View
2
Download
0
Category
Preview:
Citation preview
/
Capacity Constraints on existing
lines
Audrey Laidlaw
Lead Strategic Planner
GREENGAUGE21 Conference
03-Sept-15 1
/
GREENGAUGE21 Conference
Challenges facing WCML North
2 03-Sept-15
Beattock Summit
Passenger Class
Freight
GREENGAUGE21 Conference
WCML Beattock Down Freight loop
GREENGAUGE21 Conference
WCML Beattock area Curvature
/
GREENGAUGE21 Conference
Improving performance
reliability, journey times and
capacity
6 03-Sept-15
/
Scotland Route Study
GREENGAUGE21 Conference
Current cross-border assumptions:
• High speed trains will split and join at Carstairs
• All passenger journeys between Scotland and London will be via
high speed
• Royal Mail traffic assumed to be 1 path per hour to Shieldmuir
• 20% of current West Coast freight trains would be diverted to the
East Coast (some traffic from the East Coast ports and all from
Felixstowe)
7 03-Sept-15
/
Glasgow Central end of CP5 Train Service
Specification
Presentation Title: Insert > Header & Footer
7-Sep-15 8
Each line represents a train path per peak hour. Red shows cross-border paths.
/
Glasgow Central 2043 Indicative Train
Service Specification
Presentation Title: Insert > Header & Footer
7-Sep-15 9
Each line represents a train path per peak hour. Red shows cross-border paths.
/
GREENGAUGE21 Conference
11 03-Sept-15
Scotland Route Study
July 2016
Proposing options to develop the
railway during CP6 – for 2043 service
levels
Produced by Network Rail
Contributors
• TOCs / FOCs
• ORR
• Transport Scotland
• RAM Teams / IP / Capability Analysis / Scotland Route
Initial Industry Plan
Sept 2016
Rail industry recommendations
for CP6
Produced by Network Rail on behalf of Rail
Delivery Group
Contributors
• Network Rail
• Train Operating Companies
• Freight Operating Companies
HLOS / SoFA
July 2017
High Level Output Specification
(HLOS) –Government
requirements for CP6
Produced by Transport Scotland
on behalf of Scottish Ministers
Statement of Funds Available
(SoFA)
Strategic Business Plan
Jan 2018
Our plan of how we will deliver the outputs specified
in the HLOS
Produced by Network Rail
How we propose to deliver the
HLOS
Final Determination
Oct 2018
Confirms which HLOS projects we
will deliver
Produced by the ORR
How much we should spend
delivering HLOS Projects
Delivery Plan
April 2019
Describes how we will deliver the
Final Determination
Produced by Network Rail
CP6 Starts
Long Term Planning Process - CP6
/
GREENGAUGE21 Conference
Network Rail priorities
12 03-Sept-15
/
Beattock Summit
Passenger Class
Freight
GREENGAUGE21 Conference
/
GREENGAUGE21 Conference
Thank you
03-Sept-15 14
Recommended