Björn ZapfelUNFCCC
secretariat
http://ji.unfccc.intji-info@unfccc.int
JI small-scale projects
Fourth meeting of theJoint Implementation Supervisory Committee(JISC 04)
Bonn, GermanySeptember 2006
JI SSC projects Mandate
Mandate
Subparagraph 2 (f) of “Montreal decision”Request by the COP/MOP to the JISC to- develop guidance on criteria for baseline setting and
monitoring- including provisions for SSC projects as defined under
the CDM, as appropriate
Third meeting of the JISCRequest to the secretariat to develop, in consultation with selected JISC members/alternate members,- draft provisions for JI SSC projects and- a draft JI SSC PDD form
JI SSC projects Preparation of documents
Preparation of documents
• by the UNFCCC secretariat • on the basis of the mandate
• drawing on the CDM experience
• taking into account inputs by selected JISC members/alternate members
JI SSC projects Provisions for SSC projects
Draft provisions for JI SSC projects
Contents:
• Definition of JI SSC projects in line with the definition ofCDM SSC project activities
• Provisions on debundling• Provisions on bundling of JI SSC projects• Specific provisions for JI SSC projects in the project cycle:
• JI SSC PDD form• Baseline setting and monitoring• Determination• Verification
Main difference to the CDM approach:
No limitation on bundling as long as single projects conform to the definitions of JI SSC projects
JI SSC projects Forms
Draft JI SSC PDD form
Basis:
• JI PDD form• PDD form for CDM SSC project activities
Major adaptations of JI PDD form:
• Indication of SSC project type and category• Confirmation that debundling is not occuring• Reduction of formal requirements of monitoring plan
Draft F-JI-SSC-BUNDLE
Form to be used when submitting a JI SSC bundle
JI SSC projects Outlook
Possible revision of the definitions ofCDM SSC project activities by COP/MOP 2