22
company presentation AHK Paris 2019-03-19

company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

  • Upload
    others

  • View
    17

  • Download
    0

Embed Size (px)

Citation preview

Page 1: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

company presentation

AHK Paris

2019-03-19

Page 2: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

Company history

2009 n-bio was originally founded in

Konstanz (Germany)

2011 majority acquired by Farmatic

Anlagenbau GmbH

2015 merger of Farmatic and n-bio

2018 biogas department of Farmatic

becomes n-bio GmbH again

Our know-how: more than 20 years experience in building of AD-plants;

microbiology, process and plant engineering

Our focus: AD-plants for commercial organic waste, large scale

agricultural biogas plants and sewage sludge digestion

Our service: EPC-contracting or Engineering and key-components

2

Page 3: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

Project Development

Commissioning

Continued Process Support

Mechanical Installation

Piping and cabling

Supply of Key Components

Civil Works

Basic and Detailed

Engineering

Process Guarantee

Operation and Maintenance

n-bio SCOPE OF WORK LOCAL PARTNER / CLIENT

Engineering & Key-Components Work Flow

Page 4: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

Characteristics: Vertically stirred CSTR digester

5

Advantages:

• no sedimentation

• no floating layers

• constant substrate

circulation

• Low maintenance

and operating costs

• Roof insulation for

low heat demand

Page 5: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

500 kW

2 MW

>10 MW

Biogas plants of all sizes

6

Page 6: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT ARAVETE, EEBaltic Biogas ∙ Rotermanni 8 · EE-10111 Tallinn

7

Biogas plant

mesophilic digestion of manure and

organic waste ∙ complex substrate mix ∙

high dry matter content in some substrates

requires heavy duty cutting and feeding

machinery ∙ low ambient temperatures

Substrates: ∑ 106.200 t/aCow manure 63.000 t/a Dry dung 25.000 t/aPoultry manure 5.200 t/aGrass silage 1.000 t/aBrewery waste 8.000 t/aWhey 4.000 t/a

2 x Digester: 3.500 m³Post digester: 2.500 m³Install. power: 1.700 kWel.

Start up: 2012

General Contractor n-bio

Page 7: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT HOURTIN, FRMédoc Energies ∙ BP 34 route de Pauillac ∙ FR-33390 Hourtin

9

Biogas plant

for corn straw silage, vegetables waste,

pig manure, ray grass, rapeseed silage

and oil waste ∙ hygienisation

Substrates: ∑ 44.500 t/a

Pig manure: 7.000 t/a

Vegetable scraps: 3.000 t/a

Grass silage: 17.000 t/a

Rapeseed silage: 1.500 t/a

Corn straw silage: 11.000 t/a

Oil waste: 5.000 t/a

Digester: 2 x 3.230 m³

Post-digester: 1.700 m³

Install. power: 1.400 kWel.

Start up: 2016General contractor Farmatic

Page 8: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

Bunker filled with carrots

Reception bunker

with discharge

screws

11

BIOGAS PLANT HOURTIN, FRMédoc Energies ∙ BP 34 route de Pauillac ∙ FR-33390 Hourtin

Hammer mill

Page 9: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

13

Biogas plant

for slaughterhouse waste, animal manure

and whey

Substrates: ∑ 32.500 t/a

Cattle manure: 5.000 t/a

Pig manure: 7.000 t/a

Whey: 6.000 t/a

Slaughterhouse waste: 14.500 t/a

Digester: 5.000 m³

Digestate storage: 5.000 m³

Install. Power: 1.000 kWel.

Start up: 2015 / 2016Scope of supply: Engineering, Digester & Key components

Page 10: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

14

Page 11: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

15

Page 12: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT PELLA, GRAgroktima Akrolimnis, GR-58300, Krya Vryssi, Greece

16

Page 13: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT SKÖVDE, SEGöteborg Energi AB ∙ Mejselvägen ∙ SE-54134 Skövde

17

Biogas plant

Gas upgrading and filling station ∙

thermophilic process at 55° C used as

hygienisation method · sophisticated

heat management through heat storage

and heat recovery

Substrates: ∑ 101.000 t/a

Whey: 73.000 t/a

Slaughterhouse waste: 8.000 t/a

Dairy waste: 3.000 t/a

Packaged food 10.000 t/a

Waste water 7.000 t/a

2x Digester: 4.350 m³

Post-digester: 2.400 m³

Storage tank: 5.000 m³

Gas yield: 800 Nm³/h

Start up: 2011

General Contractor Farmatic

Page 14: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT SKÖVDE, SEGöteborg Energi AB ∙ Mejselvägen ∙ SE-54134 Skövde

18

Biogas-upgrading

and filling station

Page 15: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT SOLRØDGÅRD, DKJakobsen og Blindkilde A/S ∙ Lyngevej ∙ 3400 Hillerød ∙ Denmark

Biogas plant

Sewage sludge digestion ∙ fat and grease ∙

sight protection hides the technical

elements on the roof ∙ fully equipped pump

chamber with heat exchangers, gas

processing plant and heating boiler

Digester: 2.520 m³

Gas storage: 500 m³

Gas yield: 230 Nm³/h

Installed power: 0,2 MWel.

Start up: 2017/2018

Scope of supply: Engineering, Digester & Key components

Page 16: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT SØNDERJYSK, DKSønderjysk Biogas A/S ∙ Langvej 65 ∙ DK-6541 Bevtoft

20

Biogas plant

One of the largest manure processing

biogas plants worldwide ∙ for manure and

agricultural residues · with biogas

upgrading ∙ thermophilic operation

Substrates:Manure 425.000 t/a

Straw 50.000 t/a

Sugar beets: 50.000 t/a

Corn 10.000 t/a

6x Digester: 6.100 m³

4x Post-digester: 6.800 m³

Digestate storage: 3.500 m³

Slurry storage: 3.500 m³

2x receiving tank: 240 m³

Slurry tank: 200 m³

Production of bio methane: 5.000 Nm³/h

replace an electric power of 10 MWel.

Start up: 2016

General Contractor Farmatic

Page 17: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT SØNDERJYSK, DKSønderjysk Biogas A/S ∙ Langvej 65 ∙ DK-6541 Bevtoft

21

Receiving of

liquid manure

Page 18: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT Yunlin County, Taiwan

23

Biogas plant

Engineering and delivery of components

for a biogas plant for pig-manure and

agricultural residues (ongoing in 2019):

Digester: 4.000 m³

Install. Power: 600 kWel.

Start up: 2019

Engineering & key-components

Page 19: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT ZAGREB, HRAgroproteinka Energija ∙

Strojarska cesta 11 ∙ HR-10361 Sesvetski Kraljevec

24

Biogas plant

For kitchen waste, supermarket waste,

expired food ∙ Hygienisation for organic

waste at 70°C · Substrate pre-treatment

and elimination of impurities

Substrates: ∑ 20.000 t/a

Digester: 3.600 m³

Post-digester: 1.000 m³

Buffer tank: 490 m³

Install. Power: 1.000 kWel.

Start up: 2017

Scope of supply: Engineering, Digester & Key components

Page 20: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT ZAGREB, HRAgroproteinka Energija ∙

Strojarska cesta 11 ∙ HR-10361 Sesvetski Kraljevec

25

Receiving of

kitchen- and

supermarket-waste

Page 21: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

BIOGAS PLANT ZAGREB, HRAgroproteinka Energija ∙

Strojarska cesta 11 ∙ HR-10361 Sesvetski Kraljevec

26

Separating

hammer mill

Page 22: company presentation AHK Paris 2019-03-19 · Project Development Commissioning Continued Process Support Mechanical Installation ... Hammer mill. BIOGAS PLANT PELLA, GR Agroktima

n-bio GmbH

Michael Schuster

Dipl.-Biol., MBA – Managing Director

Max-Stromeyer-Str. 116 – 78464 Konstanz

tel +49 7531 457189-52

[email protected]

www.n-bio.de

·

Thank you!

27