    Check list for Concrete Work

    Name of Work:.

    Date:. Location:.

    Grade of Concrete: Type of Structure:..

    Sl.No.

    Points to be Checked Observation Remarks

    1 Layout

    2 Use of standard measuring boxes

    3 Grade of concrete

    4 Use of cement slurry

    5Use of water proofing compound (Ifspecified)

    6 Week of cement to be used

    7 Use of concrete mixer

    8Use of vibrator(Needle/Plate Vibrator)

    9 Thickness of concrete

    10

    Mix should be consumed within 30

    minutes (initial setting time)11 Date & curing

    Mandatory tests for concrete

    A Slump test

    B Cube test

    Mandatory tests for sand

    A Silt test

    B Particle size distribution

    C Organic Impurities

    D Bulking of sand

    Mandatory tests for aggregateA Particle size distribution

    B Crushing strength

    C Impact value

    D Bulk density

    E Specific gravity

    Check list for Reinforcement Work

    Name of Work:.

    Date:. Location:.

    Type of Structure:..

    Sl.No.

    Points to be Checked Observation Remarks

    1 Bar length

    2 No. of bars

    3 Spacing of bars

    4 Lap length

    5 Staggering of laps

    6 Spacers

    7 Chairs

    8 Cover blocks

    9 Bend if specified

    10 Cleanliness (Rusting etc)

    11 Anchorage length

    12 Tying of reinforcement

    Mandatory tests for Reinforcement

    A Tensile test

    B Retest

    C Rebound test

    D Nominal mass

    E Bend test

    F Elongation test

    G Proof stress

    Check list for Brick Work

  • 7/31/2019 Check List for Works

    2/5

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Layout of brick work

    2 Soaking of bricks

    3 Ratio of mix specified

    4Laying (Type of bond like English /Flemish bond)

    5 Joint thickness

    6 Filling of joints

    7 Line & level of brick work

    8 Plump of brick work

    9 Outer side grooves

    10 Reinforcement of half brick work

    11 Date and curing

    Mandatory tests for Bricks

    A Compressive strength test

    B Water absorption test

    C Dimensions

    D Efflorescence test

    Check list for Plaster Work

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Mix of mortar

    2 Preparation of surface

    3 Hacking of surface

    4 Applying water before starting plaster work

    5 Checking of thickness gauge

    6 Plumb

    7 Straightness of edges

    8 Preparation of Jambs / Sill / Soffits

    9 Grooves

    10 Curing

    11 Check for unevenness with straight edge

    Check list for Grit Wash

  • 7/31/2019 Check List for Works

    3/5

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Preparation of surface

    2 Making panels

    3 Preparation of thickness gauge

    4Checking of surface / thickness for roughplaster

    5Mixing of cement chips in requiredproportions

    6 Making of grooves in proper alignment

    7 Cleaning of grit wash with acid

    Check list for Mud Phaska

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Cleaning of surface

    2 Application of bitumen

    3 Mixing of mud and bhusa

    4 Making proper slope5 Fixing of tiles

    6 Grouting / pointing etc. of tiles

    7 Making of khurras

    8 Testing of seepage by stagnation of water

    Check list for Glazed Tile Work

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Checking of brand

    2 Preparation of rough surface

    3Fixing of tiles with proper mix and neatcement slurry

    4 Checking of surface with straight edge

    5 Checking of hollowness

    6 Checking of broken edges

    7 Checking of joints

    8 Curing of tiles

    Mandatory tests for Bricks

    A Dimension test

    B Water absorption test

    C Crazing test

    D Impact Strength

    E Chemical resistant test

  • 7/31/2019 Check List for Works

    4/5

    Check list for Form Work

    Name of Work:.

    Date:. Location:.

    Type of structure: .

    Sl.No. Points to be Checked Observation Remarks

    1 Form condition

    2 cleanliness

    3 Oiling of shuttering

    4 Supports / props

    5 Bracing

    6 Tie rods

    7 Clamps

    8 Purlin and rafters

    9 Leveling

    10 Camber of slab

    11 Joint packing

    12 Plumb of column

    13 Dimension of column, beam, footing etc.

    14 Removal of supports

    Check list for Water Bound Macadam

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Checking of graded stone aggregate

    A Gradation

    B Impact value

    C Water absorption

    D Flakiness and Elongation index

    2Checking quality of Binding materials i.e.Moorum / Earth

    A Gradation

    B Plasticity Limits

    3Checking for dry rolling and filling of voidswith screenings

    4Checking consolidation (Sprinkling ofbinding materials and watering)

    5Checking thickness of each compactedlayer

    6 Checking of camber

  • 7/31/2019 Check List for Works

    5/5

    Check list for Granular Sub Base (G.S.B.)

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Checking of gradation as per M.O.S.T.

    2 Checking of plasticity

    3 Checking of C.B.R.

    4 Checking of proctor density

    5 Checking of 10% fine value

    6Checking road equipment Vibratory roller,grader, dozer

    7 Checking required water and compaction

    8 Checking road width

    9 Checking thickness

    10 Checking field density

    11 Checking camber

    Check list for Bituminous Works (D.B.M / B.C.)

    Name of Work:.

    Date:. Location:.

    Sl.No.

    Points to be Checked Observation Remarks

    1 Quality of Binder

    2Cleanliness of surface for application ofTack Coat

    3Checking Impact value, water absorption,flakiness index of aggregates

    4Checking gradation of individualaggregates and mix aggregates from drieras per job mix

    5Checking control of temperature for binder,aggregates and mix at the time of layingand rolling

    6 Checking calibration of plant

    7 Checking binder content

    8Checking capacity and required type ofroller (Vibratory roller, pneumatic typeroller)

    9 Spreading with sensor paver

    10 Checking temperature at the time of rolling

    11Checking rolling with required number ofpasses

    12Checking stability of mix such as Marshal

    flow value, Voids etc.13 Density of compacted layer

    14 Core cutter

    15 Surface evenness (Bump indicator test)