Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Country/Organisation: GHANA/MoFA
Implementing Agency : MOFA
Contract
Type
PackageNumber Plan vs. Actual
Selection Method
Lumpsum/Time-Based
Estimated Amount in US$
Prior/Post Review
Prep & Submissio
n
No-objection
Date
On-line UNDB
GatewayNational
Press
Lead-time before
shortlistSubmission
Date
No-objection
DateInvitation
Date
Submission/
OpeningDate
SubmissionEvaluationReport (T)
No-objection
EvaluationReport (T)
Opening Financial
Proposals
Preparation
Eval Report(T) (F)
NegotiationsSubmission
Date
No-objection
Date
Contract Amount Contract
Award Publication
of AwardContract
Signature
Name of Contract Winner
MobilizationAdvancePayment
DraftReport
FinalReport
FinalCost Results
Plan $300,000.00 12/05/2014 N/A 19/05/2014 02/06/2014 09/06/2014 N/A 16/06/2014 30/06/2014 07/07/2014 N/A 14/07/2014 21/07/2014 28/07/2014 04/08/2014 N/A 11/08/2014 N/A 18/08/2014 25/08/2014 15/04/2015 29/04/2015
Actual $267,665.00 03/07/2014 N/A 10/07/2014 24/07/2014 07/08/2014 N/A 21/08/2014 04/09/2014 11/09/2014 N/A 12/09/2014 15/09/2014 07/10/2014 16/10/2014 N/A 21/10/2014 21/10/2014 N/A
Plan $60,000.00 15/03/2015 N/A N/A N/A 29/03/2015 N/A 12/04/2015 26/04/2015 03/05/2015 N/A 03/05/2015 N/A 10/05/2015 17/05/2015 N/A 24/05/2015 N/A 31/05/2015 14/06/2015 13/08/2015 27/08/2015
Actual
Plan $40,000.00 15/04/2015 N/A N/A N/A 29/04/2015 N/A 13/05/2015 27/05/2015 03/06/2015 N/A 03/06/2015 N/A 10/06/2015 17/06/2015 N/A 24/06/2015 N/A 01/07/2015 15/07/2015 13/09/2015 27/09/2015
Actual
Plan $60,000.00 15/06/2015 N/A N/A N/A 29/06/2015 N/A 13/07/2015 27/07/2015 03/08/2015 N/A 03/08/2015 N/A 10/08/2015 17/08/2015 N/A 24/08/2015 N/A 31/08/2015 14/09/2015 13/11/2015 27/11/2015
Actual
Plan 460,000.00$ Actual
\\
2014 CONSULTANCY SERVICES -MOFA
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Country/Organisation: GHANA/MoFA
Implementing Agency : MOFA
ContractType
PackageNumber Plan vs. Actual
Selection Method
Lumpsum/Time-Based
Estimated Amount in US$
Prior/Post Review
Prep & Submissio
n
No-objection
Date
On-line UNDB
GatewayNational
Press
Lead-time before
shortlistSubmission
Date
No-objection
DateInvitation
Date
Submission/
OpeningDate
SubmissionEvaluationReport (T)
No-objection
EvaluationReport (T)
Opening Financial
Proposals
Preparation
Eval Report(T) (F)
Negotiations
Submission Date
No-objection
Date
Contract Amount Contract
Award Publication
of AwardContract
Signature
Name of Contract Winner
MobilizationAdvancePayment
DraftReport
FinalReport
FinalCost Results
Component 1: Enabling condition for Regional Cooperation in the Generation, Dissemination and Adoption of Agricultural TechnologiesPlan 30,000.00$ 30/07/2014 N/A N/A 06/08/2014 20/08/2014 N/A N/A N/A N/A N/A 27/08/2014 03/09/2014 10/09/2014 17/09/2014 N/A 24/09/2014 N/A 28/09/2014 05/10/2014 04/11/2014 18/11/2014
Actual 34,196.00$ N/A N/A N/A 05/08/2014 19/08/2014 N/A N/A 19/08/2014 N/A 22/08/2014 26/08/2014 N/A 29/08/2014 N/A 29/08/2014
Plan 50,000.00$ 25/08/2014 N/A N/A 01/09/2014 15/09/2014 N/A 22/09/2014 06/10/2014 13/10/2014 N/A 15/10/2014 N/A 22/10/2014 24/10/2014 N/A 31/10/2014 N/A 04/11/2014 11/11/2014 11/12/2014 25/12/2014Actual 08/08/2014 N/A N/A 15/08/2014 29/08/2014 N/A 21/10/2014 07/11/2014
Plan 40,000.00$ 03/03/2014 17/03/2014 24/03/2014 21/04/2014 28/04/2014 N/A N/A N/A N/A N/A 12/05/2014 19/05/2014 26/05/2014 02/06/2014 16/06/2014 23/06/2014 N/A 07/07/2014 21/07/2014 05/09/2014 19/09/2014
Actual 61,130.50$ N/A N/A N/A N/A N/A 24/06/2014 31/07/2014 N/A 31/07/2014 22/08/2014
Component 3: Generation and Adoption of Demand-Driven Adaptive ResearchPlan 500,000.00$ 15/08/2013 29/08/2013 N/A N/A N/A N/A 01/09/2013 08/09/2013 N/A N/A 08/09/2013 N/A 15/09/2013 18/09/2013 28/09/2013 01/10/2013 04/10/2013 07/10/2013 14/10/2013 18/08/2014 16/10/2014
Actual 483,013.50$ 14/10/2013 17/05/2013 N/A N/A N/A N/A 21/11/2013 02/12/2013 N/A N/A 02/12/2013 N/A 13/12/2013 19/12/2013 24/12/2013 27/12/2013 31/12/2013
Plan 620,000.00$ Actual 578,340.00$
2014 CONSULTANCY SERVICE-CSIR
ContractType
Package
Number Plan vs. Actual
Selection
Method
Lumpsum/
Time-Based
Estimated Amount
in US$
Prior/Post
Review
Prep & Submissio
n
No-objection
Date
On-line UNDB
GatewayNational
Press
Lead-time before
shortlist
Submission
Date
No-objection
Date
Invitation
Date
Submission/
Opening
Date
SubmissionEvaluation
Report (T)
No-objection
Evaluation
Report (T)
Opening Financial
Proposals
Preparation
Eval Report
(T) (F)
Negotiations
Submission
Date
No-objection
Date
Contract Amount Contract
Award
Publication
of Award
Contract
Signature
Name of Contract
Winner
MobilizationAdvance
Payment
Draft
Report
Final
Report
Final
Cost Results
Component 2: Capacity of Centre of SpecialisationPlan $61,000.00 12/05/2014 N/A 19/05/2014 02/06/2014 09/06/2014 N/A 16/06/2014 30/06/2014 07/07/2014 N/A 14/07/2014 21/07/2014 28/07/2014 04/08/2014 N/A 11/08/2014 N/A 18/08/2014 25/08/2014 15/04/2015 29/04/2015
Actual $267,665.00 03/07/2014 N/A 10/07/2014 24/07/2014 07/08/2014 N/A 21/08/2014 04/09/2014 11/09/2014 N/A 12/09/2014 15/09/2014 07/10/2014 16/10/2014 N/A 21/10/2014 21/10/2014 N/A
Plan 61,000.00$ Actual $267,665.00
Country/Organisation: GHANA/MoFA
PROCUREMENT -CONSULTANCY 2015
3 Conduct panel studies to track
performance of target groups/Beneficiaries of WAAPP2A baseline reference studies.
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Post Implementation ECOWAS regulations on veterinary and animal products
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to fund demand-driven technology
development, dissemination and adoption at national and regional levels increased
2 1.c
Credit Number: 51360-GH Project ID: P129565 Date: 20/01/2015Preparation
Request for Proposals
Conduct socio-economic impact studies on the control of ND for VSD
MOFA/WAAPP/IC/2015/01
MOFA/WAAPP/IC/2015/02 IC Lumpsum
2.81
Lumpsum Post
Short
ListContract Implementation
Access of stakeholders (producers, processors) to technologies through the competitive grant
established to fund demand-driven technology
development, dissemination and adoption at national
4.4.1.2
4.0
Post
IC Lumpsum
RemarksDescription
1 1.c Consultancy service for the implementation of veterinary
MOFA/WAAPP/IC/2014/02 IC Lumpsum Prior Dr. Jonathan
Implementation ECOWAS regulations on veterinary and animal products
Contract Implementation
Lumpsum Post The mainstreaming and dissemination of the ECOWAS Regulation on Pesticides
3 1.f Consultancy service to renew
Gender Strategy with social
MOFA/WAAPP/IC/2014/01 IC Lumpsum Prior Mr. Wilbert
Tengey
Gender (Social protection) strategy reviewed
2 1.b Consultancy service for the Diagnostic Analysis for the
MOFA/WAAPP/CQS/2014/01 CQS
Lumpsum Prior$483,013.50
Messrs. Prep-eez
Access of stakeholders (producers, processors) to technologies through the competitive grant
4 3.2 Consultant service to Design, Implement and Support of e-
MOFA/WAAPP/SS/2013/01 SS
Sub-total Cost
Request for EOI(where required)Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014
Preparation Request for Proposals
ShortList
Country/Organisation: GHANA/MoFA
PROCUREMENT -CONSULTANCY
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Request for EOI(where required)Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014
Preparation Request for Proposals
ShortList
ConsultantProposals
Proposal Evaluation Technical (T) & Financial (F)
Proposal Evaluation and Negotiation
Draft Contract Contract Finalization
Sub-total Cost
ConsultantProposals
Proposal Evaluation Technical (T) & Financial (F)
Proposal Evaluation and Negotiation
Draft Contract Contract Finalization Contract Implementation
RemarksDescription
=A72:X731 2.8 Consultancy Service for the Development of Documentation for 17025 Accreditation of the CRI-CSIR Biotechnological Laboratory
CSIR/WAAPP/CQS/2014/01 CQS Lumpsum Post $267,665.00 Sky Portal Consults
Support priority Agricultural research programs; Alignment of national priorities with regional priorities in technology generation within participating countries National Agricultural Research Systems (NARS)
PostLumpsum CQSCSIR/WAAPP/CQS/2014/01Consultancy Service for the Development of
Documentation for 17025
$267,665.00 Sky Portal Consults
Support priority Agricultural research programs; Alignment of national priorities with regional priorities
in technology generation within participating countries
Sub-total Cost
RemarksDescription
4 Consultancy service for the midterm review of WAAPP 2A performance
MOFA/WAAPP/IC/2015/03
Contract FinalizationConsultant
Proposals
Proposal Evaluation
Technical (T) & Financial (F)
Proposal Evaluation and
Negotiation
Request for EOI(where required) Draft Contract
IC
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
2015 GOODS PROCUREMENT- MOFA
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Implementing Agency : MOFASpec. Proc
Notice
No. Component DescriptionPackage
Number
Plan vs.
Actual
Lot
Number
Estimated Amount in
US$
Procurement
Method
Pre-or Post
Qualificatio
n
Prior or Post
Review
Preparation &
Submission
No-
objection
Date
On-line UNDB/
Gateway/
National Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication
of Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of
Letter of
Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Results Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec total
Plan 70,000.00$ 16/02/2015 N/A N/A 23/02/2015 02/03/2015 09/03/2015 N/A 16/03/2015 30/03/2015 23/03/2015 N/A 06/04/2015 13/04/2015
70,000.00$ 70,000.00$
Actual
Plan 50,000.00$ 27/02/2015 N/A N/A 06/03/2015 13/03/2015 20/03/2015 N/A 27/03/2015 10/04/2015 03/04/2015 N/A 17/04/2015 24/04/2015
50,000.00$ 50,000.00$
Actual
Plan 55,000.00$ 16/03/2015 N/A N/A 23/03/2015 30/03/2015 06/04/2015 N/A 13/04/2015 27/04/2015 20/04/2015 N/A 04/05/2015 11/05/2015
55,000.00$ 55,000.00$
Actual
Plan 260,000.00$ 04/05/2015 18/05/2015 25/05/2015 25/05/2015 22/06/2015 06/07/2015 20/07/2015 03/08/2015 10/08/2015 17/08/2015 24/08/2015 16/10/2015 30/10/2015
260,000.00$ 260,000.00$
Actual
Plan 60,000.00$ 04/05/2015 N/A N/A 11/05/2015 18/05/2015 25/05/2015 N/A 01/06/2015 15/06/2015 08/06/2015 N/A 22/06/2015 29/06/2015
60,000.00$ 60,000.00$
Actual
Plan 640,000.00$ 10/02/2015 24/02/2015 03/03/2015 03/03/2015 31/03/2015 14/04/2015 28/04/2015 12/05/2015 19/05/2015 26/05/2015 02/06/2015 25/07/2015 08/08/2015
640,000.00$ 640,000.00$
Actual
Plan 420,000.00$ 01/06/2015 15/06/2015 22/06/2015 22/06/2015 20/07/2015 03/08/2015 17/08/2015 31/08/2015 07/09/2015 14/09/2015 21/09/2015 13/11/2015 27/11/2015
420,000.00$ 420,000.00$
Actual
Plan 98,000.00$ 02/07/2015 N/A N/A 09/07/2015 16/07/2015 23/07/2015 N/A 30/07/2015 13/08/2015 06/08/2015 N/A 20/08/2015 27/08/2015
98,000.00$ 98,000.00$
Actual
Plan 7,000.00$ 03/08/2015 N/A N/A 10/08/2015 17/08/2015 24/08/2015 N/A 31/08/2015 14/09/2015 07/09/2015 N/A 21/09/2015 28/09/2015
7,000.00$ 7,000.00$
Actual
Procurement of Kit for assessing Vit A in
leafy vegetables under WIAD
Plan 50,000.00$ 03/09/2015 N/A N/A 10/09/2015 17/09/2015 24/09/2015 N/A 01/10/2015 15/10/2015 08/10/2015 N/A 22/10/2015 29/10/2015
50,000.00$ 50,000.00$
Actual
Plan 156,000.00$ 01/10/2015 15/10/2015 22/10/2015 22/10/2015 19/11/2015 03/12/2015 17/12/2015 31/12/2015 07/01/2016 14/01/2016 21/01/2016 14/03/2016 28/03/2016 156,000.00$ 156,000.00$
Actual
Plan 30,000.00$ 02/11/2015 N/A N/A 09/11/2015 16/11/2015 23/11/2015 N/A 30/11/2015 14/12/2015 07/12/2015 N/A 21/12/2015 28/12/2015
30,000.00$ 30,000.00$
Actual
Plan 20,000.00$ 03/09/2015 N/A N/A 10/09/2015 17/09/2015 24/09/2015 N/A 01/10/2015 15/10/2015 08/10/2015 N/A 22/10/2015 29/10/2015
20,000.00$ 20,000.00$
Actual
Plan 80,000.00$ 02/07/2015 N/A N/A 09/07/2015 16/07/2015 23/07/2015 N/A 30/07/2015 13/08/2015 06/08/2015 N/A 20/08/2015 27/08/2015
$ 80,000.00 80,000.00$
Actual
Plan 95,000.00$ 02/07/2015 N/A N/A 09/07/2015 16/07/2015 23/07/2015 N/A 30/07/2015 13/08/2015 06/08/2015 N/A 20/08/2015 27/08/2015
95,000.00$ 95,000.00$
Actual
Plan 10,000.00$ 20/08/2015 N/A N/A 27/08/2015 03/09/2015 10/09/2015 N/A 17/09/2015 01/10/2015 24/09/2015 N/A 08/10/2015 15/10/2015
10,000.00$ 10,000.00$
Actual
Plan 2,101,000.00$ 0 0 0 226,000.00$ 105,000.00$ 331,000.00$ 60,000.00$ 640,000.00$ 273,000.00$ 17,000.00$ 330,000.00$ 450,000.00$ 2,101,000.00$
Actual 0.00
Item Amount
Goods 2,101,000.00$
Consultancy 460,000.00
Works 260,000.00$
Non-Consultancy 1,475,000.00$
Total 4,296,000.00$
2015 GOODS PROCUREMENT
Implementing Agency : CSIRSpec. Proc
Notice
No. Component DescriptionPackage
Number
Plan vs.
Actual
Lot
Number
Estimated Amount in
US$
Procurement
Method
Pre-or Post
Qualificatio
n
Prior or Post
Review
Preparation &
Submission
No-
objection
Date
On-line UNDB/
Gateway/
National Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication
of Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of
Letter of
Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Results
Plan 90,000.00$ 24/02/2015 N/A N/A 03/03/2015 10/03/2015 17/03/2015 N/A 24/03/2015 N/A 31/03/2015 N/A 14/04/2015 21/04/2015
Actual
Plan 35,000.00$ 12/03/2015 N/A N/A 19/03/2015 26/03/2015 02/04/2015 N/A 09/04/2015 N/A 16/04/2015 N/A 30/04/2015 07/05/2015
Actual
Procurement of Sixteen (16) vehicle
tyres for CSIR-HQ
Plan 6,000.00$ 20/04/2015 N/A N/A 27/04/2015 04/05/2015 11/05/2015 N/A 18/05/2015 N/A 25/05/2015 N/A 08/06/2015 15/06/2015
Actual
Plan 35,000.00$ 09/06/2015 N/A N/A 16/06/2015 23/06/2015 30/06/2015 N/A 07/07/2015 N/A 14/07/2015 N/A 28/07/2015 04/08/2015
Actual
Plan 100,000.00$ 04/05/2015 N/A N/A 11/05/2015 18/05/2015 25/05/2015 N/A 01/06/2015 N/A 08/06/2015 N/A 22/06/2015 29/06/2015
Actual
Plan 100,000.00$ 02/07/2015 N/A N/A 09/07/2015 16/07/2015 23/07/2015 N/A 30/07/2015 N/A 06/08/2015 N/A 20/08/2015 27/08/2015
Actual
Plan 510,000.00$ 04/05/2015 18/05/2015 25/05/2015 25/05/2015 22/06/2015 06/07/2015 20/07/2015 03/08/2015 10/08/2015 17/08/2015 24/08/2015 16/10/2015 30/10/2015
Actual
Plan 150,000.00$ 05/10/2015 19/10/2015 26/10/2015 26/10/2015 23/11/2015 07/12/2015 21/12/2015 04/01/2016 11/01/2016 18/01/2016 25/01/2016 18/03/2016 01/04/2016
Actual
Plan 100,000.00$ 17/09/2015 N/A N/A 24/09/2015 01/10/2015 08/10/2015 N/A 15/10/2015 N/A 22/10/2015 N/A 05/11/2015 12/11/2015
Actual
Plan 60,000.00$ 21/10/2015 N/A N/A 28/10/2015 04/11/2015 11/11/2015 N/A 18/11/2015 N/A 25/11/2015 N/A 09/12/2015 16/12/2015
Actual
Plan 98,000.00$ 21/09/2015 N/A N/A 28/09/2015 05/10/2015 12/10/2015 N/A 19/10/2015 N/A 26/10/2015 N/A 09/11/2015 16/11/2015
Actual
Plan 100,000.00$ 21/10/2015 N/A N/A 28/10/2015 04/11/2015 11/11/2015 N/A 18/11/2015 N/A 25/11/2015 N/A 09/12/2015 16/12/2015
Actual
Access of stakeholders (producers, processors) to technologies through the competitive grant established to fund demand-driven technology
development, dissemination and adoption at national and regional levels
increased
Projected Disbursement -Year 2015
11 PostPostShopping1
8
3.1
3.1
3.1
10
Access of stakeholders (producers, processors) to technologies through
the competitive grant established to fund demand-driven technology
development, dissemination and adoption at national and regional levels
increased
9
CSIR/WAAPP/GE/S/2015/08
CSIR/WAAPP/GE/S/2015/07
CSIR/WAAPP/GE/NCB/2015/02
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
NCB Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
CSIR/WAAPP/GE/S/2015/09Procurement of Laboratory Equipment
for the Biotechnology Laboratory at
NCoS, Fumesua to Facilitate the
Accreditation process
3.1
PostPost1
PostPost
CSIR/WAAPP/GE/S/2015/06
4CSIR/WAAPP/GE/NCB/2015/01
Shopping
Procurement of Field and Laboratory
Equipment for SARI
Procurement of Thirty (30) Laptops and
Softwares for CSIR-CRI and CSIR- FRI
Procurement of General Laboratory
Equipment for CSIR-CRI
Shopping
Post
PostPost
Shopping
Procurement of Processing Equipment
for FRI
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Shopping Post Post
PostPostShopping
Shopping Post Post
PostPostShopping
Access of stakeholders (producers, processors) to technologies through the competitive grant established to fund demand-driven technology
development, dissemination and adoption at national and regional levels
increased
Access of stakeholders (producers, processors) to technologies through
the competitive grant established to fund demand-driven technology development, dissemination and adoption at national and regional levels
increased
3.2.A.7
Procurement of Food processing
equipment for trials under WIAD
4
14 3.3a.10 Develop and mount billboards at
multiplication sites
Procurement of ArcGis software
(including installation) for effective
mapping of the project/intervention
areas
4.4.2.413
Print 5000 copies of Gender and Social
Protection Strategy under WIAD
Procurement of Equipment (14 pumps,
14 threshers, moisture metres,weighing
scales) for intensification of the new
varieties
16 1.f.1.3
3.3c.1115
4.a.2.3
Procurement of Sixteen (16) No. 4WD
Double Cabin Pick ups for WAAPP
Implementing Agencies and MOFA
Agricultural Stations
Procurement of 550 Small ruminants for
90 selected farmers in Eastern, Central
and Western regions and Kintampo Goat
Breeding Station under APD
4
Procurement of 1200 smartphones for
the e-Agriculture programme and seed
growers/ field agents for seed
multiplication
8 3.2c.2.3
3.2
6
3.1b27
Procurement of Tray Dryer for Cassava
Flour for FRI
3.1b2
11
3
2 3.1.4.3.1 Procurement of Twenty-Two (22)
Airconditioners and Eighteen (18)
Stabilizers for CSIR-HQ and CSIR-FRI
12
1.f
4.6.3 Procure office Office Stationeries /
Consumables for PCU
3.1.4.3.6
Develop and print various materials for
CSIR-FRI and CSIR-ARI
CSIR/WAAPP/GE/S/2015/05
Shopping Post
1
10 1.f
MOFA/WAAPP/GE/S/2015/05
Shopping Post
Post
CSIR/WAAPP/GE/S/2015/03
CSIR/WAAPP/GE/S/2015/04
1
1
1
CSIR/WAAPP/GE/S/2015/02 1
9 MOFA/WAAPP/GE/S/2015/06Procurement of 7 GPS devices to
support private sector, research, and
WASP office in order to measure fields
accurately and ensure effective
monitoring
MOFA/WAAPP/GE/S/2015/08
NCB Prior
Post
Post
3.1b2.7
6
Post Post
1
MOFA/WAAPP/GE/S/2015/10
MOFA/WAAPP/GE/S/2015/09
1
1
MOFA/WAAPP/GE/S/2015/12
MOFA/WAAPP/GE/S/2015/11
MOFA/WAAPP/GE/NCB/2015/02
Post
1 Shopping
5 3.1b2 Procurement of 250KVA Generator set
for CSIR-FRI and 100KVA Generator set
for SARI
Remarks
Shopping
1
2 NCB
1 Shopping
MOFA/WAAPP/GE/NCB/2015/03
3 NCB
Post
Shopping
Post
Post
Post
Post
1 Shopping Post
Post
Country/Organisation: GHANA/MoFA
PROCUREMENT-GOODS 2015
Credit Number: 51360-GH Project ID: P129565 Date: 20/01/2015 BASIC DATA
Procurement of General Office Supplies
and multi-media devices for PPRSD, EPA,
APD and DAES
MOFA/WAAPP/GE/S/2015/01 1 Shopping Post1 Post1.a.6.2
Contract Implementation
Remarks
MOFA/WAAPP/GE/S/2015/03 1
PostMOFA/WAAPP/GE/S/2015/02
Post
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Shopping
Draft Bid Documents,
including specs and
quantities, draft SPN
Shopping
Bidding Period Bid Evaluation Contract Finalization
1.c.1.23 Procurement of General Equipment for
two quarantine stations (PAGA &
Hameli) under VSD
2
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Procurement of 250 sets of personal
protective equipment for pesticide
inspectors (overalls, gloves, nose mask
goggles, etc.) for EPA
1.b.4.3
4 Production and printing of various
materials and posters for VSD, PPRSD,
WAAPP PCU, DAES and APD
MOFA/WAAPP/GE/NCB/2015/013.2.a.4.4
5 Procurement of ten (10) Ridgers for
DAES
MOFA/WAAPP/GE/S/2015/04 1
7
Post
Post Post
Post
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Post
Shopping Post Post
MOFA/WAAPP/GE/S/2015/07 1 Shopping Post
1
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
MOFA/WAAPP/GE/NCB/2015/04 1 NCB Post Post
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Sector regulations at regional and national level for the
generation and dissemination of improved technologies
improved
Credit Number: 51360-GH Project ID: P129565 Date: 20/01/2015 BASIC DATA Bidding Period Bid Evaluation Contract Finalization Contract Implementation
1 1.g1.1.7 Procurement of Office Equipment for
CSIR-HQ,IPR office and SARI
CSIR/WAAPP/GE/S/2015/01 1 Shopping Post
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
Post
Post
Post
PostPostShopping1CSIR/WAAPP/GE/S/2015/10Procurement of Blast Freezer for CSIR-
SRI
3.112 Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
NCB
1
1
1
PostPost
Post
Supply and Installation of Biotech Lab
Complex Security Internal -CCTV under
Plan 50,000.00$ 20/03/2015 N/A N/A 27/03/2015 10/04/2015 17/04/2015 N/A 24/04/2015 N/A 01/05/2015 N/A 15/05/2015 29/05/2015
Actual
Plan 1,434,000.00$
Actual 0.00
Item Amount
Goods 1,434,000.00$
Consultancy - Works 105,000.00$
Non-Consultancy -$
Total 1,539,000.00$
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Implementing Agency : MOFASpec. Proc
Notice
Advert
No. Component DescriptionPackage
Number
Plan vs.
Actual
Lot
Number
Estimated Amount in
US$
Procurement
Method
Pre-or Post
Qualificatio
n
Prior or Post
Review
Preparation &
Submission
No-
objection
Date
On-line UNDB/
Gateway/
National Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication
of Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of
Letter of
Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Results
Plan 160,000.00$ 27/01/2014 N/A 17/02/2014 17/02/2014 19/03/2014 02/04/2014 N/A 16/04/2014 23/04/2014 30/04/2014 07/05/2014 30/06/2014 14/07/2014Actual 152,857.14$ 04/04/2014 N/A 04/04/2014 04/04/2014 02/05/2014 02/06/2014 N/A 22/07/2014 30/07/2014 N/A
Procurement of IVR and call centre
Hosting Equipment and installation
under e-Agriculture
Plan 450,000.00$ 20/01/2014 03/02/2014 N/A N/A N/A N/A 07/03/2014 14/03/2014 N/A 21/03/2014 N/A 04/04/2014 18/04/2014
Actual 518,577.60$ 26/02/2014 18/03/2014 N/A N/A N/A N/A 02/06/2014 04/06/2014 09/06/2014 N/A 19/08/2014
Procurement of Centre Auxilary Supplies
and Installation under e-Agriculture
Plan 60,000.00$ 28/08/2014 N/A N/A 04/09/2014 11/09/2014 15/09/2014 N/A 22/09/2014 N/A 29/09/2014 N/A 13/10/2014 27/10/2014
Actual 87,457.27$ 04/06/2014 N/A N/A 11/06/2014 25/06/2014 30/06/2014 N/A 10/07/2014 N/A 17/07/2014 N/A
Procurement of e-Learning and
Resource Centre Equipment and
installation under e-Agriculture
Plan 90,000.00$ 28/08/2014 N/A N/A 04/09/2014 11/09/2014 15/09/2014 N/A 22/09/2014 N/A 29/09/2014 N/A 13/10/2014 27/10/2014
Actual 82,964.44$ 04/06/2014 N/A N/A 11/06/2014 25/06/2014 30/06/2014 N/A 10/07/2014 N/A 17/07/2014 N/A
Plan 650,000.00$ 24/04/2014 N/A 01/05/2014 08/05/2014 09/06/2014 08/07/2014 21/07/2014 28/07/2014 04/08/2014 18/08/2014 25/08/2014 17/11/2014 17/12/2014Actual 609,889.95$ 19/03/2014 12/05/2014 15/05/2014 15/05/2014 18/06/2014 12/08/2014 19/08/2014 19/08/2014 03/09/2014 N/A 09/09/2014 12/09/2014
Plan 65,000.00$ 10/11/2014 N/A N/A 17/11/2014 01/12/2014 08/12/2014 N/A 15/12/2014 N/A 22/12/2014 N/A 05/01/2015 19/01/2015Actual 67,994.60$ 30/10/2014 04/11/2014 11/11/2014 N/A N/A
Plan 50,000.00$ 20/02/2014 N/A N/A 27/02/2014 13/03/2014 20/03/2014 N/A 27/03/2014 N/A 03/04/2014 N/A 17/04/2014 01/05/2014Actual 30,395.84$ 05/03/2014 N/A N/A 12/03/2014 19/03/2014 2403/2014 N/A 27/03/2014 N/A 27/03/2014 N/A
Plan 40,000.00$ 15/04/2014 N/A N/A 22/04/2014 06/05/2014 13/05/2014 N/A 20/05/2014 N/A 27/05/2014 N/A 10/06/2014 17/06/2014Actual 29,333.33$ 25/03/2014 N/A N/A 01/04/2014 08/04/2014
Plan 15,000.00$ 08/10/2014 N/A N/A 15/10/2014 29/10/2014 05/11/2014 N/A 12/11/2014 N/A 19/11/2014 N/A 03/12/2014 17/12/2014Actual
Plan 88,000.00$ 28/04/2014 N/A N/A 05/05/2014 19/05/2014 26/05/2014 N/A 02/06/2014 N/A 09/06/2014 N/A 23/06/2014 07/07/2014
Actual 75,213.33$ 20/03/2014 N/A N/A 27/03/2014 11/04/2014 16/04/2014 N/A 21/04/2014 N/A N/A
Develop and mount billboards at
multiplication sites
Plan 80,000.00$ 03/11/2014 N/A N/A 10/11/2014 24/11/2014 01/12/2014 N/A 08/12/2014 N/A 15/12/2014 N/A 29/12/2014 11/01/2015
Actual
Procurement of Equipment (14 pumps,
14 threshers, moisture metres,weighing
scales) for intensification of the new
varieties
Plan 95,000.00$ 20/11/2014 N/A N/A 27/11/2014 11/12/2014 18/12/2014 N/A 25/12/2014 N/A 01/01/2015 N/A 15/01/2015 28/01/2015
Actual
Procurement of Contract Management
Software & Training
Plan 30,000.00$ 10/11/2014 N/A N/A 17/11/2014 01/12/2014 08/12/2014 N/A 15/12/2014 N/A 22/12/2014 N/A 05/01/2015 19/01/2015
Actual 46,700.00$ 21/10/2014 N/A N/A 23/10/2014 06/10/2014 07/11/2014 N/A 10/11/2014 N/A 13/11/2014 N/A 17/11/2014
Publish 5000 copies of fertilizer policy
for dissemination under PPRSD
Plan 30,000.00$ 07/07/2014 N/A N/A 14/07/2014 28/07/2014 04/08/2014 N/A 11/08/2014 N/A 18/08/2014 N/A 01/09/2014 15/09/2014
Actual 11,187.31$ 30/06/2014 N/A N/A 30/06/2014 07/07/2014 15/07/2014 N/A
Publish one manual for handling
(transport, storage, use and disposal) of
pesticides and one (1) pesticide
inspectors manual
Plan 20,000.00$ 06/11/2014 N/A N/A 13/11/2014 27/11/2014 04/12/2014 N/A 11/12/2014 N/A 18/12/2014 N/A 01/01/2015 15/01/2015
Actual
Publish 2000 copies of educational
materials on Newcastle disease Vaccine
(1-2) for community poultry vaccinators
under VSD
Plan 10,000.00$ 06/11/2014 N/A N/A 13/11/2014 27/11/2014 04/12/2014 N/A 11/12/2014 N/A 18/12/2014 N/A 01/01/2015 22/09/2014
Actual
Preparation of 1000 copies each of
posters and Leaflets for the continuous
education of meat processing personnel
on appropriate techniques under VSD
Plan 29,000.00$ 06/11/2014 N/A N/A 13/11/2014 27/11/2014 04/12/2014 N/A 11/12/2014 N/A 18/12/2014 N/A 01/01/2015 14/01/2015
Actual
Print 5000 copies of Gender and Social
Protection Strategy under WIAD
Plan 6,000.00$ 13/11/2014 N/A N/A 20/11/2014 04/12/2014 11/12/2014 N/A 15/09/2014 N/A 22/09/2014 N/A 11/10/2014 24/10/2014
Actual
Produce 1000 copies of information pack
on WAAPP (File, leaflet, Pen and Pad)
Plan 23,000.00$ 13/11/2014 N/A N/A 20/11/2014 04/12/2014 11/12/2014 N/A 29/09/2014 N/A 06/10/2014 N/A 11/10/2014 24/10/2014
Actual
Production of 6000 copies of Extension
Education Manuals on quality standards
of selected food crops under DAES
Plan 30,000.00$ 10/11/2014 N/A N/A 17/11/2014 01/12/2014 08/12/2014 N/A 15/12/2014 N/A 22/12/2014 N/A 15/12/2014 29/12/2014
Actual 13,290.32$ 29/09/2014 N/A N/A 30/09/2014 15/10/2014 N/A N/A N/A
Develop 10,000 copies of fact sheets on
Plants and Fertilizer Act, 2010 (Act 803)
and its Plants Fertilizer Regulations, 2012
under PPRSD
Plan 20,000.00$ 07/11/2014 N/A N/A 14/11/2014 28/11/2014 05/12/2014 N/A 12/12/2014 N/A 19/12/2014 N/A 22/12/2014 05/01/2015
Actual 4,983.87$ 29/09/2014 N/A N/A 30/09/2014 15/10/2014 N/A N/A N/A
Plan 25,000.00$ 21/07/2014 N/A N/A 28/07/2014 11/08/2014 18/08/2014 N/A 25/08/2014 N/A 01/09/2014 N/A 15/09/2014 22/09/2014Actual 25,324.58$ 11/06/2014 N/A N/A 18/06/2014 25/06/2014 26/06/2014 N/A 27/06/2014 N/A 02/07/2014 N/A
Plan 50,000.00$ 07/11/2014 N/A N/A 14/11/2014 28/11/2014 05/12/2014 N/A 12/12/2014 N/A 19/12/2014 N/A 02/01/2015 16/01/2015Actual 59,709.68$ 11/11/2014 N/A N/A 18/11/2014 02/12/2014
Plan 50,000.00$ 07/11/2014 N/A N/A 14/11/2014 28/11/2014 05/12/2014 N/A 12/12/2014 N/A 19/12/2014 N/A 02/01/2015 16/01/2015Actual 58,451.15$ 11/11/2014 N/A N/A 18/11/2014 02/12/2014
Plan 70,000.00$ 27/11/2014 N/A N/A 04/12/2014 18/12/2014 25/12/2014 N/A 01/01/2015 N/A 08/01/2015 N/A 22/01/2015 05/02/2015Actual 62,237.10$ 11/11/2014 N/A N/A 18/11/2014 02/12/2014
Plan 60,000.00$ 04/12/2014 N/A N/A 11/12/2014 25/12/2014 01/01/2015 N/A 08/01/2015 N/A 15/01/2015 N/A 29/01/2015 12/02/2015Actual 90,806.13$ 11/11/2014 N/A N/A 18/11/2014 02/12/2014
Plan 100,000.00$ 05/09/2014 N/A N/A 12/09/2014 26/09/2014 03/10/2014 N/A 10/10/2014 N/A 17/10/2014 N/A 31/10/2014 14/11/2014Actual 96,657.17$ 30/05/2014 N/A N/A 06/06/2014 20/06/2014 24/06/2014 N/A 26/06/2014 N/A 02/07/2014 N/A
Plan 100,000.00$ 19/09/2014 N/A N/A 26/09/2014 10/10/2014 17/10/2014 N/A 24/10/2014 N/A 31/10/2014 N/A 14/11/2014 27/11/2014Actual 96,171.38$ 30/05/2014 N/A N/A 06/06/2014 20/06/2014 24/06/2014 N/A 26/06/2014 N/A 02/07/2014 N/A
Plan 2,496,000.00$ Actual 2,220,202.19$ 0.00
Item Amount
Goods 2,496,000.00$
Consultancy -$
Works -$
Non-Consultancy -$
Total 2,496,000.00$
2014 GOODS PROCUREMENT-CSIR
Spec. Proc
Notice
Advert
No. Component DescriptionPackage
Number
Plan vs.
Actual
Lot
Number
Estimated Amount in
US$
Procurement
Method
Pre-or Post
Qualificatio
n
Prior or Post
Review
Preparation &
Submission
No-
objection
Date
On-line UNDB/
Gateway/
National Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication
of Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of
Letter of
Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Results
Plan 86,000.00$ 22/08/2014 N/A N/A 29/08/2014 12/09/2014 19/09/2014 N/A 26/09/2014 N/A 03/10/2014 N/A 17/10/2014 31/10/2014Actual 43,471.80$ 19/06/2014 N/A N/A 26/06/2014 18/07/2014 18/07/2014 N/A 21/07/2014 N/A 21/07/2014 N/A 31/07/2014 04/08/2014
Plan 100,000.00$ 21/07/2014 N/A N/A 28/07/2014 11/08/2014 18/08/2014 N/A 25/08/2014 N/A 01/09/2014 N/A 15/09/2014 22/09/2014
Total Cost
Remarks
Post Post HENKOQ
VENTURES
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
Draft Bid Documents,
including specs and
quantities, draft SPN
PostPost
Increase availability and accessibility of improved genetic
materials
8 3.2.c.1.1 Procurement of Guinea Fowl production
inputs (eggs, feed & drugs/vaccines) for
MOFA/WAAPP/GE/NS/2014/07
2 3.2 MOFA/WAAPP/GE/DC/2014/01 1 DC
CUMMINS
GHANA
1No. 100KVA Genset for PCU procured
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
5 4 Procurement of 14 No. 4WD Double
Cabin Pick ups for WAAPP Implementing
MOFA/WAAPP/GE/NCB/2014/03 2 NCB Post Prior LOT1: JAPAN
MOTORS CO
14 No. 4WD Double Cabin Pick ups for MoFA Agric Stations &
WAAPP Implementing Agencies and 25No. Motorbikes for VSD
4
12 3.3c.11 MOFA/WAAPP/GE/NS/2014/15 3 Shopping Post Post Two (2) breeder seed and two (2) rice varieties produced
13 4.1 MOFA/WAAPP/GE/NS/2014/16 1 Shopping Post Post I-INVERT
SOLUTION
LIMITED
Effective project coordination, management, monitoring &
evaluation system established and operationalised
Gender (Social protection) strategy reviewed
17 1.c.3.1 MOFA/WAAPP/GE/NS/2014/20 1 Shopping Post Post Implementation ECOWAS regulations on veterinary and animal
products
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
23 3.2 Procurement of Office Equipment &
Muiltimedia Devices for MOFA 5 Agric
MOFA/WAAPP/GE/NS/2014/31
21 1.a.1.4 MOFA/WAAPP/GE/NS/2014/29 1 Shopping Post Post CALM BRIDGE
ENTERPRISE
25 3.2 Procurement of Field logistics for MOFA
5 Agric Stations (Kpeve, Asuansi,
MOFA/WAAPP/GE/NS/2014/33 1 Shopping Post Post BUILDTRUST
COMPANY
National regulation for seed, fertilizer and pesticides harmonised
with ECOWAS regulations for implementation
22
National regulation for seed, fertilizer and pesticides harmonised
with ECOWAS regulations for implementation
26 3.2 Procurement of Field Equipment for
MOFA 5 Agric Stations (Kpeve, Asuansi,
MOFA/WAAPP/GE/NS/2014/34 1 Shopping Post Post EASTLIGHT
LIMITED
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
27 1.a.1.4 Procurement of General Laboratory
Equipment for PPSRD
MOFA/WAAPP/GE/NS/2014/36 1 Shopping Post Post HEMINS ENT.
LIMITED
PROCUREMENT-GOODS
11 3.3a.10 MOFA/WAAPP/GE/NS/2014/14 1 Shopping Post Post
Post Post
7 4.1 Procurement of 1No. 100KVA Genset for
PCU
MOFA/WAAPP/GE/NS/2014/06 1 Shopping Post Post
1 Shopping Post Post
2014 GOODS PROCUREMENT -MOFA
9 4.4.2.4 Procurement of ArcGis software
(including installation) for effective
MOFA/WAAPP/GE/NS/2014/09 1 Shopping Post Post
3 3.2 MOFA/WAAPP/GE/NS/2014/01 1 Shopping Post Post
1 3.2 Procurement of 500 Smart Phones with
GPS under e-Agriculture
MOFA/WAAPP/GE/NCB/2014/01 1
Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014 BASIC DATA
Country/Organisation: GHANA/MoFA
Bidding Period Bid Evaluation Contract Finalization Contract Implementation
Post Prior FORUM
NETWORK
LIMITED
NCB
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
6 1.a,1b,3.2 Procurement of Office Supplies,
Equipment and Multi-media Devices for
MOFA/WAAPP/GE/NS/2014/03 Various Shopping G.D MERCY
INVESTMENTS
Office Supplies, Equipment and Multi-media Devices for PCU,
EPA, PPRSD & Extension procured
PRESIDENT 360
LIMITED
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
3.2 MOFA/WAAPP/GE/NS/2014/02 1 Shopping Post Post PRESIDENT 360
LIMITED
ANIBIRDS
FARM ANNEXE
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
ArcGis software (including installation) for effective mapping of
the project/intervention areas procured
10 3.2c.2.3 Procurement of 550 small Ruminants for
90 farmers under APD
MOFA/WAAPP/GE/NS/2014/10 1 Shopping Post Post CALVARY
VETERINARY
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
15 1.b.3.4 MOFA/WAAPP/GE/NS/2014/18 2 Shopping Post Post The mainstreaming and dissemination of the ECOWAS Regulation
on Pesticides
14 1.a.2.2 MOFA/WAAPP/GE/NS/2014/17 1 Shopping Post Post Sector regulations at regional and national level developed for
the generation and dissemination of improved technologies
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
technology development, dissemination and adoption at national
and regional levels increased
16 1.c.1.2 MOFA/WAAPP/GE/NS/2014/19 1 Shopping Post Post Implementation ECOWAS regulations on veterinary and animal
products
19 1.h.1b.1 MOFA/WAAPP/GE/NS/2014/23 1 Shopping Post Post Effective communication strategy at NCOS implemented
18 1.f.1.3 MOFA/WAAPP/GE/NS/2014/21 1 Shopping Post Post
CUMMINS
GHANA
20 3.2.a.1.3 MOFA/WAAPP/GE/NS/2014/27 3 Shopping Post Post GETOPREX-B
VENTURES
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
1 Shopping Post Post CHRISENYO
ENTERPRISE
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
24 3.2 Procurement of Office Furniture &
Fittings for MOFA 5 Agric Stations
MOFA/WAAPP/GE/NS/2014/32 1 Shopping Post Post RAYCAST
CONSTRUCTION
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
3.2 Procurement of 1No. 60KVA Genset for
MOFA Call Centre under e-Agriculture
MOFA/WAAPP/GE/NS/2014/30 1 Shopping Post Post
1 Shopping Post Post WAGTECH
GHANA
National regulation for seed, fertilizer and pesticides harmonised
with ECOWAS regulations for implementation
Total Cost
Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014 BASIC DATA Bidding Period Bid Evaluation Contract Finalization Contract Implementation
28 1.a.1.4 Procurement of Seed Testing Laboratory
Equipment for PPRSD
MOFA/WAAPP/GE/NS/2014/37
Remarks
1 2.0, 3.1 Procurement of Office Equipment &
Supplies for CSIR-HQ, CSIR-FRI & CSIR-
CSIR/WAAPP/GE/NS/2014/01 1 Shopping Post Post Brynest
Solutions
Office Equipment & Supplies for CSIR-HQ, CSIR-FRI & CSIR-CRI
procured
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
2 3.1 Procurement of 1No. 300KVA Genset for
CSIR-H/Q (IPR) and 1No. 100KVA Genset
CSIR/WAAPP/GE/NS/2014/02 2 Shopping Post Post Annointed
Electricals
Shopping1CSIR/WAAPP/GE/S/2015/11213 Support priority Agricultural research programs; Alignment of
national priorities with regional priorities in technology
generation within participating countries National Agricultural
Research Systems (NARS)
Actual 70,000.00$ 23/05/2014 N/A N/A 30/05/2014 30/06/2014 02/07/2014 N/A 02/07/2014 02/07/2014 N/A 14/07/2014
Plan 50,000.00$ 08/09/2014 N/A N/A 15/09/2014 29/09/2014 06/10/2014 N/A 13/10/2014 N/A 20/10/2014 N/A 03/11/2014 16/11/2014Actual 21,000.00$ 02/06/2014 N/A N/A 10/06/2014 30/06/2014 02/07/2014 N/A 02/07/2014 02/07/2014 N/A 14/07/2014
Supply of Biotech Lab Complex Security
Internal -CCTV under CSIR-CRI
Plan 25,000.00$ 10/11/2014 N/A N/A 17/11/2014 01/12/2014 08/12/2014 N/A 15/12/2014 N/A 22/12/2014 N/A 05/01/2015 19/01/2015
Actual
Plan 70,000.00$ 18/08/2014 N/A N/A 25/08/2014 08/09/2014 15/09/2014 N/A 29/09/2014 N/A 06/10/2014 N/A 11/10/2014 24/10/2014Actual 68,352.91$ 19/06/2014 N/A N/A 26/06/2014 18/07/2014 21/07/2014 N/A 29/07/2014 29/07/2014 N/A
Plan 150,000.00$ 20/11/2014 N/A 27/11/2014 27/11/2014 27/12/2014 10/01/2015 N/A 24/01/2015 31/01/2015 07/02/2015 14/02/2015 09/04/2015 23/04/2015Actual
Plan 100,000.00$ 28/11/2014 N/A N/A 05/12/2014 19/12/2014 26/12/2014 N/A 02/01/2015 N/A 09/01/2015 N/A 27/11/2014 04/12/2014Actual
Procurement of Field Equipment for
CSIR-SRI
Plan 80,000.00$ 03/11/2014 N/A N/A 10/11/2014 24/11/2014 01/12/2014 N/A 08/12/2014 N/A 15/12/2014 N/A 29/12/2014 11/01/2015
Actual 95,453.95$ 19/06/2014 N/A N/A 26/06/2014 24/07/2014 25/07/2014 N/A
Plan 661,000.00$ Actual 298,278.66$ 0.00
Item Amount
Goods 661,000.00$ Consultancy -$
Works -$
Non-Consultancy -$
Total 661,000.00$
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
3 3.1.d.4 Procurement of 2No. Automatic
incubators & 2No. 30KVA Electric Gen
CSIR/WAAPP/GE/NS/2014/03 1 Shopping Post Post Annointed
Electricals
Access of stakeholders (producers, processors) to technologies
through the competitive grant established to fund demand-driven
2 3.1 Procurement of 1No. 300KVA Genset for
CSIR-H/Q (IPR) and 1No. 100KVA Genset
CSIR/WAAPP/GE/NS/2014/02 2 Shopping Post Post Annointed
Electricals
4 2 CSIR/WAAPP/GE/NS/2014/04 1 Shopping Post Post Support priority Agricultural research programs; Alignment of
national priorities with regional priorities in technology
generation within participating countries National Agricultural
Research Systems (NARS)
5 3.1 Procurement of Laboratory Equipment
for CSIR-ARI
CSIR/WAAPP/GE/NS/2014/05 1 Shopping Post Post Wagtech Ghana
Ltd
Effective communication strategy at NCOS implemented
6 3.1 Procurement of Laboratory Equipment
for CSIR-CRI
CSIR/WAAPP/GE/NCB/2014/01 1 NCB Post Post Technology for processing 3 intermediate product of cassava
transfer and adopted by 2500 primary out-processors
7 3.1 Procurement of Laboratory Equipment
for CSIR-FRI
CSIR/WAAPP/GE/NS/2014/07 1 Shopping Post Post Technology for processing 3 intermediate product of cassava
transfer and adopted by 2500 primary out-processors
8 2 CSIR/WAAPP/GE/NS/2014/08 1 Shopping Post Post Support priority Agricultural research programs; Alignment of
national priorities with regional priorities in technology
generation within participating countries National Agricultural
Total Cost
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Implementing Agency : MOFA
Plan vs.
Actual
Lot
Number
Lumpsum
or BoQProcurement Method
Estimated Amount in
US$
Pre or Post
Qualificatio
n
Refurbishment of two (2) Offices and
One (1) Conference room for DAES
Plan 60,000.00$
Actual
Plan 200,000.00$
Actual
260,000.00$
2015 WORKS PROCUREMENT -CSIR
Implementing Agency : CSIR
Country/Organisation: GHANA/MoFA
PROCUREMENT -WORKS 2015Country/Organisation: GHANA/MoFA
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Credit Number: 51360-GH Project ID: P129565 Date: 20/01/2015 Basic Data
Total Cost
BoQ Shopping
PostShoppingBoQ22 3.2
Post
Description
1 MOFA/WAAPP/WK/S/2015/01 13.2.A
Basic DataCredit Number: 51360-GH Project ID: P129565 Date: 20/01/2015
MOFA/WAAPP/WK/S/2015/02Rehabilitation of two (2) Semi-
detached houses and one (1)
Warehouse at Wenchi Agricultural
Plan vs.
Actual
Lot
Number
Lumpsum
or BoQProcurement Method
Estimated Amount in
US$
Pre or Post
Qualificatio
n
Plan 60,000.00$
Actual
Plan 10,000.00$
Actual
35,000.00$
Plan 105,000.00$ Actual
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Implementing Agency : MOFA
Plan vs.
Actual
Lot
Number
Lumpsum
or BoQProcurement Method
Estimated Amount in
US$
Pre or Post
Qualificatio
n
Post1
BoQ Post
Construction of six (6) propagation
chambers for NCOS
CSIR/WAAPP/WK/S/2015/01 Shopping1Construction of Guinea Fowl Resource
Centre including Climate Smart
Agriculture at Nyankpala under CSIR-
ARI
Description
3.1.c.1
2014 WORKS PROCUREMENT -MOFA
Country/Organisation: GHANA/MoFA
PROCUREMENT -WORKSCountry/Organisation: GHANA/MoFA
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014 Basic Data
Description
1
Total Cost
PostShoppingBoQ1CSIR/WAAPP/WK/S/2015/03Rehabilitation of Seed Storage Cold
Room of CSIR-CRI at Kwadaso
Agricultural Research Station
2.03
ShoppingBoQCSIR/WAAPP/WK/S/2015/022.02
Plan 40,000.00$ Actual 46,000.00$
Rehabilitation of Staff Quarters and
Veterinary Clinic at Paga Quarantine
Station
Plan 130,000.00$
Actual 164,831.79$
Fencing and provision of watering
points at Paga and Hameli Quarantine
Stations
Plan 115,000.00$
Actual 132,314.84$
Plan 156,000.00$ Actual $ 144,536.61
Rehabilitation of Station Office and
Poultry Unit Office at Kpeve
Agricultural Station
Plan 190,000.00$
Actual 134,014.14$
Plan 142,000.00$ Actual 124,257.91$
Plan $ 143,000.00 Actual 107,987.76$
Plan 172,000.00$
Actual $ 161,922.38
Plan 120,000.00$ Actual 110,535.00$
Plan 172,000.00$ Actual 140,873.55$
Plan 120,000.00$
Actual 80,263.43$
Rehabilitation of Guesthouse, Diesel
House, Fruit House and General
Electrical works at Wenchi Agricultural
Station
Plan 106,000.00$
Actual 97,562.96$
Rehabilitation of Station Manager’s
Bungalow and Caretaker’s Bungalow
at Babile Agricultural Station
Plan 135,000.00$
Actual 110,964.70$
Component 3: Generation and Adoption of Demand-Driven Adaptive Research
10 3.2 Rehabilitation of two (2) Semi-
detached houses and one (1)
3 1.c.1.4 MOFA/WAAPP/WK/NS/2014/03 1 BoQ Shopping Post
2 1.c.1.4 MOFA/WAAPP/WK/NS/2014/02 1 BoQ Shopping Post
5 3.2 MOFA/WAAPP/WK/NS/2014/07 1 BoQ Shopping Post
MOFA/WAAPP/WK/NS/2014/06 1 BoQ Shopping Post4 3.2 Rehabilitation of one (1) Deputy
Station Master Bungalow and two (2)
7 3.2 Rehabilitation of Laboratory, Feedmills
and Borehole at Kpeve Agricultural
MOFA/WAAPP/WK/NS/2014/09 1 BoQ Shopping Post
6 3.2 Rehabilitation of Guest house,
Warehouse and Deep Litter House at
MOFA/WAAPP/WK/NS/2014/08 1 BoQ Shopping Post
9 3.2 Rehabilitation of Station Office,
Laboratory and Overhead Water Tank
MOFA/WAAPP/WK/NS/2014/11 1 BoQ Shopping Post
8 3.2 Construction of Fencewall and
Rehabilitation of Station Master’s
MOFA/WAAPP/WK/NS/2014/10 1 BoQ Shopping Post
11 3.2 Rehabilitation of three (3) Artisan
Quarters at Wenchi Agricultural
MOFA/WAAPP/WK/NS/2014/13 1 BoQ Shopping Post
PostMOFA/WAAPP/WK/NS/2014/12 1 BoQ Shopping
13 3.2 MOFA/WAAPP/WK/NS/2014/15 1 BoQ Shopping Post
12 3.2 MOFA/WAAPP/WK/NS/2014/14 1 BoQ Shopping Post
Component 1: Enabling condition for Regional Cooperation in the Generation, Dissemination and Adoption of Agricultural Technologies
1 1.f.5.3 Rehabilitation of Food Laboratory for
WIAD
MOFA/WAAPP/WK/NS/2014/01 1 BoQ Shopping Post
Rehabilitation of Guesthouse and
Stores at Babile Agricultural Station
Plan 165,000.00$
Actual 164,906.71$
External Works at Babile Agricultural
Station
Plan 175,000.00$
Actual 160,721.95$
Rehabilitation of Office Block at Babile
Agricultural Station
Plan 95,000.00$
Actual 75,667.71$
Plan 90,000.00$ Actual 95,689.04$
Plan 90,000.00$ Actual 103,323.80$
Plan 90,000.00$ Actual 94,873.36$
Plan 90,000.00$ Actual 95,732.78$
Drill six (6) Boreholes in three (3) Agric
Stations
Plan 50,000.00$
Actual 52,600.00$
Plan 2,586,000.00$ Actual 2,399,580.42$
Implementing Agency : CSIR
Plan vs.
Actual
Lot
Number
Lumpsum
or BoQProcurement Method
Estimated Amount in
US$
Pre or Post
Qualificatio
n
Total Cost
20 3.2 Rehabilitation of Two (2) No.
Bungalows (KNT276 & KNT277) at
MOFA/WAAPP/WK/NS/2014/22
18 3.2 Rehabilitation of Two (2) Bedroom
Semi-detached Bungalows at Kpeve
MOFA/WAAPP/WK/NS/2014/20
16 3.2 MOFA/WAAPP/WK/NS/2014/18
14 3.2 MOFA/WAAPP/WK/NS/2014/16 BoQ Shopping Post
15 3.2 MOFA/WAAPP/WK/NS/2014/17 1 BoQ Shopping Post
1
BoQ Shopping Post
17 3.2 Rehabilitation of Two (2) Bedroom
Semi-detached Bungalows (KNT277) at
MOFA/WAAPP/WK/NS/2014/19 1 BoQ Shopping Post
BoQ Shopping Post
19 3.2 Rehabilitation of Two (2) Bedroom
Semi-detached Bungalows (KNT276) at
MOFA/WAAPP/WK/NS/2014/21 1 BoQ Shopping Post
1 BoQ Shopping Post
21 3.2b.2.6 MOFA/WAAPP/WK/NS/2014/23 3 BoQ Shopping Post
Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014 Basic Data
Description
Component 2: Capacity of Centre of Specialisation
1
1
Plan 170,000.00$ Actual 196,119.33$
Plan 170,000.00$ Actual 196,119.33$
Total Cost
1 3.2 Rehablitation of Seed Lab,
Entomology Unit Block, Washroom for
CSIR/WAAPP/WK/NS/2014/06 1 BoQ Shopping Post
Spec Proc
Notice
Advert
Prior or
Post
Review
Preparation
&
Submission
No-
objection
Date
On-line
UNDB
Gateway
National
Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication of
Award
Name of Contract
Winner
Date
Contract
Signature
Mobilization
Advance
Payment
Substantial
Completion
20/01/2015 N/A N/A 27/01/2015 03/02/2015 17/02/2015 N/A 24/02/2015 N/A 10/03/2015 24/03/2015 22/06/2015
24/02/2015 N/A N/A 03/03/2015 10/03/2015 24/03/2015 N/A 31/03/2015 N/A 14/04/2015 28/04/2015 26/08/2015
Spec Proc
Notice
Advert
Draft Bid Documents,
including specs and
quantities, draft SPNBasic Data Contract Finalization
Post
Contract ImplementationBidding Period
Post
Bid Evaluation
Bidding Period Bid Evaluation
Draft Bid Documents,
including specs and
quantities, draft SPN Contract ImplementationContract FinalizationBasic Data
Prior or
Post
Review
Preparation
&
Submission
No-
objection
Date
On-line
UNDB
Gateway
National
Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication of
Award
Name of Contract
Winner
Date
Contract
Signature
Mobilization
Advance
Payment
Substantial
Completion
01/04/2015 N/A N/A 08/04/2015 22/04/2015 06/05/2015 N/A 13/05/2015 N/A 27/05/2015 10/06/2015 08/09/2015
11/05/2015 N/A N/A 18/05/2015 01/06/2015 15/06/2015 N/A 22/06/2015 N/A 06/07/2015 20/07/2015 18/10/2015
11/05/2015 N/A N/A 18/05/2015 01/06/2015 15/06/2015 N/A 22/06/2015 N/A 06/07/2015 20/07/2015 18/10/2015
Spec Proc
Notice
Advert
Prior or
Post
Review
Preparation
&
Submission
No-
objection
Date
On-line
UNDB
Gateway
National
Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication of
Award
Name of Contract
Winner
Date
Contract
Signature
Mobilization
Advance
Payment
Substantial
Completion
Post
Post
Draft Bid Documents,
including specs and
quantities, draft SPNBasic Data Bidding Period Bid Evaluation Contract Finalization Contract Implementation
Post
15/09/2014 N/A N/A 22/09/2014 13/10/2014 27/10/2014 N/A 03/11/2014 N/A 17/11/2014 24/11/2014 15/02/201518/06/2014 N/A N/A 18/06/2014 02/07/2014 09/07/2014 N/A 16/07/2014 N/A 25/07/2014
15/08/2014 N/A N/A 22/08/2014 12/09/2014 26/09/2014 N/A 03/10/2014 N/A 17/10/2014 24/10/2014 22/01/2015
23/06/2014 N/A N/A 30/06/2014 14/07/2014 N/A 21/07/2014 N/A
15/08/2014 N/A N/A 22/08/2014 12/09/2014 26/09/2014 N/A 03/10/2014 N/A 17/10/2014 24/10/2014 22/01/2015
23/06/2014 N/A N/A 30/06/2014 14/07/2014 29/07/2014 N/A 14/08/2014 N/A
14/02/2014 N/A N/A 21/02/2014 07/03/2014 21/03/2014 N/A 11/04/2014 N/A 25/04/2014 09/05/2014 08/08/201407/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
14/02/2014 N/A N/A 21/02/2014 07/03/2014 21/03/2014 N/A 11/04/2014 N/A 25/04/2014 09/05/2014 08/08/2014
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
14/02/2014 N/A N/A 21/02/2014 07/03/2014 21/03/2014 N/A 11/04/2014 N/A 25/04/2014 09/05/2014 08/08/201407/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
14/02/2014 N/A N/A 21/02/2014 07/03/2014 21/03/2014 N/A 11/04/2014 N/A 25/04/2014 09/05/2014 08/08/201407/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
10/04/2014 N/A N/A 17/04/2014 08/05/2014 22/05/2014 N/A 05/06/2014 N/A 03/07/2014 17/07/2014 17/10/2014
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
10/04/2014 N/A N/A 17/04/2014 08/05/2014 22/05/2014 N/A 05/06/2014 N/A 03/07/2014 17/07/2014 17/10/201407/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
10/04/2014 N/A N/A 17/04/2014 08/05/2014 22/05/2014 N/A 05/06/2014 N/A 03/07/2014 17/07/2014 17/10/201407/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
04/07/2014 N/A N/A 11/07/2014 01/08/2014 15/08/2014 N/A 29/08/2014 N/A 29/09/2014 13/10/2014 13/01/2015
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
04/07/2014 N/A N/A 11/07/2014 01/08/2014 15/08/2014 N/A 29/08/2014 N/A 29/09/2014 13/10/2014 13/01/2015
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
04/07/2014 N/A N/A 11/07/2014 01/08/2014 15/08/2014 N/A 29/08/2014 N/A 29/09/2014 13/10/2014 13/01/2015
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
Component 3: Generation and Adoption of Demand-Driven Adaptive Research
Post REQUARTCO
CONSTRUCTION
WORKS
Post RAMAN SIDI
ENTEPRISE
Post GASPEE ENT.
LIMITED
Post BEN TOTA COMPANY
LIMITED
Post HENKOQ VENTURES
LTD
Post KINGJOJO CO. LTD
Post IRE- KAGFY
COMPANY LTD
Post CITY PLUS LIMITED
Post HANDOSKY
INTERNATIONAL LTD
Post OBAAKWAA
ENTERPRISE LTD
Post BRICKS & MINT
LIMITED
Post K. AGYEMANG
COMPANY LTD
Component 1: Enabling condition for Regional Cooperation in the Generation, Dissemination and Adoption of Agricultural Technologies
Post QUENZO ENGINEERS
& CONTRACTOR
04/07/2014 N/A N/A 11/07/2014 01/08/2014 15/08/2014 N/A 29/08/2014 N/A 29/09/2014 13/10/2014 13/01/2015
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
04/07/2014 N/A N/A 11/07/2014 01/08/2014 15/08/2014 N/A 29/08/2014 N/A 29/09/2014 13/10/2014 13/01/2015
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
04/07/2014 N/A N/A 11/07/2014 01/08/2014 15/08/2014 N/A 29/08/2014 N/A 29/09/2014 13/10/2014 13/01/2015
07/03/2014 N/A N/A 14/03/2014 28/03/2014 09/03/2014 N/A N/A
10/05/2014 N/A N/A 16/05/2014 06/06/2014 20/06/2014 N/A 14/07/2014 N/A 04/08/2014 18/08/2014 17/11/201407/03/2014 N/A N/A 04/04/2014 17/04/2014 30/04/2014 N/A
10/05/2014 N/A N/A 16/05/2014 06/06/2014 20/06/2014 N/A 14/07/2014 N/A 04/08/2014 18/08/2014 17/11/201407/03/2014 N/A N/A 04/04/2014 17/04/2014 30/04/2014 N/A N/A
10/05/2014 N/A N/A 16/05/2014 06/06/2014 20/06/2014 N/A 14/07/2014 N/A 04/08/2014 18/08/2014 17/11/201407/03/2014 N/A N/A 04/04/2014 17/04/2014 30/04/2014 N/A N/A
10/05/2014 N/A N/A 16/05/2014 06/06/2014 20/06/2014 N/A 14/07/2014 N/A 04/08/2014 18/08/2014 17/11/201407/03/2014 N/A N/A 04/04/2014 17/04/2014 30/04/2014 N/A N/A 22/05/2014
10/02/2014 N/A N/A 17/02/2014 07/03/2014 21/03/2014 N/A 14/04/2014 N/A 05/05/2014 19/05/2014 18/08/2014
28/04/2014 N/A N/A 02/05/2014 09/05/2014 12/05/2014 N/A 12/05/2014 N/A 23,05/2014
Spec Proc
Notice
Advert
Prior or
Post
Review
Preparation
&
Submission
No-
objection
Date
On-line
UNDB
Gateway
National
Press
Bid
Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-
objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication of
Award
Name of Contract
Winner
Date
Contract
Signature
Mobilization
Advance
Payment
Substantial
Completion
Post RAMABUS
ENTERPRISE LIMITED
Post G.D MERCY
INVESTMENTS
LIMITED
Post ABUBAKARI
MAHAMA CO
LIMITED
Post WOKAS ENTERPRISE
Post SULTAN PRINTING
AND CONTRUCTION
Post AZALEN COMPANY
LIMITED
Post YABI
CONSTRUCTION
Post DUFAAES LTD
Draft Bid Documents,
including specs and
quantities, draft SPNBasic Data Bidding Period Bid Evaluation Contract Finalization Contract Implementation
Component 2: Capacity of Centre of Specialisation
14/11/2014 N/A N/A 21/11/2014 12/12/2014 26/12/2014 N/A 02/01/2015 N/A 16/01/2015 23/01/2015 16/04/201523/10/2014 N/A N/A 30/10/2014 13/11/2014 N/A 21/11/2014 N/A 26/11/2014
Messrs. Pozie
Enterprise
Post
Final
Acceptance
Final
CostResults Remarks
22/07/2015
22/02/2016
Contract Implementation
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
Contract Implementation
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
Final
Acceptance
Final
CostResults Remarks
07/11/2015
17/11/2015
17/11/2015
Final
Acceptance
Final
CostResults Remarks
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
Contract Implementation
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
16/05/2015
22/04/2015
22/04/2015
07/11/2014
07/11/2014
07/11/2014
07/11/2014
16/01/2015
16/01/2015
16/01/2015
13/04/2015
13/04/2015
13/04/2015
Component 3: Generation and Adoption of Demand-Driven Adaptive Research
Implementation ECOWAS regulations on veterinary and
animal products
Implementation ECOWAS regulations on veterinary and
animal products
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
Component 1: Enabling condition for Regional Cooperation in the Generation, Dissemination and Adoption of Agricultural Technologies
Gender (Social protection) strategy reviewed
13/04/2015
13/04/2015
13/04/2015
20/05/2015
20/05/2015
20/05/2015
20/05/2015
19/02/2015
Final
Acceptance
Final
CostResults Remarks
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
and adoption at national and regional levels increased
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
Access of stakeholders (producers, processors) to
technologies through the competitive grant established to
fund demand-driven technology development, dissemination
Contract Implementation
Component 2: Capacity of Centre of Specialisation
15/07/2015 Support priority Agricultural research programs; Alignment
of national priorities with regional priorities in technology
Programme: West Africa Agricultural Productivity Programme (WAAPP-2A)
Implementing Agency : MOFA
Spec. Proc
Notice
Advert
Package
Number
Plan vs.
Actual
Lot
Number
Estimated Amount in
US$
Procureme
nt Method
Pre-or
Post
Qualifica
tion
Prior or
Post
Review
Preparation
& Submission
No-
objection
Date
On-line
UNDB/
Gateway/
National
Press
Bid Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication
of Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of
Letter of
Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Results
Plan 300,000.00$ 10/09/2014 N/A 17/09/2014 17/09/2014 18/10/2014 01/11/2014 N/A 15/11/2014 29/11/2014 06/12/2014 20/01/2015 03/02/2015
Actual 29/08/2014 N/A 05/09/2014 05/09/2014
Plan 75,000.00$ 05/05/2015 N/A N/A 12/05/2015 26/05/2015 02/06/2015 N/A 16/06/2015 N/A 23/06/2015 N/A 22/08/2015 05/09/2015Actual
Plan 1,000,000.00$ 10/02/2015 24/02/2015 03/03/2015 10/03/2015 07/04/2015 21/04/2015 N/A 05/05/2015 12/05/2015 19/05/2015 N/A 16/11/2015 16/12/2015
Actual
Plan 100,000.00$ 02/07/2015 N/A N/A 09/07/2015 23/07/2015 30/07/2015 N/A 13/08/2015 N/A 20/08/2015 N/A 19/10/2015 02/11/2015
Actual
Plan 1,475,000.00$ Actual
NON-CONSULTANCY -CSIR 2014
Implementing Agency : CSIR
Spec. Proc
Notice
Advert
Package
Number
Plan vs.
Actual
Lot
Number
Estimated Amount in
US$
Procureme
nt Method
Pre-or
Post
Qualifica
tion
Prior or
Post
Review
Preparation
& Submission
No-
objection
Date
On-line
UNDB/
Gateway/
National
Press
Bid Invitation
Date
Bid Closing/
Opening
Submission
Bid
Evaluation
Report
No-objection
Date
Contract
Amount in
US$
Date
Contract
Award
Publication
of Award
Date
Contract
Signature
Name of
Contract
Winner
Opening of
Letter of
Credit
Arrival
of
Goods
Inspection
Final
Acceptance
Results
Component 2: Capacity of Centre of SpecialisationPlan 300,000.00$ 10/09/2014 N/A 17/09/2014 17/09/2014 18/10/2014 01/11/2014 N/A 15/11/2014 29/11/2014 06/12/2014 20/01/2015 03/02/2015
Actual 29/08/2014 N/A 05/09/2014 05/09/2014
Plan 300,000.00$ Actual
Access of stakeholders (producers, processors)
to technologies through the competitive grant
established to fund demand-driven technology
development, dissemination and adoption at
Access of stakeholders (producers, processors)
to technologies through the competitive grant
established to fund demand-driven technology
Contract Finalization Contract Implementation
Remarks
Access of stakeholders (producers, processors)
to technologies through the competitive grant
established to fund demand-driven technology
development, dissemination and adoption at
national and regional levels increased
Bid Evaluation
Description
Bidding Period
Country/Organisation: GHANA/MoFA
PROCUREMENT-NON-CONSULTANCY SERVICES 2015
Draft Bid Documents,
including specs and
quantities, draft SPN
Credit Number: 51360-GH Project ID: P129565 Date: 20/01/2015
BASIC DATA
3 4 MOFA/WAAPP/NC/NCB/2015/01 1 NCB
3.2.A.8 Post Post2 Produce and telecast 5 episodes of
Video documentaries for selected
topics on R &T technologies for
male and female farmers( Yam,
Cocoyam, Sweet Potato and
Maize)
MOFA/WAAPP/NC/S/2015/01 1 Shopping
PriorConstruct, Install, operate and
manage of 150 ventilated green
houses equipment under WAAPP
Shopping Post Post
Post
Credit Number: 51360-GH Project ID: P129565 Date: 29/01/2014Draft Bid Documents,
including specs and
quantities, draft SPNBASIC DATA Bidding Period
4 1.a.3.1 Install, operate and manage 10
Envirodomes with gravity loop
drip system at 6 GIDA sites
MOFA/WAAPP/NC/S/2015/02 1
Total Cost
Bid Evaluation Contract Finalization Contract Implementation
Remarks
Description
NCB Post Post Support priority Agricultural research programs;
Alignment of national priorities with regional
Total Cost
1 2 Wireless installation at Biotech
Laboratory under CSIR-CRI
CSIR/WAAPP/NC/NCB/2014/01 1
2 Wireless installation at Biotech
Laboratory under CSIR-CRI
1 Support priority Agricultural research programs;
Alignment of national priorities with regional
priorities in technology generation within
PostPostNCB1CSIR/WAAPP/NC/NCB/2014/01