Check list for Concrete Work
Name of Work:.
Date:. Location:.
Grade of Concrete: Type of Structure:..
Sl.No.
Points to be Checked Observation Remarks
1 Layout
2 Use of standard measuring boxes
3 Grade of concrete
4 Use of cement slurry
5Use of water proofing compound (Ifspecified)
6 Week of cement to be used
7 Use of concrete mixer
8Use of vibrator(Needle/Plate Vibrator)
9 Thickness of concrete
10
Mix should be consumed within 30
minutes (initial setting time)11 Date & curing
Mandatory tests for concrete
A Slump test
B Cube test
Mandatory tests for sand
A Silt test
B Particle size distribution
C Organic Impurities
D Bulking of sand
Mandatory tests for aggregateA Particle size distribution
B Crushing strength
C Impact value
D Bulk density
E Specific gravity
Check list for Reinforcement Work
Name of Work:.
Date:. Location:.
Type of Structure:..
Sl.No.
Points to be Checked Observation Remarks
1 Bar length
2 No. of bars
3 Spacing of bars
4 Lap length
5 Staggering of laps
6 Spacers
7 Chairs
8 Cover blocks
9 Bend if specified
10 Cleanliness (Rusting etc)
11 Anchorage length
12 Tying of reinforcement
Mandatory tests for Reinforcement
A Tensile test
B Retest
C Rebound test
D Nominal mass
E Bend test
F Elongation test
G Proof stress
Check list for Brick Work
7/31/2019 Check List for Works
2/5
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Layout of brick work
2 Soaking of bricks
3 Ratio of mix specified
4Laying (Type of bond like English /Flemish bond)
5 Joint thickness
6 Filling of joints
7 Line & level of brick work
8 Plump of brick work
9 Outer side grooves
10 Reinforcement of half brick work
11 Date and curing
Mandatory tests for Bricks
A Compressive strength test
B Water absorption test
C Dimensions
D Efflorescence test
Check list for Plaster Work
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Mix of mortar
2 Preparation of surface
3 Hacking of surface
4 Applying water before starting plaster work
5 Checking of thickness gauge
6 Plumb
7 Straightness of edges
8 Preparation of Jambs / Sill / Soffits
9 Grooves
10 Curing
11 Check for unevenness with straight edge
Check list for Grit Wash
7/31/2019 Check List for Works
3/5
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Preparation of surface
2 Making panels
3 Preparation of thickness gauge
4Checking of surface / thickness for roughplaster
5Mixing of cement chips in requiredproportions
6 Making of grooves in proper alignment
7 Cleaning of grit wash with acid
Check list for Mud Phaska
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Cleaning of surface
2 Application of bitumen
3 Mixing of mud and bhusa
4 Making proper slope5 Fixing of tiles
6 Grouting / pointing etc. of tiles
7 Making of khurras
8 Testing of seepage by stagnation of water
Check list for Glazed Tile Work
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Checking of brand
2 Preparation of rough surface
3Fixing of tiles with proper mix and neatcement slurry
4 Checking of surface with straight edge
5 Checking of hollowness
6 Checking of broken edges
7 Checking of joints
8 Curing of tiles
Mandatory tests for Bricks
A Dimension test
B Water absorption test
C Crazing test
D Impact Strength
E Chemical resistant test
7/31/2019 Check List for Works
4/5
Check list for Form Work
Name of Work:.
Date:. Location:.
Type of structure: .
Sl.No. Points to be Checked Observation Remarks
1 Form condition
2 cleanliness
3 Oiling of shuttering
4 Supports / props
5 Bracing
6 Tie rods
7 Clamps
8 Purlin and rafters
9 Leveling
10 Camber of slab
11 Joint packing
12 Plumb of column
13 Dimension of column, beam, footing etc.
14 Removal of supports
Check list for Water Bound Macadam
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Checking of graded stone aggregate
A Gradation
B Impact value
C Water absorption
D Flakiness and Elongation index
2Checking quality of Binding materials i.e.Moorum / Earth
A Gradation
B Plasticity Limits
3Checking for dry rolling and filling of voidswith screenings
4Checking consolidation (Sprinkling ofbinding materials and watering)
5Checking thickness of each compactedlayer
6 Checking of camber
7/31/2019 Check List for Works
5/5
Check list for Granular Sub Base (G.S.B.)
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Checking of gradation as per M.O.S.T.
2 Checking of plasticity
3 Checking of C.B.R.
4 Checking of proctor density
5 Checking of 10% fine value
6Checking road equipment Vibratory roller,grader, dozer
7 Checking required water and compaction
8 Checking road width
9 Checking thickness
10 Checking field density
11 Checking camber
Check list for Bituminous Works (D.B.M / B.C.)
Name of Work:.
Date:. Location:.
Sl.No.
Points to be Checked Observation Remarks
1 Quality of Binder
2Cleanliness of surface for application ofTack Coat
3Checking Impact value, water absorption,flakiness index of aggregates
4Checking gradation of individualaggregates and mix aggregates from drieras per job mix
5Checking control of temperature for binder,aggregates and mix at the time of layingand rolling
6 Checking calibration of plant
7 Checking binder content
8Checking capacity and required type ofroller (Vibratory roller, pneumatic typeroller)
9 Spreading with sensor paver
10 Checking temperature at the time of rolling
11Checking rolling with required number ofpasses
12Checking stability of mix such as Marshal
flow value, Voids etc.13 Density of compacted layer
14 Core cutter
15 Surface evenness (Bump indicator test)