COPC/JAG-CCMStatus Updates and Recommendations
16 November 2010
Chris FinnigsmierActing JAG/CCM Chair
Outline
CCM Team Membership Status Updates and Recommendations
COPC Enterprise Network Requirements Development of the Next Generation COPC
Enterprise Network (aka DISA WENet Design)
2
CCM TeamMember Organization
Charles Abel* (Retires 05 Jan 2011) Air Force/AFWA/A6
Chris Finnigsmier***Air Force/AFWA/A6 (Temp CCM-Chair until 1 Apr 11)
Ken Barnett OFCM
Vacant** NOAA/NWS/NCEP/NCO (CCM-Chair)
Russell Dyson*** NOAA/NESDIS/OSDPD
Tracy LePire Navy/NAVO
Jackie Lord NOAA/NWS/OPS/TOC
Derek Eddington*** (vice Sherryl Panek) Navy/FNMOC
Charleston Simms Navy/CNMOC/N6
Technical Advisor/SME/Alternate Organization
Jami Casamento NOAA/NWS/OST
Peter Behnke Navy/FNMOC
Patrick Gregory NOAA/NESDIS/OCIO
Tom Harrison Air Force/AFWA/A6
Bruce Kenison DISA Field Office USSTRATCOM
Frank Palazzo Navy/FNMOC
* Upcoming Vacancy ** Vacant role/representative *** New to the role or group 3
COPC Enterprise Network Requirements COPC Action Item 2010-1.1
COPC Action Item 2010-1.1: Exercise established processes to coordinate and capture telecommunication requirements across COPC partners, including NUOPC and JPSS related requirements. These requirements will identify current and future data flows including source, destinations, volume, latency requirement, schedule of when new data will be or needs to be enabled, encryption requirements, other data restrictions, and related COPC business functions. This information will be used to validate technical designs and resource estimates for new network infrastructure initiatives.
4
COPC Enterprise Network Requirements COPC Action Item 2010-1.1
May/June - CCM developed a revised template TDs/JAGs reviewed template’s design Identified correct individuals (modelers, data assimilations
experts, etc.) to articulate requirements
July – Data Call sent by Deputy Federal Coordinator (Suspense: 31 Aug 10) To CNMOC (John Meyer), AFWA (Michael Howland), TOC (Craig
Hegemann), NCEP (Ben Kyger), and NESDIS (CDR Mark Moran)
Sept – All data requirements submitted
Sept/Oct – Analyzed the responses, reconciled differences between DOD and NOAA, asked for further fidelity
5
COPC Enterprise Network Requirements COPC Action Item 2010-1.1
Recommendation: Keep action item open until the requirements have been reconciled and reported
6
Development of Next Generation COPC Enterprise Network
COPC Action Item 2008-2.11
COPC Action Item 2008-2.11: JAG CCM shall coordinate the development of the next generation COPC shared network infrastructure with DoD and NOAA IT leadership. The JAG CCM shall leverage projects currently underway that are planning a NOAANet-DoD enterprise network capability.
7
July/Aug 2010: Meetings with DISA to assist in the design of the COPC Weather Enterprise Network (WENet) AFWA has funded the design effort at DISA
Sept 2010: Use the COPC Data Requirements as baseline for bandwidth, ports, and protocols
8
Development of Next Generation COPC Enterprise Network
COPC Action Item 2008-2.11
DISA Draft Concept of Design: Future proof on throughput by standardizing on 10 Gig
hardware through the WENet gateways Geographic redundancy with some local redundancy
(dual power supplies) Four routers, two at each gateway Two firewall/IDP, one at each gateway
9
Development of Next Generation COPC Enterprise Network
COPC Action Item 2008-2.11
Network TopologyA Combat Support Agency
UNCLASSIFIED // FOR OFFICIAL USE ONLY 10
DISA – Tasks completed: Validated design by performing lab testing Determined secondary WENet node location and finalize
circuit costs
DISA - Tasks to be completed: Provide detailed design document to include NOAA and
NAVO (Stennis) portion Propose a complete cost breakdown to include circuit and
equipment costs, and who pays for what
11
Development of Next Generation COPC Enterprise Network
COPC Action Item 2008-2.11
Development of the Next Generation COPC Enterprise Network
COPC Action Item 2008-2.11
Recommendation: Close this action item
DISA has provided design and has performed preliminary testing
Open new action item Each center develop detailed implementation plan to how to
achieve the final design JAG/CCM proposes the cost sharing mechanism (Annex to
DAPE)
12