Breakwater rehabilitation Pointe Noire

2011 Exercise ct 5308 – breakwaters and closure dams

May 2, 2012 2

Location of Pointe Noire

May 2, 2012 3

Location (2)

May 2, 2012 4

Location (3)

May 2, 2012 5

The breakwater

May 2, 2012 6

Hydrographic map

May 2, 2012 7

The new terminal

May 2, 2012 8

The assignment

Existing 1968 breakwater

300 m extension

Container terminal

Access channel

Inner harbour

type of breakwater:• Rock armour• Antifer cubes• Core-Loc• Dolos• Xbloc• Berm Breakwater• Caisson

Location of cross section• rehab existing part• extension part

Design life• 20 years• 50 years

May 2, 2012 9

Your assignment

The design of the rehabilitation of the breakwater has the following objectives:

• Design a cross section for either the extension or for the part in front of the container terminal

• Describe how you would build this breakwater

May 2, 2012 10

Information

• Hydrographic charts Map Room• Tides Internet sites• Waves Argoss and Global Wave Statistics

May 2, 2012 11

Argoss data

Two websites available:• Group A to O: http://www. waveclimate.com• Group P to U: http:// smart4.argoss.nl

Usernames: VerhagenA ……. VerhagenEPassword: DUT2011

May 2, 2012 12

May 2, 2012 13

Nearshore model from Argoss

• Long computational time• Limited number of users

May 2, 2012 14

Argoss Bathymetry

May 2, 2012 15

Global wave statistics

• http:// studoc.tudelft.nlvkc-water www. kennisbank-waterbouw.nl

May 2, 2012 16

Global wave statistics

May 2, 2012 17

Tidal information

• http://www.shom.fr

May 2, 2012 18

your assignment

• Design a breakwater cross section (A or B)• With the given material (rock, Xblock, etc)• For a maintenance free breakwater• With a life time of 20 years or 50 years

• Determine armour unit size • Determine overall sizes of cross section (e.g. crest

height)• Make a drawing good enough for a cost estimate• Design toe, etc.

May 2, 2012 19

Type of calculation

• Determine near shore boundary data with SwanOne• Use classical approach, and preferably also PIANC

approach and probabilistic approach• Use Breakwat and/or Cress for calculations• Make a short report (5 pages of text) including some

info on the execution method

May 2, 2012 20

Source of PIANC reports

• http:// studoc.tudelft.nlvkc-water www. kennisbank-waterbouw.nl

May 2, 2012 21

PIANC reports in repository

May 2, 2012 22

Presentation

• Give a presentation of approx. 10 minutes next week; also 5 minutes are available for questions per group

• Do not present obvious information (everyone will know where Pointe Noire is)

• Morning groups start at 8:30• Afternoon groups start at 13:00• You have to be present either in the morning, or in the

afternoon (thus not the whole day)

Your assignment

May 2, 2012 23

May 2, 2012 24

Your mark

• depends on the quality of the report• depends on the quality of your presentation• depends on the quality of the questions you ask to

other groups

May 2, 2012 25

May 2, 2012 26

May 2, 2012 27

May 2, 2012 28

May 2, 2012 29

May 2, 2012 30

May 2, 2012 31

Good Luck !!