8/10/2019 Bridges 6 Computations
1/221
The bridge deck is designed as composite concrete construction, where pre-cast concrete
units used as permanent form works are combined with added in-situ concrete to resist
flexure.
The pre-cast unit is 75mm thick, and the in-situ concrete is 175mm thick, giving the deck
a combined thickness of 250mm.
2.1 THE PRECAST CONCRETE UNITSThe pre-cast concrete slab unit is cast in strips measuring 1.0m wide, and spanning from
one beam girder to the other.
They are designed to withstand their own weight, the dead load of the in-situ concrete part
of the slab being supported by the pre-cast unit during construction, and a conservative
imposed loading during construction works.
Two types of pre-cast slab are available, TYPE A & TYPE B.
2.1.1 LOADING
Precast Slab thickness = 75 mmIn-situ concrete thickness = 175 mm
1. Dead Load, Gk
a. Self Weight of Pre-cast unit = 1.80 KN/m2
b. Weight of In-situ Concrete = 4.20 KN/m2
S = 6.00 KN/m2
2. Imposed Loading, Qk
A nominal imposed loading is considered, purely for the movement of men and materials
during the laying of reinforcement and casting of the insitu concrete
Use an Imposed load, Qk = 2.00 KN/m2
3. Design Loading, w
Design udl = 1.6Qk +1.4Gk = 11.60 KN/m2
2.1.2 THE PRECAST CONCRETE SLAB TYPE A
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
2.0 B RIDGE DECK
Page
8/10/2019 Bridges 6 Computations
2/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
They are designed as simply supported, to span between girders.
Therefore Span Length = 2.40 Lm
Maximum Shear Force, V1 = 13.92 KN
Design Moment = 8.352 KNm
DESIGN FOR BENDINGDesign as a rectangular - beam
Design Moment = KNm
Span Length = mm
Depth of slab/deck = mm
a. CALCULATION OF EFFECTIVE DEPTH, d
beam depth, h = 75 mm
width of beam web, bw = 1000 mm m m
cover to reinforcement, d' = 25.0 mm 7 5
\ reinforcement size, f = 20.0 mmstirrup diameter, t = 6.0 mm 1000 mm
effective depth, d = h - (d' + f /2 + t)
= mm
effective width, b = bw
mm
b. LEVER ARM CALCULATIONS, Z
clause 3.4.4.4 assume moment redistribution < 10%. This implies that k' = 0.156
BS8110:PART1: i. k = M/bdfcu fcu = 40 N/mm
1997 therefore, k = 0.181
since k' = 0.156
it implies that compression steel required.
use z = d
c. TENSILE REINFORCEMENT
fy = 410 N/mm
As ' = (k-k')fcu bd/(0.87fy.(d-d')) = mm
Apply T 10 @ 200 mm centres
(As prov. = mm)
As = {k'fcubd/(0.87fy.Z)} + As' = mm
Apply T 20 @ 200 mm centres
(As prov. = mm)
DESIGN FOR SHEAR
393
1,000
0.775
1,122
1,571
355
8.352
2,400
75
34
8/10/2019 Bridges 6 Computations
3/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
i. Design shear Force
Design Shear Force , V = KN
ii. Design Shear Stress, v = V/bd = N/mm
fcu = 40 N/mm
Checks: 0.8 (fcu) = 5.060 N/mm design okay with respect to shear
iii. Obtaining the design concrete shear stress, vc
a. Compute 100As/(bvd) (should be 3.00) = 4.620
b. compute 400/d (should not be < 1.00) = Use 400/d =
c. By interpolation, obtain the design concrete shear stress, vc
= 0.79(100As/(bvd)) 1/3(400/d) 0.25 /1.25 = 1.949 N/mm
iv. Obtain the form and area of shear reinforcement
a. if v < 0.5v c provide nominal links
b. if 0.5v c +v < (v c + 0.4) then A sv/S v = 0.4*b v/(0.87f yv)
c. if (vc +0.4) < v < 0.8 (fcu) then A sv/S v = b v(v - v c)/(0.87f yv)
for this design v = N/mm
vc = N/mm v c + 0.4 = N/mm
i.e. 0.5v c +v < (v c + 0.4)
A sv/S v = 0.4*b v/(0.87f yv) f yv = 410 N/mm
and Asv/Sv reqd = 1.121
Apply a 4 Leg stirrup
T 10 @ 250 mm centres
and Asv/Sv provided = 1.257
2.1.2 THE PRECAST CONCRETE SLAB TYPE BThey are designed to be simply supported, to span at the girders and to also have an overhang of 700mm.
Therefore Span Length = 2.40 Lm
Cantilever Span = 0.70 m
Maximum Shear Force, V1 = 22.04 KN
Design Span Moment = 8.352 KNm
Design Cantilever Moment = 2.842 KNm
DESIGN FOR BENDING (MAIN SPAN)
Design as a rectangular - beam
Design Moment = KNm
Span Length = mm
2.349
11.76
2,400
13.920
11.765
8.352
0.409
0.409
1.949
8/10/2019 Bridges 6 Computations
4/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Depth of slab/deck = mm
a. CALCULATION OF EFFECTIVE DEPTH, d
beam depth, h = 75 mm
width of beam web, bw = 1000 mm m m
cover to reinforcement, d' = 25.0 mm 7 5
\ reinforcement size, f = 20.0 mmstirrup diameter, t = 6.0 mm 1000 mm
effective depth, d = h - (d' + f /2 + t)
= mm
effective width, b = bw
mm
b. LEVER ARM CALCULATIONS, Z
clause 3.4.4.4 assume moment redistribution < 10%. This implies that k' = 0.156
BS8110:PART1: i. k = M/bdfcu fcu = 40 N/mm
1997 therefore, k = 0.181
since k' = 0.156
it implies that compression steel required.
use z = d
c. TENSILE REINFORCEMENT
fy = 410 N/mm
As ' = (k-k')fcu bd/(0.87fy.(d-d')) = mm
Apply T 10 @ 200 mm centres TOP
(As prov. = mm)
As = {k'fcubd/(0.87fy.Z)} + As' = mm
Apply T 20 @ 200 mm centres BOTTOM
(As prov. = mm)
DESIGN FOR SHEAR (TYPE B SLAB)
i. Design shear Force
Design Shear Force , V = KN
ii. Design Shear Stress, v = V/bd = N/mm
fcu = 40 N/mm
Checks: 0.8 (fcu) = 5.060 N/mm design okay with respect to shear
22.040
0.648
1,122
1,571
75
34
1,000
0.775
355
393
8/10/2019 Bridges 6 Computations
5/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
iii. Obtaining the design concrete shear stress, vc
a. Compute 100As/(bvd) (should be 3.00) = 4.620
b. compute 400/d (should not be < 1.00) = Use 400/d =
c. By interpolation, obtain the design concrete shear stress, vc
= 0.79(100As/(bvd)) 1/3(400/d) 0.25 /1.25 = 1.949 N/mm
iv. Obtain the form and area of shear reinforcement
a. if v < 0.5v c provide nominal links
b. if 0.5v c +v < (v c + 0.4) then A sv/S v = 0.4*b v/(0.87f yv)
c. if (vc +0.4) < v < 0.8 (fcu) then A sv/S v = b v(v - v c)/(0.87f yv)
for this design v = N/mm
vc = N/mm v c + 0.4 = N/mm
i.e. 0.5v c +v < (v c + 0.4)
A sv/S v = 0.4*b v/(0.87f yv) f yv = 410 N/mm
and Asv/Sv reqd = 1.121
Apply a 4 Leg stirrup
T 10 @ 250 mm centres
and Asv/Sv provided = 1.257
DESIGN FOR BENDING (CANTILEVERED PORTION)
Design as a rectangular - beam
Design Moment = KNm
Span Length = mm
Depth of slab/deck = mm
a. CALCULATION OF EFFECTIVE DEPTH, d
beam depth, h = 75 mm
width of beam web, bw = 1000 mm m m
cover to reinforcement, d' = 25.0 mm 7 5
\ reinforcement size, f = 20.0 mmstirrup diameter, t = 6.0 mm 1000 mm
effective depth, d = h - (d' + f /2 + t)
= mm
effective width, b = bw
34
2.842
700
75
11.76
2.349
11.765
0.648
1.949
8/10/2019 Bridges 6 Computations
6/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
mm
b. LEVER ARM CALCULATIONS, Z
clause 3.4.4.4 assume moment redistribution < 10%. This implies that k' = 0.156
BS8110:PART1: i. k = M/bdfcu fcu = 40 N/mm
1997 therefore, k = 0.061
since k' = 0.156
it implies that compression steel not required.
ii. z = d(0.5 + (0.25 - k/0.9)0.5
) = d
use z = d
c. TENSILE REINFORCEMENT
fy = 410 N/mm
As = M/(0.87fy.Z) = mm
Apply T 12 @ 250 mm centres TOP
(As prov. = mm)
2.2.1 DECK GEOMETRY2.2.1 MEMBER SIZINGThe pier are braced and restrained at both ends
a. width of deck = carriageway width + walkway width
Effective Width , Le = + = 11.00m
b. Total Depth of deck-slab = 250 mm
c. Depth of in-situ component of slab-deck = 175 mm
d. Depth of pre-cast concrete section = 75 mm
2.2.2 STRUCTURAL SYSTEM OF DECKfig. 20.1;
L.S. Blake (ed), Cross - section of bridge structure is a multiple web system.
Civ. Engr's Ref This system consists of a concrete deck/slab supported on, and integral
253
2.2 DESIGN OF IN-SITU CONCRETECOMPONENT OF SLAB DECK
452
1,000
0.926
0.926
10,000mm 2 * 1,500
8/10/2019 Bridges 6 Computations
7/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Book (4th ed) with longitudinal concrete beams (girders).
2.2.3 SPACING OF GIRDERSSection 17.20, "Girder spacing ranges from 7 to 9 feet. A deck slab overhang of about 2ft
F.S.Merritt (ed) 6ins is economical".
Std H/bk for The girders which are designed as rectangular sections (inorder to ease
Civ. Engrs. pre cast construction) have equal centre - centre of girder spacing as 2.40m,
and the edge - edge of girder as 2.20m, while the deck overhang is 700mm.
Fig 1: Sketch of the deck x-section
700 2 400 2 400 2 400 2 400 700
2.2.4 LOAD ANALYSIS2.2.4.1 Dead loads, G k (udl)
i. Self weight of slab: 24kN/m3 * 0.175m = 4.20 kN/m
2
ii. Weight of asphalt overlay: = 1.15 kN/m 2
TOTAL Gk = 5.35 kN/m 2
Clause 5.4
BS 5400:Part II: Design dead load = 6.153 kN/m 2
2.2.4.2 Point Loads (dead) on cantilevered section: P ci. weight of walk ways/kerbs:
0.35m*0.70m*24KN/m3*1.15 = 6.76 KN
ii. Weight of concrete handrails
0.15m*1.50m*24KN/m*1.15 = 6.21 KN
TOTAL P c = 12.97 KN
KN 6.15 KN/m 2 KN
700 2 400 2 400 2 400 2 400 700
1978
12.97 12.97
8/10/2019 Bridges 6 Computations
8/221
8/10/2019 Bridges 6 Computations
9/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Live loads must be place where they will produce the most severe condition of loading.
The critical positions for placing live loads will not be the same for every member.
Influence lines are therefore used in determining the most severe condition for
loading. Influence lines are primarily used to determine where to place live loads to
cause the maximum effects.
An influence line for a particular response such as reactions, shear force, bending
moment axial force is defined as a diagram in which the ordinate at any point equals
the value of that response attributable to a unit load acting at that point on thestructure.
Influence lines provide a systematic procedure for determining how the force ( or
moment or shear force) in a given part of a structure varies as the applied load moves
about the structure.
2.2.5.1 Influence Lines for udlThis is used for plotting the influence lines for uniformly distributed loads such as
those due to dead loads, and for the udl portion of HA - live loads.
Influence lines for the bending moments at Support B (penultimate support) will be
first to be plotted.
2.2.5.1.1 Geometric Propertiesi. Stiffness Coefficients.
Assume a parabolic profile for the deck.
Chapter 5.7, r A = r E = 0
Design of r.c.bdg;
Aswani, et al. r B = r D = 1.3
r C = 1.5
Fig. 5.25 with the above r values, the stiffness coefficients obtained from standard
r Bhc r Ch c r Ch c
h AB C D E
8/10/2019 Bridges 6 Computations
10/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Design of r.c.bdg; charts for concrete bridges are:
Aswani, et al. kBA = = KDE
kBC = = KDC
ii. Carry - over factors
Fig. 5.24 Using the same r values, the carry-over factors are obtained by interpolation as
Design of r.c.bdg; shown below:
Aswani, et al. C AB = CBC = C CD =
C BA = CCB = C DC =
CDE = C ED =
However, since the end spans are discontinuous, the stiffness values are
modified inorder to make the applicable to the members.
The stiffness coefficient at the discontinuous end of the beam AB,which is
discontinuous at end A is
k = (1 - C ABC BA)KBA
C AB &CBA arecarryover factors of ends A & B of member AB, while K BA is the
k'BA = [ 1 - (-0.905 * - 0.415)] * 10.50 = 6.56 = k'DE
iii. Distribution factors
We now compute the distribution factors using the stiffness coefficient:
DBA = kBA = 6.56 / {6.56 + 16.00} = = DDE
SkB
DBC = 1 - D BA = = DDC
DCB = Kc B = 16.00 / {16.00 + 16.00} = = DDE
Sk c
DCD = 1 - D CB = = DDC
2.2.5.1.2 Final Support Moments due to udl.
10.50
16.00
-0.415 -0.905
-0.071
-0.415 -0.710 -0.076
-0.905 -0.760
0.5
0.709
0.500
0.291
8/10/2019 Bridges 6 Computations
11/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
i. NotationsM AB, MBA, MBC , ... = Final moments at the support
M AB, MBA, MBC , ... = Fixed end moments
C AB, C BA, C BC, ... = Carry - over factors
D AB, D BA, D BC, ... = Distribution factors
M1 = MBA - C ABMBA
M2 = MBC - C CBMCB
M3 = MCD - C DCMDCM4 = MDE - C EDMED
V = C BCDBCDCD = -0.760 * 0.709 * 0.500 =
U = C BCCCBDBCDCB = -0.760 * -0.710 * 0.709 * 0.500 =
W = C CBDCBDBA = -0.710 * 0.500 * 0.291 =
ii. Numerical values of fixed end moments
Fig. 5.35 a. Load in span AB
Design of r.c.bdg; M AB = -0.060L Aswani, et al. MBA = -0.138L
b. Load in span BC
MBC = -0.101L
MCB = -0.111L
c. Load in span CD
MCD = -0.111L
MDC = -0.101L
d. Load in span DE
MCD = -0.138L
MDC = -0.060L
iii. Final support moments
-0.269
0.191
-0.103
8/10/2019 Bridges 6 Computations
12/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
a. First span loaded (Span AB)
(1 - D BA) - (2 - D BA)U
1 - 2U
(1 - 0.291) - (2 -0.291)0.191
[1 - (2 * 0.191) ]
But M1 = MBA - C ABM AB
MB = 0.619 [-0.138 - (-0.905 * -0.060)]L
= -0.119L
b. Second span loaded (Span BC)
DBA(1 -U)M BC - WM CB
1 - 2U
0.291(1 - 0.191)M BC - - 0.103M CB
[1 - (2 * 0.191) ]
= 0.381M BC + 0.167M CB
Inserting the values for M BC & MCB ,MB = (0.381 * -0.101)L + (0.167 * -0.111)L
= -0.057L
c. Third span loaded (Span CD)
- UD DEMDC + WM CD (-0.191 * 0.291)M DC + (-0.103)M CD
1 - 2U [1 - (2 * 0.191) ]
= -0.090M DC - 0.167M CD
Inserting the values for M DC & MCD ,
MB = (0.090 * -0.101)L + (0.167 * -0.111)L
= -0.028L
d. Fourth span loaded (Span DE)
UD DE 0.191 * 0.291
1 - U [1 - (2 * 0.191) ]
= 0.090M 4
MB = M1
MB
MB
M1 = 0.619M 1
=
=
=
=
=MB =
M4 = M4
8/10/2019 Bridges 6 Computations
13/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
But M4 = MDE - C EDMDC
MB = 0.090 [-0.138 - (-0.905 * -0.060)]L
= -0.017L
d. Value of M B when all spans are loaded
= ( -0.119 - 0.057 - 0.028 - 0.017)L = -0.114L
But L = 2.40m
MB = -0.114 * 2.40 = -0.657KNm
e Bending Moment at various sections due to the application of unit load.
after calculating the bending moment at support B, the bending moment
at various sections is now computed due to the application of unit load.
This is as tabulate below:
Calculations BM ordinates (KNm)
{(9/25) * (2.40/8)} - 0.0657
{(16/25) * (2.40/8)} - 0.1314
{(21/25) * (2.40/8)} - 0.1971
0.0
0.2 0.329
0.3 0.408
0.1
0.000
Section
0.194
8/10/2019 Bridges 6 Computations
14/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
{(24/25) * (2.40/8)} - 0.2628
{(25/25) * (2.40/8)} - 0.3285
{(24/25) * (2.40/8)} - 0.3942
{(21/25) * (2.40/8)} - 0.4599
{(16/25) * (2.40/8)} - 0.5256
{(9/25) * (2.40/8)} - 0.5913
MB = -0.657
{(9/25) * (2.40/8)} - 0.6570
{(16/25) * (2.40/8)} - 0.6570{(21/25) * (2.40/8)} - 0.6570
{(24/25) * (2.40/8)} - 0.6570
{(25/25) * (2.40/8)} - 0.6570
{(24/25) * (2.40/8)} - 0.6570
{(21/25) * (2.40/8)} - 0.6570
{(16/25) * (2.40/8)} - 0.6570
{(9/25) * (2.40/8)} - 0.6570
2.5.2 HA - live loads udl moments.from sections 2.2.4 of this report,
the ultimate udl due to HA loading = KN/m2
Using this influence ordinate table above, we now compute the various moments
0.7
0.8
0.9
0.6 0.297
-0.398
0.5
0.4
-0.196
0.034
0.145
0.428
0.392
-0.398
0.000
0.063
0.034
-0.052
-0.196-0.052
-0.657
1.4
2.0
1.5
1.6
1.7
1.8
1.9
16.875
-0.065
-0.332
1.31.2
1.1
1.0
-0.800
-0.600
-0.400
-0.200
0.000
0.200
0.400
0.600
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
BM Influence Line Diagram For udl
8/10/2019 Bridges 6 Computations
15/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
as below;
a. Support moments
influence line ordinate = KNm
design HA udl live load = KN/m2
\ HA udl support moments = KNm
b. Span momentsmaximum span moment occurs at 0.4L (1st span) and at 3.6L (4th span)
influence line ordinate = KNm
design HA udl live load = KN/m2
\ HA udl span moments = KNm
2.3.4 Dead load udl moments.from section 2.2.4 of this report,
the udl due to dead loading is = 6.15 KN/m
Using this influence ordinate table above, we now compute the various moments
as below;
a. Support moments
influence line ordinate = KNm
design dead load udl = KN/m2
\ dead load udl support moments = = KNm
b. Span momentsmaximum span moment occurs at 0.4L (1st span) and at 2.6L (3rd span)
influence line ordinate = KNm
design dead load udl = KN/m2
\ dead load udl span moments = = KNm
2.4 Influence Lines for Point Loads
7.22
-4.04
2.63
-0.657
6.1525
0.428
6.1525
-0.657
16.875
0.428
16.875
-11.09
8/10/2019 Bridges 6 Computations
16/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
The point loads are due primarily to either HA live loads or the HB live loads.
The beam girder is designed to be continuous over three spans, and has a constant
moment of inertia over all the spans. We can therfore, plot the influence lines using
standard influence line tables for a three span continuous beam.
The following assumptions are made in the analysis of the continuous bridge girders
before using the standard influence tables:
* The girder is simply supported at the supports and monolithic with the
supports.
* Rocker or roller bearings are provided at all supports.
Find below the influence line tables and charts at sections 0.1L to 1.5L
We prepared the influence charts only upto 1.5L as the loading is symmetrical over
the three spans.
n uence ne or na es or a uppor B .
0.6L -0.0994 -0.2386
0.4L-0.2400
0.7L -0.0928 -0.2227
0.3L -0.0718 -0.17230.2L -0.0502 -0.12050.1L -0.0258 -0.0619
0.0 0.0 0.0
0.8L -0.0742 -0.1781
-0.20980.5L -0.1000
0.9L -0.0408 -0.09791.0L 0.0 0.0
-0.0874
-0.2
-0.1
-0.1
0.0
0.1
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
Influence Ordinate BMD @ 1st Internal Support
8/10/2019 Bridges 6 Computations
17/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
n uence ne or na es or a uppor c .
1.1L -0.0341 -0.08181.2L -0.0612 -0.14691.3L -0.0738 -0.17711.4L -0.0764 -0.18341.5L -0.0740 -0.17761.6L -0.0614 -0.14741.7L -0.0474 -0.11381.8L -0.0306 -0.07341.9L -0.0150 -0.03602.0L 0.0 0.02.1L 0.0063 0.01512.2L 0.0126 0.03022.3L 0.0189 0.04542.4L 0.0206 0.04942.5L 0.0200 0.04802.6L 0.0170 0.04082.7L 0.0135 0.03242.8L 0.0090 0.02162.9L 0.0045 0.01083.0L 0.0 0.0
LoadPosition
Influenceline
coefficient
Influence lineordinates
3.9L4.0L 0.0
-0.0034-0.0067
0.0 0.0 0.0
-0.0067-0.0034
0.0
-0.0134-0.0168
0.1L 0.0072 0.01730.2L 0.0138 0.03310.3L 0.0192 0.04610.4L 0.0234 0.05620.5L 0.0270 0.06480.6L 0.0270 0.06480.7L 0.0252 0.06050.8L 0.0198 0.04750.9L 0.0108 0.02591.0L 0.0 0.0
3.1L3.2L3.3L3.4L3.5L3.6L3.7L3.8L
-0.0101
-0.0134-0.0101
-0.0028-0.0014
-0.0056-0.0070-0.0056-0.0042-0.0028
-0.0042
-0.0014
-0.3
-0.3
-0.2
-0.1
-0.1
0.0
0.1
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
Influence Ordinate BMD @ 2nd Internal Support
8/10/2019 Bridges 6 Computations
18/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.1L(0.240m from support A)
1.1L -0.0167 -0.04011.2L -0.0340 -0.08161.3L -0.0520 -0.12481.4L -0.0668 -0.16031.5L -0.0800 -0.19201.6L -0.0830 -0.19921.7L -0.0802 -0.19251.8L -0.0658 -0.15791.9L -0.0366 -0.08782.0L 0.0 0.02.1L -0.0255 -0.06122.2L -0.0510 -0.12242.3L -0.0765 -0.18362.4L -0.0830 -0.1992
-0.1253-0.06682.6L
2.5L -0.0800 -0.1920-0.1603
0.02503.3L
-0.08352.9L -0.0174 -0.04182.8L -0.0348
Influence lineordinates
0.0 0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. + M B
0.20980.2L 0.08 -0.0050 0.0750 0.18000.1L 0.09 -0.0026 0.0874
0.15080.4L 0.06 -0.0087 0.0513 0.12300.3L 0.07 -0.0072 0.0628
0.09600.6L 0.04 -0.0099 0.0301 0.07210.5L 0.05 -0.0100 0.0400
0.04970.8L 0.02 -0.0074 0.0126 0.03020.7L 0.03 -0.0093 0.0207
0.01421.0L 0.0 0.0 0.0 0.00.9L 0.01 -0.0041 0.0059
3.0L 0.0 0.0
2.7L -0.0522
0.0156 0.03743.4L 0.0208 0.0499
3.1L 0.0052 0.01253.2L 0.0104
3.5L 0.0260 0.06243.6L 0.0208 0.04993.7L 0.0156 0.03743.8L 0.0104 0.02503.9L 0.0052 0.01254.0L 0.0 0.0
-0.3
-0.2
-0.2
0.1
0.2
0.2
0.3Influence Ordinate BMD @ 0.1L
8/10/2019 Bridges 6 Computations
19/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.2L(0.480m from support A)
-0.00821.2L -0.0061 -0.0061 -0.01471.1L -0.0034 -0.0034
-0.01771.4L -0.0076 -0.0076 -0.01831.3L -0.0074 -0.0074
-0.01781.6L -0.0061 -0.0061 -0.01471.5L -0.0074 -0.0074
-0.01141.8L -0.0031 -0.0031 -0.00731.7L -0.0047 -0.0047
-0.00362.0L 0.0 0.0 0.0 0.01.9L -0.0015 -0.0015
0.00152.2L 0.0013 0.0013 0.00302.1L 0.0006 0.0006
0.00452.4L 0.0021 0.0021 0.00492.3L 0.0019 0.0019
0.00482.6L 0.0017 0.0017 0.00412.5L 0.0020 0.0020
0.00322.8L 0.0009 0.0009 0.00222.7L 0.0014 0.0014
0.00113.0L 0.0 0.0 0.0 0.02.9L 0.0005 0.0005
Influence lineordinates
0.0 0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. + M B
0.17960.2L 0.16 -0.0100 0.1500 0.35990.1L 0.08 -0.0052 0.0748
0.30150.4L 0.12 -0.0175 0.1025 0.24600.3L 0.14 -0.0144 0.1256
0.19200.6L 0.08 -0.0199 0.0601 0.14430.5L 0.10 -0.0200 0.0800
0.09950.8L 0.04 -0.0148 0.0252 0.06040.7L 0.06 -0.0186 0.0414
0.02841.0L 0.0 0.0 0.0 0.00.9L 0.02 -0.0082 0.0118
3.1L -0.00013.2L3.3L
-0.0003-0.0004
3.4L3.5L3.6L3.7L3.8L3.9L4.0L
-0.0006-0.0004-0.0003-0.0001
0.0 0.0 0.0 0.0
-0.0001-0.0003-0.0004-0.0006-0.0007
-0.0007
-0.0006-0.0007-0.0006-0.0004
-0.0013-0.0017-0.0013-0.0010
-0.0003-0.0003-0.0001
-0.0003-0.0007-0.0010
-0.1
0.0
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39
0.2
0.2
0.3
0.3
0.4
0.4Influence Ordinate BMD @ 0.2L
8/10/2019 Bridges 6 Computations
20/221
8/10/2019 Bridges 6 Computations
21/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.4L(0.960m from support A)
0.0 0.0 0.0-0.0004 -0.0004
1.0L 0.0 0.0 0.0 0.0-0.0246
1.2L -0.0184 -0.0184 -0.04411.1L -0.0102 -0.0102
-0.05311.4L -0.0229 -0.0229 -0.05501.3L -0.0221 -0.0221
-0.05331.6L -0.0184 -0.0184 -0.04421.5L -0.0222 -0.0222
-0.03411.8L -0.0092 -0.0092 -0.02201.7L -0.0142 -0.0142
-0.01082.0L 0.0 0.0 0.0 0.01.9L -0.0045 -0.0045
0.00452.2L 0.0038 0.0038 0.00912.1L 0.0019 0.0019
0.01362.4L 0.0062 0.0062 0.01482.3L 0.0057 0.0057
0.01442.6L 0.0051 0.0051 0.01222.5L 0.0060 0.0060
0.00972.8L 0.0027 0.0027 0.00652.7L 0.0041 0.0041
0.00323.0L 0.0 0.0 0.0 0.02.9L 0.0014 0.0014
Influence lineordinates
0.0 0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. + M B
0.11920.2L 0.12 -0.0201 0.0999 0.23980.1L 0.06 -0.0103 0.0497
0.36310.4L 0.24 -0.0350 0.2050 0.49210.3L 0.18 -0.0287 0.1513
0.38400.6L 0.16 -0.0398 0.1202 0.28860.5L 0.20 -0.0400 0.1600
0.19890.8L 0.08 -0.0297 0.0503 0.12080.7L 0.12 -0.0371 0.0829
0.05680.9L 0.04 -0.0163 0.0237
3.1L
3.6L3.7L3.8L3.9L
3.2L3.3L3.4L3.5L
4.0L
-0.0050-0.0040-0.0030-0.0020
-0.0010-0.0020-0.0030-0.0040
-0.00100.0
-0.0004-0.0008-0.0013-0.0017-0.0021-0.0017-0.0013-0.0008
-0.0021-0.0017-0.0013-0.0008
-0.0004-0.0008-0.0013-0.0017
-0.1
0.0
0.1
0.2
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.2
0.3
0.4
0.5
0.6
Influence Ordinate BMD @ 0.4L
8/10/2019 Bridges 6 Computations
22/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.5L(1.200m from support A)
1.0L 0.0 0.0 0.0 0.0-0.0327
1.2L -0.0245 -0.0245 -0.05881.1L -0.0136 -0.0136
-0.07081.4L -0.0306 -0.0306 -0.07331.3L -0.0295 -0.0295
-0.07101.6L -0.0246 -0.0246 -0.05891.5L -0.0296 -0.0296
-0.04551.8L -0.0122 -0.0122 -0.02941.7L -0.0190 -0.0190
-0.01442.0L 0.0 0.0 0.0 0.01.9L -0.0060 -0.0060
0.00602.2L 0.0050 0.0050 0.01212.1L 0.0025 0.0025
0.01812.4L 0.0082 0.0082 0.01982.3L 0.0076 0.0076
0.01922.6L 0.0068 0.0068 0.01632.5L 0.0080 0.0080
0.01300.0036 0.0036 0.00860.0054 0.0054
0.0 0.0 0.00.0018 0.0018
Influence lineordinates
0.0 0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. + M B
0.08900.2L 0.10 -0.0251 0.0749 0.17980.1L 0.05 -0.0129 0.0371
0.27380.4L 0.20 -0.0437 0.1563 0.37510.3L 0.15 -0.0359 0.1141
0.48000.6L 0.20 -0.0497 0.1503 0.36070.5L 0.25 -0.0500 0.2000
0.24860.8L 0.10 -0.0371 0.0629 0.15100.7L 0.15 -0.0464 0.1036
0.07100.9L 0.05 -0.0204 0.0296
3.1L3.2L3.3L
3.0L2.9L2.8L2.7L
3.4L3.5L3.6L3.7L3.8L3.9L4.0L
-0.0054-0.0067-0.0054-0.0040
-0.0013-0.0027-0.0040
0.0043
-0.0027-0.0013
-0.0022
0.0
-0.0006
-0.0028-0.0022-0.0017-0.0011
0.0
-0.0006-0.0011-0.0017-0.0022-0.0028-0.0022-0.0017-0.0011-0.0006
0.0 0.00.0
-0.0011-0.0017
-0.0006
-0.2
-0.1
0.0
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39
0.3
0.4
0.5
0.6Influence Ordinate BMD @ 0.5L
8/10/2019 Bridges 6 Computations
23/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.6L(1.440m from support A)
1.0L 0.0 0.0 0.0 0.0-0.0409
1.2L -0.0306 -0.0306 -0.07341.1L -0.0171 -0.0171
-0.08861.4L -0.0382 -0.0382 -0.09171.3L -0.0369 -0.0369
-0.08881.6L -0.0307 -0.0307 -0.07371.5L -0.0370 -0.0370
-0.05691.8L -0.0153 -0.0153 -0.03671.7L -0.0237 -0.0237
0.01.9L -0.0075 -0.00752.0L 0.0 0.0 0.0
0.00760.01512.2L 0.0063 0.0063
2.1L 0.0032 0.0032
0.0103 0.0103 0.02470.0095 0.0095
0.02400.0085 0.0085 0.02040.0100
0.0045 0.0045 0.01080.0068 0.0068
0.00543.0L 0.0 0.0 0.0 0.02.9L 0.0023
Influence lineordinates
0.0 0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. + M B
0.05880.2L 0.08 -0.0301 0.0499 0.11970.1L 0.04 -0.0155 0.0245
0.18460.4L 0.16 -0.0524 0.1076 0.25810.3L 0.12 -0.0431 0.0769
0.33600.6L 0.24 -0.0596 0.1804 0.43290.5L 0.20 -0.0600 0.1400
0.29840.8L 0.12 -0.0445 0.0755 0.18120.7L 0.18 -0.0557 0.1243
0.08520.9L 0.06 -0.0245 0.0355
2.6L2.5L2.4L2.3L
3.2L3.3L3.4L3.5L
3.1L
2.8L2.7L
4.0L
3.6L3.7L3.8L3.9L
-0.0007 -0.0017
0.0023
0.0162
0.0100
0.0227
-0.0180
-0.0028-0.0021
-0.0014-0.0021-0.0028-0.0035
0.0 0.0
-0.0014-0.0007
0.0
-0.0007-0.0014-0.0021-0.0028-0.0035-0.0028-0.0021-0.0014-0.0007
-0.0067-0.0050-0.0034-0.0017
-0.0034-0.0050-0.0067-0.0084
0.0
-0.2
-0.1
0.0
0.1
0.2
1 4 7 10 13 16 19 22 25 28 31 34 37 4
0.2
0.3
0.4
0.5Influence Ordinate BMD @ 0.6L
8/10/2019 Bridges 6 Computations
24/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.7L(1.680m from support A)
0.0 0.0 0.0 0.0
-0.0017 -0.0017 -0.0040-0.0008 -0.0008 -0.0020
-0.0034 -0.0034 -0.0081-0.0025 -0.0025 -0.0060
-0.0034 -0.0034 -0.0081-0.0042 -0.0042 -0.0101
-0.0017 -0.0017 -0.0040-0.0025 -0.0025 -0.0060
-0.0008 -0.0008 -0.0020
1.0L 0.0 0.0 0.0 0.0-0.0491
1.2L -0.0367 -0.0367 -0.08811.1L -0.0205 -0.0205
-0.10631.4L -0.0458 -0.0458 -0.11001.3L -0.0443 -0.0443
-0.10661.6L -0.0368 -0.0368 -0.08841.5L -0.0444 -0.0444
-0.06831.8L -0.0184 -0.0184 -0.04411.7L -0.0284 -0.0284
-0.02162.0L 0.0 0.0 0.0 0.01.9L -0.0090 -0.0090
0.00912.2L 0.0076 0.0076 0.01812.1L 0.0038 0.0038
0.02722.4L 0.0124 0.0124 0.02972.3L 0.0113 0.0113
0.02882.6L 0.0102 0.0102 0.02452.5L 0.0120 0.0120
0.01942.8L 0.0054 0.0054 0.01302.7L 0.0081 0.0081
0.00653.0L 0.0 0.0 0.0 0.02.9L 0.0027 0.0027
Influence lineordinates
0.0 0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. + M B
0.02870.2L 0.06 -0.0351 0.0249 0.05970.1L 0.03 -0.0181 0.0119
0.09540.4L 0.12 -0.0612 0.0588 0.14120.3L 0.09 -0.0503 0.0397
0.19200.6L 0.18 -0.0696 0.1104 0.26500.5L 0.15 -0.0700 0.0800
0.34810.8L 0.14 -0.0519 0.0881 0.21130.7L 0.21 -0.0650 0.1450
0.09950.9L 0.07 -0.0286 0.0414
3.1L3.2L3.3L
3.8L3.9L4.0L
3.4L3.5L3.6L3.7L
-0.2
-0.1
0.0
0.1
1 4 7 10 13 16 19 22 25 28 31 34 37 4
0.2
0.3
0.4Influence Ordinate BMD @ 0.7L
8/10/2019 Bridges 6 Computations
25/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.8L(1.920m from support A)
0.00.0
+ M B
-0.0002
Influence lineordinates
-0.0015
0.0
-0.0029-0.0039
-0.0071-0.0047
-0.0024-0.0047-0.0071-0.0094
-0.0010-0.0010 -0.0024
-0.0049-0.0039-0.0029-0.0020
-0.0118-0.0094
-0.0029-0.0039-0.0049-0.0039-0.0029-0.0020
-0.0010-0.0020
-0.0010-0.0020
1.0L 0.0 0.0 0.0 0.0-0.0573
1.2L -0.0428 -0.0428 -0.10281.1L -0.0239 -0.0239
-0.12401.4L -0.0535 -0.0535 -0.12841.3L -0.0517 -0.0517
-0.12431.6L -0.0430 -0.0430 -0.10321.5L -0.0518 -0.0518
-0.07961.8L -0.0214 -0.0214 -0.05141.7L -0.0332 -0.0332
-0.02522.0L 0.0 0.0 0.0 0.01.9L -0.0105 -0.0105
0.01062.2L 0.0088 0.0088 0.02122.1L 0.0044 0.0044
0.03182.4L 0.0144 0.0144 0.03462.3L 0.0132 0.0132
0.03362.6L 0.0119 0.0119 0.02862.5L 0.0140 0.0140
0.02272.8L 0.0063 0.0063 0.01512.7L 0.0095 0.0095
0.00763.0L 0.0 0.0 0.0 0.02.9L 0.0032 0.0032
MB coeff.
0.0101
0.0 0.02 -0.0206 -0.0006-0.0004
0.2L 0.06 -0.0574 0.0026 0.00610.1L 0.04 -0.0402
0.02420.4L 0.10 -0.0800 0.0200 0.04800.3L 0.08 -0.0699
0.09720.6L 0.14 -0.0742 0.0658 0.15780.5L 0.12 -0.0795 0.0405
0.24150.8L 0.08 -0.0326 0.0474 0.11370.7L 0.16 -0.0594 0.1006
0.00.9L 0.0 0.0 0.0
3.1L
3.6L3.7L3.8L3.9L
3.2L3.3L3.4L3.5L
4.0L
LoadPosition
0.0
coeff.
-0.2
-0.1
0.0
0.1
1 4 7 10 13 16 19 22 25 28 31 34 37 4
0.1000
0.1500
0.2000
0.2500
0.3000Influence Ordinate BMD @ 0.8L
8/10/2019 Bridges 6 Computations
26/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 0.9L(2.160m from support A)
0.0 0.0 0.0
0.0
Influence lineordinates
-0.0960
0.0132
-0.0707-0.0324
-0.0022 -0.0022 -0.0054-0.0011 -0.0011 -0.0027
-0.0056 -0.0056 -0.0134-0.0045 -0.0108
-0.0034 -0.0034 -0.0081
-0.0022 -0.0054-0.0034 -0.0034 -0.0081
-0.0045 -0.0108
-0.0011 -0.0011 -0.0027
1.0L -0.0273 -0.0273 -0.0655-0.1175
1.2L -0.0590 -0.0590 -0.14171.1L -0.0490 -0.0490
-0.14671.4L -0.0592 -0.0592 -0.14211.3L -0.0611 -0.0611
-0.11791.6L -0.0379 -0.0379 -0.09101.5L -0.0491 -0.0491
-0.05881.8L -0.0120 -0.0120 -0.02881.7L -0.0245 -0.0245
0.02.0L 0.0050 0.0050 0.01211.9L 0.0 0.0 0.0
0.02422.2L 0.0151 0.0151 0.03632.1L 0.0101 0.0101
0.03962.4L 0.0160 0.0160 0.03842.3L 0.0165 0.0165
0.03262.6L 0.0108 0.0108 0.02592.5L 0.0136 0.0136
0.0
0.01730.0036 0.0036 0.00860.0072 0.0072
0.0
3.6L
0.0 0.0
-0.0022
-0.0045
-0.0045
3.3L
-0.03170.0
LoadPosition
coeff.
MB coeff. + M B
-0.0604-0.0831-0.0928-0.0787
3.4L3.5L
-0.0252
0.00.1L 0.01
0.3L 0.03 -0.0646 -0.0346
0.0
-0.0387
-0.0232 -0.01320.2L 0.02 -0.0452
-0.02950.5L 0.05 -0.0900 -0.04000.4L 0.04
0.6L 0.06 -0.08950.7L 0.07 -0.0835 -0.0135
0.03170.9L 0.09 -0.0367 0.0533 0.12790.8L 0.08 -0.0668
3.0L3.1L3.2L
2.9L2.8L2.7L
3.7L3.8L3.9L4.0L
0.0
0.0
-0.2000
-0.1500
-0.1000
-0.0500
0.0000
0.0500
1 4 7 10 13 16 19 22 25 28 31 34 37 4
0.0
0.1
0.1
0.2Influence Line Ordinate BMD @ 0.9L
8/10/2019 Bridges 6 Computations
27/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 1.1L (0.240m from support B)
-0.0091-0.0060
-0.0038-0.0025-0.0013
-0.0030-0.0060-0.0091-0.0121-0.0151-0.0121
0.0 0.0
-0.0013-0.0025-0.0038-0.0050
-0.0030
-0.0063-0.0050
-0.0063-0.0050-0.0038-0.0025-0.0013
0.0 0.0
-0.0013
0.0
-0.0551
0.01.1L -0.0307 -0.0307 -0.07371.0L 0.0 0.0
-0.0688
-0.13221.3L -0.0664 -0.0664 -0.15941.2L -0.0551
-0.0553
-0.16501.5L -0.0666 -0.0666 -0.15981.4L -0.0688
-0.0275
-0.13261.7L -0.0427 -0.0427 -0.10241.6L -0.0553
0.0
-0.06611.9L -0.0135 -0.0135 -0.03241.8L -0.0275
0.0113
0.02.1L 0.0057 0.0057 0.01362.0L 0.0 0.0
0.0185
0.02722.3L 0.0170 0.0170 0.04082.2L 0.0113
0.0153
0.04452.5L 0.0180 0.0180 0.04322.4L 0.0185
0.0081
0.03672.7L 0.0122 0.0122 0.02922.6L 0.0153
0.0
0.01942.9L 0.0041 0.0041 0.00972.8L 0.0081
3.0L 0.0
-0.0025-0.0038-0.0050
-0.0225 -0.0540
0.0
LoadPosition
coeff.
MB coeff. MC coeff. + M B +
MC
3.1L3.2L
Influence lineordinates
0.0 0.0 0.0 0.0 0.0 0.0
-0.0438 -0.10510.1L -0.02320.2L -0.0452 0.0014
0.0007
0.4L -0.0787 0.00230.3L -0.0646 0.0019 -0.0627 -0.1505
-0.0763 -0.1832-0.0873 -0.2095-0.0868 -0.2082
0.5L0.6L -0.0895 0.0027
-0.0900 0.0027
0.8L -0.0668 0.00200.7L -0.0835 0.0025 -0.0810 -0.1944
-0.0648 -0.1555-0.0356 -0.08550.9L -0.0367 0.0011
3.5L3.6L3.7L3.8L
3.3L3.4L
3.9L4.0L
0.0
-0.2
-0.2
-0.1
-0.1
0.0
0.1
0.1
0.2
0.2
1 4 7 10 13 16 19 22 25 28 31 34 37
Influence Line Ordinate BMD @ 1.1L
8/10/2019 Bridges 6 Computations
28/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section 1.2L (0.480m from support B)
0.0005 -0.00070.0 0.0 0.0
-0.0089-0.0071-0.0053-0.0036-0.0018
-0.0007-0.0015-0.0022-0.0030
-0.0018-0.0036-0.0053-0.0071
0.00260.00210.00160.0010
-0.0037-0.0030-0.0022-0.0015
-0.0013-0.0025-0.0038-0.0050-0.0063-0.0050-0.0038-0.0025-0.0013
0.0 0.0 0.0 0.00.00050.00100.00160.0021
0.0
0.0
0.0
1.0L 0.0 0.0 0.01.1L 0.09 -0.0307 -0.0017
0.0 0.00.0576 0.1383
0.0516-0.0016 -0.0039
0.08 -0.0551 -0.0034 0.02151.3L 0.071.4L 0.06 -0.0688 -0.0067
-0.0664 -0.0052
-0.05651.5L 0.05 -0.0666
-0.0154 -0.0371
-0.0080
-0.0246-0.0080
-0.0207
-0.05901.6L 0.04 -0.0553 -0.0083 -0.0236
-0.0496-0.0339
-0.0072 -0.01720.02 -0.0275 -0.0066 -0.01410.03 -0.0427
1.9L 0.012.0L 0.0 0.0 0.0
-0.0135 -0.0037
0.01502.1L 0.0057
0.0 0.0
-0.0077
0.0031-0.0026
0.0094
0.00752.2L 0.0113 -0.0051 0.0062
0.02250.0246
0.0100 0.02400.0185 -0.0083 0.01020.0170
0.0086 0.02072.5L2.6L 0.0153 -0.0067
0.0180 -0.0080
0.01662.8L 0.0081 -0.0035 0.0046 0.01112.7L 0.0122
0.0041 -0.0017
0.0069-0.0052
0.0023 0.0055
LoadPosition
coeff.
MB coeff. MC coeff. + M B +
MCInfluence line
ordinates
3.2L3.3L3.4L
0.1L -0.0206 0.00140.0 0.0 0.0 0.0 0.0 0.0
-0.0192 -0.0461-0.0374 -0.0898-0.0536 -0.1286
0.2L0.3L -0.0574 0.0038
-0.0402 0.0028
0.5L -0.0800 0.00540.4L -0.0699 0.0047 -0.0652 -0.1566
-0.0746 -0.1790-0.0741 -0.1779-0.0692 -0.1661
0.6L0.7L -0.0742 0.0050
-0.0795 0.0054
-0.0326 0.00220.8L -0.0594 0.0040 -0.0554 -0.1330
-0.0305 -0.0732
3.0L3.1L
2.9L
2.4L2.3L
1.8L1.7L
1.2L
3.5L3.6L3.7L3.8L
0.9L
3.9L4.0L
-0.3
-0.2
-0.2
-0.1
-0.1
0.1
0.2
0.2
0.3
0.3Influence Line Ordinate BMD @ 1.2L
8/10/2019 Bridges 6 Computations
29/221
8/10/2019 Bridges 6 Computations
30/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section1.4L (0.960m from support B)
0.00140.0 0.0 0.0 0.0
-0.0010 0.0016 0.0006
0.0042-0.0020 0.0031 0.0012 0.0028-0.0029 0.0047 0.0017
0.0070-0.0039 0.0062 0.0023 0.0056-0.0049 0.0078 0.0029
0.0042-0.0039 0.0062 0.0023 0.0056-0.0029 0.0047 0.0017
0.0014-0.0020 0.0031 0.0012 0.0028-0.0010 0.0016 0.0006
0.0 0.0 0.0 0.0
-0.01020.04110.0870
0.09871.0L 0.01.1L 0.07 -0.0239 -0.0050
0.20870.3426
0.1065 0.25560.21 -0.0517 -0.0156 0.14270.14 -0.0428
1.4L 0.181.5L 0.15 -0.0518 -0.0240
-0.0535 -0.0200
0.07861.6L 0.12 -0.0430
0.0742 0.1781
-0.0197
0.0521-0.0249
0.0188
0.12511.7L 0.09 -0.0332 -0.0241 0.0328
0.04520.0204
0.0 0.00.03 -0.0105 -0.0110 0.00850.06 -0.0214
-0.0032 -0.00782.0L 0.02.1L 0.0044 -0.0077
0.0 0.0
-0.01562.3L 0.0132 -0.0230 -0.0097 -0.02332.2L 0.0088
0.0144 -0.0249
-0.0065-0.0153
-0.0105
-0.01570.0119 -0.0200
-0.0252-0.0240
-0.0081 -0.01950.0140 -0.0240 -0.0100
2.8L 0.0063-0.0062 -0.0149
2.6L2.7L 0.0095
2.9L 0.0032 -0.0052 -0.0021 -0.00500.0 0.0
-0.0041-0.0104
0.0
-0.0099
0.0
LoadPosition
coeff.
MB coeff. MC coeff. + M B +
MCInfluence line
ordinates
3.2L3.3L3.4L
0.1L -0.0155 0.00290.0 0.0 0.0 0.0 0.0 0.0
-0.0126 -0.0302-0.0246 -0.0590-0.0354 -0.0850
0.2L0.3L -0.0431 0.0077
-0.0301 0.0055
0.5L -0.0600 0.01080.4L -0.0524 0.0094 -0.0431 -0.1034
-0.0492 -0.1181-0.0488 -0.1172-0.0456 -0.1094
0.6L0.7L -0.0557 0.0101
-0.0596 0.0108
-0.0245 0.00430.8L -0.0445 0.0079 -0.0366 -0.0878
-0.0202 -0.0484
3.1L3.0L
2.5L2.4L
1.9L1.8L
1.3L1.2L
3.5L3.6L3.7L3.8L
0.9L
3.9L4.0L 0.0
0.0
-0.2
-0.1
0.0
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.2
0.3
0.4
0.5Influence Line Ordinate BMD @ 1.4L
8/10/2019 Bridges 6 Computations
31/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section1.5L (1.200m from support B)
0.00890.0060
0.01490.0119
0.00300.0
-0.0008 0.0021 0.00120.0 0.0 0.0 0.0
-0.0025 0.0062 0.0037-0.0017 0.0042 0.0025
-0.0042 0.0104 0.0062-0.0034 0.0083 0.0050
0.0089-0.0034 0.0083 0.0050 0.0119-0.0025 0.0062 0.0037
0.0030-0.0017 0.0042 0.0025 0.0060-0.0008 0.0021 0.0012
0.0 0.00.01.1L 0.06 -0.0205 -0.0067
0.0 0.0
0.12 -0.0367 -0.01360.03290.0697
0.0789
-0.0320-0.0458 -0.0267
0.16720.2758
0.1674 0.4019-0.0443 -0.0208 0.1149
-0.03680.12360.0900-0.0332
0.29661.4L 0.241.5L 0.20 -0.0444
0.21590.0595 0.1428
0.08481.7L 0.12 -0.0284 -0.03211.6L 0.16
-0.0154
-0.0090 -0.0146 0.01640.08 -0.0184 -0.0263 0.0353
0.0 0.02.0L 0.00.0393
0.0 0.0-0.0064-0.0128-0.0204
0.0038 -0.01022.1L
2.3L 0.0113 -0.03062.2L 0.0076
0.0124 -0.0332 -0.0208
-0.0308-0.0193 -0.0462
-0.0500-0.0480
-0.0165 -0.0396-0.0128 -0.0307
0.0120 -0.0320 -0.0200
2.8L 0.00540.0081 -0.02090.0102 -0.02672.6L
2.7L
2.9L 0.0027 -0.0070 -0.0043 -0.01020.0 0.0
-0.0085-0.0139
0.0
-0.0204
0.0
LoadPosition
coeff.
MB coeff. MC coeff. + M B +
MCInfluence line
ordinates
3.2L3.3L3.4L
0.1L -0.0129 0.00360.0 0.0 0.0 0.0 0.0 0.0
-0.0093 -0.0223-0.0182 -0.0437-0.0263 -0.0631
0.2L0.3L -0.0359 0.0096
-0.0251 0.0069
0.5L -0.0500 0.01350.4L -0.0437 0.0117 -0.0320 -0.0768
-0.0365 -0.0876-0.0362 -0.0869-0.0338 -0.0811
0.6L0.7L -0.0464 0.0126
-0.0497 0.0135
0.9L -0.0204 0.00540.8L -0.0371 0.0099 -0.0272 -0.0653
-0.0150 -0.0360
1.9L1.8L
1.3L1.2L
1.0L
3.5L3.6L3.7L3.8L
3.1L3.0L
2.5L2.4L
3.9L4.0L
0.04
0.18
0.0
-0.2
-0.1
0.0
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.2
0.3
0.4
0.5Influence Line Ordinate BMD @ 1.5L
8/10/2019 Bridges 6 Computations
32/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section1.6L (1.440m from support B)
0.12580.2090
0.0581
-0.0720
-0.0310
0.3067
0.0 0.01.0L 0.01.1L 0.05 -0.0171 -0.0084
0.0 0.0
-0.0306 -0.01700.15
0.02460.0524
0.0590
-0.0370 -0.0400-0.0382-0.0369 -0.0260 0.0871
-0.0334
1.6L 0.20 -0.0307
0.1284 0.30820.4152
1.4L 0.201.5L
0.0518
0.1730
1.7L 0.15 -0.0237 -0.04010.1278-0.04150.0862
0.25
0.0
0.10 -0.0153 -0.03290.05
0.20690.1243
-0.0075 -0.0183 0.02420.0
2.2L 0.0063
0.0 0.0-0.0230
2.0L 0.02.1L -0.0096
2.3L 0.0095 -0.0383-0.0192-0.0255
0.0032 -0.0128
0.0103 -0.0415 -0.0312
-0.0461-0.0288 -0.0691
-0.0749
-0.0249 -0.0598-0.0194 -0.0464
0.0100 -0.0400 -0.0300
0.0068 -0.02610.0085 -0.03342.6L
2.7L
-0.01552.8L 0.00452.9L 0.0023 -0.0087
0.0 0.0
-0.0129-0.0174
0.0-0.0065
0.0
2.5L2.4L
1.9L1.8L
1.3L1.2L
3.8L3.9L
3.2L3.3L3.4L3.5L3.6L3.7L
3.1L3.0L
4.0L
0.0046-0.0014 0.0052 0.0038 0.0091-0.0007 0.0026 0.0019
0.0137-0.0028 0.0104 0.0076 0.0182-0.0021 0.0078 0.0057
0.0228-0.0028 0.0104 0.0076 0.0182-0.0035 0.0130 0.0095
0.0137-0.0014 0.0052 0.0038 0.0091-0.0021 0.0078 0.0057
0.0 0.0 0.0 0.0-0.0007 0.0026 0.0019
0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. MC coeff. + M B +
MCInfluence line
ordinates
0.0 0.0-0.0060 -0.0144-0.0118 -0.0283
0.1L0.2L -0.0201 0.0083
-0.0103 0.0043
0.4L -0.0350 0.01400.3L -0.0287 0.0115 -0.0172 -0.0413
-0.0209 -0.0502-0.0238 -0.0571-0.0236 -0.0565
0.5L0.6L -0.0398 0.0162
-0.0400 0.0162
0.8L -0.0297 0.01190.7L -0.0371 0.0151 -0.0220 -0.0528
-0.0178 -0.0427-0.0098 -0.02360.9L -0.0163 0.0065
0.0
0.0
0.10
0.0046
-0.2
-0.1
0.0
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.2
0.3
0.4
0.5Influence Line Ordinate BMD @ 1.6L
8/10/2019 Bridges 6 Computations
33/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section1.7L (1.680m from support B)
0.0 0.01.0L 0.0 0.0 0.0
1.2L 0.08 -0.0245 -0.02041.1L 0.04 -0.0136 -0.0100 0.0163 0.0392
0.0351 0.08430.0593 0.14230.0894 0.2145
1.3L 0.121.4L 0.16 -0.0306 -0.0401
-0.0295 -0.0312
1.6L 0.24 -0.0246 -0.04981.5L 0.20 -0.0296 -0.0480 0.1224 0.2938
0.1656 0.39750.1129 0.27100.0683 0.1639
1.7L 0.181.8L 0.12 -0.0122 -0.0395
-0.0190 -0.0481
2.0L 0.0 0.0 0.01.9L 0.06 -0.0060 -0.0220 0.0320 0.0769
0.0 0.0-0.0128 -0.0307-0.0256 -0.0613
2.1L2.2L 0.0050 -0.0306
0.0025 -0.0153
2.4L 0.0082 -0.04982.3L 0.0076 -0.0459 -0.0383 -0.0920
-0.0416 -0.0997-0.0400 -0.0960-0.0333 -0.0799
2.5L2.6L 0.0068 -0.0401
0.0080 -0.0480
2.8L 0.0036 -0.02092.7L 0.0054 -0.0313 -0.0259 -0.0622
-0.0173 -0.0415-0.0086 -0.0207
0.0 0.02.9L3.0L 0.0 0.0 0.0
0.0018 -0.0104
3.2L -0.0011 0.00623.1L -0.0006 0.0031 0.0026 0.0061
0.0051 0.01230.0077 0.01840.0102 0.0246
3.3L3.4L -0.0022 0.0125
-0.0017 0.0094
3.6L -0.0022 0.01253.5L -0.0028 0.0156 0.0128 0.0307
0.0102 0.02460.0077 0.01840.0051 0.0123
3.7L3.8L -0.0011 0.0062
-0.0017 0.0094
4.0L 0.0 0.0 0.03.9L -0.0006 0.0031 0.0026 0.0061
0.0 0.0
+ M B +MC
Influence lineordinates
0.0 0.0
LoadPosition
coeff.
0.0 0.0 0.0 0.0
MB coeff. MC coeff.
0.2L -0.0151 0.00970.1L -0.0077 0.0050 -0.0027 -0.0065
-0.0054 -0.0130-0.0081 -0.0194-0.0098 -0.0236
0.3L0.4L -0.0262 0.0164
-0.0215 0.0134
0.6L -0.0298 0.01890.5L -0.0300 0.0189 -0.0111 -0.0266
-0.0109 -0.0262-0.0102 -0.0245-0.0084 -0.0202
0.7L0.8L -0.0223 0.0139
-0.0278 0.0176
0.9L -0.0122 0.0076 -0.0047 -0.0112
-0.2
-0.1
0.0
0.1
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.1
0.2
0.3
0.4Influence Line Ordinate BMD @ 1.7L
8/10/2019 Bridges 6 Computations
34/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section1.8L (1.920m from support B)
1.0L 0.0 0.0 0.0 0.0 0.00.0081 0.01940.0178 0.0428
1.1L 0.031.2L 0.06 -0.0184 -0.0238
-0.0102 -0.0117
1.4L 0.12 -0.0229 -0.04681.3L 0.09 -0.0221 -0.0364 0.0315 0.0755
0.0503 0.12080.0718 0.17230.1035 0.2484
1.5L 0.151.6L 0.18 -0.0184 -0.0581
-0.0222 -0.0560
1.8L 0.14 -0.0092 -0.04611.7L 0.21 -0.0142 -0.0561 0.1396 0.3351
0.0848 0.20340.0399 0.0957
0.0 0.01.9L 0.072.0L 0.0 0.0 0.0
-0.0045 -0.0256
2.2L 0.0038 -0.03572.1L 0.0019 -0.0179 -0.0160 -0.0383
-0.0319 -0.0766-0.0479 -0.1149-0.0519 -0.1246
2.3L2.4L 0.0062 -0.0581
0.0057 -0.0536
2.6L 0.0051 -0.04682.5L 0.0060 -0.0560 -0.0500 -0.1200
-0.0417 -0.1000-0.0325 -0.0780-0.0217 -0.0520
2.7L2.8L 0.0027 -0.0244
0.0041 -0.0365
3.0L 0.0 0.0 0.02.9L 0.0014 -0.0122 -0.0108 -0.0260
0.0 0.00.0032 0.00770.0064 0.0155
3.1L3.2L -0.0008 0.0073
-0.0004 0.0036
3.4L -0.0017 0.01463.3L -0.0013 0.0109 0.0097 0.0232
0.0129 0.03090.0161 0.03860.0129 0.0309
3.5L3.6L -0.0017 0.0146
-0.0021 0.0182
3.8L -0.0008 0.00733.7L -0.0013 0.0109 0.0097 0.0232
0.0064 0.01550.0032 0.0077
0.0 0.03.9L4.0L 0.0 0.0 0.0
-0.0004 0.0036
0.0 0.0 0.0 0.0
LoadPosition
coeff.
MB coeff. MC coeff. + M B +
MCInfluence line
ordinates
0.0 0.00.0006 0.00140.0010 0.0024
0.1L0.2L -0.0100 0.0110
-0.0052 0.0058
0.4L -0.0175 0.01870.3L -0.0144 0.0154 0.0010 0.0024
0.0012 0.00300.0016 0.00380.0017 0.0041
0.5L0.6L -0.0199 0.0216
-0.0200 0.0216
0.8L -0.0148 0.01580.7L -0.0186 0.0202 0.0016 0.0038
0.0010 0.00240.0005 0.00120.9L -0.0082 0.0086
-0.2
-0.1
0.01 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.1
0.1
0.2
0.2
0.3
0.3Influence Line Ordinate BMD @ 1.8L
`
8/10/2019 Bridges 6 Computations
35/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Influence Line ordinates for BM at the section1.9L (2.160m from support B)
0.0 0.01.0L 0.0 0.0 0.0
1.2L 0.04 -0.0122 -0.02721.1L 0.02 -0.0068 -0.0134 -0.0002 -0.0004
0.0006 0.00130.0036 0.00870.0113 0.0271
1.3L 0.061.4L 0.08 -0.0153 -0.0534
-0.0148 -0.0416
1.6L 0.12 -0.0123 -0.06641.5L 0.10 -0.0148 -0.0640 0.0212 0.0509
0.0413 0.09920.0664 0.15930.1012 0.2430
1.7L 0.141.8L 0.16 -0.0061 -0.0526
-0.0095 -0.0642
2.0L 0.0 0.0 0.01.9L 0.08 -0.0030 -0.0293 0.0477 0.1145
0.0 0.0-0.0191 -0.0459-0.0383 -0.0919
2.1L2.2L 0.0025 -0.0408
0.0013 -0.0204
2.4L 0.0041 -0.06642.3L 0.0038 -0.0612 -0.0574 -0.1378
-0.0623 -0.1495-0.0600 -0.1440-0.0500 -0.1201
2.5L2.6L 0.0034 -0.0534
0.0040 -0.0640
2.8L 0.0018 -0.02782.7L 0.0027 -0.0418 -0.0391 -0.0937
-0.0260 -0.0625-0.0130 -0.0312
0.0 0.02.9L3.0L 0.0 0.0 0.0
0.0009 -0.0139
3.2L -0.0006 0.00833.1L -0.0003 0.0042 0.0039 0.0093
0.0078 0.01860.0116 0.02790.0155 0.0372
3.3L3.4L -0.0011 0.0166
-0.0008 0.0125
3.6L -0.0011 0.01663.5L -0.0014 0.0208 0.0194 0.0466
0.0155 0.03720.0116 0.02790.0078 0.0186
3.7L3.8L -0.0006 0.0083
-0.0008 0.0125
4.0L 0.0 0.0 0.03.9L -0.0003 0.0042 0.0039 0.0093
0.0 0.0
+ M B +MC
Influence lineordinates
0.0 0.0
LoadPosition
coeff.
0.0 0.0 0.0 0.0
MB coeff. MC coeff.
0.2L -0.0050 0.01240.1L -0.0026 0.0065 0.0039 0.0094
0.0074 0.01780.0101 0.02420.0123 0.0296
0.3L0.4L -0.0087 0.0211
-0.0072 0.0173
0.6L -0.0099 0.02430.5L -0.0100 0.0243 0.0143 0.0343
0.0144 0.03450.0134 0.03220.0104 0.0250
0.7L0.8L -0.0074 0.0178
-0.0093 0.0227
0.9L -0.0041 0.0097 0.0056 0.0135
-0.2
-0.2
-0.1
-0.1
0.01 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
0.0
0.1
0.1
0.2
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 3
Influence Line Ordinate BMD @ 1.9L
8/10/2019 Bridges 6 Computations
36/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Since the structure is symmetrical, influence lines are only drawn for load positionsupto 2.0L (i.e. Support C)
. en ng momen s ue oHA live loads (point loads)
Sections 1.2 The point loads due to HA live loads is the HA Knife - Edge load (KEL).of this report With reference to Clause 6.2.2 of BS 5400: Part II: 1978, 120KN of KEL is
recommended per notional lane.Based on this, the ultimate KEL per deck span is computed as 67.32KN/m.
a. Support moments
1.0L 0.0 0.0 0.0 0.0 0.0-0.0084 -0.0203-0.0167 -0.0401
1.1L 0.011.2L 0.02 -0.0061 -0.0306
-0.0034 -0.0150
1.4L 0.04 -0.0076 -0.06011.3L 0.03 -0.0074 -0.0468 -0.0242 -0.0580
-0.0278 -0.0666-0.0294 -0.0706-0.0208 -0.0500
1.5L 0.051.6L 0.06 -0.0061 -0.0747
-0.0074 -0.0720
1.8L 0.08 -0.0031 -0.05921.7L 0.07 -0.0047 -0.0722 -0.0069 -0.0166
0.0177 0.04250.0556 0.1333
0.0 0.01.9L 0.092.0L 0.0 0.0 0.0
-0.0015 -0.0329
2.2L 0.0013 -0.04592.1L 0.0006 -0.0230 -0.0223 -0.0536
-0.0446 -0.1071-0.0670 -0.1607-0.0726 -0.1743
2.3L2.4L 0.0021 -0.0747
0.0019 -0.0689
2.6L 0.0017 -0.06012.5L 0.0020 -0.0720 -0.0700 -0.1680
-0.0584 -0.1402-0.0456 -0.1095-0.0304 -0.0730
2.7L2.8L 0.0009 -0.0313
0.0014 -0.0470
3.0L 0.0 0.0 0.02.9L 0.0005 -0.0157 -0.0152 -0.0365
0.0 0.00.0045 0.01090.0091 0.0218
3.1L3.2L -0.0003 0.0094
-0.0001 0.0047
3.4L -0.0006 0.01873.3L -0.0004 0.0140 0.0136 0.0327
0.0182 0.04360.0227 0.05450.0182 0.0436
3.5L3.6L -0.0006 0.0187
-0.0007 0.0234
3.8L -0.0003 0.00943.7L -0.0004 0.0140
0.0-0.0001 0.0047
0.0136 0.03270.0091 0.02180.0045 0.0109
0.0 0.03.9L4.0L 0.0 0.0
-0.2
-0.2
-0.1
-0.1
8/10/2019 Bridges 6 Computations
37/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
i. when first span loaded; apply KEL at 0.5L: = Pii. when second span loaded; apply KEL at 1.4L: = Piii. when third span loaded; apply KEL at 2.4L: = Piv. when fourth span loaded; apply KEL at 3.5L: = Pv. when all four spans are loaded = P
where P = design KEL = 67.5 KN/mTherefore M = KNm
b. Span momentsi. when first span loaded; apply KEL at 0.4L: = Pii. when second span loaded; apply KEL at 1.5L: = Piii. when third span loaded; apply KEL at 2.5L: = Piv. when fourth span loaded; apply KEL at 3.6L: = Pv. when all four spans are loaded = P
where P = design KEL = 67.5 KN/mTherefore M = KNm
2.6 Total Bending moments due toHA live loads + Dead loads
a. Support momentsSections 3.2.1.3 moments due to HA point loads = KNm HA + Gk 3.2.1.4 & 3.2.2.1 moments due to HA udl loads = KNm support mmts
of this report moments due to dead loads = KNm =Design HA + Dead loads = KNm -44.38KN/m
b. Span momentsmoments due to HA point loads = KNmmoments due to HA udl loads = KNm HA + Gkmoments due to dead loads = KNm support mmtsDesign HA + Dead loads = KNm =
133.93KN/m
2.7 HB Live loading2.7.1 Wheel Loads
This is done using a 45 - unit HB loading. A 45 - unit HB vehicle has 4 axles, carrying 4 wheels each.weight of each axle = 10KNTotal axle weight = 10KN /axle * 4Axles = 40KNFor a 45 - unit HB loading, wheel load = 45 * 40KN = 1,800KNTotal No. of wheels supported = 16No.Therefore, load exerted by each wheel = 1,800/16 = 112.50KN
Alternative method of calculating Load exerted by each wheel: = 2,500j Newtons (where j = no of units of HB load )
-41.51
122.167.222.63
132.01
-11.09
-4.04
122.159
-26.38
-0.2400-0.18340.0494
-0.0168
0.41520.49211.8146
-0.3908
0.49210.4152
-26.379
8/10/2019 Bridges 6 Computations
38/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
= 2,500 * 45 / 1,000 = 112.5KN
Fig 3: Dimensions of a HB vehicle
Table 9,
R.C. H/Bk,
Reynolds & Stee-
dman. (10th ed)
AXLE AXLE AXLE AXLE Fig 4 : A unit of HB - vehicle configuration
2.7.2 DISPERSION OF WHEEL LOADSSect. 1.17(11)
Design of
R.C. Bridges F = Wheel load
a x = Contact length (varies: 0 - 380mm)by = width of tyre (varies: 75 - 450mm)
wheel load dispersal = A * B
The dispersal is carried out at an angle of 45 o through the concrete.The dispersal is treated separately between the concrete and the surfacing.
a. Load Dispersal Through Asphalt
1 , 0 0 0
1 , 0 0 0
1 , 0 0 0
3 7
5
75
DIRECTION OF TRAVEL
6,100 1,8001,800
1,8001,800 6,100
F
REINFORCEMENT
da x
a xb y
B=
b y+ 2
d
A = a x + 2d
B
A
Load = 1.1N/mm
8/10/2019 Bridges 6 Computations
39/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
where, f = pressure in N/mm j = No. of units of HB loading = 45
h' = depth below surface at which load is acting
b. Load Dispersal Through Concrete
Use f = 1.1N/mm
2.7.3 MOMENTS DUE TO HB LIVE LOADSThe tyres of a HB vehicle are spaced at 1,000mm as shown in the sketch above.
a. SupportsThe point loads are placed at critical positions to produce maximum effect.
i. when 1st span only is loadedThe tyres of a HB vehicle are spaced at 1,000mm as shown in the sketch above.
Load Position BM ordinate BM But P = 112.5KNm0.5L P KNm0.9L P KNm
KNm
ii. when only 2nd span is loadedThe influence values are as tabulated below.Load Position BM ordinate BM But P = 112.5KNm
1.3L P KNm
1.7L P KNm KNm
ii. when only 3rd span is loadedThe influence values are as tabulated below.Load Position BM ordinate BM But P = 112.5KNm
2.4 P KNm2.8L P KNm
KNm
ii. when only 4th span is loaded
-0.2400 -27.00-0.0979 -11.01
0.0216 2.43
-0.1771 -19.92375
7.99
-0.1138 -12.8025-32.73
0.0494 5.5575
-38.01
f = 2,500j[ (2,500j/1.1) 0.5 + h' ]
f = 2,500 * 45[ (2,500 * 45/1.1) 0.5 + 0 ]
= 1.1N/mm
2
1
f = 2,500j[ (2,500j/1.1) 0.5 + 2h' ]
=2,500 * 45
[ (2,500 * 45/1.1) 0.5 + (2 * 0.05) ]= 0.97
8/10/2019 Bridges 6 Computations
40/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
The influence values are as tabulated below.Load Position BM ordinate BM But P = 112.5KNm
3.2L P KNm3.6L P KNm
KNm
iii. When all four spans are loaded:Total moments due to HB load = -38.01KNm -32.73KNm + 7.99KNm -1.89KNm = KNm
. pan momenThe point loads are placed at critical positions to produce maximum effect.
i. when 1st span only is loadedThe tyres of a HB vehicle are spaced at 1,000mm as shown in the sketch above.
Load Position BM ordinate BM But P = 112.5KNm0.5L P KNm0.9L P KNm
KNm
ii. when only 2nd span is loadedThe influence values are as tabulated below.Load Position BM ordinate BM But P = 112.5KNm
1.3L P KNm1.7L P KNm
KNm
ii. when only 3rd span is loadedThe influence values are as tabulated below.Load Position BM ordinate BM But P = 112.5KNm
2.4L P KNm2.8L P KNm
KNm
ii. when only 4th span is loadedThe influence values are as tabulated below.Load Position BM ordinate BM But P = 112.5KNm
3.2L P KNm3.6L P KNm
KNm
iii. When all four spans are loaded:
15.19875
-1.89
0.2425 27.280.1079 12.14
0.1920 21.60.1351
40.25
0.1715 19.293750.1863 20.95875
36.80
37.64
-0.0134 -1.5075
-64.64
0.1916 21.5550.1430 16.0875
39.42
-0.0034 -0.3825
8/10/2019 Bridges 6 Computations
41/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Total moments due to HB load = KNm
2.7.4 Total Bending moments due toHB live loads + Dead loads
a. Support momentsSections 3.2.1.4 moments due to HB point loads = KNm& 3.3.3 moments due to dead loads = KNm DesignHof this report support
Design HB + Dead loads = KNm = 71.64
b. Span momentsmoments due to HB point loads = KNmmoments due to dead loads = KNm design H
span mm
Design HB + Dead loads = KNm = 304.29
2.8 Design MomentsThe design moment is obtained by comparing the HA + Dead load momentswith those of the HB + Dead load moments.
a. Support MomentsHA + Dead Load Moments = KNmHB + Dead Load Moments = KNmDesign moment is that due to HB + Dead load moment = KNm
b. Span MomentsHA + Dead Load Moments = KNmHB + Dead Load Moments = KNmDesign moment is that due to HB + Dead load moment = KNm
DESIGN MOMENTSDesign support moments = KNm (Hogging)
Design span mmts = KNm (Sagging)
2.9 DESIGN FOR BENDING
DESIGN OF SPANDesign as a rectangular - beam
Design Moment = KNm
-68.68
154.112.63
156.75
-64.64-4.04
154.11
156.747122.159
-26.379-68.685-68.685
156.747
68.685
156.747
156.747
8/10/2019 Bridges 6 Computations
42/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Span Length = mm
Depth of slab/deck = mm
a. CALCULATION OF EFFECTIVE DEPTH, d
beam depth, h = 175 mm
width of beam web, bw = 1000 mm
Flange depth, hf = 175 mm m m
cover to reinforcement, d' = 0.0 mm 1 7 5
\ reinforcement size, f = 16.0 mmstirrup diameter, t = 10.0 mm 1000 mm
effective depth, d = h - (d' + f /2 + t)
= mm
effective width, b = bw
mm
b. LEVER ARM CALCULATIONS, Z
clause 3.4.4.4 assume moment redistribution < 10%. This implies that k' = 0.156
BS8110:PART1: i. k = M/bdfcu fcu = 40 N/mm
1997 therefore, k =
since k' =
it implies that compression steel not required.
use z = d
c. TENSILE REINFORCEMENT
fy = 410 N/mm
As ' = (k-k')fcu bd/(0.87fy.(d-d')) = mm
Apply T 16 @ 300 mm centres TOP
(As prov. = mm)
As = {k'fcubd/(0.87fy.Z)} + As' = mm
Apply T 25 @ 125 mm centres BOTTOM
(As prov. = mm)
Table A.7 Checks for minimum steel:
Mosley, Bungay As min = 0.13Ac/100 = mm
Hulse: r.c. design, 5th ed. Apply T 12 @ 250 mm centres as distribution bars
(As prov. = mm)
3.4.2 CHECKS FOR DEFLECTION
Table 3.10 a. Basic span - effective depth ratio =
BS8110:PART1: 1997 To avoid damages to finishes, modified ratio =
670
3,927
452
20.00
16.67
0.775
52
157
1,000
0.159
0.156
175
3,596
227.50
2,400
8/10/2019 Bridges 6 Computations
43/221
8/10/2019 Bridges 6 Computations
44/221
Job No.
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD Designed E
KABIR ASSOCIATES
Member Bridge Deck Date___december '04Checked
OUTPREF. CALCULATIONS
Page
Apply a 4 Leg stirrup
T 10 @ 250 mm centres
and Asv/Sv provided =
CHECK FOR INTER-PHASE SHEAR
There's need to compute the shear force at the inter phase between the precast and insitu concrete.
Shear connectors will be required to prevent slippage between the insitu concrete and the
precast concrete sections to enable them act as a single composite unit.The slippage that occurs is a maximum at the supported end of the slabs, where the shear,V
and the rate of change of moment dm/dx are a maximum. This slippage to zero at midspan
where moments is at a maximum, and shear force, SF, V = 0 for a udl.
The shear connectors are the shear reinforcement for the maximum inter-phase shear force.
Since the inter-phase between the precast concrete and the in-situ concrete is located in the
horizontal direction, it implies that the maximum interphase shear under consideration is in
the vertical direction.Section 2.1.2 & Shear due to Precast Slab = KN
of this report Therefore, the design inter phase shear, V1 = KN
CHECKS:
clause 7.4.2.3 V1 must not exceed the lesser of
BS 5400:Part 4:1990 a. k 1 .f cu .Ls
b. v 1 .Ls + 0.7Ae.fy
where,
k1 is a constant depending on the concrete bond,obtained from Table 31, BS 5400:Part 4
fcu is the characteristic cube strenght of concrete
Ls is the length of theshear plane under consideration
v1 is the ultimate longitudinal shear stress in the concrete for shear plane under consideration
taken from Table 31, BS5400:Part 4
Ae is the area of fully anchored reinforcement per unit length crossing the shear plane under consideration
fy is the characteristic strenght of the reinforcement.
Table 31 k1 = 0.15 Ae = 314 mm
13.92
1.257
13.92
8/10/2019 Bridges 6 Computations
45/221
8/10/2019 Bridges 6 Computations
46/221
a
T
No.
8/10/2019 Bridges 6 Computations
47/221
8/10/2019 Bridges 6 Computations
48/221
8/10/2019 Bridges 6 Computations
49/221
a
T
No.
8/10/2019 Bridges 6 Computations
50/221
a
T
No.
8/10/2019 Bridges 6 Computations
51/221
a
T
No.
8/10/2019 Bridges 6 Computations
52/221
a
T
No.
8/10/2019 Bridges 6 Computations
53/221
a
T
No.
8/10/2019 Bridges 6 Computations
54/221
a
T
No.
c
8/10/2019 Bridges 6 Computations
55/221
a
T
No.
8/10/2019 Bridges 6 Computations
56/221
a
T
No.
8/10/2019 Bridges 6 Computations
57/221
a
T
No.
8/10/2019 Bridges 6 Computations
58/221
8/10/2019 Bridges 6 Computations
59/221
8/10/2019 Bridges 6 Computations
60/221
a
T
No.
8/10/2019 Bridges 6 Computations
61/221
8/10/2019 Bridges 6 Computations
62/221
a
T
No.
41
8/10/2019 Bridges 6 Computations
63/221
a
T
No.
8/10/2019 Bridges 6 Computations
64/221
a
T
No.
1
8/10/2019 Bridges 6 Computations
65/221
a
T
No.
41
8/10/2019 Bridges 6 Computations
66/221
a
T
No.
41
8/10/2019 Bridges 6 Computations
67/221
a
T
No.
41
8/10/2019 Bridges 6 Computations
68/221
8/10/2019 Bridges 6 Computations
69/221
a
T
No.
0
8/10/2019 Bridges 6 Computations
70/221
a
T
No.
8/10/2019 Bridges 6 Computations
71/221
8/10/2019 Bridges 6 Computations
72/221
a
T
No.
0
8/10/2019 Bridges 6 Computations
73/221
a
T
No.
8/10/2019 Bridges 6 Computations
74/221
a
T
No.
0
8/10/2019 Bridges 6 Computations
75/221
8/10/2019 Bridges 6 Computations
76/221
a
T
No.
9 41
8/10/2019 Bridges 6 Computations
77/221
a
T
No.
9 41
8/10/2019 Bridges 6 Computations
78/221
a
T
No.
9 41
8/10/2019 Bridges 6 Computations
79/221
a
T
No.
9 41
8/10/2019 Bridges 6 Computations
80/221
a
T
No.
9 41
9 41
8/10/2019 Bridges 6 Computations
81/221
a
T
No.
8/10/2019 Bridges 6 Computations
82/221
a
T
No.
8/10/2019 Bridges 6 Computations
83/221
a
T
No.
8/10/2019 Bridges 6 Computations
84/221
a
T
No.
8/10/2019 Bridges 6 Computations
85/221
a
T
No.
8/10/2019 Bridges 6 Computations
86/221
a
T
No.
B + Gk
mts
Nm
+ Gk
s
KNm
8/10/2019 Bridges 6 Computations
87/221
a
T
No.
8/10/2019 Bridges 6 Computations
88/221
a
T
No.
8/10/2019 Bridges 6 Computations
89/221
a
T
No.
8/10/2019 Bridges 6 Computations
90/221
a
T
No.
8/10/2019 Bridges 6 Computations
91/221
3.0 DIAPHRAGM/TRANSVERSE BEAMS3.1 INTRODUCTION
For the purpose of this designs, diaphragm beams are used only at supportsas end beams to the various spans.They act as stiffeners, distribute concentrated loads, reduce local deflections,act as chords for the lateral system, and secure the aerodynamic stability of the structure.During construction, they are cast in two parts; one part as thte pre castpier cap and the second part is cast in-situ and integral with the pier cap beams.
A sketch of the slab/ deck, showing the location of diaphragm beams is asshown below:
DiaphragmBeams
Slab areasupportedby diaph -
ragm beam
BeamGirder
1 Area of slab - deck supported by intermediate diaphragm beam: = 2 * (0.5 * 1.40 * 0.70 ) + { 8 * (0.5 * 2.4 * 1.2)} = 12.50m 2
Designed E ra
Job No.
Checked
OUTPUT
KABIR ASSOCIATES
REF. CALCULATIONS
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
Member: Diaphragm/Transverse Beam Date___december '04
1 7 . 8
0 m
1 7 . 8
0 m
11.0m
0.70m 0.70m2.40m 2.40m2.40m 2.40m
1 7 .
8 0 m
Page No.
8/10/2019 Bridges 6 Computations
92/221
Designed E ra
Job No.
Checked
OUTPUT
KABIR ASSOCIATES
REF. CALCULATIONS
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
Member: Diaphragm/Transverse Beam Date___december '04 Page No.
3.2 LOAD ANALYSISa. Dead Loads, G ki. Self weight of beam = 24 * 0.45 * 1.00 * 11 = 118.80KN
Section 2.2 of ii. Dead loads from slab deck;this report 10.65KN/m 2 * 12.50m 2 = 133.13KN
TOTAL Gk = 251.93KN
b Live Loads, Q kTable 11; i. HA udlReynolds & Ste- Bridge span = 17.50medman : R.C Equivalent udl load = 10.5KN/m 2
Designer's H/bk And load per beam = 10.50 * 8.0 * 0.5 = 42.0KN/mwhere 8.0m = c/way width,
and 0.5 used because there are 2No.diaphragm beams per span.
Table 9 ; ii Foot path live load = 4.2KN/m 2
Reynolds & Ste- = 4.2KN/m 2 * 2No. = 5.6KN/medman : R.CDesigner's H/bk Total udl Live Loads = 47.6KN/m
Clause 6.2.2 iii. HA KELBS 5400: Part II 120KN is recommended as KEL per notional lane.
Total KEL = 360KN, since we have 3 notional lanes.
There fore Total KEL per beam = 360KN * 0.5 = 180KNEach beam has 4No spans.There fore Total KEL per span = 180KN/4 = 45KN
c. LOAD COMBINATIONSi. Design dead load = 1.50 * 251.93KN = 377.90KN
dead udl = 377.90KN/11m = 34.35KN/m
ii Design live loads(udl) = 1.50 * 47.60 = 71.40KN/mTOTAL UDL = 105.75KN/m
iii. Design concentrated live loads (KEL)
= 1.50 * 45.0 = 67.50KN
iv. LOADING DIAGRAMS
d. MOMENTS
216.01216.01 297.73 297.73 297.73
67.50KN 67.50KN 67.50KN 67.50KN
105.75KN/m
8/10/2019 Bridges 6 Computations
93/221
Designed E ra
Job No.
Checked
OUTPUT
KABIR ASSOCIATES
REF. CALCULATIONS
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
Member: Diaphragm/Transverse Beam Date___december '04 Page No.
I. Cantilever mmts (Negative)Mcant = 105.75 * 0.50 *0.70 2 = KNm
ii. Max Span mmtsTake mmts about the middle od the 2nd internal slab:Mspan = - (105.75 * 4.3 * 0.5) + (216.01 * 3.6 )
+ (297.73 * 1.2 ) - (67.50 * 2.4 ) = KNm
ii. Max Support mmtsTake mmts about the 3rd internal support,Msupp = (105.75 * 5.5 * 0.5) + 67.50 * ( 1.2 + 3.6 )
- ( 216.01 * 4.8 ) - ( 297.73 * 2.4 )
= KNm
1,069.55
25.91
2,366.21
8/10/2019 Bridges 6 Computations
94/221
Designed E ra
Job No.
Checked
OUTPUT
KABIR ASSOCIATES
REF. CALCULATIONS
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
Member: Diaphragm/Transverse Beam Date___december '04 Page No.
DESIGN FOR BENDING & SHEAR3.3.1 DESIGN FOR BENDING (MID - SPAN)Design as a rectangular - beam
Design Moment = KNm
Span Length = mm
Depth of slab/deck = mma. CALCULATION OF EFFECTIVE DEPTH, d
beam depth, h = 1250 mm
width of beam web, bw = 400 mm
Flange depth, hf = 250 mm m m
cover to reinforcement, d' = 30.0 mm
\ reinforcement size, f = 16.0 mmstirrup diameter, t = 12.0 mm 400 mm
effective depth, d = h - (d' + f /2 + t) = mm
effective width, b = bw+(0.7L/5)mm
b. LEVER ARM CALCULATIONS, Z
clause 3.4.4.4 assume moment redistribution < 10%. This implies that k' = 0.156
BS8110:PART1: i. k = M/bdfcu fcu = 40 N/mm
1997 therefore, k =since k' =
it implies that compression steel not required.
ii. z = d(0.5 + (0.25 - k/0.9)0.5
) = duse z = d
c. TENSILE REINFORCEMENT
fy = 410 N/mm
As = M/(0.87fy.Z) = mm
Apply 6 T 25 Bottom
(As prov. = mm)Table A.7 Checks for minimum steel:
Mosley, Bungay As min = 0.13Ac/100 = mm
Hulse: r.c. design, 5th ed. Apply 4 T 16 Top (A's prov. mm )
3.3.2 CHECKS FOR DEFLECTIONTable 3.10 a. Basic span - effective depth ratio =
BS8110:PART1: 1997 To avoid damages to finishes, modified ratio =
b. Tensile reinforcement modification factor:
Table 3.11 i. M/bd = 1.86BS8110:PART1: ii. service stress, f s = 5f y As req. /8As prov. )*1/bb = N/mm1997 Note: iii. By interpolation, Modification Factor, MF
MF should not = 0.55 + (477 - fs)/(120(0.9+(M/bd)) = 1.22
be greater than 2 Use MF = 1.22
c. Modified span - effective depth ratio = MF * Basic span - effective ratio =
d. Actual span - effective depth ratio = L/d = 2.00
Since Modified L/d > Actual L/d,
Design okay w.r.t deflection.
16.67
20.33
400
255.49
2,945
650.00
804.25
20.00
1,069.550
2,400
250
2,643
0.9450.945
0.046
0.156
1 2 5 0
1,200
8/10/2019 Bridges 6 Computations
95/221
Designed E ra
Job No.
Checked
OUTPUT
KABIR ASSOCIATES
REF. CALCULATIONS
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
Member: Diaphragm/Transverse Beam Date___december '04 Page No.
3.3.3 DESIGN FOR SHEARi. Design shear Force
Design Shear Force , V = KN
ii. Design Shear Stress, v = V/bd = N/mm
fcu = 40 N/mm
Checks: 0.8 (fcu) = N/mm design okay with respect to shear
iii. Obtaining the design concrete shear stress, vca. Compute 100As/(bvd) (should be 3.00 =
b. compute 400/d (should not be < 1.00) = Use 400/d = 1.00
c. By interpolation, obtain the design concrete shear stress, vc = 0.79(100As/(bvd)) 1/3 (400/d) 0.25 /1.25 = N/mm
iv. Obtain the form and area of shear reinforcement
a. if v < 0.5v c provide nominal linksb. if 0.5v c +v < (v c + 0.4) then A sv/S v = 0.4*b v/(0.87f yv)
c. if ( vc +0.4) < v < 0.8 (fcu) then A sv/S v = b v(v - v c)/(0.87f yv)
for this design v = N/mm
vc = N/mm v c + 0.4 = N/mm
i.e. 0.5v c +v < (v c + 0.4)
A sv/S v = 0.4*b v/(0.87f yv) f yv = 410 N/mm
and Asv/Sv reqd =
Apply a 2 Leg stirrup
T 10 @ 300 mm centres
and Asv/Sv provided =
3.4.1 DESIGN FOR BENDING (SUPPORTS)Design as a rectangular - beam
Design Moment = KNm
Span Length = mm
Depth of slab/deck = mm
a. CALCULATION OF EFFECTIVE DEPTH, d
beam depth, h = 1250 mm
width of beam web, bw = 400 mm
Flange depth, hf = 250 mm m m
fire resistance = 2.0 hrs
cover to reinforcement, d' = 30.0 mm
\ reinforcement size, f = 16.0 mmstirrup diameter, t = 12.0 mm 400 mm
effective depth, d = h - (d' + f /2 + t) = mm
effective width, b = bw+(0.7L/5)
mm
b. LEVER ARM CALCULATIONS, Z
clause 3.4.4.4 assume moment redistribution < 10%. This implies that k' = 0.156
BS8110:PART1: i. k = M/bdfcu fcu = 40 N/mm
1997 therefore, k =since k' =
it implies that compression steel not required.
ii. z = d(0.5 + (0.25 - k/0.9) 0.5 ) = d
use z = d
1,200
400
0.869
0.869
0.103
0.156
2,366.213
2,400
250
1 2 5 0
0.524
0.937
0.620
0.537
0.449
0.537
298
0.620
5.060
0.614
0.333
8/10/2019 Bridges 6 Computations
96/221
Designed E r
Job No.
Checked
OUTPUT
KABIR ASSOCIATES
REF. CALCULATIONS
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
Member: Diaphragm/Transverse Beam Date___december '04 Page No.
c. TENSILE REINFORCEMENT
fy = 410 N/mm
As = M/(0.87fy.Z) = mm
Apply 8 T 32 TOP
(As prov. = mm)
Table A.7 Checks for minimum steel:
Mosley, Bungay As min = 0.13Ac/100 = mm
Hulse: r.c. design, 5th ed. Apply 4 T 16 BOTTOM
(A's prov. mm )
3.4.2 CHECKS FOR DEFLECTIONTable 3.10 a. Basic span - effective depth ratio =BS8110:PART1: 1997 To avoid damages to finishes, modified ratio =
b. Tensile reinforcement modification factor:
Table 3.11 i. M/bd = 4.11
BS8110:PART1: ii. service stress, f s = 5f y As req. /8As prov. )*1/bb = N/mm1997 Note: iii. By interpolation, Modification Factor, MF
MF should not = 0.55 + (477 - fs)/(120(0.9+(M/bd)) = 0.88
be greater than 2 Use MF = 0.88
c. Modified span - effective depth ratio = MF * Basic span - effective ratio =
d. Actual span - effective depth ratio = L/d = 2.00
Since Modified L/d > Actual L/d,
Design okay w.r.t deflection.
3.4.3 DESIGN FOR SHEARi. Design shear Force
Design Shear Force , V = KN
ii. Design Shear Stress, v = V/bd = N/mm
fcu = 40 N/mm
Checks: 0.8 (fcu) = N/mm design okay with respect to shear
iii. Obtaining the design concrete shear stress, vca. Compute 100As/(bvd) (should be 3.00 =
b. compute 400/d (should not be < 1.00) = Use 400/d = 1.00
c. By interpolation, obtain the design concrete shear stress, vc = 0.79(100As/(bvd)) 1/3 (400/d) 0.25 /1.25 = N/mm
iv. Obtain the form and area of shear reinforcement
a. if v < 0.5v c provide nominal linksb. if 0.5v c +v < (v c + 0.4) then A sv/S v = 0.4*b v/(0.87f yv)
c. if (v c +0.4) < v < 0.8 (fcu) then A sv/S v = b v(v - v c)/(0.87f yv)
for this design v = N/mm
vc = N/mm v c + 0.4 = N/mm
i.e. 0.5v c +v < (v c + 0.4)
A sv/S v = 0.4*b v/(0.87f yv) f yv = 410 N/mm
and Asv/Sv reqd =
Apply a 2 Leg stirrup
T 10 @ 300 mm centres
and Asv/Sv provided = 0.524
0.620
0.697
650.00
804.25
281.63
14.58
298
0.620
1.097
0.449
5.060
1.340
0.333
0.697
20.0016.67
6,364
6,434
8/10/2019 Bridges 6 Computations
97/221
8/10/2019 Bridges 6 Computations
98/221
OUTP
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
REF. CALCULATIONS
Job No.
Designed EChecked
Member: Bridge Beam/Girder Date___december '04
KABIR ASSOCIATES
Page
edman : R.C Equivalent HA udl is = 10.50KN/m 2
Designer's H/bk ie load per beam = 10.50 * 8.0/5 = 16.8KN/m8.0 used above represents the c/way width.
Total udl = 5.6KN/m + 16.8KN/m 2
= 22.40KN/m
4.1.4 Load combinations: (HA live Loads + Dead Loads) I. Table 1BS 5400:Part II: Loads factors: Dead = 1.15
Live = 1.50
ii. Clause 5.1.2 a. Design dead loads, udl, G k
BS 5400:Part II: = 28.24KN/m * 1.15 = 32.48KN/m ( per beam)
b. Design concentrated dead loads per beam, P D = 93.80KN * 1.15 = 107.87KN
c. Design live loads , udl, Q k = 22.40KN/m * 1.50 = 33.60KN/m
d. Design concentrated live loads ( KEL) = 72KN * 1.50 = 108KN
Loading diagram : HA + Dead Load
4.2 DESIGN MOMENTS & SHEARThe bridge deck and girders are required to support both static and moving loads.Each element of the bridge must therefore, be designed for the most severe conditions
1978
1978
740.07KN 2*740.07KN 2*740.07KN
66.08KN/m
107.87 2*107.87
2*107.87
108 108 2*107.87 108 2*107.87
2*740.07KN
8/10/2019 Bridges 6 Computations
99/221
8/10/2019 Bridges 6 Computations
100/221
OUTP
Project: Bridge No. 6; DABAI - MAHUTA - BABBAN DADA ROAD
REF. CALCULATIONS
Job No.
Designed EChecked
Member: Bridge Beam/Girder Date___december '04
KABIR ASSOCIATES
Page
C AB &CBA arecarryover factors of ends A & B of member AB, while K BA is the
k'BA = [ 1 - (-0.905 * - 0.415)] * 10.50 = 6.56 = k'DE
iii. Distribution
Recommended