4.3-10 Connectors,
Connect to a More Efficient
and Powerful Network
1
5G World, 29-30 June 2016, London Heino Cumpanas, NGMN 4.3-10 Taskforce-Lead
Director Marketing and Product Line Management, Huawei
Booming MBB Drives Devices Evolution
2
4x4
MIMO
Flexible
CA
More Ports
More Bands
New Technology for Booming MBB Miniaturization and Integration Devices
Smaller Connector, More Value
3
Type N
1940s
7-16 DIN
1960s IEC 61169-54
4.3-10
NOW!!
BNC
1950s
7/16 Connector Item 4.3-10 Connector
32*32 Flange(mm) 25.4*25.4
PIM (112dBm) PIM Better PIM design and stable
VSWR(1.12) VSWR VSWR(1.10)
Screw Coupling
mechanisms Screw Hand Screw Push-Pull
25N Coupling torque 5N
(MAX.20N) Until stop by hand
(MAX.20N) No torque request
Benefits of 4.3-10 connector
7/16 Connector
Better PIM performance Easier and faster installation Smaller and lighter
4.3-10 Connector
allows more connectors in limited
space, ideal for multi-band
portfolio
improves network performance allows cost savings
4.3-10 Connector Migration is the Obvious Trend
4
Operators Many Operators asking for…
Others..
?
e.g.
Huawei/Nokia:
4T4R RU using
4.3-10
connector
e.g. Ericsson:
NG-Radio with
4.3-10 connector
e.g. Huawei:
switching to 4.3-10
connector
e.g. Kathrein/Andrew:
Using 4.3-10
connector
…..
e.g.
Rosenberg/Spinner/
HUBER+SUHNER/
Telegärtner:
Providing 4.3-10
connector & jumper
cables …..
…..
4.3-10 Taskforce For Minimizing Migration Risks
5
The Concerns Considered by Operators
source: the 4th Huawei global antenna & AAU summit
Elaborate a coordinated
migration proposal minimizing costs and risks
• Connector migration spread over many years
• Unmanageable mixed situation at sites
• Difficult network planning by too many
scenarios
• Higher TCO and installation cost by extra
jumpers
• Increased stock levels of similar devices with
different connectors
Activities and Objectives of Migration Project
6
Objectives
Activities
Prepare a proposal for a cost
efficient and coordinated
migration
Create an open industry
platform to exchange ideas &
concerns
Ultimately propose a common
migration strategy including
time plan
Avoid costly and time consuming
multiple replacement of site
components and exploding logistics
Deliver great customer experience
and bring operational efficiency
Facilitate multilateral cooperation of
operators and vendors
Members of the Taskforce
7
NGMN 4.3-10 Connector Taskforce
Cooperation to define a industry proposal for a cost efficient and
agreed migration from 7-16 to 4.3-10 RF connectors.
NGMN 4.3-10 Connector Taskforce - Project-Status Overview
2016.05.13
Kick-off
Conclusion regarding
advantages of 4.3-10 vs.
7/16
Defined a milestone plan
for the taskforce project and
deliverables
2016.05.20
2nd Meeting
Defined a migration
strategy for following
product groups:
RRU/active antennas,
passive antennas, ALDs
2016.06.03
3rd Meeting
Conclusion regarding
different application
scenarios and
corresponding
configuration
Conclusion regarding EoL
period of 7/16(still TBD)
Done
~2016.06.24
Create a draft of the white
paper
2016.06.30
Taskforce members review
draft version and send
feedback to reflector
2016.07
Taskforce meeting to
discuss/approve draft
white paper
Get approval from NGMN
Next
Steps
NGMN 4.3-10 Connector Taskforce - The milestone plan and deliverables
9
Item Month/Year Short activity description
Start of Project: M0 13.5.2016 • Kickoff
Milestone: M1
06/2016 • Workshops and conferences to define a proposal for a cost efficient and
coordinated migration from 7-16 to 4.3-10 RF connectors.
Milestone: M2 07/2016 • finalized common migration strategy proposal including time plan
Milestone: M3 09/2016
• Equipment vendors map out their strategies of when to change which products from 7-16 to 4.3-10;
• Operators issue clear migration strategies to be used in future RFQs and site upgrade plans
Milestone: M4.1 12/2016 • Regular meetings and workshops to exchange concerns & problems &
ideas during the 4.3-10 migration Milestone: M4.2 06/2017
Milestone: M4.3 12/2017
Milestone: M5 12/2017 • Most radio units, antennas, filters, TMAs, bias-T, and site cabling going to
market finish the 4.3-10 migration implementation
Item Month/Year Short descriptive title Intended publication
Deliverable D1* 07/2016 4.3-10 RF connector migration strategies white
paper proposal to NGMN NGMN
Deliverable D2* 08/2016 4.3-10 RF connector migration strategies white
paper official release by NGMN Public
10
Uniform Standards and Strategies Make
the Migration More Efficient
Waiting for the white paper,
preparing for connecting
efficient and powerful networks
Item Month/Year Short descriptive title Intended publication
Deliverable D1* 07/2016 4.3-10 RF connector migration strategies white
paper proposal to NGMN NGMN
Deliverable D2* 08/2016 4.3-10 RF connector migration strategies white
paper official release by NGMN Public
Recommended