Geospatial Technology in

Telecom Network Infrastructure Management

Milind Deshpande

Reliance Jio Infocomm

GeoSmart Asia 2017

24th August 2017

2

Contents

Telecom Business Characteristics

How GIS Technology meets industry challenges?

Before you set out …

Geospatial Technology in FTTx Network Plan-to-Build Architecture & Design Principles

Role of Geospatial Platform

Business Planning

Plan to Build

As-Built Capture

Provisioning and Service Fulfillment

Network O & M

3

Telecom Business Characteristics

Challenges:

Peculiar Business Requirements

• Green-field and Brown-field installations co-exist

• Incremental network build for Service Fulfillment - Routine business

• Assets in Public Domain – “where” is an extremely important question

• Highly competitive – Customer Satisfaction, Sales & Marketing very important

Process Oriented industry

• Several Complex, Inter-dependent work processes

• Involvement of multiple stake-holders

Opportunities: Hi-Tech Industry

Several IT Systems and software for various purposes

First-adapter of technology

4

GIS meets Mobile Network P2B Challenges

Define AOI

BUSINESS

Release

Project Scope

PMO

Route &

Facility

Planning –

Engineering

WIRELINE

RF Planning

LTE PROJECTS

IFC & As-Built

CONSTRCUTION

Create Physical

Inventory

ISP

Inventory

Transfer and

Service Order

Management

GIS & OSS

Plan to Build

RFS

Manage

Roll-out

DEPLOYMENT

Sites & Links

Tracing

ALL

Commissioning

Proactive

Tracking

CRM

Video Wall

NOC OPERATIONS

Coverage

Check

ALL

Operations Activity

Stake-Holder

Legend

5

FTTx Network P2B Challenges

Collect Market Data

and Define AOI

BUSINESS

Design & Engineer

N/W

NETWORK

Purchase Matl. &

Issue Contracts

PROCUREMENT

Activity

Stake-Holder FTTx Plan to Build

Legend

Construct &

Update As-Built

CONSTRUCTION

Create Physical

Inventory

NETWORK ISP

Inventory Transfer

and Service Order

Management

GIS & OSS

Manage

Roll-out

DEPLOYMENT

Sites & Links Tracing

ALL

Commissioning

Proactive Tracking

CRM / BSS

Video Wall

NOC OPERATIONS

Coverage Check

ALL

Operations

6

Before You Set Out…

Process Definition

Platform Selection Organisation

Secure Management Commitment & Budget

Plan in detail

Return on Investment

Identify Quick-Wins

Technical Execution

Project Management & Project Control

Finalize Process, Platform and Organisation iteratively

7

Geospatial Technology in

FTTx Network Plan To Build

Architectural & Design Principles

Define Data Masters / Systems of Records (SOR)

Decide Workflow and BPM Systems

Decide Dashboard / Analytics Platform

Decide Systems of Interaction (SOI) and UX

Define Integration Requirements between various SORs and SOIs

Define Integration Architecture – SOA

Design Individual System / Components

Build, Test and Deploy Incrementally

9

FTTx Workflow: GIS-NE Role

Mobile Design

Survey App

Desktop Design 3

Building Survey M

ob

ile G

IS

Buildings (Business Data) 1

GIS

Network Plan

Desktop GIS

2 Desktop

Design

GIS I/P

Route Feasibility in GIS

Feasibility I/P 4

Network

Engineer

Final Design 5

AsBuilt 10

Network

Inventory

11

RFS Buildings 12

AsBuilt 9

Mobile As-Built

Survey App

Final

Design

8

BOQ SOQ 7

6 Data Validation

10

Business Planning &

Project Management

11

Mobile App for Business Potential Survey

<< Edit Existing / Draw

New Buildings on

Mobile App

Update Building Attributes

with Simple UI on Mobile >>

12

Web-based Business Planning – Scope / Area of Interest and Priorities

13

Project Progress Monitoring

14

FTTx Network Planning

15

Scope Area for FTTx Planning

16

Network Map Issued For Construction

17

FTTx Network Build

Web App for Assigning Field Work

Reliance Jio Infocomm Limited 19

Lis

t o

f D

SA

Ma

p v

iew

at

DS

A le

ve

l

Field Engineer’s View –Tasks at DSA level with map view

Reliance Jio Infocomm Limited 20

Capture Progress, As-Built, Materials Consumption and QA

Quality check updation

22

Web App – “Ready for Service” Building Viewer

23

Benefits & ROI in Network Plan-to-Build

Qualitative Benefit Factors allowing RoI

Controlled process implementation Workflow; Repeatable, Accurate, Real-time

Data; Optimal Project Organisation

Real-world Planning from office and Construct

– as – Planned

No rework, shortest route used, reduction in

cell sites – 3% project cost

As-Built Capture Minimal efforts, Accurate; improved future

planning; Infra sharing

Data Flow-through to OSS and O&M No data entry at OSS, Service Order w/flow,

Quick roll-out and Reduced MTTR

Effective Project Management Schedule improvement – 1% project cost

Geographical Asset Management Inventory Lifecycle Management

Warranty and spares management

24

3. Provisioning & Service

Fulfillment

25

OSS Integration

NetworkEngineer™

Performance

Management

Service

Management

MDM

Physical

Inventory

Building

Status

Physical

Inventory

Map

Services

Outage

Map Event Links

Inventory

Status

26

Benefits & ROI in OSS Integration

Qualitative Benefit Factors allowing RoI

Master Physical Inventory & Link Data Single truth – alarms correlate to location

Data flow-through and re-use 2 mil equipment records entry saved

Avoid redundant data entry One-time data entry in SAP, HP-SM, TeMIP

Effective logical inventory management Quick service provisioning

Fault Localisation Substantially reduced MTTR

Effective Network Monitoring Single, Geographic view in NOC

27

4. Network O&M

28

NOC Display Wall

RFS Building and Network Trace for O&M on Mobile

• In Service FTTx Network with Connected Buildings

• Connected Buildings with Network Equipment

• Details of Selected Building

• Equipment at Selected Location

• Equipment Details

• Network Trace

30

OFC Fault Locator - Mobile App

31

Benefits & ROI in Network O & M

Qualitative Benefit Factors allowing RoI

Effective N/W Monitoring Quick identification of faulty network

Utility Management Improved operational efficiency up to 5%

Equipment Maintenance History Warranty & Service Management in SAP

Facility Planning Retrieval of plans, Space Management

Fault Localisation Reduced MTTR