 9.628 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Min Construction 14656Impvt./Conc. Paving of Imelda-
Alicia Road (Phase III) Guintolan-Lutiman Section
IX 34.360 O 0.344 0.217 0.100 0.030 0.050 0.100 84.10 -
Min Construction 14656Impvt./Conc. Paving of Imelda-
Alicia Road (Phase III) Guintolan-Lutiman Section
IX 33.460 O 0.326 0.055 0.100 0.030 0.048 0.067 62.60 -
Min Construction 14656Impvt./Conc. Paving of Imelda-
Alicia Road (Phase III) Guintolan-Lutiman Section
IX 33.460 O 0.308 0.240 0.100 0.030 0.042 0.100 82.00 -
Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road, Lutiman Section IX 17.000 O 0.400 0.300 0.070 0.030 0.037 0.100 93.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 283
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Min Construction 14656Impvt./Conc. Paving of Siocon-
Sirawai Road, Brilliantes-Pangian Section
IX 23.971 C 0.320 0.119 0.300 - - - 73.90 81.16% V. Satisfactory
Min Construction 14656Proposed Conc. of Liloy,
Zamboanga del Norte-Ipil, Phase II
IX 14.309 O 0.359 0.240 0.070 0.030 0.035 0.067 80.10 -
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) IX 19.125 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) IX 19.125 O 0.327 0.239 0.100 0.030 0.025 0.067 78.80 -
Min Construction 14656Proposed Concreting of Liloy-Labason Road (Malintuboan
Section)IX 4.631 C 0.481 - 0.500 - - - 98.10 89.58%
V. Satisfactory
Mindanao Rock 23479 Completion of Farmers Training Center (ABC Gym Phase X) X 0.959 C 0.408 - 0.500 - - - 90.80 91.64%
Outstanding
Mindanao Rock 23479 Const. of Flood Control Taguima X 0.479 C 0.404 - 0.500 - - - 90.40 89.50% V. Satisfactory
Mindanao Rock 23479 Const. of Migpangi Road (Extension) X 1.048 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
Mindanao Rock 23479Const. of Multi-Purpose Hall
(Jimenez Socio-Cultural Auditorium, Phase XII)
X 1.873 C 0.333 - 0.500 - - - 83.30 76.65% Satisfactory
Mindanao Rock 23479 Const. of Phase III Multi-Purpose Building X 1.423 C 0.286 0.300 0.000 - - - 58.60 75.54%
Satisfactory
Mindanao Rock 23479Impvt. of Ozamis-Oroquieta
Road, Lapasan-Clarin-Tudela Section
X 2.892 O 0.327 0.240 0.100 0.030 0.030 0.100 82.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 284
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Mindanao Rock 23479 Rehab. of Slip Section along CDO-Airport Road X 7.473 C 0.334 0.300 0.300 - - - 93.40 89.32%
V. Satisfactory
Minrock Multi-Builders 15845 Conc. of Road at Bishop Smith Ave., Rosary Heights 11 XII 0.940 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. Satisfactory
Minrock Multi-Builders 15845Const. of College School
Building Cotabato City State Polytechnic College (CCSPC)
XII 1.904 C 0.313 0.274 0.300 - - - 88.70 85.55% V. Satisfactory
Minrock Multi-Builders 15845 Const. of MPB @ Kimpo E/S, Rosary Heights 13 XII 1.896 C 0.362 0.181 0.300 - - - 84.30 79.05%
Satisfactory
Miracle Builders 28502
Impvt./Rehab. of Daang Maharlika along Calbayog-Allen Road, km. 723+700 - km. 729+700
with exceptions
VIII 4.823 C 0.361 0.200 0.300 - - - 86.10 *86.10% V. Satisfactory
Miracle Builders 28502 Rehab. of Road @ Patiis Brgy. Malanday IV-A 1.922 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Miracle Builders 28502Repair/Rehab. of H.E. Bldg. &
Comfort Room @ E. Rodriguez E/S
NCR 0.475 C 0.330 0.235 0.300 - - - 86.50 *86.50% V. Satisfactory
Mivico Builders and Developers 20551 Const. of Gymnasium (Multi-
Purpose Hall) III 1.058 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding
MJB Const. & Trading Corp. 15059 Const. of Drainage System Brgy.
Ninoy Aquino III 1.652 C 0.390 - 0.500 - - - 89.00 89.00% V. Satisfactory
MJB Const. & Trading Corp. 15059
CP-II Const./Repair/Rehab. of Brgy. Road @ Various Brgy. In
San FranciscoIII 0.473 C 0.388 - 0.500 - - - 88.80 88.80%
V. Satisfactory
MJF Neulid Enterprises 29107 Concreting of Shoulder, Manlurip-McArthur Road VIII 1.771 C 0.455 - 0.500 - - - 95.50 95.50%
Outstanding
MJR Construction 18794 Const. of Road, Barangay Poblacion II 0.948 C 0.347 0.300 0.300 - - - 94.70 88.10%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 285
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
MKM Marketing 15586 Impvt. of Viray-Depalo River Control Project I 2.893 C 0.367 - 0.500 - - - 86.70 *86.70%
V.Satisfactory
ML Patawaran Trading & Const. 28869 Rehab. of Barangay Road III 0.475 C 0.385 - 0.500 - - - 88.50 88.50%
V. Satisfactory
MN Revelo Construction 24789 Conc. of FMR at Brgy Dansulao IX 0.947 C 0.434 - 0.500 - - - 93.40 93.40% Outstanding
MN Revelo Construction 24789
Impvt./Conc. Paving of Usugan Bridge Approach along
Zamboanga City-Pagadian-Misamis Occidental Road
IX 1.858 C 0.268 0.205 0.300 - - - 77.30 85.10% V. Satisfactory
MN Revelo Construction 24789 Rehab. of Roads (5 Clustered Roads) IX 4.099 O 0.400 0.300 0.100 0.022 0.037 0.100 95.90 -
MNG Builders & Dev't. Corporation (Formerly MNG
Builders)16098 Const. of Doña Carmen Denia
NHS Multi-Purpose Hall XI 2.023 C 0.394 - 0.500 - - - 89.40 89.96% V. Satisfactory
Molina's General Builder 14845 Const. of FMR Brgy. Pook-Linga Road IV-A 0.477 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Molte Aries Construction & Industries 3684 Const. of 2Cl School Building I 0.671 C 0.341 - 0.500 - - - 84.10 *84.10%
V. Satisfactory
Molte Aries Construction & Industries 3684 Const. of Multi-Purpose Building
at Barangay Sevilla I 1.316 O 0.379 0.285 0.100 0.030 0.029 0.100 92.30 -
Molte Aries Construction & Industries 3684
Impvt. (Conc.) of San Fernando-Bagulin Road (Francisco L.
Ortega Highway) I 26.453 C 0.296 0.300 0.300 - - - 89.60 80.26%
V. Satisfactory
Molte Aries Construction & Industries 3684
Upgrading (Conc. Paving) of San Fernando By-Pass Road
ExtensionI 18.821 C 0.307 0.200 0.300 - - - 80.70 83.76%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 286
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Monolithic Const. & Concrete Products, Inc. 5733
Construction of Diversion Work including Supply, Delivery,
Installation and Comissioning of Rubber Dam (Cabilogan-San
Juan CIP)
NIA 46.981 C 0.390 0.180 0.300 - - - 87.00 *87.00% V.Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733
Construction of Diversion Work including Supply, Delivery,
Installation and Comissioning of Rubber Dam (South Quinale CIS)
NIA 68.027 - 0.389 0.200 0.070 0.030 0.047 0.067 80.30 80.30% V.Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733 South Quinale Communal
Irrigation System NIA-V 68.027 C 0.375 0.263 0.300 - - - 93.80 85.71% V.Satisfactory
Monolithic Construction and Concrete Products, Inc. 5733 Talibon Small Reservoir
Irrigation Project NIA 49.099 O 0.367 0.175 0.100 0.030 0.042 0.200 91.40 -
Monro Construction & Supply Corp. 14084
Conc. Paving of Shoulder along National Rd., @ Brgy.
GuilijunganVI 0.915 C 0.444 - 0.500 - - - 94.40 91.16%
Outstanding
Montaño Construction & Development Corporation 19473 Completion of Multi-Purpose
Building (Phase V) IX 3.734 C 0.450 - 0.500 - - - 95.00 *95.00% Outstanding
Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes
Road (Lebagon Section) IX 16.712 O 0.352 0.300 0.100 0.030 0.043 0.100 92.50 -
Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes
Road (Lebagon Section) IX 16.712 O 0.298 0.240 0.100 0.030 0.037 0.100 80.50 -
Montaño Construction & Development Corporation 19473
Const. of De Venta Perla Bridge & App. (Phase I) along Dipolog-Sergio Osmeña-Pagadian City
Road
IX 28.395 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 287
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Montaño Construction & Development Corporation 19473 Const. of Dilawa Bridge &
Approaches IX 17.394 C 0.293 0.283 0.300 - - - 87.60 85.47% V. Satisfactory
Montaño Construction & Development Corporation 19473
Impv't. & Const. of Roadside Protection Structure along Dipolog-Punta-Dansullan
IX 3.945 C 0.369 - 0.500 - - - 86.90 83.00% V. Satisfactory
Montaño Construction & Development Corporation 19473
Impvt./Conc. Paving of Dipolog-Punta-Dansullan Sergio Osmeña
Nat'l Road (Macleodes-Dilawa Sect.)
IX 18.788 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding
Monte Construction & Supply 19474
Conc. of Danguilan St., @ Brgy. Osmeña Solano, Nueva Vizcaya
Brgy. OsmeñaII 0.270 C 0.459 - 0.500 - - - 95.90 95.90%
Outstanding
Monte Construction & Supply 19474 Const. of Calitlitan MPB II 0.284 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V. Satisfactory
Monte Construction & Supply 19474
Rehab. of Maddiangat Bridge Piers and Bank Protection, along
Bambang-Kasibu-Quezon-Solano Road
II 4.765 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory
Monte Construction & Supply 19474
Rehab. of Papaya-Malabing-Wangal-Binugawan-Tadji-
Runruno Road (Kinalabasa Section)
II 1.755 C 0.321 0.200 0.300 - - - 82.10 *82.10% V. Satisfactory
Monterey Builders 11103 Const. of Seawall with Wave Deflector, Brgy. Melgar A IV-B 0.948 C 0.333 - 0.500 - - - 83.30 74.72%
Satisfactory
Montphil Construction Corporation 24285
Conc. of Marleodes-Dilawa Section along Dipolog Punta-
Dansullan Sergio Osmeña National Road
IX 3.806 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 288
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Montphil Construction Corporation 24285
Concrete Paving of Dipolog-Polanco-Macleodes National
RoadIX 0.915 C 0.381 0.300 0.300 - - - 98.10 *98.10%
Outstanding
Montphil Construction Corporation 24285 Concreting of Brgy. Dionum
FMR IX 0.458 C 0.433 - 0.500 - - - 93.30 93.30% Outstanding
Montphil Construction Corporation 24285 Const. of MPB @ Brgy. Silano IX 0.070 C 0.270 0.201 0.300 - - - 77.10 *77.10%
Satisfactory
Montphil Construction Corporation 24285
Const. of One (1) Unit 1 CL Modified Sch. Bldg. @ San Pedro
E/SIX 0.433 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Montphil Construction Corporation 24285
Const. of Slope Protection Structure along Dipolog-Potanco-
Pinan Jct. Oroquieta Road (Guinles Section)
IX 0.940 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
Montphil Construction Corporation 24285
Const./Completion of Multi-Purpose Bldg., (Mun. Hall Phase
III)IX 0.973 C 0.479 - 0.500 - - - 97.90 92.79%
Outstanding
Montphil Construction Corporation 24285 Const./Extension of MPB
(Municipal Bldg.) IX 0.279 C 0.356 0.145 0.300 - - - 80.10 *80.10% V. Satisfactory
Montphil Construction Corporation 24285
Impvt./Conc. Paving of Dipolog-Punta-Dansullan-Sergio Osmeña
Nat'l Road (Brgy. Dansullan-Macleodes Sect.)
IX 2.788 C 0.366 0.163 0.300 - - - 82.90 83.08% V. Satisfactory
Morning Coffee Builders 29027Const. of Multi-Purpose Building
covered Court Lian Central School
IV-A 0.948 C 0.434 - 0.500 - - - 93.40 93.40% Outstanding
Morning Steel Construction 30698 Completion of Multi-Purpose Bldg., Sitio Diaboyo III 0.281 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Morning Steel Construction 30698 Const. of Flood Control III 0.846 C 0.417 - 0.500 - - - 91.70 *91.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 289
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Morning Steel Construction 30698 Impvt./Conc. of Baler-Casiguran Road, Dibutunan-Ditale Section III 4.660 C 0.325 0.200 0.300 - - - 82.50 84.39%
V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Completion of DPWH Resthouse
(Rehab. of DPWH Field Office) CAR 8.196 O 0.236 0.240 0.100 0.030 0.029 0.100 73.50 -
Mountaineers Engineering & Const. Services 6154 Const. of Benguet NHS-Lubas
Extension CAR 3.606 C 0.344 0.129 0.300 - - - 77.30 81.26% V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Const. of Benguet SPED Center
La Trinidad, Benguet CAR 0.522 C 0.364 - 0.500 - - - 86.40 *86.40% V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Const. of BSU Multi-Purpose
Building (IPA Building) CAR 0.949 C 0.354 - 0.500 - - - 85.40 *85.40% V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Const. of Maslog-Kabilisan FMR CAR 1.972 C 0.174 - 0.500 - - - 67.40 67.40%
Fair
Mountaineers Engineering & Const. Services 6154 Const. of Various School
Building (Labino-Aquiso E/S) CAR 0.671 C 0.324 - 0.500 - - - 82.40 82.89% V. Satisfactory
MP Villegas Construction 16683 Administration Bldg. DOST 6.975 C 0.351 0.275 0.300 - - - 92.60 92.60% Outstanding
MR. Santiago Constraction 27239 Rehabilitation of Lateral G Canal (Sta. 2+380-6+637) NIA-I 5.617 C 0.250 0.300 0.300 - - - 85.00 85.19%
V.Satisfactory
MRB Construction and Supply 17701 Jagna Port Expansion Project PPA 55.085 C 0.400 0.300 0.300 - - - 98.78 98.78%
Outstanding
MRP Merchandising 13656 Concreting of Barangay Road V 0.459 C 0.378 - 0.500 - - - 87.80 *87.80% V. Satisfactory
MRP Merchandising 13656 Concreting of Brgy. Road at Calagbangan to Bocol, Sipocot V 0.917 C 0.382 - 0.500 - - - 88.20 85.14%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 290
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
MRP Merchandising 13656 Const. of MPB at Zone II Brgy. Tara V 0.281 C 0.352 0.184 0.300 - - - 83.60 *83.60%
V. Satisfactory
MSF Construction 25307 Concreting of Various Barangay Road I 0.471 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
MSF Construction 25307 Const. of Multi-Purpose Building Phase I I 2.385 C 0.308 0.200 0.300 - - - 80.80 82.76%
V. Satisfactory
MSF Construction 25307 Impvt./Rehab. of Farm to Market Road @ Brgy. Suba & Monte I 0.940 C 0.325 0.300 0.300 - - - 92.50 *92.50%
Outstanding
Mt. Guiting-Guiting Construction 17412 Repair/Maintenance of Agnipa
River Control IV-B 0.277 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Muaña Construction 9354 Const. of 1 unit, 4 Storey, 20 CL Mambaling E/S Bldg. VII 13.360 C 0.370 0.216 0.000 - - - 58.60 72.18%
Satisfactory
Muaña Construction 9354 Const. of Multi-Purpose Bldg., U.P.-Cebu High School Dept. VII 1.904 C 0.447 - 0.500 - - - 94.70 87.63%
V. Satisfactory
Mulaña Construction 30708Conc. of Toledo-Tabuelan-San
Remegio Road (Antonio Y De Pio Highway)
VII 7.606 C 0.323 0.169 0.300 - - - 79.20 *79.20% Satisfactory
Mulaña Construction 30708 Const. of Foot Bridge @ Sitio Napo, Sapangdaku VII 0.956 C 0.410 - 0.500 - - - 91.00 83.62%
V. Satisfactory
Mulaña Construction 30708 Const. of Multi-Purpose Bldg. @ Poblacion VII 0.472 C 0.293 0.300 0.300 - - - 89.30 84.19%
V. Satisfactory
Mulaña Construction 30708 Const. of Multi-Purpose Bldg., Labangon-Bliss VII 0.669 C 0.316 - 0.500 - - - 81.60 79.08%
Satisfactory
Must Enterprises 13336 Const. of MPB at Brgy. Rajahmuda XII 0.285 C 0.321 0.200 0.300 - - - 82.10 *82.10%
V.Satisfactory
Must Enterprises 13336Const. of Slope Protection
Works along Dualing-New Panay-Midsayap Road, Arizona Section
XII 3.303 C 0.377 0.200 0.300 - - - 87.70 87.28% V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 291
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
MV Confirm Construction & Development, Inc. 32469 Const. of MPB IV-A 3.858 C 0.364 0.256 0.300 - - - 92.00 84.65%
V. Satisfactory
MVVK Construction and Trading 25721 Const. of Multi-Purpose Bldg.
Brgy. Tuyom VI 0.470 C 0.395 - 0.500 - - - 89.50 89.50% V. Satisfactory
MWJ Construction 14882 Conc. of La Paz, Javier-Bito Road VIII 9.445 C 0.325 0.173 0.300 - - - 79.80 83.58%
V. Satisfactory
MWJ Construction 14882 Concrete Paving of La-Paz-Burauen Rd., Brgy. Sta. Elena VIII 2.848 C 0.415 - 0.500 - - - 91.50 87.00%
V. Satisfactory
MWJ Construction 14882 Const. of Guingauan Flood Control VIII 0.960 C 0.347 0.200 0.300 - - - 84.70 88.18%
V. Satisfactory
MWJ Construction 14882 Rehab./Impvt. of National Arterial & Secondary Roads Public Infra VIII 0.979 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
MWJ Construction 14882 Road Concreting at Brgy. San Isidro VIII 0.188 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
MWJ Construction 14882 Road Concreting of Burauen-La Paz Road VIII 0.939 C 0.308 0.300 0.300 - - - 90.80 *90.80%
Outstanding
MY Builders and Construction 22687 Const. of Multi-Purpose Bldg., @
Canaoay Community School I 0.939 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory
N & N Construction Corporation 30716
Const. of Geotextile Soil Reinforcement and
Repair/RehabIV-A 6.450 C 0.384 - 0.500 - - - 88.40 88.40%
V. Satisfactory
N & N Construction Corporation 30716
Impvt. of Catbalogan Drainage inc. Estero & Portion of Antiao
RiverVIII 8.822 O 0.335 0.160 0.100 0.020 0.040 0.200 85.50 -
N.B. Avila Construction 13751Concreting of Pantihan Rd., &
Const. of Multi-Purpose Pavement
IV-A 2.293 C 0.404 - 0.500 - - - 90.40 90.40% Outstanding
N.B. Avila Construction 13751 Const. of Macanda Bridge, Brgy. Kaytapos IV-A 0.477 C 0.258 0.300 0.300 - - - 85.80 *85.80%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 292
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
N.B. Avila Construction 13751 Const. of MPB IV-A 1.236 C 0.370 0.263 0.300 - - - 93.30 *93.30% Outstanding
N.B. Avila Construction 13751 Const. of One Classroom School Building, Bulihan E/S IV-A 0.475 C 0.396 - 0.500 - - - 89.60 *89.60%
V. Satisfactory
N.B. Avila Construction 13751 Const. of Secondary Sch. Bldg., Malabang NHS IV-A 1.283 C 0.338 0.250 0.300 - - - 88.80 *88.80%
V. Satisfactory
N.B. Avila Construction 13751 Riprapping of Kay Alaman River @ Brgy. Gomez-Zamora IV-A 0.855 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
N.B. Garcia Construction 30983 Concreting of Poblacion Magsaysay FMR IV-B 0.478 C 0.414 - 0.500 - - - 91.40 91.40%
Outstanding
N.B. Garcia Construction 30983 Const. of 2 CL S/B Victoria NHS, Selina Annex IV-B 0.980 C 0.302 0.200 0.300 - - - 80.20 81.74%
V. Satisfactory
N.B. Garcia Construction 30983 Const. of San Jose National High School IV-B 0.952 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
N.B. Garcia Construction 30983Rehab. of Various Brgy. Rd., San Jose Area, Package IV (Conc. of
Baula Brgy. Rd.) Pag-asaIV-B 0.283 C 0.347 0.300 0.300 - - - 94.70 84.98%
V. Satisfactory
N.B. Salbo Construction 6091 Const. of MPB @ Cristino M. Paragas E/S IX 2.341 C 0.306 0.300 0.300 - - - 90.60 60.64%
Fair
N.B. Salbo Construction 6091 Const. of Poblacion El Salvador Flood Control X 9.462 C 0.384 0.300 0.000 - - - 68.40 73.44%
Satisfactory
N.B. Salbo Construction 6091
Rehab. / Reconst. of Damaged Road Sections along Linamon-
Zamboanga Road (Taguitic Section)
X 19.212 O 0.251 0.300 0.100 0.024 0.045 0.100 82.00 -
N.B. Salbo Construction 6091 Conc. of Golden Shower St. X 0.942 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory
N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control X 9.462 O 0.281 0.200 0.050 0.030 0.037 0.200 79.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 293
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control X 9.462 O 0.337 0.200 0.000 0.030 0.038 0.133 73.80 -
N.F. Yamat Construction 5401 Rehab. of MPB @ Brgy. 72, Zone 6 NCR 0.420 C 0.299 0.300 0.300 - - - 89.90 80.73%
V. Satisfactory
N.K. Enterprise 29292Concreting of Various Road Segments along Anini-y-T
Fornier-Hamtic Road SectionVI 0.964 C 0.293 0.132 0.300 - - - 72.50 74.36%
Satisfactory
N.M. Parafina Builders Inc., (Formerly N.M. Parafina
Builders)11505 Const. of 1 Cl @ Pamantasang
Bayan, PUP IV-A 0.383 C 0.342 0.268 0.300 - - - 91.00 *91.00% Outstanding
N.M. Parafina Builders Inc., (Formerly N.M. Parafina
Builders)11505 Const. of One (1) Classroom
School Bldg. Atimonan Nat'l, H/S IV-A 0.377 C 0.448 - 0.500 - - - 94.80 94.80% Outstanding
N.M. Parafina Builders Inc., (Formerly N.M. Parafina
Builders)11505 Const./Impv't. of FTMR, Brgy.
Duhat IV-A 0.941 C 0.362 - 0.500 - - - 86.20 *86.20% V. Satisfactory
N.M. Parafina Builders Inc., (Formerly N.M. Parafina
Builders)11505
Repair/Const. of Multi-Purpose Pavemnet @ Purok Ilaya Brgy.
TagbakinIV-A 0.940 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
N.M.E. Construction 22984a)Rep./Rehab. of H.E.Bldg. @
E.Delos Santos E/S b) Const. of Add'l. CL @ AA Quezon E/S
NCR 2.419 C 0.375 - 0.500 - - - 87.50 77.04% Satisfactory
N.M.E. Construction 22984 Completion of MPB @ Brgy. 589 NCR 1.443 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
N.M.E. Construction 22984 Const. of Multi-Purpose Gymnasium IV-A 2.387 C 0.452 - 0.500 - - - 95.20 95.20%
Outstanding
N.M.E. Construction 22984 Proposed Const. of MPB at Brgy. 838 NCR 0.767 C 0.365 0.200 0.300 - - - 86.50 *86.50%
V. Satisfactory
N.M.E. Construction 22984 Proposed Rehab. of Syquia St. District VI NCR 9.584 C 0.257 0.300 0.300 - - - 85.70 *85.70%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 294
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
N.M.E. Construction 22984Proposed Repair/Rehab. of
Roads & Alleys and vicinities @ Brgy. 818
NCR 0.962 C 0.279 0.200 0.300 - - - 77.90 *77.90% Satisfactory
N.M.E. Construction 22984 Rehab. of Jct. Layac-Balanga-Mariveles Port Road (Pilar Sect.) III 2.880 C 0.329 0.211 0.300 - - - 84.00 *84.00%
V. Satisfactory
N.M.E. Construction 22984 Repair/Rehab. Along Railroad Street (Phase II) NCR 2.881 C 0.181 0.300 0.300 - - - 78.10 *78.10%
Satisfactory
N.M.E. Construction 22984 Repair/Rehab. of MPB at Brgy. 889 NCR 1.419 C 0.323 0.200 0.300 - - - 82.30 87.20%
V. Satisfactory
N.M.E. Construction 22984Renovation of Hostel Main
Lobby and Addition of Waiting Lounge
PUP 2.296 C 0.385 0.300 0.300 - - - 98.50 98.50% Outstanding
N.P. Uy Builders 16551 Const. of Malajog Shoreline Protection (Phase I) Bry. Malajog VIII 1.420 C 0.395 - 0.500 - - - 89.50 89.50%
V. Satisfactory
N.S. Construction and Supply 23203 Const. of Slope Protection along
Naguilian Bridge, Dallipaoen I 1.927 C 0.274 0.226 0.300 - - - 80.00 71.63% Satisfactory
N.T. Tulabut Construction and Supply 15846 Const. of MPB III 1.902 C 0.379 0.200 0.300 - - - 87.90 *87.90%
V.Staisfactory
N.T. Tulabut Construction and Supply 15846
Const. of MPB @ Brgy. San Vicente, Pilot Sch. For Phil.
Craftsment, Bulaon Resettlement
III 3.611 C 0.257 0.200 0.300 - - - 75.70 *75.70% Satisfactory
N.V. Balbuena Construction 12055 Const. of Gabon-Hacienda FMR III 2.805 C 0.330 - 0.500 - - - 83.00 61.10% Fair
N.V. Balbuena Construction 12055 Const. of One (1) Classroom School Marina Bay E/S III 0.438 C 0.350 0.240 0.300 - - - 89.00 *89.00%
V.Staisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 295
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
N.V. Balbuena Construction 12055 Repair of Gapan-San Fernando-Olongapo Road III 0.961 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V.Staisfactory
N-22 Construction & Trading 25254 Const. of Drainage Canal at San
Vicente III 0.477 C 0.350 0.200 0.300 - - - 85.00 *85.00% V.Staisfactory
N-22 Construction & Trading 25254 Const./Conc./Repair/Completion
of San Nicolas Brgy. Road III 0.474 C 0.321 0.200 0.300 - - - 82.10 *82.10% V.Staisfactory
N-22 Construction & Trading 25254 Const./Conc./Repair/Completion
of Sapa Brgy. Road III 2.567 C 0.346 0.300 0.300 - - - 94.60 *94.60% Outstanding
N-22 Construction & Trading 25254 Const./Impv't. of Amedo Dike
Slope Protection San Simon III 0.950 C 0.477 0.500 - - - 97.70 97.70% Outstanding
N-22 Construction & Trading 25254 Const./Rehab./Completion of
Sampaloc Brgy. Road III 0.477 C 0.348 - 0.500 - - - 84.80 84.80% V. Satisfactory
N-22 Construction & Trading 25254 Impvt. of Minalin-Sto. Tomas
Road III 4.744 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding
Naga E.S. Construction and Supply 6593 Const. of Multi-Purpose Building V 0.938 C 0.362 0.300 0.300 - - - 96.20 93.61%
Outstanding
Naga E.S. Construction and Supply 6593 Road Concreting at Camanaba
Road V 1.891 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
Nale Construction 18552 Const. of Elementary Sch. Bldgs. At Pio Macahig ME/S VII 0.750 C 0.319 0.254 0.300 - - - 87.30 87.09%
V.Satisfactory
Nale Construction 18552 Repair/Rehab./Widening/Regravelling of FMR, Cantabon-Luzong VII 0.697 C 0.400 0.100 0.300 - - - 80.00 85.88%
V.Satisfactory
NBL Construction 30396 Asphalt Overlay of Bauan-Mabini Road, Bagalangit Solo Sect. IV-A 9.996 C 0.284 0.300 0.300 - - - 88.40 *88.40%
V. Satisfactory
NBL Construction 30396 Conc. of FMR @ Brgy. Dao IV-A 1.888 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
NBL Construction 30396 Conc. of Palico-Cadre Road IV-A 7.497 C 0.308 0.290 0.300 - - - 89.80 *89.80% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 296
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
NBL Construction 30396Conc./Const./Rehab. of Bauan-Mabini Circ. Road, Malimotoc I
SectionIV-A 19.295 O 0.292 0.300 0.100 0.030 0.030 0.100 85.20 -
NBL Construction 30396 Const. of Bauan-Mabini Circ. Road IV-A 11.571 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
NBL Construction 30396 Const. of Gasang Seawall, Phase II IV-A 3.134 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Satisfactory
NBL Construction 30396Widening/Conc. of BauanMabini Circ. Road, San Teodoro-Mainit
Section, Phase IIV-A 19.289 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
Nescon Builders 24751 Const. of Multi-Purpose Building (Const. of Veterans Bldg.) VI 1.443 C 0.308 0.279 0.000 - - - 58.70 67.38%
Fair
Nessan Builders 25142 Const. of 2 Cl Bldg. @ Navaling P/S III 0.536 C 0.282 0.300 0.300 - - - 88.20 *88.20%
V. Satisfactory
Nessan Builders 25142 Const./Repair/Rehab/ of Brgy/ Roads, Brgy. Dau III 1.877 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
Nessan Builders 25142 Package XIV-Const.of Multi-Purpose Covered Court III 1.403 C 0.222 - 0.500 - - - 72.20 72.20%
Satisfactory
Nes-san Builders 25142 Asphalt Overlay along Arayat-Magalang-Mabalacat Road III 4.763 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Nes-San Builders 25142Constn. of Drainage System
Along Don Juico & Don Meliton Aves.
III 9.770 O 0.349 0.300 0.300 - - - 94.91 93.38% Outstanding
Nestor D. Mercado Construction 18658 Conc./Repair Calanipawan Rd. VIII 1.873 C 0.350 - 0.500 - - - 85.00 85.00%
V. Satisfactory
New Arcond Builders Inc. 9614 Const. of UP National Institute of Physics Bldg. NCR 4.716 C 0.353 0.200 0.300 - - - 85.30 84.74%
V.Statisfactory
New Arcond Builders Inc. 9614 Impvt./Conc. Blocking along C.P. Garcia St. NCR 14.234 C 0.357 0.300 0.300 - - - 95.70 92.25%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 297
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
New Arcond Builders Inc. (Formerly Arcond Builders) 9614
Concrete Blocking along Edsa, Quezon City (Km. 10+687-Km.
16+417)NCR 9.555 C 0.403 - 0.500 - - - 90.30 *90.30%
Outstanding
New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Impv't./Rehab. of Quezon
Avenue NCR 4.642 C 0.356 - 0.500 - - - 85.60 85.60% V. Statisfactory
New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Proposed Pedestrian Overpass
Crossing Roxas Blvd. NCR 8.437 C 0.382 0.300 0.300 - - - 98.20 81.79% V.Statisfactory
New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Rehab./Improvement of Reparo
Road NCR 9.434 C 0.350 0.300 0.300 - - - 95.00 94.10% Outstanding
New Big Four J Construction Inc. (Formerly: Four J
Construction)
15104 Widening of Quezon Avenue NCR 21.719 C 0.361 0.200 0.300 - - - 86.10 88.26% V. Satisfactory
New Kanlaon Const., Inc/Markbilt Const./JV 896 Water Impounding/Earth Dam
with Spillway (Dauin Dam) NIA 158.868 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 -
New Kanlaon Construction, Inc. 896 Site Dev't and Construction of 2-
Units 2-Storey School Building PRRC 25.777 O 0.378 0.29 0 0.03 0.062 0.1 86.00 -
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Banus Bridge with Detour Bridge IV-B 9.554 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Casague MPB IV-B 0.864 O 0.329 0.240 0.100 0.030 0.027 0.100 82.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 298
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Seawall at Poblacion I & II Brgy. Mulawin IV-B 4.807 O 0.256 0.200 0.100 0.024 0.042 0.200 82.20 -
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Seawall at Poblacion I & II Brgy. Mulawin IV-B 4.807 C 0.322 0.200 0.300 - - - 82.20 82.20%
V.Satisfactory
New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Concreting of Road @ Brgy.
Bubukal IV-A 0.475 C 0.382 - 0.500 - - - 88.20 88.20% V. Satisfactory
New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Const. of MPB (Annex) IV-A 0.475 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V.Satisfactory
New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Impvt. of FMR at Brgy. Banca-
Banca IV-A 0.480 C 0.347 0.200 0.300 - - - 84.70 *84.70% V.Satisfactory
New San Fabian Builders & Supplies 16348 Const. of 2 CL Sch. Bldg.,
Galintuja P/S III 0.954 C 0.364 0.265 0.300 - - - 92.90 *92.90% Outstanding
New San Fabian Builders & Supplies 16348 Const. of Multi-Purpose Bldg.,
Brgy. Dianawan III 0.663 C 0.396 0.250 0.300 - - - 94.60 *94.60% Outstanding
New TBP Construction & Development Corp. 29155 Const. of Cross Drainage
Structures along MNR I 4.417 O 0.344 0.120 0.100 0.020 0.042 0.133 75.90 -
New TBP Construction & Development Corp. 29155
Const. of Multi-Purpose Building (Covered Court @ Haven for
Woman) Phase INCR 11.546 C 0.352 0.300 0.300 - - - 95.20 91.42%
Outstanding
Newadis Construction 23806 Completion of Lumang Bayan Water System IV-B 0.955 O 0.353 0.300 0.100 0.020 0.013 0.100 88.60 -
Newadis Construction 23806 Completion of the Conc. of Magsaysay-San Jose Road IV-B 9.619 C 0.294 0.300 0.300 - - - 89.40 81.66%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 299
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Newadis Construction 23806 Const. of 2 CL Abra de Ilog NHS IV-B 0.954 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory
Newadis Construction 23806 Const. of Mamburao Seawall, Brgy. 7 IV-B 2.683 O 0.349 0.160 0.100 0.030 0.032 0.200 87.10 -
Newadis Construction 23806 Const. of Pagbahan Flood Control (Phase II) IV-B 2.294 C 0.298 0.300 0.300 - - - 89.80 89.50%
V. Satisfactory
NFH Construction & Supply 16055 Const. of Adiangao Bridge # 2 & Approaches (Phase 1), V 8.396 C 0.392 0.300 0.000 - - - 69.20 76.82%
Satisfactory
NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) V 23.780 O 0.367 0.240 0.100 0.030 0.023 0.100 86.00 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 O 0.339 0.300 0.070 0.020 0.023 0.067 81.90 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 O 0.342 0.300 0.070 0.030 0.028 0.067 83.70 -
NFH Construction & Supply 16055 Const. of Nagas Bridge & Approaches V 15.512 C 0.353 0.200 0.300 - - - 85.30 77.83%
Satisfactory
NFL Builders 12524 Const. of Drainage Canal @ Barangay 17 X 0.474 O 0.253 0.200 0.100 0.015 0.000 0.200 76.80 -
N-Four General Contractor and Supply 19475 Concreting of San Isidro-Iraya
Brgy. Road V 0.275 C 0.394 - 0.500 - - - 89.40 *89.40% V. Satisfactory
N-Four General Contractor and Supply 19475 Const. of 2Cl School Bldg. @
Tanagan E/S V 0.945 C 0.307 0.259 0.300 - - - 86.60 *86.60% V. Satisfactory
N-Four General Contractor and Supply 19475 Impv't./Rehab. of Tanawan River
Control (Part of Cluster I) V 0.459 O 0.233 0.287 0.100 0.015 0.028 0.100 76.30 -
Nippon Steel Corp./Toa Corp. (JV)
SL2-SN/000598
/FC-04-001
Second Magsaysay Bridge & Butuan City By Pass Road PJHL 2,158.802 C 0.366 0.300 0.300 - - - 96.60 94.86%
Outstanding
Nirvana Construction and Supplies 18691 Const. of 2 Cl @ KNCHS XII 0.694 O 0.382 0.180 0.100 0.030 0.038 0.100 83.00 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 300
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Nirvana Construction and Supplies 18691 Const. of 3 CL at Colon NHS
(Ireneo Lopez Annex) XII 1.301 C 0.305 0.248 0.000 - - - 55.30 *55.30% Poor
Nirvana Construction and Supplies 18691 Const. of MPB, Brgy. Zone 4 XII 1.429 O 0.335 0.240 0.100 0.030 0.021 0.100 82.60 -
Nirvana Construction and Supplies 18691 Impvt. of Lake Sebu-Maitum
Road Phase I, Brgy. Takunel XII 14.463 C 0.282 0.300 0.000 - - - 58.20 71.34% Satisfactory
Nishimatsu Construction Company Limited
SLN-SN-000579/FC-
02-036
KAMANAVA Area Flood Control & Drainage System Improvement
ProjectNIA 3,441.588 C 0.332 0.300 0.300 - - - 93.20 92.01%
Outstanding
NMJ Construction & Trading 31017 Const./Impvt. of FMR IX 0.465 C 0.380 0.200 0.300 - - - 88.00 *88.00%
V. Satisfctory
NMJ Construction & Trading 31017 Const./Impvt. of FMR, Canacan-
Sininan IX 0.464 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfctory
NMJ Construction & Trading 31017 Gravelling of Brgy. Del Pilar
Road IX 0.285 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding
Norm Construction 13784 Conc. of Road Brgy. Poblacion DOS VII 0.933 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg.,
Bantayan Elem. Sch. VIII 0.239 C 0.323 0.100 0.300 - - - 72.30 *72.30% Satisfactory
Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg.,
Pambujan Elem. Sch. VIII 0.655 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory
Norsatek Engineering and Construction Supply 26627 Multi-Purpose Pavement under
Cluster CARP-04-D2-01 VIII 0.093 C 0.356 0.244 0.300 - - - 90.00 *90.00% V. Satisfactory
Northern Builders 8789Completion of Ternate-Nasugbu
Road, Looc-Pingkian-Papaya-Hamilo Section
IV-A 24.124 C 0.296 0.300 0.300 - - - 89.60 89.78% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 301
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Northern Builders 8789 Const. (Widening) of Calamba Bridge IVA 63.341 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Northern Builders 8789 Const. of 6-Cl (2-Storey Bldg.) @ Sta. Maria E/S III 3.525 C 0.444 - 0.500 - - - 94.40 85.65%
V. Satisfactory
Northern Builders 8789 Const. of Water Supply System III 9.335 C 0.489 - 0.500 - - - 98.90 94.35% Outstanding
Northern Builders 8789 Const./Repair/Rehab. of Brgy. Road Brgy. Ninoy Aquino III 1.880 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
Northern Builders 8789
Impv't./Widening of Manila North Road (MNR) Package V,
Km.118+700 to Km.119+338.40; Km.124+680 to Km.124+940; Km.129+390 to Km.132+500;
(Tarlac Section)
III 47.288 C 0.386 0.300 0.300 - - - 98.60 89.54% V. Satisfactory
Northern Builders 8789 Impvt./Widening of Manila North Road, Phase III III 93.589 C 0.295 0.300 0.300 - - - 89.50 82.66%
V. Satisfactory
Northern Builders 8789 Pangasinan-Nueva Vizcaya Rd. I 31.182 C 0.445 - 0.500 - - - 94.50 94.50% Outstanding
Northern Builders 8789 Rehab. of San Marcelino-San Narciso Rd. III 47.529 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
Northern Builders 8789 Rehab./Impvt. of MNR & Camp Dau Road III 14.197 C 0.314 0.205 0.300 - - - 81.90 *81.60%
V. Satisfactory
Northern Builders 8789 Rehab./Reconst. of Villa Cerveza Flood Mitigation Project IV-B 55.231 O 0.328 0.160 0.100 0.030 0.032 0.200 85.00 -
Northern Builders 8789 Repair of Angeles-Dinalupihan Road III 6.591 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
Northern Builders 8789 Repair/Rehab. Along Romulo Highway III 9.320 C 0.378 0.205 0.300 - - - 88.30 *88.30%
V. Satisfactory
Northern Builders 8789 Repair/Strengthening of Insular Bilibid Prison Bridge NCR 6.049 C 0.171 0.300 0.300 - - - 77.10 *77.10%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 302
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Northern Builders / ZM Const. (JV) JV-07-685
Impvt./Upgrading/Widening of Jct. Layac-Balanga-Mariveles
Port Rd.III 105.650 O 0.361 0.300 0.100 0.030 0.047 0.100 93.80 -
Northern Builders/DMJ Construction & Supply (JV) JV-06-076
Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Tarlac City-
Sta. Rosa-Fort Magsaysay-Palayan City-Laur-Gabaldon
Road, Section 4, Sta. Rosa Fort Magsaysay
III 128.482 C 0.345 0.300 0.300 - - - 94.50 91.92% Outstanding
Northern Builders/Hanjin (JV) FC-06-007
Completion/Const. of Subic-Cawag-Balaybay Road, Phase II
(Segment 4)III 119.113 C 0.211 0.200 0.300 - - - 71.10 *71.10%
Satisfactory
Northern Cotabato Construction and Supply 15515
Conc. of Banisilan-Guiling-Alamada-Libungan Road (Camansi-Nicaan Section)
XII 4.785 C 0.357 0.200 0.300 - - - 85.70 81.86% V. Satisfactory
Northern Cotabato Construction and Supply 15515
Conc. of Kidapawan-Calunasan-M'lang Road Magsaysay-
Maligaya Sect.XII 5.290 C 0.454 - 0.500 - - - 95.40 92.88%
Outstanding
Northern Cotabato Construction and Supply 15515
Rehabilitation of Grebona Bridge along Banisilan-Guiling-Alamada-
Libungan RoadXII 13.633 C 0.386 0.300 0.300 - - - 98.60 88.34%
V. Satisfactory
Northern Negros Construction & Dev't. 17962 Concreting of Leon Kilat Street VII 1.484 C 0.370 - 0.500 - - - 87.00 67.44%
Fair
Northern Negros Construction & Dev't. 17962 Const. of Calo River Control VII 0.876 C 0.397 - 0.500 - - - 89.70 88.74%
V. Satisfactory
Northpoint Development Corp. 29573 Const. of Footbridge with
Drainage System VII 1.490 C 0.372 - 0.500 - - - 87.20 85.46% V. Satisfactory
Novanne Ventures Construction 22107 Const. of FMR Brgy. Lumpatan-
Lapak-Sumaray Rd. VI 2.886 C 0.378 - 0.500 - - - 87.80 87.80% V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 303
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Novanne Ventures Construction 22107 Cont. of MPB at Brgy. Singcang VI 2.794 C 0.396 0.124 0.300 - - - 82.00 85.57%
V. Satisfactory
Nueva Ecija Construction Company, Inc. 135 Const. of School Building,
Cavite State University IV-A 1.914 C 0.416 - 0.500 - - - 91.60 91.74% Outstanding
Nukaza Trading and Construction 32067
Impvt. of Road with Lined Canal at Summitville Subd., Putatan
ItaasNCR 2.379 C 0.303 0.236 0.300 - - - 83.90 *83.90%
V. Satisfactory
Nulas Builders 32172 Const. of 1 CL Bldg. @ Pulong Bulo PS III 0.379 C 0.331 0.300 0.300 - - - 93.10 89.60%
V. Satisfactory
NVF Construction 13941 Const. of Ponong River Wharf V 0.655 C 0.392 0.165 0.300 - - - 85.70 *85.70% V. Satisfactory
O R C Construction & Supply 17337
Rehab./Impvt. of Road Protection along Daang
Maharlika (Bontal Section)II 0.932 C 0.239 0.225 0.300 - - - 76.40 *76.40%
Satisfactory
O.G. Santos Construction 2050 Conc. of Aurora-Dipolog City Road, Josefina Section IX 13.353 C 0.251 0.201 0.300 - - - 75.20 74.87%
Satisfactory
O.G. Santos Construction 2050
Const. of Line Ext. Canal & Spillway at Various sections of
Newly completed Rehab. of Malalag-Malita-JAS Road
XI 2.878 C 0.274 0.300 0.300 - - - 87.40 87.34% V. Satisfactory
O.G. Santos Construction 2050Impvt./Conc. of By-Pass Road
connecting Panabo Wharf Road and Panabo Coastal Road
XI 13.203 C 0.302 0.200 0.300 - - - 80.20 76.94% Satisfactory
O.L. De Leon Construction 16194 Conc. of Bagong Silang-Capalonga Road V 14.188 C 0.370 0.200 0.300 - - - 87.00 88.62%
V. Satisfactory
O.L. De Leon Construction 16194 Conc. of Talobatib-Jose Pang. Road V 1.881 C 0.234 0.200 0.300 - - - 73.40 80.12%
V. Satisfactory
O.L. De Leon Construction 16194 Concreting of Daet-Mercedes Road V 0.942 C 0.354 - 0.500 - - - 85.40 86.24%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 304
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
O.L. De Leon Construction 16194 Const. of 2 CL S/B P. Ponayo H/S Brgy. Mambelite V 0.719 C 0.351 - 0.500 - - - 85.10 85.10%
V. Satisfactory
O.L. De Leon Construction 16194 Road Opening of Matango-Singi Barangay Road V 4.604 O 0.323 0.230 0.100 0.010 0.028 0.100 79.10 -
O.R. Sarmiento Construction 1411 Conc. of Danao-Getafe Road VII 9.472 C 0.256 0.300 0.300 - - - 85.60 87.92%
V. SatisfactoryO.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-
Sierra-Bullones Road VII 81.102 O 0.387 0.169 0.070 0.030 0.056 0.100 81.20 -
O.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-
Sierra-Bullones Road VII 81.102 O 0.337 0.223 0.000 0.030 0.059 0.100 74.90 -
O.R. Sarmiento Construction 1411
Const. of Spillway - Phase I, Talibon Small Reservoir
Irrigation ProjectNIA-II 8.708 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 86.50%
V. Satisfactory
O.R. Sarmiento Construction 1411
Const./Impvt. (Conc. Paving) of Concepcion, Danao-Buenavista-
Carmen RoadVII 9.592 O 0.355 0.271 0.100 0.030 0.038 0.100 89.40 -
O.R. Sarmiento Construction 1411 Naga-Toledo Road Project; Jct.
Pajo to Brgy. Ibo to Boundary R-VII 18.733 C 0.394 - 0.500 - - - 89.40 88.14% V. Satisfactory
O.R. Sarmiento Construction 1411 Talibon Small Reservoir
Irrigation Project NIA 11.574 O 0.350 0.157 0.100 0.030 0.047 0.200 88.40 -
Octant Builders & Development Corp. 23668 Const. of Health Center at
Saniboy Health Center NCR 0.959 C 0.327 - 0.500 - - - 82.70 82.70% V. Satisfactory
OIC Construction & Supply 23727 Const. of Water Works System IV-A 2.406 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory
OIC Construction & Supply 23727 Road Conc. @ Brgy. San Juan, Alitagtag and Brgy. San Isidro IV-A 0.291 C 0.277 0.300 0.300 - - - 87.70 *87.70%
V. Satisfactory
OIC Construction & Supply 23727 Waterworks Project (Level I) IV-A 2.468 C 0.389 0.200 0.300 - - - 88.90 86.50% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 305
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Omengan Construction and Development Corporation 5119 Const. of Bagu Bridge &
Approaches CAR 6.938 C 0.348 0.134 0.300 - - - 78.20 82.94% V. Satisfactory
Omengan Construction and Development Corporation 5119 Const. of Saltan Bridge &
Approaches CAR 76.227 O 0.341 0.300 0.100 0.030 0.040 0.100 91.10 -
Omengan Construction and Development Corporation 5119 Const. of Tuga Bridge & its
Approaches CAR 12.262 C 0.327 0.035 0.300 - - - 66.20 71.84% Satisfactory
Omengan Construction and Development Corporation 5119
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase
VI, Mamaga Bridge-Basao Bridge, Km. 420+970-
Km.429+940
CAR 83.149 O 0.331 0.240 0.100 0.030 0.045 0.067 81.30 -
Omengan Construction and Development Corporation 5119
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road,
Tinglayan Bdry.-Lubuagan-Tabuk Sect. II Km. 472+500-
Km.495+500
CAR 14.465 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
Omengan Construction and Development Corporation 5119
Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan
Road, Pingaan-Dalimuno SectionCAR 14.329 C 0.266 0.016 0.300 - - - 58.20 72.90%
Satisfactory
Omicron Construction 9575Const. of Multi-Purpose Bldg. at San Matias Realigned to Const.
of MPB at San JoseIII 0.949 C 0.457 - 0.500 - - - 95.70 95.70%
Outstanding
Omicron Construction 9575 Repair/Rehab. of Dike/Banks Clearing Sapang Maragul III 9.490 C 0.357 - 0.500 - - - 85.70 85.70%
V. Satisfactory
Omnicon Builders 22816Concreting of Brgy Roads at
Habay I, Molino I Proj. 18 & Niog II
IV-A 0.959 C 0.267 - 0.500 - - - 76.70 76.70% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 306
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Omnicon Builders 22816 Const. of 2 Cl Sch. Bldg. @ Pinagturilan NHS IV-B 1.339 C 0.257 0.300 0.300 - - - 85.70 70.51%
Satisfactory
Omnicon Builders 22816 Partial Const. of 2CL S/B at Julian Felipe E/S IV-A 0.767 C 0.447 - 0.500 - - - 94.70 94.70%
Outstanding
Omnicon Builders 22816 Rehab./Impvt. of Punta-Looc-Odiongan-Anahao Road IV-B 9.577 C 0.179 0.200 0.300 - - - 67.90 74.50%
Satisfactory
On Top Construction 32696 Const. of Salingao Flood Control CAR 0.238 C 0.355 0.200 0.300 - - - 85.50 *85.50% V.Satisfactory
On Top Construction 32696 Const./Conc. of Singi FMR CAR 0.238 C 0.317 0.200 0.300 - - - 81.70 *81.70% V.Satisfactory
OP Reyes Builders & Supply 32271 Conc. of Road in Brgy.
Malaruhatan IVA 0.470 C 0.292 0.216 0.300 - - - 80.80 *80.80% V. Satisfactory
OQC Construction 22690 Completion of Multi-Purpose Building @ San Andres E/S II 0.522 C 0.322 0.300 0.300 - - - 92.20 91.64%
Outstanding
OQC Construction 22690 Const of San Vicente FMR II 2.863 C 0.236 0.239 0.300 - - - 77.50 77.50% Satisfactory
OQC Construction 22690 Const. of MPB (Phase II) @ Cagayan NHS II 4.749 C 0.350 0.000 0.000 - - - 35.00 *35.00%
Poor
OQC Construction 22690 Const. of MPB @ Brgy. 9 II 1.924 C 0.388 0.200 0.300 - - - 88.80 81.87% V. Satisfactory
OQC Construction 22690 Const. of MPB @ I.S.U. II 1.895 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
OQC Construction 22690 Const. of Multi-Purpose Building (Gymnasium) II 4.821 O 0.304 0.300 0.100 0.015 0.035 0.100 85.40 -
OQC Construction 22690 Const. of Multi-Purpose Building @ Cagayan National High School II 4.821 O 0.389 0.236 0.050 0.030 0.030 0.067 80.20 -
OQC Construction 22690Seal Widening along Daang
Maharlika km. 324+000-Km.327+700
II 9.543 C 0.294 0.000 0.300 - - - 59.40 76.64% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 307
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
OQC Construction 22690Seal Widening of intersection at
Daang Maharlika & Jct. Ipil-Panang-Quirino Bdry Road
II 4.775 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory
Orani Builders Supply 5349 Cluster CY 2004 DepEd School Building Program III 4.560 C 0.478 - 0.500 - - - 97.80 95.00%
Outstanding
Orani Builders Supply 5349 Const. of MPB @ Brgy. Camachile III 0.660 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
Orani Builders Supply 5349 Const. of Multi-Purpose Building San Vicente III 2.814 C 0.456 - 0.500 - - - 95.60 89.02%
V. Satisfactory
Orani Builders Supply 5349 Impvt. of Pentor-Balsik River Control, Sta. Isabel Section III 4.767 C 0.264 0.300 0.300 - - - 86.40 *86.40%
V. Satisfactory
Orani Builders Supply 5349 Repair/Rehab. of Multi-Purpose Building VII 0.472 O 0.245 0.300 0.100 0.015 0.011 0.033 70.40 -
Orguer Trading & Construction 17111 Concreting of Road at Brgy.
Concepcion IV-A 0.286 C 0.346 - 0.500 - - - 84.60 84.60% V. Satisfactory
Orguer Trading & Construction 17111 Const. of Multi-Purpose Building
@ Brgy. Poblacion IV-A 0.477 C 0.289 0.300 0.300 - - - 88.90 *88.90% V.Satisfactory
Orguer Trading & Construction 17111 Repair of Hanging Bridge IV-A 0.190 C 0.083 - 0.500 - - - 58.30 *58.30%
Poor
Orient Star Construction 7183 Const./Impvt. of Paclasan Seawall IV-B 1.881 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V.Satisfactory
Orient Star Construction 7183 Rehab. of CSR Bansud Section IV-B 4.710 C 0.301 0.300 0.300 - - - 90.10 *90.10% Outstanding
Orient Star Construction 7183 Repair/Maintenance of Cagancan River Control IV-B 1.887 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V.Satisfactory
Oriental Sales Center & Contractor 3816
Conc. of Abra-Cervantes Road (km. 431+589 to Km. 432+185),
Lagangilang SectionCAR 4.730 C 0.293 0.186 0.300 - - - 77.90 51.14%
Poor
Oriental Sales Center & Contractor 3816 Const. of Bridge (Phase I) I 0.958 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 308
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Oriental Sales Center & Contractor 3816 Const. of MPB at Sabangan E/S,
Bonuan-Guesset (Phase I) I 1.431 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding
Oriental Sales Center & Contractor 3816
Repair/Maint. of National Roads (Package), Abra-Ilocos Sur Road
and Abra-Kalinga RoadCAR 9.521 C 0.228 0.190 0.300 - - - 71.80 *71.80%
Satisfactory
Orientech Construction & Development Corporation 8874
Const./Widening & Conc. of Dinagat-Loreto Road (Sta. Cruz-
Wilson Road)XIII 14.472 C 0.350 0.200 0.000 - - - 55.00 64.00%
Fair
Orzan Builders Enterprises 13382 Concreting of Ariman-Bulusan Lake Road V 2.750 C 0.321 - 0.500 - - - 82.10 89.66%
V. Satisfactory
Orzan Builders Enterprises 13382 Repair of Two CL Sch. Bldg. Pto. Diaz Central School V 0.288 C 0.298 0.220 0.300 - - - 81.80 *81.80%
V. Satisfactory
Oscan Builder 31158 Completion of MPB, Old Lukban E/S, Magsaysay Ave. CAR 0.953 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
Oscan Builder 31158 Repair/Rehab. of Secondary Sch. Bldg. BCNHS-Main CAR 4.772 C 0.360 0.300 0.300 - - - 96.00 89.28%
V. Satisfactory
P. C. Panopio Construction and Trading 32824
Repair/Rehab. of Slope Protection of Flood Control
along Camachile River III 1.402 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
P.B. Grey Construction 13383
Const. (Rehab., Replacement, Completion and Repair) of Two (2) Storey (6) Classroom Sch.
Bldg. at San Rafael E/S
IVA 6.934 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
P.B. Grey Construction 13383 Rehab. of Road @ Litex Village IVA 1.303 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
P.B. Grey Construction 13383 Rehab. of Road @ Sitio San Roque IVA 1.434 C 0.363 0.300 0.300 - - - 96.30 *96.30%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 309
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
P.B. Grey Construction 13383 Rehab./Impvt. of Angono Diversion Road IVA 9.602 O 0.340 0.217 0.100 0.030 0.033 0.067 78.70 -
P.B. Obial Construction 16784 Const. of 1 unit, 4 Storey, 20 CL Bulacao H/S Bldg. VII 13.356 C 0.341 0.272 0.300 - - - 91.30 80.66%
V. Satisfactory
P.B. Obial Construction 16784 Const. of Multi-Purpose Building VII 0.289 C 0.355 0.300 0.300 - - - 95.50 94.31% Outstanding
P.B. Obial Construction 16784 Const. of Pedestrian Overpass VII 3.678 O 0.312 0.240 0.100 0.010 0.044 0.100 80.60 -
P.B. Obial Construction 16784Const./Rehab. of Sch. Bldg. @ Mandaue City School for the
ArtsVII 1.446 C 0.377 0.100 0.300 - - - 77.70 *77.70%
Satisfactory
P.J. Cruz Construction & Trading 14223 Const. of Additional Classroom
(Sampaloc Site II E/S) NCR 1.420 C 0.343 - 0.500 - - - 84.30 78.70% Satisfactory
P.J. Cruz Construction & Trading 14223
Const. Partial of Two (2) Storey, Four (4) Cl School Bldg. @ Unit
1, Baclaran E/SNCR 2.861 C 0.335 0.300 0.300 - - - 93.50 78.70%
Satisfactory
P.J. Cruz Construction & Trading 14223
Repair/Rehab. of Guardrails/Railings along Nat'l
Roads anng BridgesNCR 2.963 C 0.261 0.150 0.300 - - - 71.10 *71.10%
Satisfactory
P.J. San Pedro Const. Supply 14994
Const. / Rehab. / Completion & Repair of Secondary Sch. Bldg.
@ Sta. Ana NHSXI 1.323 C 0.376 0.300 0.300 - - - 97.60 *97.60%
Outstanding
P.J. San Pedro Const. Supply 14994 Const. of MPB @ Km. 6, Brgy.
Buhangin Proper XI 1.692 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
P.J. San Pedro Construction and Supply 14994 Completion of PSHS SMC Multi
Purpose Gynasium DOST 10.692 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding
P.J. San Pedro Construction and Supply 14994 Completion of School Bldg., 3-
Storey, 12 CL @ Bangoy NHS XI 9.633 C 0.383 0.300 0.300 - - - 98.30 91.86% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 310
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
P.J. San Pedro Construction and Supply 14994
Conc. of Road at Catalunan Pequeño (Project C) Mintal-Cawa-
cawa RoadXI 2.032 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
P.J. San Pedro Construction and Supply 14994
Const. of Water Works System, Brgy. Tamugan (Lower Patag),
Marilog DistrictXI 4.710 C 0.260 0.300 0.300 - - - 86.00 86.54%
V.Satisfactory
P.J. San Pedro Construction and Supply 14994 Impvt. of Drainage along Agusan-
Davao Road XI 1.867 C 0.318 0.300 0.300 - - - 91.80 *91.80% Outstanding
P.L. Sebastian Construction 1076 Baobo River Irrigation Project NIA 224.599 O 0.368 0.162 0.070 0.030 0.042 0.200 87.17 -
P.L. Sebastian Construction 1076 Contract Package C, Malabang-
Sultan Gumander Road KFAED 793.246 C 0.373 0.300 0.300 - - - 97.30 89.66% V.Satisfactory
P.L. Sebastian Construction 1076 Const. of Bit-os Lat. Canal "D",
Sta.0+920-6+032 (new station) NIA 72.059 O 0.345 0.151 - 0.030 0.070 0.200 81.15 -
P.L. Sebastian Construction 1076 Const. of Bit-os Main Canal &
Regulating Pond NIA 247.675 C 0.299 0.300 0.300 - - - 85.47 88.47% V. Satisfactory
P.L. Sebastian Construction 1076
Const. of Limpapa-Sibuco Road, Lintangan-Pasilnahut Sect.,
Phase II along Zamboanga West Coast Road
IX 32.526 C 0.389 0.300 0.300 - - - 98.90 92.42% Outstanding
P.L. Sebastian Construction 1076 Const./Impv't. of Contract
Package XI-A Liboton-Tupas Rd. XI 101.877 C 0.337 0.300 0.070 0.030 0.037 0.067 84.10 -
P.L. Sebastian Construction 1076 Const./Impv't. of Contract
Package XI-A Liboton-Tupas Rd. XI 89.986 O 0.360 0.300 0.100 0.030 0.045 0.100 93.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 311
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
P.L. Sebastian Construction 1076
CP9: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal
Road, (Manay-Boston) Cateel-Boston Section)
XI 197.331 O 0.393 0.271 0.100 0.030 0.065 0.100 95.90 -
P.L. Sebastian Construction 1076
Widening of Cotabato-Allah-General Santos National Rd.
Poblacion Shariff Aguak Sect.XII 6.170 C 0.436 - 0.500 - - - 93.60 82.98%
V. Satisfactory
P.T. Adhi Karya (Per Sero)/Vicente T. Lao Const.
(J.V.)7040
C.P. I-A: Replacement/Repair /Retrofitting of Thirteen Bridges Iligan-Cagayan de Oro-Butuan
Rd.
X 190.137 O 0.365 0.286 0.100 0.030 0.061 0.100 94.20 -
P.T. Diamond Merchandise & Construction 15451
Completion/Continuation of Unfinished/On-going Bridge, Sapilang along Manila North
Road
I 3.542 C 0.329 0.200 0.300 - - - 82.90 *82.90% Satisfactory
P.T. Diamond Merchandise & Construction 15451
Rehab./Slope Protection of Calaoaan, Tamurong FMR,
CalaoaanI 0.474 O 0.307 0.200 0.100 0.030 0.035 0.200 87.20 -
P.T. Diamond Merchandise & Construction 15451 Replacement of Sapilang Bridge
along MNR I 12.993 C 0.379 0.200 0.000 - - - 57.90 73.40% Satisfactory
P.V.B. Construction and Trading 13269 Conc. of FMR @ Brgy. Mining III 0.912 C 0.352 0.218 0.300 - - - 87.00 *87.00%
SatisfactoryPablo S. Labasbas
Construction 6302 Concreting of Guiuan-Sulangan Road VIII 4.778 C 0.281 0.300 0.300 - - - 88.10 84.56%
V. SatisfactoryPablo S. Labasbas
Construction 6302 Const. of Sta. Maria Bridge IVB 13.507 C 0.328 0.200 0.300 - - - 82.80 82.20% V. Satisfactory
Pablo S. Labasbas Construction 6302 Rehab./Impvt. Along Tablas
Circumferential Road IVB 9.643 C 0.315 0.234 0.300 - - - 84.90 70.92% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 312
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Pablo S. Labasbas Construction 6302 Rehabilitation of Cabacungan-
Panoypoy Farm-to-Market Road VIII 0.954 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding
Pacer Construction & Development Corporation 4839 Const. of Kabadiangan Bridge
(UK-Phase III) VIII 4.605 O 0.316 0.240 0.100 0.022 0.023 0.100 80.10 -
Pacer Construction & Development Corporation 4839 Conc. of Calubian Jct.-San Isidro-
Tabango Road VIII 4.737 C 0.301 0.201 0.300 - - - 80.20 *80.20% V. Satisfactory
Pacer Construction & Development Corporation 4839 Const. of Alawihaw Bridge &
Approaches VIII 6.407 C 0.394 0.200 0.300 - - - 89.40 85.20% V. Satisfactory
Pacer Construction & Development Corporation 4839 Const. of MPB, Brgy. 83-C, 60 &
107 VIII 0.678 C 0.364 0.100 0.300 - - - 76.40 80.11% V. Satisfactory
Pacer Construction & Development Corporation 4839 Rehab./Impvt. of Cabungaan-
Tabunok-Consuega Road VIII 7.115 C 0.350 0.200 0.300 - - - 85.00 80.86% V. Satisfactory
Pacific Construction 15800 Completion of the Rehab. of Pan-Phil. Hi-Way (Agas-Agas Sect.) VIII 14.092 C 0.388 0.300 0.300 - - - 98.80 85.61%
V. Satisfactory
Pacific Star Erectors 14224 Completion of Conner Multi-Purpose Building CAR 0.962 C 0.322 - 0.500 - - - 82.20 86.05%
V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao Science H/S Phase IV CAR 1.591 C 0.314 0.300 0.300 - - - 91.40 86.89%
V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College CAR 1.854 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College Multi-Purpose Bldg CAR 1.395 C 0.464 - 0.500 - - - 96.40 92.27%
Outstanding
Pacific Star Erectors 14224 Const. of DPWH Regional Office Bldg. (Phase IV) II 26.973 C 0.384 0.300 0.300 - - - 98.40 93.46%
Outstanding
Pacific Star Erectors 14224 Const. of Poblacion-Bulo-Waga FMR CAR 0.919 C 0.190 0.300 0.300 - - - 79.00 81.85%
V. Satisfactory
Pacific Star Erectors 14224 Const. of San Carlos Bridge & Approaches II 10.903 C 0.360 0.300 0.000 - - - 66.00 76.32%
Satisfactory
Pacific Star Erectors 14224 Const. of Tammang Bridge (Pier 2 and 3) CAR 9.254 C 0.343 0.300 0.000 - - - 64.30 75.07%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 313
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Pacific Star Erectors 14224Const./Road Impvt. of Calanasan-
Ilocos Norte Road, Parina Section
CAR 13.827 O 0.355 0.300 0.070 0.030 0.037 0.100 89.20 -
Pacific Star Erectors 14224Maintenance/Rehab. & Impv't. of
National Arterial Roads & Bridges
II 2.825 O 0.311 0.257 0.070 0.015 0.016 0.067 73.60 -
Pacific Star Erectors 14224 Proposed Const. of Pudtol MPB (Gymnasium) CAR 1.427 C 0.215 0.300 0.300 - - - 81.50 *81.50%
V. Satisfactory
Pacific Star Erectors 14224 Replacement of Capagu Bridge along MNR II 12.913 C 0.381 0.200 0.300 - - - 88.10 83.78%
V. Satisfactory
Pader Construction and Supply 20213 Conc. of Dualing-Baliki-Silik
Road (Dualing Section) XII 4.789 C 0.375 0.119 0.300 - - - 79.40 78.02% Satisfactory
Pader Construction and Supply 20213 Conc. of Road @ Brgy. Ulamian XII 0.468 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. SatisfactoryPader Construction and
Supply 20213 Const. of Water System @ Brgy. Upper Baguer XII 0.370 C 0.325 0.246 0.300 - - - 87.10 *87.10%
V. Satisfactory
Pagadian Aggregates & Marketing 14886 Conc. of Brgy. Road, Opol X 1.445 C 0.389 0.200 0.300 - - - 88.90 *89.90%
V. SatisfactoryPagadian Aggregates &
Marketing 14886 Conc. of Kimaya-Solana By-Pass Road X 4.820 O 0.305 0.227 0.100 0.024 0.050 0.067 77.30 -
Pagadian Aggregates & Marketing 14886 Conc. of Nat'l Roads Lourmah-
Poblacion Section IX 1.858 C 0.342 0.200 0.300 - - - 84.20 82.22% V. Satisfactory
Pagadian Aggregates & Marketing 14886 Rehab. of Carmen-Patag-Bulua
Road X 9.540 O 0.319 0.300 0.070 0.030 0.055 0.067 84.10 -
Palafox Construction 18424 Const. of FTMR @ Cacandungan I 0.480 C 0.286 - 0.500 - - - 78.60 78.60% Satisfactory
Palmares General Merchandise 24657 Completion of MPB at Brgy.
Magsaysay XII 0.480 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Palmares General Merchandise 24657 Const. of Gymnasium Bldg. @
Brgy. Mayo XII 0.964 C 0.247 0.200 0.300 - - - 74.70 *74.70% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 314
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Palmares General Merchandise 24657 Const. of MPB @ Brgy. Kenram
(Health Center) XII 0.240 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Palmares General Merchandise 24657 Const. of Multi-Purpose Bldg.
(Mini-Gym) Poblacion Uno XI 1.419 C 0.384 0.300 0.300 - - - 98.40 87.41% V. Satisfactory
Palmares General Merchandise 24657
Const. of Sch. Bldg. @ Sultan Kudarat Polytechnic State
College XII 0.921 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
Palmares General Merchandise 24657 Impvt. of Road from Koronadal
City to Carpenter Hill XII 4.819 C 0.357 0.300 0.300 - - - 95.70 84.84% V. Satisfactory
Palmares General Merchandise 24657
Widening/Conc. of Dulawan-Marbel Road (Kalandangan
Sect.)XII 9.450 C 0.335 0.289 0.300 - - - 92.40 *92.40%
Outstanding
Panay East Coast Construction and Supply 26469 Reblocking of Pototan-Bangga
Polot-An Road VI 4.255 O 0.314 0.300 0.100 0.030 0.043 0.067 85.40 -
Pangasinan New Wilson Lumber and Construction 8313 Conc. of Palapad-Torres Road,
Brgy. Palapad I 0.945 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satistfactory
Pangasinan New Wilson Lumber and Construction 8313 Const. of Multi-Purpose Bldg. for
Boy Scout I 0.944 C 0.298 - 0.500 - - - 79.80 *79.80% Satisfactory
Pangasinan New Wilson Lumber and Construction 8313 Const./Opening of Lipi Norte-
Pao Road (Phase II) I 1.919 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satistfactory
Paradox Construction 18557 Concreting of FTMR @ Palina East-Awed I 0.479 C 0.389 - 0.500 - - - 88.90 88.90%
V. Satisfactory
Paradox Construction 18557 Const. of Farm-to-Market Road Brgy. Cabaruan I 0.479 C 0.262 - 0.500 - - - 76.20 76.20%
Satisfactory
Paradox Construction 18557 Construction of Farm-to-Market Road I 0.477 C 0.272 0.300 0.300 - - - 87.20 *87.20%
V. Satisfactory
Paris Construction & Marketing 14306 Completion/Const. of Multi-
Purpose Building XII 0.669 C 0.385 0.300 0.300 - - - 98.50 84.36% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 315
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Parojinog & Sons Construction Company 32765 Const. of MPB X 1.412 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
Parojinog & Sons Construction Company 32765 Const. of MPB X 2.384 C 0.250 0.200 0.300 - - - 75.00 *75.00%
Satisfactory
Parojinog & Sons Construction Company 32765 Rehab. of Guingona-Trigos Road X 2.328 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
Partido Construction and Supply 20631 Completion of Gubat-Tinawagan-
Libod Road V 9.360 O 0.330 0.238 0.100 0.020 0.023 0.100 81.10 -
Partido Construction and Supply 20631
Conc. of Bagong Silang-Capalonga Road, Dolores
SectionV 11.978 C 0.356 0.290 0.300 - - - 94.60 89.80%
V. Satisfactory
Partido Construction and Supply 20631 Concreting of Brgy. Road Mabca V 0.183 C 0.401 - 0.500 - - - 90.10 90.10%
Outstanding
Partido Construction and Supply 20631 Const. of 1 Cl School Buildings
@ San Miguel V 0.337 C 0.373 0.200 0.300 - - - 87.30 93.67% Outstanding
Partido Construction and Supply 20631 Const. of 1 Cl RM Sch. Bldg. @
Ipil E/S V 0.380 C 0.315 0.168 0.300 - - - 78.30 *78.30% Satisfactory
Partido Construction and Supply 20631 Const. of 1 CL Sch. Bldg at
Sibaguan Agro Industrial NHS V 0.518 C 0.372 0.203 0.300 - - - 87.50 *87.50% V. Satisfactory
Partido Construction and Supply 20631 Const. of Drainage along Baao-
Iriga-Nabua Road V 4.681 C 0.362 0.200 0.300 - - - 86.20 78.88% Satisfactory
Partido Construction and Supply 20631 Const. of Flood Control San
Roque V 0.453 C 0.233 - 0.500 - - - 73.30 73.30% Satisfactory
Partido Construction and Supply 20631 Const. of Igbac-San Pedro Road V 6.924 C 0.202 0.200 0.300 - - - 70.20 71.88%
Satisfactory
Partido Construction and Supply 20631 Const. of Multi-Purpose Bldg.
Goa Central School V 1.088 F 0.434 - 0.500 - - - 93.40 94.38% Outstanding
Partido Construction and Supply 20631
Const. of Various School Buildings @ 3rd District Congressional District of
Camarines Sur
V 0.337 O 0.393 0.300 0.100 0.030 0.041 0.100 96.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 316
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Partido Construction and Supply 20631
Impv't./Conc. of Binalay-Tamban Road, Olag-Pequeño-Sitio-Malibtong-Antipolo Section
V 9.553 C 0.223 0.200 0.300 - - - 72.30 79.83% Satisfactory
Partido Construction and Supply 20631
Re-decking of 2nd Span & Repair of Bridge approaches
Agos BridgeV 1.418 C 0.299 0.137 0.300 - - - 73.60 85.72%
V. Satisfactory
Partido Construction and Supply/Jeff Const. (JV) JV-05-051 Const. of Gipangpang Bridge &
Approaches (Phase I) V 14.550 O 0.361 0.240 0.100 0.015 0.040 0.100 85.60 -
Pastrana Construction 17340 Const./Rehab. of Havana-Bugnay Road VI 1.910 C 0.312 0.269 0.300 - - - 88.10 84.86%
V. Satisfactory
Patricia Builders 28745 Concreting of Farm-to-Market Road IV-A 0.467 C 0.325 - 0.500 - - - 82.50 *82.50%
V. Satisfactory
Patricia Builders 28745 Const. of Road, Brgy. San Francisco-Calihan IV-A 4.824 C 0.269 0.300 0.300 - - - 86.90 *86.90%
V. Satisfactory
Patricia Builders 28745
Implementation of Priority Projects in the 3rd District of
Laguna (Brgy. Sta. Veronica-San Bartolome to San Benito
IV-A 4.824 C 0.343 0.262 0.300 - - - 90.50 *90.50% Outstanding
Patricia Builders 28745 Impvt. of Brgy. San Jose FMR IV-A 0.467 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Patrick Construction 27780 Rehab./Conc. of Casili Brgy. Road II 0.943 C 0.284 0.200 0.300 - - - 78.40 *78.40%
Satisfactory
Patrila Builders Inc, 26628 Const. of Cuartero Bridge Phase III VI 9.960 C 0.340 0.300 0.000 - - - 64.00 81.46%
V. Satisfactory
Paula Mae Buhong Construction 26128 Conc. of Jct. Alfonso Lista-Mt.
Province Bdry. Road CAR 8.297 C 0.349 0.287 0.300 - - - 93.60 65.22% Fair
Paula Mae Buhong Construction 26128 Const. of Municipal Health
Center CAR 1.911 C 0.295 0.111 0.300 - - - 70.60 80.72% V. Satisfactory
Paula Mae Buhong Construction 26128 Impvt/ along Banawe-Mayoyao-
Aguinaldo-Isabela Bdry. Road CAR 1.435 C 0.384 0.300 0.300 - - - 98.40 93.90% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 317
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Paula Mae Buhong Construction/PBO Construction (JV)
JV-07-152 Widening/Conc. of Banaue-Bontoc Road (Halsema Highway) CAR 48.196 O 0.342 0.180 0.100 0.030 0.030 0.100 78.20 -
Payunan Builders 16824
Impv't. of Sarangani-Davao del Sur Coastal Road (Jct. Alabel-
Glan Boundary) Sarangani-Davao del Sur
XII 13.433 C 0.307 0.289 0.000 - - - 59.60 65.14% Fair
PBO Construction 18403 Const. of Bulanao Flood Control CAR 9.500 C 0.330 0.200 0.300 - - - 83.00 88.64% V. Satisfactory
PBO Construction 18403 Const. of Lawig-Pieza Bridge CAR 9.027 C 0.317 0.300 0.300 - - - 91.70 85.36% V. Satisfactory
PBO Construction 18403Const. of Sta. Maria-Paracelis
Road, Phase II (Pinto-Caragasan Paraceln Section)
CAR 13.344 C 0.329 0.263 0.300 - - - 89.20 *89.20% V. Satisfactory
PBO Construction 18403 Const. of Tammang Bridge (Partial Completion) CAR 19.315 C 0.373 0.300 0.300 - - - 97.30 92.30%
Outstanding
PBO Construction 18403 Contruction of Habbang Bridge, Km. 362+303-Km. 302+460 CAR 20.145 C 0.389 0.300 0.300 - - - 98.90 *98.90%
Outstanding
PBO Construction 18403
Impvt./Rehab. of Bontoc-Lubuagan-Tabuk Rd.,
Mananggol, Lubuagan-Wales Brook, Tinglayan
CAR 14.190 C 0.235 0.300 0.000 - - - 53.50 69.85% Fair
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV, Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
CAR 47.185 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -
PBO Construction 18403 Rehab. of Balawag - Malin-awa FMR CAR 19.315 O 0.360 0.190 0.100 0.023 0.054 0.100 82.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 318
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
PBO Construction 18403
Repair/Rehab. of Romualdez-Santor-Calaocan-San Pascual Section, Babalag-Kinama-San
Francisco Section
CAR 9.537 O 0.256 0.240 0.100 0.015 0.030 0.100 74.10 -
PC Builders and Supply 19191Impvt./ Repair of Shore
Protection along side NHA-Seabreeze Homes
V 2.871 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory
Pentagon Industrial Development & Const. Co.,
Inc12796 Improvement/Widening of Manila
North Road (MNR) Package II III 87.050 O 0.393 0.300 0.100 0.030 0.043 0.100 96.60 -
Pentagon Industrial Development &
Construction Company, Incorporated
12796 Riprapping of Sapangbalen Creek III 0.941 C 0.167 0.300 0.300 - - - 76.70 60.86%
Fair
Performance Builders & Dev't. Corp. 5303 Const. of Calatrava Seawall IV-B 0.462 C 0.440 0.500 94.00 94.00%
Outstanding
Performance Builders & Dev't. Corp. 5303 Const. of Tan-Agan Bridge II IV-B 21.239 C 0.319 0.200 0.300 - - - 81.90 80.13%
V.SatisfactoryPerformance Builders &
Dev't. Corp. 5303 Desilting of Dubduban River IV-B 0.281 O 0.267 0.200 0.033 0.067 0.250 81.70 -
Persan Const. Inc. (Formerly: Persan
Construction)2852 Replacement of Loboc Bailey
Bridge VII 11.564 O 0.210 0.240 0.100 0.015 0.010 0.100 67.50 -
Persan Construction, Inc. 2852Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-Bayasong
Section)V 40.123 C 0.397 210.000 0.300 - - - 90.70 93.94%
Outstanding
Persan Construction, Inc. 2852Improvement/asphalting of
Panglao Island Circumferential Road
VII 38.360 C 0.330 0.287 0.000 - - - 61.70 70.70% Satisfactory
Persan Construction, Inc. 2852Improvement/Const. of Bridge along Panabo Coastal Road
(Arieta Section)XI 28.764 C 0.436 - 0.500 - - - 93.60 91.56%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 319
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Persan Construction, Inc. 2852Impvt. (Conc. Paving) along
Carmen-Sagbayan-Bacane Nat'l Road
VII 14.256 C 0.343 0.170 0.000 - - - 51.30 57.93% Poor
Persan Construction, Inc. 2852Impvt. (Conc. Paving) of Jct. Dat-
an Carmen-Sagbayan-Sierra Bullones, Pilar-Alicia Road
VII 30.557 C 0.341 0.200 0.300 - - - 84.10 82.42% V. Satisfactory
Persan Construction, Inc. 2852Impvt. And Rehab. of Daang
Maharlika Road, San Rafael-San Ildefonso Section
III 95.473 O 0.370 0.300 0.100 0.018 0.037 0.100 92.50 -
Persan Construction, Inc. 2852 Impvt. of Panabo Coastal Road, Arieta-Puyod Section XI 28.257 C 0.380 0.300 0.300 - - - 98.00 91.82%
Outstanding
Persan Construction, Inc. 2852 Impvt./Conc. of Kapalong-Talaingod Road XI 53.764 O 0.395 0.296 0.070 0.030 0.033 0.067 89.10 -
Persan Construction, Inc. 2852 Impvt./Conc. of Kapalong-Talaingod Road XI 53.764 O 0.382 0.300 0.050 0.030 0.045 0.067 87.40 -
Persan Construction, Inc. 2852 Rehab. of Daang Maharlika Road, San Rafael-San Ildefonso III 16.496 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
Persan Construction, Inc. 2852Rehab. Old Daang Maharlika Road (Cagayan Valley Road), San Rafael to San Ildefonso
III 28.640 O 0.395 0.225 0.100 0.030 0.035 0.100 88.50 -
Persan Construction, Inc. 2852Repair/Rehab. of Cavite-
Batangas Road, Sampaloc Section
IV-A 9.904 C 0.211 0.300 0.300 - - - 81.10 *81.10% V. Satisfactory
Persan Construction, Inc. 2852 Upgrading/Conc. With Drainage Impvt. P. Aquino St. NCR 11.515 C 0.356 0.200 0.300 - - - 85.60 80.26%
V. Satisfactory
Persan Construction/ A.L. Salazar Const., Inc. (JV) 2852/3899 Asphalt Overlay of Daang
Maharlika (MSR) V 41.038 C 0.450 - 0.500 - - - 95.00 93.62% Outstanding
Peter Construction and Aggregate Supply 17343 Const. of MPB (Covered Court)
@ Estaka E/S IX 2.036 C 0.330 0.173 0.300 - - - 80.30 *80.30% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 320
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Peter Construction and Aggregate Supply 17343 Const./Extension of River
Control Structure IX 2.762 C 0.285 0.217 0.300 - - - 80.20 81.64% V. Satisfactory
Peter Construction and Aggregate Supply 17343
Road Improvement/Const. of Drainage Canal Jct. Polo-Dapitan
Park Nat'l. Rd.X 1.847 C 0.490 - 0.500 - - - 99.00 93.87%
Outstanding
Peter G. Chua Builders 25367 Completion of Multi-Purpose Building at Brgy. West Rembo NCR 0.480 C 0.366 - 0.500 - - - 86.60 86.60%
V. Satisfactory
Peter G. Chua Builders 25367 Conc. of Gil Puyat Ave. NCR 4.768 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
Peter G. Chua Builders 25367 Const. of Bridge at Pamplona 3 NCR 4.609 C 0.319 0.200 0.300 - - - 81.90 79.08% Satisfactory
Peter G. Chua Builders 25367 Const. of MPB, Phase II @ Pulanglupa I NCR 1.048 C 0.373 0.200 0.300 - - - 87.30 84.36%
V. Satisfactory
Peter G. Chua Builders 25367 Const./Completion of San Agustin Elem. Sch. NCR 0.761 C 0.378 0.300 0.300 - - - 97.80 95.42%
Outstanding
Peter G. Chua Builders 25367 Improvement/Concreting of Merville-Moonwalk Access Road NCR 0.961 C 0.278 0.200 0.300 77.80 77.02%
Satisfactory
Petrina Grocers Marketing 29695 Const. of 2-Cl School Building @ Cugman ES X 0.839 O 0.377 0.300 0.100 0.020 0.006 0.100 90.30 -
Petrina Grocers Marketing 29695 Const. of MPB (Phase II) @ Brgy. Poblacion X 0.565 O 0.361 0.300 0.100 0.015 0.013 0.100 88.90 -
Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS X 1.394 C 0.357 0.200 0.300 - - - 85.70 83.53% V. Satisfactory
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Barangay Hall Capinonan X 0.925 C 0.355 - 0.500 - - - 85.50 73.04%
Satisfactory
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Building (Phase I) X 0.942 C 0.376 0.212 0.300 - - - 88.80 86.42%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 321
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Pett Builders 26825 Completion of Multi-Purpose Building @ JEM Subdivision NCR 1.428 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
PGO Construction 15153Rehab./Reblocking of
Deteriorated Conc. Pavement along Bacolod North Road
VI 9.231 O 0.343 0.225 0.100 0.022 0.048 0.067 80.50 -
Phil Manna Construction & Supply 10320 Const. of 1 CL Sch. Bldg. @
Taculod E/S Annex V 0.459 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building
at Sitio Maligay V 0.927 C 0.421 - 0.500 - - - 92.10 *92.10% Outstanding
Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building
at Sta. Cruz-Sta. Isabel V 0.851 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory
Philippine Chemsteel Industries Inc. 16965 Const. of Water System XI 3.271 C 0.330 0.200 0.300 - - - 83.00 *83.00%
V. Satisfactory
Philippine Chemsteel Industries Inc. 16965
Repair/Rehab. Along National Roads @ CDO-Lumbia Airport-
Uguiban Rd.X 4.709 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
Philippines Chemsteel Industries Inc. 16965
Const. of Round Abouts Traffic Signal Lights & Road Signs and
Pavement MarkingsV 4.625 C 0.395 0.262 0.300 - - - 95.70 *95.70%
Outstanding
Philippines Chemsteel Industries, Inc. 16965 Const. of Multi-Purpose
Pavement @ Ringgit St. Kabute IVA 0.308 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Philippines Chemsteel Industries, Inc. 16965 Rehab./Impvt. of Andalucia St. NCR 0.933 C 0.314 0.300 0.300 - - - 91.40 *91.40%
Outstanding
Philippines Chemsteel Industries, Inc. 16965
Repair/Rehab./Impvt. of Nat'l Roads along Calbiga Road-Jct.
Dolongan-Basey RoadVIII 9.625 C 0.197 0.300 0.300 - - - 79.70 *79.70%
Satisfactory
Philworks Construction & Supply (Formerly: Philworks Const.)
32103 Const. of Arimbay Bridge, Detour & Approaches V 18.504 O 0.386 0.300 0.100 0.023 0.060 0.100 96.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 322
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Philworks Construction & Supply (Formerly: Philworks Const.)
10181 Const. of Basud Bridge & Approaches, Phase II-B V 55.604 C 0.405 - 0.500 - - - 90.50 88.94%
V. Satisfactory
Philworks Construction & Supply (Formerly: Philworks Const.)
10181 Const. of Panagan Bridge and Approaches (Phase II) V 12.497 O 0.316 0.259 0.100 0.020 0.028 0.100 82.30 -
Philworks Construction & Supply (Formerly: Philworks Const.)
10181Slope Protection of Various Slipped Sect. along Tigaon
Mayon-Rd, SibaguanV 4.506 C 0.333 - 0.500 - - - 83.30 90.26%
Outstanding
Philworks Construction and Supply 10181 Const. of Arimbay Bridge,
Detour & Approaches V 18.785 C 0.386 0.100 0.300 - - - 78.60 86.82% V. Satisfactory
Philworks Construction and Supply 32103 Const. of Cabotonan Bridge and
Approaches (Phase 1) V 17.749 C 0.384 0.232 0.300 - - - 91.60 82.87% V. Satisfactory
Philworks Construction and Supply 32103 Const. of Mabolo Flood Control V 9.460 C 0.317 0.300 0.300 - - - 91.70 *91.70%
OutstandingPhilworks Construction
and Supply 32103 Const. of Tula-tula Bridge & Detour V 8.523 C 0.327 0.225 0.300 - - - 85.20 *85.20%
V. Satisfactory
Philworks Construction and Supply 32103 Impv't./Rehab./Reblocking of
Andaya Highway V 23.880 C 0.299 0.300 0.300 - - - 89.90 85.04% V. Satisfactory
Philworks Construction and Supply 32103
Reconst./Replacement of Damaged Bridge, Traversia
Bridge 1V 23.269 C 0.355 0.200 0.300 - - - 85.50 84.87%
V. Satisfactory
Philworks Construction and Supply 32103
Road Opening/Upgrading of Uson-Tampuhan-Mambayawas-
AwayanV 9.458 O 0.328 0.300 0.100 0.030 0.033 0.100 89.10 -
Phranaret Construction 16878 Ban-May-Agui-A. Lista Isabela Brgy. Road CAR 3.195 O 0.320 0.291 0.000 0.015 0.037 0.100 76.30 -
Phranaret Construction 16878Impvt. Along Banawe-Mayoyao-Aguinaldo-Alfonso-Lista-Isabela
Bdry. Road, Kinakin SectionCAR 3.195 O 0.339 0.300 0.000 0.000 0.019 0.050 70.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 323
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Phranaret Construction 16878Repair/Rehab. of Lamut River Control, (Upstream of Lamut
Bay) Pob. WestCAR 0.925 C 0.313 0.300 0.300 - - - 91.30 74.26%
Satisfactory
Phranaret Construction 16878Widening/Conc. of Banaue-
Hungduan-Tinoc-Benguet Bdry. Road, Bokiawan Section
CAR 1.906 C 0.321 0.213 0.300 - - - 83.40 90.84% Outstanding
PIBS Trading & Construction 14734 Const. of Multi-Purpose Bldg.
Isabela West E/S IX 0.459 C 0.397 - 0.500 - - - 89.70 89.70% V. Satisfactory
PIBS Trading & Construction 14734
Rehab. of DPWH - Lanao del Norte DEO Bldg. & Emloyees'
QuarteerX 2.814 O 0.346 0.274 0.100 0.030 0.019 0.067 83.60 -
Pietras Builders Inc. 26738Slope Protection & Reblocking
of Sabulawan-Calaguise-Colubian Road Section
VIII 2.340 C 0.399 0.200 0.300 - - - 89.90 *89.90% V.Satisfactory
Pins Construction 13630 Rehab. of Drainage System San Pedro District IX 0.929 C 0.375 - 0.500 - - - 87.50 88.94%
V. Satisfactory
Pins Construction 13630 Repair of Farm to Market Road, Poblacion-Tambo X 0.192 C 0.288 0.254 0.300 - - - 84.20 *84.20%
V. Satisfactory
PJ Construction & Supply 32305 Const. of MPB Btgy. Panacan 2 IVB 0.474 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding
PJ San Pedro Const. And Supply 14994 Completion of Multi-Purpose
Gymnasium DOST 10.426 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -
PJ San Pedro Const. Supply 14994 Const. of Roads Brgy. 18-B XI 0.414 C 0.397 - 0.500 - - - 89.70 89.70%
V. Satisfactory
PJ San Pedro Const. Supply 14994 Rehabilitation of Road @ Purok
5-Panalum Proper XI 0.365 O 0.373 0.000 0.100 0.030 0.033 0.100 63.60 -
PLD Construction 1859Asphalting of Brgy. Road 1: Dungoan, 2 San Isidro and 3
TacdogVII 1.646 C 0.437 - 0.500 - - - 93.70 93.70%
Outstanding
PLD Construction 1859 Const. of Multi-Purpose Bldg. (Phase III) VII 1.929 C 0.494 - 0.500 - - - 99.40 99.40%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 324
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
PLD Construction 1859 Const. of Pedestrian Overpass VII 2.986 C 0.374 0.281 0.300 - - - 95.50 91.36% Outstanding
PLD Construction 1859Opening/Conc. of Cebu-Toledo
Wharf Road, Linao-Talisay-Minglanilla
VII 18.693 O 0.281 0.217 0.100 0.023 0.022 0.100 74.30 -
PLD Construction 1859 Rehab. of Processional Rd. Including Const. of Bridge VII 1.274 O 0.325 0.300 0.100 0.030 0.040 0.100 89.50 -
PMC Construction Corporation 1630
Const. of Covered Basketball Court & Renovation of Viewdeck
at BLCNHA 5.657 C 0.371 0.300 0.300 - - - 97.10 98.57%
Outstanding
Polangui Construction 8660Repair/Rehab. of Unpaved
Shoulder with Reblocking San Jose
V 0.360 C 0.368 - 0.500 - - - 86.80 86.80% V. Satisfactory
Polangui Construction 8660 Road Const./Rehab. @ Bongoran V 0.377 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V.Satisfactory
Polymer-vic Construction 6157 Const. of 2 CL School Bldg. @ Luakan NHS III 0.865 C 0.293 0.090 0.300 - - - 68.30 86.43%
V.Satisfactory
Polymer-vic Construction 6157 Const. of Concrete Revetment @ Brgy. Pagalanggang III 0.855 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase I)III 4.794 O 0.358 0.298 0.100 0.030 0.023 0.100 90.90 -
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase II)III 4.794 O 0.389 0.300 0.100 0.030 0.023 0.100 94.20 -
Polymer-vic Construction 6157 Repair and Rehab. Along Roman Expressway (Phase I) III 9.950 C 0.346 0.300 0.300 - - - 94.60 *94.60%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 325
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Postema Construction & Development 15283
Conc. of Brgy Road going to Bulihan Cemetery, Brgy. Old
BulihanIV-A 1.901 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
Postema Construction & Development 15283 Conc. of FMR @ Sitio Payad,
Brgy. Pulong Bunga IV-A 0.390 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Postema Construction & Development 15283 Concreting of Sitio Ilang-Ilang
Brgy. Batas FMR IV-A 0.952 C 0.306 - 0.500 - - - 80.60 83.42% V. Satisfactory
Postema Construction & Development 15283 Const. of Brgy. Hall at Medina IV-A 0.665 C 0.432 - 0.500 - - - 93.20 93.20%
OutstandingPostema Construction &
Development 15283 Const. of Multi-Purpose Building IV-A 2.121 C 0.399 0.300 0.300 - - - 99.90 *99.90% Outstanding
Postema Construction & Development 15283 Const. of Pooc Bridge IV-A 5.703 O 0.400 0.188 0.100 0.030 0.038 0.100 85.60 -
Postema Construction & Development 15283
Repair of Flood Control & Drainage System @ Timala River
Brgy. Cabuco (Baquero Br.)IV-A 0.630 O 0.306 0.200 0.300 - - - *80.60 -
Postema Construction & Development 15283 Widening of Tejero Bridge Phase
IV IV-A 8.664 C 0.320 0.300 0.300 - - - 92.00 87.56% V. Satisfactory
Power Move Builders & Construction Supply 22894
MBC CY 2004 Dumaguete Airport Road & DSR, DPR, DNR,
BKRVII 2.710 C 0.443 - 0.000 - - - 44.30 58.10%
Poor
PRC Construction 16631 Addalam River Irrigation Project NIA 2.607 C 0.300 0.240 0.300 84.000 *84.00% V. Satisfactory
PRC Construction 16631 Const. of 1-CL Acad Bldg., at Sanchez Mira C/S II 0.359 C 0.319 - 0.500 - - - 81.90 81.90%
V. Satisfactory
PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-02-06) NIA-II 4.804 C 0.389 0.200 0.000 0.015 0.028 0.200 83.19 83.19%
V.Satisfactory
PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-05-06) NIA-II 3.008 C 0.400 0.300 0.000 - - - 70.00 70.00%
Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 326
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
PRC Construction 16631 Lapogan Communal Pump Irrigation Project NIA-II 5.541 C 0.261 0.240 0.300 - - - 80.10 80.80%
Satisfactory
Presli Deles Construction 22694Const. One (1) unit CL modified
std. Sch. Bldg., Brgy. Upper Laperian
IX 0.487 C 0.371 0.193 0.300 - - - 86.40 *86.40% V. Satisfactory
Prime Edge Construction & Concrete Products 7902 Concreting of Road at Camp 7
Brgy. CAR 0.961 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory
Prime Edge Construction & Concrete Products 7902 Concreting of Road, Salud Mitra
Brgy. CAR 0.573 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding
Prime Edge Construction & Concrete Products 7902
Const. of Road at Sto. Tomas Brgy. Sto. Tomas Proper leading
to Adiwang E/SCAR 1.233 C 0.389 0.300 0.300 - - - 98.90 92.66%
Outstanding
Prime Edge Construction & Concrete Products 7902
Const./ Rehab. of Health Facilities, Campo Filipino Health
Center Campo Pilipino Health District
CAR 1.924 C 0.376 0.178 0.300 - - - 85.40 85.89% V. Satisfactory
Primitivo P. Eslabon Construction and Hardware 21904 Const. of Sta. Marcela Hall &
Pudtol Mun. Hall CAR 1.405 C 0.444 - 0.500 - - - 94.40 76.67% Satisfactory
Prodel Construction and Development Corporation 10839 Const. of School Bldg. @
Malabobo E/S I 0.864 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
Progressive Design & Construction 11826 Conc. of Camestizoan FMR I 0.190 C 0.328 0.300 0.300 - - - 92.80 *92.80%
Outstanding
Progressive Design & Construction 11826
Const. of FMR, Poblacion East Leading to Brgy. Sagneb, Arnap
& BelenI 0.474 C 0.200 - 0.500 - - - 70.00 70.00%
Fair
Progressive Design & Construction 11826 Const. of Multi-Purpose Building
@ University of Northern Phils. I 0.569 O 0.393 0.204 0.100 0.020 0.018 0.100 83.50 -
Progressive Resign & Construction 11826 Construction of Academic Bldg
I. DOST 4.295 O 0.353 0.241 0.07 0.015 0.028 0.1 80.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 327
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
P-Square Contracting Services 17963 Const. of Brgy. Roads at
Munting Tubig IVA 0.193 C 0.364 0.200 0.300 - - - 86.40 79.80% Satisfactory
P-Square Contracting Services 17963 Const. of Brgy. Roads at Pangao IVA 0.193 C 0.376 0.200 0.300 - - - 87.60 85.32%
V. Satisfactory
Pulsar Construction 24422 Completion of Abbag Bridge & Approaches II 24.514 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V.Satisfactory
Pulsar Construction 24422 Conc. of Nabannaga West New Orlins-Cabatacan East Rd. II 11.984 C 0.386 - 0.500 - - - 88.60 83.20%
V. Satisfactory
Pulsar Construction 24422 Conc. Paving of Jct. Logac-Lasam-Gagabutan Road II 8.674 C 0.350 0.283 0.300 - - - 93.30 93.30%
Outstanding
Pulsar Construction 24422
Rehab. of Pinacanauan Bridge's Approaches & Extension of
River Bank Protection & Dredging works Phase IV
II 9.524 C 0.296 0.300 0.300 - - - 89.60 *89.60% V.Satisfactory
Pulsar Construction 24422
Rehab. of Pinacanauan Bridge's Approaches & Extension of
River Bank Protection Works Phase III
II 4.598 C 0.267 0.300 0.300 - - - 86.70 *86.70% V.Satisfactory
Pulsar Construction 24422 River Control along Cagayan River Basin II 8.611 C 0.347 0.300 0.300 - - - 94.70 85.46%
V.Satisfactory
QM Builders 30743Asphalt Overlay of Santander-Barili-Toledo Road, Camboang
SectionVII 3.294 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V.Satisfactory
QM Builders 30743Asphalting of Sibonga-
Dumanjug Road, Brgy. Bulak Proper Section
VII 1.859 C 0.311 0.220 0.300 - - - 83.10 *83.10% V.Satisfactory
QM Builders 30743 Concreting of Dungo-an-Bolinawan Rd (Cluster C) VII 1.404 C 0.424 - 0.500 - - - 92.40 92.40%
Outstanding
QM Builders 30743 Const. of Flood Control Structure VII 3.555 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 328
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
QM Builders 30743 Const. of Multi-Purpose Building VII 1.056 O 0.334 0.300 0.100 0.030 0.006 0.100 87.00 -
QM Builders 30743 Const. of Pakigne Flood Control VII 2.862 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
QM Builders 30743 Impv't./Concreting of Kang-Actol Brgy. Rd. VII 1.088 C 0.429 - 0.500 - - - 92.90 83.96%
V. Satisfactory
QM Builders 30743 Rehab. & Repair of Brgy. Road @ Brgy. Manlapay VII 0.930 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V.Satisfactory
QM Builders 30743Repair/Rehab. of Sibunga-
Dumanjug Rd. (km. 51+950 - km. 53+298)
VII 9.645 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
QM Builders 30743 Repair/Rehab. of Tangke Drainage VII 0.918 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V.Satisfactory
QM Builders 30743 Repair/Rehab./Conc. of Trocio St. Brgy. Poblacion VII 5.158 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V.Satisfactory
QM Builders 30743 Repair/Rehab./Impvt. of Simala-Lindogon Brgy. Road VII 9.478 C 0.324 0.300 0.300 - - - 92.40 *92.40%
Outstanding
Quality Builder Corporation 17790 Const. of Two Classroom School Bldg VII 1.350 C 0.425 - 0.500 - - - 92.50 92.50%
Outstanding
Queen City Builders 21535 Concreting of Road @ Sitio Habitat Coronon XI 0.611 C 0.361 - 0.500 - - - 86.10 86.10%
V. Satisfactory
Quezon Victory and Gen. Contractor 6631 Const. of Sta. Cruz Diversion
Dam for Sta. Sta Cruz RIS NIA 78.176 C 0.349 0.22 0.300 - - - 86.33 86.33% V. Satisfactory
Quezon Victory General Contractor 6631 Completion of Multi-Purpose
Bldg at Brgy. 3 Poblacion IV-A 0.235 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding
Quezon Victory General Contractor 6631 Conc. of Bonliw FMR IVB 0.287 C 0.326 0.203 0.300 - - - 82.90 *82.90%
V. Satisfactory
Quezon Victory General Contractor 6631 Conc. of Brgy. Road @ Tanada
St. Brgy. San Vicente IV-A 0.283 C 0.397 0.000 0.300 - - - 69.70 *69.70% Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 329
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Quezon Victory General Contractor 6631 Conc. of MSR, Jct. Lopez-
Hondagua Port Road IVA 3.366 C 0.263 0.222 0.300 - - - 78.50 *78.50% Satisfactory
Quezon Victory General Contractor 6631 Conc. Reblocking along MSR
Diversion Road IV-A 0.288 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory
Quezon Victory General Contractor 6631 Concreting of Brgy. Road, Brgy.
Villa Padua IV-A 0.283 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding
Quezon Victory General Contractor 6631
Const. of 2 Storey 2 CL School Bldg., Library Bldg. @ Luis Palad
National H/SIV-A 1.060 C 0.162 0.300 0.300 - - - 76.20 *76.20%
Satisfactory
Quezon Victory General Contractor 6631 Const. of Drainage System at
Brgy. Cotta IV-A 0.755 C 0.473 - 0.500 - - - 97.30 *97.30% Outstanding
Quezon Victory General Contractor 6631 Const. of MPB IV-A 1.460 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB @ Brgy.
Peñafrancia IV-A 0.333 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB @ Infanta E/S IV-A 1.925 C 0.358 0.200 0.300 - - - 85.80 73.27%
Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB, Brgy. Abo,
Nagcarlan IV-A 1.337 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory
Quezon Victory General Contractor 6631 Const. of Multi-Purpose Hall @
Brgy. San Joaquin IV-A 0.862 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Quezon Victory General Contractor 6631 Impvt. of Water Supply System
@ Brgy. Pacabit IV-A 0.964 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
Quezon Victory General Contractor 6631
Maintenance, Rehab. & Impvt. of National Arterial Road along
Maharlika HighwayIV-A 9.969 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Quezon Victory General Contractor 6631 Rehab./Impvt. of Quezon-
Batangas Road IV-A 5.746 C 0.363 0.300 0.300 - - - 96.30 88.56% V. Satisfactory
Quirante Construction 32827 Const. of 1 CL Sch. Bldg. @ Balud NHS VII 0.482 C 0.341 0.248 0.300 - - - 88.90 *88.90%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 330
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R A Ignacio Construction 29977 Const./Rehab. of MPB NCR 0.942 C 0.302 0.200 0.300 - - - 80.20 *80.20% V.Satisfactory
R L K Construction and Builders 32194 Conc. of Road in Carmen West I 1.925 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
R N V Construction 12570 Conc. of Dapawan-Torrel Road IV-B 4.693 C 0.358 0.200 0.300 - - - 85.80 *85.80% V.Satisfactory
R N V Construction 12570 Rehab./Impvt. of Romblon DEO IV-B 4.693 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -
R N V Construction 12570 Repair/Rehab. of Odiongan North Central E/S IV-B 0.478 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
R. A. De Leon Construction 18078 Concreting of Binubusan Brgy. Road IV-A 0.945 C 0.389 - 0.500 - - - 88.90 88.90%
V. Satisfactory
R. Agullo Construction & Enterprises 11109 Const. of MPB @ Brgy. Sto.
Rosario (Phase III) VIII 0.282 C 0.311 0.200 0.300 - - - 81.10 *81.10% V. Satisfactory
R. Agullo Construction & Enterprises 11109 Const. of Sta. Margarita NHS
Bldg. VIII 0.508 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
R. Allosa Construction 12964 Concrete Paving Tabango-San Isidro Rd VIII 3.893 C 0.421 - 0.500 - - - 92.10 92.10%
Outstanding
R. Anin Jr. Construction 14888 Const. of Cabacao Flood Control IV-B 1.926 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
R. Anin Jr. Construction 14888
Resurfacing of Bulalacao-San Jose Jct. Mapaya Road, Paclolo
Section, Km.222+000-Km.225+500
IV-B 0.573 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
R. Agullo Construction & Enterprises 11109 Const. of Health Center @ Brgy.
Can-Uguib VIII 0.233 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
R. B. Ombao Const. 17042 Replacement of Cabcaben Bridge Cabcaben III 4.709 C 0.393 - 0.500 - - - 89.30 73.34%
Satisfactory
R. Calingasan Construction 8173 Conc/ Widening of Road Brgy. IV-A 0.188 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 331
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R. D. Ramos Const. & Enterprises 18771 Concreting of Road at Brgy.
Pook ni Kapitan IV-A 0.284 C 0.394 - 0.500 - - - 89.40 89.40% V. Satisfactory
R. G. Diaz Builders & Trading 23814
Const./Repair/Rehab. of Multi-Purpose School Bldg., @
Angeles CityIV-B 0.748 C 0.488 - 0.500 - - - 98.80 98.00%
Outstanding
R. G. Roque Const. & Trading 21788 Rehab. of School Premises @
Mexico National H/S San Carlos III 0.952 C 0.468 - 0.500 - - - 96.80 96.80% Outstanding
R. K. Engineering & Construction 12534
Conc. of Critical Section along National Circumferential
(Salawad-Pawikan-Baso Section)VIII 4.755 C 0.291 0.300 0.300 - - - 89.10 88.20%
V.Satisfactory
R. K. Engineering & Construction 12534 Const. of Biliran NAHS 2 Cl Bldg. VIII 0.830 C 0.340 0.101 0.300 - - - 74.10 *74.10%
Satisfactory
R. K. Engineering & Construction 12534 Const. of Esperanza Drainage VIII 0.095 C 0.320 0.200 0.300 - - - 82.00 76.18%
Satisfactory
R. Ochea Construction & Supplies 15775
Concreting of Toledo-Tabuelan-San Remegio Road, Mangga
Sect.VII 4.675 C 0.385 0.200 0.300 - - - 88.50 89.88%
V. Satisfactory
R. Ochea Construction & Supplies 15575 Const. of Multi-Purpose Building VII 4.748 C 0.399 0.100 0.300 - - - 79.90 85.61%
V. Satisfactory
R. Ochea Construction & Supplies 15775 Const. of Multi-Purpose Building
at Poblacion Tuburan VII 4.748 O 0.373 0.240 0.100 0.015 0.027 0.100 85.50 -
R. R. Encabo Constructors and Traders 14716
Punta- Santa Ana URA Project, URA-MLA-02A 728 Housing
ProjectPRRC 218.4 O 0.33 0.3 0.1 0.03 0.05 0.1 91.34 -
R. R. Seismundo Construction and Supply 10961 Const. of 1 CL School Bldg., at
Montevista NHS, DNAS XI 0.469 C 0.335 0.000 0.100 0.020 0.032 0.100 58.72 60.40% Fair
R. Semilla Construction and Marketing 9263 Const. of Multi-Purpose Bldg.,
Lapulabao XI 0.939 C 0.404 - 0.500 - - - 90.40 59.74% Poor
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 332
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R. Semilla Construction and Marketing 9263
Rehab./Impvt. of DPWH Davao del Sur 1st DEO inc. Employees
QuartersXI 7.700 O 0.386 0.240 0.100 0.030 0.041 0.100 89.70 -
R.A. Abaño Construction 11828 Const. of Farm-to-Market Road IV-A 0.653 C 0.347 - 0.500 - - - 84.70 *84.70% V. Satisfactory
R.A. Abaño Construction 11828 Const. of Multi-Purpose Bldg. At Brgy. Malinao-Ilaya IV-A 0.236 C 0.464 - 0.500 - - - 96.40 96.40%
Outstanding
R.A. Del Rosario Construction 4636 Const. of MPB, Brgy. San
Agustin III IV-A 4.778 O 0.322 0.231 0.100 0.015 0.029 0.100 79.70 -
R.A. Del Rosario Construction 4636 Const. of Two (2), Four (4)Cl
School Building IV-A 2.857 C 0.367 0.300 0.300 - - - 96.70 70.17% Satisfactory
R.A. Del Rosario Construction 4636 Rehab./Reconst. (Concreting) of
Indang-Alfonso via Luksuhin Rd. IV-A 39.525 O 0.325 0.300 0.100 0.020 0.028 0.100 87.30 -
R.A. Matias Const. & Developer 26346 Concreting of FTMR @
Poblacion East I 0.480 C 0.259 - 0.500 - - - 75.90 75.90% Satisfactory
R.A. Matias Const. & Developer 26346
Const. of Multi-Purpose San Vicente Brgy. Hall Brgy. San
VicenteI 0.336 C 0.390 - 0.500 - - - 89.00 89.00%
V. Satisfactory
R.A. Montejo Construction 21718 Const. of Box Culvert VIII 0.963 C 0.332 0.200 0.300 - - - 83.20 *83.20% V.Satisfactory
R.A. Montejo Construction 21718 Renovation of Research Bldg. @ Leyte Normal University VIII 0.945 C 0.393 0.300 0.300 - - - 99.30 *99.30%
Outstanding
R.A. Pahati Gravel and Sand 22495
Rehab./Impvt. of Maculcol Dike/Approach including Impvt.
Of Access RoadIII 7.795 C 0.280 0.157 0.300 - - - 73.70 *73.70%
Satisfactory
R.A. Pahati Gravel and Sand 22495 Rehab./Impvt. of River Banks
(Abitonan River) III 3.856 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 333
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.A. Pahati Gravel and Sand 22495
Rehab./Impvt. of Concrete Slope Protection along Digmala River
ControlIII 4.753 C 0.289 0.300 0.300 - - - 88.90 *88.90%
V. Satisfactory
R.A. Yolangco Construction 15602 Const. of Farm-to-Market Road IV-A 0.962 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
R.A. Yolangco Construction 15602 Const. of MPB (Coop. Union of Cavite) IV-A 1.433 C 0.376 0.247 0.300 - - - 92.30 *92.30%
Outstanding
R.A.M. Builders 10459 Conc. Of Quirino Highway, Quezon Side Phase XIV IV-A 14.420 C 0.255 0.199 0.300 - - - 75.40 *75.40%
Satisfactory
R.A.M. Builders 10549
Const. of Quezon Eco-Tourism Road (LUC-BAT CR) incl. RROW: Phase I, Guisguis-Talaan Sect.,
Conc. Of Guisguis Section
IV-A 17.780 O 0.337 0.300 0.100 0.030 0.037 0.100 90.40 -
R.A.M. Builders 10549 Impvt., Regravelling/Conc. of Road IV-A 14.387 C 0.122 0.300 0.300 - - - 72.20 79.52%
Satisfactory
R.A.M. Builders 10549Rehab./Impvt. of Lucena-
Tayabas Road, Gulang-gulang Sect.
IV-A 19.209 O 0.323 0.300 0.100 0.020 0.030 0.100 87.30 -
R.A.M. Builders 10549 Rehab./Impvt. of MSR-Old Route IV-A 14.328 O 0.315 0.300 0.100 0.020 0.030 0.100 86.50 -
R.A.M. Builders 10549Rehab./Impvt. of San Pablo-
Boundary-Dolores-Pinagdanglayan Road
IV-A 13.424 C 0.313 0.300 0.300 - - - 91.30 90.55% Outstanding
R.B. Basista Construction & Supply 26829 Impvt. of San Isidro-Trujillo Road VIII 4.796 C 0.307 0.200 0.300 - - - 80.70 * 80.70%
V. Satisfactory
R.B. Candare Construction 8819 Conc. of Bay-ang-Calamba Prov. Road XIII 1.896 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
R.B. Candare Construction 8819 Const. of MPB (Covered Court) XIII 1.875 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory
R.C. Miranda Construction & Supplies 9036 Conc. of Sta. Ines-Matalapitap
Road Phase II III 5.795 C 0.325 - 0.500 - - - 82.50 80.88% V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 334
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.C. Tagala Construction 11597 Completion of Multi-Purpose Building VI 2.854 C 0.319 0.147 0.300 - - - 76.60 83.81%
V. Satisfactory
R.C. Tagala Construction 11597 Concreting of Calategas-Aramaywan Rd., Sect. IV-B 2.154 C 0.390 - 0.500 - - - 89.00 89.00%
V.Satisfactory
R.C. Tagala Construction 11597 Concreting of Parian-Cabuluan Road Section IV-B 3.749 C 0.424 - 0.500 - - - 92.40 93.88%
V. Satisfactory
R.C. Tagala Construction 11597 Concreting of Tugdan-Alcantara Looc Road IV-B 2.209 O 0.320 0.240 0.100 0.030 0.047 0.100 83.70 -
R.C. Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Road IV-B 28.854 C 0.327 0.300 0.300 - - - 92.70 81.84%
V. Satisfactory
R.C. Tagala Construction 11597 Const. of Barokan Flood Control along MWCR, Phase II IV-B 11.902 C 0.282 0.200 0.300 - - - 78.20 *78.20%
Satisfactory
R.C. Tagala Construction 11597 Const. of Boac River Control IV-B 3.981 C 0.282 - 0.500 - - - 78.20 75.50% Satisfactory
R.C. Tagala Construction 11597 Const. of Libtangin River Control IV-B 4.748 C 0.313 0.296 0.300 - - - 90.90 90.90% Outstanding
R.C. Tagala Construction 11597 Const. of Manggamnan Bridge Approach IV-B 1.672 O 0.309 0.300 0.100 0.030 0.033 0.100 87.20 -
R.C. Tagala Construction 11597 Const. of Pagbahan Flood Control (Phase I) IV-B 13.920 O 0.266 0.200 0.100 0.023 0.025 0.200 81.40 -
R.C. Tagala Construction 11597 Const. of Sch. Bldg. (4 CL) Narra Pilot Sch. IVB 3.789 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
R.C. Tagala Construction 11597Const. of Tanjay River Control, Brgys. 1,2,3,4 and San Isidro along the Nautical Highway
VII 9.444 C 0.336 0.247 0.300 - - - 88.30 70.78% Satisfactory
R.C. Tagala Construction 11597 Const. of Taritien Bridge IV-B 4.230 C 0.369 0.300 0.300 - - - 96.90 86.88% V. Satisfactory
R.C. Tagala Construction 11597 Const. of Various School Bldg. (Tagumpay E/S) IV-B 9.043 C 0.393 - 0.500 - - - 89.30 80.34%
V. Satisfactory
R.C. Tagala Construction 11597 Impvt. of Aramaywan-Berong Road IV-B 18.964 C 0.372 0.200 0.300 - - - 87.20 80.06%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 335
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.C. Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road IV-B 18.950 O 0.280 0.225 0.100 0.030 0.033 0.100 76.80 -
R.C. Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road IV-B 18.950 O 0.346 0.225 0.100 0.030 0.038 0.100 83.90 -
R.C. Tagala Construction 11597Reblocking of Jct. MWCR-San Jose Airport Rd.-Jct. Bubog
RoadIV-B 9.607 C 0.324 0.171 0.300 - - - 79.50 71.58%
Satisfactory
R.C. Tagala Construction 11597 Rehab. of Existing Asphalt and Const. of Lined Canal IV-B 5.491 C 0.376 - 0.500 - - - 87.60 49.54%
Poor
R.C. Tagala Construction 11597 Repair/Rehab. of FMR VII 0.464 C 0.293 0.300 0.300 - - - 89.30 79.04% Satisfactory
R.D. Cobacha Construction 20833 Const. of ABC Hall VIII 1.280 C 0.350 0.196 0.300 - - - 84.60 72.21% Satisfactory
R.D. Interior Junior Const./J.H. Pajara Const.
Corp. (J.V.)
SL2-SN-000366/JV-
02-019
Const./Impv't. (PCCP) of C.P.B.: Sultan Gumander-Dobliston Jct.
RoadKFAED 608.260 C 0.334 0.300 0.300 - - - 93.40 90.58%
Outstanding
R.D. Interior Junior Construction 6483 Asphalt Overlay along Cordon-
Aurora Brgy. Road II 4.920 C 0.392 0.300 0.300 - - - 99.20 *99.20% Outstanding
R.D. Interior Junior Construction 6483
Conc. of SDCR, Marihatag-Hinatuan-Bislig Section,
(Tagbina-Hinatuan Subsection)XIII 282.908 O 0.331 0.300 0.100 0.030 0.050 0.100 91.10 -
R.D. Interior Junior Construction 6483 Const. of Runruno Bridge &
Approaches II 7.803 C 0.480 - 0.500 - - - 98.00 97.46% Outstanding
R.D. Interior Junior Construction 6483 Const. of Sinippil Bridge and
Approaches II 13.688 C 0.335 0.277 0.300 - - - 91.20 86.90% V. Satisfactory
R.D. Interior Junior Construction 6483 Const./Asphalting of Dumabato
Norte Brgy. Road II 0.455 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
R.D. Interior Junior Construction 6483 Const./Asphalting of Guinalbin
Brgy. Road II 0.932 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
R.D. Interior Junior Construction 6483 Const./Asphalting of Villa Norte
Brgy. Road II 1.388 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 336
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.D. Interior Junior Construction 6483 Impvt. of Maria Clara-Gabriela
Road II 4.783 C 0.312 0.300 0.300 - - - *91.20 91.20% Outstanding
R.D. Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag & San Vicente Bridge)
XIII 289.168 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -
R.D. Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo & San Vicente Bridge)
XIII 289.168 O 0.326 0.300 0.100 0.030 0.038 0.100 89.40 -
R.D. Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo & San Vicente Bridge)
XIII 289.168 O 0.294 0.281 0.100 0.022 0.055 0.100 85.20 -
R.D. Interior Junior Construction 6483
Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo & San Vicente Bridge)
XIII 289.168 O 0.352 0.300 0.100 0.030 0.055 0.100 93.70 -
R.D. Interior Junior Construction 6483 Repair/Maint. of Nat'l Road along
Santiago-Tuguegarao Road II 4.975 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory
R.D. Policarpio & Co., INC. 4414Construction of Overpasses
Project in the Province of Bataan, Pampanga and Tarlac
BCDA 208.033 C 0.351 0.300 0.300 - - - 95.07 91.17% Outstanding
R.D. Policarpio & Company, Inc. / Pumyang
Construction Company, Ltd. (JV)
4414 ADB Sixth Road Impv't. Project CP 6MI-15 IX 740.582 O 0.360 0.300 0.000 0.024 0.037 0.067 78.80 -
R.D. Policarpio Company, Inc. 4414
Contract Package "N": Replacement/Retrofitting of
Three (3) BridgesADB 67.207 O 0.335 0.300 0.000 0.030 0.042 0.000 70.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 337
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.D. Policarpio Company, Inc. 4414
CP 6: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Baganga Section Phase I
XI 157.077 O 0.339 0.240 0.100 0.030 0.055 0.100 86.40 -
R.D. Policarpio Company, Inc. 4414
Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan (Bulacan) to
Mabalacat (Pampanga) Ph-IV Package VII, Replacement of
Tinajero Bridge & App.
III 45.805 O 0.373 0.240 0.100 0.030 0.061 0.100 90.40 -
R.D. Policarpio Company, Inc. 4414
Sixth Road Project Component CP 4 Gen. Santos-Cotabato City
RoadXII 170.852 O 0.301 0.298 0.000 0.030 0.061 0.067 75.70 -
R.D. Sadsad Const. & Trading 19240 Concrete Reblocking with
Rehab., Impvt. of Rizal Ave, III 5.414 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding
R.D. Sadsad Const. & Trading 19240 Impvt./Rehab. of Anunas-Margot
Road III 2.820 C 0.326 0.200 0.300 - - - 82.60 * 82.60% V. Satisfactory
R.D. Sadsad Const. & Trading 19240
Package 16: Const./Rehab./Impv't. of FMR
Porac, Sta. Rita & GuaguaIII 0.944 C 0.311 - 0.500 - - - 81.10 81.10%
V. Satisfactory
R.D. Sadsad Const. & Trading 19240 Rehab. of Canal @ Brgy. San
Pablo II Road III 0.949 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
R.D. Sadsad Const. & Trading 19240 Rehab. of Road @ Brgy. Gulod
Malagu IV-A 0.960 C 0.387 0.300 0.300 - - - 98.70 *98.70% Outstanding
R.D. Sadsad Const. & Trading 19240 Repair/Rehab., Gapan-San
Fernando-Olongapo (GSO) III 9.653 O 0.348 0.200 0.100 0.030 0.058 0.100 83.60 -
R.D. Sadsad Const. & Trading 19240
Upgrading/Impvt. of San Fernando-Lubao Road (Sto.
Tomas Section)III 4.730 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
R.F. Diaz Construction 3398 Const. of School Building at University of Rizal System IV-A 9.609 C 0.155 0.300 0.300 - - - 75.50 69.83%
Fair
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 338
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.F. Diaz Construction 3998 Impvt./Completion of Calalay Bldg. @ Sto. Cristo E/S NCR 2.631 C 0.326 0.300 0.300 - - - 92.60 90.99%
Outstanding
R.F. Diaz Construction 3998 Impvt./Rehab. of MPB NCR 2.387 C 0.369 0.300 0.300 - - - 96.90 85.21% V. Satisfactory
R.F. Varquez Const. 24302 Completion of Timamana MPB, Brgy. Timamana XIII 1.638 C 0.332 0.300 0.300 - - - 93.20 *93.20%
Outstanding
R.F.G. Construction 13188 Completion of MPB @ Brgy. Dayano XIII 0.555 C 0.377 0.221 0.300 - - - 89.80 68.73%
Fair
R.F.G. Construction 13188 Concreting of Shoulder along Surigao Wharf Road XIII 7.274 C 0.393 - 0.500 - - - 89.30 83.72%
V. Satisfactory
R.F.G. Construction 13188 Concreting of Surigao-San Juan Lipata Coastal Rd. XIII 1.548 C 0.411 - 0.500 - - - 91.10 84.74%
V. Satisfactory
R.F.G. Construction 13188 Const. of Banahaw Bridge, Phase IV XIII 9.904 C 0.367 0.300 0.300 - - - 96.70 91.30%
Outstanding
R.F.G. Construction 13188 Const. of MPB @ Brgy. 12 XIII 1.925 C 0.336 0.131 0.000 - - - 46.70 68.54% Fair
R.F.G. Construction 13188 Const. of Municipal Public Market, Phase III XIII 1.795 C 0.311 0.300 0.300 - - - 91.10 81.86%
V. Satisfactory
R.F.G. Construction 13188 Const. of Sabang Bridge III Phase V XIII 9.167 C 0.364 0.300 0.300 - - - 96.40 90.14%
Outstanding
R.F.G. Construction 13188 Const. of Sabang Bridge III, Phase IV XIII 4.583 C 0.328 - 0.500 - - - 82.80 79.38%
Satisfactory
R.F.G. Construction 13188 Const. of Toledo S. Pantilo MPB XIII 0.927 C 0.343 0.300 0.000 - - - 64.30 71.30% Satisfactory
R.F.G. Construction 13188 Const.Completion of Tayaga Disaster Evacuation Center XIII 0.463 C 0.384 0.224 0.300 - - - 90.80 90.80%
Outstanding
R.G. Diaz Builders & Trading 23814
Package XIV-Const. of Multi-Purpose Bldg. (Covered Court)
@ San Nicolas E/SIII 0.937 C 0.381 0.300 0.300 - - - 98.10 *98.10%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 339
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.G. Erillo Construction, Incorporated 932 Widening/Impv't. of Bacolod
South-Kabankalan Rd. VI 9.623 C 0.396 - 0.500 - - - 89.60 90.68% Outstanding
R.G. Florentino Construction & Trading 18301 Concreting of Upper Jun Carlo
FMR IV-B 0.462 C 0.344 0.084 0.300 - - - 72.80 72.80% Satisfactory
R.G. Florentino Construction & Trading 18301 Const. of Brgy. Multi-Purpose
Bldg. Poblacion IV-B 0.268 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory
R.G. Florentino Construction & Trading 18301 Rep./Maintain of Colis RCDG
Bridge Approach Km.019+342 IV-B 0.189 C 0.433 0.500 - - - 93.30 93.30% Outstanding
R.J. Ibarra Construction 23538Asphalt Overlay & Conc.
Reblocking along Olongapo-Bugallon Rd.
III 4.670 C 0.333 0.300 0.000 - - - 63.30 77.34% Satisfactory
R.J. Ibarra Construction 23538 Completion of Bangal Bridge III 5.644 C 0.366 0.237 0.300 - - - 90.30 *90.30% Outstanding
R.J. Ibarra Construction 23538 Const. of 2 CL Sch. Bldg. Secondary III 2.062 O 0.260 0.266 0.100 0.030 0.023 0.100 77.90 -
R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal III 0.930 C 0.272 0.300 0.300 - - - 87.20 83.49% V. Satisfactory
R.J. Ibarra Construction 23538 Const. of MPB @ San Marcelino III 2.072 C 0.305 0.151 0.300 - - - 75.60 76.23% Satisfactory
R.J. Ibarra Construction 23538 Repair/Rehab. of 3-Cl, 1-Storey S/B Bangal E/S III 0.281 C 0.473 - 0.500 - - - 97.30 81.87%
V. Satisfactory
R.J. Ibarra Construction 23538
Repair/Rehab. of Slope Protection along Linasin Creek,
San Marcelino-San Antonio Road
III 1.930 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
R.K.X. Odiamar Construction 16107 Const. of MPB @ Penfrancia V 1.498 C 0.365 0.200 0.300 - - - 86.50 *86.50%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 340
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.M. Nuñez Construction 26206Asphalt Overlay of Ninoy Aquino Ave., North Bound Kabihasnan
Duty Free w/ exceptionNCR 4.937 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
R.M. Nuñez Construction 26206 Const. of Lower Bicutan Bridge NCR 3.297 C 0.235 0.200 0.300 - - - 73.50 *73.50% Satisfactory
R.M. Padillo Builders 31206 Completion of MPB @ Remedios T. Romualdez Elem. Sch. VIII 0.964 C 0.274 0.200 0.300 - - - 77.40 *77.40%
Satisfactory
R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ Alang-alang NHS VIII 0.503 C 0.364 0.200 0.000 - - - 56.40 71.10%
Satisfactory
R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ San Jose NHS VIII 0.501 C 0.381 0.100 0.300 - - - 78.10 *78.10%
Satisfactory
R.M. Padillo Builders 31205 Const. of Reinforced Concrete Box Culvert (RCBC) VIII 2.830 C 0.358 0.300 0.300 - - - 95.80 70.36%
Satisfactory
R.M. Padillo Builders 31206
Repair/Replacement of Lined Canal & Road Embankment
Protection at Daan Maharlika km. 903+400 - km. 906+200
VIII 2.848 C 0.337 0.200 0.300 - - - 83.70 83.64% V.Satisfactory
R.M. Pingol Const. & Dev't. Corporation 11163
CP IV-A, Jct. Maharlika Highway-Jaen-San Isidro Rd.(Km.98+453.0 to Km.105+256.275) w/ exception
III 34.837 O 0.372 0.300 0.000 0.012 0.025 0.033 74.20 -
R.M. Vitug Construction 9227 Conc. of Sta. Barbara Road III 4.026 C 0.361 - 0.500 - - - 86.10 86.10% V.Satisfactory
R.M. Vitug Construction 9227 Const. of MPB III 0.931 C 0.313 0.200 0.300 - - - 81.30 83.89% V. Satisfactory
R.M. Vitug Construction 9227 Const./Impvt. of San Jose Road III 5.703 C 0.328 0.200 0.300 - - - 82.80 *82.80% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 341
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.M. Vitug Construction 9227 Const./Repair/Rehab. of Various Road Brgy. Cutcut III 3.380 C 0.416 - 0.500 - - - 91.60 91.60%
Outstanding
R.M. Vitug Construction 9227 Improvement of Multi-Purpose Building III 0.187 C 0.437 - 0.500 - - - 93.70 90.34%
Outstanding
R.M. Vitug Construction 9227 Repair/Rehab. of Retaining Wall and Drainage Out Fall III 0.468 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
R.M. Vitug Construction 9227 Riprapping of Balimbing River, Country Homes, NCR 0.958 C 0.350 - 0.500 - - - 85.00 *85.00%
V. Satisfactory
R.M.A.J. Construction 18623 Conc. of Manburao-Paluan Rd. (Tayamaan Sect.) IV-B 1.433 C 0.327 - 0.500 - - - 82.70 65.24%
Fair
R.M.A.J. Construction 18623 Concreting of Paclolo FMR IV-B 0.937 C 0.409 - 0.500 - - - 90.90 90.90% Outstanding
R.M.A.J. Construction 18623 Rehab. of Abut. B of Mompong Bridge Approach "B" IV-B 2.894 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
R.N.G.M. Construction 20281 Const. of Multi-Purpose Pavement III 0.521 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
R.N.G.M. Construction 20281 Water Supply Project @ Brgy. 3 & 4 III 2.353 C 0.311 0.300 0.300 - - - 91.10 85.50%
V. Satisfactory
R.O. Builders & Dev. Corp. 22393Conc. of Aritao-Dupax-Kasibu-
Quirino Road, Mangagyang-Banganan Section
II 6.566 C 0.366 0.172 0.300 - - - 83.80 89.38% V. Satisfactory
R.O. Builders & Dev. Corp. 22393Const. of Banganan Flood
Control, Upstream of Mangayang Bridge
II 2.853 C 0.380 0.300 0.300 - - - 98.00 76.82% Satisfactory
R.O. Builders & Dev. Corp. 22393 Const. of Inaban Bridge and Approaches II 7.939 C 0.472 - 0.500 - - - 97.20 97.20%
Outstanding
R.O. Builders & Dev. Corp. 22393 Const. of Mangayang Bridge Phase IV, Banganan II 14.449 C 0.466 - 0.500 - - - 96.60 94.26%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 342
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.O. Builders & Dev. Corp. 22393 Const. of Namamparan Bridge & Approaches II 13.528 O 0.262 0.253 0.070 0.030 0.028 0.067 71.00 -
R.O. Builders & Dev. Corp. 22393
Rehab. of Daang Maharlika Intermittent Section, from
Macate Section, Bambang-San Luis Sect.
II 19.289 C 0.267 0.300 0.300 - - - 86.70 86.40% V. Satisfactory
R.O. Builders & Dev. Corp. 22393 Repair/Maint./Rehab. & Impv't. of Daang Maharlika II 4.180 C 0.286 - 0.500 - - - 78.60 80.64%
V. Satisfactory
R.O. Builders & Development Corporation 22393
Conc. of Aritao-Dupax-Kasibu-Quirino Road, Mangayang
SectionII 16.182 O 0.351 0.279 0.100 0.020 0.033 0.067 85.00 -
R.O.M. Builders 28654 Conc. of Roads in Brgy. Kapito IV-A 0.471 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
R.O.M. Builders 28654 Conc. of Roads, Brgy. Gumamela IV-A 0.477 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Outstanding
R.P. Inducil Construction 8984 Conc. of Roads at Brgy. Poblacion III 0.949 C 0.342 0.300 0.300 - - - 94.20 *94.20%
Outstanding
R.P. Parayno Construction 32862Dredging/Desilting & Const. of
Drainage @ Zone 1 7 III & Calambayan
I 1.435 O 0.364 0.120 0.100 0.020 0.042 0.133 77.90 -
R.R. A. Requillas Construction & Supply 20217 Const. of Revetment V 1.425 C 0.335 0.200 0.300 - - - 83.50 76.54%
Satisfactory
R.R. Encabo Const. & Traders 14716 Const. of 2 CL School Bldg. @
Cristo Rey H/S (ORES) III 0.885 C 0.297 0.272 0.300 - - - 86.90 *86.90% V. Satisfactory
R.R. Encabo Const. & Traders 14716
Punta-Santa Ana URA Project, URA-MLA-02A 728 Housing
ProjectPRRC 218.400 O 0.333 0.300 0.100 0.030 0.050 0.100 91.34 -
R.R. Ricafort Construction 14402 Conc. of FMR @ Brgy. Balayang III 0.614 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 343
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.R. Ricafort Construction 14402Conc. of Main Canal @ Rizal St.
(San Gavino-Sta. Barbara Section)
III 2.330 C 0.362 0.200 0.300 - - - 86.20 84.46% V. Satisfactory
R.R. Ricafort Construction 14402 Const. of 1 CL Sch. Bldg. @ Paniqui South Central E/S III 0.480 C 0.263 0.300 0.300 - - - 86.30 * 86.30%
V. Satisfactory
R.R. Ricafort Construction 14402 Const. of 1 CL School Bldg. @ Carangian E/S III 0.376 O 0.356 0.262 0.100 0.030 0.029 0.100 87.70 -
R.R. Ricafort Construction 14402 Const. of North Central E/S III 0.373 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding
R.R. Ricafort Construction 14402Const. of Two (2) Storey 10 CL
Sch. Bldg. at Capas High School (Formerly Sto. Domingo H/S)
III 6.430 C 0.312 0.272 0.300 - - - 88.40 *88.40% V. Satisfactory
R.R. Ricafort Construction 14402 NHA-PNP Camp Macabulos Housing Project NHA 3.124 C 0.38 0.300 0.300 - - - 98.0 98.00%
Outstanding
R.R. Ricafort Construction 14402Repair and Rehab. of
Concepcion-Lapaz Road (Lapaz Section)
III 4.746 C 0.371 0.216 0.300 - - - 88.70 *88.70% V. Satisfactory
R.R. Ricafort Construction 14402Repair/Rehab. of MPB @ Tarlac North Command (North Luzon
Command)III 0.917 C 0.344 0.174 0.300 - - - 81.80 * 81.80%
V. Satisfactory
R.R. Ricafort Construction and Supplies (Formerly:
R.R. Ricafort Construction)14402 Const. of MPB, Brgy. Burgos III 3.004 O 0.302 0.240 0.100 0.000 0.018 0.100 76.00 -
R.R. Seismundo Construction & Supply 10961
Const. of Add'l Two (2) Lanes @ Nabunturan-Mainit Park Rd. Pob.
Nabunturan Sect.XI 3.557 C 0.207 - 0.500 - - - 70.70 77.78%
Satisfactory
R.R. Seismundo Construction & Supply 10961 Const. of One (1) Cl School Bldg.
in New Allegria ES XI 0.384 C 0.367 0.209 0.300 - - - 87.60 84.80% V. Satisfactory
R.R. Seismundo Construction & Supply 10961 Const. of One (1) CL School
Bldg., at Montevista NHS, DNAS XI 0.469 O 0.352 0.000 0.100 0.020 0.032 0.100 60.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 344
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.R. Seismundo Construction & Supply 10961 Const. of Two (2) CL Bldg., @
Mawab Nat'l. High School XI 0.723 C 0.475 - 0.500 - - - 97.50 97.50% Outstanding
R.R. Tandem Construction Corporation 12846 Rehab. of Manila North Road III 6.659 C 0.304 0.275 0.300 - - - 87.90 *87.90%
V. Satisfactory
R.S. Reyna Construction 9648 Const. of Inopacan Seawall VIII 4.698 C 0.350 0.200 0.300 - - - 85.00 80.92% V. Satisfactory
R.S. Reyna Construction 9648 Const. of MPB @ Brgy. Maybog (Phase II) VIII 0.469 C 0.221 0.200 0.300 - - - 72.10 *72.10%
Satisfactory
R.S. Reyna Construction 9648 Const. of MPB @ Brgy. Proteccion (Phase II) VIII 0.471 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
R.S. Sepian Construction and Trucking 20519
Impvt./Rehab. Of Bontoc-Lubuagan-Tabuk Rd., Circle-
Caluttit Road CAR 13.470 C 0.325 0.300 0.000 - - - 62.50 63.72%
Fair
R.T. Lim Construction and Supply 17045 Conc. of Road, Pan-ay Diot X 0.877 C 0.313 0.200 0.300 - - - 81.30 *81.30%
V. Satisfactory
R.T. Lim Construction and Supply 17045
Improvement of Roads Including Drainage, Ozamis-Oroquieta
RoadX 0.803 C 0.381 - 0.500 - - - 88.10 *88.10%
V. Satisfactory
R.T. Morabe Construction 11377 Completion of UP Tacloban Multi-Purpose Bldg. VIII 0.921 C 0.462 - 0.500 - - - 96.20 *96.20%
Outstanding
R.T. Morabe Construction 11377 Conc. of Municipal Road VIII 4.720 C 0.321 0.200 0.300 - - - 82.10 *82.10% V.Satisfactory
R.T. Morabe Construction 11377 Conc. of Oras-San Policarpio Road Sect. VIII 9.430 C 0.341 0.109 0.000 - - - 45.00 61.20%
Fair
R.T. Morabe Construction 11377 Const. of Oras-Concepcion-Jipapad Rd VIII 11.428 C 0.385 - 0.500 - - - 88.50 83.46%
V.Satisfactory
R.T. Morabe Construction 11377 Impvt. of ABC Hall VIII 0.192 C 0.371 0.200 0.300 - - - 87.10 *87.10% V.Satisfactory
R.T.Y. Construction 10341 Completion of San Roque Bridge I along Eco-Tourism Road IV-A 14.291 O 0.329 0.240 0.100 0.030 0.042 0.100 *84.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 345
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.T.Y. Construction 10341Completion/Continuation of
Unfinished/On-going Bridge, San Roque Bridge I
IV-A 15.324 C 0.380 0.300 0.300 - - - 98.00 87.02% V. Satisfactory
R.T.Y. Construction 10341 Conc. of Bachao-Ibaba FMR IV-B 0.285 C 0.313 0.283 0.300 - - - 89.60 *89.60% V. Satisfactory
R.T.Y. Construction 10341Conc. of Boac-Mogpog
Circumferential Road (Murallon-Tampos Section)
IV-B 6.645 O 0.341 0.300 0.100 0.023 0.022 0.100 88.60 -
R.T.Y. Construction 10341 Conc. of Catanuan-San Roque (Agno) Road IV-A 6.750 C 0.306 0.200 0.300 - - - 80.60 *80.60%
V. Satisfactory
R.T.Y. Construction 10341Conc. of Marinduque
Circumferential Road, Dili Section
IV-B 2.658 C 0.295 0.294 0.300 - - - 88.90 *88.90% V. Satisfactory
R.T.Y. Construction 10341 Conc. of MCR (Bantauyan-Sibucao Section) IV-B 2.620 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
R.T.Y. Construction 10341 Conc. of San Narciso-San Andres Road, San Narciso Sect. IV-A 6.750 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
R.T.Y. Construction 10341 Conc./Impvt. of Boac-Gasan Nat'l Road IV-B 10.803 C 0.343 0.219 0.300 - - - 86.20 70.54%
Satisfactory
R.T.Y. Construction 10341 Concreting of Sumangga-Magapua-Malusak Section IV-B 2.004 C 0.415 - 0.500 - - - *91.50 91.50%
Outstanding
R.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge IV-A 4.773 C 0.357 0.200 0.300 - - - 85.70 82.46%
V. Satisfactory
R.T.Y. Construction 10341Const. (Completion) of San Roque Bridge I along Eco-
Tourism RoadIV-A 9.573 C 0.378 0.249 0.300 - - - 92.70 *92.70%
Outstanding
R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg., Brgy. San Isidro Elem. Sch. IV-A 1.020 C 0.398 0.210 0.300 - - - 90.80 *90.80%
Outstanding
R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg., Brgy. San Isidro National High Sch. IV-A 0.558 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 346
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.T.Y. Construction 10341Const. of 2 Classroom 2 Storey School bldg., Lusacan National
High SchoolIV-A 1.435 C 0.369 0.200 0.300 - - - 86.90 *86.90%
V. Satisfactory
R.T.Y. Construction 10341 Const. of 2 Storey 2 CL School Bldg., @ Luis Palad National H/S IV-A 1.439 C 0.396 0.217 0.100 0.030 0.015 0.100 85.80 85.80%
V. Satisfactory
R.T.Y. Construction 10341 Const. of 2-Cl, 2-Storey S/B @ Talao-Talao E/S IV-A 1.405 C 0.447 - 0.500 - - - 94.70 *94.70%
Outstanding
R.T.Y. Construction 10341 Const. of Bagtingon River Control IV-B 4.732 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
R.T.Y. Construction 10341 Const. of Flood Control at Brgy. Muliguin IV-A 2.892 C 0.386 0.300 0.300 - - - 98.60 *98.60%
Outstanding
R.T.Y. Construction 10341 Const. of Line Canal IV-A 0.240 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
R.T.Y. Construction 10341 Const. of Magsaysay Elem. School IV-A 0.481 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
R.T.Y. Construction 10341 Const. of Multi-Purpose Bldg. (Covered Court) at South E/S IV-A 1.137 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
R.T.Y. Construction 10341 Const. of One (1) CL Sch. Bldg. at Brgy. Kalilayan E/S IV-A 0.541 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
R.T.Y. Construction 10341 Const. of Prov. Hospital (Dr. Damian Reyes Memorial Hospital IV-B 6.972 C 0.277 0.240 0.300 - - - 81.70 80.55%
V. Satisfactory
R.T.Y. Construction 10341 Const. of Various FMR (Caganhao B/R) IV-B 5.720 C 0.417 - 0.500 - - - 91.70 82.82%
V. Satisfactory
R.T.Y. Construction 10341Const./Impv't. of Multi-Purpose Bldg. @ Don Gregorio C. Yumul
Sr. E/SIV-A 0.473 C 0.476 - 0.500 - - - 97.60 *97.60%
Outstanding
R.T.Y. Construction 10341 Const./Impv't. of Spillway Bridge IV-A 0.472 C 0.369 0.233 0.300 - - - 90.20 *90.20% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 347
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.T.Y. Construction 10341
Rehab./Recont. And Conc. Paving of San Francisco-San
Andres Nat'l Road, San Andres Section
IV-A 19.298 C 0.327 0.300 0.300 - - - 92.70 90.54% Outstanding
R.T.Y. Construction 10341Road Upgrading (Gravel to
Conc.) (HDM4 Project Analysis), Talaba-Summit-Panaon Road
IV-A 14.465 C 0.348 0.300 0.300 - - - 94.80 *94.80% Outstanding
R.U. Aquino Construction 23507 Repair and Rehabilitation of 70 Male and Female Comfort Room DBP 21.506 C 0.339 0.200 0.216 - - - 75.48 75.48%
Unsatisfactory
R.V. Construction 6110
Conc. of Calbayog-Catarman Road, Mag-ubay-Nabang Sect.,
km.798+800-km. 803+500 w/ exceptions
VIII 4.275 C 0.385 0.300 0.300 - - - 98.50 83.38% V. Satisfactory
R.V. Construction 6110 Const. of 1 Cl School Bldg. @ Brgy. Cag-Olango E/S VIII 0.477 C 0.275 0.300 0.300 - - - 87.50 *87.50%
V. Satisfactory
R.V. Construction 6110 Const. of Cabay Seawall VIII 2.821 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
R.V. Construction 6110 Const. of Covered Court VIII 1.392 O 0.269 0.300 0.070 0.015 0.032 0.067 75.30 -
R.V. Construction 6110 Const. of Gandara-Matuguinao Road VIII 0.952 C 0.431 - 0.500 - - - 93.10 *93.10%
Outstanding
R.V. Construction 6110
Impvt./Rehab. of Flood Control Structure along Calbayog-
Catarman Road, Brgy. Oquendo Road Section
VIII 4.820 C 0.353 0.200 0.300 - - - 85.30 85.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 348
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.V. Construction 6110 Impvt./Rehab. of Flood Control Structure, Brgy. Tinambacan VIII 3.850 C 0.359 0.200 0.300 - - - 85.90 81.34%
V. Satisfactory
R.V. Construction 6110 Rehabilitation of Gadgaran-Limarayon Brgy. Road VIII 0.952 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Outstanding
R.V. Construction 6110 Repair/Maintenance of Lirang Revetment VIII 0.962 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
R.V. Construction 6110
Widening of Calbayog-Catarman Road, Mag-ubay-Nabang Sect.,
km.798+800-km. 803+500 w/ exceptions
VIII 4.275 O 0.190 0.300 0.100 0.020 0.023 0.100 73.30 -
R.V. Construction 6110 Widening of Existing Road, Brgy. Macawat-Brgy. Roxas II VIII 4.820 C 0.271 0.200 0.300 - - - 77.10 84.54%
V. Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB @ Guimaras State College VI 1.283 C 0.314 0.200 0.300 - - - 81.40 *81.40%
V. Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB @ Sta. Teresa E/S VI 0.419 C 0.370 0.200 0.300 - - - 87.00 80.42% V. Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB, San Miguel VI 0.236 C 0.473 - 0.500 - - - 97.30 97.30% Outstanding
R.V. Laborte Builders 20459 Completio of Olongtao MPB IV-A 3.370 O 0.325 0.300 0.100 0.020 0.023 0.100 86.80 -
R.V. Laborte Builders 20459 Concreting of Tiaong By-Pass Road IV-A 9.435 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
R.V. Laborte Builders 20459Concreting of Torrijos-
Buenavista National Road (Phase I)
IV-B 2.869 C 0.422 - 0.500 - - - 92.20 91.00% Outstanding
R.V. Laborte Builders 20459
Concreting of Torrijos-Buenavista Road with exception Km.78+034-Km.78+463 (Marilao
Sect.) and Km.72+300-Km.73+367, Banocboc Section
IV-B 8.687 C 0.314 0.300 0.300 - - - 91.40 90.14% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 349
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.V. Laborte Builders 20459 Const. of 1-Cl School Building IV-A 0.376 C 0.295 0.300 0.300 - - - 89.50 *89.50% V. Satisfactory
R.V. Laborte Builders 20459 Const. of 1-Cl School Building @ Jongo E/S IV-A 0.376 C 0.154 0.300 0.300 - - - 75.40 *75.40%
Satisfactory
R.V. Laborte Builders 20459 Const. of 2-Storey, 2-Cl S/B @ Gumaca 1 CS IVA 1.320 C 0.392 - 0.500 - - - 89.20 *89.20%
V. Satisfactory
R.V. Laborte Builders 20459 Const. of MPB @ Maasin Norte E/S IV-A 1.052 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
R.V. Laborte Builders 20459 Const./Impvt. of MSR, Daang Maharlika IV-A 14.457 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
R.V. Laborte Builders 20459Impvt. of (Geometric &
Protective Wall) Tiaong By-Pass Road
IV-A 10.495 C 0.304 0.200 0.300 - - - 80.40 81.78% V. Satisfactory
R.V. Laborte Builders 20459 Impv't./Concreting of Various Municipal Roads IV-B 10.625 C 0.275 - 0.500 - - - 77.50 74.92%
Satisfactory
R.V. Laborte Builders 20459 Rehab. of FMR, Sitio Yungib IV-A 0.383 C 0.347 0.300 0.300 - - - 94.70 85.76% V. Satisfactory
R.V. Laborte Builders 20459Rehab./Impvt. of MSR-Jct.-
Tiaong Dolores Road (Asphalt Section)
IV-A 14.359 C 0.353 0.300 0.300 - - - 95.30 88.16% V. Satisfactory
R.V. Laborte Builders 20459
Rehab./Recont. And Conc. Paving of Mulanay-San
Francisco-San Andres Nat'l Road, San Andres Section
IV-A 9.640 C 0.361 0.300 0.300 - - - 96.10 89.98% V. Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Conc. of Binakayan Diversion
Road IV-A 9.553 C 0.359 0.300 0.300 - - - 95.90 *95.90% Outstanding
R.V. Rieta Trading & Gen. Construction 28671 Concreting of Roads at San
Rafael III IV-A 0.288 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
R.V. Rieta Trading & Gen. Construction 28671 Const. of 2 Storey MPB IV-A 0.575 O 0.295 0.263 0.100 0.030 0.018 0.100 80.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 350
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R.V. Rieta Trading & Gen. Construction 28671 Const. of 4 CL Sch. Bldg. at
Bacoor E/S IV-A 1.720 C 0.260 0.225 0.300 - - - 78.50 *78.50% Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Const. of Concrete Pathway IV-A 0.191 C 0.295 0.300 0.300 - - - 89.50 *89.50%
V. Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Impvt. (Conc. Widening) of
Dasmarinas-Carmona Road IV-A 9.553 C 0.255 0.200 0.300 - - - 75.50 *75.50% Satisfactory
R.V. Rieta Trading & Gen. Construction 28671
Slope Protection along Ilang-ilang River, Sta. Rosa & San
Antonio IIIV-A 4.033 C 0.250 0.200 0.300 - - - 75.00 *75.00%
Satisfactory
R2K Builders Construction and Trading 29708 Const. of Sch. Bldg. at Brgy.
High School Poblacion III 1.896 C 0.366 0.269 0.300 - - - 93.50 *93.50% Outstanding
Rabbit Construction & Development Corporation 8545
Completion (Impvt./Conc. Paving) of Licomo-Quiniput
Road, Segment 1 (Sinoropan-Vitali Section)
IX 33.007 C 0.306 0.300 0.000 - - - 60.60 77.46% Satisfactory
Rabbit Construction & Development Corporation 8545 Reconst. of Zamboanga City-
Labuan-Limpapa Road IX 46.600 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -
Rachel Faye Construction 30339 Conc. of Modayan-Kitongan FMR CAR 0.284 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Rachki Enterprises (Formerly: Geto Const.) 17689 Const. of MPB at Bilibiran IV-A 0.288 C 0.306 0.200 0.300 - - - 80.60 83.61%
V. Satisfactory
Rachki Enterprises (Formerly: Geto Const.) 17689
Impvt./Rehab. of Drainage, Marcos Highway (Intermittent
Sections)IV-A 0.956 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Rachki Enterprises (Formerly: Geto Const.) 17689
Riprapping/Impvt. of Various Brgys. (Package II) Upper East
Kamias CreekIV-A 2.586 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Racso Construction 14601 Const. of DPWH Ifugao DEO, Phase II CAR 2.378 C 0.339 0.118 0.000 - - - 45.70 71.22%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 351
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Racso Construction 14601 Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. Road CAR 1.196 C 0.415 - 0.500 - - - 91.50 82.92%
V. Satisfactory
Racso Construction 14601 Impv't. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Rd. CAR 0.985 C 0.373 - 0.500 - - - 87.30 85.86%
V.Satisfactory
Racso Construction 14601Preventive Maint. Along Nueva
Vizcaya-Ifugao-Mt. Province Bdry. Road
CAR 4.502 O 0.332 0.184 0.100 0.010 0.035 0.067 72.80 -
Racso Construction 14601Widening/Conc. of Banaue-
Hungdan-Tinoc-Benguet Bdry. Road, Gohang-Ujah Section
CAR 1.899 C 0.351 0.088 0.300 - - - 73.90 70.72% Satisfactory
Radiance Traders & Builders 32891 Const. of Aurora DEO III 1.909 C 0.385 0.247 0.300 - - - 93.20 *93.20%
Outstanding
Raf General Construction 6699 Const. of Baguinge-Mappit FMR CAR 0.465 O 0.322 0.196 0.100 0.007 0.030 0.100 *75.50 -
Raf General Construction 6699 Const. of Chico River Flood Control, Bontoc Section CAR 4.815 C 0.248 0.200 0.300 - - - 74.80 *74.80%
Satisfactory
Raf General Construction 6699 Const. of Flood Control X 4.787 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory
Raf General Construction 6699 Const. of MPB @ Upper Jasaan X 1.445 C 0.362 0.259 0.300 - - - 92.10 *92.10% Outstanding
Rain Construction 15959 Const. of Multi-Purpose Pavement @ Alabang E/S NCR 1.717 C 0.389 0.300 0.300 - - - 98.90 *98.90%
Outstanding
Rain Construction 29977 Const./Rehab. of MPB NCR 2.489 C 0.371 0.200 0.300 - - - 87.10 *87.10% V.Satisfactory
Rain Construction 15959 Drainage Impvt.of Aguinaldo St. and Col. Santos St. NCR 2.860 C 0.374 0.200 0.300 - - - 87.40 *87.40%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 352
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ramar Enterprises 8092Const. of Iriga Flood Control and
Drainage Structure PNR, San Francisco-San Roque
V 4.618 C 0.434 - 0.500 - - - 93.40 90.10% Outstanding
Ramar Enterprises 8092Deepening/Earthdiking of
Nancascasan River, Balangibang-Apad-Lanigay Sect.
V 19.155 C 0.400 - 0.500 - - - 90.00 *90.00% V. Satisfactory
Ramar Enterprises 8092 Rehab. of Malinta-Tigbao Road V 4.738 C 0.371 0.300 0.300 - - - 97.10 91.46% Outstanding
Ramconstrack Dev't Services & Supplies 22821 Rehab. of Old Hospital Building,
Malasin II 1.904 C 0.297 0.200 0.300 - - - 79.70 55.97% Poor
Ramconstrak Dev't Services & Supplies 22821 Conc. of Anting Road II 1.445 C 0.262 0.200 0.300 - - - 76.20 *76.20%
Satisfactory
Ramijo Construction 10963 Const. of MPB VII 0.958 C 0.264 0.300 0.300 - - - 86.40 *86.40% V. Satisfactory
Ramises Construction 17351 Const. of Lake Mainit Circumferential Road XIII 6.219 C 0.454 - 0.500 - - - 95.40 95.40%
Outstanding
Ramona Construction & Enterprises 14661 Const. of Multi-Purpose Bldg VII 0.865 C 0.396 - 0.500 - - - 89.60 71.89%
Satisfactory
Ramona Construction & Enterprises 14661 Repair/Rahab./Impv't. of FMR at
Olo VII 0.372 C 0.413 - 0.500 - - - 91.30 91.30% Outstanding
Ramona Construction and Enterprises 14661
Conc. of Jct. Tubod-Lakewood Nat'l Secondary Road
(Biswangan-Lukuan Section)IX 9.189 C 0.355 0.114 0.300 - - - 76.90 74.86%
Satisfactory
Ramona Construction and Enterprises 14661 Conc. of Midsalip-Sominot Road IX 4.645 C 0.317 0.200 0.300 - - - 81.70 77.98%
Satisfactory
Ramona Construction and Enterprises 14661
Concreting of Siquijor Circumferential Road Sta. 0+000-
Sta.0+130VII 1.867 C 0.341 0.300 0.300 - - - 94.10 92.06%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 353
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ramona Construction and Enterprises 14661 Const. of 2 CL School Bldg. @
Payao NHS IX 0.871 C 0.369 0.218 0.300 - - - 88.70 74.00% Satisfactory
Ramona Construction and Enterprises 14661 Const. of MPB Phase 1 IX 4.600 C 0.285 0.169 0.300 - - - 75.40 73.65%
Satisfactory
Ramona Construction and Enterprises 14661 Const. of Multi-Purpose Building VII 4.722 C 0.378 0.168 0.300 - - - 84.60 87.47%
V. Satisfactory
Ramona Construction and Enterprises 14661 Repair/Rehab. of Campalanas to
Lower Cabangcalan Brgy. Road VII 0.928 C 0.341 0.213 0.300 - - - 85.40 *85.40% V.Satisfactory
Ramona Construction and Enterprises 14661 Repair/Rehab. of FMR at
Campalanas-Cangmunag VII 0.744 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory
Ramona Construction and Enterprises 14661 Repair/Rehab. of Licoan (to
Bonga to Capisacan) Brgy. Road VII 0.931 C 0.350 0.206 0.300 - - - 85.60 *85.60% V.Satisfactory
Ramsa Construction 25580 Completion of Home Economics Bldg., Pug-os E/S I 0.283 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
Ramsa Construction 25580 Conc. of MNR Solot-Solot Road I 0.608 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Ramsa Construction 25580 Const. of Tagudin Bridge I 0.758 C 0.305 - 0.500 - - - 80.50 *80.50% V. Satisfactory
Ramsa Construction 25580 Improvement/Concreting of FMR Bayubay Sur I 0.473 C 0.375 - 0.500 - - - 87.50 87.50%
V. Satisfactory
Ramsa Construction 25580 Impv't./Concreting of Farm-to-Market Road, Brgy. Nanerma I 0.472 C 0.285 - 0.500 - - - 78.50 78.50%
Satisfactory
Rano's Construction 11433 Const. of Public Market XII 1.366 C 0.358 0.300 0.300 - - - 95.80 62.62% Fair
Rano's Construction 11433 Repair/Rehab. & Impv't. of Cabidianan-Mainit Sect. XI 4.815 C 0.300 - 0.500 - - - 80.00 80.00%
Satisfactory
Rasec Builders & General Merchandise 13866 Const. of MPB @ Brgy.
Caduawan VII 0.186 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 354
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Raykin Construction and Supply 14404 Const. of School Bldg., @
Tagum National High School XI 0.944 C 0.437 - 0.500 - - - 93.70 88.94% V. Satisfactory
Raykin Construction and Supply 14404 Improvement of National Road
along Cateel-Baganga Section XI 9.434 C 0.358 0.200 0.300 - - - 85.80 *85.80% V.Satisfactory
Raykin Construction and Supply 14404 Impv't. of Roads along Caraga
Sect. XI 4.704 C 0.384 - 0.500 - - - 88.40 88.82% V. Satisfactory
Raykin Construction and Supply 14404 Impvt./Rehab. of Lumao-San
Antonio Section XI 9.209 C 0.331 0.200 0.300 - - - 83.10 83.34% V.Satisfactory
Raymundo H. Tecson Const. 21681 Impv't./Concreting of Baguio-
Cadalian Road XI 4.091 C 0.447 - 0.500 - - - 94.70 71.48% Satisfactory
Raymundo H. Tecson Construction 21681 Const. of Bridge @ Purok 2 XI 1.354 C 0.302 - 0.500 - - - 80.20 *80.20%
V. Satisfactory
RBM Construction 5961 Const. of Multi-Purpose Bldg. Brgy. Gen. Luna III 0.468 C 0.451 - 0.500 - - - 95.10 73.82%
Satisfactory
RBM Construction 5961 Const. of Salian Concrete Revetment Brgy. Salian III 0.470 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
RBT Construction 15290 Impv't. of Multi-Purpose Bldg., @ Brgy. Nangkaan IV-A 0.191 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. SatisfactoryRCD Gen. Contractor &
Construction Supply 21616 Rehab. of Don Andres, Valdez & Ferdinand Road I 2.143 C 0.425 - 0.500 - - - 92.50 92.50%
Outstanding
RCD General Contractor & Construction Supply 21616 Completion of Banna Multi-
Purpose Hall I 2.850 C 0.386 0.200 0.300 - - - 88.60 85.94% V. Satisfactory
RCD General Contractor & Construction Supply 21616 Const. of MPB (Phase I) at Brgy.
Madamba I 0.379 C 0.194 0.300 0.300 - - - 79.40 *79.40% Satisfactory
RCDG Construction Corp. 5063
Impv't./Widening of Z.C. West Coast Road (Caragasan-Maasin Sect.) & Const. of 1 Barrel RCBC with exception of Maasin Bridge
IX 11.560 O 0.382 0.239 0.100 0.030 0.058 0.100 90.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 355
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
RCDG Construction Corp. 5063Widening of Zamboanga City West Coast Road, Const. of
Three (3) Barrels RCBCIX 4.678 O 0.349 0.240 0.100 0.030 0.059 0.100 87.80 -
R'Cel General Contractor & General Merch. 13385 Concreting of Mabunga-San
Isidro Brgy. Road IV-A 0.471 C 0.398 - 0.500 - - - 89.80 89.80% V. Satisfactory
R'Cel General Contractor & General Merch. 13385 Concreting of Road at Hugo St.
Brgy. San Antonio IV-A 0.476 C 0.415 - 0.500 - - - 91.50 91.50% Outstanding
R'Cel General Contractor & General Merch. 13385 Const. of FTM Road @
Nagcarlan-Calauan Road IV-A 2.336 C 0.451 - 0.500 - - - 95.10 *95.10% Outstanding
R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sta. Ana IV-A 0.955 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sto. Angel
Sur IV-A 0.955 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Academic Classroom
at Prudencia Fule NHS IV-A 1.465 C 0.353 0.259 0.300 - - - 91.20 *91.20% Outstanding
R'Cel General Contractor & General Merchandise 13385 Const. of Atingay Suspension
Bridge (Phase II) IV-A 2.192 C 0.308 0.278 0.300 - - - 88.60 *88.60% V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Drainage System IV-A 0.479 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
R'Cel General Contractor & General Merchandise 13385 Const. of FMR, Brgy. Bubukal IV-A 1.911 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Three (3) Storey, Six
(6) Classroom IV-A 4.776 O 0.397 0.180 0.100 0.023 0.053 0.067 82.00 -
R'Cel General Contractor & General Merchandise 13385 Const./Completion of Limao-
Perez Bridge IV-A 14.250 C 0.340 0.200 0.300 - - - 84.00 77.85% Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const./Conc. of Tala-Malasena
FMR IV-A 1.896 C 0.290 0.293 0.300 - - - 88.30 *88.30% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 356
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
R'Cel General Contractor & General Merchandise 13385 Impvt. of FMR at Brgy. San
Agustin IV-A 0.477 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Repair/Rehab. of FMR, Brgy. San
Andres & San Ildefonso IV-A 0.478 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory
RD Cobacha Construction 8878 Const. of MPB @ Brgy. Lamak VIII 0.950 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory
RD Cobacha Construction 8878 Const. of MPB, Andaya Bldg., Naval Institute of Technology VIII 0.950 C 0.183 0.249 0.300 - - - 73.20 78.80%
Satisfactory
RD Cobacha Construction 8878 Const. of Shoreline Protection, Phase II District I VIII 0.723 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
RD Cobacha Construction 8878 Rehab./Impvt. of Bangon Flood Control VIII 1.920 C 0.371 0.200 0.300 - - - 87.10 89.38%
V. Satisfactory
RD Cobacha Construction 8878 Repair of Main DPWH Bldg., Eastern Samar DEO VIII 0.856 C 0.400 0.194 0.300 - - - 89.40 *89.40%
V.Satisfactory
RD Cobacha Construction 8878 Road Opening / Rehab. of FMR @ Tangay-Aligarog Road VIII 2.829 C 0.324 0.200 0.000 - - - 52.40 *52.40%
Poor
RD Pimentel Construction 19487 Completion of Multi-Purpose Building CAR 0.282 C 0.451 - 0.500 - - - 95.10 *95.10%
Outstanding
RD Pimentel Construction 19487Const. of Flood Control @ Magsaysay Private Road
BarangayCAR 0.953 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
RDF Construction and Supply 12843 Const. of Barangay Hall @
Tubod XI 0.561 C 0.357 - 0.500 - - - 85.70 81.22% V. Satisfactory
RDF Construction and Supply 12843 Const. of MPB @ F. Bustamante
E/S XI 0.809 C 0.367 0.300 0.300 - - - 96.70 88.72% V.Satisfactory
RDG Construction & Supply (Formerly: RDG
Construction)19488
Const. of Multi Purpose Pavement @ Bastida E/S
Science ParkXI 1.181 C 0.346 0.300 0.300 - - - 94.60 93.04%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 357
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Readycon Trading & Const. Corp. 15452
Repair & Maint. of Nat'l Road & Bridges (Asphalt Overlay) alon
P. Burgos-Potatanin Road (Malicboy Section)
IV-A 9.949 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Readycon Trading & Const. Corp. 15452
Repair/Impvt. Asphalt Overlay of Marikina-Victoria Valley-Antipolo
RoadIV-A 14.430 C 0.286 0.200 0.300 - - - 78.60 *78.60%
Satisfactory
Readycon Trading & Const. Corp. 15452 Repair/Rehab. of MSR Old Route IV-A 14.401 C 0.274 0.200 0.300 - - - 77.40 *77.40%
Satisfactory
Rebsons Construction 17118 Const. of Mambalili-Sitio Bong FMR XIII 7.545 C 0.400 0.200 0.300 - - - 90.00 88.26%
V. Satisfactory
Red Mole Construction 15710 Const. of Uyugan Diversion Road II 1.922 C 0.417 - 0.500 - - - 91.70 91.70%
Outstanding
Red Scorpion Construction & Supply 32046 Completion of San Roque E/S NCR 0.812 C 0.355 0.300 0.300 - - - 95.50 *95.50%
Outstanding
Red Scorpion Construction & Supply 32045 Const. of Multi-Purpose Hall,
Brgy. Guitnang Bayan I IV-A 0.958 C 0.226 0.281 0.300 - - - 80.70 *80.70% V. Satisfactory
Redcar Trading & Construction 27368 Const. of Multi-Purpose Hall at
Topland NCR 1.878 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
Redcar Trading & Construction 27368
Impvt. of Multi-Purpose Pavement @ Victoria Homes E/S
(Tunasan E/S Annex)NCR 2.372 C 0.387 0.206 0.300 - - - 89.30 *89.30%
V. Satisfactory
Redcar Trading & Construction 27368 Renovation of MPB, Rainbow
Village, Brgy. San Isidro NCR 1.428 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Redcar Trading & Construction 27368 Repair/Rehab. of MPB NCR 2.383 C 0.391 0.300 0.300 - - - 99.10 92.52%
Outstanding
Redcar Trading & Construction 27368
Repair/Rehab. of MPH, JPA Subdivision (Biason Covered
Court)NCR 1.152 C 0.294 0.200 0.300 - - - 79.40 *79.40%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 358
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
REE Construction 10342 Conc. of FMR @ Brgy. Luna IVA 0.374 C 0.397 - 0.500 - - - 89.70 *89.70% V. Satisfactory
REE Construction 10342 Conc. of Road at Brgy. Bulihan IVA 0.471 C 0.357 0.216 0.300 - - - 87.30 *87.30% V. Satisfactory
Regenterprises Const. *Fabrication* Supplies &
Gen. Services17177
Conc. of Bambang-Kasibu-Solano National Road, Caloocan
SectionII 9.349 C 0.274 0.300 0.300 - - - 87.40 *87.40%
V. Satisfactory
Regenterprises Const. *Fabrication* Supplies &
Gen. Services17177 Const. of Abatan E/S School
Bldg. II 0.442 C 0.328 0.137 0.300 - - - 76.50 71.32% Satisfactory
Regenterprises Const. *Fabrication* Supplies &
Gen. Services17177 Const. of Drainage along Daang
Maharlika II 4.649 O 0.310 0.157 0.100 0.030 0.044 0.200 84.10 -
Regional Infrastructure Development Corporation 26373 Conc. of Bah-bah-Prosperidad
Road XIII 2.819 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Conc. of Talacogon-La Paz Road XIII 9.593 C 0.326 0.200 0.300 - - - 82.60 81.01%
V. Satisfactory
Regional Infrastructure Development Corporation 26373 Conc. of Trento-Bislig Road
(Salvacion Section XIII 9.580 C 0.267 0.300 0.300 - - - 86.70 84.72% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Conc. of Zillovia Road Section
along Talacogon San Luis Road XIII 2.342 C 0.388 0.200 0.300 - - - 88.80 92.94% Outstanding
Regional Infrastructure Development Corporation 26373 Concreting of Brgy. Marbon
along Secondary Road XIII 1.885 C 0.299 0.300 0.300 - - - 89.90 89.12% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Concreting of Osmeña-
Magkiangkang Road XIII 2.780 C 0.234 0.300 0.300 - - - 83.40 89.58% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Concreting of Talacogon-DPWH
Road Section XIII 2.330 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Const. of Mas-Omot Road,
Prosperidad ARC XIII 24.656 C 0.339 0.300 0.300 - - - 93.90 91.34% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 359
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Regional Infrastructure Development Corporation 26373
Gravelling of Talacogon-La Paz-Loreto-Veruela-Sta. Josefa
Circumferential Rd., Desamparados-Osmena-Silco-
Waloe Sect.
XIII 11.515 C 0.250 0.200 0.300 - - - 75.00 73.68% Satisfactory
Regional Infrastructure Development Corporation 26373
Restoration of Andanan Bank Protection & Installation of Spur Dike along Agusan-Davao Road
XIII 10.792 C 0.237 0.186 0.300 - - - 72.30 84.27% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Restoration of Shore Protection,
Afga Slip Agusan-Davao Road XIII 7.493 C 0.306 0.200 0.300 - - - 80.60 80.30% V. Satisfactory
Reko General Konstruct 14663 Conc. of Baguio-Itogon-Dalupirip Rd. km. 248+906.5-km. 249+119.5 CAR 2.890 C 0.328 0.200 0.300 - - - 82.80 *82.80%
V. Satisfactory
Reko General Konstruct 14663Conc. of Gurel-Bokod-Kabayan Buguias Road, km. 304+240-Km.
394+978CAR 6.669 C 0.355 0.100 0.300 - - - 75.50 81.53%
V. Satisfactory
Rely Construction & Supply 10433 Conc. of Bislig-Trento Road XIII 18.949 C 0.152 0.300 0.300 - - - 75.20 73.82% Satisfactory
Rely Construction & Supply 10433 Conc. of Juction Lingig-Trento Road XIII 28.878 O 0.342 0.212 0.100 0.030 0.043 0.100 82.70 -
Rely Construction & Supply 10433 Const. of Bigaan Bridge XIII 14.383 C 0.230 0.200 0.300 - - - 73.00 76.90% Satisfactory
Rely Construction & Supply 10433 Const. of Brgy. Roads Tubigon XI 1.886 C 0.379 0.060 0.300 - - - 73.90 76.60% Satisfactory
Rely Construction & Supply 10433 Const. of Flood Control XI 4.381 C 0.301 0.200 0.300 - - - 80.10 84.30% V. Satisfactory
Rely Construction & Supply 10433Const. of Libuganon Flood
Control crossing Agusan-Davao River, Tagum-Asuncion Area
XI 9.436 C 0.201 0.300 0.300 - - - 80.10 77.40% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 360
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Rely Construction & Supply 10433Const. of Pigsapawan Bridge & Approaches, Tibanban-Lavigan
RoadXI 10.792 C 0.302 0.300 0.300 - - - 90.20 79.16%
Satisfactory
Rely Construction & Supply 10433 Impvt. of Cadalian-Baguio Road XI 14.164 O 0.389 0.278 0.100 0.030 0.043 0.100 94.00 -
Rely Construction & Supply 10433 Impvt./Rehab. of Dapnan-Lambajon Section XI 9.607 C 0.336 0.200 0.300 - - - 83.60 85.34%
V. Satisfactory
Rely Construction & Supply 10433 Impv't/Conc. of Calinan-Baguio-Cadalian Road XI 9.599 C 0.345 0.287 0.300 - - - 93.20 93.20%
Outstanding
Rely Construction & Supply 10433 Rehab./Impv't. of Damian Reyes Memorial Road (Boac Side) IV-B 14.244 C 0.241 0.300 0.300 - - - 84.10 *84.10%
V. Satisfactory
Rely Construction & Supply 10433
Rehab./Impv't. of Tagum-Asuncion-Kapalong-Sto. Tomas-
Dapecol-Panabo Circ. Road, Kapalong-Sto. Tomas Sect.
XI 14.461 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Rely Construction & Supply 10433 Rehab./Repair of Butuan City-Masao Port Road XIII 4.469 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Rely Construction & Supply 10433Repair/Rehab. of T-A-K-ST.-D-P
Circ. Road and Jct. Agusan-Davao Road-Panabo Wharf Road
XI 4.714 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
Remigio General Construction 2298
Conc. Over Renolith Roads, MMSU-Bakukang Rd.
Cangrunaan Rd. & Mabaleng RdI 2.856 C 0.447 - 0.500 - - - 94.70 93.08%
Outstanding
Remigio General Construction 2298
Const. of Reinforced concrete Flume along Ilocos Norte-Abra
Rd.I 4.742 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
Remjie's Construction Development 13768 Conc. of Lino Type St., Four
Estate, San Antonio NCR 1.907 C 0.381 0.200 0.300 - - - 88.10 *88.10% V Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 361
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Remjie's Construction Development 13768 Conc. of San Andres St., Ramos
Compound, Sun Valley NCR 1.429 C 0.334 0.200 0.300 - - - 83.40 *83.40% V Satisfactory
Remp Enterprises 25916 Const. of Drainage System @ Mercury St. III 0.465 O 0.310 0.175 0.100 0.030 0.029 0.200 84.40 -
Rene T. Bayawa Construction & Hauling
Services20740 Const. of 1 Unit 2 CL School
Bldg. @ Balok E/S IX 0.757 C 0.275 0.214 0.300 - - - 78.90 *78.90% Satisfactory
Rene T. Bayawa Construction & Hauling
Services20740 Repair/Rehab. of Library Bldg. at
Sindangan NHS IX 0.283 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory
RENZ Const. & Trading 25605 Completion of Itbud Diversion Road II 0.479 C 0.458 - 0.500 - - - 95.80 95.80%
Outstanding
Revere Construction & Supply 17426 Const. of Rancho Bridge &
Approaches IV-A 17.041 C 0.370 0.212 0.300 - - - 88.20 *88.20% V. Satisfactory
Revere Construction & Supply 17426
Rehab./Reconst. of Damaged National Roads, Batangas-Quezon Road, Padre Garcia
Section
IV-A 14.470 C 0.313 0.292 0.300 - - - 90.50 *90.50% Outstanding
Revere Construction & Supply 17426 Road Upgrading of Talisay-
Laurel-Agoncillo Road IV-A 13.506 O 0.323 0.300 0.100 0.030 0.033 0.100 88.60 -
Revere Construction & Supply 17426 Asphalt Overlay of Lipa-Rosario
Road IV-A 13.192 C 0.358 0.200 0.300 - - - 85.80 *85.80% V. Satisfactory
Revere Construction & Supply 17426 Const. of Multi-Purpose Bldg., @
Bilibinwang IV-A 0.336 C 0.364 0.207 0.300 - - - 87.10 *87.10% V. Satisfactory
Revere Construction and Supply 17426 Asphalt Overlay of Brgy.
Poblacion IV-A 1.147 C 0.490 - 0.500 - - - 99.00 *99.00% Outstanding
Revere Construction and Supply 17426 Const. of 2 Cl @ Quiling E/S IV-A 0.770 C 0.265 0.300 0.300 - - - 86.50 *86.50%
V. Satisfactory
Revere Construction and Supply 17426 Rehab. & Impvt. of Lipa-Balete
Road, Km. 77+476 to Km. 80+876 IV-A 9.996 C 0.385 0.200 0.300 - - - 88.50 *88.50% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 362
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Revere Construction and Supply 17426 Repair/Improvement of Lipa City
Museum & Library IV-A 1.843 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Revere Construction and Supply 17426 Widening/Impvt. of Manila-
Batangas Road, Lipa Section IV-A 9.641 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory
Rex E. Morales Construction 17427 Const. of Multi-Purpose
Pavement VIII 0.944 C 0.418 - 0.500 - - - 91.80 *91.80% Outstanding
Reydan Builders 13059 Const. of MPB @ Brgy. Lamba XII 0.950 C 0.376 0.300 0.300 - - - 97.60 97.53% Outstanding
Reydan Builders 13059 Const. of MPB @ Carpenter Hill XII 0.770 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory
Reydan Builders 13059 Const. of Multi-Purpose Bldg., Open Warehouse (Mini-Gym) XI 1.218 C 0.446 - 0.500 - - - 94.60 62.12%
Fair
Reydan Builders 13059 Const. of Multi-Purpose Building (Mini Gym) XI 1.418 C 0.394 0.251 0.300 - - - 94.50 82.95%
V. Satisfactory
Reydan Builders 13059 Const. of Multi-Purpose Building @ Polomolok XII 0.460 C 0.394 - 0.500 - - - 89.40 *89.40%
V. Satisfactory
Reydan Builders 13059 Const. of Pedestrian Overpass XI 4.718 C 0.395 0.293 0.300 - - - 98.80 97.66% Outstanding
Reydan Builders 13059 Const. of San Felipe RCDG Bridge XII 3.856 C 0.387 0.145 0.300 - - - 83.20 84.88%
V. Satisfactory
Reydan Builders 13059 Const. of Shadol I Bridge XII 4.308 C 0.381 0.293 0.300 - - - 97.40 88.91% V. Satisfactory
Reyrose Construction 20748 Conc. of Various Municipal and Brgy. Roads II 1.149 O 0.327 0.240 0.100 0.023 0.025 0.100 81.50 -
Reyrose Construction 20742 Const. of Drainage System at Centro II 0.942 C 0.296 0.200 0.300 - - - 79.60 *79.60%
Satisfactory
RFN Construction and Development Corporation 8722 Const. of Special Education
Bldg., (Additional 2Cl) NCR 1.444 C 0.290 - 0.500 - - - 79.00 82.90% V. Satisfactory
RGP Builders 20680 Concreting of Malvar-Punta FMR IV-A 1.875 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 363
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
RGP Builders 20680 Concreting of Unisan Seawall (Extension) IV-A 0.749 C 0.392 - 0.500 - - - 89.20 89.20%
V. Satisfactory
RGP Builders 20680 Const. of 3 Units School Building with CRs IV-A 1.347 O 0.383 0.300 0.100 0.030 0.022 0.100 93.50 -
RGP Builders 20680 Const. of Water Works System III 0.288 C 0.428 - 0.500 - - - 92.80 *92.80% Outstanding
RGP Builders 20680 Impvt. of Gen. Luna Public Market IV-A 0.478 C 0.250 0.300 0.300 - - - 85.00 *85.00%
V.Satisfactory
RGP Builders 20680Repair/Rehab. of Drainage System along Gen. Luna-
Catanauan RoadIII 1.155 C 0.422 - 0.500 - - - 92.20 *92.20%
Outstanding
RGS Construction 14095 Const. of Various Multi-Purpose Building IX 0.314 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
RGS Construction 14095 Concreting of Purok 4, FMR IX 0.180 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding
RGS Construction 14095 Concreting/Widening of Dipolog-Aurora Road Sinaman IX 3.138 C 0.378 - 0.500 - - - 87.80 87.80%
V. Satisfactory
RGS Construction 14095 Const. of New Two (2) Storey MPB (TESDA) IX 4.722 C 0.316 0.200 0.300 - - - 81.60 74.46%
Satisfactory
RGS Construction 14095Const. of Two (2) Storey Bldg. @
Jose Rizal Memorial State College
IX 1.368 C 0.399 0.200 0.300 - - - 89.90 93.33% Outstanding
RHH Construction 11467 Conc. of Burgos-General Aguinaldo National Road II 18.329 C 0.356 0.300 0.300 - - - 95.60 93.20%
Outstanding
RHH Construction 11467 Conc. of Jct. National Potia Road II 10.697 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 364
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
RHH Construction 11467Const. of Dalibubon Bridge
(Remaining Works) and Approaches (Partial Const.)
II 11.337 O 0.228 0.299 0.100 0.018 0.040 0.100 78.50 -
Rhodamay Construction Supply 25989 Const. of Multi-Purpose Bldg.
Sitio Tina Brgy. Tagusao IV-B 0.188 C 0.414 - 0.500 - - - 91.40 91.40% Outstanding
Rhodamay Construction Supply 25989 Const. of Multi-Purpose
Building, Brgy. Poblacion IV-B 0.466 C 0.393 0.136 0.300 - - - 82.90 87.52% V. Satisfactory
Rhodamay Construction Supply 25989 Const. of Panacan River Control IV-B 0.922 C 0.375 - 0.500 - - - 87.50 87.50%
V. SatisfactoryRhodamay Construction
Supply 25989 Const., of E/S Building Brgy. Taritien IV-B 0.282 C 0.230 0.079 0.300 - - - 60.90 63.21%
Fair
Rhodwill Parts and Hardware 18871 Conc. of Davao Oriental-Surigao
Coastal Road XI 13.812 C 0.280 0.300 0.300 - - - 88.00 *88.00% V. Satisfactory
Rhodwill Parts and Hardware 18871 Conc. of Mati-Maragusan Road
(Buso Section) XI 19.298 O 0.275 0.300 0.100 0.030 0.050 0.067 82.20 -
Rhodwill Parts and Hardware 18871 Const. of Manikling Multi-
Purpose Building XI 1.606 C 0.361 0.300 0.300 - - - 96.10 92.18% Outstanding
Rhodwill Parts and Hardware 18871 Improvement of National Road
along Baganga-Cateel Section XI 9.443 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
Rhodwill Parts and Hardware 18871
Impvt. of Manikling-Lavigan Road (Cambaleon-Talisay
Section)XI 14.470 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Rhodwill Parts and Hardware 18871 Impvt./Rehab. of Manhoc-Ban-ao
Section XI 9.605 O 0.298 0.300 0.100 0.030 0.060 0.100 88.80 -
Rhodwill Parts and Hardware 18871 Rehab./Impvt. of Compostela-
Cateel Road XI 4.720 C 0.283 0.300 0.000 - - - 58.30 72.88% Satisfactory
Rhodwill Parts and Hardware 18871 Repair of Scoured Approach
Carabatuan Bridge App. A XI 1.924 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 365
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Richmar Construction 18797 Conc. of Nabua-Balatan Road (Mang-it Section) V 8.509 C 0.302 0.234 0.300 - - - 83.60 81.02%
V. Satisfactory
Richmar Construction 18797 Conc./Impvt. of Polangui Upland Rd. (Cepres-Itaran Section) V 9.595 C 0.346 0.189 0.300 - - - 83.50 *83.50%
V. Satisfactory
Richmar Construction 18797 Concreting of Irosin-Bulusan Asphalt Road V 3.276 C 0.344 0.208 0.300 - - - 85.20 *85.20%
V. Satisfactory
Richmar Construction 18797
Construction of Checkgate, Canal with Lining & Canal
Structures (Muladbucad Grande CIP)
NIA 3.903 C 0.358 0.087 0.300 - - - 74.40 *74.40% Satisfactory
Richmark Construction 14227 Completion of Antiao Bridge Approaches VIII 3.209 C 0.461 - 0.500 - - - 96.10 70.06%
Satisfactory
Richpil Builders 30923 Widening/Concreting of Binangonan Diversion Rd. IV-A 1.909 C 0.407 - 0.500 - - - 90.70 90.70%
Outstanding
Ricomar Construction 31606 Sch. Bldg. Project (C.P.G. H/S) VII 0.437 C 0.328 0.300 0.300 - - - 92.80 85.31% V. Satisfactory
R-II Builders Inc. 11235 Dev't. of 50-Hectare Reserved Area, NBP Compound, Ph. I NHA 155.77 O 0.380 0.300 0.100 0.030 0.056 0.100 96.6 -
R-II Builders, Inc./J.M. Luciano Const./310 Const.
(JV)JV-01-041
Rehab. of Surigao-Davao Coastal Road (Manay-Mati
Section)IBRD 746.066 C 0.293 0.200 0.300 - - - 79.30 85.36%
V. Satisfactory
R-II Builders,Inc./Bauer Int'l Phil./PhilEco Sys
Corp/Supermax Phils.,Inc.
Consortium
Comp. of Remaining Land Dev. Works,Garbage Disposal,Const
of STPs and Repair of Permanent Housing
NHA 217.993 D 0.374 0.300 0.000 0.018 0.019 0.000 71.10 71.10% Satisfactory
Rim Construction 15938 Conc. of Bulanao-Paracelis Road CAR 3.199 C 0.393 - 0.500 - - - 89.30 87.98% V. Satisfactory
Rim Construction 15938 Rehab./Impvt. of Bontoc-Lubuagan-Tabuk Road CAR 11.469 C 0.302 0.300 0.300 - - - 90.20 *90.20%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 366
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ritche-Nathalie Builders and General Merchandise 27501 Concreting to Tangub-Polao
Road X 1.250 C 0.425 - 0.500 - - - 92.50 95.02% Outstanding
Ritche-Nathalie Builders and General Merchandise 27501 Const. of River Control @
Migcanawang River X 4.768 C 0.290 0.300 0.300 - - - 89.00 89.18% V. Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Const. of Seawall/Shore
Protection Northern Poblacion X 0.385 C 0.315 - 0.500 - - - 81.50 81.50% V. Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Rehab./Impvt. of Bonifacio-Don
Victoriano National Road X 2.860 C 0.328 0.283 0.300 - - - 91.10 71.54% Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Repair/Rehab. of Multi-Purpose
Bldg. X 0.475 C 0.381 0.300 0.300 - - - 98.10 85.10% V. Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Tangub-Polao By-Pass Road X 8.582 O 0.339 0.300 0.100 0.023 0.045 0.100 90.70 -
Ritz Commercial 19132 Concreting of Dapdap East Brgy. Road IV-A 4.752 O 0.356 0.300 0.050 0.030 0.028 0.067 83.10 -
Ritz Commercial 19132 Impvt. of Rizal-San Jose Road III 9.361 C 0.320 0.200 0.300 - - - *82.00 82.00% V.Satisfactory
Ritz Commercial 19132Impvt./Rehab. Along Daang
Maharlika Road, km. 390+000-km. 390+170, Naguilian-Gamu
II 9.567 C 0.378 0.261 0.300 - - - 93.90 *93.90% Outstanding
Ritz Commercial 19132Impvt./Rehab. Along Ganu-
Roxas Road, km. 408+900-km. 410+000
II 9.566 C 0.340 0.300 0.300 - - - 94.00 *94.00% Outstanding
Ritz Commercial 19132Reblocking/Impvt. of Roman
Expressway Alas-asin Section (Phase I)
III 9.445 C 0.375 0.290 0.300 - - - 96.50 *96.50% Outstanding
Riva Construction 23820 Cluster I- Const. of Various School Bldg. VII 10.280 C 0.363 - 0.500 - - - 86.30 87.98%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 367
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
River of Life Engineering Construction & Aggregates 30516 Const. of 2 Storey 4 Cl Sch.
Bldg. @ Benguet NHS CAR 1.640 C 0.302 0.231 0.300 - - - 83.30 *83.30% V.Satisfactory
River of Life Engineering Construction & Aggregates 30516 Impvt. Along Acop-Kapangan-
Kibungan Road CAR 4.775 C 0.335 0.202 0.300 - - - 83.70 *83.70% V.Satisfactory
RKX Odiamar Construction 16107 Const. of Seawall at Kinahulugan V 0.183 C 4.160 - 0.500 - - - 91.60 91.60%
OutstandingRLK Construction and
Builders 32194 Const. of Sch. Bldg. @ Bakit-Bakit E/S I 0.385 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
RM Joyce Construction & Supplies 16642 Const. of Bauan-Mabini Circ.
Road (Mainit Section) IVA 0.664 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
RM Joyce Construction & Supplies 16642 Const./Impvt. of MPB at
Malimatoc I IVA 0.380 C 0.166 0.200 0.300 - - - 66.60 *66.60% Fair
RM Joyce Construction & Supplies 16642 Const./Rehab. of Road at
Malimatoc II IVA 0.285 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory
RMAJ Construction 18623 Const. of Mompong Flood Control IV-B 0.954 C 0.309 0.205 0.300 - - - 81.40 *81.40%
V. Satisfactory
RMS Builder and Supply 19490 Rehab. of Farm-to-Market Road @ Cangmohao VII 0.932 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -
RNN Construction 24880 Repair/Strengthening of Old Viejo Bridge NCR 3.222 C 0.265 0.300 0.300 - - - 86.50 *86.50%
V.Satisfactory
RNV Construction 12570 Const. of Odiongan Multi-Purpose Bldg. IV-B 0.456 C 0.377 - 0.500 - - - 87.70 87.70%
V. Satisfactory
RNV Construction 12570 Rehab. of Boliganay FMR IV-B 0.901 C 0.352 - 0.500 - - - 85.20 85.20% V. Satisfactory
Road Edge Trading & Development Services 33140 Impvt./Conc. Along Daang
Maharlika II 4.822 C 0.370 0.200 0.300 - - - 87.00 *87.00% V.Satisfactory
Road Edge Trading & Development Services 33140 Impvt./Rehab. of del Carmen-San
Benito Road XIII 4.817 C 0.352 0.200 0.300 - - - 85.20 *85.20% V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 368
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Road Edge Trading & Development Services 33140 Repair/Rehab. Along del Carmen-
San Benito-Sta. Monica Road XIII 4.817 C 0.324 0.200 0.300 - - - 82.40 *82.40% V.Satisfactory
Road Edge Trading & Development Services 33140 Repair/Rehab. of Jct. Osmeña-
Pilar Road XIII 4.817 C 0.334 0.200 0.300 - - - 83.40 *83.40% V.Satisfactory
Roadtech Construction 17580 Conc.of Brgy. La Paz Road I 1.927 C 0.232 0.300 0.300 - - - 83.20 78.46% Satisfactory
Roadtech Construction 17580 Const. of School bldg., at San Jacinto E/S I 4.699 C 0.498 - 0.500 - - - 99.80 94.62%
Outstanding
Roadtech Construction 17580
Maintenance, Rehab. & Impvt. of Nat'l Road & Secondary Road
(Rehab. Of Drainage & Shoulder along Camiling-Wawa-
Bayambang-Malasiqui-Sta. Barbara)
I 0.998 C 0.350 0.300 0.300 - - - 95.00 *95.00% Outstanding
Roadtech Construction 17580
Rehab./Replacement of Calvo Bridge (Span 4 &5) Carmen Jct.-Bayambang San Carlos-Manat
Road
I 48.246 O 0.300 0.240 0.070 0.030 0.049 0.067 75.60 -
Roadtech Construction 17580
Rehab./Replacement of Calvo Bridge (Span 4 &5) Carmen Jct.-Bayambang San Carlos-Manat
Road
I 48.246 O 0.312 0.186 0.100 0.030 0.033 0.100 76.10 -
Roadtech Construction 17580Repair/Rehab. of Sinucalan
Bridge along Urd. Jct.-Dagupan Rd
I 2.704 C 0.375 - 0.500 - - - 87.50 92.48% Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Completion of MPB XII 0.942 C 0.352 0.293 0.300 - - - 94.50 *94.50%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Completion of School Building
at Sison Elem. School XII 0.375 C 0.345 0.285 0.300 - - - 93.00 86.84% V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 369
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175
Conc. of Kapingkong Bridge Approaches along Kidapawan-
Allah Jct. RoadXII 8.489 C 0.353 0.288 0.300 - - - 94.10 94.10%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175
Concreting of Jct. Kapaya Section along Dukay-Sen. Ninoy
Aquino-Lebak RoadXII 7.199 O 0.392 - 0.500 - - - 89.20 -
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of 3-Cl School Building XII 1.146 O 0.318 0.300 0.100 0.030 0.018 0.100 86.60 -
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of Multi Purpose Bldg. XII 0.954 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of Multi Purpose Bldg. at
Brgy. Dansuli XII 0.458 C 0.362 0.200 0.300 - - - 86.20 *86.20% V.Satisfactory
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Road Upgarding, Gamasil
Section XII 14.048 O 0.161 0.300 0.100 0.030 0.043 0.100 73.40 -
Robitan Construction 10553 Concreting of Brgy. Rd., Brgy. Sapaan IV-A 0.471 C 0.366 - 0.500 - - - 86.60 86.60%
V. Satisfactory
Rocali Construction & Trading 18779 Const./Rehab./Impv't. of Road
Drainage NCR 0.932 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Rockstone Construction Services and Supply 22702 Const. of MPB at Simsiman XII 0.767 C 0.317 0.200 0.300 - - - 81.70 82.47%
V.Satisfactory
Rockstone Construction Services and Supply 22702 Const. of MPB, Lugan National
High School XII 0.754 O 0.328 0.240 0.100 0.030 0.014 0.100 81.20 -
Rockstone Construction Services and Supply 22702
Impvt. of MPB at Surallah National Agricultural School
(SUNAS)XII 1.437 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V.Satisfactory
Rockworld Industries 7582Const. of Drainage Sytem @
Daan Maharlika, Picas-Apitong Road
VIII 1.887 O 0.400 0.169 0.100 0.015 0.028 0.200 91.20 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 370
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Rockworld Indutries 7582 Conc. of Shoulders, Tacloban-Lilo-an Road VIII 4.748 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V.Satisfactory
Rockworld Indutries 7582 Conc. Paving of San Victor-Ada-San Victor Calsadahay Rd. VIII 1.927 C 0.337 0.200 0.300 - - - 83.70 80.46%
V.Satisfactory
Rockworld Indutries 7582Const. of Drainage Sytem @
Daan Maharlika, Picas-Apitong Road
VIII 1.930 C 0.280 0.300 0.300 - - - 88.00 89.92% V.Satisfactory
Rockworld Indutries 7582 Const. of FMR at Brgy. Plaridel VIII 1.414 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory
Rockworld Indutries 7582 Const. of FMR at Ciabu-Zacarito VIII 1.420 C 0.340 0.200 0.300 - - - 84.00 *84.00% V.Satisfactory
Rockworld Indutries 7582 Road Conc.at Brgy. Lapay VIII 0.193 C 0.326 0.200 0.300 - - - 82.60 *82.60% V.Satisfactory
Rocky 5 G Builders 32506 Repair/Rehab. of Tam-Awan Longlong Road CAR 0.187 C 0.368 0.100 0.300 - - - 76.80 85.50%
V.Satisfactory
Roda Construction & Gen. Supply 19674 Completion of Multi-Purpose
Building V 1.418 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding
Roda Construction & Gen. Supply 19674 Concreting of San Isidro FMR V 0.461 C 0.341 - 0.500 - - - 84.10 87.22%
V.Satisfactory
Roda Construction & Gen. Supply 19674 Const. of Allanosa National High
School Bldg. San Pedro V 1.375 C 0.437 - 0.500 - - - 93.70 77.60% Satisfactory
Roda Construction & Gen. Supply 19674 Const. of Ariman Seawall, Brgy.
Ariman V 0.183 C 0.433 - 0.500 - - - 93.30 93.30% Outstanding
Roda Construction & Gen. Supply 19674 Repair of Marok-Barok Spillway V 0.327 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
Roda Construction and General Supply 19674 Completion of Public Market V 0.477 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Roda Construction and General Supply 19674 Const. of 1 Cl Sch. Bldg. @ San
Juan Bag-o HS V 0.528 C 0.397 0.122 0.300 - - - 81.90 *81.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 371
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Roda Construction and General Supply 19674
Hand-laid Rock bed with concrete facing of Buenavista
River ControlV 0.907 C 0.300 0.200 0.300 - - - 80.00 79.64%
Satisfactory
Roda Construction and General Supply 19674 Repair/Rehab. of Brgy. J.P.
Laurel going to Inararan FMR V 0.945 C 0.395 0.300 0.300 - - - 99.50 70.16% Satisfactory
Roim Builders & Construction Supply 20226 Conc. of Bucac-Marcelina Road XIII 2.808 C 0.344 0.200 0.300 - - - 84.40 81.55%
V. Satisfactory
Roim Builders & Construction Supply 20226 Concreting along Patin-ay-La
Caridad Road XIII 1.846 C 0.192 0.300 0.300 - - - 79.20 79.86% Satisfactory
Roim Builders & Construction Supply 20226 Concreting of BAHBAH Road
(Road Network) XIII 1.823 C 0.199 0.300 0.300 - - - 79.90 85.54% V. Satisfactory
Roim Builders & Construction Supply 20226 Concreting of Barangay 1
Municipal Street XIII 1.864 C 0.268 0.300 0.000 - - - 56.80 72.52% Satisfactory
Roim Builders & Construction Supply 20226 Repair/Rehab. of Unsayawon
PSCG Bridge XIII 2.848 C 0.340 0.200 0.000 - - - 54.00 61.98% Fair
Roim Builders and Construction Supply 20226 Gravelling of Bitan-Agan-Das-
Agan Road XIII 1.832 C 0.400 0.200 0.300 - - - 90.00 84.06% V. Satisfactory
Rolingbell Construction & Trading 32543 Construction of Multi-Purpose
Building III 1.907 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
Rol-Mar Developer and Enterprises 26151 Const. of Multi-Purpose Bldg.,
Youth Council Bldg. X 0.943 C 0.333 0.300 0.000 - - - 63.30 69.60% Fair
Romanjo Construction 32485 Const. of 1 Cl Sch. Bldg. @ Lorenzo P. Ziga H/S V 0.518 C 0.396 0.197 0.300 - - - 89.30 *89.30%
V. Satisfactory
Romhead S.J. Builders and Development Incorporated 30279 Const. Macalelon Seawall IV-A 2.890 C 0.333 0.300 0.300 - - - 93.30 87.42%
V. Satisfactory
Romina Construction 32090 Const. of MPB at G. Perfecto H/S NCR 2.989 C 0.381 0.200 0.300 - - - 88.10 83.31% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 372
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ronwood Const. Supply 25311BRS Pilot Project for Conc.
along Dapa-Cabugao-Lobogon Rd.
XIII 3.845 C 0.345 0.200 0.300 - - - 84.50 87.20% V. Satisfactory
Ronwood Const. Supply 25311 Conc. of Brgy. Ilihan Crossing XIII 2.829 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory
Ronwood Const. Supply 25311 Const. of Catangan-Cabitoonan-Libertad Road & Bridges XIII 9.644 O 0.284 0.213 0.100 0.030 0.032 0.100 75.90 -
Ronwood Const. Supply 25311 Const. of Drainage System XIII 0.928 C 0.381 0.300 0.300 - - - 98.10 93.48% Outstanding
Ronwood Const. Supply 25311 Const. of River Protection @ Mambayaan Bridge II (Phase I) X 4.720 C 0.369 0.219 0.300 - - - 88.80 88.56%
V. Satisfactory
Ronwood Const. Supply 25311Dela Carmen-San Benito-San Isidro Road along Cancohoy
SectionXIII 7.718 O 0.307 0.272 0.100 0.030 0.032 0.100 84.10 -
Ronwood Const. Supply 25311Impvt./Conc. of Siargao Circ.
Road (San Juan, San Benito, & Alegria, Sapao)
XIII 9.458 C 0.270 0.200 0.300 - - - 77.00 78.74% Satisfactory
Ronwood Const. Supply 25311 Replacement of Asinan Timber Bridge II to RCBC XIII 4.824 C 0.295 0.200 0.300 - - - 79.50 69.00%
Fair
Ronwood Const. Supply 25311 Slope Protection along Jct. Osmeña-Pilar Road XIII 5.447 C 0.343 0.300 0.000 - - - 64.30 82.12%
V. Satisfactory
Ronwood Construction & Supply 25311 Cluster EQ: Rehabilitation of
FMR Pook, X 0.951 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
Ronwood Construction & Supply 25311 Clustered Conc. of Municipal
Streets XIII 1.130 C 0.474 - 0.500 - - - 97.40 97.40% Outstanding
Ronwood Construction & Supply 25311 Conc.of FMR Brgy. Del Carmen XIII 0.944 C 0.478 - 0.500 - - - 97.80 *97.80%
Outstanding
Ronwood Construction & Supply 25311
Concreting of Dapa-Sayak-Cancohoy Road, Sta. Fe.
Lobongon Sect.XIII 6.112 C 0.404 - 0.500 - - - 90.40 89.86%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 373
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ronwood Construction & Supply 25311 Const./Regravelling of Rd. XIII 0.940 C 0.427 - 0.500 - - - 92.70 92.70%
Outstanding
Ronwood Construction and Supply 25311 Improvement of Dapa-Del
Carmen Road (Slope Protection) XIII 1.373 O 0.367 0.200 0.300 - - - *86.70 -
Roprim Construction 8546 Const. of Cuartero Bridge, Phase II VI 8.881 C 0.350 0.300 0.300 - - - 95.00 92.00%
Outstanding
Roprim Construction 8546 Const. of Janiuay-Badiangan Road, Km.36+320-Km.37+620 VI 13.886 C 0.295 0.200 0.000 - - - 49.50 69.72%
Fair
Roprim Construction 8546 Const. of Nabitasan River Control VI 4.756 O 0.400 0.200 0.100 0.023 0.056 0.200 97.90 -
Roprim Construction 8546 Const. of Nabitasan River Control VI 4.756 O 0.356 0.200 0.070 0.023 0.047 0.133 82.90 -
Roprim Construction 8546 Const. of Tumalalud Bridge (Phase II) VI 1.430 C 0.357 0.208 0.000 - - - 56.50 71.29%
Satisfactory
Roprim Construction 8546 Reblocking of Pototan-Mina Janiuay Road VI 9.546 O 0.293 0.225 0.100 0.015 0.032 0.100 76.50 -
Rosand Builders 15781 Beautification of K-H Park, Brgy. West Kamias NCR 0.700 C 0.392 - 0.500 - - - 89.20 89.20%
V.Satisfactory
Rosand Builders 15781Const. of Flood Control within the vicinity of Brgy. Tamugan
Bridge at Sitio AcaciaXI 4.714 C 0.287 0.200 0.300 - - - 78.70 82.00%
V.Satisfactory
Rosand Builders 15781 Const. of MPB (Student Pavillion) CSSP NCR 0.473 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Rosand Builders 15781 Const. of Sch. Bldg. @ UP College of Music NCR 0.946 C 0.390 0.300 0.300 - - - 99.00 *99.00%
Outstanding
Rosand Builders 15781 Const. of Tugbok Lined Canal along Davao-Bukidnon Road XI 2.822 C 0.267 0.205 0.300 - - - 77.20 82.42%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 374
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Rosand Builders 15781
Impvt. of Davao River Flood Control along Davao-Cotabato
Road, Generoso Bridge II (Downstream Right Side)
XI 2.826 C 0.293 0.300 0.300 - - - 89.30 *89.30% V.Satisfactory
Rosand Builders 15781 Impvt./Conc. of 20th Ave. NCR 4.752 C 0.305 0.300 0.300 - - - 90.50 *90.50% Outstanding
Rosand Builders 15781
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston Section) Manay-Caraga Section
XI 14.633 C 0.328 0.237 0.300 - - - 86.50 *86.50% V.Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of Farm-to-Market Road IV-A 0.570 C 0.266 - 0.500 - - - 76.60 *76.60%
Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of Flood Control/Drainage
System IV-A 2.866 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of FMR @ Municipalty of
Victoria IV-A 0.934 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding
Rosvar Enterprises and General Contractor 17998 Const. of MPB at Brgy. San Felix IV-A 1.143 C 0.359 0.200 0.300 - - - 85.90 *85.90%
V. SatisfactoryRosvar Enterprises and
General Contractor 17998 Const. of Multi-Purpose Hall IV-A 0.938 C 0.449 - 0.500 - - - 94.90 *94.90% Outstanding
Rovilla Construction 19514 Const. of 2-CL S/B (Part of Cluster A) VII 0.491 C 0.380 - 0.500 - - - 88.00 *88.00%
V. Satisfactory
Rovilla Construction 19514 Construction of 1-CL S/B at Tominjao NHS VII 0.480 C 0.366 0.153 0.300 - - - 81.90 *81.90%
V. Satisfactory
Rovilla Construction 19514 Construction of 2-CL S/B at San Remegio NHS VII 0.964 C 0.350 0.155 0.300 - - - 80.50 *80.50%
V. Satisfactory
Rowie's Construction 23595Completion of School Building
(New Admin.), SSPSC San Miguel Campus
XIII 2.030 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory
Rowie's Construction 23565 Const. of Lambunao Flood Control XIII 4.715 C 0.336 0.300 0.300 - - - 93.60 *93.60%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 375
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Farm-to-Market
Road Buenlag III 1.544 C 0.384 0.200 0.300 - - - 88.40 88.10% V. Satisfactory
Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Rizal-Caramutan-
Dumarais Road III 1.850 C 0.335 0.287 0.300 - - - 92.20 *92.20% Outstanding
Royal Crown Monarch Const. & Supplies Corp. 9036 Rehab. of Sto. Domingo Road III 8.261 C 0.361 0.289 0.300 - - - 95.00 *95.00%
OutstandingRoyal Crown Monarch
Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &
Supplies)
9036 Const. of MPB @ Brgy. San Francisco East Anao (Phase I) III 9.235 O 0.308 0.221 0.100 0.030 0.048 0.100 80.70 -
Royal Crown Monarch Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &
Supplies)
9036 Const. of MPB @ Brgy. San Francisco East Anao (Phase I) III 9.364 C 0.383 0.269 0.300 - - - 95.20 85.05%
V. Satisfactory
Royal Crown Monarch Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &
Supplies)
9036 Const./Rehab. of Tarlac River Dike Flood Control III 4.177 C 0.373 0.200 0.300 - - - 87.30 83.34%
V. Satisfactory
Royal Crown Monarch Construction & Supplies Corporation (Formerly: R.C. Miranda Const. &
Supplies)
9036 Rehab. Of Old Manila North Road III 7.063 C 0.339 0.218 0.300 - - - 85.70 *85.70%
V. Satisfactory
Royal Sea Bees Construction 30099 Const. of Provincial Cooperative
Office MPB CAR 0.473 C 0.133 0.300 0.300 - - - 73.30 *73.30% Satisfactory
Royal Sea Bees Construction 30099 Implementation of Various
Projects under Package 15 CAR 0.933 O 0.241 0.214 0.100 0.030 0.030 0.067 68.20 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 376
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Royal Sea Bees Construction 30099
Widening/Regravelling incl. slope protection & drainag of
Bontoc-Lubuagan-Tabuk RoadCAR 4.787 C 0.326 0.237 0.300 - - - 86.30 81.50%
V. Satisfactory
RPBJ Trading & Construction 30006 Const. of Drainage System along
Nulatula VIII 2.046 C 0.354 - 0.500 - - - 85.40 85.40% V.Satisfactory
RPBJ Trading & Construction 30006
Const. of Multi-Purpose Bldg., (Covered Court) at Brgy. 82
(Phase II)VIII 0.950 C 0.398 - 0.500 - - - 89.80 51.93%
Poor
RPBJ Trading & Construction 30006 Road Conc. of Brgy. Dagami-
Pastrana Road VIII 0.937 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding
RPBJ Trading and Construction 30006 Completion/Repair of 3 CL ES
Building @ Sangkahan ES VIII 0.499 C 0.400 0.200 0.300 - - - 90.00 *90.00% V.Satisfactory
RPBJ Trading and Construction 30006 Const. of 2 CL SB at Brgy. P.
Barrantes Primary School VIII 0.965 C 0.376 0.200 0.300 - - - 87.60 *87.60% V.Satisfactory
RPBJ Trading and Construction 30006
Road Junction, Rechannelization at Maharlika-PHHC Anibong
RoadVIII 1.897 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V.Satisfactory
RREncabo Constructors & Traders 14716 Fort Santiago Linear Park
Project PRRC 13.595 O 0.349 0.300 0.100 0.030 0.050 0.100 92.90 -
RRMD Construction & Supply (Formerly: RRMD
Const.)23615 Conc. of Iligan-Bukidnon Road X 8.938 O 0.358 0.236 0.100 0.030 0.044 0.100 86.80 -
RRMD Construction & Supply (Formerly: RRMD
Const.)23615 Const. of Linamon-Zamboanga
Road, Kalabugan Section X 9.061 C 0.353 0.200 0.300 - - - 85.30 83.50% V.Satisfactory
RRN Construction 20228
Const. of Concrete Lined Ditch along Jct. A. H. Aglayan-Kibangay Rd. Poblacion
Lantapan Sect.
X 0.321 C 0.470 - 0.500 - - - 97.00 95.44% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 377
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
RSP Enterprises Inc. 16795 Concreting of Road at Brgy. Tagakpan XI 0.940 C 0.333 - 0.500 - - - 83.30 81.02%
V.Satisfactory
RSP Enterprises Inc. 16795Const. of Flood
Control/Drainage, Guadalupe Village, Matina Crossing
XI 0.661 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
RSP Enterprises Inc. 16795 Const. of Multi Purpose Pavement at Brgy. 7A XI 0.661 C 0.345 0.300 0.300 - - - 94.50 88.74%
V. Satisfactory
RSP Enterprises, Inc. 16795 Const. of 1-Cl, School Bldg. @ Elias Lopez Memorial H/S XI 0.330 C 0.309 - 0.500 - - - 80.90 87.20%
V. Satisfactory
RTY Construction 10341 Concreting of Balanacan FMR Balanacan IV-B 0.239 C 0.013 0.300 0.300 - - - 61.30 *61.30%
Fair
Ruby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay III 4.606 O 0.334 0.225 0.100 0.030 0.016 0.100 80.50 -
Ruby Lim Const. & Supplies 11685 Conc. of Cudamos Brgy. Road
New Dagupan IV-B 0.366 C 0.449 - 0.500 - - - 94.90 94.90% Outstanding
Ruby Lim Const. & Supplies 11685 Conc. of San Fernando-Talisay
Road V 12.672 C 0.318 0.229 0.300 - - - 84.70 79.54% Satisfactory
Ruby Lim Const. & Supplies 11685 Const. of Multi-Purpose
Pavement V 0.364 C 0.332 0.100 0.300 - - - 73.20 *73.20% Satisfactory
Ruby Lim Const. & Supplies 11685 Const. of MPB V 9.448 C 0.355 0.200 0.300 - - - 85.50 76.47%
Satisfactory
Ruby Lim Const. & Supplies 11685 Const. of MPB (Gymnasium)
Phase IV V 4.720 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Ruby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay III 4.606 C 0.255 0.253 0.300 - - - 80.80 80.62%
V. Satisfactory
Rumil Construction 13484 Const. of S/B @ Barobo NHS (Main), Package 1 XIII 1.156 C 0.369 0.200 0.300 - - - 86.90 86.34%
V. Satisfactory
Rumil Construction 13484 Const. of USEP-Bislig MPB @ Brgy. Maharlika XIII 1.923 C 0.213 0.300 0.300 - - - 81.30 81.65%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 378
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Rusmen Builders & Development Corporation 10674 Asphalt Overlay of Lipa-Rosario
Road IV-A 10.543 C 0.366 0.200 0.300 - - - *86.60 86.60% V. Satisfactory
Rusmen Builders & Development Corporation 10674
Completion of Multi-Purpose Sch. Bldg. in Dr. Crisogono
Ermita Sr. NHSIV-A 3.858 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Rusmen Builders & Development Corporation 10674 Const. of Brgy. Road at Brgy.
Maugat West (Sitio Ilaya) IV-A 1.928 C 0.357 0.200 0.300 - - - 85.70 *85.70% V.Satisfactory
Rusmen Builders & Development Corporation 10674 Rehab. of Banay-banay-Cuenca
Road (San Jose Section) IV-A 4.798 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
Rusmen Builders & Development Corporation 10674
Rehab./Reconst. of Damaged National Roads, Banay-Banay-Cuenca-Mojon Road, San Jose
Section
IV-A 13.509 C 0.347 0.267 0.300 - - - 91.40 *91.40% Outstanding
Rusmen Builders & Development Corporation
(Formerly: Rusmen Corporation)
10674 Const. of Multi-Purpose Building IV-A 4.769 O 0.369 0.200 0.100 0.030 0.043 0.100 84.20 -
Rusmen Builders & Dev't. Corp. 10674 Const of San Jose Market Brgy.
Taysan IV-A 8.595 O 0.400 0.217 0.100 0.030 0.020 0.100 86.70 -
Rusmen Builders & Dev't. Corp. 10674 Impv't. of Manila-Batangas By
Pass Road Phase I IV-A 9.562 C 0.456 - 0.500 - - - 95.60 95.60% Outstanding
RWD Construction 27116 Maintenance/Rehab. & Impvt. of GSO Road III 0.995 C 0.358 0.200 0.300 - - - 85.80 *85.80%
V. Satisfactory
S & G Construction 11773 Const. of Tacurong Drainage Canal XII 6.624 C 0.323 - 0.500 - - - 82.30 88.98%
V. Satisfactory
S & G Construction 11773 Rehabilitation of Manin Canal (Sta. 21+714-26+526) NIA-I 7.304 C 0.250 0.300 0.300 - - - 85.00 84.87%
V.Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 379
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
S & K Builders, Inc. 24039 Const. of 5-CL School Building @ Quezon NHS X 1.406 C 0.347 0.000 0.500 0.000 0.000 0.000 84.70 77.91%
Satisfactory
S B G Construction 12022 Concreting of Brgy. Road, Bonbon X 0.960 C 0.353 0.218 0.300 - - - 87.10 *87.10%
V. Satisfactory
S. S. Tria Construction 18002 Rehab. of Public Market, New Dagupan IV-B 0.576 C 0.379 0.300 0.300 - - - 97.90 67.38%
Fair
S.A. Gomez Construction 6265 Const. of Malasag Eco-Tourism Facilities PTA 11.167 O 0.373 0.300 0.070 0.015 0.039 0.067 86.43 -
S.J. Yu Construction 17048Rehabilitation of Various
Buildings @ C.L. Montelibano Regional Hospital
VI 4.090 O 0.361 0.195 0.000 - - - 55.60 -
S.M. Castro Management & Construction Services 18216 Const. of Capinahan Bridge VIII 3.931 C 0.452 - 0.500 - - - 95.20 93.28%
Outstanding
S.M. Castro Management & Construction Services 18216
Gravelling of Roadway & Installation of Guardrails along
Dinagat-Loreto RoadXIII 4.814 C 0.311 0.200 0.300 - - - 81.10 74.56%
Satisfactory
S.M. Castro Management & Construction Services 18216 Impvt. Along Gamu-Roxas Road
(Guardrails Installation) II 9.644 C 0.272 0.225 0.300 - - - 79.70 *79.70% Satisfactory
S.M. Castro Management & Construction Services 18216 Rehab. & Maintenance of Roads
along Gamut-San Miguel Sect. XIII 14.390 C 0.400 0.146 0.300 - - - 84.60 *84.60% V. Satisfactory
S.R. Baldon Construction & Supply 15405 Concreting of Cabid-an Road
(Seabreeze), Cabid-an V 0.920 C 0.268 0.000 0.500 0.000 0.000 0.000 76.80 *76.80% Satisfactory
S.R. Baldon Construction & Supply 15405 Const. of Multi-Purpose
Building, Madlawan V 0.240 C 0.372 0.000 0.500 0.000 0.000 0.000 87.20 *87.20% V. Satisfactory
S.W. Taya-an Construction 33085 Const. of Mapaway Deepwell with Elevated Tank CAR 0.958 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 380
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sabutan Construction 5520 Const. of Footbridge, Brgy. Labnig IVA 0.479 C 0.270 0.300 0.300 - - - 87.00 82.20%
V. Satisfactory
Sabutan Construction 5520Repair/Rehab. of Manila South
Road, Pagbilao-Atimonan Section, Phase III
IVA 4.999 C 0.390 0.200 0.300 - - - 89.00 *89.00% V.Satisfactory
Sabutan Construction 5520Road Widening of
Canggumantong-Poo-Lazi Interior Road
VII 1.391 C 0.400 0.193 0.300 - - - 89.30 89.54% V. Satisfactory
Salidummay Gen. Construction 21403 Completion of Multi-Purpose
Building CAR 0.476 C 0.384 0.250 0.300 - - - 93.40 *93.40% Outstanding
Salidummay Gen. Construction 21403 Const. of Multi-Purpose
Building, Pinsao-Pilot Brgy. CAR 1.620 C 0.398 0.000 0.500 0.000 0.000 0.000 89.80 63.34% Fair
Samjan Builders 27855 Completion of Multi Purpose Bldg. At Campo Filipino Brgy. CAR 0.953 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
Samjan Builders 27855 Rehabilitation along Pico-Lamtang Road CAR 2.173 C 0.383 0.000 0.500 0.000 0.000 0.000 88.30 86.74%
V. Satisfactory
Sammi Construction Company , Ltd. FC-05008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road IV-B 649.871 O 0.400 0.300 0.050 0.030 0.070 0.067 91.70 -
Sammi Construction Company , Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road IV-B 649.871 O 0.365 0.300 0.030 0.030 0.070 0.067 86.20 -
Samurai Construction 32214 Const. of Multi Purpose Pavement @ Brgy. Sarong IV-B 0.208 C 0.173 0.000 0.300 - - - 47.30 *47.30%
Poor
San Fernando Builders 21295 Conc. of Calingcamasan Road I 0.470 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
San Fernando Builders 21295 Const. of Multi-Purpose Bldg. I 2.846 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding
San Fernando Builders 21295 Const. of Multi-Purpose Structure at Brgy. Sili I 0.187 C 0.303 0.000 0.500 0.000 0.000 0.000 80.30 *80.30%
V. Satisfactory
San Fernando Builders 21295 Construction of Multi-Purpose Bldg. I 5.646 C 0.376 0.252 0.300 - - - 92.80 *92.80%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 381
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
San Fernando Builders 21295 Construction of Multi-Purpose Bldg. @ Brgy. Ortega I 0.940 C 0.321 0.253 0.300 - - - 87.40 *87.40%
V. Satisfactory
San Fernando Builders 21295 Repair/Impvt. of FMR I 0.096 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
San Fernando Builders 21295 Repair/Impvt. of FMR @ Brgy. Sta. Rita West I 0.096 C 0.254 0.300 0.300 - - - 85.40 *85.40%
V. Satisfactory
San Fernando Builders 21295 Repair/Impvt. of FMR @ Brgy. Sto. Rosario East I 0.096 C 0.291 0.300 0.300 - - - 89.10 *89.10%
V. Satisfactory
San Guillermo Const. and Trading Corp. 25661 Const. of MPB @ La
Consolacion NCR 1.627 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory
San Rafael Builders 30496 Rehab. of DPWH-Region IVA Building IV-A 1.915 C 0.391 0.200 0.300 - - - 89.10 85.46%
V. Satisfactory
Sandstorm Construction 23411 Const. of Flood Control System @ Brgy. Zone 13 IV-A 0.471 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Fair
Sandstorm Construction 23411 Const. of Line Canal IV-A 0.189 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Sandstorm Construction 23411 Const. of MPB/Structure (2nd Floor) in Mahabang Ludlod IV-A 0.479 C 0.263 0.200 0.300 - - - 76.30 *76.30%
Satisfactory
Sandstorm Construction 23411 Const. of Multi-Purpose Building at Brgy. Sta. Elena IV-A 0.477 C 0.450 - 0.500 - - - 95.00 *95.00%
Outstanding
Sanlahi Group of Builders, Inc. 11874 Concreting of Baco-Puerto
Galera Road (Phase II) IV-B 9.500 C 0.314 0.300 0.300 - - - 91.40 81.50% V. Satisfactory
Sanlahi Group of Builders, Inc. 11874 Concreting of Brgy. Panikian
Road, Naujan IV-B 1.894 C 0.198 0.000 0.500 0.000 0.000 0.000 69.80 71.96% Satisfactory
Sanlahi Group of Builders, Inc. 11874 Concreting of Road @ Kalinisan IV-B 1.909 C 0.300 0.200 0.300 - - - 80.00 80.48%
V. Satisfactory
Sanlahi Group of Builders, Inc. 11874
Const. of Drainage System (w/cover) Brgy. Tawiran-Sta.
Isabel,IV-B 4.035 C 0.356 0.000 0.500 0.000 0.000 0.000 85.60 85.60%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 382
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sanlahi Group of Builders, Inc. 11874 Const./Repair of Multi-Purpose
Building, Masipit IV-B 0.947 C 0.391 0.000 0.500 0.000 0.000 0.000 89.10 89.10% V. Satisfactory
Sanlahi Group of Builders, Inc. 11874 Rehab./Reconst. of Calapan
South Road IV-B 9.503 O 0.326 0.237 0.100 0.023 0.038 0.100 82.40 -
Sanlahi Group of Builders, Inc. 11874 Widening of Libis-Lumangbayan-
Sta. Isabel Road IV-B 6.441 C 0.378 0.300 0.300 - - - 97.80 94.32% Outstanding
Sanlahi Group of Builders, Inc./811 Trading & Const.
(JV)JV-06-067
Conc. of East Coast Road, Calapan-Mansalay Section,
Palaypay SectionIV-B 19.240 C 0.295 0.300 0.300 - - - 89.50 88.06%
V. Satisfactory
Santech Builders 16797 Concreting of Molimono-Pili Road, Cawayan (Phase VII) XIII 4.587 C 0.369 0.200 0.300 - - - 86.90 84.86%
V. Satisfactory
Santech Builders 16797 Const. of Magtangale-Macopa Road, San Francisco XIII 2.651 C 0.366 0.000 0.500 0.000 0.000 0.000 86.60 86.42%
V. Satsifactory
Santech Builders 16797 Const. of Multi-Purpose Building XIII 4.652 C 0.274 0.300 0.300 - - - 87.40 82.92% V. Satisfactory
Santech Builders 16797 Const. of Rosita Bridge III, PSCG (Type IV-B) XIII 4.608 C 0.377 0.300 0.300 - - - 97.70 87.38%
V. Satisfactory
Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 O 0.393 0.155 0.100 0.020 0.028 0.200 89.60 -
Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 O 0.357 0.200 0.050 0.015 0.035 0.200 85.70 -
Sanvar Development Corporation 2342
Repair/Renovation of DBP Commonwealth Branch Bldg.
and PremisesDBP 2.249 C 0.411 0.200 0.141 - - - 75.20 75.20%
Unsatisfactory
Sapdoy Enterprises 21995 Completion of MPB @ BGH Compound CAR 0.952 O 0.301 0.300 0.100 0.023 0.032 0.100 *85.60 -
Sarangani Rockmixer 6549Completion/Concreting of
Crossing Rubber-Tampakan Road
XII 5.583 C 0.465 - 0.500 - - - 96.50 96.44% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 383
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sarangani Rockmixer 6549Const. of GSC Circumferential Road, San Isidro Section, Brgy.
San IsidroXII 4.698 C 0.435 0.000 0.500 0.000 0.000 0.000 93.50 *93.50%
Outstanding
Sarangani Rockmixer 6549 Rehab./Impvt. of Digos-Makar Road (Intermittent Section) XII 11.000 C 0.340 0.191 0.300 - - - 83.10 83.10%
V.Satisfactory
Sarangani Rockmixer 6549Widening of Additional 2 Lanes
of Marbel-Tupi-Makar Road, Carpenter Hill Sect.
XII 14.455 C 0.369 0.205 0.300 - - - 87.40 86.08% V. Satisfactory
Sarangani Rockmixer 6549Widening of Makar-Tupi-Marbel
Road (Labangal-Apopong Section)
XII 7.150 C 0.369 0.200 0.300 - - - 86.90 81.26% V. Satisfactory
Sarca Estate Development Corporation 20520
Completion of Municipal Health Center & Const. of Health Center
@ Brgy. GumianIV-A 0.964 C 0.311 0.282 0.300 - - - 89.30 *89.30%
V. Satisfactory
Sarca Estate Development Corporation 20520 Const. of Municipal Health
Center IV-A 0.964 C 0.271 0.300 0.300 - - - 87.10 82.62% V. Satisfactory
Sarca Estate Development Corporation 20520 Rehab. of Famy-Real-Infanta-
Dinahican Port Road IV-A 14.458 C 0.270 0.300 0.300 - - - 87.00 84.84% V. Satisfactory
Sards Construction 15408 Conc. (Concrete Reblocking) of 1,220 lm Nat'l Road VI 9.411 C 0.300 0.100 0.300 - - - 70.00 71.98%
Satisfactory
Sarex Builders 23734 Completion of Gutalac Public Market, Gutalac IX 0.739 C 0.482 0.000 0.500 0.000 0.000 0.000 98.20 88.20%
V. Satisfactory
Sarex Builders 23734 Conc. of Dualing-Baliki-Silik Road, Dualing Section XII 9.403 C 0.377 0.228 0.300 - - - 90.50 *90.50%
Outstanding
Sarex Builders 23734 Conc. of Road at Brgy. Dagupan XII 0.469 C 0.335 0.287 0.300 - - - 92.20 87.70% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 384
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sarex Builders 23734 Concreting of Road at Molave Street, Poblacion Carmen XII 1.878 C 0.345 0.000 0.500 0.000 0.000 0.000 84.50 *84.50%
V. Satisfactory
Sarex Builders 23734 Const. of MPB XII 0.286 C 0.388 0.264 0.300 - - - 95.20 *95.20% Outstanding
Sarex Builders 23734 Const. of MPB @ Brgy Ilbocean XII 0.330 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
Sarex Builders 23734 Const. of Multi-Purpose Bldg. @ Brgy. Gen. Luna XII 0.235 C 0.432 0.000 0.500 0.000 0.000 0.000 93.20 *93.20%
Outstanding
Sarex Builders 23734 Const. of Multi-Purpose Pavement at Brgy. Presbitero XII 0.473 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
Sarex Builders 23734 Const. of Water Supply / Spring Development Brgy. Malitubog XII 0.462 C 0.336 0.000 0.300 - - - *63.60 79.56%
Satisfactory
Sarex Builders 23734Impvt. of Molo River
Control/Flood Control, Molo Section
XII 4.807 C 0.326 0.231 0.300 - - - 85.70 *85.70% V. Satisfactory
Sarex Builders 23734 Proposed Const. of Seawall Manil Leon Postigo IX 0.779 C 0.416 0.000 0.500 0.000 0.000 0.000 91.60 *91.60%
Outstanding
Sarex Builders 23734 Redecking of Carmen Bridge (Phase 2) XII 3.744 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V. Satisfactory
Sargasso Construction and Development Corp. 6587 Const. of Manggamnan Bridge IV-B 13.332 O 0.267 0.240 0.000 0.023 0.035 0.067 63.20 -
Sargasso Construction and Dev't. Corp. 6587 Const./ Replacement of
Manggamnan Bridge IV-B 13.347 O 0.289 0.237 0.100 0.030 0.047 0.100 80.30 -
SATRAP Construction Co., Inc. 2526 Improvement of San Fernando
Airport BCDA 471.406 O 0.3997 0.2988 0.070 0.024 0.03 0.067 88.91 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 385
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
SATRAP Construction Co., Inc. 2526 Improvement of San Fernando
Airport BCDA 471.406 O 0.3831 0.3 0.050 0.024 0.055 0.067 87.88 -
Satrap Construction Co., INC. 2526 Improvement of San Fernando
Airport PPA 471.406 O 0.379 0.271 0.100 0.030 0.064 0.100 94.41 -
Satrap Construction Co., INC. 2526 Improvement of San Fernando
Airport PPA 471.406 O 0.368 0.297 0.100 0.030 0.055 0.100 94.94 -
Satrap Construction Co., INC. 2526 Improvement of San Fernando
Airport PPA 471.406 O 0.354 0.300 0.100 0.030 0.045 0.100 92.85 -
Satrap Construction Company, Inc. 2526 Asphalting of Shoulder along
MNR San Ildefonso I 1.256 C 0.317 - 0.500 - - - 81.70 81.76% V. Satisfactory
Satrap Construction Company, Inc. 2526 Rehab./Replacement of Bussawit
Bridge 2 along MNR I 8.364 C 0.391 0.200 0.300 - - - 89.10 89.52% V. Satisfactory
Satrap Construction Company, Inc. 2526 Replacement of Bantaoay along
Manila North Road I 19.893 O 0.363 0.214 0.100 0.030 0.047 0.100 85.40 -
Satrap Construction Company, Inc. 2526 Replacement of Bantaoay along
Manila North Road I 19.893 O 0.372 0.300 0.070 0.030 0.051 0.100 92.30 -
SBB Construction & Supply 31238 Conc. of Road at Catmon St., Sto. Nino-YCF XI 0.417 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
SBB Construction and Supply 31238 Concreting of Road @ Dama de
Noche XI 0.462 C 0.303 - 0.500 - - - 80.30 85.70% V. Satisfactory
SBB Construction and Supply 31238 Const. of 1CL 1 Storey S/B at
Mintal E/S XI 0.425 C 0.378 0.176 0.300 - - - 85.40 *85.40% V. Satisfactory
SBF Construction & Dev't Corp. 11470 Conc. of Passi-Calinog Road VI 13.509 C 0.342 0.300 0.300 - - - 94.20 85.56%
V. Satisfactory
SCP Construction 8797Conc. of SDCR, (Tagasaka-Bislig
Subsection) along Hinatuan-Bislig-Boston Section
XIII 158.872 O 0.278 0.184 0.100 0.030 0.030 0.100 72.20 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 386
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
SCP Construction 8797 Const. of Brgy. Cuarenta-Luna Road, San Jose XIII 13.026 C 0.383 0.300 0.000 - - - 68.30 72.98%
Satisfactory
SCP Construction 8797
Rehab./Reconst. of Damaged Paved National Roads along Butuan City-Cagayan de Oro
City-Iligan City Road
X 18.867 O 0.365 0.240 0.100 0.030 0.035 0.067 83.70 -
SCP Construction / Persan Construction / G & P
Builders, Incorporated (JV)JV-99-175
Const./ Impv't. of Bulua (Jct. ICB Road)P.N. Road-Lumbia (Jct.
Airport Road)X 121.472 C 0.367 0.300 0.300 - - - 96.70 93.19%
Outstanding
SCV Construction 14523 Const. of Multi-Purpose Building X 0.933 O 0.341 0.225 0.100 0.000 0.008 0.100 77.40 -
Segal Construction 17243 Const. of Drainage System, New Lucban Brgy. CAR 0.959 C 0.399 - 0.500 - - - 89.90 89.90%
V. Satisfactory
Sercher Development Corporation 26332 Const. of Flood Control &
Drainage System VII 0.477 C 0.276 0.300 0.300 - - - 87.60 87.60% V.Satisfactory
Serg Construction 8003Construction of 1-CL School Building @ Don Carlos NHS, Gupaco PS & Sinayawan PS
X 1.400 C 0.379 0.230 0.300 - - - 90.90 *90.90% Outstanding
Serra Ty Construction 7373Conc. of East/West Lateral Road,
(Tandag-Gamut-San Miguel-Bayugan Road)
XIII 19.274 O 0.342 0.237 0.030 0.023 0.027 0.100 75.90 -
Serra Ty Construction 7373 Concreting of Road from Airport to Brgy. Awasian XIII 1.353 C 0.357 0.000 0.500 0.000 0.000 0.000 85.70 *85.70%
V. Satisfactory
Serra Ty Construction 7373Impvt. of Road Slip and other
related activities, Cortes-Junction Section
XIII 2.885 C 0.244 0.200 0.300 - - - 74.40 76.38% Satisfactory
Serra Ty Construction 7373 Rehab./Impvt. of Gamut-Unaban Section, along SCDR XIII 9.605 C 0.285 0.268 0.300 - - - 85.30 78.34%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 387
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Settlers Builder 21643 Conc. of Sibalom-San Remegio-Leon Road, Barangbang Section VI 2.746 C 0.278 0.276 0.300 - - - 85.40 83.72%
V. Satisfactory
Settlers Builder 21643 Const. of Libonan Bridge VI 7.199 C 0.400 0.200 0.300 - - - 90.00 88.26% V. Satisfactory
Seven Digit Construction & Supplies 25471 Conc. of PPSR, Km. 222+505.5 -
km. 223+063.50 IV-B 5.680 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding
Seven Digit Construction & Supplies 25471 Concreting of Roads in Brgy. 3 IV-B 0.473 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. SatisfactorySeven Digit Construction &
Supplies 25471 Const. of 1CL at Panindigan E/S IV-B 0.376 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Caramay Seawall
(Phase 2) IV-B 0.473 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc.
Bridge, Dayandante Bridge I IV-B 9.347 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc.
Bridge, Talog Bridge IV-B 9.350 O 0.300 0.240 0.100 0.030 0.047 0.100 81.70 -
Seven Digit Construction & Supplies 25471
Raising of Grade of Puerto Princesa-Roxas, Taytay-El Nido
RoadIV-B 3.642 C 0.283 0.300 0.300 - - - 88.30 89.62%
V. Satisfactory
Seven Digit Construction & Supplies 25471 Reconst. of Kaylubong Bridge II IV-B 8.454 C 0.261 0.300 0.300 - - - 86.10 89.16%
V. Satisfactory
Seven Digit Construction & Supplies 25471 Rehab./Improvement of San
Vicente Airport Runway IV-B 9.139 C 0.280 0.300 0.300 - - - 88.00 83.86% V. Satisfactory
Seven Digit Construction & Supplies 25471 Repair/Maintenance of Puerto
Princesa North Road (PPNR) IV-B 9.513 O 0.358 0.159 0.100 0.030 0.048 0.100 79.50 -
Seven Digits Construction & Supplies 25471 Rehabilitation of San Jose-Port
Barton Road IV-B 4.102 C 0.389 0.209 0.300 - - - 89.80 85.66% V. Satisfactory
Seven Digits Construction & Supplies 25471 Repair/Rehab. & Const. of
Bagiong Bayan Bebeladan FMR IV-B 2.660 C 0.387 - 0.500 - - - 88.70 85.76% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 388
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Seven Digits Construction & Supply 25471 Const. of Flood Control at
Barangay Sowangan IV-B 0.947 C 0.389 0.000 0.500 0.000 0.000 0.000 88.90 *88.90% V. Satisfactory
SGB Concrete Products & General Merchandise 20745 Rehab./Impv't. of Antipolo-
Tukulan Road IVA 1.917 C 0.359 - 0.500 - - - 85.90 91.00% Outstanding
SGL Trading 27767 Concreting of Agtangao-Manila Road, Benguet CAR 0.452 C 0.344 0.000 0.500 0.000 0.000 0.000 84.40 *84.40%
V. Satisfactory
SGSS Construction 27502 Const. of Covered Line Canal @ Brgy. Pob. 8 IV-A 0.192 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
SGSS Construction 27502 Const. of Multi-Purpose Building IVA 0.287 C 0.401 - 0.500 - - - 90.10 *90.10% Outstanding
Shak Construction and Supply 28289 Const. of 1 CL Tamborong E/S VI 0.500 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Sheen-Sheen Construction 29015 Concreting of Soro-Soro Road X 0.917 C 0.341 0.300 0.300 - - - 94.10 91.04% Outstanding
Sheen-Sheen Construction 29015 Const. of Agoho Multi-Purpose Building X 1.395 O 0.365 0.300 0.100 0.030 0.038 0.100 93.30 -
Sheen-Sheen Construction 29015 Const. of MPB @ Yumbing E/S X 0.376 C 0.363 0.174 0.300 - - - 83.70 *83.70% V. Satisfactory
Sheen-Sheen Construction 29015 Const./Conc. of Sitio Vulcan Brgy. Naasag Road X 0.921 C 0.343 0.200 0.300 - - - 84.30 80.52%
V. Satisfactory
Sheen-Sheen Construction 29015 Rehab./Conc. of Brgy. Butay Road X 0.556 C 0.385 0.300 0.300 - - - 98.50 *98.50%
Outstanding
Shinsung Eng'g. & Construction Corp. Co. Ltd.
SL2-SN-000402
Contract Package 3, Monkayo Tagum Section Compostella
ValleyPJHL 1,508.785 C 0.377 0.300 0.300 - - - 97.70 95.71%
Outstanding
Silk & Steel Construction 25314 Completion of One CL 2-Storey ESH @ Rizal Central School VIII 0.819 C 0.377 0.100 0.300 - - - 77.70 *77.70%
Satisfactory
Silk & Steel Construction 25314 Const. of 1 CL Sch. Bldg. at Abuyugon E/S VIII 0.435 C 0.272 0.183 0.300 - - - 75.50 *75.50%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 389
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Silk & Steel Construction 25314 Const. of 1-Unit, 2-Cl RM School Building @ Brgy. Pinggan VIII 0.856 C 0.272 0.279 0.300 - - - 85.10 *85.10%
V. Satisfactory
Silliman Avenue Construction & Supply 22759 Completion of MPB VII 0.870 O 0.391 0.153 0.100 0.015 0.018 0.100 77.70 -
Silliman Avenue Construction & Supply 22759 Const. of Provincial Road-Purok
2 Sulop Cemetery XI 0.469 C 0.324 0.000 0.500 0.000 0.000 0.000 82.40 79.64% Satisfactory
Silliman Avenue Construction & Supply 22759 Const./Completion of San Jose
Public Market (Phase II) XIII 2.595 C 0.383 - 0.500 - - - 88.30 *88.30% V. Satisfactory
Simplified Builders 20747 Const. of 2 CL School Building @ Solana North C/S II 0.951 C 0.329 0.190 0.300 - - - 81.90 *81.90%
V. Satisfactory
Sixteen Enterprises 18187Conc. of Calapan South
(Himpaparay-San Antonio Section), Mansalay
IV-B 4.020 C 0.396 0.000 0.500 - - - 89.60 89.60% V. Satisfactory
Sixteen Enterprises 18187 Const. of Bucayao River Control, Calapan City IV-B 4.749 C 0.442 0.000 0.500 - - - 94.20 94.20%
Outstanding
Sixteen Enterprises - Calapan Branch 18187
Conc. of Calapan North Road, San Teodoro and Puerto Galera
Road IV-B 17.896 C 0.349 0.300 0.300 - - - 94.90 92.56%
Oustanding
Sixteen Enterprises - Calapan Branch 18187 Conc. of Pinamalayan Airport
Road IV-B 9.464 O 0.308 0.256 0.100 0.023 0.043 0.100 *83.00 -
Sixteen Enterprises - Calapan Branch 18187
Const. of Bucayao-Magasawang Tubig River Flood Control
Mitigation ProjectsIV-B 4.038 C 0.417 0.000 0.500 0.000 0.000 0.000 91.70 89.60%
V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Const. of MPB at Happy Valley IV-B 0.669 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187
Const. of Protection Dike and Riprapping at Sitio 2-13N Proper
AlcateIV-B 1.909 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Const. of San Rafael Road
Roxas IV-B 1.897 C 0.431 0.000 0.500 0.000 0.000 0.000 93.10 *93.10% Oustanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 390
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sixteen Enterprises - Calapan Branch 18187 Rehab./Reconst. of CNR along
Calapan North Road IV-B 9.500 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory
SKI Const. Group, Inc. (Formerly: Summa
Kumagai, Inc.)3381
NAIA Expressway and its Related Roads Project, Phase I,
Package I, Sales Interchange Components
URPO 180.000 C 0.284 0.300 0.000 - - - 58.40 74.89% Satisfactory
SNR Builder 14539 Const. of MPB @ Brgy. Ramos West II 0.956 C 0.493 0.000 0.000 0.000 0.000 0.000 49.30 74.33%
Satisfactory
So Construction 17714 Const. of 1 CL Sch. Bldg., Dinalungan Central Sch. III 0.907 C 0.331 0.258 0.300 - - - 88.90 *88.90%
V. Satisfactory
So Construction 17714 Const. of Multi-Purpose Bldg., Brgy. Wenceslao III 0.185 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
So Construction 17714 Rehab. of MPB at Baler C/S III 0.927 C 0.298 0.237 0.300 - - - 83.50 81.33% V. Satisfactory
So Construction 17714 Rehab./Conc. of Road leading to Municipal Hall III 4.634 C 0.431 - 0.500 - - - 93.10 85.96%
V. Satisfactory
Socor Construction Corporation 8020
Asphalt Overlay of Mis. Or.-Lanao Road, Opol-Lugait
SectionX 9.614 C 0.325 0.300 0.300 - - - 92.50 *92.50%
Outstanding
Socor Construction Corporation 8020 Impvt./Asphalt Overlay of Road NCR 2.509 C 0.377 0.300 0.300 - - - 97.70 *97.70%
Outstanding
Socor Construction Corporation 8020
Impvt./Rehab. of Iligan-Cagayan de Oro-Butuan Road (Initao-
Lugait Section)X 14.305 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
Socor Construction Corporation 8020
Rehab./Impvt. of Asphalt Pavement along Sulat-Borongan
Road SectionVIII 9.461 C 0.355 0.300 0.300 - - - 95.50 *95.50%
Outstanding
Socor Construction Corporation 8020 Repair/Rehab. of Limon-Leyte-
Biliran Road VIII 9.474 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory
Socor Construction Corporation 8020 Repair/Rehab. of P. del Rosario
St. (Sta. 2+007-Sta. 2+505) VII 6.269 C 0.327 0.274 0.300 - - - 90.10 *90.10% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 391
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Socor Construction Corporation 8020
Repair/Rehab./Impvt. of National Road (Asphalt Overlay)
Borongan-GuiuanVIII 24.115 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Socorro Villamor Enterprises 1529 Conc. of E. Rodriguez Ave. &
Impvt. of Drainage IVA 4.166 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory
Socorro Villamor Enterprises 1529 Improvement of San Vicente
Port, Ivana II 0.942 C 0.433 0.000 0.500 - - - 93.30 93.30% Outstanding
Solfio P. Jacinto Construction 17799 Concreting of Road in Brgy
Valdefuente III 3.260 O 0.356 0.300 0.100 0.030 0.022 0.100 90.80 -
Solid M Construction 30293 COLAB-OG CIS (Irrigation) NIA 0.774 C 0.337 0.176 0.300 - - - 81.30 *81.30% V.Satisfactory
Solid M Construction 30293 San Jose CIS (Irrigation) NIA 1.038 C 0.356 0.170 0.300 - - - 82.62 *82.62% V. Satisfactory
Solid Merchandising 31609 Const. of 3 Cl Sch. Bldg. @ Colong Colong NHS VI 1.085 C 0.378 0.200 0.300 - - - 87.80 86.82%
V. Satisfactory
Solid North Construction and Development
Corporation8204 Rehab. of Various Farm-to-
Market Roads I 0.473 C 0.364 - 0.500 - - - 86.40 *86.40% V. Satisfactory
Solid Rock Construction 8958 Concreting of Brgy. Road St. Anthony IV-A 1.910 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
Solid Rock Construction 8958 Const. of Congressional Avenue Extension, Phase V NCR 8.114 C 0.338 0.200 0.300 - - - 83.80 91.18%
Outstanding
Solid Rock Construction 8958
Proposed Const./Rehab./Completion & Repair of Elem. & Secondary Sch. Bldg., Marcelo Marcela
Elem. Sch.
NCR 2.142 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Solid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica NCR 1.439 C 0.342 0.300 0.300 - - - 94.20 93.99%
Outstanding
Solid Rock Construction 8958 Rehab./Asphalting of Sucat Road (Phase II) NCR 9.613 C 0.286 0.206 0.300 - - - 79.20 *79.20%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 392
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Solid Rock Construction 8958 Widening/Conc. of Commonwealth Ave. NCR 48.138 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
Solid Square Construction 28566 Const. of Multi-Purpose Building @ Dugayong II 0.476 C 0.397 0.300 0.000 - - - 69.70 47.90%
Poor
Solid Square Construction 28566 Repainting of Ipil Bridge along Daang Maharlika II 0.268 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
South Builders and Construction Supplies 20238 Const. of FTM Road at Brgy.
Laguan IV-A 0.653 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
South Builders and Construction Supplies
(Formerly: South Builders Const.)
20238 Completion of Home Economics Bldg. @ Unisan C/S IV-A 0.571 C 0.313 0.197 0.300 - - - 81.00 *81.00%
V. Satisfactory
South Builders and Construction Supplies
(Formerly: South Builders Const.)
20238 Const. of Water Supply System IV-A 0.722 C 0.373 0.200 0.300 - - - 87.30 *87.30% V.Satisfactory
South Builders and Construction Supplies
(Formerly: South Builders Const.)
20238Const. of 1 CL Sch. Bldg. at
Brgy. Kinagunan NHS /Danlagan Extension
IV-A 0.541 C 0.339 0.262 0.300 - - - 90.10 *90.10% Outstanding
South Pacific Builders Center, Inc. 24594
Iloilo Flood Control Proj., Ph II, Package III (Road Network)
Sooc, MandurriaoVI 29.561 C 0.466 0.000 0.500 - - - 96.60 93.00%
Outstanding
Southern Dawn Development Company 12294 Concreting of Barangay Road IVA 0.471 C 0.375 - 0.500 - - - 87.50 *87.50%
V. Satisfactory
Southern Dawn Development Company 12294 Const. of Multi-Purpose Building
(Covered Court) IV-A 1.420 C 0.454 0.000 0.500 - - - 95.40 *95.40% Outstanding
Soy Eng Construction 15533
Completion/Repair of Widening/Slope Protection along Rizal Shrine-Rizal Town Coastal
Loop Road
IX 2.788 C 0.359 0.300 0.300 - - - 95.90 94.16% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 393
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Soy Eng Construction 15533Conc. Paving of Rizal Shrine-
Rizal Town Coastal Loop Road, Banbanan-Guimputian Sect.
IX 1.782 O 0.283 0.236 0.100 0.020 0.042 0.100 *78.10 -
Soy Eng Construction 15533 Concrete Paving of Canlucani-Tag-Ulo Road, Canlucani Section IX 1.681 C 0.435 0.000 0.500 - - - 93.50 *93.50%
Oustanding
Soy Eng Construction 15533Concreting of Rizal Shrine-Rizal
Town Coastal Loop Road (Talisay-Taguilon Section)
IX 2.788 C 0.377 0.230 0.300 - - - 90.70 90.58% Outstanding
Soy Eng Construction 15533 Const. of Multi-Purpose Building Brgy. Liyang E/S IX 0.929 C 0.490 0.000 0.500 - - - 99.00 90.60%
Oustanding
Soy Eng Construction 11533 Const./Completion of MPB (Farmer's Building) IX 0.950 C 0.400 0.200 0.350 - - - 95.00 *95.00%
Outstanding
Soy Eng Construction 11533 Const./Completion of MPB (Municipal Gym) IX 2.836 C 0.330 0.200 0.300 - - - 83.00 73.97%
Satisfactory
Soy Eng Construction 11533 Const./Completion of MPB at Mutia IX 0.945 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Soy Eng Construction 15533
Const./Completion of Multipurpose Bldg. (Subanen
Tribe), Jose Rizal Memorial State College
IX 0.462 C 0.334 0.221 0.300 - - - 85.50 *85.50% V. Satisfactory
Soy Eng Construction 15533Const./Completion of
Multipurpose Bldg., Jose Rizal Memorial State College
IX 0.703 C 0.345 0.194 0.300 - - - 83.90 *83.90% V. Satisfactory
Spam Engineering Enterprise 14205
Impvt of NRJ Agusan-Misamis-R. Calo-Agusan Pequeno, Butuan
City (Phase II)XIII 6.260 C 0.444 - 0.500 - - - 94.40 87.32%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 394
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Spectrum Builders 8124Impvt./Rehab. of Cuna-Sitio
Magkailaw Road Sitio Makailaw Cuna
X 2.245 C 0.323 0.242 0.100 0.030 0.048 0.100 84.30 -
Speed Movers Construction 19206 Completion of Del Rosario Bridge Approach (Tiaong Side) IV-A 2.046 C 0.392 0.000 0.500 - - - 89.20 *89.20%
V. Satisfactory
SPNR Builders 31329Completion of Concreting of
Road & Drainage Canal @ Guinhawa
III 3.796 C 0.062 0.292 0.300 - - - 65.40 72.24% Satisfactory
SPNR Builders 31329 Rehab. of Roman Expressway (Bilolo Section) III 2.880 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
SPNR Builders 31329 Road Concreting at Sta. Cruz III 0.477 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory
Spring Star Construction and Supply 20240
Const. of S.B. Sen. Rene Cayetano Science & Technology
Memorial H/SNCR 2.865 C 0.372 0.300 0.300 - - - 97.20 *97.20%
Outstanding
Springfield Construction 14097 Const. of Multi-Purpose Bldg., (Public Market) III 0.473 C 0.368 0.263 0.300 - - - 93.10 88.06%
V. Satisfactory
Springfield Construction 14097 Const. of Sto. Niño Public Market IV-B 1.800 C 0.344 0.300 0.300 - - - 94.40 *94.40%
OutstandingSquare Cube Trading
Division and Consruction Division
25120 Completion of MPB @ del Carmen Este VII 0.093 C 0.276 0.100 0.300 - - - 67.60 36.94%
Poor
Square Cube Trading Division and Consruction
Division25120 Conceting/Improvement of Loay
and Carmen VII 14.155 C 0.384 0.239 0.000 - - - 62.30 71.66% Satisfactory
Square Cube Trading Division and Consruction
Division25120 Impvt. of MPB @ Brgy.
Kalunasan VII 0.948 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory
Square Cube Trading Division and Construction
Division 25120
Const. of Farm-to-Market Road (Sta. 0+000-Sta. 3+820) Brgy.
Capt. ClaudioVII 9.439 O 0.311 0.024 0.100 0.010 0.013 0.100 55.80 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 395
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
St. Bernard Construction 28368 Concreting of Brgy. Road, Brgy. Rebbron to Brgy. Lupi V 0.926 C 0.384 0.000 0.500 - - - 88.40 *88.40%
V. Satisfactory
St. Bernard Construction 28368 Const. of Health Center @ Brgy. San Isidro V 0.378 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
St. Bernardine Construction 18474 Completion of MPB V 1.425 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
St. Bernardine Construction 18474 Conc. of Barangay Road Brgy.
San Jose-Alanao, Lupi V 0.458 C 0.194 0.000 0.500 - - - *69.40 69.40% Fair
St. Bernardine Construction 18474 Conc. of Busak Bypass Road V 2.837 C 0.310 0.222 0.300 - - - 83.20 87.10%
V. SatisfactorySt. Bernardine Construction 18474 Concreting of Sta. Lucia-
Magarao Road, Sta. Lucia V 0.461 C 0.373 0.000 0.500 - - - *87.30 87.30% V. Satisfactory
St. Bernardine Construction 18474 Const. of MPB at Brgy. Colacling V 0.468 C 0.385 0.100 0.300 - - - *78.50 78.50%
SatisfactorySt. Bernardine Construction 18474 Const. of MPB, Municipal Hall
Complex V 0.950 C 0.381 0.214 0.300 - - - 89.50 *89.50% V. Satisfactory
Sta. Anastacia Builders 32472 Rehabilitation of Sta. Cruz RIS NIA 4.178 O 0.378 0.1574 0.1 0.023 0.045 0.1 80.35 -
Sta. Cruz Construction 9301 Concreting of Barangay Road, Brgy. Grijalvo, San Fernando V 0.459 C 0.246 0.000 0.500 - - - 74.60 *74.60%
Satisfactory
Sta. Cruz Construction 9301 Const. of MPB (Lying-in Center) V 1.405 C 0.378 0.154 0.300 - - - 83.20 83.20% V.Satisfactory
Sta. Isabel Construction Corporation 26774 Const. of Drainage System @
Brgy. Poblacion IV-B 1.637 C 0.391 0.222 0.300 - - - 91.30 *91.30% Outstanding
Sta. Isabel Construction Corporation 26774 Const. of Multi-Purpose Building IV-B 0.472 O 0.365 0.211 0.100 0.010 0.013 0.100 79.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 396
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Stars & Stripes Construction 23484
Const. of 1 Unit - 2 CL School Bldg. @ Maras National High
School, MarasIX 0.627 C 0.397 0.000 0.500 - - - 89.70 89.70%
V. Satisfactory
Stars & Stripes Construction 23484 Repair of 3 CL School Building
Miputak East Central School IX 0.730 C 0.418 0.000 0.500 - - - 91.80 *91.80% Outstanding
Stay Construction 23323 Conc. of Itogon-Dalupirip-San Manuel Bdry. Road CAR 17.321 O 0.307 0.155 0.100 0.020 0.025 0.100 70.70 -
Stay Construction 23323 Const. of Buiguias NHS, Bot-oan Extension CAR 2.633 C 0.343 0.032 0.300 - - - 67.50 71.25%
Satisfactory
Steel City Fabricators Corporation 27035 Const. of 1 CL Sch. Bldg. at
Mimbunga NHS X 0.494 C 0.366 0.236 0.300 - - - 90.20 *90.20% Outstanding
Steel City Fabricators Corporation 27035 Const. of 1-CL Steeltek School
Building @ Laguindingan CES X 8.445 C 0.466 0.000 0.500 - - - 96.60 *96.60% Outstanding
Steel City Fabricators Corporation 27035 Const. of Various S/B (1-Cl S/B)
Brgy. Garcia, Tagoloan X 0.312 C 0.319 0.000 0.500 - - - 81.90 88.76% V. Satisfactory
Steven Construction and Supply 21987 Const. of 2 Storey MPB (Phase I)
@ Brgy. GRS V 0.940 C 0.396 0.100 0.300 - - - 79.60 77.78% Satisfactory
Steven Construction and Supply 21987 Const. of Covered Court,
Catbalogan V CES VIII 1.814 C 0.328 0.300 0.300 - - - 92.80 82.09% V. Satisfactory
Steven Construction and Supply 21987 Repair/Impv't. of DPWH Bldg.,
Albay Engineering District V 0.919 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Sto. Cristo Construction 26096 Const. of 1 Cl Sch. Bldg. at San Roque E/S III 0.477 C 0.296 0.200 0.300 - - - 79.60 *79.60%
Satisfactory
Sto. Cristo Construction 26096Const. of Two (2) Cl Sch. Bldg. at San Vicente-San Francisco
NHSIII 0.822 C 0.287 0.300 0.300 - - - 88.70 *88.70%
V. Satisfactory
Sto. Cristo Construction 26096 Const./Repair/Completion of Sto. Domingo Brgy. Road III 0.475 C 0.391 - 0.500 - - - 89.10 88.44%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 397
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sto. Cristo Construction 26096 Impvt. of San Vicente FMR III 1.901 C 0.250 0.200 0.300 - - - 75.00 74.64% Satisfactory
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.900 O 0.219 0.229 0.100 0.030 0.037 0.100 71.50 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.690 O 0.357 0.230 0.100 0.030 0.030 0.067 81.40 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Mahayag-Josefina)
IX 18.549 O 0.318 0.160 0.100 0.030 0.042 0.100 75.00 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Mahayag-Josefina)
IX 18.549 O 0.374 0.240 0.100 0.030 0.035 0.100 87.90 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
IX 18.550 O 0.237 0.223 0.100 0.030 0.042 0.100 73.20 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
IX 18.550 O 0.340 0.220 0.100 0.030 0.030 0.100 82.00 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Blancia-Mahayag Section
IX 18.550 O 0.223 0.180 0.100 0.030 0.032 0.100 66.50 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Blancia-Mahayag Section
IX 18.550 O 0.340 0.220 0.100 0.030 0.030 0.067 78.70 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Poblacion-Molave-Josefina Road IX 18.550 O 0.293 0.140 0.100 0.030 0.042 0.100 70.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 398
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Poblacion-Molave-Josefina Road IX 18.550 O 0.386 0.235 0.100 0.030 0.030 0.100 88.10 -
Sto. Niño Construction 4867 Conc. of Loguilo By-Pass Road X 8.679 O 0.301 0.299 0.100 0.030 0.040 0.067 83.70 -
Sto. Niño Construction 4867 Conc. of Midsalip-Sominot Road IX 9.299 C 0.298 0.107 0.300 - - - 70.50 75.48% Satisfactory
Sto. Niño Construction 4867Conc. of Pagadian City-Buug Rd. (Kamalarang Section), Pagadian-
Ipil RoadIX 27.550 O 0.324 0.186 0.100 0.030 0.025 0.100 76.50 -
Sto. Niño Construction 4867Conc. of Provincial Road Jct.
Lower Dimaya-Pob. Dinas Zamboanga Del Sur
IX 10.264 C 0.202 0.188 0.300 - - - 69.00 69.96% Fair
Sto. Niño Construction 4867 Const. of MPB @ Brgy. 24 X 0.943 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
Sto. Niño Construction 4867 Const. of Multi-Purpose Building IX 0.484 C 0.365 0.249 0.300 - - - 91.40 *91.40% Outstanding
Sto. Niño Construction 4867 Const. of Poblacion Opol Flood Control X 9.642 C 0.344 0.200 0.300 - - - 84.40 86.20%
V. Satisfactory
Sto. Niño Construction 4867 Const. of River Control @ Salug River IX 9.310 O 0.272 0.120 0.100 0.030 0.035 0.200 75.70 -
Sto. Niño Construction 4867 Const. of River Control at Maclob Bridge IX 1.667 C 0.223 0.200 0.300 - - - 72.30 *72.30%
Satisfactory
Sto. Niño Construction 4867Const./Extension of Dipolog Flood Control Dipolog City-
Dapitan City RoadIX 4.712 C 0.347 0.200 0.300 - - - 84.70 76.36%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 399
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sto. Niño Construction 4867 Impvt./Conc. of Poblacion to Aromahon Road X 9.643 C 0.364 0.200 0.300 - - - 86.40 87.96%
V. Satisfactory
Sto. Niño Construction 4867 Impvt./Conc. Paving along Jct. Kagawasan-Tabina Rd. IX 4.759 C 0.214 0.285 0.300 - - - 79.90 77.86%
Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Aurora-Dipolog City Road, Mahayag-
Josefina SectionIX 18.450 C 0.345 0.300 0.000 - - - 64.50 72.78%
Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-Alicia Road, (Phase I), Baluran-
Guintolan SectionIX 34.948 C 0.317 0.190 0.300 - - - 80.70 77.54%
Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-
Alicia Road, (Phase II), Guintolan Section
IX 33.916 O 0.301 0.200 0.070 0.030 0.045 0.067 71.30 -
Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-
Alicia Road, (Phase III), Guintolan Section
IX 33.916 O 0.295 0.235 0.100 0.030 0.042 0.100 80.20 -
Sto. Niño Construction 4867 Rehab. of Bawang-Silupa Roads IX 0.954 C 0.186 0.300 0.300 - - - 78.60 *78.60% Satisfactory
Sto. Niño Construction 4867 Rehab. of Oroquieta City-Calamba Mt. Road X 15.675 O 0.373 0.260 0.000 0.023 0.038 0.067 76.10 -
Sto. Niño Construction 4867Repair/Rehab. of Brgy. Kauswagan, Diplahan, Zamboanga Sibugay
IX 0.941 C 0.460 - 0.500 - - - 96.00 *96.00% Outstanding
Sto. Niño Construction 4867 Repair/Rehab. of Farm-to-Market Road, Diplo-Sanlagmanok Road IX 4.520 C 0.477 - 0.500 - - - 97.70 95.60%
Outstanding
Stocon Construction Service 26111 Concreting of Cugman By Pass
Road X 1.412 C 0.359 0.273 0.300 - - - 93.20 81.50% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 400
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Stoneline Construction 13132 Conc. of Cotabao City Diversion Road XII 9.627 C 0.250 0.300 0.300 - - - 85.00 78.64%
Satisfactory
Stoneline Construction 13132Conc. of Cotabato City
Circumferential Highway, (Lugay-Lugay-Kalanganan Section)
XII 4.780 C 0.337 0.200 0.000 - - - 53.70 71.82% Satisfactory
Stoneline Construction 13132Conc. of Western
Circumferential Roads (Purok Balas-Purok Sagingan Sect.)
XII 1.901 C 0.343 0.200 0.300 - - - 84.30 76.20% Satisfactory
Stoneline Construction 13132Concrete Reblocking of
Cotabato-Alla-Marbel National Road
XII 4.761 C 0.331 0.200 0.000 - - - 53.10 67.38% Fair
Stoneline Construction 13132 Const. of MPB XII 0.761 O 0.347 0.240 0.100 0.020 0.027 0.100 83.40 -
Stoneline Construction 13132 Const. of Road at Esteros Rosario heights 9 XII 1.380 C 0.200 0.200 0.300 - - - 70.00 77.68%
Satisfactory
Stoneline Construction (Formerly: Abubakar
Engineering Exponent)13132 Concreting of SKC Lugay-Lugay
Road XII 3.717 O 0.358 0.300 0.100 0.030 0.053 0.100 94.10 -
Stoneline Construction (Formerly: Abubakar
Engineering Exponent)13132 Const. of MPB XII 0.761 C 0.359 0.225 0.300 - - - 88.40 84.90%
V. Satisfactory
Struktura Teknika Services Company 16646 Const. of 2 Storey RGR Type
Sch. Bldg. Phase II IVA 5.752 C 0.398 0.200 0.300 - - - 89.80 87.98% V. Satisfactory
Struktura Teknika Services Company 16646 Const. of MPB @ M. Naval St. NCR 5.682 C 0.399 0.300 0.300 - - - 99.90 87.58%
V.Satisfactory
Stvinta Construction 32620 Conc. of road Valcres, Mabolo III 0.962 C 0.297 0.200 0.300 - - - 79.70 *79.70% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 401
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
STX Enterprises 21547 Const. / Improvement of MWCR, Balansay Section IV-B 1.412 C 0.335 - 0.500 - - - 83.50 80.92%
V. Satisfactory
Subcon Corporation 25079 Conc. of Mactan St. III 1.387 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
Subcon Corporation 25079Concreting of E-25th St. and
26th St. (Elicano St.,-Dead End) East
III 1.302 C 0.377 0.200 0.300 - - - 87.70 82.90% V. Satisfactory
Sui Generis Construction 28174 Const. of Lasti-Tadloc Riverside Road (Phase I) IVB 3.819 O 0.318 0.300 0.100 0.023 0.028 0.100 86.90 -
Sui Generis Construction 28174
Const. of Molino Blvd., Niog-Mambog-Molino Section, Sta.
0+510 - Sta. 7+770.29 (Intermittent Section)
IV-A 43.393 O 0.324 0.243 0.050 0.030 0.059 0.100 80.60 -
Sulim Construction & Supply 26588 Rosario CIS (Irrigation) NIA 0.763 C 0.358 0.174 0.300 - - - 83.26 *83.26%
V.SatisfactorySumitomo Construction Co.
Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 869.429 O 0.394 0.300 0.100 0.024 0.070 0.100 98.80 -
Sumitomo Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 869.429 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -
Summa Kumagai, Incorporated 3381
NAIA Expressway & Its related Proj., Phase I, Package I, Sales
Interchange ComponentURPO 164.128 O 0.348 0.300 0.100 0.030 0.043 0.100 92.10 -
Summa Kumagai, Incorporated 3381
NAIA Expressway and its Related Roads Project, Phase I,
Package I, Sales Interchange Components
URPO 164.128 O 0.320 0.300 0.100 0.030 0.065 0.100 91.50 -
Summercap Const. and Allied Services 30787 Completion of Lengey MPB CAR 2.279 C 0.334 0.219 0.000 - - - 55.30 73.01%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 402
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Summercap Const. and Allied Services 30787 Const. of Poblacion-Bulo-
Magabta FMR CAR 1.331 C 0.370 0.300 0.300 - - - 97.00 *97.00% Outstanding
Sunstone Construction 11122 Conc. of Cotabao City Diversion Road XII 9.267 O 0.258 0.236 0.100 0.015 0.035 0.100 74.40 -
Sunstone Construction 11122Conc. of Dualing-New Panay-
Midsayap Road (New Leon-New Panay Sect.)
XII 9.437 O 0.370 0.254 0.100 0.030 0.027 0.067 84.80 -
Sunstone Construction 11122 Conc. of Road @ Brgy. Barongis XII 0.478 C 0.370 0.283 0.300 - - - 95.30 *95.30% Outstanding
Sunstone Construction 11122 Conc. of Road @ Brgy. Central Katingawan XII 0.826 C 0.351 0.300 0.300 - - - 95.10 75.06%
Satisfactory
Sunstone Construction 11122 Const. of FTMR @ Barangiran XII 0.428 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding
Sunstone Construction 11122 Const. of MPB @ Brgy. Batiocan XII 0.287 C 0.340 0.300 0.300 - - - 94.00 *94.00% Outstanding
Sunstone Construction 11122 Rehab./Conc. of Davao-Cotabato Road, Dualing Section XII 5.692 C 0.313 0.300 0.000 - - - 61.30 75.10%
Satisfactory
Sunwest Construction & Development Corporation 15906 Davao Port Expansion Project PPA 396.089 O 0.400 0.030 0.300 0.030 0.07 0.100 93.00 -
Sunwest Construction & Development Corporation 15906 Lamoa Port Expansion Project PPA 98.213 O 0.383 0.300 0.030 0.030 0.060 0.033 83.60 -
Sunwest Construction & Development Corporation 15906 Proposed Davao Port Expansion PPA 396.089 O 0.400 0.300 0.100 0.024 0.065 0.100 98.90 -
Sunwest Construction and Development Corporation 15906 Channelization Nasisi River V 14.420 C 0.417 - 0.500 - - - 91.70 *91.70%
Oustanding
Sunwest Construction and Development Corporation 15906 Channelization of Padang River V 7.183 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 403
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Sunwest Construction and Development Corporation 15906 Channelization of Tubli River V 28.497 C 0.300 - 0.500 - - - 80.00 *80.00%
Satisfactory
Sunwest Construction and Development Corporation 15906 Const. of Bahi Seawall, Rock
Causeway & Access Road V 47.945 C 0.450 0.500 - - - 95.00 95.12% Outstanding
Sunwest Construction and Development Corporation 15906 Dredging of Talisay River V 19.225 C 0.250 - 0.500 - - - 75.00 83.46%
V. Satisfactory
Sunwest Construction and Development Corporation 15906 Legaspi Airport Development
Project DOTC 59.212 O 0.351 0.296 0.150 0.020 0.057 0.050 92.40 -
Sunwest Construction and Development Corporation 15906 Proposed Davao Port Expansion PPA 396.089 C 40.000 30.000 30.000 - - - 99.39 99.39%
Outstanding
Sunwest Construction and Development Corporation 15906
Repair/Impvt./Asphalt Overlay of Shoulders of Calayucay-Sula-
Mosboron RoadV 11.415 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
Sunwest Construction and Development Corporation 15906 Replacement of Bubulusan
Bridge V 17.328 O 0.374 0.240 0.100 0.030 0.019 0.100 86.30 -
Sunwest Construction and Development Corporation 15906 Road Opening leading to Orok-
Osok Falls V 28.499 C 0.398 0.296 0.300 - - - 99.40 96.10% Oustanding
Sunwest Construction and Development Corporation 15906 Road Opening of Obi to Orok-
Osok Falls V 28.496 C 0.327 0.137 0.300 - - - 76.40 86.12% V. Satisfactory
Sunwest Construction and Development Corporation 15906 Road Opening of Tilod-Batolinao-
Pacugon Road V 19.260 C 0.400 0.277 0.000 - - - 67.70 73.14% Satisfactory
Sunwest Construction and Development Corporation 15906
Widening / Improvement of National Road, Bagamanoc-
Pandan RoadV 14.195 C 0.387 0.293 0.300 - - - 98.00 96.62%
Oustanding
Sunwest Construction and Development Corporation 15906 Widening of Catanduanes Circ.
Road (Bato-Baras Section) V 28.495 C 0.395 0.287 0.300 - - - 98.20 95.92% Oustanding
Sunwest Construction and Development Corporation 15906 Widening of Catanduanes Circ.
Road (Hinipaan Section) V 28.511 C 0.397 0.288 0.300 - - - 98.50 91.90% Oustanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 404
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Superpower Construction 17149 Conc. of Brgy. Road, Brgy. Parang IV-A 0.577 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
Superpower Construction 17149 Const. of Pahinga Norte-Malabanban Sur Spillway IV-A 1.893 C 0.335 0.000 0.500 0.000 0.000 0.000 83.50 *83.50%
V. Satisfactory
SWACS Enterprises 30009 Conc. of Road going to the E/S @ Pinget Brgy. CAR 1.432 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
SWACS Enterprises 30009 Rehab. of Abatan-Poblacion FMR CAR 0.481 C 0.365 0.200 0.300 - - - 86.50 *86.50%
V. Satisfactory
SY Construction 30009 Rehab. of Drainage Canal @ St. Theresa St. CAR 0.285 C 0.252 0.119 0.300 - - - 67.10 *67.10%
Fair
SY Construction 12333 Rehabilitation/Restoration of Farm-to-Market Road IV-A 1.924 C 0.389 0.300 0.000 - - - 68.90 81.80%
V. Satisfactory
Sydglen Builders and Enterprises 28848
Conc. of Shoulders along Daan Maharlika-Naga-Naga Anibong
Sect.VIII 1.895 C 0.282 0.300 0.300 - - - 88.20 *88.20%
V. Satisfactory
Sydglen Builders and Enterprises 28848 Const. of 1 Cl Sch. Bldg. @
Alang-alang I C/S VIII 0.507 C 0.359 0.300 0.300 - - - 95.90 *95.90% Outstanding
Sysmic Enterprises & Construction 29697 Const. of Hernani Seawall,
Hernani VIII 0.914 C 0.312 0.000 0.500 0.000 0.000 0.000 81.20 *81.20% V. Satisfactory
System One Builders 26480Proposed Partial Const. of Zobel
Roxas Extension Alabastro to Onyx St.
NCR 4.719 C 0.414 0.000 0.500 0.000 0.000 0.000 91.40 81.14% V. Satisfactory
T R Construction 11697 Concreting of EM's Barrio Brgy. Road V 0.226 C 0.452 0.000 0.500 0.000 0.000 0.000 95.20 *95.20%
Oustanding
T. Solomon Construction 10046 Const. of Road @ Brgy. Banjo East IV-A 0.963 C 0.298 0.300 0.300 - - - 89.80 *89.80%
V. Satisfactory
T. Solomon Construction 10046 Const. of Six (6) CL Sch. Bldg. @ Brgy. Gonzales IV-A 2.890 C 0.334 0.200 0.300 - - - 83.40 *83.40%
V. Satisfactory
T. Solomon Construction 10046 Repair/Impvt. of MPB at Brgy. Balele IV-A 3.375 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
T.A.D. Construction 14098 Const. of Brgy. Road at Brgy. San Roque IVA 0.381 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 405
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
T.A.D. Construction 14098Const. of Flood Control Pilot Project at Kinanliman River
ControlIV-A 9.640 C 0.360 0.300 0.300 - - - 96.00 81.78%
V. Satisfactory
T.A.D. Construction 14098 Const. of MPB @ Quezon National Agricultural IVA 1.929 C 0.327 0.300 0.300 - - - 92.70 *92.70%
Outstanding
T.A.D. Construction 14098 Const. of Multi-Purpose Bldg. (BSP) @ Tayabas East (E/S) IVA 4.810 C 0.454 - 0.500 - - - 95.40 *95.40%
Outstanding
T.A.D. Construction 14098 Const. of Olo Bridge VII 2.744 C 0.327 0.300 0.300 - - - 92.70 *92.70% Outstanding
T.A.D. Construction 14098 Const./Completion of MPB at Caitican VII 0.472 C 0.261 0.237 0.300 - - - 79.80 *79.80%
Satisfactory
T.A.D. Construction 14098Repair/Maintenance of Lined Canal along Lucena Bdry.-
Tayabas-Lucban RoadIVA 0.289 C 0.232 0.300 0.300 - - - 83.20 *83.20%
V. Satisfactory
T.J. Velasco Construction and Supply 10560 Const. of 14 Core Housing Units NHA
Region I 3.023 C 0.394 0.300 0.300 - - - 99.40 85.40% V.Satisfactory
T.N.J. Buhong Construction 19687 Impvt. along Ban-Hung-Benguet
Bdry. Road Alimit-Hiwang Sect. CAR 2.455 C 0.366 - 0.500 - - - *86.60 86.60% V. Satisfactory
T.N.J. Buhong Construction 19687
Impvt. Along Jct. Potia-Mt. Province Bdry. Road, Pob.
SectionCAR 1.580 C 0.341 0.300 0.300 - - - 94.10 81.44%
V.Satisfactory
T.N.J. Buhong Construction 19687
Impvt. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Road,
Km. 297+000-Km. 300+000CAR 0.488 C 0.390 - 0.500 - - - 89.00 *89.00%
V. Satisfactory
T.N.J. Buhong Construction 19687
Widening/Conc. of Poblacion-Banaue-Brgy. Bangaan, Awaan-
Banagan SectionCAR 23.123 O 0.268 0.126 0.070 0.008 0.030 0.033 53.50 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 406
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
T.R.A. Builders 26775 Const. of MPB, Don Jose Ynares Sr. MNHS IV-A 1.633 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Tabs Construction & Construction Supplies 10495
Replacement of Deteriorated Macadam Road to PCCP along
Davao-Cotabato Road (NORCIT-KPES Sect.)
XII 5.217 C 0.472 - 0.500 - - - 97.20 90.18% Outstanding
Tacloban Ras Construction Corporation 17184
Rehab./Impvt. of Asphalt Road leading to San Juanico Bridge
Field OfficeVIII 1.996 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
Tacolod Enterprises 10721 Const. of One (1) Unit, 1-CL School Bdlg. @ Andulawan NHS VI 0.357 C 0.462 - 0.500 - - - 96.20 88.92%
V. Satisfactory
Taisei Philippine Construction Incorporated /
Marubeni (JV)
SL2-SN-000432
Const. of Cebu South Coastal Road Project-Segment 3B-1,
offshorre Ramps SectionMCDP 695.488 O 0.352 0.300 0.100 0.030 0.065 0.100 94.70 -
Tango Romeo General Construction 18926 Conc. of Legarda Road CAR 2.810 C 0.279 0.300 0.300 - - - 87.90 *87.90%
V. SatisfactoryTango Romeo General
Construction 18926 Conc./Widening of La Chesa @ Brgy. Upper Tadiangan CAR 2.782 C 0.298 0.300 0.300 - - - 89.80 *89.80%
V. Satisfactory
Tango Romeo General Construction 18926 Concreting/Widening of Road,
Trancoville Brgy. CAR 1.142 C 0.390 - 0.500 - - - 89.00 *89.00% V. Satisfactory
Tango Romeo General Construction 18926 Rehab./Impvt. of Harrison Road
2 CAR 4.724 C 0.394 0.108 0.300 - - - 80.20 *80.20% V. Satisfactory
Tantuco Const. and Trading Corp. 7255 Rehab./Impvt. of Road at Purok
Pinag-isa, Brgy. Cotta IV-A 0.329 C 0.375 - 0.500 - - - 87.50 87.50% V. Satisfactory
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.
Supply)
7255 Conc. of San Pablo Boundary-Dolores-Pinagdanglayan Road IV-A 7.509 C 0.269 0.200 0.300 - - - 76.90 *76.90%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 407
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.
Supply)
7255 Const. of Elevated Water Tank with Pipelines IV-A 0.944 C 0.352 0.300 0.300 - - - 95.20 *95.20%
Outstanding
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber & Const.
Supply)
7255
Const. of Quezon Eco-Tourism Road (LUC-BAT CR) inc. RROW:
Phase II, Guisguis-Bantilan Sect., Conc. of Guisguis-Bignay I
Sect.
IV-A 17.750 C 0.348 0.265 0.300 - - - 91.30 *91.30% Outstanding
Tarifa Constuction & Supplies 33239 Const. of Road (FMR), Sito Sto.
Rosario, Brgy. Baculong III 1.685 C 0.330 0.279 0.300 - - - 90.90 *90.90% Outstanding
TCAT Construction 20822 Const. of Municipal Hall VIII 0.961 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding
TDR Construction & Supply 8560 Conc. of Brgy. Road @ Brgy. Kawit IVA 0.470 C 0.275 0.300 0.300 - - - 87.50 *87.50%
V. Satisfactory
Teddie Construction Development, Inc. 6313
Const. (New Opening) of Zamboanga West Coast Road, Sirawai-Sibuco Road, Bitugan-Tapanayan-Talabiga Section
IX 32.446 O 0.160 0.043 0.000 0.030 0.042 0.100 37.50 -
Teddie Construction Development, Inc. 6313 Const. of Bangayan Bridge and
Approaches IX 6.054 C 0.376 0.201 0.300 - - - 87.70 84.46% V. Satisfactory
Teddie Construction Development, Inc. 6313
Impvt. of Nat'l Road (Asphalt Overlay along Maria Clara L.
Lobregat HighwayIX 14.998 C 0.279 0.300 0.300 - - - 87.90 90.06%
Outstanding
Teddie Construction Development, Inc. 6313 Impvt./Road Widening of Sangali
Nat'l Road IX 9.201 C 0.356 0.200 0.300 - - - 85.60 81.16% V. Satisfactory
Teddie Construction Development, Inc. 6313
Rehab./Impvt. of Nat'l Road (Asphalt Overlay Labuan-
Limpapa Road along Zamboanga City)
IX 11.676 C 0.320 0.100 0.300 - - - 72.00 *72.00% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 408
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Tessa Construction & Trading 26437 Concrete Paving of Brgy. Muñoz
West Road II 0.944 C 0.259 - 0.500 - - - 75.90 *75.90% Satisfactory
Tessa Construction & Trading 26437 Const. of Multi-Purpose Building II 1.889 O 0.365 0.300 0.070 0.015 0.027 0.067 84.40 -
Tessa Construction & Trading 26437 Rehab./Const. of Road II 1.889 O 0.330 0.294 0.100 0.030 0.055 0.100 90.90 -
Tessa Construction & Trading 26437 Repair/Rehab. of Multi-Purpose
Building with CR, Brgy. Marulas NCR 0.444 C 0.333 - 0.500 - - - 83.30 *83.30% V. Satisfactory
Tessa Construction & Trading 26437 Road Impvt. Along Gamu-Roxas
Road II 4.940 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
The Steadfast Builders 8176 Const. of Drainage System at Sto. Simona, Brgy. San Isidro IV-A 0.955 C 0.451 - 0.500 - - - 95.10 *95.10%
Outstanding
The Steadfast Builders 8176 Const. of Multi-Purpose Building (Dialysis) NCR 2.812 C 0.459 - 0.500 - - - 95.90 *95.90%
Outstanding
The Steadfast Builders 8176 Const. of Two (2) Storey, Six (6) Classroom IV-A 4.662 C 0.382 0.300 0.300 - - - 98.10 60.75%
Fair
The Steadfast Builders 8176
Maintenance by Contract Package I, CY-2003 R-10,
Tayuman, Zaragosa, Moriones and Juan Luna
NCR 5,279 C 0.408 - 0.500 - - - 90.80 83.30% V. Satisfactory
The Steadfast Builders 8176 Rehab. of MPB at Brgy. Nayong Kanluran (Covered Court) NCR 2.697 O 0.300 0.300 0.100 0.030 0.028 0.067 82.50 -
The Steadfast Builders 8176 Rehab./Const. of MPB @ Zone 25, 26, 29, 32, & 33 NCR 1.827 C 0.384 0.300 0.300 - - - 98.40 94.20%
Outstanding
The Steadfast Builders 8176 Rehab./Impvt. of F.P. Felix Ave. (Formerly Imelda Ave.) IV-A 14.417 C 0.365 0.200 0.300 - - - 86.50 *86.50%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 409
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
The Steadfast Builders 8176 Rehab./Impvt. of Drainage and Flood Control IV-A 9.602 C 0.300 0.300 0.300 - - - 90.00 79.56%
Satisfactory
The Steadfast Builders 8176Upgrading/Concreting with
Drainage Impv't. of Brgy. 118, Zone 9
NCR 2.052 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory
The Tuscan Structures and Supplies 18257 Conc. of Bugko-Nenita Road VIII 14.313 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
The Tuscan Structures and Supplies 18257 Const./Impvt./Rehab. of
Bantayan-Malobago Road VIII 18.795 O 0.289 0.245 0.100 0.023 0.047 0.100 80.40 -
The Tuscan Structures and Supplies 18257 Rehab. of Naga to Mombon Sect.
along Calbayog Diversion Road VIII 9.630 O 0.338 0.235 0.100 0.030 0.042 0.100 84.50 -
Thel Construction & Supplies 17671
Conc. of Dualing-New Panay-Midsayap Road (Katalicanan
Sect.)XII 4.775 C 0.330 0.300 0.000 - - - 63.00 71.82%
Satisfactory
Thel Construction & Supplies 17671 Const. of 1-Cl School Building XII 0.375 C 0.325 - 0.500 - - - 82.50 *82.50%
V. Satisfactory
Thel Construction & Supplies 17671 Const. of MPB @ Brgy. Sta. Cruz XII 0.282 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
Three W Builders, Inc 19722 Repair/Rehabilitation/ Construction of Butas Dam NIA 34.95 C 0.3358 0.2184 0.300 - - - 85.41 85.41%
V. Satisfactory
Three W Builders, Incorporated 10722
Completion (conc.) of Ternate-Nasugbu Road, Balaytigue-
Calayo-Looc SectionIV-A 23.988 C 0.342 0.300 0.300 - - - 94.20 91.17%
Outstanding
Three W Builders, Incorporated 10722 Const. of 2- Storey, 4-CL School
Building IV-A 2.784 C 0.393 - 0.500 - - - 89.30 86.78% V. Satisfactory
Three-In-One Construction & Trading 14695 Conc. of Brgy. Road @ Brgy.
Callulut III 0.475 C 0.315 0.274 0.300 - - - 88.90 *88.90% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 410
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Thrivelight Enterprises & Construction 26842 Const. of MPS @ Brgy.
Ambangonan, Rosaario I 0.930 C 0.331 - 0.500 - - - 83.10 *83.10% V. Satisfactory
Thunder Construction 17247 Conc. of Poblacion Pilar-Dalit Road CAR 1.884 C 0.277 0.200 0.300 - - - 77.70 *77.70%
Satisfactory
Thunder Construction 17247 Const. of MPB Completion of MPB (Package), Brgy. Calaba CAR 2.364 C 0.268 0.200 0.000 - - - 46.80 *46.80%
Poor
Thunder Construction 17247Const. of Slope Protection Work
along Abra-Cervantes Road, Bucay Section
CAR 4.722 C 0.200 0.116 0.300 - - - 61.60 72.52% Satisfactory
Thunder Construction 17247
Const./Road Opening of Abra-Cervantes Road, Gangal-
Subusob-Salapay Section, km. 445+000 - km. 457+945
CAR 12.076 C 0.229 0.200 0.000 - - - 42.90 53.82% Poor
Thunder Construction 17247 Rehabilitation of FMR @ Villa Mercedes CAR 0.468 C 0.284 0.200 0.300 - - - 78.40 74.08%
Satisfactory
Thunder/Gonzalo Joint Venture
SL1-SN-004984 (JV-07-
003)
Const. of Masiwsiw RCDG Bridge & Approaches CAR 15.537 C 0.353 0.100 0.300 - - - 75.30 76.84%
Satisfactory
Thunderheads Construction Corporation 22420 Conc. of Road @ San Isidro IV-B 0.951 O 0.372 0.300 0.100 0.023 0.047 0.067 90.90 -
Thunderheads Construction Corporation 22420 Conc. of Road @ San Isidro IV-B 0.951 C 0.347 0.280 0.300 - - - 92.70 91.62%
Outstanding
Thunderheads Construction Corporation 22420 Const. of Paclasan Seawall IV-B 0.875 C 0.396 - 0.500 - - - 89.60 89.60%
V. Satisfactory
Tibaraw Construction 22710 Const. of Multi-Purpose Building VIII 1.702 C 0.370 0.200 0.300 - - - 87.00 85.71% V. Satisfactory
Tibaraw Construction 22710 Const./Rehab. of FMR, Bagacay-Concord Road VIII 1.789 C 0.000 - 0.500 - - - 50.00 40.00%
Poor
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 411
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Titanium Builders Inc. 24921 Concreting of Barangay Road, Brgy. Poblacion X 0.964 C 0.337 0.300 0.300 - - - 93.70 88.18%
V. Satisfactory
Titanium Builders, Inc. 24921 Conc. of Purok Mutya-Brgy. Katipunan Road, Villanueva X 0.955 C 0.422 - 0.500 - - - 92.20 *92.20%
Outstanding
Titanium Builders, Inc. 24921 Const. of Brgy Maputi Flood Control, Naawan X 0.239 C 0.445 - 0.000 - - - 44.50 *44.50%
Poor
TKS Builders and Supplies 23415 Concreting of Roads at Sitio Batulosa Bangkas Heights XI 1.407 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
TKS Builders and Supplies 23415 Const. of MPB at Brgy. Fire Station XI 2.599 C 0.364 0.300 0.300 - - - 96.40 96.82%
Outstanding
TKS Builders and Supplies 23415 Const. of MPB at Camanchiles XI 1.575 C 0.326 0.300 0.300 - - - 92.60 90.92% Outstanding
TLI Construction 19209Const. of MPB (Haven for the
elderly) inside the National Training School for Boys
IV-A 9.615 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
TM Abad Construction 9302Completion/Conc. of Road @
Panorama Hills, Etn. Brgy. Cupang
IV-A 0.431 C 0.290 0.244 0.300 - - - 83.40 *83.40% V. Satisfactory
TM Abad Construction 9302 Const. of MPB @ J.P. Rizal E/S NCR 2.894 C 0.383 0.300 0.300 - - - 98.30 89.20% V. Satisfactory
TM Abad Construction 9302 Riprapping of Putting Kahoy Creek IV-A 1.050 C 0.375 - 0.500 - - - 87.50 *87.50%
V. Satisfactory
Toa Construction
FC-01-054/SLI-
SN-004426
Const. of the Agno River Control Project, Phase II, Package I MFCDP-II 708.981 O 0.296 0.200 0.100 0.024 0.059 0.200 87.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 412
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Toa Construction
FC-01-054/SL2-
SN-000567
Const. of the Agno River Control Project, Phase II, Package I MFCDP-II 925.116 O 0.355 0.200 0.100 0.030 0.065 0.200 95.00 -
Tokwing Construction 9650 Const. of Mindanao Ave. Extension (Segment C) NCR 161.879 O 0.375 0.180 0.100 0.030 0.042 0.067 79.40 -
Tokwing Construction 9650 Repair/Rehab. of Ayala Bridge NCR 42.303 C 0.324 0.300 0.300 - - - 92.40 90.12% Outstanding
Tokwing Construction/ZM Construction (JV) JV-05-006
Const. of Maculcul Bridge & Approaches along Iba-South
Road (Phase III)III 93.730 O 0.377 0.300 0.100 0.030 0.037 0.100 94.40 -
Tokwing Construction/ZM Construction (JV)
SL1-SN-004749
Const. of Maculcul Bridge (Phase II) III 47.664 O 0.356 0.300 0.100 0.030 0.040 0.100 92.60 -
Tokwing Construction/ZM Construction (JV)
JV-060-054
Const. of Tarlac-Nueva Ecija-Dingalan Port Road, (Tarlac City-
Sta. Rosa-Fort Magsaysay-Palayan City-Laur Gabaldon-
Dingalan Road)
III 52.105 C 0.338 0.300 0.300 - - - 93.80 93.20% Outstanding
Tokwing Construction/ZM Construction (JV) JV-05-006
Construction of Maculcul Bridge & Approaches along Iba-South
Road (Phase III)III 94.890 C 0.389 0.300 0.300 - - - 98.90 96.20%
Outstanding
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 414.099 O 0.355 0.256 0.100 0.030 0.065 0.100 90.60 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 457.260 O 0.336 0.240 0.000 0.023 0.055 0.067 72.10 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 597.836 O 0.284 0.240 0.000 0.024 0.061 0.100 70.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 413
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 597.836 O 0.283 0.240 0.050 0.024 0.059 0.100 75.60 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway Ramps 2 & 3URPO 597.836 O 0.294 0.291 0.000 0.024 0.047 0.100 75.60 -
Toledo Const. Corp./ Advanced Foundation
Const. System Corp. (JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway Ramps 2 & 3URPO 721.651 O 0.330 0.300 0.000 0.030 0.047 0.100 80.70 -
Toledo Construction Corporation 6349
Completion of Approaches/Slope Protection of
Kaliraya BridgeNCR 7.623 C 0.371 0.300 0.300 - - - 97.10 70.58%
Satisfactory
Toledo Construction Corporation 6349 Sct. Ranger Housing Village
Project. Phase 2 NCL 51.090 C 0.203 0.296 0.300 - - - 79.90 79.90% Satisfactory
Tonka Construction 4064 Upgrading/Asphalting of Manila North Road (Mabalacat Section) III 4.697 C 0.470 - 0.500 - - - 97.00 *97.00%
Outstanding
Tonn Builders (Phils.) Const., Inc. 5815
Const. (Widening) of Soro-Soro Bridge, MSR-Rizal Boundary, San Pedro-Calamba Section)
IVA 26.570 O 0.322 0.240 0.100 0.030 0.035 0.100 82.70 -
Tonn Builders (Phils.) Const., Inc. 5815
Const. (Widening) of Soro-Soro Bridge, MSR-Rizal Boundary, San Pedro-Calamba Section)
IVA 28.940 O 0.318 0.240 0.100 0.023 0.033 0.100 81.40 -
Tonn Builders (Phils.) Const., Inc. 5815 Const. of Lepote Bridge &
Approaches (Phase I & II) IVA 22.899 O 0.366 0.237 0.100 0.022 0.033 0.100 85.80 -
Top Most Development and Marketing Corporation 13361
Concreting of Lambunao-Pototan Road (Lambunao
Poblacion Portion)VI 2.595 C 0.431 - 0.000 - - - 43.10 71.45%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 414
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Top Most Development and Marketing Corporation 13361 Const. of Nato Bridge VI 3.304 C 0.434 - 0.500 - - - 93.40 72.70%
Satisfactory
Top Most Development and Marketing Corporation 13361
Repair/Rehab. of National Road (Secondary Arterial), Bugnay-
Constancia SectionVI 6.629 C 0.334 0.300 0.300 - - - 93.40 *93.40%
Outstanding
Top Tech Trading & Construction 25522 Asphalt Overlay/Rehab. of Palico-
Balayan-Batangas Road IV-A 4.995 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
Top Tech Trading & Construction 25522 Conc. of Barangay Road @ Brgy.
Gulod IV-A 0.470 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Top Tech Trading & Construction 25522 Concreting of FMR, Brgy. Dita IV-A 0.473 C 0.433 - 0.500 - - - 93.30 *93.30%
Outstanding
Top Tech Trading & Construction 25522
Const. of Drainage along Palico-Balayan-Batangas Road, Lemery
SectionIV-A 1.102 C 0.413 - 0.500 - - - 91.30 *91.30%
Outstanding
Toreja's Construction Supply Corporation 15453
Asphalt Overlay-Preventive Maintenance Palico-Balayan-
Batangas Rd. (Balayong-Manghinao I Sect.)
IV-A 20.740 C 0.231 0.300 0.300 - - - 83.10 *83.10% V. Satisfactory
Toreja's Construction Supply Corporation 15453 Conc. of Road @ Brgy. Simlog IV-A 4.744 C 0.333 0.281 0.300 - - - 91.40 *91.40%
Oustanding
Toreja's Construction Supply Corporation 15453 Const. of Open Canal IV-A 0.475 C 0.400 - 0.500 - - - 90.00 *90.00%
V. SatisfactoryToreja's Construction Supply Corporation 15453 Impvt./Rehab. of Lipa-Rosario
Road IV-A 4.817 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Toreja's Construction Supply Corporation 15453 Impvt./Rehab. of Rosario-Taysan
Road IV-A 4.817 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
Toreja's Construction Supply Corporation 15453
Rehab./Reconst. of Lobo-Malabrigo-San Juan Road,
Malabrigo, Soloc-Sawang & Mabilog na Bundok Section
IV-A 19.294 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 415
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Toyo Construction Co. Ltd. SL1-SN-004893
Rehab./Enhancement of Ormoc Flood Mitigation Structures MFCDP-II 121.513 C 0.389 0.300 0.300 - - - 98.90 94.36%
Oustanding
Toyo Construction Co., LTD
SL1-SN-004890
Const. of Super Diversion Canal(Sta. 26+600 to Sta.
29+240)NIA-III 506.085 O 0.373 0.200 0.100 0.024 0.047 0.200 94.40 -
Toyo-Nippon Steel-Miyaji Joint Venture FC-06-038
Const. of CP I, Urgent Bridges Const. Projects for Rural Devt.
(Quirino Bridge)UBCPRD 625.614 O 0.356 0.300 0.100 0.030 0.065 0.100 95.10 -
Toyo-Nippon Steel-Miyaji Joint Venture FC-06-038
Const. of CP I, Urgent Bridges Const. Projects for Rural Devt.
(Sarrat Bridge)UBCPRD 576.844 O 0.359 0.300 0.100 0.030 0.060 0.100 94.90 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Bacao Bridge)
UBCPRD 23.103 O 0.320 0.300 0.100 0.030 0.037 0.100 88.70 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Gusay Bridge)
UBCPRD 16.616 C 0.381 0.200 0.000 - - - 58.10 77.68% Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Madugo Bridge)UBCPRD 11.819 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Nagpatay Bridge)UBCPRD 37.840 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Piela Bridge)
UBCPRD 25.177 C 0.373 0.200 0.300 - - - 87.30 84.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 416
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Salitran Bridge)UBCPRD 57.188 C 0.388 0.200 0.300 - - - 88.80 82.68%
V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Tiguisan Bridge)UBCPRD 14.821 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Bacao Bridge)
UBCPRD 23.103 O 0.308 0.259 0.100 0.030 0.051 0.100 84.80 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Basiao Bridge)
UBCPRD 22.310 O 0.399 0.300 0.000 0.024 0.061 0.067 85.10 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Batolinao Bridge)UBCPRD 18.351 O 0.379 0.300 0.000 0.024 0.061 0.000 76.40 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Borbocolan Bridge)UBCPRD 23.577 C 0.372 0.300 0.000 - - - 67.20 78.66%
Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Catmon Bridge)
UBCPRD 12.936 C 0.387 0.200 0.000 - - - 58.70 75.38% Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Gusay Bridge)
UBCPRD 16.616 O 0.370 0.271 0.050 0.030 0.055 0.067 84.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 417
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Hulugan Bridge)UBCPRD 17.240 O 0.386 0.300 0.000 0.024 0.061 0.067 83.80 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for
Rural Devt. (Langgang Bridge)UBCPRD 14.949 C 0.356 0.300 0.000 - - - 65.60 78.17%
Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Piela Bridge)
UBCPRD 25.177 O 0.370 0.202 0.070 0.030 0.056 0.100 82.80 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent Bridges Const. Projects for Rural Devt. (Salitran Bridge)
UBCPRD 57.188 O 0.310 0.240 0.050 0.030 0.056 0.100 78.60 -
Toyo-Tobishima (JV) FC-06-034 CP III UBCPRD - Const. of Pantal Bridge & Approaches UBCPRD 933.106 C 0.360 0.300 0.300 - - - 96.00 95.64%
Oustanding
TR Construction 11697Repair/Restoration of Legazpi-Punta De Jesus Road, Imalnod
SectionV 1.436 C 0.305 0.200 0.300 - - - 80.50 81.52%
V. Satisfactory
Tracsom Builders Inc. 5935 Const. of School Building @ Highway Hills E/S NCR 9.542 O 0.400 0.204 0.100 0.030 0.035 0.100 86.90 -
Tracsom Builders Incorporated 5935
Const. of 4 Storey 82 Classrooms Academic Building
@ Eulogio Rodriguez E/SNCR 14.316 C 0.256 0.201 0.300 - - - 75.70 72.64%
Satisfactory
Traffic Supplies and Construction Corp. 19584
Improvement of Midsayap-Dulawan-Marbel Road (Sta. Km.
1776-Sta. Km. 1793+000)XII 0.946 C 0.375 0.000 0.500 0.000 0.000 0.000 87.50 *87.50%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 418
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Trams Construction 32964 Conc. of Access Road CAR 1.894 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory
Trams Construction 32964 Const. of MPB CAR 0.945 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
Trans-Aurora Construction 11388 Conc. of Road leading to Dr. Juan C. Angara Airport III 4.703 C 0.306 0.300 0.300 - - - 90.60 *90.60%
Outstanding
Trans-Aurora Construction 11388Impvt./Conc. of San Luis-Ma.
Aurora-Castaneda Road, Brgy. Baubo -Brgy. Sto. Tomas Proper
III 13.453 C 0.360 0.200 0.300 - - - 86.00 89.06% V. Satisfactory
Trans-Aurora Construction 11388Impvt./Conc. of San Luis-Ma.
Aurora-Castaneda Road, Brgy. Sto. Tomas Proper
III 13.646 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Trans-Aurora Construction 11388Impvt./Conc. of Nat'l Road SLMAC Road, Wenceslao
SectionIII 7.177 C 0.299 0.227 0.300 - - - 82.60 84.82%
V. Satisfactory
Trez Construction and General Merchandise 32769 Const. of Malapatan Flood
Control XII 1.908 C 0.319 0.200 0.300 - - - 81.90 77.70% Satisfactory
Tribu Design Construction 12756 Const. of Pantal Bailey Bridge CAR 0.665 C 0.284 0.161 0.300 - - - 74.50 *74.50% Satisfactory
Tri-dom Trading and Construction 10843 Const. of Viga River Control V 3.856 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V. Satisfactory
Tri-dom Trading and Construction 10843
Const. of Virac Drainage System along Francia-Lanao-
Constantino & MoonwalkV 8.191 C 0.270 0.100 0.300 - - - 0.67 67.00%
Fair
Tri-dom Trading and Construction 10843 Road Opening of Dugui-Wala-
Sinamla Road V 3.985 O 0.373 0.268 0.100 0.020 0.020 0.100 88.10 -
Trilex Builders Construction and Supply 26590 Completion of MPB at Albert
Elem. Sch. NCR 1.919 C 0.379 0.217 0.300 - - - 89.60 *89.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 419
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Trilex Builders Construction and Supply 26590 Const. of MPB at the Albert E/S
(Phase I) NCR 1.919 O 0.231 0.300 0.100 0.030 0.047 0.100 80.80 -
Trinnadel Const. & Supply 15801 Asphalting of Access Road, Poblacion III 4.681 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
Trinnadel Const. & Supply 15801 Const. of Multi-Purpose Building III 2.794 O 0.229 0.000 0.100 0.018 0.029 0.100 47.60 -
Triparco Development Corporation 23327 Asphalt Overlay/Impvt. of Butuan
Masao Port Road XIII 4.820 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satsifactory
Triparco Development Corporation 23327 Const. of Sangay-San Isidro
FMR, Kitcharo XIII 1.804 C 0.310 0.000 0.500 0.000 0.000 0.000 81.00 *81.00% V. Satsifactory
Triple 8 Construction & Supply 10684 Concreting/Upgrading of
Bustamante/M.H. del Pilar St. NCR 4,030 C 0.429 - 0.500 - - - 92.90 85.64% V. Satisfactory
Triple 8 Construction & Supply 10684 Rehab./Repair of Various Road /
Alleys and Drainage System NCR 0.954 C 0.317 0.300 0.300 - - - 91.70 *91.70% Outstanding
Triple 8 Construction & Supply 10684 Repair/Impvt. of Manila North
Road III 14.798 C 0.318 0.300 0.300 - - - 91.80 82.80% V. Satisfactory
Triple 8 Construction & Supply 10684
Upgrading/Conc. of Roads with Drainage Impvt. Of Gov. Pascual
Ave. NCR 9.492 C 0.374 0.200 0.300 - - - 87.40 *87.40%
V. Satisfactory
Triple 8 Construction & Supply 10684 Widening of Ortigas Ave. Phase
II NCR 9.544 C 0.314 0.300 0.300 - - - 91.40 91.64% Outstanding
Triple 8 Construction & Supply 10684
Widening/Concreting with Drainage Improvement along
M.H. Del Pilar St.NCR 3.778 C 0.389 - 0.500 - - - 88.90 *88.90%
V. Satisfactory
Triple P Construction 31616 Const. of District IV MPB (Reservist Phase II) II 0.747 C 0.400 0.240 0.300 - - - 94.00 *94.00%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 420
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Triple P Construction 31616 Const. of Domang MPB (Phase II) II 0.481 C 0.299 0.300 0.300 - - - 89.90 85.70%
V. Satisfactory
Triple P Construction 31616 Const. of Mabulso MPB II 0.469 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding
Triple P Construction 31616 Const. of Malasin MPB II 0.285 C 0.358 0.220 0.300 - - - 87.80 *87.80% V. Satisfactory
Triple P Construction 31616 Const. of Mauan Women's Association MPB II 0.188 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
Tri-sons Construction and Supply 16890 Const. of Gymnasium Bldg. @
Brgy. Paitan XII 0.963 C 0.371 0.300 0.000 - - - 67.10 62.20% Fair
Triumph Builders and Steel Inc. 2272 Const. of one(1) unit Three-
Storey School Building NHA 18.007 C 0.383 0.300 0.300 - - - 98.30 98.30% Outstanding
TRM Construction & Dev't. Corp. 30713
Package IV-Concreting & Drainage Rehab. of Sorsogon St., Brgy. Nayong Kanluran &
East Riverside/Aragon St.,
NCR 1.914 C 0.426 - 0.500 - - - 92.60 *92.60% Outstanding
TRPL Construction 14236 Const. of Pagduque-Rosario Road VI 2.376 C 0.354 - 0.500 - - - 85.40 70.04%
Satisfactory
TSD Builders Construction and Supply 22129 Conc. of Bacolod-Granada-City
Bdry. Road VI 2.751 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
TSD Builders Construction and Supply 22129
Conc./Repair/Rehab. of Tangub Bridge I, along Bacolod-South
Kabankalan RoadVI 1.569 C 0.291 0.300 0.300 - - - 89.10 88.26%
V. Satisfactory
TSD Builders Construction and Supply 22129 Const. of Talisay Road at Brgy.
Zone1 VI 0.916 C 0.304 0.197 0.300 - - - 80.10 81.54% V. Satisfactory
TSD Builders Construction and Supply 22129 Widening of Bacolod-South
Kabankalan Road VI 1.294 C 0.294 0.300 0.300 - - - 89.40 *89.40% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 421
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
T-Square Builders 14268Completion of Big Margus RCDG
Bridge along Sarangani-Davao del Sur Coastal Road
XII 4.716 C 0.314 0.134 0.300 - - - 74.80 72.22% Satisfactory
T-Square Builders 14268 Conc. of Additional 2-lanes along Digos Junction Road XI 2.581 C 0.351 0.300 0.300 - - - 95.10 94.38%
Outstanding
T-Square Builders 14268Conc./Widening of Marbel-Tupi-Makar Road, Crossing Rubber-
Palian SectionXII 9.158 C 0.383 0.107 0.300 - - - 79.00 85.03%
V. Satisfactory
T-Square Builders 14268 Const. MPB @ Brgy. Poblacion (Municipal Hall) XII 4.751 C 0.361 0.300 - - - - 66.10 77.09%
Satisfactory
T-Square Builders 14268 Const. of 1-Cl at Malibago E/S Sitio Cassava VII 183.115 C 0.414 - 0.500 - - - 91.40 *91.40%
Outstanding
T-Square Builders 14268 Const. of MPB XII 0.477 C 0.277 0.300 0.300 - - - 87.70 *87.70% V. Satisfactory
T-Square Builders 14268
Const./Conc. of General Santos City Circumferential Road (Western Section) Brgy.
Sinawal/Fatima
XII 7.917 C 0.355 0.157 0.300 - - - 81.20 *81.20% V. Satisfactory
T-Square Builders 14268 Const./Widening of Digos Junction Road XI 9.424 C 0.318 0.200 0.300 - - - 81.80 86.18%
V. Satisfactory
T-Square Builders 14268Impvt./Conc. of Road at
Bansalan-Mt. Apo National Park Road
XI 28.919 O 0.214 0.279 0.100 0.030 0.040 0.100 76.30 -
T-Square Builders 14268Package I-Concreting of Various Road with Lined Canal Brgy. San
IsidroXII 1.439 C 0.366 - 0.500 - - - 86.60 *86.60%
V. Satisfactory
TTK Construction Corporation 31907 Cluster II: Const. of Multi-
Purpose Bldg. CAR 0.940 C 0.373 0.117 0.300 - - - 79.00 87.26% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 422
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Tuchar Construction 13644 Completion of Multi-Purpose Building at Strip 70 NCR 0.609 C 0.435 - 0.500 - - - 93.50 *93.50%
Outstanding
Tuchar Construction 13644 Conc./Drainage Impvt. of Block 3, Sct. Borromeo NCR 0.474 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
Tuchar Construction 13644 Repair/Rehabilitation A. Bonifacio Avenue NCR 4.869 C 0.346 0.200 0.300 - - - 84.60 *84.60%
V. Satisfactory
Turquoise Construction 21801 Upgrading of National Road San Fernando - Lagundi III 4.771 C 0.385 - 0.500 - - - 88.50 88.50%
V. Satisfactory
Twin Dragon Construction 11392 Const. of Odiongan Multi-Purpose Bldg. IV-B 2.864 C 0.398 0.198 0.300 - - - 89.60 *89.60%
V. Satisfactory
Twin Dragon Construction 11392 Const. of Panique-Trangkalan Farm to Market Road IV-B 0.908 C 0.374 - 0.500 - - - 87.40 *87.40%
V. Satisfactory
Twin Dragon Construction 11392 Lining Ditches along Looc-Ferrol Rd., Km. 114+450 - 114+600 IV-B 0.283 C 0.444 0.500 - - - 94.40 94.40%
Outstanding
Twin Dragon Construction 11392 Repair of Odiongan Public Market IV-B 1.888 C 0.352 0.184 0.300 - - - 83.60 *83.60%
V. Satisfactory
Twin Dragon Construction 11392 Repair/Maint. of Bangon River Control IV-B 0.375 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
Twina Builders and Supply 23897 Const. of Water Supply Brgy. Luna, Kapalong XI 0.754 C 0.350 - 0.500 - - - 85.00 89.09%
V. Satisfactory
Twina Builders and Supply 23897 Rehab. of MPB (Cons. of Fire Station Bldg. Phase V) XI 4.714 C 0.354 0.200 0.300 - - - 85.40 88.27%
V. Satisfactory
Twina Builders and Supply 23897 Repair/Rehab. of MPB (Phase IV) @ Brgy. New Pandan XI 1.880 O 0.340 0.240 0.100 0.020 0.041 0.100 84.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 423
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Twintech Builders & Developers, Inc. 23511 Conc. of Abra-Ilocos Sur Road,
Km. 387+200-Km. 407+000 CAR 4.754 C 0.294 0.195 0.300 - - - 78.90 *78.90% Satsifactory
Twintech Builders & Developers, Inc. 23511 Conc. of Riang-Penarrubia FMR CAR 2.843 C 0.206 0.300 0.300 - - - 80.60 *80.60%
V. Satisfactory
Twintech Builders & Developers, Inc. 23511 Const. of Multi-Purpose
Building, Dolores CAR 3.680 C 0.421 - 0.500 - - - 92.10 75.72% Satisfactory
Twintech Builders & Developers, Inc. 23511 Const. of Sinalang River
Irrigation Flume CAR 3.749 C 0.397 - 0.500 - - - 89.70 90.81% Outstanding
Twintech Builders & Developers, Inc. 23511
Const./Road Opening of Abra-Ilocos Norte Road, km. 436+000 -
km. 446+020, Sogao-Malango Section
CAR 10.663 O 0.400 0.300 0.070 0.015 0.028 0.067 88.00 -
Twintech Builders & Developers, Inc. 23511
Const./Road Opening of Abra-Ilocos Norte Road, km. 446+020 - km. 452+620, Singit-Nagbolang-
Atip Section
CAR 11.680 O 0.380 0.000 0.100 0.008 0.038 0.100 62.60 -
Two Aces Construction and Supplies 15413 Conc. of Lapucon Cemetery
Road XIII 3.749 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding
Two Aces Construction and Supplies 15413 Const. of Poblacion Drainage
Canal, Kitcharo XIII 0.453 C 0.319 - 0.500 - - - 81.90 77.22% Satisfactory
U & N Engineering Services 16743 Concreting of Municipal Streets, Malabuyoc VII 1.893 C 0.386 - 0.500 - - - 86.90 *86.90%
V. Satisfactory
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 O 0.400 0.300 0.100 0.020 0.023 0.033 87.60 -
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 O 0.132 0.300 0.100 0.030 0.037 0.100 69.90 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 424
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 O 0.344 0.225 0.050 0.030 0.032 0.067 74.80 -
UGM Construction 22047 Const. of Secondary Sch. Bldg.(3 Cl) IV-B 1.184 C 0.367 0.300 0.300 - - - 96.70 *96.70%
Satisfactory
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase I VII 43.189 O 0.380 0.225 0.070 0.030 0.037 0.100 84.20 -
UKC Builders, Inc. 10759Const. of Cagayan de Oro City
3rd Bridge & Approaches Phase II
X 63.689 C 0.390 0.300 0.300 - - - 99.00 92.64% Outstanding
UKC-Equi-Parco, Joint Venture 0624S Backup Area for the Newly
Constructed Wharf PPA 429.380 C 0.396 0.300 0.300 99.64 99.64% Outstanding
Ulticon Bluilders, Inc. 17267Const./Impvt./Widening of
Caraga-Maragusan Sect. Road, Phase III
XI 47.149 C 0.235 0.106 0.300 - - - 64.10 79.28% Satisfactory
Ulticon Bluilders, Inc. 17267CP 10: Impv't./Conc. of Surogao Sur-Davao Oriental Coastal Road (Manay-Boston) Boston Section
XI 286.479 O 0.345 0.284 0.100 0.030 0.060 0.100 91.90 -
Ulticon Bluilders, Inc. 17267 Impvt. of Monkayo-Diwalwal Road XI 92.878 O 0.374 0.277 0.100 0.030 0.037 0.100 91.80 -
Ulticon Bluilders, Inc. 17267 Impvt. of Monkayo-Diwalwal Road XI 92.878 O 0.332 0.300 0.100 0.030 0.043 0.100 90.50 -
Ulticon Bluilders, Inc. 17267Maint./Impv't. of Malalag-Malita-
Jose Abad Santos Road, Kumassie-Bagsak Sect.
XI 19.268 C 0.328 0.300 0.300 - - - 92.80 90.52% Outstanding
Ulticon Bluilders, Inc. 17267
Rehab./Impvt. of Bukidnon-Davao City Road, Puntian-Sinuda Section (selective
Sections)
X 13.810 C 0.292 0.200 0.300 - - - 79.20 * 79.20% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 425
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan
Road.XI 9.342 O 0.318 0.255 0.100 0.023 0.048 0.100 84.40 -
Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan
Road.XI 9.342 O 0.395 0.300 0.100 0.030 0.048 0.100 97.30 -
Ulticon Builders, Inc. 17267 Const. of Tubay-La Fraternidad-Binuangan FMR XIII 2.746 C 0.397 0.295 0.300 - - - 99.20 97.42%
Outstanding
Ulticon Builders, Inc. 17267 Impvt. of Mawab-Sawangan-Maco Alternate Road, Phase II XI 9.400 C 0.422 - 0.500 - - - 92.20 92.53%
Outstanding
Ulticon Builders, Inc. 17267 Rehabilitation & Improvement of Davao-Cotabato Road XI 18.869 C 0.330 0.205 0.300 - - - 83.50 82.42%
V. Satisfactory
Ultron Construction and Supply 30275
Const. of San Roque Bridge I along Quezon Eco-Tourism
Road (Phase I)IV-A 4.687 C 0.267 0.300 0.300 - - - 86.70 81.00%
V. Satisfactory
Ultron Construction Corporation 14313 Const. of San Antonio II Flood
Control IV-A 0.960 C 0.150 - 0.500 - - - 65.00 75.86% Satisfactory
Uni Construction 13198 Concreting of Brgy. Road, Sitio Paitan V 0.916 C 0.337 0.220 0.300 - - - 85.70 86.78%
V. Satisfactory
Uni Construction 13198Const. of MPB (Brgy. Covered Court and Perm. Roofing over
the Social Hall in front of Stage)V 0.954 O 0.394 0.240 0.100 0.030 0.016 0.067 84.70 -
Unicon Construction 26990 Repair/Rehab. of Burgos Ave. (Vicinity of McDonald Jct) IV-A 3.468 C 0.235 0.300 0.300 - - - 83.50 * 83.50%
V. Satisfactory
Unitec Builder, Inc. 4803 Const. of Labason Bridge and Approaches IX 14.626 C 0.343 0.200 0.000 - - - 54.30 74.31%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 426
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Unitec Builders, Inc. 4803 Widening of Sinunuc Bridge &
Approaches, Phase I, along Zamboanga City-Labuan Road
IX 21.668 O 0.354 0.289 0.100 0.030 0.045 0.100 91.80 -
Unitec Builders, Inc. 4803
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment IV (Curuan
Poblacion Section)
IX 16.521 C 0.342 0.230 0.300 - - - 87.20 89.60% V. Satisfactory
Unitec Builders, Inc. 4803
Completion of Road Widening (Gap Section) @ San Bernardino
Bridge, Maria Clara Lobregat Highway
IX 6.201 C 0.304 0.200 0.300 - - - 80.40 77.72% Satisfactory
Unitec Builders, Inc. 4803 Const. of MPB at San Roque VIII 0.946 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory
Unitec Builders, Inc. 4803
Impv't./Widening of Z.C. West Road (Caragasan Section)
including the Const. of 1 Barrel RCBC w/ except of Caragasan
Bridge
IX 12.112 C 0.336 0.200 0.300 - - - 83.60 87.04% V. Satisfactory
Unitec Builders, Inc. 4803
Proposed Widening of Sinunuc Bridge & Approaches, Phase I, along Zamboanga City-Labuan
Road
IX 21.672 O 0.311 0.240 0.000 0.030 0.042 0.067 69.00 -
Urban Infrastructures Incorporated 16144
Cluster III-Const. of School Building Projects-(E.B. Magalona
NHS)VI 0.410 C 0.365 0.099 0.300 - - - 76.40 81.51%
V. Satisfactory
Uy Construction & Development/ARN Builders
(JV)JV-07-001 Conc. of Bais-Kabankalan Road
@ Intermittent Section VII 95.268 O 0.388 0.238 0.100 0.024 0.055 0.100 90.50 -
Uy Construction & Development/ARN Builders
(JV)JV-07-001 Conc. of Bais-Kabankalan Road
@ Intermittent Section VII 95.268 O 0.295 0.221 0.070 0.030 0.065 0.100 78.10 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 427
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Uy Construction and Development 12558 Asphalting of Valencia-Baconf
Road VII 1.163 C 0.415 - 0.500 - - - 91.50 *91.50% Outstanding
Uy Construction and Development 12336 Conc. of Dumaguete South Road
(DSR) VII 21.705 O 0.380 0.300 0.100 0.030 0.038 0.100 94.80 -
Uy Construction and Development 12336 Concreting of Jct. S.H.- Banglud -
Mailog-By Pass Road, Mailag X 4.439 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Uy Construction and Development 12558 Const. of Canturing River
Control (Bogo Section) VIII 3.762 C 0.373 0.122 0.300 - - - 79.50 *79.50% Satisfactory
Uy Construction and Development 12336 Const. of Weighbridge Station
along DNR VII 2.793 C 0.400 - 0.500 - - - 90.00 89.68% V . Satisfactory
Uy Construction and Development 12336 Const./Repair/Rehab. of School
Bldg. @ Buenavista E/S VIII 0.378 C 0.346 0.300 0.300 - - - 94.60 86.97% V. Satisfactory
Uy Construction and Development 12336 Dumaguete Airport Development
Project DOTC 81.824 C 0.460 0.200 0.300 - - - 96.00 96.00% Very Satisfctory
Uy Construction and Development 12336
Rehab. of Dumaguete North Road Sta. 110+000-Sta. 135+000
(Asphalt Overlay along Sta. 126+570-Sta. 127+920)
VII 9.995 C 0.394 0.200 0.300 - - - 89.40 *89.40% Satisfactory
Uy Construction and Development 12336 Rehab./Conc. of Hinigaran-
Isabela Road (Rumirang) VI 14.238 C 0.324 0.205 0.300 - - - 82.90 83.62% Satisfactory
Uy Construction and Development 12336 Rehab./Impvt. of Pob. NRJ-Ninoy
Aquino FMR X 11.846 C 0.352 0.281 0.300 - - - 93.30 77.10% Satisfactory
Uy Construction and Development 12336
Widening/Asphalting-Overlay of Bais-Kabankalan Road including
ReConst. of (2) Bridges-Cang-abok & Canlumbong
VII 22.315 C 0.384 0.300 0.300 - - - 98.40 94.98% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 428
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
V N Grande Builders & Supply 32238 Const. of MPB (Justice Hall) VI 3.314 C 0.313 0.300 0.300 - - - 91.30 86.68%
V. Satisfactory
V N Grande Builders & Supply 32238 Const. of Road, Poblacion Ilaya
to Maravilla St. VI 0.941 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding
V T J Construction & Supply 11250
Widening of Quezon Ave. (Mabuhay Rotonda to Elliptical
Road)NCR 21.677 C 0.371 0.300 0.300 - - - 97.10 89.30%
V. Satisfactory
V.B. Manubay Construction 32705 Const. of 1 CL Sch. Bldg. at Arabiat E/S II 0.416 C 0.370 0.238 0.300 - - - 90.80 *90.80%
Outstanding
V.B. Manubay Construction 32705 Rehab. Along Santiago-Tuguegarao Road II 4.822 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
V.B. Manubay Construction 32705 Rehab. of Farm to Market Road at Salinungan West II 1.902 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
V.B. Manubay Construction 32705 Rehab./Regravelling along Ilagan-Delfin Albano-Mallig Road II 4.822 C 0.377 0.200 0.300 - - - 87.70 *87.70%
V. Satisfactory
V.B. Manubay Construction 32705 Rehab./Regravelling along Santiago-Tuguegarao Road II 4.822 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V. Satisfactory
V.C. Bautista Construction 21114 Concreting of Barangay Lebueg Road, Laoac I 0.480 C 0.295 - 0.500 - - - 79.50 *79.50%
Satisfactory
V.C.P. Concrete Products 7713 Concreting of Bislig-Surigao Road XIII 4.651 C 0.189 0.277 0.000 - - - 46.60 71.98%
Satisfactory
V.C.P. Concrete Products 7713Rehab./Reconst. of Damaged
Pavement along Surigao-Davao Coastal Road
XIII 9.594 C 0.239 0.300 0.300 - - - 83.90 81.08% V. Satisfactory
V.E. Solis Construction 30751 Const. of 1 CL @ Cabubugan E/S (Spacial Plan) VI 0.479 C 0.367 0.200 0.300 - - - 86.70 87.40%
V. Satisfactory
V.F. Construction 10048 Completion of Road, Barangay Salian, Abucay III 1.440 C 0.442 - 0.500 - - - 94.20 *94.20%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 429
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
V.F. Construction 10048 Const. of FMR, Barangay Sta. Isabel III 0.468 C 0.282 - 0.500 - - - 78.20 *78.20%
Satisfactory
V.F. Construction 10048 Const. of Gabon-Decena Road III 1.871 C 0.356 0.164 0.300 - - - 82.00 *82.00% V. Satisfactory
V.F. Construction 10048 Const. of Salian Farm-to-Market Road III 1.868 C 0.300 - 0.500 - - - 80.00 48.20%
Poor
V.O. Chupuico Construction 17585 Rehab. of Drainage System
Mantuyong-Ibabao VII 0.905 C 0.352 0.300 0.300 - - - 95.20 90.22% Outstanding
V.R. Duque Construction 22233 Const. of 2-Classroom School Building @ Mabuhay E/S IV-B 0.953 C 0.283 0.300 0.300 - - - 88.30 83.12%
V. Satisfactory
V.R. Duque Construction 22233 Const. of MPB @ Ilaya IV-B 0.475 C 0.234 0.242 0.300 - - - 77.60 *77.60% Satisfactory
V.R. Duque Construction 22233 Rehabilitation of Multi-Purpose Bldg., Brgy. Ilaya IV-B 0.474 C 0.331 0.300 0.300 - - - 93.10 89.53%
V.Satisfactory
V.R. Guevarra Construction & Trading 31565 Const. of 1 Unit Free Flowing
Artesian Well III 0.596 C 0.207 0.300 0.300 - - - 80.70 * 80.70% V. Satisfactory
V.R. Patron Builders & Developers 13487 Const. (Conc.) of Crisanto M. de
los Reyes Ave., Amadeo Section IV-A 28.930 C 0.320 0.200 0.300 - - - 82.00 84.88% V. Satisfactory
V.R. Patron Builders & Developers 13487
Improvement of Quilo-Quilo Road, Padre Garcia Integrated
ARCIV-A 6.550 O 0.347 0.250 0.100 0.030 0.040 0.100 86.70 -
V.R. Patron Builders & Developers 13487
Improvement of Quilo-Quilo Road, Padre Garcia Integrated
ARCIV-A 6.550 O 0.395 0.200 0.100 0.030 0.042 0.100 86.70 -
V.R. Patron Builders & Developers 13487 Impvt./Rehab. of Banay-banay
Mojon Jct. Road IV-A 3.816 C 0.328 0.300 0.300 - - - 92.80 *92.80% Outstanding
V.R. Patron Builders & Developers 13487
Impvt./Rehab. of Flood Control Project along Tagaytay-Tuy-
Nasugbu Road, Kaylaway Section
IV-A 4.775 C 0.307 0.300 0.300 - - - 90.70 *90.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 430
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
V.R. Patron Builders & Developers 13487
Rehab./Reconst. of Damaged National Roads, Manila-
Batangas Road, Lipa Section IV-A 19.292 O 0.380 0.254 0.100 0.030 0.030 0.100 89.40 -
V.R. Patron Builders & Developers 13487 Repair/Rehab. of Municipal Hall IV-A 0.955 C 0.412 - 0.500 - - - 91.20 91.20%
Outstanding
V.R. Patron Builders & Developers 13487 Road Conc. @ Brgy. Dalipit East IV-A 0.191 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
V.R.D.J. Construction 19837 Const. of 1 CL Std. School Bldg. at Josefina T. Albano NHS II 0.474 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
V.R.D.J. Construction 19837 Const. of Sto. Tomas MPB II 3.818 O 0.317 0.240 0.100 0.030 0.037 0.067 79.10 -
V.R.D.J. Construction 19837 Rehab./Impvt. of Namnama Brgy Road II 0.317 C 0.317 0.012 0.000 - - - 32.90 *32.90%
Poor
V.R.D.J. Construction 19837 Repair/Rehab. of Pilitan E/S Bldg. II 0.094 C 0.400 0.200 0.300 - - - 90.00 * 90.00%
V. Satisfactory
V.R.P. Builders Construction and Supply 25056 Concreting of FTM Road at Brgy.
Malaya IV-A 0.764 C 0.447 - 0.500 - - - 94.70 94.70% Oustanding
V.R.P. Builders Construction and Supply 25056
Const. of Two (2) School Building at Pinagtung-Ulan NHS
Pinagtung-UlanIV-A 0.955 C 0.477 - 0.500 - - - 97.70 *97.70%
Outstanding
V4M Construction 3211 Const.of Canal @ Maloma III 0.477 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
Valley Construction & Aggregates 14315
Cluster I a) Conc. of Dantay-Sagada Rd., b) Conc. of Dantay-
Sagada Rd.,Ambasing Suyo Balili Rd.
CAR 10.754 C 0.360 0.300 0.300 - - - 96.00 92.70% Outstanding
Valley Construction & Aggregates 14315 Completion of MPB @ New
Lucban Brgy. CAR 1.904 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
Valley Construction & Aggregates 14315 Const. of Senior Citizen's MPB at
East Quirino Hill Brgy. CAR 1.926 C 0.384 0.172 0.300 - - - 85.60 *85.60% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 431
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Valley Construction & Aggregates 14315
Continuation of Road Widening along Purok 4, Imelda Village
BarangayCAR 0.953 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan
National Road CAR 18.822 O 0.321 0.240 0.100 0.023 0.030 0.100 81.40 -
Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan-
Kibungan National Road CAR 18.822 O 0.272 0.276 0.100 0.020 0.037 0.100 80.50 -
Valley Construction & Aggregates 14315 Rehab. Along Acop-Kapangan-
Kibungan Road CAR 19.100 O 0.265 0.292 0.100 0.020 0.037 0.100 81.40 -
Vanmarvil Construction 19224Const. of MPB (Police Precinct)
@ Commonwealth Ave. Cor. Tandang Sora
NCR 1.909 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Vannie General Merchandise 27335 Completion of Public Market VI 1.924 C 0.390 0.257 0.300 - - - 94.70 90.15%
Outstanding
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage
Canal VI 5.738 O 0.320 0.200 0.070 0.030 0.032 0.133 78.50 -
Vans Turf Construction Corporation 13778 Const. of MPB III 3.253 C 0.357 0.294 0.300 - - - 95.10 *95.10%
Outstanding
Vans Turf Construction Corporation 10813 Const. of Multi-Purpose Building IV-A 2.708 C 0.439 - 0.500 - - - 93.90 *93.90%
Outstanding
Vans Turf Construction Corporation 13778 Const. of Multi-Purpose Building
@ Meycauayan III 2.837 C 0.483 - 0.500 - - - 98.30 *98.30% Outstanding
Vans Turf Construction Corporation 13778 Contruction of Multi-Purpose
Building III 2.591 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
Vanvi Construction 29387 Completion of MPB at Langub E/S XI 0.752 C 0.382 0.300 0.300 - - - 98.20 96.52%
Outstanding
Vanvi Construction 29387 Const. of MPB at Clib XI 1.429 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding
Vanvi Construction 29387 Const. of Water System at Sinaragan XI 1.411 C 0.388 0.300 0.300 - - - 98.80 87.11%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 432
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
VAR Builders 20327 Sagay City Resettlement Project NHA 5.910 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding
Various Construction 26640 Concreting of Upper Pinget Brgy. Road CAR 0.956 C 0.341 - 0.500 - - - 84.10 62.20%
Fair
VCD Construction 13949 Const. of Various Day Care Center I 0.329 C 0.291 - 0.500 - - - 79.10 *79.10%
Satisfactory
VCD Construction 13949 Rehabilitation of Ilocos Norte National School I 3.827 C 0.298 0.300 0.300 - - - 89.80 92.88%
OutstandingVCH Construction and
Trading 32050 Const. of MPB IV-B 0.479 C 0.299 0.300 0.300 - - - 89.90 *89.90% V. Satisfactory
VCH Construction and Trading 32050 Const. of Sch. Bldg. (1CL)
Panacan NHS IV-B 0.945 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB III 2.829 C 0.382 0.234 0.300 - - - 91.60 *91.60%
Outstanding
VCV Const. & Development Corp. 12575 Const. of MPB @ Brgy. Pilar VIII 3.339 C 0.327 0.272 0.300 - - - 89.90 *89.90%
V. Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB at Bgry. Alas-Asin III 3.310 C 0.381 0.215 0.300 - - - 89.60 *89.60%
V. Satisfactory
VCV Const. & Development Corp. 12575 Impvt. of Water Supply Project III 1.888 C 0.361 0.200 0.300 - - - 86.10 *86.10%
V.Satisfactory
VCV Const. & Development Corp. 12575 Const. of Conc. Revetment @
Tenejero River, Phase I III 3.456 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB @ Prov. Police
Headquarters III 3.741 C 0.330 0.224 0.300 - - - 85.40 *85.40% V. Satisfactory
VCV Const. & Development Corp. 12575 Repair/Rehab. of San Marcelino-
San Antonio Road III 9.851 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 433
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ven Ray Construction 18310Conc. of Antonio de Pio
Highway, (Tigabawan-Olivio-Luyang Section)
VII 14.154 O 0.295 0.300 0.000 0.010 0.022 0.100 72.70 -
Ven Ray Construction 18310 Concreting of P. Gicain St., Pasamanos, Dawis Norte VII 0.385 C 0.335 - 0.500 - - - 85.50 *85.50%
V. Satisfactory
Ven Ray Construction 18310 Const. of 2 CL S/B @ Bulwang E/S Compostela VII 0.895 C 0.359 0.249 0.300 - - - 90.80 *90.80%
Outstanding
Ven Ray Construction 18310 Const. of 2 CL Sch. Bldg. @ Liloan NHS VII 1.930 O 0.354 0.265 0.100 0.030 0.013 0.100 86.20 -
Ven Ray Construction 18310 Const. of 2-Storey, 4-Cl Science High School VII 4.469 C 0.388 0.240 0.300 - - - 92.80 *92.80%
Outstanding
Ven Ray Construction 18310 Const. of 3 CL Sch. Bldg. @ Sogod Central School VII 1.394 C 0.341 0.200 0.300 - - - 84.10 * 84.10%
V. Satisfactory
Ven Ray Construction 18310 Const. of 4th Flr. Extension at Beatriz D. Durano Memorial NHS VII 1.768 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Ven Ray Construction 18310 Const. of Annex Bldg. of Bogo Public Market VII 1.868 C 0.383 - 0.500 - - - 88.30 *88.30%
V. Satisfactory
Ven Ray Construction 18310 Const. of Drainage Sytem VII 0.445 C 0.263 0.200 0.300 - - - 76.30 *76.30% Satisfactory
Ven Ray Construction 18310 Const. of New Public Market VII 0.931 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory
Ven Ray Construction 18310 Const. of One (1) Storey Two (2) CL Sch. Bldg. Guinsay NHS VII 0.866 C 0.256 0.300 0.300 - - - 85.60 * 85.60%
V. Satisfactory
Ven Ray Construction 18310Reconst./Reblocking/Asphalt Overlay of Cebu Toledo Wharf
RoadVII 37.225 C 0.387 0.205 0.300 - - - 89.20 *89.20%
V. Satisfactory
Ven Ray Construction 18310 Rehab./Conc. of Roads at Barangay Poblacion VII 0.459 C 0.391 0.300 0.300 - - - 99.10 92.62%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 434
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Ven Ray Construction 18310Rehab./Reconst. of Siquijor
Circ., Larena-Enrique Villanueva Rd. Sect.
VII 46.671 O 0.331 0.246 0.100 0.022 0.027 0.100 82.60 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. VII 31.737 O 0.363 0.238 0.100 0.030 0.032 0.100 86.30 -
Ven Ray Construction 18310Repair/Rehab. of Luyang-
Canggumantong Rd. (Intermittent Section)
VII 9.645 C 0.214 0.202 0.300 - - - 71.60 83.24% V. Satisfactory
Ven Ray Construction 18310Repair/Rehab./Impvt./Maint. of
Siquijor Circ. Road, Larena-Enrique Villanueva Road Section
VII 24.989 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Venus Engineering & Construction 18358
Const. of MP Hall Realigned to Impvt. of MP Hall Brgy.
BuenavistaVIII 0.187 C 0.460 - 0.500 - - - 96.00 79.55%
Satisfactory
Verca Const. Trading & Services 14477 Const. of FMR @ Brgy. Bacong III 0.475 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
Verca Const. Trading & Services 14477 Const. of Multi-Purpose Bldg. at
Tenejero E/S III 0.610 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding
Versatile Builders 12069 Const. of MPB @ Vitali NHS IX 4.679 C 0.398 0.152 0.300 - - - 85.00 80.84% V. Satisfactory
Vertical Builders 14029Conc. of Sarangani-Davao del
Sur Coastal Road, Gumasa Section
XII 9.422 C 0.276 0.300 0.000 - - - 57.60 66.60% Fair
Vertical Builders 14029 Const. of 2 Cl @ FVR E/S III 1.351 O 0.346 0.240 0.100 0.030 0.059 0.100 87.50 -
Vertical Builders 14029 Datu Paglas Resttlement Project NHA 5.925 O 0.387 0.300 0.070 0.023 0.042 0.100 92.10 -
Vertical Builders 14029 Saub River Flood Control XII 1.897 C 0.315 0.225 0.300 - - - 84.00 82.98% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 435
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Vertical Builders 14029 Small Margus Seawall XII 4.769 C 0.379 0.300 0.000 - - - 67.90 71.68% Satisfactory
VF Construction 10048Const. of Drainge Canal from RBM Ent. To ER Venzon Plant
Brgy. Panillao & Brgy. Sta. RosaIII 0.845 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
VF Construction 10048 Impvt. of Multi-Purpose Pavement @ Brgy. Pto. Rivas III 0.488 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
VF Construction 10048 Rehab./Impv't. of Roman Expressway (Sabatan Section) III 0.990 C 0.295 0.300 0.300 - - - 89.50 *89.50%
V. Satisfactory
Vicente T. Lao Construction 7040 Cotabato Airport Development Project DOTC 14.404 C 0.443 0.200 0.300 - - - 94.30 94.30%
Very Satisfactory
Vicente T. Lao Construction 7040 CP MN - D3 (Katipunan-Manukan Road) ADB 462.152 O 0.376 0.291 0.000 0.030 0.047 0.100 84.40 -
Vicente T. Lao Construction 7040CP MN-D (3-1) Nipaan -
Sindangan Rd., Oroquieta-Sindangan Road
ADB 184.345 O 0.366 0.277 0.100 0.024 0.070 0.100 93.70 -
Vicente T. Lao Construction 7040Impvt. of Tagum-Asuncion-
Kapalong-Sto. Tomas-Dapecol-Panabo Circ. Road, Left Side
XI 16.396 C 0.220 0.300 0.300 - - - 82.00 *82.00% V. Satisfactory
Vicente T. Lao Construction 7040Impvt./Conc. Paving of
Sindangan-Siayan-Dumingag Road
IX 28.546 O 0.304 0.240 0.000 0.030 0.042 0.100 71.60 -
Vicente T. Lao Construction 7040Impvt./Conc. Paving of
Sindangan-Siayan-Dumingag Road
IX 28.948 O 0.345 0.240 0.100 0.030 0.040 0.100 85.50 -
Vicente T. Lao Construction 7040Impvt./Concrete Paving of
Gutalac-Baliguian-Siocon Road, Sta. Maria Section
IX 48.156 O 0.270 0.252 0.000 0.030 0.042 0.100 69.40 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 436
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Vicente T. Lao Construction 7040Impvt./Rehab. of Butuan-
Cagayan de Oro-Iligan Road, Dampil-Kabulawan Section
X 9.461 C 0.263 0.206 0.300 - - - 76.90 88.90% V. Satisfactory
Vicente T. Lao Construction 7040Impvt./Rehab. of Dipolog-
Polanco-Piñan Jct. Oroquieta Road, Barcelona-Polanco Sect.
IX 14.316 C 0.291 0.122 0.300 - - - 71.30 *71.30% Satisfactory
Vicente T. Lao Construction 7040Impvt./Rehab. of Dipolog-
Sindangan-Liloy Road, Talinga-Bacungan Section
IX 28.943 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory
Vicente T. Lao Construction 7040 Impvt./Rehab. of Road, Davao-Cotabato Road XI 12.408 C 0.339 0.300 0.300 - - - 93.90 *93.90%
Outstanding
Vicente T. Lao Construction 7040 Impvt./Rehab. of Sindangan-Liloy Road IX 4.899 C 0.388 0.300 0.300 - - - 98.80 *98.80%
Outstanding
Vicente T. Lao Construction 7040 Laguindingan Resttlement Project, Phase II NHA 38.798 O 0.383 0.297 0.000 0.018 0.047 0.067 81.16 -
Vicente T. Lao Construction 7040Reconst. of Dipolog-Polanco-
Piñan Jct. Oroquieta Nat'l Road, Pob. Piñan Section
IX 19.092 C 0.387 0.201 0.300 - - - 88.80 *88.80% V. Satisfactory
Vicente T. Lao Construction 7040 Rehab. Along Junction Polo-Dapitan Park Road IX 4.818 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V.Satisfactory
Vicente T. Lao Construction 7040
Rehab./Impvt. (Asphalt Overlay) of Sarangani-Davao del Sur Coastal Road, Gian Padidu
Section
XII 14.456 C 0.365 0.277 0.300 - - - 94.20 87.12% V. Satisfactory
Vicente T. Lao Construction 7040Rehab./Impvt. of Banisilan-
Guiling-Alamada-Libungan Road (Nicaan-Montay Section)
XII 11.433 C 0.359 0.234 0.300 - - - 89.30 *89.30% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 437
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Vicente T. Lao Construction 7040 Rehab./Impvt. of Digos-Makar Road, Malalag Cogon Section XII 14.466 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
Vicente T. Lao Construction 7040Rehab./Impvt. of Dualing-New
Panay-Midsayap Road Kimagango Highway Junction
XII 14.288 C 0.360 0.258 0.300 - - - 91.80 *91.80% Outstanding
Vicente T. Lao Construction 7040 Rehab./Impvt. of National Road Ozamis City-Oroquieta City Road X 14.366 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
Vicente T. Lao Construction 7040
Rehab./Impvt. of Nat'l Roads Preventive Maint. (Asphalt
Overlay), Oroquieta-Plaridel-Calamba-Sapang Dalaga Road
X 14.384 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding
Vicente T. Lao Construction 7040 Remaining Works of Asphalt Overlay of Makar-Kiamba Road XII 39.554 C 0.374 0.300 0.300 - - - 97.40 80.72%
V. Satisfactory
Vicente T. Lao Construction 7040
Upgrading/Impvt./Rehab. Along Dipolog By Pass Road Ph III,
Dicayas-Minaog Section (Supply & Installation of Traffic Eng'g)
IX 9.635 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Vicente T. Lao Construction 7040
Upgrading/Impvt./Rehab. of Dipolog-Oroquieta Road
(Supply & Installation of Traffic Eng'g)
IX 14.456 C 0.346 0.136 0.300 - - - 78.20 84.23% V. Satisfactory
Vicmar Construction Inc. 28997 Conc. of Brgy. Road @ Poblacion IV-A 1.416 O 0.300 0.300 0.100 0.030 0.035 0.067 83.20 -
Vicmar Construction Inc. 28997Const. of Baywalk Facilities,
Foreshore Area, Phase 3, Brgy. 11
IV-A 9.594 O 0.360 0.272 0.100 0.030 0.035 0.100 89.70 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 438
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Vicmar Construction Inc. 28997 Const. of Bridge at Batangas-Lobo Road (San Miguel Sect.) IV-A 9.498 C 0.339 0.200 0.300 - - - 83.90 81.02%
V. Satisfactory
Vicmar Construction Inc. 28997 Const. of MPB @ Poblacion IV-A 1.423 O 0.300 0.275 0.100 0.030 0.037 0.100 84.20 -
Vicmar Construction Inc. 28997 Const. of Seawall @ Brgy. Wawa IV-A 0.476 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Vicmar Construction Inc. 28997 Rehab./Impvt. of Batangas-Lobo Road IV-A 6.803 O 0.354 0.300 0.100 0.030 0.030 0.100 91.40 -
Vicmar Construction Inc. 28997
Rehab./Impvt. of Damaged National Road at Batangas-Tabangao-Lobo Road, Pulot
Aplaya-Talahib Pandayan Section
IV-A 19.295 O 0.344 0.300 0.100 0.030 0.035 0.100 90.90 -
Victoria Development and Construction Supply 32638 Conc. of Belen-Consuegra Road VIII 9.473 C 0.288 0.200 0.300 - - - 78.80 75.92%
Satisfactory
Victoria Development and Construction Supply 32638 Const. of MPB VIII 0.933 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
Victoria Development and Construction Supply 32638 Rehab./Impvt. of Villaba Flood
Control VIII 3.785 C 0.307 0.200 0.300 - - - 80.70 82.56% V. Satisfactory
Victoria Trading 15717 Const. of Drainage @ Brgy. Calapandayan III 0.354 C 0.247 0.300 0.300 - - - 84.70 *84.70%
V. Satisfactory
Victoria Trading 15717 Const. of Multi-Purpose Building @ Brgy. Calapacuan III 0.606 C 0.273 0.200 0.300 - - - 77.30 *77.30%
Satisfactory
Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Bldg.,
(Public Market) X 9.331 C 0.341 0.300 0.300 - - - 94.10 84.02% V. Satisfactory
Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Building
(Phase I), Calamba X 1.445 C 0.439 - 0.500 - - - 93.90 85.5% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 439
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Victoriano C. Lim Construction 25318 Const. of Ozamiz City Coastal By
Pass Road @ Brgy.Malaubang X 11.823 C 0.309 0.300 0.300 - - - 90.90 82.86% V. Satisfactory
Victoriano C. Lim Construction 25318 Gravelling of Guimad-Guingona-
Trigos Road X 2.826 C 0.317 0.300 0.000 - - - 61.70 *61.70% Fair
Victoriano C. Lim Construction 25318
Gravelling/Concreting of Pavement Ozamis By-Pass
Circumferential- Bangkal Airport Road
X 2.020 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Victoriano C. Lim Construction 25318 Impvt./Rehab. of Lagbas Creek X 9.546 C 0.290 0.300 0.300 - - - 89.00 82.70%
V. Satisfactory
Victoriano C. Lim Construction 25318 Regravelling of Litapan-Manaka-
Gala Road X 2.822 C 0.381 - 0.500 - - - 88.10 75.50% Satisfactory
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon
Road (Maluko Slip Section) X 14.457 O 0.356 0.300 0.050 0.030 0.035 0.100 87.10 -
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon
Road (Maluko Slip Section) X 14.457 O 0.347 0.236 0.000 0.030 0.035 0.067 71.50 -
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon
Road (Maluko Slip Section) X 14.457 O 0.304 0.300 0.000 0.030 0.050 0.067 75.10 -
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon
Road (Mangima Section) X 14.451 C 0.366 0.200 0.000 - - - 56.60 68.34% Fair
Victoriano C. Lim Construction 25318 Rehab./Impvt. of S.H. Alae-
Kisolon Road (Mangima Section) X 14.451 O 0.336 0.300 0.030 0.030 0.041 0.000 73.70 -
Victoriano C. Lim Construction 25318 Rehabilitation of Manaca-Gala
Road X 1.903 C 0.395 0.231 0.300 - - - 92.60 88.64% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 440
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Victoriano C. Lim Construction 25318 San Juro CIP MOPIO 10.103 C 0.342 0.240 0.300 - - - 88.15 *88.15%
V.Satisfactory
Victoriano C. Lim Construction 25318 Sumasap-Panaon Communal
Irrigation ProjectCARP-IC
ARCD 8.380 C 0.342 0.242 0.300 - - - 88.45 *88.45% V.Satisfactory
Victorino Baroña, Jr. Construction 15166 Const. of Sinalang Bridge &
Approaches CAR 10.890 C 0.352 0.212 0.300 - - - 86.40 85.80% V. Satisfactory
Victorino Baroña, Jr. Construction 15166 Impvt. of Abra-Kalinga Road,
Baguio Section, Baay-Licuan CAR 3.135 C 0.387 - 0.500 - - - 88.70 *88.70% V. Satisfactory
Victorino Baroña, Jr. Construction 15166 Impvt. of Denden-Callao Road,
Villaviciosa ARC CAR 15.862 C 0.334 0.300 0.300 - - - 93.40 87.28 V. Satisfactory
Victorino Baroña, Jr. Construction 15166 Rehabilitation of Abra-Ilocos
Norte Road CAR 0.941 C 0.372 - 0.500 - - - 87.20 *87.20% V. Satisfactory
Vicvera Builders, Inc. 13903 Const. of Three (3) Storey, 12 CL School Bldg. at Alabang E/S NCR 4.569 C 0.336 0.300 0.300 - - - 93.60 85.34%
V. Satisfactory
Vicvera Builders, Inc. 13903 Rehab. of Road, Brgy. Poblacion NCR 2.087 C 0.257 0.197 0.300 - - - 75.40 *75.40% Satisfactory
Vigan Fortune Construction 3887 Candon-Salcedo Road I 18.922 O 0.344 0.060 0.100 0.022 0.025 0.067 61.80 -
Vigan Fortune Construction 3887 Const. of Darapidap Seawall I 9.454 C 0.333 0.200 0.300 - - - 83.30 85.70% V. Satisfactory
Vigan Fortune Construction 3887 Const. of Santa Seawall & Flood Control I 9.493 C 0.320 0.300 0.300 - - - 92.00 77.36%
Satisfactory
Vigan Fortune Construction 3887 Continuation of Const. of Candon City Hospital I 4.744 C 0.358 - 0.500 - - - 85.80 85.80%
Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 441
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Vigan Fortune Construction 3887Continuation of the Phil. Science High School Bldg. (PSHS) Ilocos
Region CampusI 7.952 C 0.296 - 0.500 - - - 79.60 72.53%
Satisfactory
Vigan Fortune Construction 3887 Impvt. of San Emilio-del Pilar Road I 9.451 O 0.335 0.194 0.070 0.022 0.025 0.067 71.30 -
Vigan Fortune Construction 3887 Impv't. of Sta.Lucia-Salcedo Road I 4.002 C 0.272 - 0.500 - - - 77.20 58.12%
Poor
Vigan Fortune Construction 3887 Rehab./Replacement of Gongogong Bridge along MNR I 7.127 C 0.310 0.200 0.300 - - - 81.00 81.42%
V. Satisfactory
Vigan Fortune Construction 3887 Rehab./Replacement of Paing Bridge 2 along MNR I 8.362 O 0.272 0.300 0.100 0.030 0.035 0.100 83.70 -
Vigan Fortune Construction 3887 Rehab./Replacement of Paing Bridge 2 along MNR I 8.362 O 0.302 0.271 0.100 0.030 0.037 0.100 84.00 -
Vigan Fortune Construction 3887Stone Masonry of Sabangan Seawall, Phase III, Sabangan,
SantiagoI 1.207 C 0.293 - 0.500 - - - 79.30 *79.30%
Satisfactory
Viguz Construction Corporation 8178 Const. of Candi-is Bridge VIII 5.518 C 0.348 0.189 0.300 - - - 83.70 77.94%
Satisfactory
Viguz Construction Corporation 8178 Const. of Malirong Bridge VIII 4.655 C 0.381 0.180 0.300 - - - 86.10 83.94%
V. Satisfactory
Viguz Construction Corporation 8178 Road Widening of Carigara
Wharf VIII 1.424 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Const.)8178 Conc. of Burauen-Mahagnao
Road VIII 9.448 C 0.271 0.168 0.300 - - - 73.90 81.52% V. Satisfactory
Viguz Construction Corporation (Formerly:
Viguz Const.)8178 Const. of Maasin Flood Control VIII 9.442 C 0.341 0.156 0.300 - - - 79.70 84.08%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 442
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Viguz Construction Corporation (Formerly:
Viguz Const.)8178 Const./Extension of Canturing
River Control (Bogo Section) VIII 9.449 C 0.130 0.300 0.300 - - - 73.00 81.40% V. Satisfactory
Vijisi Construction 26643 Impvt./Concrete Paving of Don Federico Sison St. I 0.617 C 0.355 0.300 0.300 - - - 95.50 *95.50%
Outstanding
Viking Construction and Supplies 18129 Completion of Bigbiga Multi-
Purpose Building I 0.759 C 0.385 0.287 0.300 - - - 97.20 88.94% V. Satisfactory
Viking Construction and Supplies 18129 Completion of MPB I 3.743 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
Viking Construction and Supplies 18129 Conc. of Eco-Tourism Road I 14.395 C 0.324 0.200 0.300 - - - 82.40 86.84%
V. Satisfactory
Viking Construction and Supplies 18129 Rehab. of Concrete Pavement
along MNR, Candon Section I 9.484 C 0.277 0.200 0.300 - - - 77.70 80.46% V. Satisfactory
Viking Construction and Supplies 18129 Rehab. of Manila North Road I 4.739 C 0.175 0.300 0.300 - - - 77.50 *77.50%
Satisfactory
Viking Construction and Supplies 18129 Repair/Rehab. of MPB I 0.189 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
Viking Construction and Supplies 18129 Sta. Lucia-Salcedo Road I 9.457 O 0.305 0.092 0.050 0.015 0.027 0.067 55.60 -
Villaflor Construction and Supplies 21631 Const. of Multi-Purpose Hall,
Phase II VI 1.439 C 0.363 0.210 0.300 - - - 87.30 90.17% Outstanding
Virac NRC Construction 11396 Const. of Multi-Purpose Building (Phase I) V 0.944 C 0.391 - 0.500 - - - 89.10 *89.10%
V. Satisfactory
Virginia Construction 12893 Concreting of Farm-to-Market Brgy. Saang Bago III 0.374 C 0.293 - 0.500 - - - 79.30 *79.30%
Satisfactory
Virlo Construction 5765Conc. of Antonio de Pio
Highway, Luyang Victoria, Kinawahan Sect.
VII 30.402 O 0.292 0.239 0.100 0.020 0.022 0.100 77.30 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 443
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) VI 22.306 O 0.335 0.225 0.100 0.010 0.038 0.067 77.50 -
Virlo Construction 5765Const/Rehab. of 4-CL, 2-Storey
S/B @ Central Lilo-An E/S Poblacion
VII 1.516 C 0.406 - 0.500 - - - 90.60 90.60% Outstanding
Virlo Construction 5765 Repair/Impvt./Rehab. of Bonbon-Sinsin Road VII 9.996 C 0.212 0.200 0.300 - - - 71.20 *71.20%
Satisfactory
Virlo Construction 5765 Repair/Rehab. of S. Osmena Blvd. VII 9.646 C 0.054 0.100 0.300 - - - 45.40 72.16%
Satisfactory
Virlo Construction 5765 Road Widening of Osmeña St. Radaza Plaza to Petron VII 20.948 C 0.377 0.200 0.300 - - - 87.70 87.04%
V. Satisfactory
Vision 3000 Builders 32327 Const. of MPB, Region I Medical Center I 2.110 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
Vites Construction & Development Corporation 9444 Rehab./Const. of Multi-Purpose
Building @ Zone 38 (Brgy. 377) NCR 5.035 C 0.328 0.300 0.300 - - - 92.80 91.26% Outstanding
Vites Construction & Development Corporation (Formerly: Vites Trading &
Const.)
9444 Drainage Impvt. With Concreting/Upgrading NCR 1.151 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
Vivid Construction 21115 Proposed Const. of 2 Storey MPB NCR 1.925 C 0.285 0.237 0.300 - - - 82.20 *82.20%
V. Satisfactory
Vivid Construction 21115 Rehab. of Roxas Boulevard Service Road NCR 9.649 C 0.231 0.200 0.300 - - - 73.10 *73.10%
Satisfactory
Vivid Construction 21115 Riprapping of Creek at Sitio Tanag IVA 0.959 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
VNKC Construction 12614Construction, Fabrication &
Installation of Garbage Conveyor System with Boomtrap
PRRC 17.008 C 0.499 0.338 0.100 - - - 93.70 *93.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 444
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
VRF Construction 15301 Conc. of Bertese-Sta. Rita Road, Quezon Section III 6.465 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
VRF Construction 15301 Paving/Upgrading of Bongabon-Rizal Road (Rizal Section) III 8.250 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Satisfactory
VRF Construction 15301Repair/Rehab. of Gapan-
Peñaranda-Fort Magsaysay Road
III 7.720 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
VRP Builders Construction and Supply 25056 Road Conc. @ Brgy. Maugat IV-A 0.481 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
VTJ Construction & Supply 11250 Const. of Multi-Purpose Building at Brgy. Geronimo IV-A 0.964 C 0.459 - 0.500 - - - 95.90 *95.90%
Outstanding
VUC Engineering 7918Conc. of Luna-Kabugao-Pudtol-Luna Road, Cabatacan-Dagupan
SectionCAR 9.395 C 0.339 0.200 0.300 - - - 83.90 80.51%
V. Satisfactory
VUC Engineering 7918Concreting of Dagupan-
Palongkada Section Kabugay-Pudtol-Luna Road
CAR 7.692 C 0.425 - 0.500 - - - 92.50 86.11% V. Satisfactory
VUC Engineering 7918 Const. of Lanna Retaining Wall, Lanna CAR 0.873 C 0.352 0.300 0.300 - - - 95.20 *95.20%
Outstanding
VUC Engineering 7918 Impvt./Conc. of Tabuk-Tinglayan Road (Bantay Section) CAR 4.777 O 0.299 0.300 0.100 0.023 0.063 0.100 88.50 -
VUC Engineering 7918 Rehabilitation & Concreting of Magsaysay-Mapaway Road CAR 7.615 C 0.353 - 0.500 - - - 85.30 *85.30%
V. Satisfactory
VUC Engineering 7918 Road Impvt. of Dagupan-Palangkada Section, Luna CAR 7.692 C 0.264 0.235 0.070 0.030 0.030 0.100 72.90 -
VUC Engineering 7918Upgrading & Conc. of
Tuguegarao-Tabuk-Tinglayan Road (Banat-Gonogon Section)
CAR 9.510 C 0.215 0.051 0.300 - - - 56.60 70.28% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 445
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Vulcan Development Construction 19080 Concreting of Jct. Milagros-
Aroroy Road V 9.592 O 0.321 0.240 0.100 0.023 0.037 0.067 78.80 -
Vulcan Development Construction 19080 Const. of Circumferential Road
@ Brgy. Ibingay V 9.490 C 0.360 0.200 0.300 - - - 86.00 83.00% V. Satisfactory
VVER Construction 14122 Completion of East Central Home Economics Bldg. VII 0.548 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
VVER Construction 14122 Completion of MPB (Day Care Center) @ Brgy. Batinguel VII 0.277 C 0.331 0.200 0.300 - - - 83.10 *83.10%
V. Satisfactory
VVER Construction 14122 Const. of 1-Unit, 3-Cl School Building @ Olandao E/S VII 1.033 O 0.369 0.240 0.070 0.030 0.029 0.067 80.50 -
VVER Construction 14122 Const. of Brgy. Road at Canlasog VII 1.400 C 0.278 0.246 0.300 - - - 82.40 78.44%
Satisfactory
VVER Construction 14122 Const. of Cambagahan E/S VII 0.442 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory
VVER Construction 14122 Const. of MPB at Poblacion VII 0.949 C 0.307 0.032 0.300 - - - 63.90 *63.90% Fair
VVER Construction 14122 Const. of MPB/Center at Cang-Alwang VII 0.469 C 0.267 0.300 0.300 - - - 86.70 84.95%
V. Satisfactory
VVER Construction 14122 Continuation of MPB at Sibulan VII 0.917 C 0.289 0.300 0.300 - - - 88.90 84.49% V. Satisfactory
VVER Construction 14122 Repair/Rehab. of Upper Cabangcalan VII 1.393 C 0.337 0.207 0.300 - - - 84.40 *84.40%
V.Satisfactory
W B X Construction 28370Impvt. of Farm to Market Road, Brgy. Bagbaguin Sto. Tomas
RoadIII 2.569 C 0.324 0.300 0.300 - - - 92.40 *92.40%
Outstanding
W B X Construction 28370 Repair/Rehab. of Roads Brgy. Pinagkuartelan III 0.382 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
W B X Construction 28370 Repair/Rehab. of two (2) units of Classroom Bldg. at Caingin E/S III 0.954 C 0.343 0.300 0.300 - - - 94.30 *94.30%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 446
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
W B X Construction 28370 Road Concreting San Pedro III 0.478 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
W. Palma Construction 11988Const. of 4 Storey 12 Cl
Secondary Sch. Bldg. @ Roman Duterte Memorial NHS
VII 6.895 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory
W. Rivera Construction & Equipment Rentals 31378
Const. of 2 Storey RGR Type Sch. Bldg. @ Sta. Maria & San
Pedro E/SIVA 9.546 C 0.376 0.246 0.300 - - - 92.20 91.57%
Outstanding
W.C. Doyola Construction 26044 Paguite CIS PIO 833.488 C 0.339 0.175 0.300 - - - 81.35 81.35% V.Satisfactory
W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.240 O 0.400 0.160 0.100 0.020 0.028 0.133 84.10 -
W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.238 O 0.380 0.155 0.100 0.022 0.028 0.133 81.80 -
W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.240 C 0.267 0.200 0.300 - - - 76.70 77.27%
Satisfactory
W.D. Navarro Construction Co. 14327
Upgrading/Impvt. of Manila North Road (Jct. Bangag-
Mabanguc-Paruddun Sect.)II 20.042 O 0.320 0.240 0.100 0.020 0.033 0.067 78.00 -
W.J. Construction 19497 Installation of Pipeline @ Brgy. Camaysa IVA 0.477 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
W.J.P. Construction and Supply 23192 Conc. of Balicanaway Road I 2.886 C 0.321 0.200 0.300 - - - 82.10 *82.10%
V. Satisfactory
W.M. Salayog Construction and General Merchadise 12851 Conc. of Cristobal Road, Brgy.
Sapangi I 0.568 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
W.S. Aniar Trading & Construction 23192 Conc. of Casanicolasan Road I 0.960 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
W.S. Aniar Trading & Construction 20471 Const. of Multi Purpose
Pavement @ Brgy. Sapa IV-B 0.208 C 0.244 0.000 0.300 - - - 54.40 *54.40% Poor
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 447
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Walter Ng Lao Construction 23739 Concreting of Oroqueta-Calamba Mt. Rd., X 1.603 O 0.351 0.300 0.000 - - - 65.10 -
Walter Ng Lao Construction 23739 Panansalan-Cartagena Communal Irrigation System NIA 5.787 O 0.370 0.160 0.070 0.015 0.053 0.200 86.72 -
Wangjo Construction 29924Conc. of Sta. Maria-Paracelis Road (Phase I), Busilac-Pito
SectionCAR 9.529 C 0.362 0.287 0.300 - - - 94.90 58.84%
Poor
Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) CAR 1.601 C 0.261 0.288 0.300 - - - 84.90 86.52%
V. Satisfactory
Wangjo Construction 29924 Const. of Poblacion East Lamut MPB CAR 0.477 C 0.383 0.300 0.300 - - - 98.30 *98.30%
Outstanding
Wangjo Construction 29924 Installation of Tupaya Bridge CAR 0.946 C 0.335 0.300 0.300 - - - 93.50 90.02% Outstanding
WBX Construction 28370 Completion of 4 Cl 2 Storey Bldg. @ Bagbagin E/S III 1.520 C 0.250 0.291 0.300 - - - 84.10 *84.10%
V. Satisfactory
WBX Construction 28370 Const. of Brgy. Multi-Purpose Bldg., Brgy. Andaya III 0.468 C 0.296 0.300 0.300 - - - 89.60 87.29%
V. Satisfactory
WBX Construction 28370 Rehab. of Sta. Maria By Pass Road III 5.711 C 0.264 0.300 0.300 - - - 86.40 *86.40%
V. Satisfactory
WBX Construction 28370 Road Rehabilitation Pulang Gubat III 0.376 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
WCS Construction Inc. 6516 Const. of Multi-Purpose Hall-Phase II V 1.865 C 0.296 0.300 0.300 - - - 89.60 *89.60%
V. Satisfactory
WCS Construction Inc. 6516Development/Const. of Sula Seawall "A" and "B" and its
Access RoadV 9.355 C 0.254 0.252 0.300 - - - 80.60 85.94%
V. Satisfactory
WCS Construction Inc. 6516 Improvement of Lidong-Polangui Road V 33.052 C 0.304 0.200 0.300 - - - 80.40 87.00%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 448
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
WCS Construction Incorporated 6516 Land Development of Polangui
Resettlement Project NHA 23.994 O 0.38 0.300 0.100 0.03 0.045 0.100 95.5 -
WCS Construction Incorporated 6516 Land Development of Polangui
Resettlement Project SLB 23.994 O 0.332 0.243 0.000 0.030 0.065 0.033 70.29 -
WCS Construction, Inc. 6516 Const. of Buang River Control V 8.073 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
WCS Construction, Inc. 6516 Const. of Lubad Bridge V 23.885 C 0.386 0.172 0.300 - - - 85.80 80.49% V. Satisfactory
WCS Construction, Inc. 6516 Const. of MPB Covered Court (Phase I) V 4.279 C 0.357 0.200 0.300 - - - 85.70 86.05%
V. Satisfactory
WCS Construction, Inc. 6516 Land Dev't. of Polangui Resettlement Project NHA 23.994 C 0.368 0.300 0.000 - - - 66.82 66.82%
Fair
WCS Construction, Inc. 6516 Opening/Const. of Iluluan-Mapaco Road V 19.230 C 0.363 0.244 0.300 - - - 90.70 90.16%
Outstanding
WCS Construction, Inc. 6516 Yawa River (Banag Section & Culiat Section) V 47.661 C 0.333 0.200 0.300 - - - 83.30 83.03%
V. Satisfactory
WCS Construction, Inc. 6516 Yawa River (Banag Section) V 47.661 O 0.328 0.160 0.100 0.008 0.038 0.200 83.40 -
WDM Construction & Supplies 18877 Cluster EM: Concreting of FMR
Agay-Ayan-Sitio Kulgao Rd. X 0.456 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
WDM Construction & Supplies 18877 Conc. of FMR at South
Poblacion X 0.462 O 0.297 0.253 0.100 0.030 0.055 0.067 80.20 -
WDM Construction & Supplies 18877 Concreting of FMR, Barangay 24 X 0.477 C 0.385 0.300 0.300 - - - 98.50 *98.50%
Outstanding
WDM Construction & Supplies 18877 Const. of FMR, Odiongan-
Malinao-Sio-an Rd. X 0.953 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 449
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
WDM Construction & Supplies 18877 Const. of MPB X 0.464 C 0.309 0.200 0.300 - - - 80.90 *80.90%
V. Satisfactory
WDM Construction & Supplies 18877 Const. of MPB X 0.187 C 0.341 0.200 0.300 - - - 84.10 *84.10%
V. Satisfactory
WDM Construction & Supplies 18877 Const. of Multi-Purpose Building
(Initial) X 1.908 C 0.367 0.300 0.300 - - - 96.70 91.31% Outstanding
WDM Construction & Supplies 18877 Rehab. of Butuan-Cagayan-Iligan
Road, Medina By-Pass X 9.293 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding
Wearr Enterprises & Devt. Corp. 14123 Repair/Impvt. of Cabilogan River
Control V 14.474 C 0.350 0.200 0.300 - - - 85.00 73.42% Satisfactory
Wearr Enterprises & Devt. Corp. 14123 Restoration of San Vicente River
Control V 4.750 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Wee Builders 16375
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road, Segment III (Mulawin-
Tigbalabag Section)
IX 36.863 C 0.363 0.125 0.000 - - - 48.80 70.04% Satisfactory
Wee Eng Construction, Inc. 16380 Const. of Reiforced Box Culvert, Macalelon-Mulanay Road IV-A 1.939 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Wee Eng Construction, Inc. 16380Const. of Reinforced Conc. Box
Culvert along Macalelon-Mulanay Road
IV-A 0.816 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
Wee Eng Construction, Inc. 16380
Const. of SCDR Marihatag-Barobo Section (Conc. of
Amontay-Sto. Niño Section with Toril & Amontay Bridges)
XIII 122.026 C 0.374 0.300 0.300 - - - 97.40 89.56% V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 450
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Wee Eng Construction, Inc. 16380Const. of SCDR Marihatag-
Hinatuan-Bislig Road (Marihatag-San Agustin-Lianga Sect)
XIII 146.935 O 0.351 0.300 0.100 0.030 0.045 0.100 92.60 -
Wee Eng Construction, Inc. 16380Const. of SDCR (Lianga-Barobo
Subsection) along Marihatag-Hinatuan-Bislig Sect
XIII 257.508 O 0.317 0.300 0.100 0.030 0.065 0.100 91.20 -
Wee Eng Construction, Inc. 16380 Rehab./Impvt. of Rtalomo River Control, NHA Village XI 18.871 C 0.382 0.300 0.300 - - - 98.20 *98.20%
Outstanding
Welex Const. / Goldrock Const. & Dev. Corp. JV-03-004 Soil Erosion Protection Project
(Rehab. of Taytay-El Nido Road) SPIADP 898.994 C 0.342 0.294 0.300 - - - 93.60 94.54% Outstanding
Welex Construction 9323 Land Dev't. of Taysan Resettlement Project Region V 49.807 O 0.372 0.275 0.000 0.030 0.065 0.100 84.20 -
Welex Construction 9323 Land Dev't. of Taysan Resettlement Project
SLBMO-Region V 49.802 O 0.382 0.288 0.000 0.030 0.070 0.067 83.70 -
Werr Corporation (International) 14133 Const. of 2-Cl, 2-Storey S/B @
Bangoy NHS XI 0.683 O 0.189 0.250 0.000 0.015 0.018 0.033 50.50 -
Werr Corporation (International) 14133 Const. of 4-CL, 2-Storey S/B @
Eulogio Rodriguez, Jr. E/S IVA 5.550 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding
Werr Corporation (International) 14133 Const. of Bucal Bypass Bridge
(Phase I) IVA 10.176 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Westan Construction and Supply 24331 Const. of Flood Control @
Brgy. Parparoroc I 4.689 O 0.354 0.106 0.100 0.023 0.030 0.133 74.60 -
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 451
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Westmin Enterprises and Construction Services 20989
Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop Road,
Tag-ulo-Guimputlan Sect.IX 2.747 C 0.354 0.220 0.300 - - - 87.40 *87.40%
V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const. of MPB @ Rizal IX 0.945 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const./Completion of MPB
(Municipal Gym) IX 2.842 C 0.287 0.200 0.300 - - - 78.70 80.24% V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const./Impvt. of MPB IX 0.099 C 0.340 0.300 0.300 - - - 94.00 *94.00%
Outstanding
Westmin Enterprises and Construction Services 20989
Improvement/Concrete Paving along Rizal Shrine-Rizal Town
Coastal Road, Guimputlan-Banbanan-Carang Road Section
(Guimputlan-Banbanan Sect.)
IX 2.758 C 0.388 0.200 0.300 - - - 88.80 91.92% Outstanding
Westmin Enterprises and Construction Services 20989
Impv't./Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop
RoadIX 2.743 C 0.361 0.300 0.300 - - - 96.10 90.34%
Outstanding
Westmin Enterprises and Construction Services 20989 Rehab. of Banbanan-Carang
Road IX 1.893 C 0.326 0.225 0.300 - - - 85.10 79.10% Satisfactory
Westwalk Corporation 30650 Const. of MPB NCR 2.101 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
Whee Bon Construction & Supply 21731 Repair//Rehab. of Classroom @
Gumaca Nat'l. H/S IV-A 0.094 C 0.400 0.000 0.335 - - - 73.50 *73.50% Satisfactory
Wilper Construction, Inc. 1632 M'lang Airport Development Project DOTC 28.833 C 0.400 0.200 0.300 - - - 90.00 90.90%
Very Satisfactory
Wilper Construction, Inc. 1632 Conc. of Tigbao-Pulac Sta. Fe-San Miguel Road VIII 9.629 C 0.362 0.200 0.300 - - - 86.20 87.28%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 452
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Wilper Construction, Inc. 1632 Impvt. of Drainage Canal System along SLMAC III 4.701 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Wilper Construction, Inc. 1632Widening/Lowering/Impvt. of
Baler-Casiguran Road, Abuleg Sect.
III 5.864 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory
Wilper Construction, Inc. 1632Widening/Lowering/Impvt. of
Baler-Casiguran Road, Pimpolisan Sect.
III 5.856 C 0.308 0.200 0.300 - - - 80.80 75.46% Satisfactory
Wilpres Enterprises 19698 Conc. of FMR @ Brgy. Bocaclew I 0.482 C 0.273 0.200 0.300 - - - 77.30 *77.30% Satisfactory
Wilsam Construction & Dev. Corp. 27046 Continuation of Concreting of
Borongan Boulevard VIII 9.162 O 0.346 0.000 0.100 0.030 0.032 0.100 60.80 -
Winley Tan Construction 22368 Completion of School Building with CR @ Siparok E/S IX 0.182 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Winley Tan Construction 22368 Const. of 1-Unit, Two (2) CL School Bldg. @ Roxas E/S IX 0.719 C 0.379 0.200 0.300 - - - 87.90 93.36%
Outstanding
Winley Tan Construction 22368 Const. of MPB (Covered Court) at Galas E/S IX 2.367 C 0.361 0.200 0.300 - - - 86.10 91.63%
Outstanding
Winley Tan Construction 22368Const. of One (1) CL Sch. Bldg.
at Pamansalan Ecotech High Sch.
IX 0.563 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Winley Tan Construction 22368
Const. of Patunan River Control (Downstream) crossing Nat'l
Highway along Dipolog Dumingag Drainage Section
IX 4.746 C 0.348 0.200 0.300 - - - 84.80 85.94% V. Satisfactory
Winley Tan Construction 22368 Repair/Rehab. of Sch. Bldg. (ESP Bldg.) @ JRMSC IX 0.448 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. Satisfactory
Wizard Enterprises 27504 Const. of Water Works System IV-A 0.964 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 453
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Wizard Trading and Construction 21921 Conc. of San Jose-Llanera Road III 2.980 C 0.354 0.209 0.300 - - - 86.30 *86.30%
V. Satisfactory
Wizard Trading and Construction 21921 Const. of Box Culvert III 2.300 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Wizard Trading and Construction 21921 Const. of MPB @ Brgy. Bagong
Flores III 1.695 C 0.310 0.269 0.300 - - - 87.90 *87.90% V. Satisfactory
Wizard Trading and Construction 21921 Const. of MPB @ Namulandayan
E/S III 1.264 C 0.335 0.300 0.300 - - - 93.50 84.54% V. Satisfactory
Wizard Trading and Construction 21921 Const. of MPB at Balbalungao
E/S III 0.752 C 0.304 0.300 0.300 - - - 90.40 *90.40% Outstanding
Wizard Trading and Construction 21921 Const. of MPB, Brgy. Cordero III 1.030 C 0.369 0.200 0.300 - - - 86.90 83.75%
V. Satisfactory
WMLC Trading & Construction Supply 24535 Rehab. of San Juan-Laiya Road IV-A 14.468 C 0.320 0.202 0.300 - - - 82.20 *82.20%
V. Satisfactory
Worldwide Builders 31408 Construction of Multi-Purpose Building VII 0.479 C 0.310 0.000 0.300 - - - 61.00 *61.00%
Fair
Worldwide Builders 31408 Const. of 2 CL Academic Sch. Bldg., Mantalongon NHS VII 0.888 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Worldwide Builders 31408 Rehab. & Repair of Duldol-Bitoon Rd. VII 0.934 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Worldwide Builders 31408 Rehab. & Repair of Poblacion-Bunlan Road VII 0.932 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
WSR Enterprises 17589 Rehabilitation of Caugahan Bridge I V 0.755 C 0.250 0.300 0.300 - - - 85.00 *85.00%
V. Satisfactory
WT Construction, Inc. 5490Const. of CP MN-D2, Oroquieta-
Sindangan Rd., Barcelona-Katipunan Section
ADB 267.525 O 0.382 0.300 0.070 0.030 0.042 0.067 89.10 -
WT Construction, Inc. 5490 Const. of CP PY-C, Kalibo-Nabas Road VI 208.009 C 0.375 0.300 0.300 - - - 97.50 88.83%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 454
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
WTG Construction and Development Corporation 7494 Asphalt Overlay of Antonio Y. de
Pio Highway VII 6.468 C 0.313 0.204 0.300 - - - 81.70 *81.70% V. Satisfactory
WTG Construction and Development Corporation 7494 Conc. of Toledo-Pinagmungahan-
Aloguinsan-Mantalongon Road VII 45.125 O 0.348 0.225 0.030 0.023 0.022 0.100 74.80 -
WTG Construction and Development Corporation 7494 Concrerting of Road @ Brgy.
Dacudao, Brgy. Dacudao XI 1.880 C 0.280 0.300 0.300 - - - 88.00 74.40% Satisfactory
WTG Construction and Development Corporation 7494 Const. of Asturias Bridge VII 7.899 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
WTG Construction and Development Corporation 7494
Const. of Bango Bridge & Approaches, Compostela-Cateel
RoadXI 9.834 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
WTG Construction and Development Corporation 7494 Const. of DPWH Regional Office
No. VII Bldg. (Phase III) VII 9.384 C 0.373 0.200 0.300 - - - 87.30 84.40% V. Satisfactory
WTG Construction and Development Corporation 7494
Const. of Gov. Cuenco Flyover, Gov. Cuenco Ave. , Jct. A.S.
Fortuna St. VII 86.914 O 0.281 0.220 0.100 0.030 0.047 0.100 77.80 -
WTG Construction and Development Corporation 7494
Const. of Mambusao Bridge & Approaches, Compostela-Cateel
RoadXI 6.669 C 0.395 0.300 0.300 - - - 99.50 94.94%
Outstanding
WTG Construction and Development Corporation 7494 Impv't of Binawan-Cabantian
Road XI 9.440 C 0.337 0.300 0.300 - - - 93.70 *93.70% Outstanding
WTG Construction and Development Corporation 7494
Naga-Toledo Road Project, Jct. Proog to Jct. Sangi, Sta. 20+504-
Sta.32+000VII 91.674 C 0.285 0.261 0.300 - - - 84.60 88.80%
V. Satisfactory
WTG Construction and Development Corporation 7494 Widening of Velez Bridge VII 12.301 C 0.338 0.300 0.300 - - - 93.80 82.34%
V. Satisfactory
WYNN Construction 19358 Bien Unido Port Development Project DOTC 478.918 C 0.458 0.200 0.300 - - - 95.80 95.80%
Very Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 455
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
WYNN Construction 19358 Tagbilaran Airport Development Project DOTC 2.404 C 0.458 0.200 0.300 - - - 95.80 95.80%
Very Satisfactory
Y.S. Construction 11928 Const. of Sagbayan Multi-Purpose Building VII 0.891 C 0.367 0.300 0.300 - - - 96.70 92.36%
Outstanding
Yakal Construction 9685 Asphalt Overlay of Lapaz-Javier-Bito Road VIII 9.635 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Yakal Construction 9685Conc. of Toledo-Pinamungajan-Aloguinsan-Mantalongon Road
(Bojo Section)VII 9.470 C 0.273 0.300 0.300 - - - 87.30 83.76%
V. Satisfactory
Yakal Construction 9685 Conc. of Toledo-Tabuelan-San Remegio Road VII 9.469 C 0.354 0.200 0.300 - - - 85.40 84.08%
V. Satisfactory
Yakal Construction 9685 Const. of Anas Flood Control VIII 3.798 C 0.350 0.300 0.300 - - - 95.00 83.00% V. Satisfactory
Yakal Construction 9685 Const. of Balaquid Bridge VIII 3.649 C 0.360 0.300 0.300 - - - 96.00 80.76% V. Satisfactory
Yakal Construction 9685 Const. of Catbalogan Diversion Road (Phase VI) VIII 28.949 O 0.400 0.283 0.030 0.022 0.043 0.033 81.10 -
Yakal Construction 9685 Rehab. Along Tacloban-Baybay South Road, Maihi Section VIII 1.890 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
Yakal Construction 9685 Rehab. of Dale River Control, Catarman-Rawis Road VIII 9.463 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
Yakal Construction 9685Rehab. of Salog Bridge &
Approaches along Tac-Ormoc-Baybay-Maasin Rd.
VIII 6.085 C 0.343 0.200 0.300 - - - 84.30 84.60% V. Satisfactory
Yakal Construction 9685 Rehab./Impv't. of Tagnipa-Batwan-Tomoy Tomoy FMR VIII 14.467 C 0.383 0.300 0.300 - - - 98.30 87.80%
V. Satisfactory
Yakal Construction 9685 Rehabilitation of Roxas City Roads VI 4.736 C 0.340 0.300 0.300 - - - 94.00 88.78%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 456
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Yap Mabuhay Enterprises, Inc. 15540 Completion of Multi-Purpose
Bldg., Brgy. Benitez XII 0.943 C 0.376 0.300 0.300 - - - 97.60 90.32% Outstanding
Yap Mabuhay Enterprises, Inc. 15540 Const. of MPB @ Brgy. Lopez
Jaena XII 0.758 O 0.312 0.240 0.100 0.020 0.027 0.100 79.90 -
Yap Mabuhay Enterprises, Inc. 15540 Const. of MPB @ Brgy. Lopez
Jaena XII 0.711 C 0.270 0.300 0.300 - - - 87.00 82.03% V. Satisfactory
Yap Mabuhay Enterprises, Inc. 15540
Widening to 4 Lanes of Marbel-Tupi-Makar Road, Saravia Sect.,
Brgy. SaraviaXII 16.394 C 0.278 0.300 0.300 - - - 87.80 85.49%
V. Satisfactory
Yap Mabuhay Enterprises, Incorporated 15540 Completion of Multi-Purpose
Bldg. @ Zone II XII 0.865 C 0.236 0.267 0.300 - - - 80.30 82.47% V. Satisfactory
YCT Builders Center Co. 23830 Const. of 1 Cl Standard Sch. Bldg. at Jimalalud NHS VII 0.406 C 0.362 0.257 0.300 - - - 91.90 85.35%
V. Satisfactory
YCT Builders Center Co. 23830 Impvt. of Guihulngan-Isabela National Road VII 3.764 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
YCT Builders Center Co. 23830 Impvt. of Guihulngan-Isabela National Road, Luz Section VII 5.710 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
YCT Builders Center, Co. Inc. 23830 Const. of 2CL S/B @ Dungcan
E/S VII 0.711 C 0.367 0.100 0.300 - - - 76.70 77.96% Satisfactory
YCT Builders Center, Co. Inc. 23830
Impvt. of Nat'l Road (Missing Link) along Vallehermoso-La
Castellana RoadVII 2.454 C 0.330 0.149 0.300 - - - 77.90 *77.90%
Satisfactory
YCT Builders Center, Co. Inc. (Formerly YCT Builders
Center Co.)23830 Impv't./Repair of DNR Sta. Cruz,
Tayasan VII 0.886 C 0.321 0.290 0.300 - - - 91.10 57.08% Poor
YL Trading General Merchandising 22543 Conc. of Iloilo-Antique Rd. along
Pob. Culasi VI 9.622 C 0.353 0.300 0.300 - - - 95.30 93.29% Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 457
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
YL Trading General Merchandising 22543
Conc. of Iloilo-Antique Rd. along Poblacion Culasi, Antique
National Road ( w/ exception)VI 9.622 O 0.340 0.261 0.100 0.030 0.047 0.100 87.80 -
YL Trading General Merchandising 22543 Conc. of the Gap Portion of Iloilo-
Antique Road, Culasi Section VI 4.814 O 0.365 0.225 0.100 0.023 0.037 0.100 85.00 -
YL Trading General Merchandising 22543
Conc. of the Gap Portion of Iloilo-Antique Road, Culasi, Tibiao &
Barbasa SectionVI 19.237 C 0.346 0.200 0.300 - - - 84.60 85.74%
V. Satisfactory
YL Trading General Merchandising 22543 Concreting of 247.50 L.M.
National Road VI 2.886 C 0.345 0.115 0.300 - - - 76.00 78.10% Satisfactory
Yoyen Enterprises 15541 Completion of Multi Purpose Hall @ Brgy. Jaena VIII 0.462 O 0.264 0.263 0.100 0.000 0.027 0.100 75.40 -
Yoyen Enterprises 15541Conc. of Culaba-Caibiran
National Circ. Road, Culaba-Looc Section
VIII 3.742 O 0.320 0.281 0.100 0.015 0.037 0.100 85.30 -
Yoyen Enterprises 15541 Conc. of Dayhagan-Salvacion-Coob-Libertad Road VIII 12.537 O 0.317 0.220 0.100 0.020 0.038 0.100 79.50 -
Yoyen Enterprises 15541 Conc. of Kananga-Tungonan Road (Hotspring ) VIII 14.461 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Yoyen Enterprises 15541
Conc. Paving of Critical Portion of National Circ. Road, Caibiran-Cabucgayan Road (Rawid Road
Section)
VIII 3.807 C 0.266 0.200 0.300 - - - 76.60 82.60% V. Satisfactory
Yoyen Enterprises 15541Const. of Divisoria-Libertad-
Antipolo-Mabini-Liong-Nabangig Road
V 3.673 O 0.272 0.225 0.100 0.015 0.014 0.100 72.60 -
Yoyen Enterprises 15541 Const. of Farm-to-Market Road VIII 1.840 C 0.261 0.300 0.300 - - - 86.10 76.44% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 458
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Yoyen Enterprises 15541 Const. of Multi-Purpose Pavement, INAVS VIII 0.465 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Yoyen Enterprises 15541 Rehab./Deepening of Can-Untog River Control VIII 9.461 C 0.381 0.275 0.300 - - - 95.60 *95.60%
Outstanding
Yoyen Enterprises 15541 Rehab./Deepening of Panilahan River Control VIII 9.567 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
Yoyen Enterprises 15541 Repair/Restoration of Buenavista Slope Protection VIII 0.248 C 0.331 0.300 0.300 - - - 93.10 *93.10%
Outstanding
YS Construction 11928 Conc. of Critical Sections along Danao-Sagbayan Road VII 4.690 C 0.328 0.300 0.300 - - - 92.80 92.14%
Outstanding
YS Construction 11928Conc. of Sta. Fe-Magtangtang
Road Leading to Francisco Dagohoy Cave
VII 0.947 C 0.307 0.300 0.300 - - - 90.70 75.64% Satisfactory
YS Construction 11928Const. of Drainage Project
(Outfall), Tagbilaran City-San Jose St.
VII 9.380 C 0.294 0.300 0.300 - - - 89.40 87.48% V. Satisfactory
YS Construction 11928 Const. of MPB VII 4.665 C 0.345 0.300 0.300 - - - 94.50 *94.50% Outstanding
YSL Builders 19516Conc./Rehab. of Punta-
Dansullan-Cogon-Sergio Osmena Road
IX 2.706 C 0.251 0.193 0.300 - - - 74.40 83.70% V. Satisfactory
YSL Builders 19516 Concreting of Liloy-Labason Road (Ganase-Patawag Sect.) IX 4.637 C 0.355 0.300 0.300 - - - 95.50 92.50%
Outstanding
YSL Builders 19516 Const. of MPB (Covered Court) @ Olingan E/S IX 2.367 C 0.336 0.300 0.300 - - - 93.60 *93.60%
Outstanding
YSL Builders 19516 Const. of MPB (Gymnasium Phase IV) IX 0.957 C 0.389 0.187 0.300 - - - 87.60 *87.60%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 459
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
YSL Builders 19516 Const. of MPB (Mini Gym) IX 1.079 C 0.383 0.000 0.300 - - - 68.30 *68.30% Fair
YSL Builders 19516Proposed Concreting of Liloy-
Labason Road (Patawag Section)
IX 4.632 C 0.392 0.295 0.300 - - - 98.70 96.78% Outstanding
Yu Construction 10470 Concreting of Corella-Sikatuna Road VII 9.187 O 0.342 0.247 0.100 0.030 0.037 0.100 85.60 -
Yu Construction 10470 Const. of 8 CL Bldg. for CVSCAFT VII 11.135 C 0.356 0.300 0.300 - - - 95.60 83.49%
V. Satisfactory
Yu Construction 10470 Impvt. (Conc. Paving) of Jct. Ter, Trinidad-Bien Unido Rd. VII 18.950 C 0.349 0.300 0.300 - - - 94.90 89.80%
V. Satisfactory
Yu Construction 10470Rehab./Const. of Damaged
Paved National Road along TER (Loay-Jagna)
VII 15.052 O 0.353 0.240 0.100 0.030 0.048 0.100 87.10 -
Yu Construction 10470 Talibon Small Reservoir Irrigation Project SRIP 14.630 O 0.322 0.177 0.100 0.030 0.047 0.200 87.60 -
YU Construction - ARN Builders joint venture JV-06-006
Const. of Dam Embankment - Phase III, Talibon Small Resrvior
Irrigation ProjectNIA 14.799 O 0.293 0.300 0.300 - - - *89.30 -
Z & L Construction & Supplies 25322 Const. of Multi-Purpose Bldg. X 0.681 C 0.396 0.259 0.300 - - - 95.50 90.53%
Outstanding
Z.A.S. Construction 8971Concreting of Critical Portion along Julita-Balaquid Road
SectionVIII 2.678 C 0.349 0.300 0.300 - - - 94.90 72.97%
Satisfactory
Z.A.S. Construction 8971 Const. of 1 CL Sch. Bldg. of Carigara Sch. of Fisheries VIII 0.499 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
Z.A.S. Construction 8971 Const. of MPB Phase I, Brgy. San Pedro VIII 0.469 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Z.A.S. Construction 8971 Const. of Multi-Purpose Building (Health Center) VIII 0.189 C 0.365 0.300 0.300 - - - 96.50 93.42%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 460
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Z.A.S. Construction 8971 Const. of One (1) CL Elem. School Bldg. @ Mercyville E/S VIII 0.440 C 0.395 0.100 0.300 - - - 79.50 *79.50%
Satisfactory
Z.F. Construction 17676 Const. of 2-CL Building III 0.809 C 0.345 0.300 0.300 - - - 94.50 *94.50% Outstanding
Z.F. Construction 17676Impvt./Conc. of San Luis-Ma. Aurora Rd., So. Hilltop-So.
Gulugod Baboy, Brgy. DianawanIII 18.346 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
Zabu Engineering 31104 Completion of School Bldg., at SPED Center CAR 0.293 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Zabu Engineering 31104 Const./ Rehab./Impv't. of Angngalipan FMR Road CAR 0.960 C 0.267 0.300 0.300 - - - 86.70 90.48%
Outstanding
Zabu Engineering 31104 Repair/Rehab. of Liwan West-Santor FMR CAR 1.910 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
Zacarias Enterprise 17446 Const. of MPB III 0.473 C 0.379 0.259 0.300 - - - 93.80 *93.80% Outstanding
Zamboanga Engineers & Contractors, Inc. 6239 Const. of MPB @ Mercedes Nat'l
High School IX 3.774 C 0.326 0.200 0.300 - - - 82.60 80.15% V. Satisfactory
Zillion Builders 15655Completion of Marouy Multi-
Purpose Building, DPWH Compound
IVA 4.810 O 0.369 0.240 0.100 0.030 0.055 0.100 89.40 -
Zillion Builders 15655 Const. of Waterworks at Brgy. San Pedro II IVA 1.579 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
Zion Construction 14881 Const. of Bato II Bridge along Santander-Barili-Toledo Road VII 11.021 C 0.361 0.257 0.300 - - - 91.80 *91.80%
Outstanding
Zion Construction 14881 Const./Replacement of Giligaon Bridge VII 14.410 C 0.376 0.300 0.300 - - - 97.60 93.04%
Outstanding
Zion Construction (Formerly: Masterpiece
Const. & Supply14881
Const./Repair of Two (2) Storey Industrial Building At Badian
NHSVII 1.855 C 0.255 0.300 0.300 - - - 85.50 *85.50%
V. Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 461
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
Zion Construction (Formerly: Masterpiece
Const. & Supply)14881
Asphalt Overlay of Natallio Bacalso Ave. (NBA), Bojoon-
Oslob SectionVII 14.998 C 0.308 0.300 0.300 - - - 90.80 *90.80%
Outstanding
Zion Construction (Formerly: Masterpiece
Const. & Supply)14881
Asphalt Overlay of Natallio Bacalso Ave. (NBA), Oslob
SectionVII 11.998 C 0.340 0.300 0.300 - - - 94.00 *94.00%
Outstanding
Zion Construction (Formerly: Masterpiece
Const. & Supply)14881 Const. of Retaining Wall (Riprap)
along Butuanon River, Tambis VII 1.394 C 0.244 0.200 0.300 - - - 74.40 *74.40% Satisfactory
ZM Construction 9052Asphalt Overlay along Iba National Road Candelaria
SectionIII 4.850 C 0.373 0.207 0.300 - - - 88.00 *88.00%
V. Satisfactory
ZM Construction 9052 Concreting of Balacbac Brgy. Road III 0.933 C 0.479 - 0.500 - - - 97.90 81.90%
V. Satisfactory
ZM Construction 9052 Impvt./Rehab. of Bataan Expressway, Mabatang Section III 14.342 C 0.259 0.205 0.300 - - - 76.40 76.40%
Satisfactory
ZM Construction 9052Rehab./Asphalting of Road,
Slope Protection along Iba North Road
III 7.165 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding
ZM Construction 9052 Rehab./Widening of Consuelo Bridge along Iba South Road III 18.705 C 0.321 0.289 0.300 - - - 91.00 *91.00%
Outstanding
ZMS Construction 10471 Conc. of Imelda-Alicia Road, Guintolan Section IX 4.810 C 0.238 0.208 0.300 - - - 74.60 74.30%
Satisfactory
ZMS Construction 10471Conc. of Tubod-Lakewood-
Pob.Lakewood Nat'l Secondary Road, Sibuwan-Tubod Section
IX 14.235 C 0.316 0.115 0.300 - - - 73.10 *73.10% Satisfactory
ZMS Construction 10471Conc. of Tubod-Lakewood-
Pob.Lakewood Nat'l Secondary Road, Tubod-Sibuwan Section
IX 14.248 C 0.348 0.112 0.300 - - - 76.00 *76.00% Satisfactory
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 462
CIAP - PDCB CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports - On-going and Completed Projects from Jan. 1, 2006 to Dec. 30, 2008
NAME of CONSTRUCTOR LICENSE NO.
CONTRACT*IMPL.
AGENCY
PROJECT
PROJECTWMS MTLSTATUSAMOUNT
(Php, M)
FINAL RATING/QUALITA
TIVE DESCRIPTION
CPES VISIT
RATINGTIME FAC ESH RDR
ZMS Construction 10471Conc. Paving of Siquijor
Circumferential Road, Lazi-San Juan Section
VII 4.674 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory
ZMS Construction 10471Const. of Demorok Bridge &
Approaches, Phase II, Josefina-Sergio Osmena Nat'l Road
IX 4.499 C 0.155 0.300 0.300 - - - 75.50 79.76% Satisfactory
ZMS Construction 10471Impvt./Conc. Paving of Pagadian-Buug Road Section (Segment VI)
along Pagadian-Ipil RoadIX 30.684 C 0.263 0.291 0.300 - - - 85.40 85.76%
V. Satisfactory
ZMS Construction 10471Impvt./Conc. Paving of Pagadian-
Buug Road Section (Segment VIII) along Pagadian-Ipil Road
IX 41.843 C 0.271 0.300 0.000 - - - 57.10 75.88% Satisfactory
ZMS Construction 10471
Impv't./Concrete Paving of Road Pagadian-Buug Road Section,
Segment II, Phase I along Pagadian-Ipil Road
IX 23.264 C 0.367 0.225 0.300 - - - 89.20 89.98% V. Satisfactory
ZMS Construction 10471Rehab. & Conc. Paving of Jct.
Tubod-Lakewood Road ( Lukuan-Tubod Section)
IX 19.199 C 0.207 0.200 0.300 - - - 70.70 *70.70% Satisfactory
Zoniuq Enterprises 25223 Improvement of Roads, Salasad (Brgy. Lumot-Mahipon) IV-A 0.286 C 0.406 - 0.500 - - - 90.60 *90.60%
Outstanding
Zota Trading and Construction 21424 Const. of Multi-Purpose Building
@ Ceralde E/S I 0.479 C 0.366 0.206 0.300 - - - 87.20 *87.20% V. Satisfactory
ZPM General Merchandise 28726 Const. of MPB, Canizales High School XII 1.907 C 0.328 0.300 0.300 - - - 92.80 *92.80%
Outstanding
18 June 2009* 1st/Final* For DPWH, only the region and PMO office are listed
8th CPES release Page 463