3

Ocean Installer • At a glance

MCE Deepwater Development 2017

4

Normand Vision• Vessels – CSV Normand Vision

Long-term charter from Solstad

Ordered and developed in cooperation between OI, Solstad and Vard

Class leading asset design

Tailored for installation of flexible risers and flowlines

Length: 156,7m

Breadth: 27m

VLS: 150t

Crane capacity: 400t

Bunks: 140

Under deck carousel: 3000 ton

On deck carousel: 1800 ton

.

• 8 OFF VESSELS WITH SAME DESIGN

Skandi Acergy

Deep Artic (DSV)

Aker Wayfarer

Lewek Connector

Normand Oceanic

Skandi Vitoria

Skandi Niteroi

MCE Deepwater Development 2017

A VISION FOR THE YEAR

/ INTRODUCTION

/ NIGERIA FIRST

/ THE NORTH SEA AND BEYOND

/ BACK TO AFRICA

/ QUESTIONS

MCE Deepwater Development 2017

6

Nigeria First• OI’s First African Project - Aje

8 x anchors / mooring chains 1 x STP buoy system (APL Asia)1 x manifold & suction anchor foundation 1 x 4” 3km flexible gas lift flowline/riser 1 x 8” 3km flexible production flowline/riser 1 x 115mm OD 3km umbilical, UTA, mudmat & stand 4 x flexible jumpers 11 x Flying Leads

CA24.11.15

MOB04.01.16

DEMOB03.03.16

2 months (incl Christmas & New Year) 2 months

MCE Deepwater Development 2017

A VISION FOR THE YEAR

/ INTRODUCTION

/ NIGERIA FIRST

/ BACK TO THE NORTH SEA

/ RETURN TO AFRICA

/ QUESTIONS

MCE Deepwater Development 2017

8

The North Sea and Beyond• Statoil SLMP

8

MCE Deepwater Development 2017

9

The North Sea and Beyond

RE-INSTALLATION OF 2 MOORING LEGS

REPOSITIONING OF 2 MOORING LEGS

NORMAND VISION AND NORMAND INSTALLER WORKING SIMULTANEOUSLY

• Kraken Mooring Remedial work

MCE Deepwater Development 2017

A VISION FOR THE YEAR

/ INTRODUCTION

/ NIGERIA FIRST

/ THE NORTH SEA AND BEYOND

/ BACK TO AFRICA

/ QUESTIONS

10

MCE Deepwater Development 2017

11

MOHO NORD DEVELOPMENT

Client: TOTAL

Ownership: TOTAL (~53.5%) – Operator

Chevron (~31.5%)

Société Nationale des Pétroles du Congo (~15%)

Location: 75km SW of Pointe Noire – Congo

Water Depth: 750 – 1,200m

Subsea Infrastructure:

• 28 Subsea wellheads tied back to FPUs

• 17 additional wells from new TLP

Production capacity: 140,000 b/d

Moho Phase 1 Bis Scope:

• Extension of Moho Bilondo subsea development

• Tied back to Alima FPU

Ocean Installer won the MPI Contract

Total © Total ©

Total ©

Total ©

MCE Deepwater Development 2017

12

TOTAL

OVERVIEW

MOHO NORD CPI

2 x 45Te Transformers

Tendered Weight - 220Te

12,5m Long Topside end

6,3km MPP Power & Control Umbilical

Support & Leveling Structure

252 Te Multi Phase Pump Module

Dummy Multi Phase Pump Module

20 x Flying Leads

Tendered Weight – 307Te

175Te Pump Control Module

70Te SUT

Tendered Weight 60Te

MCE Deepwater Development 2017

13

Equipment OverviewInstallation & Tooling

Installation

• 2 x I/O Transformers

• PCM (Pump Control Module)

• MPP Umbilical

• MPP module

• 20 x Flying leads

Project equipment

• Project side VLS

• Project rigging & tools

• Horizontal connection system

• Survey

• Precommissioning

4,5m

8,9m

13,4m

6,4m

6,3km

12,5m6,25m

6,3m

5,4m6,7m

21m

MCE Deepwater Development 2017

14

Deck Overview

Deck Plan

Plan view of deck ready for transit from Rosyth

MCE Deepwater Development 2017

15

FPU Alima

• Location: Moho Nord Field – Congo

• Moored on fixed heading (12 Mooring lines)

• L: 188.5m

• B: 34m

• Slot 5: Umbilical Pull-in

• M41C: PCM Installation

• M51A: Transformer Installation (2x)

INSTALLATION SITES

MCE Deepwater Development 2017

16

PCM INSTALLATION.

MCE Deepwater Development 2017

17

PCM Installation Overview – PCM Lift

Crane Curve – Sealift Mode

• Radius – 19m

• Available Lifting Height – 38.5 m

• Capacity – 265 Te

• Utilisation (Dyn.) – Approx 75%

MCE Deepwater Development 2017

18

PCM Installation Overboarding Sequence

18

MCE Deepwater Development 2017

19

SimulationF1 Technology

MCE Deepwater Development 2017

20

SIMULATIONS

• Real time simulation

• Vessel crew

• Operational experience

• Crane and Moored FPU simulation

• Crane Controls as per vessel

• Tugger functionality as per vessel

Full System Check

MCE Deepwater Development 2017

21

INSTALLATION PCM operations

MCE Deepwater Development 2017

22

MCE Deepwater Development 2017

23

MPP INSTALLATION.

MCE Deepwater Development 2017

24

Product loadout

Umbilical Operations

MCE Deepwater Development 2017

25

Sim Vrs Installation

MPP UMBILICAL INSTALLATION

MCE Deepwater Development 2017

/ INTRODUCTION

/ NIGERIA FIRST

/ THE NORTH SEA AND BEYOND

/ BACK TO AFRICA

/ QUESTIONS

MCE Deepwater Development 2017

27QUESTIONS