Portfolio :Conor J Daly m.ARB :
Professional
C o n o r J D a l y | P o r t f o l i o
Residential Architect/MakespaceArchitects
Project StewartsLodge, LondonSW4
Value 17millionapprox.
Duration 12months
Tasks-Projectarchitecton66-unitresidentialdevelopmentwithafloorareaofover6,000sq.m-Successfullytookcontrolofprojectpost-planning,developingthedesignanddetailingtoconstructionstage-Producedallcriticalconstructiondetailsandactedaspointofcontactforanyon-sitequeries-Workedandco-ordinateddesignteamandallconsultantdesignsontheschemetoensureaccurateintegrationofallservices-Responsibleforallplanningissuesandestablishedagood-working
relationshipwithplannerstosolveanddischargeconditions
RendershowingdevelopmentfromWandsworthRd.
Rendershowingviewofinternalcourtyard
Professional Professional
C o n o r J D a l y | P o r t f o l i o
ConciergeDesk
Bedroom 1
Balcony5m
Balcony9m
Balcony4m
Balcony10m
Private Garden20m
Private Garden37.5 m2
Private Garden40.9 m2
Private Garden25.9m2
Block BPlot 1
Type A [HA]
TYPE APLOT G07
TYPE BPLOT G05
TYPE APLOT G06
TYPE EPLOT G04
TYPE FPLOT G03TYPE E
PLOT G02
191
82
106
1570
200
360
0
1573
668
8 389 14
Block BPlot 2
Type B [HA]
Block BPlot 4
Type D [HA]
453
445
3411209
5 42
2 43
3570
6000
400
0
ConciergeDesk
Hall
Bedroom 1
Hall
Bathroom
Cup'd
Hall
1a
3a
3k
D4.AG06.f.1
D4.AG06.d.1
D3.EG02.c.1
D19.A1.a.1
FD60s
D19.C3.a.1
FD20
FD20
FD30s
FD30s
D29.D5.g.1
FD30s
W9.EG04.2
W9.
BG
05.2
TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat
TIM
BE
RP
LA
NTE
RS4
000m
mX
1000
mm
x4
00m
m
TIM
BE
RP
LA
NTE
RS4
000m
mX
1000
mm
x4
00m
m
TIM
BE
RP
LA
NTE
RS4
000m
mX
1000
mm
x4
00m
m
TIM
BE
RP
LA
NTE
RS4
000m
mX
1000
mm
x4
00m
m
21.555
Shaft
96
8301 6638
3430310334784718
4353
3139
10348 7909
3307449739542728
5735
1979
4945
TYPE 1 METAL RAILING @ 1100mmREF DRAWING: 1238-30-5426B
TYPE 2 METAL RAILING @ 1800mmREF DRAWING: 1238-30-5426B
TYPE 2 METAL RAILING @ 1100mmREF DRAWING: 1238-30-5426B
212
1457
TIM
BE
RP
LA
NTE
RS4
000m
mX
1000
mm
x4
00m
m
Marshalls Saxon Slabs Natural colour450x450x35mm or s imilar
NOTE: Planters located over padfoundations
Timber benches by Street DesignTimber benches by Street Design
Timber benches by Street DesignTimber benches by Street Design
Timber benches by Street Design
Play Area Equipment Wicks teed Grovec limber or similar approved.Wet poursafety surface beneath N.B. Depth ofImpac t surfac ing beneath equipment tobe appropriate for crit ical fall heightpossible from equipment
TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat
TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat
TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat
TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat
TIMBER PLANTERS4000mm X 1000mm x 400mmby Street Des ign, Diplomat
Marshalls Argent Slabs SmoothLT colour 400x400x35mmor similart
Tower Sands toneor s imilarin random pattern
Low maintenance grasson slope interplanted withbulbs & wildf lower plug plants
Low maintenance grasson slope interplanted withbulbs & wildf lower plug plants
13290
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminated glass throughout-seew indow schedule 1238-50-5506/5510]
[Window to be laminatedglass throughout -see
w indow schedule1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
[Window to be laminatedglassthroughout - see window
schedule 1238-50-5506/5510]
1800
2400
2400
600
2400
600
2400
600 200
200
1560
1240
200
1560
1240
2700
3600 2080
600
970
PD
F cr
eate
d w
ith p
dfFa
ctor
y P
ro tr
ial v
ersi
on w
ww
fact
ory.
com
SouthElevation NorthElevation
GroundFloorPlan FirstFloorPlan
Professional
C o n o r J D a l y | P o r t f o l i o
SectionB-B
SectionF-F
SelectionofcriticaljunctionsthroughexternalbrickslipwallandLightweightsteelstructure
Gas memebrane by specialist
T.O.W19.900[T.B.C.]
EXTERIOR F.F.L = 18.600
25x50mm batten fixed to retaining wall.
1515
250
PARAPET DETAIL WITH BRICKSLIPS
VA
RIE
S: 1
0-18
5MM
PARAPETTOS
TOP OFPARAPET
FINISH
20
30
Allow for 3mm Expansion joints between Cement particle board
Gebrik panel with prebonded insulation; 10mm mortar jointmin 15mm external grade board by Gebrik
Vertical railing to form cavity by Gebrik
SPAN DIRECTION; FIRRINGS CUT TOFORM 1:80 FALL TO DECKING ABOVE 22mm T&G WBP plyboard
deck laid to fall on timberfirrings. To be primed
CELOTEX INSULATION TA4000 - 135MMOR SIMILAR APPROVED TO ACHIEVE
0.16W/m2K U-Value
WIDOPAN filter fleece
Growing medium & vegetation /sedum blanket
Continous Horizontal cavity barrier withintumescent tape by EnvirowallExpansion joint 10mm gap mastic filled
250 deep lattice joists to structural engineer'sspec; pitched to form slight fall in roof
VCL tape sealed at joist u/s
100mm mineral wool; isover apr 1200
Vapour control layer, proctor procheckPremier 500 or equal approved
15mm GTEC dB BOARD
15mm GTEC UNIVERSAL BOARD
Vertical timber battens 25x50mm toform cavity
Min 15mm external gradeboard by gebrik
Gebrik panel with prebondedinsulation; 10mm mortar joint
Fire Cavity Barrier byRockwool Fire Barrier
Allow for 3mm Expansion jointsbetween Cement particle board
100mm mineral wool; isover apr 1200
1m Ballast acrosswhole perimeter.
70mm Phenolic insulation byKingspan or similar approved
Widopan FD applied to primed plywood
25mm drainage mat
18mm Plyboard laid to fall
Aluminium edge capping 75mm x 190mm profile RAL 7015 or similar finish approved by HH
WiIDOPAN FD membrane to overlap aluminium edge capping.
36mm Knauf Insulation PolyfoamHigh Impact & Upstand Board
WIDOPAN membrane with min 50mm overlap under aluminium edge capping
WIDOPAN filter fleece
WIDOPAN FD applied to upstand
Continue WIDOPAN fleece min, 150mmabove finish
Resilient flanking strip
300
WINDOW HEAD AND SILL DETAIL2560 10
102560 1515
15
15
100
100
Allow for 3mm Expansion jointsbetween Cement particle board
Min 15mm externalgrade board by Gebrik
or similar approved
Gebrik panel with prebondedinsulation; 10mm mortar joint
EPDM
Deflection strip above window
Vcl tape sealed at joist u/s
High density mineral wool batt fullyfilled for flanking sound 33-60kg/m3;extend vertically 600mm belowceiling level; 900 o/a
Vapour control layer, proctor procheckpremier 500 or equal approved
15mm GTEC dB Board15mm GTEC universal boardVCL clamped by window build-up on all sides3mm ms galv strip by window installer
Steel plate by steel frame contractor; toproject 80mm beyond stud
VCL clamped by window build-up on all sides
3mm ms galv strip by window installer
Sill board to match window frame;with timber packer as necessary
Mastic seal between sill board & drylining
15mm GTEC universal board
15mm GTEC dB Board
Vapour control layer, proctor procheckpremier 500 or equal approved
100mm mineral wool, isover apr 1200.fully filled in stud & held in place toprevent slumping.
PU expanding foam by window installer
Timber packing by window installer
Compressible seal
Aluminium flashing
115
70mm Phenolic insulation byKingspan K5 or similar approved
70
70
1025 1515
EXTERNAL WALL / PARTY FLOOR
1825
015
15
250 DEEP LATTICE JOISTS TOSTRUCTURAL ENGINEER'S SPEC
100
70
600
2025
1819
100
17
High density mineral wool batt fullyfilled for flanking sound 100kg/m3;extend vertically 600mm belowceiling level; 900 o/a
Vapour control layer, proctor procheckpremier 500 or equal approved
15mm GTEC dB Board
15mm GTEC universal board, joints to bestaggered with db board beneath
100mm mineral wool, isover apr 1200.fully filled in stud & held in place toprevent slumping.
Floor finish
18mm T&G boarding19mm GTEC plank board25mm rock mineral wool, density 75kg/m3
18mm plyboard
100mm rock mineral wool insulationdensity 45kg/m3, laid between joists
GTEC resilient bar rbg3000 @400 ctrs15mm GTEC dB Board15mm GTEC universal board, joints to bestaggered with db board beneath
Vcl tape sealed at joist u/s
VCL to lap down onto floor deck
Flexible acoustic sealant below plasterboard
5mm resilient flanking stripAllow for 3mm Expansion joints
between Cement particle board
Rockwool insulation fire break
Continuous horizontal cavity barrierwith intumescent tape by envirowall
Expansion joint 10mm gap insheathing, mastic filled
Gebrik panel with prebondedinsulation; 10mm mortar joint
Resilient flanking strip
70mm Phenolic insulation byKingspan K5 or similar approved
650
PD
F cr
eate
d w
ith p
dfFa
ctor
y P
ro tr
ial v
ersi
on w
ww
fact
ory.
com
Professional Professional
C o n o r J D a l y | P o r t f o l i o
Residential Architect/MakespaceArchitects
Project Apartments,CommercialRoad, LondonE2
Value 3.25millionapprox.
Duration 14months
Tasks -Projectarchitecton14-unitresidentialdevelopmentaspartofre-designundernewclient-Undertookafulldesignreviewonbeingappointedtotheprojecttodevelopthedesign/undertakecostanalysisexercisesrespondingtonewclientsneeds-Co-ordinatedallconstructiondrawingswithBuildingControl-Prepareddesignmanualforprojectrolloutandproducedconstructiondetails-Conductedsiteinspectionsandwasreponsibleforvaluationsandissuingcerificates-Liasedwiithcontractorandactedaspointofcontactforallon-siteRFIsandconsultantqueries.
LongSectionthroughdevelopmentshowing2residentialblocksandcourtyardatriumRenderoffrontelevationfromCommercialRoad
C O M M E R C I A L R O A D
LANDSCAPEDCOURTYARD
FIRST FL.
SECOND FL.
THIRD FL.
BED 1LIVING / DINING
LIVING / DINING
LIVING / DININGKITCHEN
GROUND FL.
EN-SUITEKITCHEN
KITCHEN
LIVING / DINING
KITCHEN
BASEMENT FL.
UNISEX TOILETWC
BED
FIRST FL.
SECOND FL.
THIRD FL.
LIVING / DINING KITCHEN KITCHEN LIVING / DINING
LIVING / DINING
FOURTH FL.
LIVING / DINING
OFFICE
FIFTH FL.
FOURTH FL.
FIFTH FL.
COMMERCIAL UNIT
RETAIL UNIT
KITCHEN
KITCHEN
GROUND FL.
BASEMENT FL.
COMMERCIAL UNIT
RETAIL UNIT
235
12
351
272
55
562
351
300
0
235
12
351
300
0
SECTION A-A
13
25 mm Timber deck ing on spreaders18 mm spreaders3 layers of 20mm Asphalt22 mm WBP Plyboard
110mm Celotex insulat ion TD3116 - toachieve U-value of 0.19W/m2k
Visqueen 1200 gauge - VCL layer
65mm Structural screed with Rft mesh
15 mm Floor f inish18 mm T&G Plyboard flooring
350 mm RC slab
25mm Insulation to be min 150Kg/m3Visqueen 1200 gauge layer
40 mm Leveling screed
113 mm Suspended ceiling
707
250mm (min) in-situ concretef loor s lab, 2400kg/m3
Robus t separating f loor e-fc-2with ff t 2 f loat ing floor system
18 mm T&G Plyboard
50x50mm cradle batten res ilient layer system
250mm (min) in-situ concretef loor s lab, 2400kg/m3
Handrail @ 1100mmhigh around sky light
25 mm Timber deck ing on spreaders18 mm spreaders3 layers of 20mm Asphalt22 mm WBP Plyboard
110mm Celotex insulat ion TD3116 - toachieve U-value of 0.19W/m2k
Timber firrings cut to falls
272
5
570
200
400170
357
LIVING / DINING
20mm Flexcel board +Polysuphide sealant
2 Layers slip strips
Water Bar
20mm Flexcellboard to Eng spec
Voltex water proofmembrane to Eng spec
2 layers of Vandex slurry appliedto inner retaining wall. To Engspec
2 layers of Vandex slurry appliedto inner retaining wall. To Eng
spec
50mm Isowool insulation
Cav ity barrier to f loor /wall junc tion by TDI
(UK) Limited. Flexiblecavity tray dressed
behind.
All voids between s lab & inner leaff illed with f lexible closer or sealent
All voids between s lab & inner leaff illed with f lexible closer or sealent
All voids between s lab & inner leaff illed with f lexible closer or sealent
All voids between s lab & inner leaff illed with f lexible closer or sealent
All voids between s lab & inner leaff illed with f lexible closer or sealent
All voids between s lab & inner leaff illed with f lexible closer or sealent
Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign
Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign
Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign
Halfen HIT -BQ-F90 250mmdeep to Eng spec & des ign
Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.
Cav ity barrier to f loor / wall junctionby TDI (UK) Limited. Flex ible cavity
tray dressed behind.
18mm Plyboard on Timber joists toEng spec - Insulation betweenjoists (to M&E spec). Vapour controllayer 1 layer of Plas terboard withskim & emulsion f inish
Timber deck ing on spreaders . Insulationand membrane by Axter Wilotek t-Plus -
subcontractor to install.
Timber deck ing on spreaders . Insulationand membrane by Axter Wilotek t-Plus -subcontractor to install.
Timber fillet with Asphalt dressedover. Code 3 Lead f lashing to be
dressed over Asphalt.
Timber deck ing on spreaders.Insulat ion and membrane byAxter Wilotek t-Plus -subcontractor to install.
All handrails @1100mm high
250mm (min) in-situ concretef loor s lab, 2400kg/m3
Robus t separating f loor e-fc-2with ff t 2 f loat ing floor system
18 mm T&G Plyboard
50x50mm cradle batten res ilient layer system
250mm (min) in-situ concretef loor s lab, 2400kg/m3
Robus t separating f loor e-fc-2with ff t 2 f loat ing floor system
18 mm T&G Plyboard50x50mm cradlebatten resilient layer system
KITCHEN
KITCHEN
KITCHEN
Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.
Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.
Cav ity barrier to f loor /wall junc tion by TDI
(UK) Limited. Flexiblecavity tray dressed
behind.
Cav ity barrier to f loor /wall junc tion by TDI
(UK) Limited. Flexiblecavity tray dressed
behind.
Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.
Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.
Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.
Cav ity barrier to f loor /wall junc tion by TDI(UK) Limited. Flexiblecavity tray dressedbehind.
NEW TIMBER TERRACE
NEW TIMBERTERRACE
226
ELECTRIC SLIDINGROOF GLAZING
TOUGHENED
Plyboard Hoarding withdiagonal battens
Aluminium capping
AREA IN ABEYANCE
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.
Struc tural glassASD ELEGANCE.
Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallow
fall within to disperse water.
Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.
Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallow
fall within to disperse water.
Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallow
fall within to disperse water.
Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallowfall within to disperse water.
Balcony supported by Halfen insulatedsupports or s imilar, refer to Eng details.
Concrete 200mm Balcony.Timber deck ing on spreaders.Ensure concrete has shallowfall within to disperse water.
Balcony supported by Schock insulatedsupports or s imilar, refer to Eng details.
200
200
261
6
200
281
62
616
372
3
200
261
6
200
261
6
200
Ancon f ix ings shot fired to concrete slab.Steel angle of ancon to take externalblockwork wall.
316
12mm Thermaline windowsurrour insulat ion.
Galvanised steel to Eng specwith concrete topping.
Galvanised steel to Eng specwith concrete topping.
Balcony to be supported of steelplatform. Eng to detail.
Balcony to be supported of steelplatform. Eng to detail.
1 6
307
3
All handrails @ 1100mm highStruc tural glass balcony.
All handrails @ 1100mm highStruc tural glass balcony.
Smoked glass toughened
All handrails @ 1100mm highStruc tural glass balcony.
All handrails @ 1100mm highStruc tural glass balcony.
Smoked glass toughened
All handrails @ 1100mm highStruc tural glass balcony.
All handrails @ 1100mm highStruc tural glass balcony.
Smoked glass toughened
All handrails @ 1100mm highStruc tural glass balcony.
All handrails @ 1100mm highStruc tural glass balcony.
Smoked glass toughened
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.
Brilliant white, 25mm render by Webber.Finish to be Satin silk . Contractor to provide
1m2 sample to c lient before order. Renderto be self cleaning.
Brilliant white, 25mm render by Webber.Finish to be Satin silk . Contractor to provide1m2 sample to c lient before order. Renderto be self cleaning.
Brilliant white, 25mm render by Webber.Finish to be Satin silk . Contractor to provide
1m2 sample to c lient before order. Renderto be self cleaning.
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. byASD ELEGANCE.
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. by
ASD ELEGANCE.
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. by
ASD ELEGANCE.
Struc tural glass Juliet Balcony withinreveals of wall. Frameless system. by
ASD ELEGANCE.
1652
39 168
165
271
225
275
165 2
37167
499
1
152
9
3483
PD
F cr
eate
d w
ith p
dfFa
ctor
y P
ro tr
ial v
ersi
on w
ww
fact
ory.
com
Professional
C o n o r J D a l y | P o r t f o l i o
Renderofrearelevation,NelsonStreet.
Imageofkitchenasbuilt,CommercialRoadblock
Floorplans-Ground/First/Second
19 0 0
1800
Residentialrefuse6.5M 2
2212* 3755 3120 2616*
420
04
830
313
06
000
662
0*6
000
471
02
100
2212* 3755 3120 2616*
210
02
800
541
05
210
A
1000
BASEMENTENTRANCE
D10.PU.4
EXISTINGCROSSOVER
C. UNIT - C2350 M2
ENTRANCETO RETAIL UNIT
ENTRANCETORESIDENTIAL BLOCK
FD60 FD60W1.C2.01.1D10.PU.2
D10.PU.1
ELEV B
1069
5173
1 900
1800
GROUND FLOOR PLAN
2130
2992
DISABLED WC3.8M 2C2-02
C
SERVICES ZONE INCLUDESVERTICAL DUCTING FORMECHANICAL VENTING TOGROUND FLOOR +BASEMENT - ALLOW FLOORTO BE KNOCKED OUT
LOADING LIFTTO BASEMENT
SD
SD
E
ME
SD
594 2084 2084 485 875 175 975 61610092
4117
4960
3425
A
G G
125
16
3066
SD
1325
6 531
2309
31 6 6
879
1054
1656
2000
1019
3241
3600
5200
Commercialrefuse
LOADING BAY20.0M 2
Lobby
BIKES7.8M 2
D4.PU.2FD60s
ALLOW FOR A 7.5tDELIVERY TRUCK
Eng to allow for truck for loading. Min 7.5
3384
1840
Level+11.770
Level+11.770
Level+11.770
Level+12.050
Level+12.050
Level+12.050
Level+12.050
Level+12.050
Level+12.050
Level+11.770
Handrail to both sides@ 900mm High
Pavement Level+12.050
Level+12.543
Pavement Level+11.770
SD
SD
EF
EF
EF
EF
EF
EF
EF EF
EF
EF
EF
EF
EFEF
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
Level+12.050
RAMP
F F
13
141516
17
18
20
19
12
11
961123 462
4805
181
1703
400
6359
3351
5168
1654
75 30
1000 250 1000
1022
H
B
contrac tor to place louvredpanel within opening.
contrac tor to ins tall de-mountable f ire resistantsmoke sealed panel for
access on to service riser
contrac tor to place louvredpanel within opening.
contrac tor to ins tall de-mountable f ire resistantsmoke sealed panel for
access on to service riser
8992
1.5M 2
3651
1125
1124
1900
Concrete stairs to be @ max170mm risers @ 250mm mingoing. Handrail to both s ides tobe 900mm height.
Concrete stairs to be @ max170mm risers @ 250mm min
going. Handrail to both s ides tobe 900mm height.
E
SD
6368
CONTRACTOR TO INSTALLLETTERBOXES FORCOMMERCIAL RD BLOCK
CONTRACTOR TO INSTALLLETTERBOXES FORCOMMERCIAL RD BLOCK
METAL GRILL TO BE AT FFL LEVEL TOALLOW MAX 2 PERSONS TO ENTER ANDWORK ON PLATFORM
METAL GRILL TO BE AT FFL LEVEL TOALLOW MAX 2 PERSONS TO ENTER ANDWORK ON PLATFORM
22
WALL TYPE C FA (FROM ABOVE)
3
TOPCRETE DENSEBLOCKWORK TO BE LAID ONSIDE WITH 1 LAYER OF 15MMFIRELINE PLASTERBOARDEACH SIDE WITH SKIM &EMULSION FINISH.
573
800
LOCATION OF DRY RISER SUBJECT TO M+E DESIGN & SPEC.LANDING BOX REQUIREMENT SUBJECT TO MLM APPROVAL
LOCATION OF DRY RISER SUBJECT TO M+E DESIGN & SPEC.LANDING BOX REQUIREMENT SUBJECT TO MLM APPROVAL
918
C22
1276
2721
1272
2330
797
400
1100
OPENING INCONCRETE FOR GASVENTILATION TODISCHARGE OUTSIDE
1010
STR
UC
TURAL
OPEN
ING
2000
1735
107
332
567
2 way swing
1846
1 63
1042
1011
1188
1015
2009
1117
3588
LOCATION OFDRY RISER INLET.
INSTALLATION OF DROPKEY SWITCH TOMANUALLY OPEN DOORSTO RESI UNITS
INSTALLATION OF DROPKEY SWITCH TOMANUALLY OPEN DOORSTO RESI UNITS
ENSURE SCREED IS SCRABBLED DOWNTO MATCH EXTERNAL PAVEMENTLEVEL TO FORM LEVEL THRESHOLD
ENSURE SCREED IS SCRABBLED DOWNTO MATCH EXTERNAL PAVEMENTLEVEL TO FORM LEVEL THRESHOLD
W1W1
255-259CommercialRoad
10481600115380017222400841
9563
C3-02
DOC M WC5.7M 2
OFFICE102.6M 2
C. UNIT -C3 111 M 2
C3-01
7367
120
29
831 24001920 16
00 1302
8052
1331
1578
UNIT - F13 BED123.0 M2
W1.F1.05.1W3.F1.06.1
1349
5141
2440
1859
900
1331
4 943
W5.F1.02.1 W2.F1.02.1
W4.F1.02.1
2007
2814
2560
5994
1676
9484
249CommercialRoad
SD
1000
2212* 3755 3120 2616*
420
04
830
313
06
000
662
0*6
000
471
02
100
2212* 3755 3120 2616*
210
02
800
541
05
210
SD
SVP
SD
C
HD
SD
FIRST FLOOR PLAN
HD
SD
SD
1118
A
A
C
3661
2975
4762
SERVICES ZONE WITHGOOSE NECK (OR SIMILAR)VENT TO MECHANICALLYVENTILATE GROUND FLOOR+ BASEMENT - ALLOWFLOOR TO BE KNOCKEDOUT
FD60sD0.PU.4
926
Coping Stone on DPC
FALL
FALL
FALL
FALL
FALL
FALL
A
ELEV B
A
G G
769
1536
9 26
1 100
2539
866
776
Level+ 15.833
926
Level+ 15.833
Level+ 15.833
ALL DRAINAGE OUTLET'S / GULLY'S TO BELOCATED & POSITIONED BY M&E CONSULTANT
ALL DRAINAGE OUTLET'S / GULLY'S TO BELOCATED & POSITIONED BY M&E CONSULTANT
LOW ENERGY FLOOR LIGHTSPROJECTING UPWARDS.
LOW ENERGY FLOOR LIGHTSPROJECTING UPWARDS.
LOW ENERGY FLOOR LIGHTSPROJECTING UPWARDS.
SD
SD
AREA = 97.2M 2
F F
1150
250 1000
4860
1525
4344
1637
B
All door opeings toA.O.V to be min of
30min f ire seperating& 2100mm High
AOV BY SE CONTROLSOR SIMILAR
1.5M2
1124
1900
Cav ity barrier to f loor /wall junc tion by TDI (UK)
Limited. Flex ible cavitytray dressed behind.
2 no. 15mm Soundbloc pb on 50x75 s.ws tuds . finished with sk im & emulsion finish
Concrete stairs to be @ max170mm risers @ 250mm mingoing. Handrail to both s ides tobe 900mm height.
Concrete stairs to be @ max170mm risers @ 250mm mingoing. Handrail to both s ides tobe 900mm height.
800
BO
ILE
R
1914
1076
450
999
CORDYLINE BANKSII X 1
MISCANTHUS X 1
PHORMIUM X 1
YUCCA X 1
CORDYLINE BANKSII X 1
LOCATION OF DRY RISERSUBJECT TO M+E DESIGN &SPEC. NOT TO BE WITHIN THESAME RISER AS BOILER FLUES.
LOCATION OF DRYRISER SUBJECT TOM+E DESIGN & SPEC.NOT TO BE WITHINTHE SAME RISER ASBOILER FLUES.
OPENINGS FOR VENTILATION TO BASEMENTTO BE GRILLED OVER AND SEALED UNTIL ENDUSER IS TO TAKE SHELL & CORE BASEMENT&GROUND. IT WILL BE THE END USER'SRESPONSIBILTY TO COMPLY WITH BUILDINGREGULATIONS AND PLANNING WHENPROPOSING/INSTALLING ANY VENTILATIONUNIT.
5172
BALCONY
BALCONY
ALL OPENINGS TO BE CAPPED WITH FORMWORKPLYBOARD. TIMBER UPSTAND AROUND OPENING.PLYBOARD TO BE FIXED DIRECTLY TO TIMBER WITH1 LAYER OF FELT.
ALL OPENINGS TO BE CAPPED WITH FORMWORKPLYBOARD. TIMBER UPSTAND AROUND OPENING.PLYBOARD TO BE FIXED DIRECTLY TO TIMBER WITH1 LAYER OF FELT.
ALL OPENINGS TO BE CAPPED WITH FORMWORKPLYBOARD. TIMBER UPSTAND AROUND OPENING.PLYBOARD TO BE FIXED DIRECTLY TO TIMBER WITH1 LAYER OF FELT.
1918
1100
1100
4432
3858
2275
TO BE FINISHED WITH 22MM PLYBOARD FINISH WITHDIAGONAL BRACING. TOO BE PRICED FOR.
LOC
AT
ION
FO
RBOILE
R FLUE'S
1 2 2 6
Secure Trellis with plant ing
WATER
FEATURE
1315
2000
LANDSCAPED GREEN AREA
31.8 sq. m
GRAVEL AREA
31.9 sq. m
'STEPPINGSTONE'
FEATURE
5142
Struc tural glazed balconies8274
FINAL LAYOUT FOR OFFICETO BE CONFIRMED.
CONTRACTOR TO FIT OUTFLOORING AND CEILING.CEILING VOID ALLOW FOR180MM VOID.
ADDITIONAL LAYER OFSOUNDBLOCPLASTERBOARD TO BEADDED TO CEILING
ALLOW FOR WATER PUMPAND WATER FEATURE.
STUDY
DW
1228
527
1571
3054
1056
2557
1494
239
2088
2757
DISABLEDREFUGE
1319
1226
2139
5247
698
764
26 6
2209
416 926
1870 1745
Toughened glasspartition to clients spec
4562
7264
F1-04
ENSUITE5.7M 2
KITCHEN
F1-05
BED 119M2
F1-06
BED 211M 2
F1-07
BED 214.2M 2
LIVING / DINING41.8M 2
F1-02
1421
428
1019
Stud wall c reated toc reate x3 openingsequally in height tocontain shelv ing fordisplays.
2462
1299
4007
1206
1301
2537
3719
3537
2388
1882
7 65
720
1702
1161
3565
2911
1521
6864
2567
2203
720
7591707
1122
620
1423
ROTATING SPHERE@450KG
13
50
2400
FD60sD0.PU.3
FIRST FLOOR PLAN
Installat ion of Refuge call point bySigtel Disabled refuge Alarm &communication sys tem. to BS 5839Part 9.
FD60s
Penetrations made through insulationand f looring for posts to s it on concretepads as per Eng spec & design.
SD
SD
100
1087
32643264
1088
F5-02
LIVING / DINING17.0M 2 F5-03
BED15.2M 2
KITCHEN9.1M 2
F5-04
BATH4.3M 2
FD30s
FD20
W5.F4.04.1 W2.F4.05.1W4.F4.06.1
UNIT - F51 BED52.9 M2
F4-02
BATH5.2M 2F4-03
KITCHEN6.1M 2
LIVING / DINING25.0M 2
UNIT - F42 BED72.3 M2
F4-04
F4-01
HALL9.1M 2
F4-05
BED 28.6M 2 F4-06
BED 111.7M 2
ENSUITE3.1M 2
D3.F4.02.1
FD20D11.F4.04.1
E
E
SD
SD
SD
SD
HD
HD
B
D
420
04
830
313
06
000
662
0*5
700
19 0 0
1800
2212* 3755 3120 2616*
420
04
830
313
06
000
662
0*6
000
210
02
800
F3-03
LIVING / DINING22.6M 2
KITCHEN7.0M 2
BATH4.3M 2
F3-02
F3-01
HALL3.5M 2
F3-04
BED13.9M 2
F2-03
LIVING / DINING20.9M 2
F2-04
STUDY11.2M 2 F2-05
BED 114.0M 2
UNIT - F21 BED65.4 M2
UNIT - F31 BED54.0M2
BATH4.3M 2
F2-02
KITCHEN7.2M 2
F2-01
HALL5.3 M 2
W5.F3.03.1
W1.F2.03.1 W2.F2.04.1 W3.F2.05.1
FD20
FD20
FD30s
FD30s
D3.F2.02.1
FD20
FD20
51
52
53
963 2400 1467
1600 10087438
176
59
5994
2560
800 2400 1085 800 2402 1600 1006
10092
120
40
4517
2477
8196
2677
1775
2577
2018
600
1775
2500
2600
85 1 9
826
37243010
4718
826
826
1074
1470200
1100
249CommercialRoad
255-259CommercialRoad
SECOND FLOOR PLAN
ELEV C
ELEV D
E
E
HD
HD
SD
SD
SD
C/B0.5M 2
565
A
G G
ELEV B
A
926
Level+19.449
Level+19.449
Level+19.449
Level+19.449
Level+19.449
Level+19.449
471
0
2212* 3755 3120 2616*
210
05
410
521
0
841 24001722 800 115
3 16001048
9563
9848
8 098
821 24001791 800
1104 16001108
9624
7372
106
94
3898
2675
3571
15 9 0
1790
3000
8 264 869
6766
1 9 4 9
2129
1150
1800
1900
3526
1899
2120
31553195
3295
SD
SD
54
BALCONY7.4M 2
BALCONY11.2M 2
F F
750
E
SD
2027
1984
1857
1532
3456
3709
1676
4343
999
15 2 5
1654
B
All door opeings to A.O.V to bemin of 30min fire seperating
Contrac tor to place louvredpanel within opening.
Cav ity barrier to f loor / walljunct ion by TDI (UK) Limited.
Flexible cavity tray dressed behind.
Cav ity barrier to f loor / walljunct ion by TDI (UK) Limited.
Flexible cavity tray dressed behind. 1.5M 2
1124
1900
1125
1900
Cav ity barrier to f loor /wall junc tion by TDI (UK)
Limited. Flex ible cavitytray dressed behind.
Concrete stairs to be @ max170mm riser @ 250mm mingoing. Handrail to both s ides tobe 900mm height.
FD20
3103
1466
2700
2100
826 826
1606
2507
1328
3154
27 7 0
5437
2866
3 5015 34
4035
826
826
1047
353
0
826
2375
209
5051
1443
2048
895
DW
FR
C
C
C
3476
4613
600
1565
3051
600
470
FR 1000
926
2076
1100
1100
1330
8894
1331
600
SECOND FLOOR PLANHandrail/ railings & glass panels to c lient spec & design.Contrac tor to confirm with client before any orders are placed.
Handrail @ 1100mm high
LOC
AT
ION
FO
RBOILE
R FLUE'S
LOC
AT
I ON
FO
RB
OILER FLUE
'S
FD20D11.F4.04.1
FD20
Struc tural glazed balconies8274
587
786
2037
626
710
All door opeings toA.O.V to be min of30min f ire seperating.AOV door to be by SEcontrols or s imilarapproved.
LOCATION OF DRY RISERSUBJECT TO M+E DESIGN &SPEC. NOT TO BE WITHIN THESAME RISER AS BOILER FLUES.
LOCATION OF DRY RISERSUBJECT TO M+E DESIGN &SPEC. NOT TO BE WITHIN THESAME RISER AS BOILER FLUES.
1084
1085
1133
PD
F cr
eate
d w
ith p
dfFa
ctor
y P
ro tr
ial v
ersi
on w
ww
fact
ory.
com
Professional Professional
C o n o r J D a l y | P o r t f o l i o
Cultural Architect/MakespaceArchitects
Project HackneyRoadMosque, LondonE2
Value 1.1million
Duration 8months
Tasks -Supervisedprojectconstructionasarchitectondesignteamon contemporaryMosqueextensionandrenovation.-Developedthedesignwiththeclientaroundtheprogrammatic requirementsoftheschemeandtookcontrolofsubsequentplanningpermissionsthrought0successfulgranting.-Responsibleforon-siteinspectionsandinspectionofwork-Involvedinissuingcerificatesandcontractvaluations-Liasedwithcontractorandactedaspointofcontactforallon-site
RFIsandconsultantqueries.
RendershowingcomtamporatoryextensioninrelationtoexistingVictorianbuilding
Southernelevationofexistinghouseandextension RenderofsouthernelevationhighlightingIslamicintervention
Professional
C o n o r J D a l y | P o r t f o l i o
Residential Architect/MakespaceArchitects
Project HouseonChalcotRoad LondonNW1
Value 850,00
Duration 6months
Tasks-ProjectarchitectforextensionandrenovationofbasementfloorofGeorgiantownhouse-Successfullyconceivedanddevelopedprojectwithindemandingprogrammeincludingpreparationofallplanningapplications,presentations,and3dvisualisations-Producedfulltender,constructiondrawingsandscheduledocumentationandmanagedtenderingprocess-Liasedwithandensuredco-ordinationbetweenallconsultants,whileoverseeingallworkswithparty-wallsurveyorandbuildingcontrol.
Flat roof
Neighbouring Garden No. 30 Chalcot Road
Neighbouring Garden No. 28 Chalcot Road
No.29
Neighbouring Property No. 30 Chalcot Road
Neighbouring Property No. 28 Chalcot Road
Proposed Roof Plan
No. 31
No. 29
Boundary
new rwpSVP1
SVP2new rwpNewWP
Boundary
New skylight - double glazedtinted glass
Existing WP from f lats aboveWP
New WP to take waste water fromf lats above with new pipe laid over
f lat roof
2243
560
2544
Existing RWP discharge onto f latroof
Planting Beds
REA
R W
ALL
TER
RAC
ES
STR
EET
ACC
ES L
INE
STR
EET
ACC
ES L
INE
2544
ADJO
ININ
G
CO
NSE
RVA
TOR
Y
A
Vault No. 2
Vault No. 3
PLAN Proposed Ground Floor Plan
BATH
SHOE STORAGE
1 2
2A 2B
3
3A
4 5 6
A
H C1
-930
0.00
V
FIRE-BOX f lue
-510
900
2400
900
SHOWER ROOM
6733 2514 3649 1984 2054 4102 2040 2260
650
631
No. 31
No. 29
Boundary
New boundary wall rebuilt
NOTE:Refer to drainage plan for details of drainage
New WP picking up f lats above
boiler 650
1050
KITCHEN
bench
bench
800
2158
island 2.2x900
1050
716
skylight 2.2x560
fridgefrz
P
600
1269
TAP
TAP
1050
Boundary
Folding sliding doors
820
600
1800
2000
515 300
650
1322
892
-510
-930
UP
815
Fixed glass
1538
811
1202
300
18001050 82
8
5278
0 500 1 2 3 5m
YG
FFL=0.000FFL=-0.510
MH02-Ref to Drainage plan MH01-Ref to
Drainage plan
B
B
C
C
D
D
E
E
G
G
F
F
BBQ
1800
Water feature
1500 3000
-510-1020
450
688
2400
ShedFP
flue
2779
flue
6451
steps
Glass door
Existing staircase retained
Steel post to SE spec (both sides)Brick nib removed, structurally supported to SE details
Vault No. 1
1933
Existing timber doors replaced with window - toughened glass
H
steps
Relocate gas meter to built in storage unit
New openings between vaults, structure to SE details
Vaults fully lined with drained cavity tanking system (Newton or similar) by approved contractor with warranty. Plasterboard + skim f inish
813
2278
1022 99
0
Glass door
312
Provide gas supply
sink
slot
dra
in
3112
TAP
New cavity wall - 100mm block internal, 100mm cavity with insulation, brick external skin
Yard gulley to sumppump to manhole
In situ concrete benchand planters
In-situ concrete formed waterfeature, lined with waterproof
concrete/ screed
Polished concrete f loor togarden
Concrete worktop
fall to floor gulley
Water proof polished screed f loor throughout - contractor to recommend mix/ sealant to be approved
TAP
2800
oven
1500
Concrete worktop and concrete moulded sink
Grassed area - contractorto ensure effective soak
away
WM DRY
Flue to tap into existing cooks f lue 578
Steel ships ladder with handrails both sides
ClientSiteTITLE
Dwg No.DateScaleSheet size
Heidi29a Chalcot Rd NW1 8LN
PROPOSED GROUNDFLOOR + ROOF PLAN
1180-50-10020.09.12
1:50A1
copyright makespace architectsUnit 9 51 Derbyshire St London E2 6JQt: 020 7729 6022 e: curious@makespace.co.ukwww.makespace.co.uk
Rev Notes Date By
FOR TENDER
Checked
These drawings have been prepared for Building Regulatiion compliance and Tender purposes only, and SHOULD NOT BE USED FOR CONSTRUCTION. If they are used, any discrepencies / lack of information that results is not the responsibility of the architect.
All dimensions (especially head heights / clearances of new starcases / windows / doors) to be checked on site prior to any orders being placed & the commencement of any works.
DO NOT SCALE OFF DRAWING.
All drainage to contractors / M&E design and to L.A. approval.
All services supply & installation to be arranged & installed by contractor to LA approval.
These drawings do not necessarily comply with Local Authority Building Regulations and should be checked & appoved prior to any works on site.
Planning permission is to be obtained on all relevant works prior to implementation.
All work to be carried out in accordance with Building Regulations and to DS approval on regular inspections organised by contractor.
Renderofinternalviewthroughkitchenarea
Groundfloorplan Cesigndevelopmentmodel
Professional Professional
C o n o r J D a l y | P o r t f o l i o
Professional
C o n o r J D a l y | P o r t f o l i o
PAVEMENT
PROPOSED FINISHED CELLAR LEVEL
250
2
205
0
275
5
1623
EXISTING FLOOR LEVEL
EXISTING FLOOR LEVELRETAINED
153
0
872
166
4
FLOOR BUILD UP TYPE B -65mm polished screed overunderf loor heating pipework on100mm insulation on tanking onconcrete slab on hardcore to SEspec
WALL TYPE B - Drained cavitytanking system to walls, ceillingand f loor, by Newton or similar
Insulation and plasterboard liningto walls and ceiling
Existing brick corbels cut off to SEspec
Undepinning + ground slab to SEspec
Drain channels + sump pumpdetails and location tomanufacturers spec
Existing timber door replaced withtoughened glass windows, cillraised with stock brick to match
Existing window replaced withnew, head height reduced andnew lintel installed to SE spec
Existing door replaced with newexterior hardwood timber door and
fanlights, toughened glass
SECTION H - THROUGH NEW FRONT
WINDOW AND VAULTS
FLOOR BUILD UP TYPE A -65mm polished screed f inish on
100mm insulation on concrete slabon DPM on sand blinding on
hardcore. Screed to have have25mm perimeter insulation all
around
WALL TYPE A - 40mm insulationplasterboard on all perimeter walls
Ceiling build up type A
10
12
17
73
Underpinning to SE details
Delta membrane egg crate tanking system applied to wall / f loor / ceiling of
vaulted rooms.
85mm Celotex GA4000 insulation
12.5mm Gyproc plasterboard with skim f inish
Removal of corbel foundations subject to SE design and spec
40mm perimeter drainage channel to be installed
All channels to be directed to sump pump - Allow for Sump pump externally
500 Gauge Polythene sheet DPC
USED FOR CONSTRUCTION. If they are used, any discrepencies /
lack of information that results is not the responsibility of the
architect.
All dimensions (especially head heights / clearances of new
starcases / windows / doors) to be checked on site prior to any
orders being placed & the commencement of any works.
DO NOT SCALE OFF DRAWING.
All drainage to contractors / M&E design and to L.A. approval.
All services supply & installation to be arranged & installed by
contractor to LA approval.
These drawings do not necessarily comply with Local Authority
Building Regulations and should be checked & appoved prior to
any works on site.
Planning permission is to be obtained on all relevant works prior
to implementation.
All work to be carried out in accordance with Building
Regulations and to DS approval on regular inspections organised
by contractor.
EXISTING FLOOR LEVEL
NEIGHBOURING ENTRANCE
PAVEMENT
NEIGHBOURING APARTMENT
EXISTING FLOOR LEVEL
PROPOSED FINISHED FLOOR LEVEL
PROPOSEDFINISHED CELLARLEVEL
EXISTINGFLOORLEVEL
Detail 11
2
2 A 2 B
3
3 A
4 5 6
2514 3649 1984 2054 4102 2040 2260
250
5
250
0
202
9
200
5
219
5
240
0
316
93
0
51
0
23
05
NOTE:Refer to drainage plan for details of gradients/ sizes/ positions
Existing drainage runs
New drainage
33
9
Location of Shower wall
20
6
Code 4 lead f lashing dressedunder brick parapet
Brick parapet
Flush glass roof light by theRoof light Company or similar f itted
to manufacturers instructions
CEILING TYPE A - Existingceiling lining stripped out,Rockwool Acoustic insulationplaced between existing f loorjoists and 1 layer of 15mmsoundbloc plasterboard liningf itted on resilient bars
WALL TYPE B
FLOOR TYPE B
Form recess for LED srtipdownlight
MH02 and new drain 150dia @ 1:80
Existing drain + manhole
60
5
12
40
Sand & cement 75mm screed with A142 mesh. Screed to have Polished
f inish
FLOOR DETAIL
Warmaf loor underf loor heating system (wet). Clip rail system with pipes
at 200mm centres
85mm Celotex FF4000 insulation
25mm Celotex XR4000 insulation
Concrete slab to Eng spec & design
10mm Movement joint
300mm hardcore MOT type 1 compacting down ground
25mm sand blinded hardcore
TAIL 05
Sectionthroughlowercellararea Detailthroughstairsjunction Detailthroughcellarfoundation
LongSectionA-Afromreargardenthroughtocellar
Professional
C o n o r J D a l y | P o r t f o l i o
Residential ArchitecturalAssistant/MakespaceArchitects
Project PainesLane, LondonHA5
Value 275,000
Duration 5months
Tasks-Performedroleasjob-runnerthroughoutproject-ManageddesigndevelopmentfromconcepttoRIBAworkstageDofcontemporaryextensiontoArtsandCraftsstylehouse-Produceddesignpresentations,models,rendersanddrawingsforpresentationtobothclientandplanningauthority-Collaboratedextensiveresearchonconservationareaandlocal
planningpolicyaspartofproductionofplannningapplication.
SitePlanshowingcontextwithinconservationareaModelproducedduringdesigndevelopmentRendershowingdesigndevelopmentoffacade
Renderofproposedextensionincontext
Professional Professional
C o n o r J D a l y | P o r t f o l i o
11309
4903
LIVING SPACE21.1M2F1-02
CHILDREN'S 'DEN'13.2M2F1-05
LOBBY1.8M2F1-01
KITCHENETTE2.6M2F1-03
BATH2.4M2F1-04
STO
RAG
E
'SIT
ON
'STO
RAG
E
9503535668EXISTING OPENING
1430
243
EXISTING OPENING3683
EXI
STIN
GO
PEN
ING
4430
373
D2.F1.04.1969
726
540 900
810
D1.F1.01.1
1378
3105
4333
4514
4333
1668
700
292
863
SVP
E
SD
HD
2905
868
836
836
F1GR. FL. + MEZZ. FL.42.9 + 17.8 = 60.7M2
11309
W3.F1.05.1W1.F1.02.1
W2.
F1.0
2.1
11309
4903
75263651
4398
373
11177
W1.F1.02.1
W4.
F1.0
2.1 STORAGE
5.2M2F1-06
MEZZANINE12.2M2F1-07
BOOK SHELVING
BOOK SHELVING
STO
RAG
E
DOUBLE HEIGHTLIVING SPACE
D3.F1.07.1
OUT LINE OFROOF LIGHT
4333
1642
863
848
2902
2293
1967
1967 1350
1425
936
A
FD60
A
A
A
A
B
C
C
C
C
C
C
C
C
C
C
A A
A
A
Level+100.00
Level+99.34
Level+102.29
Level+101.82OUT LINE OF
ROOF LIGHT
RWP
RWP
RWP
RWP
A A
B
B
B
B
A A
C
C
C
C
1630
W1.F1.02.1
294
836
868
672
250
N
Handrail to one side. 900mm high of pitch ofstair. Handrail to be Oak finish, with stainlesssteel fixing to wall.
1146
Concrete Lintel above opening. tobear min of 200mm on each end.
863
Allow for levelling floor andlaying min 20mm Engineered
Timber Walnut flooring.
Allow for levelling floor andlaying min 20mm EngineeredTimber Walnut flooring.
NEW WALL700
Structural glassbalustrade @1100mm high
Allow for DPC within course 150mmabove new concrete slab level.
D2.F1.04.1
2090
LIVING SPACE
CHILDREN'S 'DEN'
LOBBY
1100
674
W2.F1.02.1 271
1
2235
891
165300
MEZZANINE
W6.F1.08.1 W6.F1.08.2
11309
STO
RAG
E
STORAGE
25mm Floor finish on18mm chipboard on200mm Joist infilledwith 100mm Rockwoolinsulation on 15mmGyproc plasterboard
W5.F1.02.1
EQEQEQ
BO
UN
DAR
YLI
NE
Assumed level of existing footing. Allow forinvestigative works for depth of footing.Underpinning required to contractors/Engineers design. Note this is onneighbours party line, any damage will needto be made good.
25mm Engineered timber Walnutflooring and build up, placed ontoscreed. Polythene 500 Gaugeseparating layer on Celotex GA400070mm DPM Polythene, 1200 Gaugelayer on concrete. 250mm concrete slabto Contractors spec & Design.Polythene separating layer on 25mmSand blinding on min 300mm MOT type1 Hardcore
SLAB
HARDCORE
Timber stairs. Walnut Riser & goings
Structural glass balustrade.
connectors to be concealedwithin floor joists.
50mm Celotex insulation board
Foundations to Contractors spec
DPC
DPM high performance dressed up Engineering brick.
2040
120mm MDF Chamferedskirting. Painted white.
Allow for x3 coats ifemulsion on skim
PD
Fcr
eate
dw
ithpd
fFac
tory
tria
lver
sion
ww
w.p
dffa
ctor
y.co
m
Residential ArchitecturalAssistant/MakespaceArchitects
Project Outhouse,PainesLane, LondonHA5
Value 125,000
Duration 4months
Tasks -Follow-onprojectfromPainesLaneextensionagainactingasjobrunner-Developedconcepttomaximiseusablespacewithinboundariesofpermitteddevelopmentrights-Producedfullsetofconstructiondrawingsandworkingdetailsforpurposesofbuildingcontrolandtender.Completedfullbuildingscheduletoreadinconjunctionwithdrawings.
-Managedtenderprocessthroughtoawardingofcontract
AxonometricofpublicstepsandviewingspaceSection-Constructionset
Conceptsketchofinternallayout
FloorPlans-Constructionset
Professional
C o n o r J D a l y | P o r t f o l i o
Academic / Leisure ArchitecturalAssistant/MurrayOLaoireArchitects
Project AnTailteann, MaryImmaculateCollege, Ireland
Value 10.5million
Duration 3months
Tasks-Memberoflargemulti-disciplinarydesignteaminvolvedoninternationalawardwinningproject.-Preparedconstructiondetailsandwasresponsibleforexteriorhard-landscapinganddrainagedetails.-Assistedwithrespondingtoon-siteRFIsandprojectsnagging-Produceddesignpresentations,models,rendersanddrawingsforpresentationtobothclientandplanningauthority
Lower-groundfloorPlan
Imagefromplayingpitchesshowingnorthelevationandmainplaza
Axonometricofpublicstepsandviewingspace Imageofmainentranceandpublicplaza
Professional Competition
C o n o r J D a l y | P o r t f o l i o
Cultural Architect/MakespaceArchitects
Project FRIDAYSATURDAYSUNDAY
DesignWorkshoptodesigna Tri-partiteWorshipSpace-Enclosingachurch,mosque,andsynogogueinoneelement-Contemporyspacemaintainingdesignandcustomsofallthree religionsintorunconcurrently-FeaturedinRIBAJournalDecember2011-Involvedindevelopmentofconceptdesignandreponsiblefor
productionofdrawings,design,presentations,3dvisualizations,n
e
119.0
se
0m 10m
friday/ saturday/ sunday
axis1:100 @ A1
oct 2011
Rendershowingmainhall
FloorPlanExternalRender
Diagramofaxes
Diagramaticuseplan
Competition
C o n o r J D a l y | P o r t f o l i o
Community Architect/MakespaceArchitects
Project Europan11
WATERSPACE EastWall,Dublin,Ireland
-BasedonthethemeofIdentity-thisurbaninfillsitesituatedinthedilapidatedEastWallareaofDublindocklandswithabrieftocreateasustainablecommunity-Interventionformedaroundthere-establishingtraditionalwatercoursesintheregionandintroducingwaterasasustainabledesignelementtointeractwiththesiteondifferentscales-Finalentrycommendedbyjudgesforinnovativeuseoftraditionalnaturalresources.
Tasks-Leadprojectteamof3members-delegatedallprojecttasksandco-ordinatiatedworkflowofteammembers.-Oversawdevelopmentofdesignconceptandmanagedpresentationandcompetitionsubmissiondocuments.
Perspectiveviewfromsea-waterspatopublicplazashowingtheinternal/externalinteractionofscheme
Sectionthroughsunkenpublicplazaintheheartoftheschemeshowinggalleryspaceandsea-waterspa
Masterplanofscheme
Competition Competition
C o n o r J D a l y | P o r t f o l i o
RESERVE
NAVETTE
CERN
RESERVE
NAVETTE
CERN
2516
mm
1500:PLAN
fghfgjdghjd
5 set down space near future CERN building
10 short stay parking spaces
5 set down spaces
3 Disabled parking spaces
4 shuttle bus set down spaces
50 communal cycles, 50 cycle spaces
2 coach set down spaces
Multi- vehicle turning circle
2516
mm
Cultural Architect/MakespaceArchitects
Project Internationaldesigncompetition
CERNpublicspacesmasterplan, Meyrin,Geneva,Switzerland
-UrbandesigncompetitionmasterplanningpublicspaceonthemaincomponentoftheCERNnuclearresearchcampus,Geneva-Competitionbriefwastoredefinemainvisitorareaandcreate landmarkfocalpointthatrespondstoexistingvisitorreceptionandpublictransportlinksandproposedInnovationcentre
Tasks-Involvedfromconceptstageanndmanagedthedevelopmentofpreliminarydesignideastofinalpresentation-Establishedbriefandtargetsforcompetitionsubmission-Supervisedandco-ordinatedprojectteamof2juniorstaffmembers
Imageofphysicalmodelfordesigndevelopment
Masterplanofpublicspaceincludingfragmentedrouteway
Renderofinterventionshowingpublicroutewayandreceptionbuilding
Academic
C o n o r J D a l y | P o r t f o l i o
1 2 3 4 5 6
A
p r
d e t a i l ss e g e m e n t e d s e c t i o n 1:50
j u n c t i o n w i t h e x i s t i n g w a l l1:50
s e c t i o n t h r o u g h w o r k i n g y a r d1:50
g a l l e r y s e c t i o n1:50
B
C
Dc i r c u l a t i o n i n
Wall Construction [Detail A]Metal flashing Reconstituted stone capping 120mmOn exsiting wallMetal steel C section for drainage 190 x 180 x 15mmInsulation 60mmSteel covering plate welded to Corten beam 12mmIPET parallel corten Steel section 355 x 302mmSelf supporting structural unitized curtain wall system -Fitting bracket bolted to beam
Floor Construction [Detail D]Weatherproof corten sheet steel 4000 x 2500 x 15mm - 20mm jointsHorizontal fixing, steel angle - connected to sub-structure and faade plates via bolds welded onInsulation 100mmHEM Wide flange heavy duty steel beam 990 x 302mmSlimfloor steel beams w. precast aerated concrete slabs 225mmVapour barrierScreed covering 60mmTimber battens 10mmWooden Floorboards 16mm
perspective of internal court
north elevation 1:2000 [approx.]
StructureDiagram showing dore supporting portalframe to span cantilever
HEM Wide flange heavy duty steel beamThickness 900mm supporting 225mmslimfloor beams
Tension cables to tie structure and in collarboration with extended foundations atfulcrum to counteract torsional forces
perspective of internal court
north elevation
series of concept models
segmented section
Cultural DublinSchoolofArchitecture
Project NationalSculptureFactory atCustomHouseQuay,Cork
ThesisProject, DublinSchoolotArchitecture. DITBoltonStreet
-ThebriefwasestabvlishedtorejunvenateahistoricyetdilapidatedsiteontheperipheryofCorkcitycentrebystitchingitbackintothedeterioratingbuiltenvironment.-Theclientwasselected-theNationalSculptureFactory-acollectivethatprovideslocalartistswithwork-spaceandfacilitiesfortherealisationoftheirownprojects.-Achallengingprogrammehadtoconsistofbothflexiblework spacestoallowtosculpterstocreatewithoutdistractionalongsideapublicandcompemptoryexhibitionspaces-Anyinterventionhadtoworkwiththeexistingfootprintofthebondedwarehouses-aprotectedstructure-andbesympathectictothearchitecturalstyle.-Are-interpretationoftheinternallayoutcreatedenclosurestodefinedifferentactivitieswhileengagingtheexistingstructureasadevicetogroupanddivideuses,whilethequayperformstheroleofbothpromenadeanddisplaycase
site context
Concept sketches : Intergration, permeability, functionality
National Sculpture FactoryCustom House Quay, Cork
The main focus of the project is to reju-venate the historic site of the city, where
the Cork bonded warehouse are situated, while trying to re-intergrate the dock-lands, rapidily declining into a state of
delapiation, back into the city.
For the client, the National Sculpture Fac-tory, is it an chance to provide a contem-
pory and exible space for the realiza-tion of sculptural projects of differing
scale for artists, and to act as a forum for interaction with the public in the form of
a venue for events, lectures, discussions and most importantly display
RenderfromHorgansQuayshowingmainexhibitionspaceextrudingovertheexsitingwarehousewall.
Seriesofexploratorymodelsinvestigatingtopicssuchasinteractionwithexistingbuiltenvironment,urbanstitchingandrejuvenation
S
iteplanwith
urban
grainsh
own
Academic Academic
C o n o r J D a l y | P o r t f o l i o
00 1:200
level 0 1:1000 [approx]
East Section 1:1000 [approx]
Groundlevelplan
LongsectionAAthroughsite[Facingeast]
Academic
C o n o r J D a l y | P o r t f o l i o
1 2 3 4 5 6
A
p r
d e t a i l ss e g e m e n t e d s e c t i o n 1:50
j u n c t i o n w i t h e x i s t i n g w a l l1:50
s e c t i o n t h r o u g h w o r k i n g y a r d1:50
g a l l e r y s e c t i o n1:50
B
C
Dc i r c u l a t i o n i n
Wall Construction [Detail A]Metal flashing Reconstituted stone capping 120mmOn exsiting wallMetal steel C section for drainage 190 x 180 x 15mmInsulation 60mmSteel covering plate welded to Corten beam 12mmIPET parallel corten Steel section 355 x 302mmSelf supporting structural unitized curtain wall system -Fitting bracket bolted to beam
Floor Construction [Detail D]Weatherproof corten sheet steel 4000 x 2500 x 15mm - 20mm jointsHorizontal fixing, steel angle - connected to sub-structure and faade plates via bolds welded onInsulation 100mmHEM Wide flange heavy duty steel beam 990 x 302mmSlimfloor steel beams w. precast aerated concrete slabs 225mmVapour barrierScreed covering 60mmTimber battens 10mmWooden Floorboards 16mm
perspective of internal court
north elevation 1:2000 [approx.]
StructureDiagram showing dore supporting portalframe to span cantilever
HEM Wide flange heavy duty steel beamThickness 900mm supporting 225mmslimfloor beams
Tension cables to tie structure and in collarboration with extended foundations atfulcrum to counteract torsional forces
perspective of internal court
north elevation
series of concept models
segmented section
Renderofpublicenclosurefacingexhibitionspace
Axon
ometricdiagram
ofprogrammaticelem
entsofprojectSectionalcuttingthroughworkspace/privateenclosure/
offices/publicenclosuretohighlightkeyjunctions
Recommended