Company history

2009 n-bio was originally founded in

Konstanz (Germany)

2011 majority acquired by Farmatic

Anlagenbau GmbH

2015 merger of Farmatic and n-bio

2018 biogas department of Farmatic

becomes n-bio GmbH again

Our know-how: more than 20 years experience in building of AD-plants;

microbiology, process and plant engineering

Our focus: AD-plants for commercial organic waste, large scale

agricultural biogas plants and sewage sludge digestion

Our service: EPC-contracting or Engineering and key-components

2

Project Development

Commissioning

Continued Process Support

Mechanical Installation

Piping and cabling

Supply of Key Components

Civil Works

Basic and Detailed

Engineering

Process Guarantee

Operation and Maintenance

n-bio SCOPE OF WORK LOCAL PARTNER / CLIENT

Engineering & Key-Components Work Flow

Characteristics: Vertically stirred CSTR digester

5

Advantages:

• no sedimentation

• no floating layers

• constant substrate

circulation

• Low maintenance

and operating costs

• Roof insulation for

low heat demand

500 kW

2 MW

>10 MW

Biogas plants of all sizes

6

BIOGAS PLANT ARAVETE, EEBaltic Biogas ∙ Rotermanni 8 · EE-10111 Tallinn

7

Biogas plant

mesophilic digestion of manure and

organic waste ∙ complex substrate mix ∙

high dry matter content in some substrates

requires heavy duty cutting and feeding

machinery ∙ low ambient temperatures

Substrates: ∑ 106.200 t/aCow manure 63.000 t/a Dry dung 25.000 t/aPoultry manure 5.200 t/aGrass silage 1.000 t/aBrewery waste 8.000 t/aWhey 4.000 t/a

2 x Digester: 3.500 m³Post digester: 2.500 m³Install. power: 1.700 kWel.

Start up: 2012

General Contractor n-bio

BIOGAS PLANT HOURTIN, FRMédoc Energies ∙ BP 34 route de Pauillac ∙ FR-33390 Hourtin

9

Biogas plant

for corn straw silage, vegetables waste,

pig manure, ray grass, rapeseed silage

and oil waste ∙ hygienisation

Substrates: ∑ 44.500 t/a

Pig manure: 7.000 t/a

Vegetable scraps: 3.000 t/a

Grass silage: 17.000 t/a

Rapeseed silage: 1.500 t/a

Corn straw silage: 11.000 t/a

Oil waste: 5.000 t/a

Digester: 2 x 3.230 m³

Post-digester: 1.700 m³

Install. power: 1.400 kWel.

Start up: 2016General contractor Farmatic

Bunker filled with carrots

Reception bunker

with discharge

screws

11

BIOGAS PLANT HOURTIN, FRMédoc Energies ∙ BP 34 route de Pauillac ∙ FR-33390 Hourtin

Hammer mill

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

13

Biogas plant

for slaughterhouse waste, animal manure

and whey

Substrates: ∑ 32.500 t/a

Cattle manure: 5.000 t/a

Pig manure: 7.000 t/a

Whey: 6.000 t/a

Slaughterhouse waste: 14.500 t/a

Digester: 5.000 m³

Digestate storage: 5.000 m³

Install. Power: 1.000 kWel.

Start up: 2015 / 2016Scope of supply: Engineering, Digester & Key components

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

14

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

15

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

16

BIOGAS PLANT SKÖVDE, SEGöteborg Energi AB ∙ Mejselvägen ∙ SE-54134 Skövde

17

Biogas plant

Gas upgrading and filling station ∙

thermophilic process at 55° C used as

hygienisation method · sophisticated

heat management through heat storage

and heat recovery

Substrates: ∑ 101.000 t/a

Whey: 73.000 t/a

Slaughterhouse waste: 8.000 t/a

Dairy waste: 3.000 t/a

Packaged food 10.000 t/a

Waste water 7.000 t/a

2x Digester: 4.350 m³

Post-digester: 2.400 m³

Storage tank: 5.000 m³

Gas yield: 800 Nm³/h

Start up: 2011

General Contractor Farmatic

BIOGAS PLANT SKÖVDE, SEGöteborg Energi AB ∙ Mejselvägen ∙ SE-54134 Skövde

18

Biogas-upgrading

and filling station

BIOGAS PLANT SOLRØDGÅRD, DKJakobsen og Blindkilde A/S ∙ Lyngevej ∙ 3400 Hillerød ∙ Denmark

Biogas plant

Sewage sludge digestion ∙ fat and grease ∙

sight protection hides the technical

elements on the roof ∙ fully equipped pump

chamber with heat exchangers, gas

processing plant and heating boiler

Digester: 2.520 m³

Gas storage: 500 m³

Gas yield: 230 Nm³/h

Installed power: 0,2 MWel.

Start up: 2017/2018

Scope of supply: Engineering, Digester & Key components

BIOGAS PLANT SØNDERJYSK, DKSønderjysk Biogas A/S ∙ Langvej 65 ∙ DK-6541 Bevtoft

20

Biogas plant

One of the largest manure processing

biogas plants worldwide ∙ for manure and

agricultural residues · with biogas

upgrading ∙ thermophilic operation

Substrates:Manure 425.000 t/a

Straw 50.000 t/a

Sugar beets: 50.000 t/a

Corn 10.000 t/a

6x Digester: 6.100 m³

4x Post-digester: 6.800 m³

Digestate storage: 3.500 m³

Slurry storage: 3.500 m³

2x receiving tank: 240 m³

Slurry tank: 200 m³

Production of bio methane: 5.000 Nm³/h

replace an electric power of 10 MWel.

Start up: 2016

General Contractor Farmatic

BIOGAS PLANT SØNDERJYSK, DKSønderjysk Biogas A/S ∙ Langvej 65 ∙ DK-6541 Bevtoft

21

Receiving of

liquid manure

BIOGAS PLANT Yunlin County, Taiwan

23

Biogas plant

Engineering and delivery of components

for a biogas plant for pig-manure and

agricultural residues (ongoing in 2019):

Digester: 4.000 m³

Install. Power: 600 kWel.

Start up: 2019

Engineering & key-components

BIOGAS PLANT ZAGREB, HRAgroproteinka Energija ∙

Strojarska cesta 11 ∙ HR-10361 Sesvetski Kraljevec

24

Biogas plant

For kitchen waste, supermarket waste,

expired food ∙ Hygienisation for organic

waste at 70°C · Substrate pre-treatment

and elimination of impurities

Substrates: ∑ 20.000 t/a

Digester: 3.600 m³

Post-digester: 1.000 m³

Buffer tank: 490 m³

Install. Power: 1.000 kWel.

Start up: 2017

Scope of supply: Engineering, Digester & Key components

BIOGAS PLANT ZAGREB, HRAgroproteinka Energija ∙

Strojarska cesta 11 ∙ HR-10361 Sesvetski Kraljevec

25

Receiving of

kitchen- and

supermarket-waste

BIOGAS PLANT ZAGREB, HRAgroproteinka Energija ∙

Strojarska cesta 11 ∙ HR-10361 Sesvetski Kraljevec

26

Separating

hammer mill

n-bio GmbH

Michael Schuster

Dipl.-Biol., MBA – Managing Director

Max-Stromeyer-Str. 116 – 78464 Konstanz

tel +49 7531 457189-52

schuster@n-bio.de

www.n-bio.de

·

Thank you!

27

Recommended