View
217
Download
0
Category
Preview:
Citation preview
CER-DM-PR-2008 Date: 1/5/2009
CERES DMT to DAAC Production Requests YEAR 2008
by
CERES Data Management Team
Climate Sciences Branch Science Directorate
NASA Langley Research Center Hampton, VA 23681-2199
Science Systems and Applications, Inc (SSAI) One Enterprise Parkway
Hampton, Virginia 23666
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 2
posted at: http://asd-www.larc.nasa.gov/ceres/dmt2daac/
Document Revision Record
IssueDate Release Number
DCCRa
Number Preparedb
by Description of Revision
Section Affected
1/23/08 R11V1 tbd ebg • Closed Aqua Edition2A SRBAVG requests (PRs 124-07, 125-07) • Added Terra Editon2F and Aqua Edition2C CRS and FSW requests (PRs 1-08 to 8-08) • Added Terra and Aqua Beta4W and Beta4C TSI requests (PRs 7-08 to 10-08) • Added Terra and Aqua Beta4W and Beta4C synoptic SARB requests (PRs 7B-08 to
10B-08)
Table 1:
2/25/08 R11V2 tbd ebg • Corrected ending date for Terra Edition2F FSW request (PR 1-08) • Comment related to Inst SARB processing applies to Aqua and not Terra. Removed
comment from request (PR 1-08 to 3-08) • Closed Aqua Edition2B CRS post processing for 2006 (PR 77-07) • Closed Aqua Edition2B SSF processing (PR 10-07 to 12-07) • Closed Aqua Edition2B SFC processing (PR 7-07 to 9-07) • Closed Aqua Edition2B CRS processing (PRs 84A-07 to 84D-07)
Table 1:
3/12/08 R11V3 tbd lhc • Added Aqua and Terra Beta1-Ed3 SSFI processing for seasonal months beg. 10/03 and January and July 06 (PRs 11-08 and 12-08, respectively)
• Changed cc5 value from “020029” to “020030” for PRs 01-08 through 06-08 • Closed PRs 1-06 and 2-06
Table 1: Table 2:
4/07/08 R11V4 tbd lhc • Added PRs 13-08 and 14-08 for Terra and Aqua Inversion Beta1-Ed3 • Closed PRs 3-08, 6-08, 90-0, 91-07, 92-07, 80-07, 90A-07, and 91A-07, and 130-07
through 135-07 • Corrected processing dates for 7-07 and 10-07 and added explanatory note in red in
comment section above those PRs • PR 133-07 Output PS was modified according to 3/26/08 note in comment section above
block of PRs • Added note to comments to turn on CloudVis file for PRs 11-08, 12-08, 132-07 • Added corrective note to PRs 92-07, 96-07, 132-07, 135-07, and 138-07 regarding
CloudVis flag • Added PRs 15-08 and 16-08 to reprocess selected days through Clouds for the evaluation
of the sample GMAO G5 data • Ending dates added for PRs 1-02 and 2-06
Table 1:
Table 2:
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 3
Document Revision Record
IssueDate Release Number
DCCRa
Number Preparedb
by Description of Revision
Section Affected
6/09/08 R11V5 tbd lhc • Closed PRs 73-07, 91-08, 15-08, 16-08, 12-08, 11-08, 10-08, 10B-08, 9-08, 9B-08, 8-08, 8B-08, 7-08, 7B-08, 5-08, 4-08, 129-07, 136-07, 137-07, 138-07
• Closed PRs 108-07 through 113-07 for Subsystem 10 to be reopened at a later date • Added PRs 17-08, 18-08, 19-08, 20-08 to process ISCCP-D2like (PGE 9.0P1) for FM1,
FM2, FM3, and FM4 • Added PRs 21-08 through 35-08 for Instrument Subsystem validation (ValR10-Ed2)
processing through Instrument and ERBE-like • Added PRs 36-08 through 44-08 for ValR11 runs for gains and SRF through August
2007
Table 1:
6/18/08 R11V6 tbd lhc • Corrected date for PR 40-08 from 09/07 to 08/07 • Added date to Revision history table for 6/09/08 • Corrected Instrument column value for PR 23-08 “FM1, FM2, FM3” to “FM4” • Corrected Output PS for PRs 21-08 thru 24-08 from “ValR10” to “ValR10-Ed2” • Corrected Input PS for PRs 21-08 and 22-08 from “ValR10” to “ValR10-Ed2”
Table 1:
6/23/08 R11V7 tbd lhc • Added PR 45-08 to process 1 day of latest G5 sample data through Clouds • Closed PRs 36-08 through 44-08, 4-08, 129-07 • Changed PRs 11-08 and 12-08 to indicate still open instead of closed
Table 1:
6/27/08 R11V8 tbd lhc • Added PRs 46-08 through 52-08 Table 1:
7/16/08 R11V9 tbd lhc • Added PRs 53-08 through 64-08 • Closed PRs 128-07 and 45-08 • Reinstated “on hold” comment for PRs 21-08 through 35-08 • 7/9/08 – changed PS4_1 for PRs 63-08 and 64-08 from Edition2B to Edition1B-MIGBP• 7/16/08 – Changed output PS for PRs 61-08 and 60-08 from “Ed2-NoSW” to Ed2C-
NoSW”
Table 1:
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 4
Document Revision Record
IssueDate Release Number
DCCRa
Number Preparedb
by Description of Revision
Section Affected
7/21/08 R11V10 tbd lhc • Closed PRs 46-08 through 52-08, 127-07, 19-08, 1-08 • Added PRs 65-08 through 72-08 to process Beta4 and Beta5 SYN/AVG/ZAVG • Added PR 73-08 to process the Beta1 GGEO ISCCP-D2like • Added PRs 74-08 through 79-08 to process Beta10 and Edition2A GGEO from 11/05
through 08/07 • Changed PS2 and PS3 for PR 31-08 from “ValR10-Ed2” to “ValR10” • Added PRs 31-08B through 31-08D for ERBE-like ValR10 • Divided PRs 29-08 and 30-08 so that PGE CER1.2P1 has separate PRs for ValR10 • Removed “ON HOLD” note from PRs21-08 through 35-08 • 8/1/08 – Added “HOLD NOTICE” to comments for PRs 74-08 through 79-08 • 8/1/08 – Filled in CC numbers for cc4_0, cc9_3, and cc12 for PRs 74-08 through 79-08
Table 1:
9/26/08 R11V11 tbd lhc • Canceled further processing of PRs 11-08 and 12-08 • Canceled all processing for PRs 13-08, 14-08, 67-08, 68-08, 69-08, 71-08 • Corrected underscore typo in PS for PRs 60-08 and 61-08 from “_NoSW” to “-NoSW” • Closed PRs 126-07, 17-08, 18-08, 20-08 through 34-08, 60-08 through 62-08, 65-08, 66-
08 • Changed SCCR number affiliated with PRs 74-08 through 79-08 from 675 to 653 • Correct PR 57-08 to replace input “PS4_1” with “PS1” • Correct PRs 31-08D and 31-08E to change Cmdline arg from “M” to “N” • Added PRs 80-08 through 81-08, then canceled PR 81-08 • Modified PRs 70-08 and 72-08 to eliminate the April months already processed in SIT
and to add the remainder of the 2001 months
Table 1:
11/3/08 R11V12 tbd lhc • Closed PRs 58-08, 59-08, 72-08, 73-08, 81-08 • Put HOLD status on PRs 57-08, 56-08, and 55-08 • Added PRs 82-08, 83-08, and 84-08 to produce the Beta1 ISCCP-D2like-Day/Nit/GEO
products • Note added to DAAC verification column heading to use most recent CC# when one is
not provided
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 5
Document Revision Record
IssueDate Release Number
DCCRa
Number Preparedb
by Description of Revision
Section Affected
12/08/08 R11V13 tbd lhc • Added PRs 89-08 through 92-08 for Ed2 G5-CERES MOA and PMOA (89-08 canceled)
• Added PRs 85-08 through 88-08 for Beta6 SYN/AVG/ZAVG • Placed 53-08 and 54-08 on hold for July 2007 forward • Canceled 74-08 to 79-08, to be requested at a more realistic time
12/31/08 R11V14 tbd lhc • Closed 90-07, 83-08, 85-08, 86-08, 87-08, 88-08, 90-08, 92-08
a. Document Configuration Change Request Number b. Prepared by: ebg - Erika Geier, NASA lhc – Lisa Coleman, SSAI
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 6
CERES DMT to DAAC Production Requests, YEAR 2008
This set of tables serves as a format for requesting production activities from the CERES Data Management Team (DMT) to the Langley TRMM/Terra Information System (LaTIS). The organization of the requests is as follows: • CERES Data Processing Policy • Table 1:: Production Request for CERES Processing (PR) • Table 2:: Standing Production Request for CERES Misc. Processing (M-PR) • Table 3:: Standing Production Request for CERES Terra Processing (AM-PR) • Table 4:: Standing Production Request for CERES Aqua Processing (PM-PR) A Change bar (|) is used, on left side of document, to indicate changes since the last request. Note: Shaded boxes are completed Production Requests. All CERES Processing Requests should be referenced as: CERES PR’Item#’. Examples: CERES PR3-99 is Production Request 3 made in year 1999 and CERES PM-PR 4-01 is the 4th standing Aqua production request made in 2001.
CERES Data Processing Policy
Under normal circumstances, a Data Month must be processed with a unique Software Code. If an emergency Software Code Fix must be made in the middle of a processing month, all days previously processed must be reprocessed to maintain consistency of the data.
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 7
CERES Production Requests, YEAR 2008 RP = Runtime Parameter.
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
12/3/08 – Process overlap data for G5-CERES (SCCRs 686 for MOA and 684 for PMOA) NOTE: The available data months to run at this time are not those that correspond to currently planned Edition2 2008 processing. They are of the same format, however, and are suitable for the first production runs of the newly delivered Regrid MOA and PMOA PGEs. Computing Platform – Magneto P4 ENVIRONMENT VARIABLES For 12.1P1 For PR 90-08 Set G5Stream = 1 For PR 92-08 Set G5Stream = 2
cc12= assigned with latest promotion cc9_1= assigned with latest promotion
92-08 12.1P1 CERES PS12in=DAO-G5-CERES PS12out= DAO-G5-CERES
9/30/2007 12/31/2007 Done 12/31/08
91-08 9.1P1 CERES PS12= DAO-G5-CERES
PS9_1= DAO-G5-CERES
10/2007 11/2007
90-08 12.1P1 CERES PS12in=DAO-G5-CERES PS12out= DAO-G5re-CERES
10/01/2007 10/31/2007 Done 12/31/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 8
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
89-08 9.1P1 CERES PS12= DAO-G5re-CERES
PS9_1= DAO-G5re-CERES
10/07 10/07 Cancel. 12/8/08
11/19/08 – Process SYN/AVG/ZAVG Beta6 SCCR 689 NOTE: April 2001 was originally processed thru TSI and SYNI at the SCF, so it must be processed in the Op environment before that month can run thru SS8 Computing Platform – Magneto P4 For 86-08 , use PS7_1 and PS7_2 =Beta5 except for months 1/01, 7/01, 10/01 when Beta4 is used For PR 86-08: Month -Instrument 01-FM1, 02-FM2, 03-FM2, 04-FM2, 05-FM1, 06-FM1, 07-FM1, 08-FM2, 09-FM2, 10-FM2, 11-FM1, 12-FM1
cc4_0= cc4_2= cc5= cc12= cc6= cc10= cc11= cc11_6= cc7_1= cc7_2=
cc8=assigned with latest promotion
88-08 7.1.1P1 FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A
PS7_1=Beta5 04/01 04/01 Done 12/14/08
87-08 7.2.1P1 FM2
PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta5
PS7_2=Beta5 04/01 04/01 Done 12/16/08
86-08 8.1P1 FM1 or FM2
PS7_1=Beta5/Beta4 (see note) PS7_2=Beta5/Beta4(see note)
PS8=Beta6 01/01 12/01 Done. 12/22/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 9
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
85-08 8.1P1 FM3 or FM4
PS7_1=Beta4/Beta5(Apr) PS7_2=Beta4/Beta5(Apr)
PS8=Beta6 07/02 (FM4) 10/02 (FM4) 1/03 (FM3) 4/03 (FM4)
07/02 10/02 1/03 4/03
Done. 12/23/08
11/03/08 – Process PGE CER9.0P1 (SCCR 672) to correspond with full Terra and Aqua Data record processed to date, and CER11.7P1 (SCCR 675) to correspond with GEO data record to date No need to reprocess Beta1 months already processed – see PRs 17-08 through 20-08 for months already processed through 9.0P Cross-track data only FM1: 5/2000 thru 7/2000,11/2000 thru 1/2001, 5/2001 thru 7/2001, 11/2001 thru 12/2005, 3/2006 thru 8/2007 FM2: 3/2000 thru 4/2000, 8/2000 thru 10/2000, 2/2001 thru 4/2001, 8/2001 thru 10/2001, 1/2006 thru 2/2006 FM3 = 7/02; 11/02 thru 1/03; 5/03 thru 7/03; 4/05 thru 12/07 FM4 = 7/02 thru 10/02; 2/03 thru 4/03; 8/03 thru 3/05 Computing Platform: Run on Magneto – ASDC P4
cc4_5= TerraEd2B: 026030, 027031 (7/04, 7/05) AquaEd2B: 034039 TerraEd2F: 027033
AquaEd2C: 034040 cc9=02303
cc11= cc11_7=
84-08 9.0P1 FM1, FM2 PS4_5=Edition2B/ Edition2F
PS9_0=Beta1 03/2000 ( see PRs 17-08 and 18-08 for months already processed)
08/2007
83-08 9.0P1 FM3, FM4 PS4_5=Edition2B/ Edition2C
PS9_0=Beta1 07/2002 ( see PRs 19-08 and 20-08 for months already processed)
08/2007 Done. 12/22/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 10
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
83-08 9.0P1 FM3, FM4 PS4_5=Edition2B/ Edition2C
PS9_0=Beta1 07/2002 ( see PRs 19-08 and 20-08 for months already processed)
08/2007
82-08 11.7P1 Composite PS11=Edition2A PS11_7=Beta1 03/2000 (process months with corresponding GGEO data - except 07/02, 10/02, 01/03, &
04/03)
10/2005 (except 07/02, 10/02, 01/03, & 04/03)
Process ERBE-like Edition2 Combined Satelllite Process with instruments in crosstrack only These PRs should have been included with the suite of PRs 46-08 through 52-08
cc3=024031 cc3_2=024031
81-08 3.2P1 FM1+FM3 PS3=Edition2 (Terra) PS3=Edition2 (Aqua)
PS3_2=Edition2 1/07 8/07 Done. 10/17/08
80-08 3.2P1 FM2+FM3 PS3=Edition2 (Terra) PS3=Edition2 (Aqua)
PS3_2=Edition2 1/07 8/07 Cancel. 9/30/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 11
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
07/21/08 – Process GGEO (SCCR 653) All input to PGE 11.1P10 must be in MCIDAS format Note: SFC input to GGEO must always be from the crosstrack instrument. FM1 is in crosstrack 11-12/05, 3/06 through 6/08 Use FM2 for 01-02/06 http://asd-www.larc.nasa.gov/dsnyder/Terra/ceres_info.html Note: These PRs correct usage of cc9 to now be cc9_3, consistent with the latest version of the Operator’s Manual 8/1/08 HOLD NOTICE: PRs 74-08, 75-08, and 76-08 are on hold until the Beta10 runs are approved PR 77-08 is on hold pending the availability of input products. As inputs become available, PR 77-08 may be processed
cc4_0=021022, 021023 cc9_3=023031 cc11= cc11_4= cc11_6= cc12=017027, 017028, 018029
79-08 11.1P10 11.1P10 11.1P10 11.1P10 11.1P10
11.1P10 11.1P10 11.1P10
11.1P10
METEO-5 METEO-7 METEO-8 METEO-9 MTSAT-1 GOES-09 GOES-10 GOES-11 GOES-12
PS4_0= NSIDC_NESDIS SS9_1=PS12= DAO-GEOS4
PS11_M=Beta10 11/05 8/07 12/8/08 - Cancel until more realistic time
78-08 11.2P2 Composite PS11_M=Beta10 PS11=Beta10 11/05 8/07 12/8/08 - Cancel until more realistic time
77-08 11.4P1 Composite PS11_M=Beta10 PS11_4=Beta10 11/05 8/07 12/8/08 - Cancel until more realistic time
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 12
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
76-08 11.1P10 11.1P10 11.1P10 11.1P10 11.1P10
11.1P10 11.1P10 11.1P10 11.1P10
METEO-5 METEO-7 METEO-8 METEO-9 MTSAT-1 GOES-09 GOES-10 GOES-11 GOES-12
PS4_0= NSIDC_NESDIS SS9_1=PS12= DAO-GEOS4
PS11_M=Edition2A 11/05 8/07 12/8/08 - Cancel until more realistic time
75-08 11.2P2 Composite PS11_M=Edition2A PS11=Edition2A 11/05 8/07 12/8/08 - Cancel until more realistic time
74-08 11.6P1 Composite PS11=Edition2A PS11_6=Edition2A 11/05 8/07 12/8/08 - Cancel until more realistic time
07/21/08 – Process new PGE CER11.7P1 (SCCR 675)
cc11= cc11_7=
73-08 11.7P1 Composite PS11=Edition2A PS11_7=Beta1 07/02 10/02 01/03 04/03
07/02 10/02 01/03 04/03
Done. 10/7/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 13
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
07/16/08 – Process Beta5 TISA TSI (SCCR 671) Process Synoptic SARB SYNI (SCCR 663, 662) Process SYN/AVG/ZAVG (SCCR 667) Rerunning Beta4 Aprils as Beta5, along with additional months, to test logic associated with the number of days of the month Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05.
Crosstrack Only
FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07
FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/0 ENVIRONMENT VARIABLES: Environment variable for synoptic SARB must be set as follows: SS7_2_MATCH = C4
cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1= cc7_2=004008 cc8=
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 14
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
72-08 7.1.1P1 FM1, FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A
PS7_1=Beta5 04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04
04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04
Done. 10/9/08
71-08 7.1.1P1 FM3, FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A
PS7_1=Beta5 04/03 04/04 04/05
04/03 04/04 04/05
Canceled. 9/26/08. Processed at SCF
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 15
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
70-08 7.2.1P1 FM1, FM2 PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta5
PS7_2=Beta5 04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04
04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04
Done. 10/28/08
69-08 7.2.1P1 FM3, FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta5
PS7_2=Beta5 04/03 04/04 04/05
04/03 04/04 04/05
Canceled. 9/26/08. Processed at SCF
68-08 8.0P1 FM1, FM2 PS7_1=Beta5 PS7_2=Beta5
PS8=Beta5 04/00 04/01 04/02 04/03 04/04 04/05
04/00 04/01 04/02 04/03 04/04 04/05
Canceled. 9/25/08 To be processed at SCF
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 16
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
67-08 8.0P1 FM3, FM4 PS7_1=Beta5 PS7_2=Beta5
PS8=Beta5 04/03 04/04 04/05
04/03 04/04 04/05
Canceled. 9/25/08 To be processed at SCF
07/16/08 – Process Beta4 SYN/AVG/ZAVG (SCCR 667) Crosstrack Only
FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01
FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07
FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/0
cc7_1= cc7_2=004007 cc8=
66-08 8.0P1 FM1, FM2 PS7_1=Beta4 PS7_2=Beta4
PS8=Beta4 7/00 Seasonal months EXCEPT April only
10/05 Done. 9/7/08
65-08 8.0P1 FM3, FM4 PS7_1=Beta4 PS7_2=Beta4
PS8=Beta4 7/02 Seasonal months EXCEPT April only
10/05 Done. 9/7/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 17
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
06/24/08 Process Clouds and Inversion Edition2 for 2 years of Aqua (01/01/2004 through 12/31/2005) with special IGBP map (SCCR 673) PRIORITY NOTE: Special processing with “run-in-the-background” priority Process cross-track only for January 04 through February 05, FM3 for March through December 2005 Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure to use CERES_ECS–OA0063m_Aqua-MODIS_Edition1A and CER_ECS-OA0213m_Aqua-MODIS_Edition1A as clear sky maps as starting point Rename 01/01/2004 and 01/02/2004 CER_ECS-OA0063m_Aqua-MODIS_Edition1A and CER_ECS-OA0213m_Aqua-MODIS_Edition1A and start with the renamed ones. ENVIRONMENT VARIABLES
Note: Need to turn OFF CloudVis files: $ENV{‘CV’} = ‘n’; NEW! Need to set $ENV{‘MODIS_IGBP’}=’y’
cc12=most recent cc1=most recent cc4_0=most recent cc4_1=
cc4_2= cc4_3=
64-08 4.1-4.1P5 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM3, FM4 MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1=Edition1B PS4_1=Edition1B-MIGBP
01/01/2004 12/31/2005
63-08 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1
FM3, FM4 PS4_1=Edition1B PS4_1=Edition1B-MIGBP PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5= Ed2C-MOD-C4-Land-IGBP
01/01/2004 12/31/2005
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 18
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
06/24/08 Process Clouds, Inversion, SARB, and TISA-Gridding (SFC and FSW), Edition2 through September 2007 PRIORITY NOTE: Aqua processing through May 07 is the highest priority PR 55-08, 5-08, and 57-08 7/27/07 forward on hold pending resolution of mismatched MODIS input file Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps for 7/06 ValR13 run. Rename the 7/1/05 Edition1A CERES_ECS files and start with those. Do NOT use CERES_ECS start-up maps when running Edition1B, instead rename Edition1B maps and use those as starting point. Wrong CC number used for 4.5-6.2P2 and 4.5-6.4P1. Will rerun when remainder of 2007 is processed.
Note: Use Edition2A-QC clear-sky maps for Terra ENVIRONMENT VARIABLES
Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’; NEW! Need to set $ENV{‘MODIS_IGBP’}=’n’
cc12=most recent cc1=most recent cc4_0=most recent cc4_1=
cc4_2= cc4_3= cc2_4= cc4_8= cc4_9= cc4_10= cc9_1= cc9= cc9_3= cc9_4=
cc5= cc5_4= cc6= cc6_3=
cc9_1=
62-08 4.1-4.1P5 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM3, FM4 MODIS V005
PS1=Edition2/Ed2-NoSW PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1=Edition1B 1/1/07 9/01/07 Done. 9/3/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 19
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
61-08 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1
FM3, FM4 PS1=Edition1B PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5=Edition2C/Ed2C-NoSW
1/1/07
9/01/07 Done. 9/3/08
60-08 9.2P1 9.3P1 9.4P1
FM3, FM4 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2C/Ed2C-NoSW
PS9=Edition2C/Ed2C-NoSW
12/31/06 hour 12
9/1/07 hour 11 Done. 9/3/08
59-08 5.0P1 5.1P2 5.4P2
FM3 V005 MOD08
PS4_5=Edition2C PS5 = Edition2C PS12=DAO-GEOS4
PS5=Edition2C 1/01/07 8/31/07 Done. 10/1/08
58-08 6.1P1 6.2P1 6.3P1
FM3 PS4_5=Edition2C PS5=Edition2C PS9_1=PS12= DAO-GEOS4
PS6=Edition2C 1/01/07 8/31/07 Done. 10/2/08
57-08 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM1, FM2, MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1= Edition2A-QC 1/1/07
9/01/07 11/3/08 – ON HOLD 7/27/07 forward
56-08 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1
FM1, FM2 PS4_1=Edition2A-QC PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5= Edition2F
1/1/07
9/01/07
11/3/08 – ON HOLD 7/27/07 forward
55-08 9.2P1 9.3P1 9.4P1
FM1, FM2 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2F
PS9= Edition2F 12/31/06 hour 12
9/1/07 hour 11 11/3/08 – ON HOLD 7/27/07 forward
54-08 5.0P1 5.1P1 5.4P1
FM1 V005 MOD08
PS4_5=Edition2F PS5 = Edition2F PS12=DAO-GEOS4
PS5=Edition2F 1/01/07 8/31/07 12/4/08 – ON HOLD 7/01/07 forward
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 20
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
53-08 6.1P1 6.2P1 6.3P1
FM1 PS4_5=Edition2F PS5=Edition2F PS9_1=PS12= DAO-GEOS4
PS6=Edition2F 1/01/07 8/31/07 12/4/08 – ON HOLD 7/01/07 forward
06/24/08 Process Instrument and ERBE-like Edition2 through September 2007 with gains and SRF delivered 5/30/08 PRIORITY NOTE: Aqua processing through May 07 is the highest priority
cc1=most recent cc1_2= cc1_3= cc2= cc2_1=
cc3= 52-08 2.4P1 FM1, FM2
FM3 FM4*
cmdline arg = 12 PS2=Edition2 *PS2=Ed2-NoSW (FM4)
01/07 08/07 done. 6/27/08
51-08 1.3P3 FM1, FM2 FM3, *FM4
PS1=Edition1-CV *PS1=Ed1-CV-NoSW (FM4)
PS1_1=Edition2 *PS1_1=Ed2-NoSW (FM4)
1/1/07
9/01/07 Done. 7/4/08
50-08 1.2P1 FM1, FM2 FM3 *FM4
PS1=Edition2 *PS1=Ed2-NoSW (FM4)
PS1_1=Edition2 *PS1_1=Ed2-NoSW (FM4)
1/1/07
9/01/07 Done. 7/4/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 21
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
49-08 2.2P1 FM1, FM2 FM3, *FM4
PS1=Edition2 PS2_1=NSIDC PS2_4=Edititon2 Cmdline arg = AFMT *PS1=Ed2-NoSW (FM4) *PS2_4=Ed2-NoSW (FM4)
PS2=Edition2 *PS2=Ed2-NoSW (FM4)
1/01/07
8/31/07
Done. 7/4/08
48-08 2.3P1 FM1, FM2 FM3, *FM4
PS1=Edition2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg = AFMT *PS1=Ed2-NoSW (FM4) *PS2_4=Ed2-NoSW (FM4)
PS2=Edition2 *PS2=Ed2-NoSW (FM4)
2/01/07 3/01/07 4/01/07 5/01/07 6/01/07 7/01/07 8/01/07 9/01/07
2/01/07 3/01/07 4/01/07 5/01/07 6/01/07 7/01/07 8/01/07 9/01/07
Done. 7/4/08
47-08 2.3P2 FM1, FM2 FM3, *FM4
PS1= Edition2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg = AFMT *PS2_1=Ed2-NoSW (FM4) *PS2_4=Ed2-NoSW (FM4)
PS2=Edition2 *PS2=Ed2-NoSW (FM4)
1/31/07 2/28/07 3/31/07 4/30/07 5/31/07 6/30/07 7/31/07 8/31/07
1/31/07 2/28/07 3/31/07 4/30/07 5/31/07 6/30/07 7/31/07 8/31/07
Done. 7/4/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 22
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
46-08 3.1P1 FM1, FM2 FM3, *FM4
PS2=Edition2 *PS2=Ed2-NoSW (FM4)
PS3=Edition2 *PS3=Ed2-NoSW (FM4)
01/07 08/07 Done. 7/4/08
06/19/08 Process Cloud (SCCR 654 CERESlib SCCR 655) Evaluating GMAO G5 data – MODIS Collection5, GEOS-4 MOA data Use DAO-TestSCF2-G5-CERES MOA created at SCF. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward Note: Use Edition2A-QC clear-sky maps
Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’;
cc12=most recent cc1=most recent cc4_0=most recent cc4_1=028036
cc4_2=028036
45-08 4.1-4.1P4 4.1-4.2P3
FM2 MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF2- G5-CERES
PS4_1= TestSCF2-G5-CERES
1/06/06 1/06/06
Done. 6/26/08
06/02/08 Validate Instrument and ERBE-like gains and SRF through September 2007 delivered 5/30/08
cc1=most recent cc1_2= cc1_3= cc2= cc2_1= cc3=
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 23
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
44-08 2.4P1 FM1, FM2 FM3, FM4
PS1=ValR11 PS2_1=NSIDC cmdline arg = 12
PS2=ValR11 01/07 08/07
01/07 08/07
Done. 6/19/08
43-08 2.2P1 FM1, FM2 FM3, FM4
PS1=ValR11 PS2_1=NSIDC PS2_4=ValR11 Cmdline arg = AFMT
PS2=ValR11 1/01/07 4/30/07 8/01/07
1/31/07 6/01/07 8/31/07
Done. 6/16/08
42-08 2.3P1 FM1, FM2 FM3, FM4
PS1=ValR11 PS2_1=NSIDC PS2_4=ValR11 Cmdline arg = AFMT
PS2=ValR11 2/01/07 6/01/07 9/01/07
2/01/07 6/01/07 9/01/07
Done. 6/16/08
41-08 2.3P2 FM1, FM2 FM3, FM4
PS1= ValR11 PS2_1=NSIDC PS2_4=ValR11 Cmdline arg = AFMT
PS2=ValR11 7/31/07 8/31/07
7/31/07 8/31/07
Done. 6/16/08
40-08 3.1P1 FM1, FM2 FM3, FM4
PS2= ValR11 PS3= ValR11 9/07 08/07
09/07 08/07
Done. 6/16/08
39-08 1.2P1 FM4 PS1=ValR11 PS1_1=ValR11 1/1/07 4/30/07 7/31/07
2/01/07 6/01/07 9/01/07
Done. 6/16/08
38-08 1.2P1 FM1, FM2 FM3
PS1=ValR11 PS1_1=ValR11 1/1/07 4/30/07 7/31/07
2/01/07 6/01/07 9/01/07
Done. 6/16/08
37-08 1.3P3 FM4 PS1=Ed1-CV-NoSW
PS1_1=ValR11 1/1/07 4/30/07 7/31/07
2/01/07 6/01/07 9/01/07
Done. 6/16/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 24
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
36-08 1.3P3 FM1, FM2 FM3
PS1=Edition1-CV
PS1_1=ValR11 1/1/07 4/30/07 7/31/07
2/01/07 6/01/07 9/01/07
Done. 6/16/08
05/20/08 Process validation of Instrument Subsystem delivery (SCCR 610) through ERBE-like ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs. CORRECTION 9/8/08 – PRs 31-08C and 31-08D Cmdline arg “M” changed to “N”
cc1= cc1_2= cc1_3= cc1_4= cc1_5= cc2= cc2_1= cc3=
35-08 2.4P1 FM1, FM2 FM3, FM4
PS1=ValR10-Ed2 PS2_1=NSIDC cmdline arg = A F M T
PS2=ValR10-Ed2 1/07
8/07 cancel
34-08 2.2P1 FM1, FM2 FM3, FM4
PS1=ValR10-Ed2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T
PS2=ValR10-Ed2 09/01/07 3/5/05 3/15/05 3/25/05
09/30/07 3/5/05 3/15/05 3/25/05
Done. 9/9/08
33-08 2.3P1 FM1, FM2 FM3, FM4
PS1=ValR10-Ed2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T
PS2=ValR10-Ed2 10/01/07 10/01/07 Done. 9/9/08
32-08 2.3P2 FM1, FM2 FM3, FM4
PS1= ValR10-Ed2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T
PS2=ValR10-Ed2 8/31/07 8/31/07 Done. 9/9/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 25
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
31-08D 2.2P1 FM1, FM2 FM3, FM4
PS1=ValR10 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T
PS2=ValR10 09/01/07 3/5/05 3/15/05 3/25/05
09/30/07 3/5/05 3/15/05 3/25/05
Done. 8/21/08
31-08C 2.3P1 FM1, FM2 FM3, FM4
PS1=ValR10 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T Cmdline arg=A F N T
PS2=ValR10 10/01/07 10/01/07 Done. 8/21/08
31-08B 2.3P2 FM1, FM2 FM3, FM4
PS1= ValR10 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T Cmdline arg=A F N T
PS2=ValR10 8/31/07 8/31/07 Done. 8/21/08
31-08 3.1P1 FM1, FM2 FM3, FM4
PS2= ValR10-Ed2 PS2=ValR10
PS3= ValR10-Ed2 PS3=ValR10
09/07 09/07 Done. 8/21/08
30-08 1.1P3 1.1P5 1.2P1
FM1, FM2 FM3
(PS1=>)
PS1=ValR10 8/31/07 3/5/05 3/15/05 3/25/05
10/1/07 3/5/05 3/15/05/ 3/25/05
Done. 8/21/08
30-08B 1.2P1 FM1, FM2 FM3
(PS1=>)
PS1=ValR10 8/31/07 3/5/05 3/15/05 3/25/05
10/1/07 3/5/05 3/15/05/ 3/25/05
Done. 8/21/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 26
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
29-08 1.1P5 1.2P1
FM4 (PS1=>) PS1=ValR10 3/5/05 3/15/05 3/25/05
3/5/05 3/15/05 3/25/05
Done. 8/21/08
29-08B 1.1P5 1.2P1
FM4 (PS1=>) sat=SW_OFF, ic=OFF
PS1=ValR10 8/31/07
10/1/07
Done. 8/21/08
29-08C 1.2P1 FM4 (PS1=>) PS1=ValR10 3/5/05 3/15/05 3/25/05
3/5/05 3/15/05 3/25/05
Done. 8/21/08
29-08D 1.2P1 FM4 (PS1=>) sat=SW_OFF, ic=OFF
PS1=ValR10 8/31/07
10/1/07
Done. 8/21/08
28-08 1.3P2 FM1, FM2 FM3
PS1=ValR10
PS1_3=ValR10 09/07 09/07 Done. 8/21/08
27-08 1.3P2 FM4 PS1=ValR10
PS1_3=ValR10 09/07 09/07 Done. 8/21/08
26-08 1.3P1
FM1, FM2 FM3
PS1=ValR10
PS1_3=ValR10 09/01/07 09/30/07 Done. 8/21/08
25-08 1.3P1
FM4 PS1=ValR10 PS1_1=ValR10 09/01/07 09/30/07 Done. 8/21/08
24-08 1.3P3 FM1, FM2 FM3
PS1=ValR10
PS1_1=ValR10 PS1=ValR10-Ed2
3/5/05 3/15/05 3/25/05
03/05/05 03/15/05 03/25/05
Done. 9/9/08
23-08 1.3P3 FM1, FM2 FM3 FM4
PS1=ValR10
PS1_1=ValR10 PS1=ValR10-Ed2
3/5/05 3/15/05 3/25/05
03/05/05 03/15/05 03/25/05
Done. 9/9/08
22-08 1.2P1
FM4 PS1=ValR10 PS1=ValR10-Ed2
PS1=ValR10 PS1=ValR10-Ed2
3/5/05 3/15/05 3/25/05
03/05/05 03/15/05 03/25/05
Done. 9/9/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 27
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
21-08 1.2P1
FM1, FM2 FM3
PS1=ValR10 PS1=ValR10-Ed2
PS1=ValR10 PS1=ValR10-Ed2
3/5/05 3/15/05 3/25/05
03/05/05 03/15/05 03/25/05
Done. 9/9/08
05/20/08 Process new TISA PGE 9.0P1 (SCCR 672) for Beta1 results This PGE was delivered to both warlock and magneto Cross-track data only Data Months with “*” have priority over data months without “*”. If the TISA Working Group decides the results from the “*” months are not of the quality hoped for, the remaining monhs will not need to be processed. Data Months with “**” are based on Edition2C (Aqua) or Edition2F (Terra) input data
cc9=023030 cc4_5= TerraEd2B: 026030, 027031 (7/04, 7/05) AquaEd2B: 034039 TerraEd2F: 027033 AquaEd2C: 034040
20-08 9.0P1 FM4 PS4_5=Edition2B (except for months with “**”) PS4_5=Edition2C (for months with “**”)
PS9_0=Beta1 *10/02 *04/03 01/04 01/05 **01/06 **07/06
10/02 04/03 01/04 01/05 01/06 07/06
Done. 7/20/08
19-08 9.0P1 FM3 PS4_5=Edition2B PS9_0=Beta1 *07/02 *01/03
07/02 01/03
Done. 7/18/08
18-08 9.0P1 FM2 PS4_5=Edition2B PS9_0=Beta1 04/00 04/00 Done. 7/19/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 28
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
17-08 9.0P1 FM1 PS4_5=Edition2B (except for months with “**”) PS4_5=Edition2F (for months with “**”)
PS9_0=Beta1 *07/02 *10/02 *01/03 *04/03 **01/06 **07/06
07/02 10/02 01/03 04/03 01/06 07/06
Done. 7/18/08
04/07/08 Process Cloud (SCCR 654 CERESlib SCCR 655) Evaluating GMAO G5 data – MODIS Collection5, GEOS-4 MOA data Use DAO-GEOS4 MOA created at ASDC. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward Note: Use Edition2A-QC clear-sky maps
Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’;
cc12=most recent cc1=most recent cc4_0=most recent cc4_1=028036
cc4_2=028036
16-08 4.1-4.1P4 4.1-4.2P3
FM2 MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1= Test-C5G4-CERES2
1/06/06 1/29/06
1/06/06 1/29/06
done. 4/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 29
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
04/07/08 Process Cloud (SCCR 654 CERESlib SCCR 655) Evaluating GMAO G5 data – MODIS Collection5, G-5 MOA data MOA data were created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward Note: Use G5 MOA Clear-sky maps already generated for earlier G5 test runs (reference PR 135-07).
Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’;
cc12=999999 cc1=most recent cc4_0=most recent cc4_1=028036 cc4_2=028036
15-08 4.1-4.1P4 4.1-4.2P3
FM2 MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES
PS4_1= Test-G5-CERES2
1/06/06 1/29/06
1/06/06 1/29/06
done. 4/18/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 30
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
4/01/08 Process Inversion SSF (SCCR 666) Processing same months as Clouds to validate Beta1-Ed3 Run all of Inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed.
cc12=most recent (016023, 016025,
018029) cc2_4=most recent cc4_1 = Terra: 029037 Aqua: 031040 cc4_5 =
Terra: 029035 Aqua: 035040
cc4_8= Terra: 027033 Aqua: 034040
cc4_9= Terra: 026032 Aqua: 026035
cc4_10=023032 14-08 4.5-6.1P4
4.5-6.2P3 4.5-6.4P2
FM1, FM2 MODIS V005
PS4_1=Beta1-Ed3 PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 =NULL
PS4_5=Beta1-Ed3 10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006
10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006
Canceled. 8/18/08
13-08 4.5-6.1P5 4.5-6.2P3 4.5-6.4P2
FM3, FM4 MODIS V005
PS4_1=Beta1-Ed3 PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 =NULL
PS4_5=Beta1-Ed3 10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006
10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006
Canceled. 8/18/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 31
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
2/29/08 Process Clouds SSFI (SCCR 658) Validating Beta1-Ed3 Four seasonal months beginning with October 2003 and also July 2006 to coincide with Calipso, and using MODIS Collection 5. January 2006 is processed with both Collection 4 and 5 at the request of the Inversion Team.
Use start-up maps supplied with delivery - For Terra: CER_ECS-SOA0160m_Terra-MODIS_StartUp_016000.XXXXMM For Aqua: CER_ECS-SOA0160m_Aqua-MODIS_StartUp_016000.XXXXMM where MM means month (01 --> Jan, 02--> Feb, so on) 4/2/08 correction - Turn on ClouVis files: $ENV{‘CV’} = ‘y’:
cc12=most recent (016023, 016025,
018029) cc1=most recent
(Terra: 028029, 030032, 031036 Aqua: 028029,
029030, 030032, 031036)
cc4_0P1=most recent (021021, 021022)
cc4_1P6, cc4_2, & cc4_3=
Terra: 029037 Aqua: 031040
12-08 4.1-4.1P6 4.1-4.2P4 4.1-4.2P5 4.1-4.3P3
FM1, FM2 MODIS V005
PS1=Edition2/Ed2-NoSW PS4_0=NSIDC-NESDIS PS12=DAO-GEOS4
PS4_1=Beta1-Ed3 10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006
10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006
Cancel further processing. 8/18/08
11-08 4.1-4.1P6 4.1-4.2P4 4.1-4.2P5 4.1-4.3P3
FM3, FM4 MODIS V005
PS1=Edition2/Ed2-NoSW PS4_0=NSIDC-NESDIS PS12=DAO-GEOS4
PS4_1=Beta1-Ed3
10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006
10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006
Cancel further processing 8/18/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 32
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
1/22/08 Process TISA TSIB (SCCR 660) Process Synoptic SARB (SCCR 663, 662) Process Terra and Aqua crosstrack instrument TSI for the seasonal months (Jan, Apr, Jul, and Oct) for one year on the magneto cluster. Process Terra and Aqua crosstrack instrument synoptic SARB for one month on the cluster. Remember to set envrionment variable as follows: SS7_2_MATCH = C4 Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05. Only crosstrack instrument data will be processed. FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05
cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1=012017 cc7_2=004006
10-08 7.1.1P1 FM1 or FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A
PS7_1=Beta4c 1/01 seasonal months only
10/01 seasonal months only
Done. 5/9/08
10B-08 7.2.1P1 FM1 or FM2 PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4c
PS7_2=Beta4c 1/01
1/01
Done. 5/20/08
9-08 7.1.1P1 FM3 or FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A
PS7_1=Beta4c 1/03 seasonal months only
10/03 seasonal months only
Done. 5/9/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 33
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
9B-08 7.2.1P1 FM3 or FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4c
PS7_2=Beta4c 1/03 1/03 Done. 5/21/08
1/22/08 Process TISA TSIB (SCCR 660) Process Synoptic SARB (SCCR 663, 662) Process Terra and Aqua crosstrack instrument for the seasonal months (Jan, Apr, Jul, and Oct) for one year on warlock Process Terra and Aqua crosstrack instrument synoptic SARB for one month on warlock. Remember to set envrionment variable as follows: SS7_2_MATCH = C4 Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05. Only crosstrack instrument data will be processed. FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05
cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1=012017 cc7_2=004006
8-08 7.1.1P1 FM1 or FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A
PS7_1=Beta4w 1/01 seasonal months only
10/01 seasonal months only
Done. 5/5/08
8B-08 7.2.1P1 FM1 or FM2 PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4w
PS7_2=Beta4w 1/01
1/01
Done. 5/27/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 34
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
7-08 7.1.1P1 FM3 or FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A
PS7_1=Beta4w 1/03 seasonal months only
10/03 seasonal months only
Done. 5/5/08
7B-08 7.2.1P1 FM3 or FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4w
PS7_2=Beta4w
1/03 1/03 Done. 5/27/08
1/8/08 Promote SARB (SCCR 664) Process TISAgridding (SCCR 619). Do not proceed Edition2C until ValR11 files have been verified. PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. MATCH data for this round of processing is MODIS collection 5 based, environment variable must be set, for all 3 SARB PGEs, as follows:SS5_MATCH = C5 Process CRS for crosstrack instrument ONLY FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05
cc12= most recent cc4_5= most recent cc5=020030 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent
6-08 5.0P1 5.1P2 5.4P2
FM3 V005 MOD08
PS4_5=Edition2C PS5 = ValR11 PS12=DAO-GEOS4
PS5=ValR11 5/06 5/06 done. 3/17/08
5-08 5.0P1 5.1P2 5.4P2
FM3 V005 MOD08
PS4_5=Edition2C PS5 = Edition2C PS12=DAO-GEOS4
PS5=Edition2C 5/1/06 12/31/06 Done. 4/28/08
4-08 6.1P1 6.2P1 6.3P1
FM3 PS4_5=Edition2C PS5=Edition2C PS9_1=PS12= DAO-GEOS4
PS6=Edition2C 5/1/06 12/31/06 Done. 4/28/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 35
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
1/8/08 Process SARB (SCCR 664) Process TISAgridding (SCCR 619). Do not process Edition2F until ValR11files have been approved MATCH files for these runs are collection 5 based, environment variable must be set, for all 3 SARB PGEs, as follows: SS5_MATCH = C5 PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. Process Terra CRS and FSW for crosstrack instrument ONLY FM1 is crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05, 3/06 - 2/07 FM2 is crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01, 1/06 - 2/06
cc12= most recent cc4_5= most recent cc5=020030 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent
3-08 5.0P1 5.1P1 5.4P1
FM1 V005 MOD08
PS4_5=Edition2F PS5 = ValR11 PS12=DAO-GEOS4
PS5=ValR11 5/06 5/06 done. 3/17/08
2-08 5.0P1 5.1P1 5.4P1
FM1 V005 MOD08
PS4_5=Edition2F PS5 = Edition2F PS12=DAO-GEOS4
PS5=Edition2F 5/06 12/06 done
1-08 6.1P1 6.2P1 6.3P1
FM1 PS4_5=Edition2F PS5=Edition2F PS9_1=PS12= DAO-GEOS4
PS6=Edition2F 5/1/06 12/31/06 Done. 7/10/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 36
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
12/17/07 Process Cloud (SCCR 654 CERESlib SCCR 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) MOA and PMOA data will be created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps. Rename the Edition1A CERES_ECS files and start with those. These runs are being requested in order to evaluate the Jan’06 G5-CERES. No need to do any testing in SI&T. These are not official CERES runs, but rather test runs.
4/2/08 Note: For PR 138-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;
cc12=999999 cc1=most recent cc4_0=most recent cc4_1=030039 cc4_2=030039 cc4_3 = 030039 cc2_4=most recent cc4_5=cc4_8= 034040 cc4_9=025034 cc4_10=022031 cc9_1=999999 cc9=022029 cc9_3=023031 cc9_4=022031
138-07 4.1-4.1P5 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM3 MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES
PS4_1= Test-G5-CERES1
1/06 1/06 Done. 3/23/08
137-07 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1
FM3 PS4_1= Test-G5-CERES1 PS12=DAO-TestSCF- G5-CERES PS2_4=Edition2 PS4_7=NULL
PS4_5= Test-G5-CERES1
1/06 1/06 Done. 3/23/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 37
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
136-07 9.2P1 9.3P1 9.4P1
FM3 PS9_1=PS12=DAO- TestSCF-G5-CERES PS4_5= Test-G5-CERES1
PS9= Test-G5-CERES1
1/06 1/06 Done. 3/23/08
12/17/07 Process Cloud (last promoted SCCRs 654 & 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) MOA and PMOA data will be created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps. Rename the Edition2-QC CERES_ECS files and start with those. These runs are being requested in order to evaluate the Jan’06 G5-CERES data. No need to do any testing in SI&T. These are not official CERES runs, but rather test runs. 3/26/08 - Note for Terra SFC G5 - the output production strategy for CER9.2P1 data are TestSCF-G5-CERES due to an operator error. The output PS was incorrectly changed from Test-G5-CERES1 to TestSCF-G5-CERES. The final outputs from the monthlies are Test-G5-CERES1.
4/2/08 Note: For PR 135-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;
cc12=999999 cc1=most recent cc4_0=most recent cc4_1=028036 cc4_2=028036 cc4_3 = 028036 cc2_4=most recent cc4_5=cc4_8= 027033 cc4_9=025031 cc4_10=022031 cc9_1=999999 cc9=022029 cc9_3=023031 cc9_4=022031
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 38
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
135-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM2, MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES
PS4_1= Test-G5-CERES1
1/06 1/06 done. 3/18/08
134-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1
FM2 PS4_1= Test-G5-CERES1 PS12=DAO-TestSCF- G5-CERES PS2_4=Edition2 PS4_7=NULL
PS4_5= Test-G5-CERES1
1/06 1/06 done. 3/18/08
133-07 9.2P1 9.3P1 9.4P1
FM2 PS9_1=PS12=DAO- TeestSCF-G5-CERES PS4_5= Test-G5-CERES1
PS9= Test-G5-CERES1 (see 3/26/08 note in comments above for PGE 9.2P1)
1/06 1/06 done. 3/19/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 39
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
12/17/07 Process Cloud (last promoted SCCRs 654 & 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) MOA and PMOA data will be created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps. Rename the Edition2-QC CERES_ECS files and start with those. These runs are being requested in order to evaluate the G5-CERES data. No need to do intense testing in SI&T. These are not official CERES runs, but rather test runs.
4/2/08 Note: For PR 132-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;
cc12=999999 cc1=most recent cc4_0=most recent cc4_1=028036 cc4_2=028036 cc4_3 = 028036 cc2_4=most recent cc4_8=027033 cc4_9=025031 cc4_10=022031 cc9_1=999999 cc9=022029 cc9_3=023031 cc9_4=022031
132-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM1, MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES
PS4_1= Test-G5-CERES1
7/04 7/04 done. 3/23/08
131-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1
FM1 PS4_1= Test-G5-CERES1 PS12=DAO-TestSCF- G5-CERES PS2_4=Edition2 PS4_7=NULL
PS4_5= Test-G5-CERES1
7/04 7/04 done. 3/23/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 40
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
130-07 9.2P1 9.3P1 9.4P1
FM1 PS9_1=PS12=DAO- TestSCF-G5-CERES PS4_5= Test-G5-CERES1
PS9= Test-G5-CERES1
7/04 7/04 done. 3/23/08
12/17/07 Process TISA TSIB (SCCR 660) Process Synoptic SARB (SCCR 663, 662) Process Terra and Aqua crosstrack instrument for the seasonal months (Jan, Apr, Jul, and Oct) between covers-open and 10/05. Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05. Environment variable for synoptic SARB must be set as follows: SS7_2_MATCH = C4 Only crosstrack instrument data will be processed. FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05
cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1=012017 cc7_2=004006
129-07 7.1.1P1 FM1 or FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A
PS7_1=Beta4
4/00 seasonal months only
10/05 seasonal months only
Done 6/3/08
128-07 7.2.1P1 FM1 or FM2
PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4
PS7_2=Beta4 4/00 seasonal months only
10/05 seasonal months only
Done. 6/24/08
127-07 7.1.1P1 FM3 or FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A
PS7_1=Beta4
10/05 seasonal months only
Done. 7/11/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 41
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
126-07 7.2.1P1 FM3 or FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4
PS7_2=Beta4 7/02 seasonal months only
10/05 seasonal months only
Done. 8/18/08
11/27/07 Process TISA averaging (sccr 637) GGEOW files must be staged for 7/02, 9/02, 10/02, 11/02, 1/03, 3/03, 4/03, 5/03, 8/03, 9/03, 10/03, 12/03, 2/04, 3/04, 6/04, 7/04, 10/04, 12/04, 1/05, 5/05, 7/05, 9/05, and 10/05. Note: There is no reason to ever produce a -NoSW SRBAVG output. 12/11/07 FM4 for Oct 2004 has saturated radiances from Oct 1 - 12, 2004. Current processing left these FOVs off all data sets from BDS/IES onward. This causes problems for TISA. All FM4 data from Instrument through TISA must be reprocessed for Oct’04 in a manner that estimates the saturated radiances and fluxes rather than eliminating them .
cc4_0=use latest cc9_3 =use latest cc9_1=use latest cc10_5=016030 cc10_4=016030 cc11=use latest cc11_6=use latest
125-07 10.1P5 10.1P4
FM3, FM4 PS9=PS9_3=Edition2A PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=Edition2A 7/02 11/04
9/04 3/05
Done 12/25/07
124-07 10.1P5 10.1P4
FM3 PS9=PS9_3=Edition2A PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=Edition2A 10/04 4/05
10/04 10/05
Done 12/26/07
6/8/07 Promote TISA averaging (sccr 650) GGEOW files must be staged for 1/01, 2/01, 5/01, 8/01, 10/01, 12/01, 1/02, 4/02, 5/02, 7/02, 9/02, 10/02, 11/02, 1/03, 3/03, 4/03, 5/03, 8/03, 9/03, 10/03, 12/03, 2/04, 3/04, 6/04, 7/04, 10/04, 12/04, 1/05, 5/05, 7/05, 9/05, and 10/05. SRBAVG processing is not setup for -NoSW input, and it doesn’t make sense to even produce such a data set.
cc4_0=use latest cc9_3 =use latest cc9_1=use latest cc10_?=017031 cc10_?=017031 cc11=use latest cc11_6=use latest
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 42
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
113-07 10.0P1 10.0P2 10.0P3
FM3, FM4 PS9=PS9_3=Edition2A PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=ValR9 7/02 1/03 10/04
7/02 1/03 10/04
Closed 5/29/08. To be reopened at a later date.
112-07 10.0P1 10.0P2 10.0P3
FM3, FM4 PS9=PS9_3=Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=ValR10 7/02 1/03
7/02 1/03
Closed 5/29/08. To be reopened at a later date.
111-07 10.0P1 10.0P2 10.0P3
FM1, FM2 PS9=PS9_3=Edition2C PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=ValR9 7/02 1/03
7/02 1/03
Closed 5/29/08. To be reopened at a later date.
110-07 10.0P1 10.0P2 10.0P3
FM3 PS9=PS9_3= Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=Edition2B 7/02 10/05 Closed 5/29/08. To be reopened at a later date.
109-07 10.0P1 10.0P2 10.0P3
FM4 PS9=PS9_3= Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=Edition2B 7/02 3/05 Closed 5/29/08. To be reopened at a later date.
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 43
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
108-07 10.0P1 10.0P2 10.0P3
FM1, FM2 PS9=PS9_3= Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4
PS10=Edition2E 3/00 10/05 Closed 5/29/08. To be reopened at a later date.
6/8/07 Process Cloud (last promoted SCCRs 654 & 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) 7/20/07 added Jan’06 to Edition requests as per e-mail with science. Remember to rename Edition2-QC clear sky maps. 7/25/07 Rerun Clouds ValR13 with incremented cc#. First time around there was a problem with the recently staged MODIS files. 7/27/07 ASDC has requested that instead of rerunning with a new cc#, reuse the cc# but alter the processing strategy to ValR13B. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps for 7/06 ValR13 run. Rename the 7/1/05 Edition2-QC CERES_ECS files and start with those. The CERES_ECS startup maps CAN be used to process 9/22/06 ValR13, which is getting run to verify that an eclipse is handled correctly. Do NOT use CERES_ECS start-up maps when running Edition2F, instead rename Edition2-QC maps and use those as starting point. FM1 was in stow Jan and Feb 2006. 4/2/08 Note: For PRs 92-07 and 96-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;
cc12=most recent cc1=most recent cc4_0=most recent cc4_1=028036 028037 cc4_2=028036 028037 cc4_3 = 028036 028037 cc2_4=most recent cc4_8=027033 cc4_9=025031 cc4_10=022031 cc9_1=most recent cc9=022029 cc9_3=023031 cc9_4=022031
96-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM1, FM2, MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1= ValR13B 7/06 7/06 done 8/6/07
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 44
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
95-07 4.1-4.1P4 FM1, FM2, MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1= ValR13B 9/22/06 9/22/06 done 8/6/07
94-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1
FM1, FM2 PS4_1=ValR13B PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5= ValR13B 7/06 7/06 done 8/6/07
93-07 4.5-6.1P2 FM1, FM2 PS4_1=ValR13B PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5= ValR13B 9/22/06 9/22/06 done 8/6/07
92-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2
FM1, FM2, MODIS V005
PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4
PS4_1= Edition2A-QC 1/06 4/30/06
1/06 1/1/07
done. 3/12/08
91A-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1
FM2 PS4_1=Edition2A-QC PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5= Edition2F 1/06
1/06
done. 10/02/07
91-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1
FM1, FM2 PS4_1=Edition2A-QC PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL
PS4_5= Edition2F 4/30/06 1/1/07 Done. 3/12/08
90A -07 9.2P1 9.3P1 9.4P1
FM2 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2F
PS9= Edition2F 1/06 1/06 done. 10/2/07
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 45
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
90-07 9.2P1 9.3P1 9.4P1
FM1, FM2 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2F
PS9= Edition2F 4/30/06 hour 12 1/1/07 hour 11 Done. 3/12/08
3/15/07 Promote SARB (SCCR 648, 647, 651, 664) Process TISAgridding (sccr 619). Do not proceed until ValR10 files have been verified. PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. 3/23/07 There is a hold on these PRs. SARB may make a delta delivery to support Aqua processing. 3/30/07 All MATCH data received to date is MODIS collection 4 based. Added ValR10 requests for FM4 and filled in dates for FM3 ValR10 requests. 5/3/07 Added PRs for Aqua Version2B CRS processing of 7/02 - 12/05 data. Modified PRs for the Aqua Version2B CRS 1/06 - 4/06 data extension. Process CRS for crosstrack instrument ONLY FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05
cc12= most recent cc4_5= most recent cc5=020029 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent
89-07 5.0P1 FM4 V004 MOD08
PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4
PS5=ValR10 7/02 7/02 done 6/14/07
88-07 5.1P2 FM4 V004 MOD08
PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4
PS5=ValR10 7/02 7/02 done 6/15/07
87-07 5.4P2 FM4 V004 MOD08
PS5=ValR10 PS12=DAO-GEOS4
PS5_4=ValR10 7/02 7/02 done 6/18/07
86-07 5.0P1 FM3 V004 MOD08
PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4
PS5=ValR10 12/05 4/06
12/05 4/06
done 7/3/07
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 46
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
85-07 5.1P2 FM3 V004 MOD08
PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4
PS5=ValR10 12/05 4/06
12/05 4/06
done 7/3/07
84-07 5.4P2 FM3 V004 MOD08
PS5=ValR10 PS12=DAO-GEOS4
PS5_4=ValR10 12/05 4/06
12/05 4/06
done 7/3/07
84A-07 5.0P1 FM3 or FM4 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 7/02 1/06 Done 2/12/08
84B-07 5.1P2 FM3 or FM4 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 7/02 1/1/06 hour 11 Done 2/12/08
84C-07 5.4P2 FM3 or FM4 V004 MOD08
PS5=Edition2B PS12=DAO-GEOS4
PS5_4=Edition2B 7/02 12/05 Done 2/12/08
84D-07 6.1P1 6.2P1 6.3P1
FM3 or FM4 PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4
PS6=Edition2B 7/02 1/1/06 hour 11 Done 2/15/08
83-07 5.0P1 FM3 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 12/05 2/06
5/06 done 10/31/07
82-07 5.1P2 FM3 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 12/31/05 hour 12 1/1/06 hour 12
5/1/06 hour 11 done 10/31/07
81-07 5.4P2 FM3 V004 MOD08
PS5=Edition2B PS12=DAO-GEOS4
PS5_4=Edition2B 1/06 4/06 done 11/5/07
80-07 6.1P1 6.2P1 6.3P1
FM3 PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4
PS6=Edition2B 12/31/05 hour 12
5/1/06 hour 11 done 11/25/07
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 47
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
3/15/07 Process SARB (SCCR 648, 647, 651) Process TISAgridding (sccr 619). Do not process until Terra Edition2B cc5= 333333 files have been verified. (These are the ValR files for Terra.) 4/17/07 Terra collection 4 MODIS inputs available through 7/06 and MATCH files available through 6/06. PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. FM1 is in stow during 1/06 and 2/06. Therefore no 2/28/06 overlap data will be available to gridding. Process Terra CRS and FSW for crosstrack instrument ONLY FM1 is crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05, 3/06 - 2/07 FM2 is crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01, 1/06 - 2/06
cc12= most recent cc4_5= most recent cc5=020029 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent
79-07 5.0P1 FM1 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 3/06 5/06 6/06
done 12/3/07
78-07 5.1P1 FM1 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 3/1/06 5/1/06 hour 11 6/30/06
done 12/3/07
77-07 5.4P1 FM1 V004 MOD08
PS5=Edition2B PS12=DAO-GEOS4
PS5_4=Edition2B 3/06 4/06 6/06
Done 1/31/08
76-07 5.0P1 FM2 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 12/05 3/06 done 11/30/07
75-07 5.1P1 FM2 V004 MOD08
PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4
PS5=Edition2B 12/31/05 hour 12
3/1/06 hour 11 done 11/30/07
74-07 5.4P1 FM2 V004 MOD08
PS5=Edition2B PS12=DAO-GEOS4
PS5_4=Edition2B 1/06 2/06 done 11/30/07
73-07
6.1P1 6.2P1 6.3P1
FM1
PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4
PS6=Edition2C 3/1/06 5/1/06 hour 11 6/06
Done. 12/14/07
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 48
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
72-07 6.1P1 6.2P1 6.3P1
FM2 PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4
PS6=Edition2C 12/31/05 hour 12
3/1/06 hour 11 done 11/30/07
2/1/07 Process Inversion (sccr 638) Process TISA Gridding (sccr 594) ValRs must be approved before Edition2B processing can begin. Using Aqua Edition2A/Ed2A-NoSW SSF as input, reprocess SSF and SFC as Edition2B/Ed2B-NoSW to correct SOFA SW Model B surface fluxes. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed.
3/25/08 note: There should be no data processing for Production Strategy “Ed2B-NoSW” (PRs 10-07 and 7-07) for data dates, 07/19/2005 – 08/30/2005. This processing is covered under PRs 222-05 through 227-05 using Production Strategy “AnomOps-Ed1-CV”. (note added and PRs corrected 3/25/08)
cc12=017027 cc2_4=most recent cc4_6=most recent cc4_5=034039 cc4_9=024033 cc4_10=022030 cc9_1= 016021 cc9 = cc9_2= 022029 cc9_3=023031 cc9_4=022031
12-07 4.5-6.6P3 4.5-6.2P2 4.5-6.4P1
FM3 PS4_6=Edition2A PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 = NULL
PS4_5=Edition2B 7/2/02 hour 15 1/1/06 12/31/05 hour 11
Done 2/7/08
11-07 4.5-6.6P3 4.5-6.2P2 4.5-6.4P1
FM4 PS4_6=Edition2A PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 = NULL
PS4_5=Edition2B 7/2/02 hour 15 3/30/05 hr 17 Done 1/15/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 49
Table 1: Production Request for CERES Processing (PR)
PR Year
& Item_# PGEs
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification (If no CC #
provided, use most recent)
10-07 4.5-6.6P3 4.5-6.2P2 4.5-6.4P1
FM4 PS4_6=Ed2A-NoSW PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 = NULL
PS4_5=Ed2B-NoSW 3/30/05 hr 18 3/30/05 hr 18 8/31/05
1/1/06 12/31/05 hour 11 7/18/05 12/31/05 hr 11
Done 2/7/08
9-07 9.2P1 9.3P1 9.4P1
FM3 PS9_1=PS12= DAO-GEOS4 PS4_5=Edition2B
PS9=Edition2B 7/2/02 1/1/06 hr 11 Done 2/12/08
8-07 9.2P1 9.3P1 9.4P1
FM4 PS9_1=PS12= DAO-GEOS4 PS4_5=Edition2B
PS9=Edition2B 7/2/02 3/30/05 hour 17 Done 1/8/08
7-07 9.2P1 9.3P1 9.4P1
FM4 PS9_1=PS12= DAO-GEOS4 PS4_5=Ed2B-NoSW
PS9=Ed2B-NoSW 3/31/05 hr 12 3/31/05 hr 12 8/31/05 hr 12
1/1/06 hr 11 7/01/05 hr 11 1/01/06 hr 11
Done 2/12/08
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 50
CERES Miscellaneous Standing Production Requests
Table 2: Standing Production Request for CERES Misc. Processing (M-PR)
M-PR Date
& Item_# PGE
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification
3/22/06 Process MOA and PMOA (starting when SCCR 615 promotes and is checked out) PMOA overlap is critical. Please wait unil next month of MOA is available prior to processing PMOA. Overlap from previous and next months is critical. If MOA cc# changes for current month, either rename or rerun last day of previous month. If MOA cc# changes for next month, temporarily rename first day of next month before processing PMOA.
cc12=018029 cc9_1=016022
2-06 12.1P1 CERES PS12=DAO-GEOS4 1/31/06 12/31/07 Done 3/12/08 1-06 9.1P1 CERES PS12=DAO-GEOS4 PS9_1=PS12=
DAO-GEOS4 1/06 12/07 Done 3/12/08
10/18/02 Process Snow map for Clouds use latest ccode for cc4_0
3-02 4.1-4.0P1 CERES PS4_0=NSIDC- NESDIS
8/01
8/12/02: Process ERBElike Snow map required for Terra and Aqua. This request is typically run 5 days after the end of the data month, after inputs are available.
use latest ccode for cc2_1 (See Table 1:)
1-02 2.1P1 CERES PS2_1=NSIDC 6/18/02
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 51
CERES Terra Standing Production Requests
Table 3: Standing Production Request for CERES Terra Processing (AM-PR)
AM-PR Date
& Item_# PGE
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to process
DAAC Verification
11/9/05: Use PS1 = ‘Edition1-CV’ Standing Request: Terra Instrument SS1 {FM1, FM2} Processing Request. Reprocessing requests provided for 2/25/00 - 11/1/05 (PR 154-05, 158-05). This standing request only takes data forward from where the reprocessing request left off.
use latest ccode {cc1} (See Table 1:)
7-05 6-05
1.1P3 1.2P1 1.3P1
FM1,FM2 (PS1=>) PS1=Edition1-CV 11/2/05
11/9/05: Standing Request: Terra ERBElike SS2, SS3 {FM1, FM2} Processing Request Reprocessing requests provided for 2/25/00 - 11/1/05 (PR 153-05, 155-05 to 157-05). This standing request only takes data forward from where the reprocessing request left off.
ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.
use latest ccodes {cc2, cc2_1, cc3} (See Table 1:)
5-05 4-05 3-05
2.2P1 2.3P2 2.3P1
FM1,FM2 PS1=Edition1-CV PS2_1=NSIDC cmdline arg = A F N T
PS2=Edition1-CV 11/2/05 10/31/05 12/1/05
2-05 3.1P1 FM1,FM2 PS2=Edition1-CV PS3=Edition1-CV 11/05 1-05 1.3P2 FM1,FM2 PS1=Edition1-CV PS1=Edition1-CV 11/05
8/2/02 Processing Scenario updated/corrected; Added PR 1A-02. 2/8/02: New processing scenario for Baseline1-QC BDS and ERBElike processing. Anticipate this will go into affect starting with Feb 2002 data. For earlier data, continue using PR 1-00 through PR 8-00. PRs 1-02 and 2-02 are to run 48 hours after data date; PR 1A-02 is run at the end of the month. Standing Request: Terra Instrument SS1 {FM1, FM2} Processing Request Note: Delete these data sets after data reprocessed as Baseline1 or Edition1. ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.
use latest ccode {cc1, cc2} (See Table 1:)
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 52
Table 3: Standing Production Request for CERES Terra Processing (AM-PR)
AM-PR Date
& Item_# PGE
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to process
DAAC Verification
2-02 1.1P3 1.2P1 1.3P1
FM1,FM2 (PS1=>) PS1=Baseline1-QC ??
1-02
2.2P1 FM1,FM2 PS1=Baseline1-QC
PS2_1=NotAvailable cmdline arg = C F N T
PS2=Baseline1-QC ??
1A-02 1.3P2 FM1,FM2 PS1=Baseline1-QC PS1=Baseline1-QC ??
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 53
CERES Aqua Standing Production Requests
Table 4: Standing Production Request for CERES Aqua Processing (PM-PR)
PM-PR Date
& Item_# PGE
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification
11/9/05 Edition1-CV processing limited to FM3 while FM4 experiencing SW problems. This request is run 5-25 days after the end of the data month, when ASDC has received as much data as they expect to receive. Edition1-CV processing requests for 6/18/02 - 11/1/05 are listed as regular PRs (PRs 171 to 182-05 Standing Request: Aqua Instrument SS1 and ERBElike SS2 {FM3} Processing Request. ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.
use latest ccode {cc1, cc1_2, cc1_3, cc1_4, cc1_5, cc2, cc2_1, cc2_4, cc3, cc3_2} (See Table 1:)
18-05 1.1P5 1.2P1 1.3P1
FM3 (PS1=>) PS1=Edition1-CV
PS1=Edition1-CV PS1_3=Edition1-CV
11/2/05
17-05 2.2P1 2.3P2 2.3P1
FM3 PS1=Edition1-CV PS2_1=NSIDC cmdline arg = A F N T
PS2=Edition1-CV 11/2/05 10/31/05 12/1/05
16-05 1.3P2 FM3 PS1=Edition1-CV PS1=Edition1-CV 11/05 15-05 3.1P1 FM3 PS2=Edition1-CV PS3=Edition1-CV 11/05
11/9/05 Ed1-CV-NoSW processing replaces Ed1-NoSW and should be run until SW problems on FM4 can be corrected or further problems occur. Ed1-CV-NoSW processing requests for 3/31/05 - 11/1/05 are listed as regular PRs (PR 159-05 to 164-05). This request is run 5-25 days after the end of the data month, when ASDC has received as much data as they expect to receive. Standing Request: Aqua Instrument SS1 and ERBElike SS2 {FM4} Processing Request. Instrument cmdline arg:-ic OFF -sat SW_OFF (these args. are for Ed1 NoSW processing) ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.
use latest ccode {cc1, cc1_2, cc1_3, cc1_4, cc1_5, cc2, cc2_1, cc2_4, cc3, cc3_2} (See Table 1:)
14-05 1.1P5 1.2P1 1.3P1
FM4 (PS1=>) PS1=Ed1-CV-NoSW
PS1=Ed1-CV-NoSW PS1_3=Ed1-CV-NoSW
11/2/05
CER-DM-PR-2008 Date: 1/5/2009
CERES Data Management Team Page 54
Table 4: Standing Production Request for CERES Aqua Processing (PM-PR)
PM-PR Date
& Item_# PGE
Instrument (INST)
Input Production Strategy
Output Production Strategy
Begin Datadate to
process
End Datadate to
process
DAAC Verification
13-05 2.2P1 2.3P2 2.3P1
FM4 PS1=Ed1-CV-NoSW PS2_1=NSIDC cmdline arg = A F N T
PS2=Ed1-CV-NoSW 11/2/05 10/31/05 12/1/05
12-05 1.3P2 FM4 PS1=Ed1-CV-NoSW PS1=Ed1-CV-NoSW 11/05 11-05 3.1P1 FM4 PS2=Ed1-CV-NoSW PS3=Ed1-CV-NoSW 11/05
12/20/03: Use PS1 = ‘Baseline1-QC’ until further notice PRs 12-03 and 13-03 are to run 48 hours after data date; PR 11-03 is run at the end of the month. Standing Request: Aqua Instrument SS1 {FM3, FM4} Processing Request. Note: All Baseline1-QC files may be deleted when data has been reprocessed as Baseline1. Baseline1-QC files do not need to be archived. If they are archived, they should be deleted when Baseline1 is processed. ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.
use latest ccode {cc1, cc1_2, cc1_3, cc1_4, cc2, cc2_1, cc3} (See Table 1:)
30-02 1.1P5 1.2P1 1.3P1
FM3,FM4 (PS1=>) PS1=Baseline1-QC 12/02
29-02 2.2P1 FM3,FM4 PS1=Baseline1-QC PS2_1=NotAvailable cmdline arg = C F N T
PS2=Baseline1-QC 12/02
28-02 1.3P2 FM3,FM4 PS1=Baseline1-QC PS1=Baseline1-QC 12/02
Recommended