Total Area: 3162 sft Project Cost in Rs.: 4069474.238
Project Cost Rs. Per SFT: 1287
Item Quantity Unit Rate Total Amount
Bazri 69.564 CUM 1400 97389.6
Binding Wire 63.24 Kg 70 4426.8
Bitumen 107.508 Kg 60 6450.48
Brick Blast 28.458 CUM 600 17074.8
Brick Tiles 12648 NOS 7 88536
Bricks 61342.8 NOS 6 368056.8
Cement 1103.8384 Bags 320 353227.02
Cement for Base Coarse 53.754 Bags 320 17201.28
Cement Paint 474.3 SqM 35 16600.5
CI Pipe 47.43 Meter 500 23715
Coarse Sand 37.944 CUM 1300 49327.2
Commercial Hardwood 1422.9 RFT 201 286002.9
Earth 28.458 CUM 220 6260.76
Fine Sand 44.268 CUM 975 43161.3
Glaze Tile 467.976 SqM 800 374380.8
Hard Wood Shutter 47.43 NOS 4380 207743.4
Hardwood and Commercial Plyboard 12.648 NOS 4590 58054.32
Hardwood Window Shutter 94.86 NOS 1030 97705.8
Iron Grills 790.5 Kg 70 55335
Labour for Brick Sup. Str 47430
Labour for Brick Tiles 34782
Labour for Brick Work Foundation 15810
Labour for Ceiling Plaster 12648
Labour for Cement Concrete 22134
Labour for Ceramic Glaze Tile 41106
Labour for DPC 1581
Labour for Earth Excavation & Earth Filling 63240
Labour for pipe including cost of Joints 7905
Labour for Pointing 37944
Labour for RCC 34782
Labour for Steel RCC 18972
Labour for Wall Plaster 50592
MS Steel 6324 Kg 50 316200
Oil Bound Distemper with Labour 1328.04 SqM 62 82338.48
Paint Work with Labour 632.4 SqM 60 37944
Sand 98.022 CUM 975 95571.45
Shuttering 4743 SFT 20 94860
Stone Blast 63.24 CUM 1050 66402
White Cement 3.162 Bags 850 2687.7Sub Total: 3255579.39
Construction Cost Estimate. A high level rough estimate.
A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of
various cost involved in a construction project.
Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to support@gharexpert.com)
Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design.
Item Quantity Unit Rate Total Amount
Cement 148.614 Bags 320 47556.48
Stone Blast 63.24 CUM 1050 66402
Sand 31.62 CUM 975 30829.5
Labour for Cement Concrete 22134Total for Cement Concrete 1:6:12 166921.98
Labour for Brick Work Foundation 15810
Sand 9.486 CUM 975 9248.85
Cement 44.268 Bags 320 14165.76
Bricks 15810 NOS 6 94860Total for Brick Work in Foundation with Cement Mortar 1:6 134084.61
Labour for DPC 1581
Bitumen 53.754 Kg 60 3225.24
Cement 7.905 Bags 320 2529.6
Coarse Sand 6.324 CUM 1300 8221.2
Bazri 12.648 CUM 1400 17707.2
Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM) 33264.24
Labour for Earth Excavation & Earth Filling 63240Total for Earth Work in Excavation in Foundation and Filling
under Floors 63240
Labour for RCC 34782
Shuttering 4743 SFT 20 94860
Bazri 56.916 CUM 1400 79682.4
Coarse Sand 28.458 CUM 1300 36995.4
Cement 509.082 Bags 320 162906.24Total for RCC without Steel Cement Concrete 1:1.5:3 409226.04
Labour for Steel RCC 18972
MS Steel 6324 Kg 50 316200
Binding Wire 63.24 Kg 70 4426.8Total for MS Steel For RCC 339598.8
Labour for Brick Sup. Str 47430
Cement 113.832 Bags 320 36426.24
Sand 25.296 CUM 975 24663.6
Bricks 45532.8 NOS 6 273196.8Total for Brick Work in Super Structure Cement Mortar 1:6 381716.64
Earth 28.458 CUM 220 6260.76
Sand 3.162 CUM 975 3082.95
Cement 28.458 Bags 320 9106.56
Labour for Brick Tiles 34782
Brick Tiles 12648 NOS 7 88536
Bitumen 53.754 Kg 60 3225.24Total for Brick Tile Tracing on Roof 144993.51
CI Pipe 47.43 Meter 500 23715
Labour for pipe including cost of Joints 7905Total for Rain Water Pipe 31620
Glaze Tile 309.876 SqM 800 247900.8
Cement 58.7974 Bags 320 18813.9
White Cement 3.162 Bags 850 2687.7
Cement for Base Coarse 53.754 Bags 320 17201.28
Fine Sand 44.268 CUM 975 43161.3
Brick Blast 28.458 CUM 600 17074.8
Coarse Sand 3.162 CUM 1300 4110.6
Labour for Ceramic Glaze Tile 41106Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality
with course 392056.38
Brick Work in Super Structure Cement Mortar 1:6
Brick Tile Tracing on Roof
Rain Water Pipe
Flooring
Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course
Brick Work in Foundation with Cement Mortar 1:6
Horizontal DPC with Cement Concrete 1:2:4( 40MM)
Earth Work in Excavation in Foundation and Filling under Floors
Super Structure
RCC without Steel Cement Concrete 1:1.5:3
MS Steel For RCC
Foundation
Cement Concrete 1:6:12
Sand 6.324 CUM 975 6165.9
Cement 34.782 Bags 320 11130.24
Labour for Ceiling Plaster 12648Total for Plaster on Ceiling (Roof) Cement Mortar 1:4 29944.14
Labour for Wall Plaster 50592
Cement 126.48 Bags 320 40473.6
Sand 18.972 CUM 975 18497.7Total for Plaster on Walls Cement Mortar 1:4 109563.3
Sand 3.162 CUM 975 3082.95
Labour for Pointing 37944
Cement 31.62 Bags 320 10118.4Total for Cement Pointing Cement Mortar 1:2 51145.35
Glaze Tile 158.1 SqM 800 126480Total for Glazed Tiles in Dado or Skirting in Bathroom snd
Kitchen Walls 126480
Hard Wood Shutter 47.43 NOS 4380 207743.4Total for Hardwood Door 207743.4
Commercial Hardwood 1422.9 RFT 201 286002.9Total for Hardwood Frame Including Labour 286002.9
Hardwood Window Shutter 94.86 NOS 1030 97705.8Total for Hardwood Window 97705.8
Hardwood and Commercial Plyboard 12.648 NOS 4590 58054.32
Total for Hard Wood Frame and Commercial Plyboard Shutter 58054.32
Iron Grills 790.5 Kg 70 55335Total for Iron Grilling with Labour 55335
Paint Work with Labour 632.4 SqM 60 37944Total for Paint on Wooden Doors and Windows 37944
Oil Bound Distemper with Labour 1328.04 SqM 62 82338.48Total for Oil Bound Distemper with Filling on Walls 82338.48
Cement Paint 474.3 SqM 35 16600.5Total for Exterior Finish Cement Paint Snowcem 16600.5
Sub Total: 3255579.39
325557.939
325557.939
162778.9695
4069474.238
Oil Bound Distemper with Filling on Walls
Exterior Finish Cement Paint Snowcem
Add 10% for Electric fitting wiring & Labor:
Add 10% for Water Supply fitting & Sanitary:
Add 5% for Sewerage:
Grand Total:
Hardwood Frame Including Labour
Hardwood Window
Hard Wood Frame and Commercial Plyboard Shutter
Iron Grilling with Labour
Paint
Paint on Wooden Doors and Windows
Plaster on Ceiling (Roof) Cement Mortar 1:4
Plaster on Walls Cement Mortar 1:4
Cement Pointing Cement Mortar 1:2
Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls
Door,Window,Cupboard shutter,Iron Grills
Hardwood Door
Plastering/Wall tiles
See Elevation/Interior Designs
Project Labor Cost in Rs.: 486157.5
Project Labor Rs. Cost Per SFT: 154
Knowledgebase Links Vendor 1 Price Quoted by Vendor 1 Vendor 2 Price Quoted by Vendor 2
Guidelines for Bazri
Guidelines for Binding Wire
Guidelines for Bitumen
Guidelines for Brick Blast
Guidelines for Brick Tiles
Guidelines for Bricks
Guidelines for Cement
Guidelines for Cement for Base Coarse
Guidelines for Cement Paint
Guidelines for CI Pipe
Guidelines for Coarse Sand
Guidelines for Commercial Hardwood
Guidelines for Earth
Guidelines for Fine Sand
Guidelines for Glaze Tile
Guidelines for Hard Wood Shutter
Guidelines for Hardwood and Commercial
Plyboard
Guidelines for Hardwood Window Shutter
Guidelines for Iron Grills
Guidelines for Labour for Brick Sup. Str
Guidelines for Labour for Brick Tiles
Guidelines for Labour for Brick Work
Foundation
Guidelines for Labour for Ceiling Plaster
Guidelines for Labour for Cement Concrete
Guidelines for Labour for Ceramic Glaze Tile
Guidelines for Labour for DPC
Guidelines for Labour for Earth Excavation &
Earth Filling
Guidelines for Labour for pipe including cost
of Joints
Guidelines for Labour for Pointing
Guidelines for Labour for RCC
Guidelines for Labour for Steel RCC
Guidelines for Labour for Wall Plaster
Guidelines for MS Steel
Guidelines for Oil Bound Distemper with
Labour
Guidelines for Paint Work with Labour
Guidelines for Sand
Guidelines for Shuttering
Guidelines for Stone Blast
Guidelines for White Cement
Construction Cost Estimate. A high level rough estimate.
A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of
various cost involved in a construction project.
Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to support@gharexpert.com)
Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design.
Guidelines for Foundation
Guidelines for Cement Concrete 1:6:12
Guidelines for Brick Work in Foundation with
Cement Mortar 1:6
Guidelines for Horizontal DPC with Cement
Concrete 1:2:4( 40MM)
Guidelines for Earth Work in Excavation in
Foundation and Filling under Floors
Guidelines for Super Structure
Guidelines for RCC without Steel Cement
Concrete 1:1.5:3
Guidelines for MS Steel For RCC
Guidelines for Brick Work in Super Structure
Cement Mortar 1:6
Guidelines for Brick Tile Tracing on Roof
Guidelines for Rain Water Pipe
Guidelines for Flooring
Guidelines for Ceramic Glaze Tiles Flooring
300X300 MM First Quality with course
Guidelines for Plastering/Wall tiles
Guidelines for Plaster on Ceiling (Roof)
Cement Mortar 1:4
Guidelines for Plaster on Walls Cement
Mortar 1:4
Guidelines for Cement Pointing Cement
Mortar 1:2
Guidelines for Glazed Tiles in Dado or
Skirting in Bathroom snd Kitchen Walls
Guidelines for Door,Window,Cupboard
shutter,Iron Grills
Guidelines for Hardwood Door
Guidelines for Hardwood Frame Including
Labour
Guidelines for Hardwood Window
Guidelines for Hard Wood Frame and
Commercial Plyboard Shutter
Guidelines for Iron Grilling with Labour
Guidelines for Paint
Guidelines for Paint on Wooden Doors and
Windows
Guidelines for Oil Bound Distemper with
Filling on Walls
Guidelines for Exterior Finish Cement Paint
Snowcem
Recommended