Ask question from Experts Total Area: 3162 sft Project Cost in Rs.: 4069474.238 Project Cost Rs. Per SFT: 1287 Item Quantity Unit Rate Total Amount Bazri 69.564 CUM 1400 97389.6 Binding Wire 63.24 Kg 70 4426.8 Bitumen 107.508 Kg 60 6450.48 Brick Blast 28.458 CUM 600 17074.8 Brick Tiles 12648 NOS 7 88536 Bricks 61342.8 NOS 6 368056.8 Cement 1103.8384 Bags 320 353227.02 Cement for Base Coarse 53.754 Bags 320 17201.28 Cement Paint 474.3 SqM 35 16600.5 CI Pipe 47.43 Meter 500 23715 Coarse Sand 37.944 CUM 1300 49327.2 Commercial Hardwood 1422.9 RFT 201 286002.9 Earth 28.458 CUM 220 6260.76 Fine Sand 44.268 CUM 975 43161.3 Glaze Tile 467.976 SqM 800 374380.8 Hard Wood Shutter 47.43 NOS 4380 207743.4 Hardwood and Commercial Plyboard 12.648 NOS 4590 58054.32 Hardwood Window Shutter 94.86 NOS 1030 97705.8 Iron Grills 790.5 Kg 70 55335 Labour for Brick Sup. Str 47430 Labour for Brick Tiles 34782 Labour for Brick Work Foundation 15810 Labour for Ceiling Plaster 12648 Labour for Cement Concrete 22134 Labour for Ceramic Glaze Tile 41106 Labour for DPC 1581 Labour for Earth Excavation & Earth Filling 63240 Labour for pipe including cost of Joints 7905 Labour for Pointing 37944 Labour for RCC 34782 Labour for Steel RCC 18972 Labour for Wall Plaster 50592 MS Steel 6324 Kg 50 316200 Oil Bound Distemper with Labour 1328.04 SqM 62 82338.48 Paint Work with Labour 632.4 SqM 60 37944 Sand 98.022 CUM 975 95571.45 Shuttering 4743 SFT 20 94860 Stone Blast 63.24 CUM 1050 66402 White Cement 3.162 Bags 850 2687.7 Sub Total: 3255579.39 Construction Cost Estimate. A A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimension various cost involved in a construction project. Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrive Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the

Cost Estimate Ghar

Embed Size (px)

Citation preview

Page 1: Cost Estimate Ghar

Ask question from Experts

Total Area: 3162 sft Project Cost in Rs.: 4069474.238

Project Cost Rs. Per SFT: 1287

Item Quantity Unit Rate Total Amount

Bazri 69.564 CUM 1400 97389.6

Binding Wire 63.24 Kg 70 4426.8

Bitumen 107.508 Kg 60 6450.48

Brick Blast 28.458 CUM 600 17074.8

Brick Tiles 12648 NOS 7 88536

Bricks 61342.8 NOS 6 368056.8

Cement 1103.8384 Bags 320 353227.02

Cement for Base Coarse 53.754 Bags 320 17201.28

Cement Paint 474.3 SqM 35 16600.5

CI Pipe 47.43 Meter 500 23715

Coarse Sand 37.944 CUM 1300 49327.2

Commercial Hardwood 1422.9 RFT 201 286002.9

Earth 28.458 CUM 220 6260.76

Fine Sand 44.268 CUM 975 43161.3

Glaze Tile 467.976 SqM 800 374380.8

Hard Wood Shutter 47.43 NOS 4380 207743.4

Hardwood and Commercial Plyboard 12.648 NOS 4590 58054.32

Hardwood Window Shutter 94.86 NOS 1030 97705.8

Iron Grills 790.5 Kg 70 55335

Labour for Brick Sup. Str 47430

Labour for Brick Tiles 34782

Labour for Brick Work Foundation 15810

Labour for Ceiling Plaster 12648

Labour for Cement Concrete 22134

Labour for Ceramic Glaze Tile 41106

Labour for DPC 1581

Labour for Earth Excavation & Earth Filling 63240

Labour for pipe including cost of Joints 7905

Labour for Pointing 37944

Labour for RCC 34782

Labour for Steel RCC 18972

Labour for Wall Plaster 50592

MS Steel 6324 Kg 50 316200

Oil Bound Distemper with Labour 1328.04 SqM 62 82338.48

Paint Work with Labour 632.4 SqM 60 37944

Sand 98.022 CUM 975 95571.45

Shuttering 4743 SFT 20 94860

Stone Blast 63.24 CUM 1050 66402

White Cement 3.162 Bags 850 2687.7Sub Total: 3255579.39

Construction Cost Estimate. A high level rough estimate.

A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of

various cost involved in a construction project.

Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to [email protected])

Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design.

Page 2: Cost Estimate Ghar

Item Quantity Unit Rate Total Amount

Cement 148.614 Bags 320 47556.48

Stone Blast 63.24 CUM 1050 66402

Sand 31.62 CUM 975 30829.5

Labour for Cement Concrete 22134Total for Cement Concrete 1:6:12 166921.98

Labour for Brick Work Foundation 15810

Sand 9.486 CUM 975 9248.85

Cement 44.268 Bags 320 14165.76

Bricks 15810 NOS 6 94860Total for Brick Work in Foundation with Cement Mortar 1:6 134084.61

Labour for DPC 1581

Bitumen 53.754 Kg 60 3225.24

Cement 7.905 Bags 320 2529.6

Coarse Sand 6.324 CUM 1300 8221.2

Bazri 12.648 CUM 1400 17707.2

Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM) 33264.24

Labour for Earth Excavation & Earth Filling 63240Total for Earth Work in Excavation in Foundation and Filling

under Floors 63240

Labour for RCC 34782

Shuttering 4743 SFT 20 94860

Bazri 56.916 CUM 1400 79682.4

Coarse Sand 28.458 CUM 1300 36995.4

Cement 509.082 Bags 320 162906.24Total for RCC without Steel Cement Concrete 1:1.5:3 409226.04

Labour for Steel RCC 18972

MS Steel 6324 Kg 50 316200

Binding Wire 63.24 Kg 70 4426.8Total for MS Steel For RCC 339598.8

Labour for Brick Sup. Str 47430

Cement 113.832 Bags 320 36426.24

Sand 25.296 CUM 975 24663.6

Bricks 45532.8 NOS 6 273196.8Total for Brick Work in Super Structure Cement Mortar 1:6 381716.64

Earth 28.458 CUM 220 6260.76

Sand 3.162 CUM 975 3082.95

Cement 28.458 Bags 320 9106.56

Labour for Brick Tiles 34782

Brick Tiles 12648 NOS 7 88536

Bitumen 53.754 Kg 60 3225.24Total for Brick Tile Tracing on Roof 144993.51

CI Pipe 47.43 Meter 500 23715

Labour for pipe including cost of Joints 7905Total for Rain Water Pipe 31620

Glaze Tile 309.876 SqM 800 247900.8

Cement 58.7974 Bags 320 18813.9

White Cement 3.162 Bags 850 2687.7

Cement for Base Coarse 53.754 Bags 320 17201.28

Fine Sand 44.268 CUM 975 43161.3

Brick Blast 28.458 CUM 600 17074.8

Coarse Sand 3.162 CUM 1300 4110.6

Labour for Ceramic Glaze Tile 41106Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality

with course 392056.38

Brick Work in Super Structure Cement Mortar 1:6

Brick Tile Tracing on Roof

Rain Water Pipe

Flooring

Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course

Brick Work in Foundation with Cement Mortar 1:6

Horizontal DPC with Cement Concrete 1:2:4( 40MM)

Earth Work in Excavation in Foundation and Filling under Floors

Super Structure

RCC without Steel Cement Concrete 1:1.5:3

MS Steel For RCC

Foundation

Cement Concrete 1:6:12

Page 3: Cost Estimate Ghar

Sand 6.324 CUM 975 6165.9

Cement 34.782 Bags 320 11130.24

Labour for Ceiling Plaster 12648Total for Plaster on Ceiling (Roof) Cement Mortar 1:4 29944.14

Labour for Wall Plaster 50592

Cement 126.48 Bags 320 40473.6

Sand 18.972 CUM 975 18497.7Total for Plaster on Walls Cement Mortar 1:4 109563.3

Sand 3.162 CUM 975 3082.95

Labour for Pointing 37944

Cement 31.62 Bags 320 10118.4Total for Cement Pointing Cement Mortar 1:2 51145.35

Glaze Tile 158.1 SqM 800 126480Total for Glazed Tiles in Dado or Skirting in Bathroom snd

Kitchen Walls 126480

Hard Wood Shutter 47.43 NOS 4380 207743.4Total for Hardwood Door 207743.4

Commercial Hardwood 1422.9 RFT 201 286002.9Total for Hardwood Frame Including Labour 286002.9

Hardwood Window Shutter 94.86 NOS 1030 97705.8Total for Hardwood Window 97705.8

Hardwood and Commercial Plyboard 12.648 NOS 4590 58054.32

Total for Hard Wood Frame and Commercial Plyboard Shutter 58054.32

Iron Grills 790.5 Kg 70 55335Total for Iron Grilling with Labour 55335

Paint Work with Labour 632.4 SqM 60 37944Total for Paint on Wooden Doors and Windows 37944

Oil Bound Distemper with Labour 1328.04 SqM 62 82338.48Total for Oil Bound Distemper with Filling on Walls 82338.48

Cement Paint 474.3 SqM 35 16600.5Total for Exterior Finish Cement Paint Snowcem 16600.5

Sub Total: 3255579.39

325557.939

325557.939

162778.9695

4069474.238

Oil Bound Distemper with Filling on Walls

Exterior Finish Cement Paint Snowcem

Add 10% for Electric fitting wiring & Labor:

Add 10% for Water Supply fitting & Sanitary:

Add 5% for Sewerage:

Grand Total:

Hardwood Frame Including Labour

Hardwood Window

Hard Wood Frame and Commercial Plyboard Shutter

Iron Grilling with Labour

Paint

Paint on Wooden Doors and Windows

Plaster on Ceiling (Roof) Cement Mortar 1:4

Plaster on Walls Cement Mortar 1:4

Cement Pointing Cement Mortar 1:2

Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls

Door,Window,Cupboard shutter,Iron Grills

Hardwood Door

Plastering/Wall tiles

Page 4: Cost Estimate Ghar

See Elevation/Interior Designs

Project Labor Cost in Rs.: 486157.5

Project Labor Rs. Cost Per SFT: 154

Knowledgebase Links Vendor 1 Price Quoted by Vendor 1 Vendor 2 Price Quoted by Vendor 2

Guidelines for Bazri

Guidelines for Binding Wire

Guidelines for Bitumen

Guidelines for Brick Blast

Guidelines for Brick Tiles

Guidelines for Bricks

Guidelines for Cement

Guidelines for Cement for Base Coarse

Guidelines for Cement Paint

Guidelines for CI Pipe

Guidelines for Coarse Sand

Guidelines for Commercial Hardwood

Guidelines for Earth

Guidelines for Fine Sand

Guidelines for Glaze Tile

Guidelines for Hard Wood Shutter

Guidelines for Hardwood and Commercial

Plyboard

Guidelines for Hardwood Window Shutter

Guidelines for Iron Grills

Guidelines for Labour for Brick Sup. Str

Guidelines for Labour for Brick Tiles

Guidelines for Labour for Brick Work

Foundation

Guidelines for Labour for Ceiling Plaster

Guidelines for Labour for Cement Concrete

Guidelines for Labour for Ceramic Glaze Tile

Guidelines for Labour for DPC

Guidelines for Labour for Earth Excavation &

Earth Filling

Guidelines for Labour for pipe including cost

of Joints

Guidelines for Labour for Pointing

Guidelines for Labour for RCC

Guidelines for Labour for Steel RCC

Guidelines for Labour for Wall Plaster

Guidelines for MS Steel

Guidelines for Oil Bound Distemper with

Labour

Guidelines for Paint Work with Labour

Guidelines for Sand

Guidelines for Shuttering

Guidelines for Stone Blast

Guidelines for White Cement

Construction Cost Estimate. A high level rough estimate.

A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of constructed area and would help you in understanding breakup of

various cost involved in a construction project.

Bill of Quantity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to [email protected])

Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary depending upon the design.

Page 5: Cost Estimate Ghar

Guidelines for Foundation

Guidelines for Cement Concrete 1:6:12

Guidelines for Brick Work in Foundation with

Cement Mortar 1:6

Guidelines for Horizontal DPC with Cement

Concrete 1:2:4( 40MM)

Guidelines for Earth Work in Excavation in

Foundation and Filling under Floors

Guidelines for Super Structure

Guidelines for RCC without Steel Cement

Concrete 1:1.5:3

Guidelines for MS Steel For RCC

Guidelines for Brick Work in Super Structure

Cement Mortar 1:6

Guidelines for Brick Tile Tracing on Roof

Guidelines for Rain Water Pipe

Guidelines for Flooring

Guidelines for Ceramic Glaze Tiles Flooring

300X300 MM First Quality with course

Page 6: Cost Estimate Ghar

Guidelines for Plastering/Wall tiles

Guidelines for Plaster on Ceiling (Roof)

Cement Mortar 1:4

Guidelines for Plaster on Walls Cement

Mortar 1:4

Guidelines for Cement Pointing Cement

Mortar 1:2

Guidelines for Glazed Tiles in Dado or

Skirting in Bathroom snd Kitchen Walls

Guidelines for Door,Window,Cupboard

shutter,Iron Grills

Guidelines for Hardwood Door

Guidelines for Hardwood Frame Including

Labour

Guidelines for Hardwood Window

Guidelines for Hard Wood Frame and

Commercial Plyboard Shutter

Guidelines for Iron Grilling with Labour

Guidelines for Paint

Guidelines for Paint on Wooden Doors and

Windows

Guidelines for Oil Bound Distemper with

Filling on Walls

Guidelines for Exterior Finish Cement Paint

Snowcem